Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
RES 15-079 APPROVING THE 2016 FEE SCHEDULE
CITY OF ST. ANTHONY VILLAGE STATE OF MINNESOTA RESOLUTION 15 -079 A RESOLUTION APPROVING THE 2016 FEE SCHEDULE WHEREAS, the City of St. Anthony Village has approved an ordinance allowing fees to be established by resolution; and WHEREAS, staff has established a fee schedule that can be amended annually; and WHEREAS, attached is the 2016 Fee Schedule. Adopted this 8th day of December, 2014. Jerome O. Faust, Mayor ATTEST: zzw NicWC94iller, Cit Clerk Reviewed for administration: I& /!✓ZG (:t / Mark Casey, City Manager �ain ills tl opny e C� City of St. Anthony Village -- 3301 Silver Lake Road St. Anthony, Minnesota 55418 FEE SCHEDULE comom 0VV ©QQ ©G2 THIS PAGE LEFT INTENTIONALLY BLANK ",a c07 Table of Contents General Construction Building..................................................................... ..............................1 Electrical................................................................... ............................... 2 Mechanical............................................................... ............................... 3 Miscellaneous.......................................................... ............................... 3 Plumbing................................................................. ............................... 3 ManufacturedHome .............................................. ............................... 4 LandUse Applications .................................................... ............................... 4 Licenses.............................................................................. ............................... 5 MiscellaneousFees ........................................................... ............................... 6 ParkContributions ................................................. ............................... 6 Rightof Way ............................................................ ............................... 6 Utilities FireControl Devices ............................................... ............................... 7 IrrigationRates ........................................................ ............................... 7 SewerRates .............................................................. ............................... 7 Storm water Facilities Rates .................................. ............................... 7 WaterMeters ........................................................... ............................... 8 WaterRates .............................................................. ............................... 8 1 GENERAL CONSTRUCTION BUILDING PERMITS FEES: Total Valuation $1 to $500 Amount $29.50 $501 to $2,000 $28 for the first $500 plus $3.70/ additional $100 or fraction thereof, to including $2,000 $2,001 to $25,000 $83.50 for the first $2,000 plus $16.55 /additional $1,000 or fraction thereof, to including $25,000 $25,001 to $50,000 $464.15 for the first $25,000 plus $12.00 /additional $1,000 or fraction thereof, to including $50,000 $50,001 to $100,000 $764.15 for the first $50,000 plus $8.45 /additional $1,000 or fraction thereof, to including $100,000 $100,001 to $500,000 $1,186.65 for the first $100,000 plus $6.75/ additional $1,000 or fraction thereof, to including $500,000 $500,001 to $1,000,000 $3,886.65 for the first $500,000 plus $5.50 /additional $1,000 or fraction thereof, to including $1,000,000 $1,000,001 and up $6,636.65 for the first $1,000,000 plus $4.50 /additional $1,000 or fraction thereof Inspections outside of normal business hours $65.00per hour (minimum charge, 2 hours) (or the total hourly cost to the jurisdiction, which is the greatest. This cost shall include supervision, overhead, equipment, hourly wages, and fringe benefits of the employees involved) Re- inspection; fees assessed under provisions $65.00per hour of §32.08 Inspections for which no fee is specifically $65.00per hour indicated (minimum charge, l/2 hour) Additional plan review required by changes, additions, or revisions to plans (minimum $65.00per hour charge, 1/2 hour) For use of outside consultants for plan Actual costs checking and