My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC MINUTES 07282026
StAnthony
>
City Council
>
City Council Minutes
>
2026
>
CC MINUTES 07282026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/13/2026 12:44:54 PM
Creation date
8/13/2026 12:44:12 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City Council Regular Meeting Minutes <br />July 28, 2026 <br />Page 6 <br />1 intersection of Silver Lake Road and 29th Avenue. He stated that they are looking for ways to <br />2 improve this area, and that they acquired a grant through MnDOT to put on a temporary <br />3 demonstration of the Active Transportation Plan, which could improve flow at this intersection <br />4 and make it safer by utilizing a mini -roundabout. He noted that this will be a low -commitment <br />5 opportunity to explore community input on this project. He stated MnDOT felt they had a great <br />6 location to use this grant funding. City Engineer Messner stated that there may be slowdowns <br />7 and issues that come up, but that this is a good educational opportunity to develop long-term <br />8 improvement. He encouraged residents to share their thoughts on the roundabout, and expressed <br />9 a desire for all feedback, positive and negative. City Engineer provided a quick review of what a <br />10 Quick -Build Demonstration project is, and why it is beneficial. He emphasized the lack of a <br />11 capital commitment, the opportunity to build public awareness and gain community feedback, <br />12 and the opportunity to gather real -world traffic data during use of the temporary project. He <br />13 reminded the Council and the community that Silver Lake Road is operated and maintained by <br />14 Hennepin County. He noted that the demonstration will be seven weeks, but long enough to <br />15 understand how individuals navigate the intersection after becoming more used to it. He <br />16 commented that the cost is slightly higher than other temporary demonstrations, but reminded <br />17 that this was a product of grant funding. City Engineer Messner informed the Council that this is <br />18 a combination of the Active Transportation Plan and Complete Streets. He stated that this <br />19 intersection was one of the community's highest priorities for safety improvements, which is <br />20 why this location was selected. He highlighted that roundabouts have been shown to improve <br />21 safety, including for pedestrians, and that if they move forward with the roundabout <br />22 permanently, they will include the flashing beacons for pedestrian crossings. City Engineer <br />23 Messner reiterated that the roundabout will replace the existing four-way stop and confirmed that <br />24 when setting up the demonstration, this intersection will be closed. He informed the Council that <br />25 the roundabout will have a 15-mile-per-hour speed limit, which can improve visibility of <br />26 pedestrians and bikers, and encourage driver awareness. City Engineer Messner recognized the <br />27 difficulty of larger trucks navigating roundabouts, and stated that they will restrict trucks from <br />28 taking left or right turns on the roundabout and will recommend alternative routes for these <br />29 drivers. He informed the Council that there are many complaints about truck traffic on these <br />30 roads, and he hopes that this change will discourage some truck traffic. City Engineer Messner <br />31 reviewed the project timeline and stated that the installation will take place on August 8, the <br />32 demonstration will be in place from mid -August to September, and that removal will take place <br />33 on September 26. He stated that data will be evaluated by Hennepin County into 2027 to <br />34 understand what a potential long-term improvement could be. City Engineer Messner reminded <br />35 all that public comments are necessary for the success of this project, and provided a link to a <br />36 survey where residents can provide their feedback on the project. He informed the public that <br />37 traffic cameras will be utilized, but that these are not speed cameras and are only utilized to <br />38 monitor traffic patterns. He stressed that no decisions about permanent changes will be made <br />39 during or immediately after the demonstration, and that future funding will need to be sought. <br />40 City Engineer Messner provided a slide reiterating clarifications for the community, reminding <br />41 them that this is temporary, that community engagement is hugely important, that this project is <br />42 being done in collaboration with MnDOT and Hennepin County, and that the intersection will be <br />43 returned to the original four-way stop after the project is completed. <br />44 <br />45 Councilmember Doolan appreciated the thoroughness of his presentation, and noted that her only <br />46 question was surrounding what data would be captured with the cameras. City Engineer Messner <br />
The URL can be used to link to this page
Your browser does not support the video tag.