My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC PACKET 10272009
StAnthony
>
City Council
>
City Council Packets
>
2009
>
CC PACKET 10272009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/30/2015 12:21:06 PM
Creation date
5/7/2014 2:14:44 PM
Metadata
Fields
Template:
City Council
Document Type
Council Agenda/Packets
Supplemental fields
City Code Chapter Amendment
Keywords
Missing
Ordinance #
Ordinance Summary
Ordinance Title
Planning File #
Property Address
Property PIN
Publication Newspaper
Publication Title
Publication Type
Resolution #
Resolution Summary
Resolution Title
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
78
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A <br />WSB <br />34 <br />& Associates, Inc. Infrastructure ■ Engineering s Planning ■ Construction 701 Xenia Avenue South <br />Suite 300 <br />Minneapolis, MN 55416 <br />Tel: 763 541-4800 <br />Fax: 763 541-1700 <br />October 19, 2009 <br />The Honorable Mayor, City Council, and Staff <br />City of St. Anthony Village <br />3301 Silver Lake Road NE <br />St. Anthony, MN 55418 <br />Re: City Engineer's Update for October 2009 <br />W SB Project No. 1626-37 <br />Dear Honorable Mayor, City Council and Staff: <br />This letter is intended to provide you with an update on the current status of ongoing City projects. <br />Outlined below please find a list of the projects, along with the current status of each project and the <br />activities anticipated to be completed in the upcoming months: <br />I. 2009 Street Reconstruction Project <br />The 2009 Street Reconstruction Project is nearing substantial completion. All utility <br />construction and road grading has been competed. The remaining items to be completed <br />are temporary striping, turf establishment, and the final lift of pavement. <br />II. Water Tower Park Watermain Replacement Project <br />Replacement of the waternnain surrounding Water Tower Park has been completed. <br />III, Arbors Alley Improvement Project <br />The Arbors Alley Improvement Project has been completed. <br />IV. St. Anthony Boulevard Mill and Overlay Project <br />Resurfacing of St. Anthony Boulevard has been completed from Coolidge Street to Silver <br />Lake Road and from Hwy 88 to the east approximately 1,100 feet. <br />V. St. Anthony Village Water Reuse Facility <br />The Water Reuse Facility has been completed and is operational. Staff will be reviewing <br />the first year of operation and looking for ways to improve the systems performance. <br />VL Emerald Park <br />The grand opening for Emerald Park was held on Wednesday October 14, 2009. <br />VII, 2010 Street Reconstruction Project <br />Design of the 2010 Street Reconstruction project has begun. We have explored a variety <br />of proposed road layouts including installing a cul-de-sac at select locations on Silver <br />Lane. Attached are two potential layouts for cul-de-sacs. <br />F1W P W IN11065-221LTR-EngrUpdate-052008.doe <br />
The URL can be used to link to this page
Your browser does not support the video tag.