My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC PACKET 09092008
StAnthony
>
City Council
>
City Council Packets
>
2008
>
CC PACKET 09092008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/30/2015 7:43:13 AM
Creation date
5/7/2014 2:16:24 PM
Metadata
Fields
Template:
City Council
Document Type
Council Agenda/Packets
Supplemental fields
City Code Chapter Amendment
Keywords
Missing
Ordinance #
Ordinance Summary
Ordinance Title
Planning File #
Property Address
Property PIN
Publication Newspaper
Publication Title
Publication Type
Resolution #
Resolution Summary
Resolution Title
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
P tilt q55 29Po closelan Rardixo l <br />August 27, 2008 <br />Michael Morrison, City Manager <br />City of St. Anthony <br />St. Anthony Village City Hall <br />3301 Silver Lake Road <br />St. Anthony, Minnesota 5541 B <br />Dear Michael, <br />Below is a brief description of file proposed renovation of Emerald Park: <br />The concept plan for the renovation of Emerald Park provides improved facilities for a variety of <br />uses and offers a range of amenities for the residents of St. Anthony Village. <br />Recreational and athletic users will find newly renovated fields for soccer and baseball, along <br />with new removable hockey boards, and space for open skating. Athletic field lighting will be <br />improved. A new park building will provide restrooms along with a flexible space suitable for <br />community meetings and for use cls a warming house. <br />Families will find a new playground, with equipment suitable for preschool and school-age <br />children. A splash deck will provide additional summer fun. An arbor will be constructed near the <br />playground to provicle a shady refuge. <br />A new picnic area and shelter will provide space for both large and small gatherings in the <br />southeast corner of the park. The new picnic area will be nestled into the existing trees. A <br />perimeter walkway will provicle space for strolling around the entire park, and cars will be moved <br />to parallel parking allowing the existing parking lot to be converted into green. <br />There will be references in the park of the cultural history of the site, which among other things was <br />once the site of an apple orchard. <br />The schedule for the project is set to complete construction documents by November 2008 with <br />-- <br />documents sent out for bid in December. Construction will start spring of 2009 with construction <br />complete October of 2009. <br />Sincerely, <br />Jean M. Garbarini ASLA <br />CLOSE Landscape Architecture+ <br />soo ml Aonne North Suk, Sao, MionceJIMN, 1114 Sq ,oi <br />
The URL can be used to link to this page
Your browser does not support the video tag.