inspections, or both (including administrative and overhead costs) Notes to Table: A plan review fee of 65% of the permit fee will be charged for building permits which requires the submittal of plans. Fees for similar plans will be charged in accordance with provisions of MN Rules, Chapter 1300.0160, subd. 5. ELECTRICAL PERMITS FEES: Purpose of Fee: Residential or Commercial Building or Garage Electrical panel change out, repair or service upgrade Description Up to 300 amps 400 amps For each additional 100 amps add Amount $50.00 $58.00 $14.00 Reconnected circuits Charge for each $3.00 Residential or Commercial Building or Garage New circuits or reconnected circuits spliced outside of electric panel are at full fee Charge for each up to 30 amps $8.00 Charge for each up to 100 amps $10.00 For each additional 100 amps add $5.00 New Home New Single Family Residence or Building Remodel $150.00 up to 200 amps and 30 circuits used or less - includes a maximum of 3 inspection trips (T here is no maximum fee if the service is larger than 200 amps) All Remodel Projects Single Family Residence or Building Remodel Total costs equals required number of inspections trips multiplied by $35 each or the total cost of the circuits being used whichever is greater, but not both. Multi- Family Dwelling with 3 or more Units $70.00 Each housing unit - up to 200 amps with a meter bank application and 20 circuits or less. Additional inspection trip $35.00 House Wiring and service is separate. Above fees apply. Transformers 0 -10 kilovolt- amperes $10.00 11- 76 kilovolt- amperes $40.00 over 76 kilovolt - amperes $80.00 Retro fit lighting (ballast & lamps only; new fixture is per circuit fee) for the first 10 fixtures $10.00 each additional fixture $0.65 Sign Transformer $8.00 Swimming Pools per trip plus circuit fees $50.00 Street Lights and lot lights per pole $4.00 Traffic Signals per standard $7.00 Remote Control, Signal, fire alarm & energy management for the first 10 devices $10.00 for each additional device $0.65 MECHANICAL PERMIT: Puipose of Fee Amount Each dwelling unit (new construction) $150 Other (furnace, gas range, gas dryer, hot water heater, air $30 conditioner, gas piping, duct work, and the like) $75 Commercial, light industrial, and multi-family (C, Ll, R-3,and R-4) $20 All 3 % of contract price Add $20 administrative fee and $1.00 surcharge to all permits $30 NOTES TO TABLE: The minimum permit fee for commercial, industrial, institutional, or business occupancies is $20 plus state permit fee surcharge. MISCELLANEOUS PERMIT: Antennas, disk antennas and towers Per Building Permit Fee Schedule Demolition Permit $50 Residential $75 Commercial Driveway/ Sidewalk $75 Fence $75 Public Safe $20 Solar $50 plus 1.25% of total valuation Zoning Permit $30 PLUMBING PERMIT: First bath $100 Each additional bath $35 3/4 bath $35 1/2 bath $20 Laundry $20 Water softener $20 Other $30 Commercial, Light Industrial, and Multi-Family (C, LL R-3, and R-4) All 3% of contract price Lawnsprinklers, residential $20 Lawnsprinklers, commercial $30 Add $20 administrative fee and $1.00 surcharge to all permits MANUFACTURED HOME/ACCESSORY INSTALLATION PERMIT: Single Wide $79 Double Wide $95 Each Additional 1' Width $16 Add $20 administrative fee and $1.00 surcharge to all permits $200 LAND USE APPLICATION: Appeal Purpose (Code $500.00 and an Escrow deposit of $500 Comprehensive Plan $750 and an Escrow deposit of $1,500 for Residential and $3,500 for Commercial Conditional Use Permit ( §152243) $200 and an Escrow deposit of $450 for Residential and $850 for Commercial Easement Vacation ( §151.11) $200 Final Plat ( §151.04) $500 with an Escrow deposit of $500 Garage Setback permit ( §152.176) $60 Planned Unit Development (§152.176) $750 with a $2,500 Escrow deposit Preliminary Plat ( §151.03) $500 with a $500 Escrow deposit Rezoning ( §152.242) $500 with a $750 Escrow deposit Sign Permit ( §155) $75 for cost of $1 to $500, plus $5 each $100 over $500 Sign Plan review ( §155) $75 Site Plan ( §152.241) $250 with an Escrow deposit of $450 Subdivision /Lot Split $250 with a $1,250 Escrow deposit Variance ( §152.245) $200 and an Escrow deposit of $450 for Residential and $850 