Laserfiche WebLink
24 <br />IV. PROJECT SUMMARY <br />The expenditures to be undertaken with this Street Reconstruction Plan (SRP) <br />are limited to those listed in Appendix A. All other foreseeable capital <br />expenditures within the City government will come through other means. The <br />following expenditures have been submitted for inclusion in this SRP: <br />2010 Expenditures <br />• $1.4 Million — This project includes street reconstruction, storm sewer, <br />sanitary sewer, and water main improvements to Silver Lane from <br />Silver Lake Road to 16"' Avenue SW and the sidewalk and street <br />lighting improvements along Silver Lane from Stinson Boulevard to <br />1.6`h Avenue SW. This project also includes the mill and overlay of Old <br />Highway 8 fi•om the Highway 88 access to 33`d Avenue NE and <br />Higherest Road fi•om 33`d Avenue NE to 37`h Avenue NE. <br />2011 Expenditures <br />• $2.5 Million — This project includes street reconstruction, storm sewer, <br />sanitary sewer, and water main improvements to the following: <br />Wendhurst Avenue from Penrod Lane to Chelmsford Lane, Edgemere <br />Avenue from Penrod Lane to Chelmsford Lane, Penrod Lane from 36`1' <br />Avenue NE to County Road D, and Chelmsford Lane from 36`h Avenue <br />NE to County Road D. This project also includes sidewalk <br />improvements along 39`h Avenue NE from Silver Lake Road to <br />Macalaster Drive and an at grade railroad crossing on Macalaster Drive. <br />2012 Expenditures <br />• $2.5 Million — This project includes street reconstruction, storm sewer, <br />sanitary sewer, and water main improvements to the following: 35"h <br />Avenue NE from Belden Drive to Harding Street NE, Coolidge Street <br />NE from 34`h Avenue NE to 36`h Avenue NE, and Belden Drive from <br />34`h Avenue NE to 36`' Avenue NE. This project also includes <br />sidewalk and street lighting improvements along Stinson Boulevard <br />from 37`' Avenue NE to Silver Lane. <br />Ehlers & Associates, Inc. Page 6 <br />