Laserfiche WebLink
1, EXECUTIVE SUMMARY <br />This project has been entitled the 2007 Sidewalk and Street Lighting Improvement <br />Project. It provides for the construction of proposed concrete sidewalk and street lighting <br />along the west side of Highcrest Road from 37 th Avenue NE (County Road D) south to <br />Old Highway 8 and continuing the sidewalk along the northwest side of Old Highway 8 <br />� y <br />from Highcrest Road to the cutoff to County Road 88. The proposed sidewalk will cross <br />Old County Highway 8 to the southeast side and continue south to join the existing <br />sidewalk along the north side of 291h Avenue NE. Street lighting will be placed along <br />both sides of Old Highway 8. <br />A total estimated project cost is approximately $679,640. Funding for the project may <br />come from the City's street and utility construction funds and Municipal State Aid Funds. <br />The project construction can be completed, including all restoration items, in 2007. <br />This project is feasible, necessary, and cost effective from an engineering standpoint and <br />should be constructed as proposed herein. <br />2007 SIDEWALK AND STREET LIGHTING IMPROVEMENT PROJECT <br />FEASIBILITY REPORT <br />CITY OF ST. ANTHONY <br />WSB PROJECT NO. 1626-23 <br />PAGE I <br />