Loading...
HomeMy WebLinkAboutCC PACKET 05141991 i Meeting Sheet All I I 103034 Box: 30 ii Folder: CC PACKETS 1990-1994 Documen ': CC PACKET 05141991 i' II. I I CITY OF ST. ANTHONY ORDINANCE 1991-003 AN ORDINANCE REGULATING THE SURFACE USE OF THE WATER OF SILVER LAKE LOCATED WITHIN THE BOUNDARIES OF THE CITY OF ST. ANTHONY; AMENDING THE 1973 CODE OF ORDINANCES TO ADD A NEW SECTION 1500:00 The City Council of the City of St. Anthony, Minnesota, ordains: Section 1. The 1973 Code of Ordinances is amended to add a new Section 1500:00 to read as follows: Section 1: PURPOSE, INTENT AND APPLICATION: As authorized by M.S. § 378.32 (459.20), Subdivision 1 as now in effect and as hereafter amended, this Ordinance is enacted for the purpose and with the intent to control and regulate the use of the waters of Silver Lake in Ramsey County, Minnesota, said bodies of water being located within the boundaries of St. Anthony, to promote its fullest use and enjoyment by the public in general and the citizens of St. Anthony in particular; to insure safety for persons and property in connection with the use of said waters; to harmonize and integrate the varying uses of said waters; and to promote the general health, safety and welfare of the citizens of St. Anthony, Minnesota. Section 2: ADOPTION AND INCORPORATION BY REFERENCE OF MINNESOTA WATERS AND WATERCRAFT SAFETY LAWS, AND BOAT AND WATER SAFETY RULES PROMULGATED BY THE MINNESOTA DEPARTMENT OF NATURAL RESOURCES: The Minnesota Waters and Watercraft Safety Laws, M.S. § 361.01-361.29, as they now exist and are hereafter amended by the State of Minnesota Department of Natural Resources,Minn. Rules parts 6110.0100-.2300 as the same now exist and are hereafter amended, are hereby adopted, incorporated herein by reference, and made a part hereof as if set forth in their entirety. At least three copies of said Waters and Watercraft Safety Laws and Boat and Water Safety Rules and Regulations, so adopted, shall be marked as official copies and filed in the office of the City Auditor along with this Ordinance. Section 3: VIOLATIONS OF THE MINNESOTA WATERS AND WATERCRAFT SAFETY LAWS, AND BOAT AND WATER SAFETY RULES PROMULGATED BY THE MINNESOTA DEPARTMENT OF NATURAL RESOURCES: Any person violating the Minnesota Waters and Watercraft Safety Laws, and the Boat and Water Safety Rules and Regulations promulgated by the Minnesota Department of Natural Resources, adopted and incorporated herein by reference, shall be guilty of a misdemeanor. 2 Section 4: RESTRICTIONS DURING CERTAIN HOURS: Between the hours of 11:00 A.M. and 3:00 P.M. and between the hours of 7:00 P.M. and 3:00 A.M. on each and every day of the week, no motorboat shall be operated at a speed in excess of five (5) miles per hour. At all other times during each and every day of the week, motorboats shall be subject to no speed limit and may be operated at unrestricted speeds. Section 5: DIRECTION OF TRAVEL DURING UNRESTRICTED SPEED TIMES: During the hours in which unrestricted operating speeds are permitted, all motorboats shall travel and be operated in a counterclockwise direction around Silver Lake. Section 6: NONSANCTIONED RACING PROHIBITED: Racing, that is the participation of two (2) or more operators of motorboats operating their motorboats in a competition of speed, shall be prohibited on the waters of Silver Lake unless the same takes place as part of a scheduled or public race, regatta, tournament or other competition or exhibition duly sanctioned by the county sheriff pursuant to Section 361.20 of the Minnesota Statutes, as amended. ` Section 7:. ENFORCEMENT: The enforcement of this Ordinance shall be the primary responsibility of the Ramsey County Sheriffs Department, and the City of St. Anthony's peace officers. Other licensed peace officers including Conservation Officers of the Department of Natural Resources of the State of Minnesota are also authorized. Section 8: All authorized Resource Management, Emergency and Enforcement Personnel, while acting in the performance of their assigned duties are exempt from the foregoing restrictions. Section 9: EFFECTIVE DATE: This Ordinance shall be in effect from and after the date of its passage and publication. First Reading: May 14, 1991 Second Reading: Adopted: Mayor ATTEST: City Clerk Published in the St. Anthony Bulletin on the day of —11991. CITY OF ST. ANTHONY • CITY COUNCIL AGENDA MAY 14, 1991 7:30 P.M. CITY COUNCIL CHAMBERS I. CALL TO ORDER/PLEDGE OF ALLEGIANCE. II. ROLL CALL. III. APPROVAL OF MAY 14, 1991 COUNCIL AGENDA. IV. APPROVAL OF APRIL 23, 1991 RECONVENED BOARD OF REVIEW MINUTES. APPROVAL OF APRIL 23, 1991 COUNCIL MINUTES. V. LiCENSES/PERMITS/PGTITIONS. A REPRESENTATIVE FROM MASTER BREAD THRIFT STORE, 3007 - 37TH AVENUE N.E. WILL BE PRESENT TO REQUEST PERMISSION TO OPERATE A HOT DOG STAND ON MAY 23 AND 24, 1991. VI. PRESENTATION OF CLAIMS. A. Stuart J. Bonniwell - $7,500.00. B. Barr Engineering - $1,617.00. C. Dorsey-& Whitney - $2,924.10. D. Dorsey & Whitney - $1,267.05. E. Dorsey & Whitney - $1,624.53. F. Hance & LeVahn - $21400.00. G. Grossman Chevrolet - $12.742.00. H. Grossman Chevrolet - $121742.00. I. Verifieds. VII. REPORTS. A. Planning Commission - April 16, 1991. 