Laserfiche WebLink
City Council Regular Meeting Minutes <br />January 9, 2007 <br />Page 6 <br />1 Mr. Hubmer stated the streets slated for reconstruction in and around St. Charles Church were <br />2 the last of the bituminous portion and St. Anthony west of Silver Lake Road to be constructed. <br />3 He stated Silver Lake Road slid in front of this. He mentioned that since the financing was <br />4 delayed one year from the County, this project was brought back in line with the project <br />5 schedule. He stated 39°i Avenue would be reconstructed to upgrade the sanitary sewer system to <br />6 handle the Mows from the Silver Lake Village development. Mr. Hubmer indicated the Foss <br />7 Road lift; station and the forced main would be increased in size to handle the additional sanitary <br />8 flow from the new development and to convey that to the Metropolitan Councils line in <br />9 Roseville. He stated that originally this was planned to be accomplished using underground <br />10 trenching techniques; however, the cost came in better for a total reconstruction. <br />11 <br />12 Councilmember Thuesen noticed there is alley work involved and asked if is there are changes <br />13 being made based on what was learned from previous alley construction projects. <br />14 <br />15 Mr. Hubmer replied the alleys are very difficult to reconstruct because the sanitary sewer is <br />16 much deeper than other recent alley reconstruction. He stated two alternate options were bid this <br />17 year, one being the trenchless technology option and an open trench option. Mr. Hubmer stated <br />18 the open cut option is $400,000 more than the trenchless bid. He stated the option for the <br />19 trenchless technology was chosen. <br />20 <br />21 Councilmember T huesen asked if there are any properties that would have work done in front <br />22 and back of residential properties, and if so the construction would be staggered so as not to <br />23 close access from both sides. <br />24 <br />25 Mr. Huhiner replied the contract is written so that both sides would not be ripped up at the same <br />26 time. <br />27 <br />28 Councilmember Stille asked when the contractor would be known. <br />29 <br />30 Mr. Hubmer stated nine bids were received with the low bidder at this time being Meyer <br />31 Construction with a bid of $3,484,012.56. <br />32 <br />33 Councilmember Stille asked, in terms of new construction, would this benefit the City. <br />34 <br />35 Mr. Hubmer stated lie believed it would and the bids are very competitive. Ile stated it is a very <br />36 close bidding environment. <br />37 <br />38 Councilmember Stille indicated it is wise the City went forward with the street reconstruction <br />39 projects at this time. <br />40 <br />41 Mr. Hubmer reported the third bidding of the Foss Road Lift Station saved the City $355,000 <br />42 over the last bidding and saved another $250,000 by eliminating the building. <br />43 <br />44 Mayor Faust stated that by rejecting the earlier bids and combining them, the City saved <br />45 $350,000. He asked Mr. Hubmer to discuss some of the funding and costs. <br />46 <br />11 <br />