Laserfiche WebLink
Project costs are anticipated to be approximately $84,000, which includes the total <br />roadway and water main reconstruction of the alley located immediately south of Croft <br />Drive and west of Old Highway 8. <br />Due to the insufficient structural condition of the existing roadway, poor drainage <br />characteristics, and deterioration of the existing watermain, this project is both feasible <br />and necessary from an engineering standpoint. Alternative methods of improving the <br />utility systems and roadways are not feasible or cost effective due to the location and <br />condition of the existing utilities and. the existing soils conditions. <br />Based on our analysis and data presented, the proposed project is feasible, necessary, and <br />cost effective from an engineering standpoint. We recommend reconstruction of the <br />watermain and the roadway as detailed in this report. <br />Feasibility Report <br />Arbors Alley Roadway and Utility Improvement Project <br />City of St. Anthony <br />WS/3 Project No. 1026-42 <br />Page 9 <br />