My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC PACKET 09102013
StAnthony
>
City Council
>
City Council Packets
>
2013
>
CC PACKET 09102013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/30/2015 8:58:53 AM
Creation date
4/30/2014 4:41:24 PM
Metadata
Fields
Template:
City Council
Document Type
Council Agenda/Packets
Supplemental fields
City Code Chapter Amendment
Keywords
Missing
Ordinance #
Ordinance Summary
Ordinance Title
Planning File #
Property Address
Property PIN
Publication Newspaper
Publication Title
Publication Type
Resolution #
Resolution Summary
Resolution Title
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
93
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
30 <br />4.7 Additional Considerations <br />The City Council's original authorization for the preparation of a feasibility study <br />identified the following roadways to be included for reconstruction: <br />Alternate I <br />36°i Avenue NE from Penrod Lane to Chelmsford Lane <br />Chelmsford Lane from 36t" Avenue NE to 37°' Avenue NE (Co. Rd. 93) <br />Alternate 2 <br />® 36°i Avenue NE from Silver lake Road (Co. Rd. 136) to Highcrest Road <br />® Penrod Lane from 36°i Avenue NE to Skyeroft Drive <br />® Chelmsford Lane from 36t" Avenue NE to Maplewood Drive <br />® Sky Croft Drive from Penrod Lane to Maplewood Drive Road <br />® Maplewood Lane from Sky Croft Drive to Highcrest Road <br />Improvements proposed for Alternates I and 2 include reconstructing the roadways as <br />identified in Section 4.4 and replacing the existing sanitary and water main facilities as <br />identified in Sections 4.1 and 4.2. Drainage improvements include removing and <br />replacing the existing storm sewer system and supplementing the existing storm sewer <br />facilities with the installation of additional catch basins as necessary. <br />Funding for Alternates 1 and 2 has been allocated for 2015 and 2016, respectively. The <br />economic feasibility to reconstruct Alternates I and 2 in conjunction with the identified <br />improvement area in 2014 has been investigated as a means to reduce total project costs <br />and take advantage of low bond rates by reconstructing a larger project area (economies <br />of scale). Based on funding limitations, Alternates I and 2 have been separated from the <br />recommended project area for improvements in 2014 and are proposed to be constructed <br />in 2015 and 2016, or as funding allows. A separate cost estimate for Alternates I and 2 <br />has been completed for future reference, and may be found in Appendix C of this report. <br />2014 STREET AND UTILITY IMPROVEMEN"r P12oiiS,cr <br />FEASIRILI'IN REPORT <br />CITY OF Sr. ANTHONY VILLAGE <br />WS12 PROJECT NO. 1626-82 <br />TABU? OF CONTENTS <br />PAGE <br />
The URL can be used to link to this page
Your browser does not support the video tag.