Laserfiche WebLink
On June 27, 2006, the St. Anthony City Council authorized the preparation of an <br />engineering feasibility report for the 2007 Sidewalk and Street Lighting Improvement <br />Proj ect. <br />3. EXISTING CONDITIONS <br />Highcrest Road has existing concrete curb and gutter along the entire length of the project <br />area.' Most of the existing boulevard area is about 8 feet to 10 feet wide with various <br />street and traffic control signs. There are several yards with shrubbery and other <br />plantings, particularly near the ends of their driveways. The Wilshire Elementary School <br />is located on the southwest corner of the intersection of 37 1h Avenue NE and Highcrest <br />Road has a wide, open yard area. There is a 750 -foot long section of Old Highway 8 at <br />the south end of the project area that does not have concrete curb and gutter along either <br />side of the roadway. There is a wide, shallow to moderately deep swale with culverts <br />under driveways along the :northwest .side that drain to culverts under the roadway t0 the <br />southeast. <br />4.1 Proposed Improvements <br />The proposed improvements consist of placement of 5 -foot and 6 -foot wide concrete <br />sidewalk along the west side of Highcrest Road and the north side of Old Highway 8. <br />There will be about 600 linear feet of 5 -foot wide sidewalk with a boulevard between 37th <br />Avenue NE and 3 6thAvenue NE along the school property. The sidewalk will then <br />become 6 -feet wide starting immediately behind the back of the existing concrete curb <br />south of 36th Avenue NE to the intersection with 33rd Avenue NE. There are too many <br />existing trees, fences, slopes and other obstructions in this area to provide a boulevard <br />and a 5 -foot wide sidewalk. <br />South of 33rd Avenue NE we are proposing a 5 -foot wide sidewalk with a boulevard <br />along the northwest . side of Old Highway 8 southeast to the intersection with the cutoff to <br />County Road 88. The sidewalk will cross Old Highway 8 after the cutoff road and will <br />transition to a 6 -foot wide sidewalk along proposed concrete curb and gutter to be placed <br />along the existing edge of road southwest to and around the existing cul-de-sac at the end <br />Rankin Road and will connect to the existing sidewalk along 29th Avenue N.E. <br />Street lights will be placed along the west -side of Highcrest Road at all intersections and <br />will be spaced about 200 -feet apart between intersections. Street lights will be spaced <br />about 150 -feet apart on a staggered pattern along both sides of Old Highway No. 8 and at <br />intersections. <br />The project area is shown on .figure 1 and the typical section is shown on .figure 2 in <br />Appendix A. <br />2007 SIDEWALK AND STREET LIGHTING IMPROVEMENT PROJECT <br />FEASIBILITY REPORT <br />CITY OF ST. ANTHONY <br />WSB PROJECT NO. 1626-23 <br />.PAGE 3 <br />