My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC PACKET 02282012
StAnthony
>
City Council
>
City Council Packets
>
2012
>
CC PACKET 02282012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/30/2015 9:33:33 AM
Creation date
4/30/2014 4:42:18 PM
Metadata
Fields
Template:
City Council
Document Type
Council Agenda/Packets
Supplemental fields
City Code Chapter Amendment
Keywords
Missing
Ordinance #
Ordinance Summary
Ordinance Title
Planning File #
Property Address
Property PIN
Publication Newspaper
Publication Title
Publication Type
Resolution #
Resolution Summary
Resolution Title
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
159
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
91 <br />WS <br />& Assoctores, t„o. Engineering ■ Planning a Environmental x Construction <br />January 9, 2012 <br />Mr. Jay Hartman <br />Director of Public Works <br />City of St. Anthony Village <br />3301 Silver Lake Road <br />St. Anthony, MN 55418-1699 <br />Re: Review of Autumn Woods Phase Il <br />WSB Project No. 01626-60 <br />Dear Mr. Hartman: <br />701 Xenia Avenue South <br />Suite 300 <br />Minneapolis, MN 55416 <br />Tel: 763-541-4800 <br />Fax: 763-541-1700 <br />We have reviewed the revised grading and utility plans prepared by Jay P. Nelson Architect, dated <br />January 4, 2012 for the above-mentioned project, and have found them to be in conformance with St. <br />Anthony Village Engineering Standards with the addition of the following comment. <br />1. Sheet C2.02 -The plan indicates the existing catch basin casting located at the entrance off <br />Kenzie'ferrace be replaced with a valley gutter grate. The existing catch basin at this <br />location should be removed and replaced with the proposed catch basin located five feet to <br />the east as indicated on sheet C4.03 of the revised plan set. <br />We have also reviewed the response memo prepared by MFRA Inc., dated January 3, 2012 and note <br />that all comments have been addressed with exception of comments 1 through 4 on sheet C4.02. <br />MFRA Inc. has indicated they will coordinate the revisions to the storm water model with the City <br />Engineer prior to building permit submittal. MFRA Inc. has indicated these revisions will have <br />minor impact on the overall performance of the storm water treatment system, which may result in <br />minor revisions to the surface landscaping scheme. <br />If you have any future questions or concerns please feel free to contact me at (763) 287-7160. <br />Sincerely, <br />WSB & Associates, Inc. <br />Todd E. Hubmer, PE <br />City Engineer <br />Minneapolis ■ St. Cloud <br />Equal Opportunity Employer <br />CVknvinlmR and Scni."'hub—m.'% al&c Ilpldav'1'—Nram 1;11-11'wconlmitOul]m W4M000H9r1. W14artninn-010913 (2}dox <br />
The URL can be used to link to this page
Your browser does not support the video tag.