My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC PACKET 10102006
StAnthony
>
City Council
>
City Council Packets
>
2006
>
CC PACKET 10102006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/30/2015 11:20:59 AM
Creation date
5/7/2014 2:29:09 PM
Metadata
Fields
Template:
City Council
Document Type
Council Agenda/Packets
Supplemental fields
City Code Chapter Amendment
Keywords
Missing
Ordinance #
Ordinance Summary
Ordinance Title
Planning File #
Property Address
Property PIN
Publication Newspaper
Publication Title
Publication Type
Resolution #
Resolution Summary
Resolution Title
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
98
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1. EXECUTIVE SUMMARY <br />This project has been entitled the 2007 Street and Utility Improvement Project. It <br />provides for the street and utility reconstruction of 39th Avenue from Silver Lake Road to <br />Fordham Drive; Pahl Avenue from Roosevelt Street NE to Wilson Street; 27th Avenue <br />NE from Stinson Boulevard to Coolidge Street; Roosevelt Street NE from 27th Avenue <br />NE to the alley north of Pahl Avenue; the alley north of Pahl Avenue from. Roosevelt <br />Street NE to Wilson Street; the alley south of Pahl Avenue from Roosevelt Street NE to <br />Wilson Street and the alley south of 27th Avenue NE from Stinson Boulevard to Wilson <br />Street. The project also provides for the replacement and enlargement of the sanitary <br />sewer main from the intersection of 39th Avenue and Fordham Drive east to Chandler <br />Drive and north on Chandler -Drive to Foss Road. <br />This Feasibility Report outlines the proposed reconstruction of approximately 4,465 feet <br />of 30 -foot urban section streets, approximately 545 feet of 22 -foot urban section street <br />complete with bituminous paving and concrete curb and gutter, and approximately 2,725 <br />feet of 12 -foot wide bituminous paved alleys. Also proposed is the replacement of <br />approximately 4,400 feet of watermain, approximately 89 water services, 5,000 feet of <br />sanitary sewer main, and approximately 89 sanitary sewer services. An additional 735 <br />feet of sanitary sewer main will be burst in-place and replaced with new, larger pipe. The <br />installation of new storm mains and several new storm sewer catch basins are also <br />proposed. <br />A total estimated project cost is approximately $2.9 million. Funding for the project will <br />come from the City's street reconstruction funds, storm water utility fund, TIF funds, <br />water and sanitary sewer utility funds, and special assessments. <br />The project reconstruction can be completed, including the first lift of bituminous and all <br />- restoration items, in 2007. The final lift of bituminous is proposed to be installed in June <br />of 2048. <br />This project is feasible, necessary, and cost effective from an engineering standpoint and <br />should be constructed as proposed herein. <br />2007 STREET AND UTILITY IMPROVEMENT PROJECT <br />FEASIBILITY REPORT <br />CITY OF ST. ANTHONY <br />WSB PROJECT NO. 1626-22 <br />PAGE 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.