My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC PACKET 08142012
StAnthony
>
City Council
>
City Council Packets
>
2012
>
CC PACKET 08142012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/30/2015 9:21:03 AM
Creation date
4/30/2014 4:42:47 PM
Metadata
Fields
Template:
City Council
Document Type
Council Agenda/Packets
Supplemental fields
City Code Chapter Amendment
Keywords
Missing
Ordinance #
Ordinance Summary
Ordinance Title
Planning File #
Property Address
Property PIN
Publication Newspaper
Publication Title
Publication Type
Resolution #
Resolution Summary
Resolution Title
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
70
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FEASIBILITY AND RECOMMENDATION <br />Project costs are anticipated to be approximately $2.1 million, which includes the total <br />street and utility reconstruction of 36°i Avenue NE from Roosevelt Street NE to Silver <br />Lake Road and Edward Street from 35°i Avenue NE to 361' Avenue NE. <br />Due to the poor structural condition of portions of the street sections, the deterioration of <br />the existing sanitary sewer and storm sewer systems, and frequent watermain breaks, this <br />project is both feasible and necessary from an engineering standpoint. Alternative <br />methods of improving the utility systems and roadways are not feasible or cost effective <br />due to the location and condition of the existing utilities and the existing soils conditions. <br />Based on our analysis and data presented, the proposed project is feasible, necessary, and <br />cost effective from an engineering standpoint. We recommend reconstruction of the <br />sanitary sewer, watermain, storm water collection system, and the street as detailed in this <br />report. <br />2013 STREET AND UTILITY IMPROVEMENT PROJECT <br />FEASIBILITY REPORT <br />CITY OF ST. ANTHONY VILLAGE <br />WSB PROJECT NO. 1626-66 <br />PAGE 11 <br />39 <br />
The URL can be used to link to this page
Your browser does not support the video tag.