My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC PACKET 10262010
StAnthony
>
City Council
>
City Council Packets
>
2010
>
CC PACKET 10262010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/30/2015 10:23:44 AM
Creation date
4/30/2014 4:45:20 PM
Metadata
Fields
Template:
City Council
Document Type
Council Agenda/Packets
Supplemental fields
City Code Chapter Amendment
Keywords
Missing
Ordinance #
Ordinance Summary
Ordinance Title
Planning File #
Property Address
Property PIN
Publication Newspaper
Publication Title
Publication Type
Resolution #
Resolution Summary
Resolution Title
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
91
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
St. Anthony High School Football/Soccer <br />12 -Oct -10 <br />Typical <br />Floodlighting 0000 <br />CD <br />Eouioment 5- a4e►J.. <br />Total kWh 1 641,520 1 187,68 <br />Metric Tons of CO21 460.6 1 134.8 <br />Exhibit A <br />Your Savings <br />325.9 <br />Energy <br />$46,656 <br />$15,014 <br />$31,642 <br />Group Relamp <br />Lamp Maintenance <br />Controls - Energy <br />Controls - Labor <br />$16,500 <br />$0 <br />$16,500 <br />$3,750 $0 <br />$3,750 <br />$4,666 $0 <br />$4,666 <br />$37,000 $0 <br />$37,000 <br />25 -Year Life -Cycle Cost <br />$108,572 <br />$15,014 <br />$93,558 <br />Assu <br />Customer Provided Energy Data: <br />Controls Data: <br />Energy Cost per kWh <br />$0.080 <br />Controls Energy Savings 10% <br />Annual Operating Hours <br />150 <br />Labor Rate per Hour $10.00 <br /># On/Off Cycles per Year 37 <br />Technology Specific Data: <br />Labor Hours per Cycle 4 <br />Musco Green Fixture Qty. <br />32 <br />Average kW demand per fixture <br />1.564 <br />Lamp Maintenance Data: <br />Useful lamp life hours <br />5000 <br />Lamp replacement cost $125 <br />Typical Floodlighting Fixture Qty. <br />96 <br />including parts, equipment & labor <br />Average kW demand per fixture <br />1.62 <br />Useful lamp life hours <br />3000 <br />Life -cycle costs are based upon the assumptions given by the customer above. Any variation in this data will change <br />the life -cycle cost proportionately. Typical Floodlighting Equipment total kWh includes base operating hours plus extra <br />kWh consumed if no controls system Included. Musco guarantees the average Green Generation Lighting system kW <br />per hour and useful life of the lamp. <br />Carbon dioxide (CO2) is emitted by the power plant when generating the total kWh used by the lighting system. <br />Generating one kWh of electricity in the United States emits an average of 1.583 lbs of CO 2. One metric ton equals <br />2, 204.6 lbs. <br />Source for CO2 calculations: http://www.epa.gov/cleanenergy/energy-resourceslrefs.htmi (4-15-09) <br />0 2005, 2009 Musco Lighting 50.7200-2 <br />0000 <br />muss. <br />We Make It Happen. <br />
The URL can be used to link to this page
Your browser does not support the video tag.