1. Forest and Marty Harstad, for 3816 Foss Road; rezoning and preliminary plat approval requests. B. City Council. C. City Manager. 1. Recycling Center. • 2. Pavement Management Study (proposal approval). VIII. PUBLIC HEARINGS - None. IX. NEW BUSINESS. A. Approval of Road Materials Quotations. B. Resolution 91-026, re: Drainage District 6 system capacity study. C. Ordinance 1991-003, re: Regulations on lake usage (1st reading). X. UNFINISHED BUSINESS. XI. ADJOURNMENT. i • • 1 ST. ANTHONY CITY COUNCIL 2 RECONVENED BOARD OF REVIEW - APRIL 23 , 1991 4 5 L 1 . CALL TO ORDER p Mayor Ranallo reconvened the Board of Review at 6:30 p.m. . 9 2. ROLL CALL 1C 11 12 Present : Mayor Ranallo, Counc i I members Enrooth , Marks , Fleming and 13 Wagner IH 5 Staff Present : City Manager Tom Burt 1 15 Hennepin County Senior Appraiser Richard Becken 17 16 3. STAFF RESPONSES TO AGGRIEVED VALUATIONS 19 20 Members of the Council and the City. Manager received books of comparable 21 values. This book contains a breakdown of homes in the City by types of 22 housing; that being, sale price compared to assessed value. In all cases 23 but one, the homes sold in 1990 sold for more than the assessed value. 24 The sale price was taken off the Certificate of Real Estate values. 25 Mayor Ranallo felt these were good comparables. The Mayor read a memo 2 5 • 27 from the Hennepin County Appraiser which advised property owners that 98 they still had the option to attend the Hennepin County Board of 29 Equalization if they did not agree with the appraiser' s recommendation. 30 The Hennepin County' s recommendations are as follows: 32 John Jadinak, 2805 27th Avenue N.E. ; reduce from $76, 100 to $73 ,200. 33 Motion by Marks , second by Wagner to reduce the valuation on the property located at 2805 27th Avenue N.E. as recommended by the Hennepin County 35 36 appraiser. 37 Motion carried unanimously 38 39 Evelyn Jorgensen, 2908 Anthony Lane (two properties) ; 0027' - reduce from 40 41 $63,000 to $50,000 and 0029 - reduce from $819,400 to $760,000. 41 Motion by Marks , second by Enrooth to reduce the valuation on the properties 43 located at 2908 Anthony Lane as recommended by the Hennepin County appraiser. 44 Motion carried unanimously 46 Izabelle Jesakow, 3316 Belden Drive; no change - 47 Motion by Marks, second by Wagner to accept the Hennepin County appraiser' s 48 recommendation for no change in valuation of the property located at 49 3316 Belden Drive. 30 Motion carried. unanimously • Reconvened Board of Review April 23, 1991 page 2 1 Alfred Kemper, 3413 33rd Avenue N.E. ; reduce from $108,800 to $104 ,900 • 2 Mr. Kemper had felt the value of $102,000 was more accurate but he accepted the value placed on it by the. Hennepin County appraiser. 4 Motion by Marks , second by Enrooth to accept the Hennepin County 5 appraiser' s valuation of the property at 3413 33rd Avenue N.E . 7 Motion carried unanimously P 9 Gary Carlson, 3104 32nd Avenue N.E. ; reduce from $81 ,200 to $79,400. 10 Motion by Fleming, second by Wagner to reduce the valuation on the property 11 located at 3104 32nd Avenue N.E. as recommended by the Hennepin County 12 appraiser. 3 Motion carried unanimously 15 15 Richard McKenney, 3304 Croft Drive; no change 17 Motion by Marks , second by Wagner to accept the Hennepin County appraiser' s 18 recommendation to make no change in the valuation of the property located 19 at 3304 Croft Drive. 20 21 Motion carried unanimously 22 �3 Frank Lang, Autumn Woods Apartments; This property was not viewed until 24 April 22nd and there is no information available at this_ point in time. 5 Motion by Enrooth, second by Marks to make no change in the valuation 2 25 on the Autumn Woods Apartments. 27 • 98 Motion carried unanimously �9 Bruce Holten, 2909 Rankin Road; no change 30 Motion by Marks, second by Wagner to make no change in the valuation 31� 3 of the property located at 2909 Rankin Road as recommended by the 33 Hennepin County appraiser. 34 35 Motion carried unanimously 36 Charlotte Olson, 3412 Skycroft Drive; reduce from $133,500 to $130, 100 37 38 Mrs. Olson stated she had expected a large reduction and noted that the 39 value of her property had increased $13,000 in three years. 30 Motion by Marks, second by Wagner to reduce the valuation on the property 41 located at 3412 Skycroft Drive as recommended by the Hennepin County 42 appraiser. ;3 44 (lotion carried unanimously 4b Dorothy Boarchardt, Mobile Home kE29; no change 46 'Mo'tion by-Mai=ks,second by` Fleming to make no change' in the Va-luation-- 48 of the mobile home at #E29 as recommended by the Hennepin County 49 appraiser. 