Laserfiche WebLink
36 <br />2. After receiving and reviewing the building data, Sebesta Blomberg will conduct an on-site facility walk- <br />through to execute the following tasks: <br />a. Interview select operations and maintenance staff and energy management personnel to further <br />discuss and understand the facility and its current operational performance characteristics <br />b. Walk through the space to gain first hand knowledge of the design and current operational <br />conditions of the facility <br />3. Sebesta Blomberg will create and present a final report that will include all recommendations for <br />replacement with special emphasis on building system performance and energy efficiency <br />Deliverables <br />Sebesta Blomberg will prepare a,final facility assessment report including: <br />1. An executive summary highlighting our general findings and recommendations <br />2. A matrix of all ECOs that includes the following: <br />3. Description of the ECO <br />4. Estimated first costs associated with implementation of the ECO <br />S. Estimated energy and maintenance savings associated with the ECO <br />6. List of all design and operational issues discovered during the facility analysis including <br />recommendations for remediation <br />Building Systems <br />Sebesta Blomberg proposes to provide the services as outlined above to the following building systems: <br />1. HVAC Systems including: packaged rooftop units, boilers and hydropic heating system, exhaust systems <br />and controls <br />2. Electrical Systems including normal electrical and lighting <br />3. Building envelope including windows and roof <br />Clarifications <br />This proposal is based on the following clarifications: <br />1. The depth of our analysis will be directly related to the Owner's ability to provide the facility data <br />requested with this proposal. All documentation required (as -built drawings, as -built sequence of <br />operations, TAB data, etc.) will be provided prior to the initial site visit. <br />2. This proposal does not include the implementation of any recommendations, nor the measurement and <br />verification of any energy conservation methods if and when implemented by the Owner. Sebesta <br />