Laserfiche WebLink
OPINION -OF PROBABLE COST <br />HIGHCREST ROAD AND OLD HIGHWAY 8 SIDEWALK & STREET LIGHTING <br />CITY PROJECT NO. <br />PROJECT NO. 1626-23 <br />ST ANTHONY, MN <br />10/3/2006 <br />St Anthony Village <br />3301 Silver Lake Road NE <br />St Anthony, MN <br />No. <br />Mat. No. <br />Item <br />Units <br />Qty <br />Estimated <br />Unit Price <br />Estimated <br />Total Price <br />SCHEDULE B - PROPOSED IMPROVEMENTS - OLD HIGHWAY 8 <br />1 <br />2021.501 <br />MOBILIZATION <br />LUMP SUM <br />1 <br />$4,750.00 <br />$4,750.00 <br />2 <br />2101.511 <br />CLEARING AND GRUBBING - SHRUB <br />EACH <br />10 <br />$325.00 <br />$3,250.00 <br />3 <br />2104.501 <br />REMOVE CURB AND GUTTER <br />LIN FT <br />60 <br />$2.00 <br />$120.00 <br />4 <br />2104.505 <br />REMOVE BITUMINOUS PAVEMENT <br />SQ YD <br />205 <br />$3.00 <br />$615.00 <br />5 <br />2104.513 <br />SAWING BITUMINOUS PAVEMENT (FULL DEPTH) <br />LIN FT <br />1230 <br />$4.00 <br />$43920.00 <br />6 <br />2564.602 <br />SALVAGE AND REINSTALL SIGN <br />EACH <br />23 <br />$100.00 <br />$2,300.00 <br />7 <br />2105.501 <br />COMMON EXCAVATION <br />CU YD <br />815 <br />$10.00 <br />$8,150.00 <br />8 <br />2105.522 <br />SELECT GRANULAR BORROW (CV) (P) <br />CU YD <br />1835 <br />$11.00 <br />$20,185.00 <br />9 <br />2105.604 <br />GEOTEXTILE FABRIC TYPE V <br />SQ YD <br />1835 <br />$1.50 <br />$2,752.50 <br />10 <br />2521.501 <br />4" CONCRETE WALK <br />SQ FT <br />16500 <br />$3.00 <br />$491500.00 <br />11 <br />2531.501 <br />CONCRETE CURB & GUTTER DESIGN B618 <br />LIN FT <br />1300 <br />$10.00 <br />$13,000.00 <br />12 <br />2531.602 <br />PEDESTRIAN CURB RAMP <br />EACH <br />6 <br />$400.00 <br />$27400.00 <br />13 <br />2545.509 <br />CONDUIT SYSTEM (LIGHTING) <br />LUMP SUM <br />1 <br />$13500.00 <br />$1,500.00 <br />14 <br />.2545.602 <br />LIGHT STANDARD <br />EACH <br />22 <br />$5,000.00 <br />$110,000.00 <br />15 <br />2563.601 <br />TRAFFIC CONTROL <br />LUMP SUM <br />1 <br />$3,750.00 <br />$3,750.00 <br />16 <br />2564.618 <br />ZEBRA CROSSWALK WHITE-EPDXY <br />SQ FT <br />96 <br />$5.00 <br />$480.00 <br />17 <br />2573.502 <br />SILT FENCE, TYPE HEAVY DUTY (ORANGE) <br />LIN FT <br />950 <br />$5.00 <br />$4,750.00 <br />18 <br />2573.602 <br />INLET PROTECTION <br />EACH <br />2 <br />$350.00 <br />$700.00 <br />19 <br />2575.505 <br />SODDING, TYPE LAWN (INCL. TOPSOIL & FERT.) <br />SQ YD <br />2150 <br />$3.00 <br />$6,450.00 <br />20 <br />2104.601 <br />CLEAN UP <br />LUMP SUM <br />1 <br />$12250.00 <br />$1,250.00 <br />21 <br />2505.601 <br />UTILITY COORDINATION <br />LUMP SUM <br />1 <br />$1,250.00 <br />$1,250.00 <br />SUBTOTAL SCHEDULE B - PROPOSED IMPROVEMENTS - OLD HIGHWAY 8 $242,072.50 <br />+ 15% CONTINGENCIES $36,311.00 <br />SUBTOTAL SCHEDULE A - PROPOSED IMPROVEMENTS $278,383.50 <br />+ 25% ADMINISTRATIVE, LEGAL, ETC. $69,600.00 <br />TOTAL SCHEDULE B - PROPOSED IMPROVEMENTS - OLD HIGHWAY 8 $3475980.00 <br />