50 Motion carried unanimously Reconvened Board of Review April 23, 1991 Page 3 1 Mayor Ranallo read a letter received from Jake Cadwallader, Property 2 Manager of Real Property Management Company, regarding properties located at 2938 and 3004 Old Highway 8 which are fourplexes. He is 4 requesting consideration for value reduction. 5 Mr. Becken advised that this property owner can be considered as having appeared at the Board of Review and can come before the Board of P Equalization. The City Manager noted that this property owner is 9 requesting an analysis done on the basis of income. 10 11 Motion by Marks, second by Enrooth to add the properties located at 12 2938 and 3004 Old Highway 8 as having: appeared at the Board of Review 13 and secure the owner 's right to appear at the Board of Equalization. !N 15 Motion carried unanimously 16 17 David Jacobson, 3336 Highcrest Road , had sent a letter to the Board of 18 Review held on April 9, 1991 . The City Manager stated that Mr. Jacobson 19 was requesting acknowledgement of his letter having been received and 20 was not requesting a property reviewal . 21 22 Mr. Becken advised that appointments to appear at the Board of Equalization 23 should be made by June 10th as the Board will be meeting for two weeks 24 starting June l7th. Each property owner who will be appearing will- be 5 allotted ten minutes to present his/her information regarding the value 2 • 25 of the property. He noted that all property owners who have appeared 27 at the City's Board of Review have been advised of the Findings of 98 the Hennepin County appraiser of the value of their property. This �9 advisory letter also explains how their value can be appealed at the 30 Board of Equalization. The Ci.ty Manager was requested to notify those 31 property owners who had attended the April 9th Board of Review and 32 were not present at this Reconvened Board of Review as to the process. 33 Doug Jones explained that a property owner can apply for an abatement 34 which must be done by May 15th. Mr. Becken advised that an abatement 35 can correct an erroneous value from a previous year. 36 37 38 ADJOURNMENT 39 4 0 Motion by Marks, second by Wagner to adjourn the meeting at 7: 10 p.m. . 41 42 1,3 Motion carried unanimously 44 Respectfully submitted, LS ' 46 Jo-Anne Student, Council Secretary 47 48 Mayor Clarence Ranallo 49 ATTEST: 50 City Clerk ST. ANTHONY CITY COUNCIL 2 REGULAR COUNCIL MEETING 4 5 APRIL 23 , 1991 V .7 P 1 . PLEDGE OF ALLEGIANCE/CALL TO ORDER 10 The meeting was called to order by Mayor Ranallo and he led the 11 Pledge of Allegiance. 12 13 2. ROLL CALL i4 15 Present : Mayor Ranallo, Councilmembers Enrooth , Marks, Fleming and 16 Wagner 17 18 Staff Present: City Manager Tom Burt 19 20 3. APPROVAL OF APRIL 23 , 1991 COUNCIL AGENDA 21 22 Motion by Wagner, second by Marks to approve the agenda for the April 23 23, 1991 Council Meeting. 24 25 Motion carried unanimously • 26 27 4 . APPROVAL OF APRIL 9, 1991 COUNCIL MEETING MINUTES 28 �9 Motion by Marks, second by Enrooth to approve the minutes of the April 30 9, 1991 Council Meeting with the following corrections : 31 32 page 6, lines 34 b 35: Delete the words "creating a topography map" 33 and "both" and insert the wcrd "analysis" 34 and delete "and District #P 35 page 7, line 3: Add before "Construction" the word "Road" and add to 36 the end of the line the word "study'' 37 Motion carried unanimously 39 40 41 Request for Permission to Sell Onions 42 Councilmember Wagner is requesting permission for the Shriners to sell 43 Vandalia onions on May 4th in the -City. The proceeds from this sale 44 will be used for the Burn Unit and the Crippled Children' s Hospital . 6r, . .__46 Motion by.._Ma.rks,.. second b_y, Rana.l;l.o to approve the Shriner' s request to 47 sell onions in the City on May 4th. 48 49 Roll call : Enrooth, Marks , Fleming, Ranallo - aye 50 Wagner - abstain • Regular Council Meeting April 23., 1991 page 2 _ 1 Motion carries • 2 5. LICENSES/PERMITS/PETITIONS 4 5 General Contractors Motion by Marks , second by. Enrooth to approve licenses for the following 7 contractors: R 9 Dalco Roofing b Sheet Metal , Inc. , Plymouth, Mn. 10 Nedegaard Construction Company, Inc. , Coon Rapids, Mn. 11 Milton L. Johnson Roofing b Sheet Metal Co. , Minneapolis, Mn. 12 Rein Builders, Inc. , St. Paul , fin. 13 Rick' s Roofing 6 Siding , New Brighton, Mn. IM Motion ion carried unanimously 16 17 Amusement Devices 18 Motion by Enrooth, second by Ranallo to approve the license for amusement 19 devices for C .D.L. , Champlin , Mn. 20 21 The City Manager advised he thinks this firm was the company which pur- 22 chased the Fun Center from Mr. Vados. The Council approved the request 23 subject to it being requested by the. Fun Center. 