Laserfiche WebLink
City Council Regular Meeting Minutes <br />August 8, 2006 <br />Page 8 <br />1 Mr. Hubmer replied St. Anthony and most communities with utilities of the same age category <br />g Y <br />2 are in a rehab program. He explained, because St. Anthony has aggressive clay soil, utilities <br />3 break down quicker as opposed to cities with sandy soil. He stated .if the aged utilities are left in, <br />4 maintenance and repair costs would go up consistently - <br />5 <br />6 Mayor Faust reminded the Council this is a feasibility study and if it comes back as not being <br />7 feasible, rejecting it is an option. <br />8 <br />9 Motion by Councilmember Thuesen, seconded by Councilmember Stille, to approve Resolution <br />10 06-068; a Resolution ordering preparation of a feasibility report for 2007 street and utility <br />11 improvements. <br />12 <br />13 Motion carried unanimous <br />14 <br />15 F. General E'n2ineermg Update <br />16 <br />17 Mr. Todd Hubmer, WSB & .Associates, Inc, summarized the status of general engineering <br />18 projects within the City. These projects include: the 2005 Street Reconstruction Project, 2006 <br />19 Street Reconstruction Project, and Automated Water Meters. <br />20 <br />21 Mr. Hubmer reported the 2005 Street Reconstruction Prop <br />`ect is complete. He informed residents <br />J <br />22 if there are issues they feel have not been addressed, to please contact him or Mr. Hartman. <br />23 <br />24 Mr. Hubmer reported the 2006 Street Reconstruction Project is nearing completion. He stated the <br />25 contractor completed all utility work, curb and gutter, street paving and is currentlylacin <br />p g <br />26 topsoil and sod for the final restoration of the project. Mr. Hubmer stated he anticipates <br />27 completion by August 11. <br />28 <br />29 Mr. Hubmer indicated perennials, topsoil, seeding, and landscaping in front of the Village Pub <br />p g g <br />30 would be completed as soon as the irrigation is in. Mr. Hubmer reported the sidewalk is in and <br />31 the asphalt repaired in front of the Montessori. <br />32 <br />33 -Mr. Hubmer reported two new technologies with automated water meters havePP o ed u p . He <br />p <br />34 stated he would meet with a company with remote reading capabilities. He indicated there is a <br />35 cost savings associated with this technology. Mr. Hubmer anticipates bid packages would be out <br />36 in the next three weeks. <br />37 <br />38 Mr. Hubmer informed the Council he had been in contact with arovider of sum um <br />p pp p <br />39 inspection and installation services. Mr. Hubmer said the value added is this company knows <br />p Y <br />40 what they are looking for and it would be more economical to do both services at the same time. <br />41 <br />42 Councilmember Thuesen stated in, regards to the 2005 street reconstructs the sod replaced g p on <br />43 -some of the cutouts is bad. He asked Mr. Hubmer drive around and look at the condition of the <br />44 sod before this project is closed. <br />45 <br />8 <br />