Commercial LICENSES: License , Alarm Permits: ( §111.152) Commercial $25 Residential $10 Christmas Tree Lots: Non -Profit No fee Other Applicants $50 Contractors ( §111.231) $35 or $5 if licensed by state Courtesy Ad Bench $30 per bench New $10 per bench renewal Fireworks: ( §111.371) $100 Existing $350 Stand Alone Dog ( §91.011) $15 every two years unspayed or unneutered; $12 every two years spayed or neutered Duplicate license or to $1.50 Gasoline service stations $75 for station and 1 production line, plus $15 (stations with multiple products dispensed through 1 hose) for each product line dispensed. Haulers of Garbage or Recyclables ( §111.216) $150 Kennel ( §%.2o) $50 Laundromats (coin - operated not in multiple family building) $10 per machine, up to a maximum of $190 per location Liquor: (March 15th renewal date, annually) ( §112.03) Beer: off -sale; 3.2% malt liquor license $100 Beer: on -sale; 3.2% malt liquor license $350 Beer: Temporary on -sale 3.2% malt liquor license None Liquor: on -sale intoxicating liquor $8,000 Liquor: Sunday on -sale $200 Wine: only $400 license fee & $100 processing fee Wine: with strong beer endorsement $1,500 license fee & a 100 processing fee Wine: temporary None Multiple Dwellings ( §111.188) $150 base fee plus $10 per unit for 3 or more (penalty after July 1st base fee increases to $250 Pawnbroker ( §111.287) $8,000 license fee; $750 investigation fee Peddler ( §113.01) $50 Physical culture and health service or club, reducing club or salon, sauna parlor, therapeutic massage $500 in studio ( §111.3x1) $250 Therapist Secondhand good dealer ( §111.252) $5,000 license fee; $750 investigation fee Tobacco or tobacco related products ( §111.047) $300 Towing /Motor Vehicle Starting ( §111.111) $30 for first vehicle and $20 for each additional vehicle Transient Merchant ( §113.01) $50 MISCELLANEOUS FEES: Security False Alarm ( §111.155 D) Vehicle Impounding Fee ( §72.33) Delinquent Utility Assessment Notification First 2 are free, 3rd is $75 and e; additional is an additional $25 $85 for tow: $25 per day storage (applied the first day) $25 Tow Company Administration $15 SAPD Administration $25 PARK CONTRIBUTION: (815172) Single Family lot $1,500/ unit Duplex lot $1,800 /unit Townhouse development $2,000 /unit Mobile Home $1,000 /unit Multi -famil , a artmentor condominium $1,500 /unit Commercial /Industrial $4,000 er acre RIGHT OF WAY: Registration Fee Excavation Permit Fee: Hole Trench Obstruction permit base fee Permit Extension fee Street Excavation ( §150.031) $40 $125 $70/100 lineal foot (plus hole fee) $50 plus $.05 /lineal foot $55 $50 3 UTILITIES: FIRE CONTROL DEVICES: (billed quarterly) 2" $7.88 3" $10.50 4" $15.75 6" $21.00 8" $26.25 10" $42.00 IRRIGATION RATES: SEWER CONNECTION CHARGE: SEWER RATES: $4.12 per 1,000 gallons $850.00 -per Metropolitan Council Environmental Services (MCES) units initial or re- determination. $4.38per 1,000 gallons STORM WATER FACILITIES: (billed quarterly) Classification 1 Charge (per acre) $61.20 2 $59.00 3 $59.00 4 $140.93 5 $179.75 6 $224.55 WATER CONNECTION CHARGE: WATER METERS: $850.00 -per Metropolitan Council Environmental Services (MCES) units initial or redetermination. SIZE 5/8" METER PRICE $130.00 RADIO $130.00 TOTALCOST $260.00 3/4" $140.00 $130.00 $270.00 1" $190.00 $130.00 $320.00 1'h" $505.00 $130.00 $635.00 2" $690.00 $130.00 $820.00 WATER RATES: (billed quarterly) TIER 1 0 -7,500 $3.10 TIER II 7,500 - 15,000 $3.27 TIER III 15,000- 22,500 $3.59 TIER IV 22,500 - 30,000 $4.12 TIER V Over 30,000 $5.17 TIER 1 0 -7,500 $3.10 TIER II 7,500 - 53,500 $3.27 TIER III 53,500- 175,000 $3.59 TIER IV 175,000 - 300,000 $4.12 TIER V Over 300,000 $5.17 WILSHIRE TIER 1 Cons 11111ption( gallons) 0 -7,500 Kate/ per 1,000 gallons $3.10 TIER II 7,500- 510,000 $3.27 TIER III 510,000 - 610,000 $3.59 TIER IV 610,000 - 710,000 $4.12 TIER V Over 710,000 $5.17 SAVHS TIER 1 Consumption 0 -7,500 1,000 $3.10 TIER II 7,500 - 850,000 $3.27 TIER III 850,000 - 1,150,000 $3.59 TIER IV 1,150,000- 1,450,000 $4.12 TIER V Over 1,450,000 $5.17 TIER 1 0 -7,500 $3.10 TIER II 7,500- 3,650,000 $3.27 TIER III 3,650,000- 4,650,000 $3.59 TIER IV 4,650,000 - 5,650,000 $4.12 TIER V Over 5,650,000 $5.17