24 25 6. PRESENTATION OF CLAIMS 26 •27 A. Rieke Carroll Muller Associates , Inc. 28 Motion by Marks, second by Wagner to approve payment of the claim in 29 the amount of $725.38 to Rieke Carroll Muller Associates , Inc. for 30 professional services- rendered from February 24 , 1991 to March 30, 31 1991 for Well House #3• 32 33 Motion carried unanimously 34 35 B. Calgon Carbon Corporation 36 Motion by Marks, second by Wagner to approve, payment of the claim in 37 the amount of $95,489.00 to Calgon Carbon Corporation. 38 39 Motion carried unanimously 40 41 C. Maier Stewart Corporation 42 Motion by. Wagner, second by Enrooth to approve payment of the claim in 43 the amount of $596.81 to Maier Stewart Corporation for engineering services 44 rendered from December 30, 1990 through February 2, 1991 . bS 46 _ Motion carried unanimously 47 48 D. Verified Claims 49 Motion by Marks, second by Fleming to approve payment of the Verified 50 Claims for the Accounts Payable. • Regular Council Meeting April 23, 1991 page 3 • 1 Motion carried unanimously 2 ' 7. REPORTS 4 5 A. Council Reports y 7 Report of Councilmember Wagner P Councilmember Wagner gave a status report on the City' s participation 9 in the Special Olympics. He will be in contact with the City which is 10 being hosted by St . Anthony. He will invite the athletes to visit the 11' City if possible and make arrangements for souvenirs to be given to 12 the athletes . 13 i4 Apache Plaza is presently installing a garden center.. Councilmember 15 Wagner noted that the Health Fair held at the Plaza recently was very 16 successful as was the Pine Box Derby. He felt these activites were 17 very positive and were encouraging for the Plaza. 18 19 Mayor Ranallo advised he has received calls from residents across from 20 Apache Plaza expressing concern with a "hut" and he inquired what this 21 structure was supposed to be . The City Manager felt the City staff had 22 been misled when the structure was requested that it should have an 23 accessory use designation. He will contact the owners regarding the 24 need for a conditional use permit. 25 • 26 Report of Councilmember Fleming 27 Councilmember Fleming attended the reception for retiring Officer Bill 28 Ferguson. She presented the award for the twenty-six year employee. 29 30 Report of Councilmember Marks 31 Councilmember Marks had nothing to report at this time. 32 33 Report of Councilmember Enrooth 34 Councilmember Enrooth received photos of the Recycling Center from _Sue 35 VanderHeyden. He noted that there are tires left at the Center each 36 week and there is broken glass. He felt the appearance .of the Center 37 is getting worse. 38 39 Councilmember Enrooth expressed concern with the amount of funding 40 the Center is requiring each year and felt serious consideration should 41 be given to continuing its use. He recommended that the bin be locked. 42 - 43 Mayor Ranallo has noticed that large pieces of furniture are being left 44 at the Recycling Center and it costs the City to have these items re- 4S moved. He suggested that it be open only during certain hours. 46 47 The City Manager advised that the gate is open during the week as 48 vehicles from the Public Works Department use this area for access. 49 This facilitates dumping all week long by residents as well as non- 50 residents. He will contact the Public Works Director regarding changing • Regular Council Meeting April 23, 1991 page 4 1 the location of the Center. He also felt that hiring someone to work • 2 at the Center should be considered. Mayor Ranallo suggested this may be an opportunity to use volunteers. 4 5 Doug Jones, a resident of the City, felt rubbish removal should include a recycling charge. He stated his experience with a rubbish hauler. The 7 Mayor felt the City did not want to get into a billing responsibility R for rubbish hauling. Mr. Jones felt that recycling should be mandatory. 9 He suggested that one hauler could be responsible for picking up all 10 of the recyclables. 11 12 The City Manager stated that mandated recycling is coming very soon. 13 He felt that organized hauling in each city will be next . i4 15 Mayor Ranallo noted that "pooling" of rubbish is taking place in the 16 City already. He felt the Recycling Committee could make some sug- 17 gestions on this issue. 18 19 Report of Mayor Ranallo 20 Mayor Ranallo attended the 25th Anniversary Celebration of the Lions 21 Club. He presented a plaque to the organization from the City. He 22 was amazed at all of the activities this organization participated in 23 as well as the fundraising which was done that benefitted the City and 24 its residents. He noted there is a need for more members as the Lions 25 Club presently has eighteen members. The meetings are on the second and 26 fourth Tuesdays of each .month. 