Laserfiche WebLink
SECTION IV <br />IV. PROBLEMS AND CORRECTIVE ACTIONS <br />Outlined below is an assessment of existing and potential water resource -related problems that <br />are known at this time. These problems have been identified based on an analysis of the land <br />and water resource data collected as part of this plan preparation and through information from <br />the City. A description of any existing or potential problem within the topic area has been listed <br />and future corrective actions have been incorporated into an implementation plan. <br />A. Lake and stream water quality problems <br />City of St. Anthony. <br />Identified Problem, Issue, or Concern <br />Corrective Action <br />1 <br />There is a concern regarding water quality, <br />a. Work with the RCWD and Ramsey <br />sediment deposition and floatable material <br />County SWCD to develop a feasibility <br />entering Silver Lake from direct storm sewer <br />study for Silver Lake which will <br />discharges. Silver Lake has been classified <br />establish a recommended long-term <br />as impaired by the MPCA due to excess <br />management program. This study <br />a. Complete feasibility study to identify <br />nutrients present. <br />should identify alternatives available <br />options to provide additional flood <br />for protecting or improving water <br />protection to the Anthony Lane <br />quality, maintaining reasonably stable <br />Industrial Area. <br />lake levels, and outlining a <br />management program that will <br />assure that proper and reasonable <br />management measures are <br />implemented. <br />b. The City will continue to implement a <br />catch basin stenciling program within <br />the Silver Lake drainage area. <br />B. Street ponding, drainage problems and stormwater rate control concerns within the <br />City of St. Anthony. <br />Identified Problem, Issue, or Concern <br />Corrective Action <br />1 <br />From 1998 to 2006, the City completed <br />nearly $16 million in flood improvements. <br />The City now provides 1% storm event flood <br />protection to all residents. <br />2 <br />Flooding has occurred in the Anthony Lane <br />a. Complete feasibility study to identify <br />Industrial Area, <br />options to provide additional flood <br />protection to the Anthony Lane <br />Industrial Area. <br />City of St. Anthony Section IV - Page 1 <br />WSS Project No. 1626-25 <br />August 2007 <br />M1 <br />