My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC PACKET 09272011
StAnthony
>
City Council
>
City Council Packets
>
2011
>
CC PACKET 09272011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/30/2015 9:55:19 AM
Creation date
4/30/2014 4:43:53 PM
Metadata
Fields
Template:
City Council
Document Type
Council Agenda/Packets
Supplemental fields
City Code Chapter Amendment
Keywords
Missing
Ordinance #
Ordinance Summary
Ordinance Title
Planning File #
Property Address
Property PIN
Publication Newspaper
Publication Title
Publication Type
Resolution #
Resolution Summary
Resolution Title
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
93
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
vim <br />September 8, 2011 <br />Ms. Kim Moore -Sykes <br />Assistant City Manager <br />City of St. Anthony <br />St. Anthony City Hall <br />3301 Silver Lake Road <br />St. Anthony, MN 55418-1699 <br />Re: Fapade and Site Improvement Project <br />St. Anthony Shopping Center <br />St. Anthony, MN <br />Dear Ms. Moore -Sykes, <br />W <br />KOZULLA & ASSOCIATES, INC. <br />7851 METRO PARKWAY, SUITE '121 <br />BLOOMINGTON, MN 55425 USA <br />TEL 952-345-0258 <br />FAX 952-854-9403 <br />I am writing to you with respect to various Zoning Code and City process items we briefly discussed which may assist <br />the City in upcoming reviews and approvals. <br />Easements— Although there are easements associated with this property with either the City or the County, this project is <br />not requesting any new easement or proposing amendment to any existing easement. <br />Variances — This project is not requesting any variances. <br />Parkin — It is the intent to mill and overlay and restripe the existing parking lot. Concrete curb & gutter landscape <br />islands and parking lot lighting will remain in their current locations. The current Zoning Code requires parking spaces <br />equating to 1 space per 300 square feet of gross floor area. This property contains three buildings. The north building <br />(46,052 s.f), the west building (39,388 s.f) and the Dairy Queen (1,124 st), totaling 86,564 gross square feet. A factor <br />of 300 s.f. suggests 288 parking spaces required. The existing parking lot has a total of 294 spaces, thus meeting current <br />quantity requirements. It is the intent of the proposed parking layout to replicate that of the existing striping layout; <br />however accessible ramp locations and accessible space locations will differ from the existing layout. Space widths vary <br />from 8.78' to 10' depending on the location. Existing striping is 18' long. Because the landscaped islands <br />dimensionally lock the parking lot striping layout, the 18' space length must be maintained. If we find the 18' length can <br />be increased, the design will accommodate. <br />Setbacks — In some cases, this property has zero lot setbacks. It is my understanding that since this project is not a <br />redevelopment project setback restrictions will be grandfathered. <br />Comprehensive Sign Plan — This project submitted a Comprehensive Sign Plan to the City. This Sign Pian was briefly <br />discussed at the August 16 Planning Commission, however not to detail. The City is currently reviewing the proposed <br />property Sign Plan and scheduled to be on the September 20 Planning Commission agenda. <br />Site Drainaee — Communications were held with the City and WSB & Associates with respect to storm water <br />management. Given it is the intent to do a mill & overlay rather than a replacement, it was determined an underground <br />storm water management system or specific site retention location not be required. <br />Planning Commission and City Council — Given the project is not requesting any rezoning, variances, easements, etc., it <br />is the opinion of this office the project is more of an administrative City process, however, this project's representatives <br />are willing to work with City staff, Planning Commission and City Council as necessary. <br />
The URL can be used to link to this page
Your browser does not support the video tag.