27 28 The Mayor received a letter from the Tri-City American Legion requesting 29 the Council to authorize participation in the Legion' s Fourth of July 30 Celebration in New Brighton. He requested members of the Council to give 31 this request some thought. 32 33 The Mayor' s preference is to have some celebration in St . Anthony. He 34 requested this be an agenda item at the next Council work session. 35 36 B. Report of the City Manager 37 38 a. Status of Filtration Plant 39 The City Manager thanked the Councilmembers who attended the GAC 4 0 ceremony. 41 42 Congressman Sabo' s office staff have contacted the City Manager re- 43 garding their willingness to help with EPA. EPA had contacted the 44 Congressman' s office and advised that the City has a "fully protected bS system." The staff is aware that the City is not accepting the system 46 and will gather more information on the City' s behalf. The faci.lity - - -- 47 still belongs to the MPCA. Senator Durenberger's office had expressed 48 a willingness to be of any help necessary to the City. Senator Marty's 49 staff has also been advised of the situation. 50 Regular Council Meeting April 23, 1991 page 5 • 1 The City Manager stated to all interested parties that the City' s 2 residents expect and trust a fully protected system. He noted that if one of the pumps were not in use the pumping capacity of 4 the system would be reduced by two-thirds. Sprinkling bans are 5 anticipated for this summer. Presently, there is no backup. Y 7 A thank you letter has been sent to Congressman Sabo for his well wishes which P his staff who had attended the dedication conveyed to the City. 9 10 b. Stop Sign at 29th Avenue and Crestview 11 A letter was sent to residents in the- area of this stop sign inquiring 12 if they held any opinion regarding the disposition of the sign. No 13 responses were received but it was felt that it may be prudent to i4 leave the sign in its present location. 15 16 c. Assistant to the City Manager's Position Vacancy 17 The City Manager stated that Sue VanderHeyden will be missed. In light 18 of the State' s financial problems the City Manager is recommending that 19 the position be filled by an intern at an hourly rate without benefits. 20 He feels the position is important and that approximately eighty percent 21 of the tasks will focus on recycling. 22 23 Mayor Ranallo recognized the need to be conservative with finances and 24 noted that the -City has already reduced the work force by eliminating 25 one police officer position and one public works position. 26 27 8. PUBLIC HEARINGS 28 29 A. Allocation of Community Development Block Grant Funds 30 The Public Hearing was opened at : 10 p.m. . It was scheduled for 31 7:45 but no one was in attendance for this issue so it was not 32 affected by the hearing opening later. 34 The public hearing is on the housing and community development needs 35 of the City. The Statement of Objectives consists of seven program 36 areas. The City Manager reviewed the program areas and the funds 37 which will be used for these programs. 39 Motion by Marks, second by Enrooth to close the public hearing at .40 8: 12 p.m. . 41 42 Motion carried unanimously J,3 44 Adoption of Resolution No. 91 -023 be Motion by Marks, second by Wagner to adopt Resolution No. 91-023 being 46 -a__reso.l ut i.on .approving.-proposed program for Year V1 I Urban Hennep i n 47 County Community Development Block Grant funds and authorizing its 48 submittal . 49 50 Motion carried unanimously Regular Council Meeting April 23, 1991 page 6 - 1 •2 9. NEW BUSINESS A. Resolution No. 91 -024; Re: Police Union Agreement for 1992 Motion by Marks, second by Fleming to adopt Resolution No. 91-024 ; being a resolution ratifying the 1992 agreement between the City L of St. Anthony and American Federation of State , County, and P Municipal Employees (AFSCME) -Council 14, Local 57, representing 9 St. Anthony Police Department employees . 1C 11 Motion carried unanimously 12 13 B. Resolution No. 91 -025; Re: Ramsey County Recycling Expansion Grant IM 5 Agreement 15 Motion by Marks, second by Enrooth to adopt Resolution No. 91-025 17 being a resolution approving the Ramsey County Recycling Expansion 18 Grant Program. 19 Motion carried unanimously 20 21 C. Sidewalk Petition 22 Mayor Ranallo had received a petition from residents on Silver Lane �3 for the installation of a sidewalk on the south side of that street. 24 The City Manager advised that the owners of the Equinox Apartments 25 have stated they will not support the installation of the sidewalk. 26 The assessment for these apartments would be approximately $14,000. 