My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC PACKET 10102006
StAnthony
>
City Council
>
City Council Packets
>
2006
>
CC PACKET 10102006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/30/2015 11:20:59 AM
Creation date
5/7/2014 2:29:09 PM
Metadata
Fields
Template:
City Council
Document Type
Council Agenda/Packets
Supplemental fields
City Code Chapter Amendment
Keywords
Missing
Ordinance #
Ordinance Summary
Ordinance Title
Planning File #
Property Address
Property PIN
Publication Newspaper
Publication Title
Publication Type
Resolution #
Resolution Summary
Resolution Title
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
98
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7. FEASIBILITY AND RECOMMENDATION <br />Project costs are anticipated to be approximately $2.9 million, which includes the total <br />street and utility reconstruction of 39th Avenue NE, Roosevelt Street NE, Pahl Avenue <br />27th Avenue NE, and the three alleys from just north of Pahl Avenue to just south of 27th <br />Avenue NE. <br />Due to the poor structural condition of portions of the sanitary sewer mains, the <br />deterioration of the existing storm sewer catch basins, watermains, and street sections, <br />this project is both feasible and necessary from an engineering standpoint. The location <br />and condition of the existing utilities, the available street right-of-way, the existing soils <br />conditions, and the need to provide utility service to all of the properties in the project <br />area, other methods of improving the utility systems, and the roadway are not feasible or <br />cost effective. <br />Based on our analysis and data presented, the proposed project is feasible, necessary, and <br />cost effective from an engineering standpoint. We recommend reconstruction of the <br />sanitary sewer, reconstruction of the watermain, replacement and extension of the storm <br />water collection system, and the reconstruction of streets and alleys as detailed in this <br />report. <br />2007 STREET AND UTILITY IMPROVEMENT PROJECT <br />FEASIBILITY REPORT <br />CITY OF ST. ANTHONY <br />WSB PROJECT NO. 1626-22 <br />PAGE 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.