My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC PACKET 10262010
StAnthony
>
City Council
>
City Council Packets
>
2010
>
CC PACKET 10262010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/30/2015 10:23:44 AM
Creation date
4/30/2014 4:45:20 PM
Metadata
Fields
Template:
City Council
Document Type
Council Agenda/Packets
Supplemental fields
City Code Chapter Amendment
Keywords
Missing
Ordinance #
Ordinance Summary
Ordinance Title
Planning File #
Property Address
Property PIN
Publication Newspaper
Publication Title
Publication Type
Resolution #
Resolution Summary
Resolution Title
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
91
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
45 <br />The expanded usage is currently in question, however, since there have been concerns <br />raised about the light pollution caused by the current lighting system of the Stadium <br />Athletic Complex. Up to sixteen properties that border the Park, a mere 75 feet from the <br />fenceline of the Stadium, have their entire backyards lighted to the same level as is the <br />midfield of the Complex. This is caused by an outdated lighting system installed in <br />1971 intended to "flood" the field with light. Unfortunately, such an approach also <br />floods neighboring properties with that same light, affecting the enjoyment of those <br />properties, which can create community resistance of usage during the all-important <br />evening hours. The exciting environmental impact of this updated system is reducing <br />the electrical load from 355 amps down to 118 amps. There are presently 961500 watt <br />quartz fixtures lighting the field to approximately 15 footcandles. We can increase the <br />field lighting to 40 footcandles using 321500 watt LSG fixtures. <br />The lighting system, which has served the complex well for almost 40 years, has <br />exceeded its expected lifespan. The lights are obsolete in terms of modern technology; <br />the electrical components of the light standards have shorted out, requiring professional <br />repair; and the cost of replacement and labor to change bulbs is exorbitant. The current <br />system uses 1500 -watt quartz bulbs, and the expense and difficulty of replacement <br />allows only one opportunity per year to change any bulbs then burned -out. The cost of <br />running the current six pole system is approximately $40 per hour, and gives off subpar <br />quality—flooding the field and neighboring properties at around ten to fifteen foot- <br />candles at its brightest spots; this same light level is cast several hundred feet beyond <br />the Complex's fences. <br />hurthermore, the current chain-link fence surrounding the field has fallen into disrepair, <br />in part because of community desire to use the facility even while it had been closed for <br />safety concerns. As a result, fence caps are missing; posts are broken and tilted; and <br />gates are, in some places, unusable because of vandalism or other damage. As the <br />desire is to encourage use of the facility during appropriate times, as well as <br />maintaining a safe environment against attractive nuisances (the bleacher facilities are <br />accessible within the confines of the complex), a safe and secure fence replacement is <br />necessary. Previously, the track had been fenced off due to safety and security <br />concerns; with the updates, community use of the new track will be encouraged, limited <br />only by the lighting in the Park. <br />The School District's referendum and renovation monies addressed the curricular need <br />for the facility — a need that is predominantly met during daylight hours without the <br />requirement of lighting or fencing. However, the youth sports need could not be <br />remedied as the need for lighting and fencing goes well beyond the curricular function <br />for which ISD#282 is specifically responsible. Therefore, this grant proposal directly <br />impact the youth athletic component with little crossover to School District activities. <br />29 <br />
The URL can be used to link to this page
Your browser does not support the video tag.