27 78 The City Manager advised that to assess a benefitted property owner �9 the City has to prove that the property will be benefitted in property 30 value in the same amount as the assessment . He suggested that an 31 appraiser could be hired to prove the benefit of this sidewalk. The 32 appraiser services will add to the cost of the project which is esti- 33 mated to be approximately $27,000. If benefit is not proven the City would be responsible for a portion of the costs on the southside 35 of the project. 36 37 Doug Jones stated that the Sports Boosters have indicated a willingness 38 to participate in the costs for material for the project. 39 40 Mayor Ranallo advised that pull tab monies cannot be used to benefit 41 one area. These funds must be used to benefit all . He requested the 42 City Manager to contact the State Charitable Gambling Board regarding 43 this matter. The City Manager will also contact Ramsey County to inquire 44 if C.D.B.G. funds for this purpose. bg 46 Motion by Marks, second by Wagner to receive the peti-tion and place. i-t. 47 on file and to direct the City Manager to contact an appraiser. 48 49 Motion carried unanimously 50 • Regular Council Meeting April 23, 1991 page 7 1 The City Manager suggested a preliminary assessment hearing be 2 scheduled for this project when the project estimates are received. 4 .10. UNFINISHED BUSINESS 5 L A. Review of Chapters 8 (Streets, Sidewalks and Weed Control ) ; 9 -,r (Traffic Regulations) ; 14 (Signs) ; and, 15 (Subdivision Regulations) R for Ordinance Recodification �9 Councilmember Marks noted that bicyclists are subject to all of the 11 rules of operation as are motorists. He felt enforcement was a big 12 problem. 13 i4 Councilmember Wagner expressed concern with travel by snowmobiles. 15 He questioned if this were allowd within the City limits. The City 16 Manager responded that presently this cannot be prohibited and now 17 is the time to address the issue. 18 19 Mayor Ranallo requested that the Police Chief research the matter. 20 21 Councilmember Wagner inquired if there were a termination date on permits. 22 Councilmember Marks felt this may be addressed in State Statute and �3 requested that the City Attorney be contacted on this matter. 24 25 11 . ADJOURNMENT 26 27 Motion by Enrooth, second by Fleming to adjourn the meeting at 8:45 28 p.m. . 3pMotion carried unanimously 31 32 33 Respectfully submitted, 54 35 Jo-Anne Student, Council Secretary 36 37 38 Mayor Clarence Ranallo 39 40 41 42 ATTEST: 43 City Clerk 4+ bS 46 47 48 49 50 . aioffla teho n. DA TE : A P PR OVA L = May 8, 1991 TO : Mayor and Councilmembers FROM : Judy Monson, License Clerk I TEM : LICENSE/PERMITS FOR COUNCIL APPROVAL: General Contractors: ' Twintown Remode.lers, Inc. , Mp.ls. , MN _ D. Kelly Heath Co. , St. Paul, MN 55119 Pro-Exteriors , Crystal, MN Advanced Design, . Inc. , St. Anthony, MN Norsk Concrete Construction, Inc. , Moundsview, MN Midwest Fence & Manufacturing Co. , Inc. Carlson - LaVine, Inc. , Minneapolis , MN Advanced Home Products , Inc. , Minneapolis, MN Asphalt Special Co. , ACT Specialities Co. , Lakeland, MN Green Masters Industries, Inc. ,505 Highway 169 , Plymouth, MN Heating License: Anderson Heating & Air Conditioning, Columbia Heights, MN. Garbage Haulers License: Larry's Quality Sanitation, Ramsey, MN. Nitti Disposal, Inc. , Eagan, MN Juke Box License : Bono's Malt Shop STUART J . BONNIWELL Cey- ified Priblic .Accom7taya 7101 York Avenue South Minneapolis, Minnesota 55435 (612) 921-3354 May 8, 1991 Mr. Roger A. Larson, Sr. Finance Director City of St. Anthony 3301 Silver Lake Road St. Anthony, Minnesota 55418 Professional Services Rendered: Progress billing in connection with the audit and preparation of financial report of the City of St. Anthony for the year ended December -31 , 1990 . $7,500.00 Barr Engln�er ng Com;;a.ny 7803 Glenroy Road Minneapolis,MN 55439.3123 6121830.0555 6121835-0186(Facsimile) Page I 1 Statement $ 7040-3360 Project $ 23/27-467 April 16, 1991 City Of St. Anthony 3301 Silver Lake Road Minneapolis, MN 55418 Statement of Account with BARR ENGINEERING CO. For professional services during the period of November 4, 1990 through March 30, 1991 Relating to evaluation of outfall capacity along CSAH 88. Dennis E. Palmer, Professional Engineer 15.7 hours @ $100.00 per hour . . . . . . . . $ 1,570.00 Technical 0.4 hours @ $55.00 per hour . . . . . . . $ 22.00 Expenses Telephone . . . . . . . . . . . . . . . . $ 2.50 Mileage . . . . . . . . . . . . . . . $ 22.50 a�oc�acoaaaa� Total Payable $ 1,617.00 Z34 -�------- -------- Dennis E. Palmer DORSEY & WHIT\EY P.0. BOX Viso (T.■ 1lcn n liu pion Na-41•C2:333") STATEN',FNT OF ACCOUNT FOR PROFI:.SSIONAL SERVICES Client: 178820 St. Anthony City Attn: Mr. Thomas D. Burt April 30, 1991 3301 Silver Lake Road Minneapolis, ?