Laserfiche WebLink
6 IV. Street and Utility Improvements Program <br />2013 Annual Report · Public Works Department · St. Anthony Village, Minnesota <br />IV. Street and Utility <br />Improvements Program <br />STREET IMPROVEMENTS <br />To date, 17. 4 miles of road reconstruction has occurred in St. Anthony Village since 1997. <br />6.8 miles are planned from 2015-2024. <br />The City of St. Anthony worked with WSB & Associates, Inc. to reconstruct over 0.5 miles <br />of residential roadway as part of their annual street and utility reconstruction project. This <br />project included the complete replacement of the municipal water distribution system, sanitary <br />sewer, and road surface of Edward St from 35th Ave NE to 36th Ave NE and 36th Ave <br />NE from Roosevelt Ave to Silver Lake Road. Numerous drainage improvements were also <br />completed with this project as part of the City’s ongoing effort to reduce flooding. This street <br />reconstruction project completes the residential street improvement program located west of <br />Silver Lake Road. <br />Streets completed in 2013 include: <br />• 36th Avenue from Silver Lake Road to Roosevelt Street <br />• Edward Street