My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC PACKET 10262010
StAnthony
>
City Council
>
City Council Packets
>
2010
>
CC PACKET 10262010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/30/2015 10:23:44 AM
Creation date
4/30/2014 4:45:20 PM
Metadata
Fields
Template:
City Council
Document Type
Council Agenda/Packets
Supplemental fields
City Code Chapter Amendment
Keywords
Missing
Ordinance #
Ordinance Summary
Ordinance Title
Planning File #
Property Address
Property PIN
Publication Newspaper
Publication Title
Publication Type
Resolution #
Resolution Summary
Resolution Title
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
91
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
October 11, 2010 <br />Troy Urdahl CAA <br />St. Anthony New Brighton Schools <br />Director of Athletics, Activities, and Facilities <br />3303 33rd Avenue NE <br />St. Anthony Village, MN 55418 <br />Dear Troy: <br />There are two very important features you need to maintain athletic fields at this <br />level of play, one is irrigation the second is proper drainage. It seems you have <br />adequate irrigation but drainage is lacking which is the most important. The <br />existing conditions resulted in poor turf quality, inability to play due to unstable <br />wet conditions and higher maintenance costs. <br />3, <br />After reviewing the original construction design the drainage appears to be <br />limited, with having a sand base natural turf field it is imperative that a subsurface <br />drainage system be in place. Sand and peat hold water, that is good, but the <br />water has to be released to grow grass and allow high traffic sport activities. This <br />is a fixable issue without removing the existing field surface and reducing down <br />time. <br />We recommend installing a subsurface drainage system within the existing fields <br />connecting this system to the existing storm drains. <br />Sincerely, <br />Jeffery Hartman <br />8099 Bavaria Rd. Victoria, MN 55386 Ph. 952-443-2990 Fax 952-443-2835 <br />www.harlr?7ancompanies.com <br />06 N. <br />
The URL can be used to link to this page
Your browser does not support the video tag.