-LN 55418 For Legal Services Rendered From September 1, 1990 Through March 31, 1991 Codification of Ordinances Telephone conferences regarding codification of additional sections; revise additional chapters; draft additional Code sections; draft Chapter 8 regarding streets, sidewalks and weed control; redraft Chapters 8 through 15; finalize Chapters 8, 9, 14, and 15; letter to T. Burt; meet with T. Burt and S. VanderHeyden. Total For Services $2,826.25 Plus Disbursements Per Attached Sheet $97.85 Total This Statement $2,924.10 WRS/615 In addition-to direct costs and out=of-pocket expenditures.service charges may include indirect costs. Disbursements and service charges,which either have not been recei%-cd or processed,will appear on a later statement. PAYMENT DUE UPON RECEIPT LAWOFFICES STATEMENT OF ACCOUNT HANCE & LEVAHN SAINT ANTHONY NATIONAL BANK BUILDING.SUITE 200 DATE: May 1, 1991 2401 LOWRY AVENUE NORTHEAST MINNEAPOLIS,MINNESOTA 55A18 Thomas D. Burt, City Administrator PLEASE DETACH AND RETURN THIS City of St. Anthony PORTION WITH YOUR REMITTANCE. 3301 Silver Lake :Road St. Anthony, Minnesota 55418 (M) a AMOUNT REMITTED $ RE: Village Prosecutions DATE DESCRIPTION • $ 0.00 PAYMENTS CREDITS & ACCOUNT ADJUSTMENTS UNPAID PREVIOUS BALANCE FINANCE CHARGE PROFESSIONAL SERVICES Legal services rendered for the month of May, 1991, relative to St: Anthony prosecutions. 2,400.00 CURRENT FEES NEW BALANCE DUE- F2,400. F NIMUM PAYMENT DUE $ N Accounts due upon presentment of statement.A FINANCE CHARGE at a periodic rate of 1-1/3%per month,equaling an ANNUAL PERCENTAGE RATE of 16%will be imposed upon any Unpaid Previous Balance greater than $1.00,with a minimum FINANCE CHARGE of$0.50.The FINANCE CHARGE is applied to the outstanding balance at the end of each billing cycle,if the balance for that billing cycle was not paid in full within 30 days. NOTICE: See reverse side for important information. HANCE & LEVAHN Invoice 237987 �s DORSFY & N1{HIT\EY � t'.PT.f P.Per I•.' -Ui•r. !'wr.r r..lU..l (r.w q.P.l r.. - 6// 1`.(). liftX ]Gso >11\�}.:�1'OI_Iti.\11\\},v(.)T-\ .i33ii0•!t�1!� (7.■ Id—tihcutiee No. 41-0::3337) STATEMENT OF ACCOI NT FOR PROFESSIONAL SERVICES Client: 178820 St. Anthony City Attn: Mr. Thomas D. Burt April 30, 1991 3301 Silver Lake Road Minneapolis, MN 55418 For Legal Services Rendered From March 1, 1991 Through March 31, 1991 Pirino Property 180.00 Hepatitis B Vaccinations 195.00 EPA Requirements for Storm Water Drainage 437.50 Water Treatment Facility 312.50 Review agenda materials and minutes; discussions with City Manager 125.00 Total For Services $1,250.00 Plus Disbursements Per Attached Sheet $17.05 Total This Statement $1,267.05 WRS/615 N In addition to direct costs and out-of-pocket expenditures,service charges may include indirect costs. Disbursements and service charges,which either have not been received or processed.Will appear on a later statement. PAYMENT DUE UPON RECEIPT DORSET & WHIT\E1' P.0. BOX M INN EAI,OI.IN.M INN lacrl'.x :VWS 1-9�0!) ((;1—1)340-_600 (-... l6 rc a 11(.t-n No. 11-02:3337) �J VI LNII NT OF ACCOI N i FOR PROFESSIO\aL S RVIC ES Client: 178820 St. Anthony City Attn: Mr. Thomas D. Burt April 30, 1991 3301 Silver Lake Road Minneapolis, MN 55418 For Legal Services Rendered Through 03/31/91 Foss Road Lift Station (NewMech Companies) Conference with S. Champlin regarding status; attempt to contact G. Duffy; conference with G. Duffy; work on drafting complaint against NewMech; work on draft complaint; draft complaint; conference with 3. Lavik; conference with S. Champlin regarding status; revise complaint; prepare for service of complaint; draft letter to G. Duffy; draft complaint; letter to G. Duffy; conference with B. Lavik; review file; revise complaint; conference with B. Lavik regarding project; conference with Secretary of State regarding registered address; telephone conference with Ramsey County Sheriff regarding service of summons and complaint on NewMech Companies; prepare letter to Sheriff to accompany documents; arrange for service; conference with S. Champlin regarding complaint; revise complaint; arrange for service of complaint; conference with T. Burt regarding same; letter to T. Burt regarding same; telephone conference with B. Lavik; draft complaint. Total For Services $1,577.25 Plus Disbursements Per Attached Sheet $47.28 Total This Statement $1,624.53 WRS/615 in addition to direct costs and out-of-pocket expenditures,service charges may include indirect costs. Disbursements and service charges,which either have not been received or processed,will appear on a later statcment. PAYMENT DUE UPON RECEIPT 21430 EW CHEVROLET COMPANY, INC. G�0 S BU1�OSV��I!S 1200 West 141 st St. Phone: 435-8501 BURNSVILLE. MINNESOTA 55337 DATE 08 MAY 1091 SOLD TO: CITY OF ST ANTHONY INVOICE NO. 788-7654 ADDRESS 3301 SILVER LAKE ROAD ST ANTHONY MN 55418 42154 CUST. NO. STOCK NO. YEAR-MAKE MODEL NEW OR SERIAL NO. KEY NO. SALESMAN USED 914158 91 CAPR 53U9 8565 ' 216788 CHEV 4 DR SDN NEW 1G16L5377MR13323 53U9 INSURANCE COVERAGE INCLUDES PRICE OF CAR 12742.0 FIRE AND THEFT 13 PUBLIC LIABILITY - AMT. FREIGHT AND HANDLING 1 0 COLLISION - AMT. DEDUCT. 