My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC PACKET 08142012
StAnthony
>
City Council
>
City Council Packets
>
2012
>
CC PACKET 08142012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/30/2015 9:21:03 AM
Creation date
4/30/2014 4:42:47 PM
Metadata
Fields
Template:
City Council
Document Type
Council Agenda/Packets
Supplemental fields
City Code Chapter Amendment
Keywords
Missing
Ordinance #
Ordinance Summary
Ordinance Title
Planning File #
Property Address
Property PIN
Publication Newspaper
Publication Title
Publication Type
Resolution #
Resolution Summary
Resolution Title
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
70
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FW3XdljiPT INVLriUM <br />This project has been entitled the 2013 Street and Utility Improvement Project. The project <br />proposes the street reconstruction of the following: <br />36°i Avenue NE from Roosevelt Street to Silver Lake Road <br />Edward Street from 35°i Avenue NE to 36°' Avenue NE <br />This Feasibility Report outlines the proposed reconstruction of approximately 2,650 feet of <br />30 -foot urban section street complete with bituminous paving and concrete curb and gutter. <br />Also proposed is the replacement of approximately 1,950 feet of watermain and <br />approximately 1,300 feet of sanitary sewer main. The installation of new storm mains and <br />new storm sewer catch basins is also proposed. <br />A total estimated project cost for the street and utility reconstruction is approximately $2.1 <br />million. Funding for the project will come from the City's Street and Utility Reconstruction <br />Funds (Public Improvement Bonds), Water Utility Fund, Stormwater Utility Fund, Sanitary <br />Sewer Utility Fund, and Special Assessments to benefiting properties. <br />The project reconstruction can be completed, including the first lift of bituminous and all <br />restoration items, in 2013. The final lift of bituminous is proposed to be installed in June of <br />2014. <br />This project is feasible, necessary, and cost effective from an engineering standpoint and <br />should be constructed as proposed herein. <br />2013 STREET AND UTILITY IMPROVEMENT PROJECT <br />FEASIBILITY REPORT <br />CITY OF ST. ANTHONY VILLAGE <br />WSB PROJECT NO. 1626-66 <br />PAGE <br />29 <br />
The URL can be used to link to this page
Your browser does not support the video tag.