0 PROPERTY DAMAGE - AMT. OPTIONAL EQUIP. g ACCESS. OPTIONAL EQUIPMENT AND ACCESSORIES GROUP DESCRIPTION PRICE PO# 2693 SALES TAX LICENSE AND TITLE TOTAL CASH PRICE 12742.00 FINANCING INSURANCE TOTAL TIME PRICE SETTLEMENT. DEPOSIT CASH ON DELIVERY USED CAR:- TYPE SERIAL NO. ENGINE NO. PAYMENTS: 12742.0 TOTAL 12742,0 ALWAYS SHOW SERIAL. ENGINE AND KEY NUMBERS 585 12530-1.2 NORICK OKLAIIOMA CITY PRINIEU IN U.S.A. _ 21431 CHEVROLET COMPANY, INC. �� S 1200 West 141st St. Phone: 435-8501 � S Burwvlll! BURNSVILLE, MINNESOTA 55337 DATE 08 MAY 1991 SOLD TO: CITY OF ST ANTHONY INVOICE NO. 788-7654 ADDRESS 3301 SILVER LAKE ROAD ST ANTHONY MN 55418 42155 CUST. NO. STOCK NO. YEAR-MAKE MODEL NEW On SERIAL NO. KEY NO. SALESMAN USED 91 CAPR 53U9 56 ' 216788 CHEV 4 DR SDN NEW 1G1aL5372MR13407 53U9 INSURANCE COVERAGE INCLUDES PRICE OF CAR 12742.0 FIRE AND THEFT O PUBLIC LIABILITY - AMT. FREIGHT AND HANDLING COLLISION - AMT. DEDUCT. O PROPERTY DAMAGE - AMT. OPTIONAL EQUIP. 9 ACCESS. OPTIONAL EQUIPMENT AND ACCESSORIES GROUP DESCRIPTION PRICE PO# 2693 SALES TAX LICENSE AND TITLE TOTAL CASH PRICE 12742.00 FINANCING INSURANCE TOTAL TIME PRICE SETTLEMENT. DEPOSIT CASH ON DELIVERY USED CAR:- TYPE SERIAL NO. ENGINE NO. PAYMENTS: 12742.0 TOTAL 12742.0 ALWAYS SHOW SERIAL. ENGINE AND KEY NUMBERS 585-12530 1 2 NOAICK OKLAHOMA CITY PRINTED IN U.S.A. --BRC-FINANCIAL--SYSTEM ---- - -- - - - -- - - - ------- ----- -- -ST--_ANTHONY ..VILLAGF 05/07/91 13 : 16 Check Register GL540R-VO4 . 07 PAGE WCHECK#--DATE- --AMOUNT-.-.-._. FIRS FIRSTAR ST. ANTHONY CHECKING , 000237 A T & T COMMUNICATION - 1016 05/15/91 48 . 13 - 000235 A T & T INFORMATION SYST 1017 05/15/91 41 . 33 000058 - iIRSIGNAL-INC -1018-05/..15/-9.1 32.. 30 -. 000104 ALMAC PLASTICS INC 1019 05/15/91 49 . 12 000120 AMERICAN LINEN 1020 05/15/91 14 . 84 0001-35 AMERICAN--RISK-SERVICES I -----1021--05/.15/.91..____._-_-3?7_._0.0_-__-___ 005201 AMERICAN STORES 1022 05/15/91 18.46 :: 000115 AMES PHOTO FINISH 1023 05/15/91 17 . 63 000-2-70-CANYON-DATA-SYSTEMS 1024-05/-15/01 &.9.5-0.0-- 000310 BATTERY & TIRE WHSE 1025 05/15/91. 5 .47 005116 CABLE TV NORTH CENTRAL 1026 05/15/91 8 . 45 0023-35 EELLULAR-ONE - -1027-05/15/91 ::.008124 CENTURY SIGN/ADV... SPEC. 1028 05/15/91 243 .80 005029 CLEVELAND COTTON PRODUCT 1029 05/15/91 145 .69 000685 -------COAST-TO-COAST---_-- __ . ._ ._. _. _. ...._.-..- _ ._- 1030 -05/15/91 - - -- --- 105 .49 _ _.--_.. 000690 COLOR TILE 1031 05/15/91 72 . 60 0006.25 COPY DUPL PRODUCTS 1032 05/15/91 150 . 00 -------007178 D-ROCK CENTER & SMALL- EN - - - -1033 -05/15/91 ------ -- -- .----- . 4 . 85 008011 DIRECTOR/PROP TAXATION 1034 05/15/91 1 4 . 00 005048 DPC INDUSTRIES INC 1035 05/15/91 .630 . 60 007222-- ED-DEVELOPMENT-SYS/REC--- 08126 ERNIES CATERING SERVICE 1037 05/15/91 550 . 53 000920 FEED RITE CONTROLS 1038 05/15/91 982 . 00 ----001080----FRATTALLONES -HARDWARE-- ---------------1039 - 05/15/91 - -- -- ---- .-7 . 38 . ..-.. _.... 001030 G & K SERVICES 1040 05/15/91 146 . 64 008120 GENERAL OFFICE PRODUCTS 1041 05/15/91 500 . 00 003-245 GLENWOOD INGLEWOOD '042-05/-15/91 32.40-- 001155 GLIDDEN PAINT 1043 05/15/91 132 . 00 001200 GOPHER BEARING 1044 05/15/91 1.2 . 96 ----001230 --------GOPHER-STATE ONE CALL- - - - - -- - ---1045 -05/15/91 - 25 .00 . 007057 GOPHER WELDING SUPPLY 1046 05/15/91 19. 11 008127 GRAFIX SHOPPE 1047 05/15/91 983 .00 --- .-06297 ----HARRIETTE-HUNT- --- - - - -- 1048 -05/15/91 - - --- 50.00.-_. 008088 HAWK ENTERPRISES INC 1049 05/15/91 49. 88 001505 HENN CO SHEFIFF 1050 05/15/91 40 . 00 ---._--001501- --HENNEPIN -COUNTY-TREASURE -- - - _1051 05/15/91------ ---13 .00 - . _ 005017 HENNEPIN COUNTY TREASURE 1052 05/15/91 2,460. 00 008013 I C M A 1053 05/15/91 19 . 30 -- 008223----ICMA------- ---- - - --- - -- - -1054 -05/15/91-------------- 382.50 008125 INTOXIMETERS, INC. 1055 05/15/91 48 . 00 008107 JOHNSON/CAROL 1056 05/15/91 13 . 75 - 008068 - ---JWP -INFORMATION- SYSTEMS - - - .1057 - 05/15/91 - - - --104 . 001810 KIWANIS CLUB 1058 05/15/91 101 .00 001980 LEAGUE OF MN CITIES 1059 05/15/91 70. 00 ----002040 -----LILLIE SUBURBAN -NEW SPAPE ----- - --1060--05/15/91 -----------.---- -79. 62 . 002125 MALENICK/JOHN 1061 05/15/91 49 . 99 � 002130 MAMA 1062 05/15/91 12 . 00 - 004255 - MB SUPPLY COMPANY - - - ----1063--05/15/91-_ ---14 . 12 _ BRC-FINANCIAL--SYSTEM- ----------._.._._.. .... ____ __-_____-._. _____.___._-___--.._--ST. -ANTHONY-VI LLAG - 05/07/91 13 : 16 Check Register GL540R-VO4 .07 PAGE BANK VENDOR - - - - CHECK# DATE AMOUNT FIRS FIRSTAR ST. ANTHONY CHECKING 002200 MEDICAL OXYGEN EQUIPMENT 1064 05/15/91 1 . 98 002280 MIDWEST ASPHALT CORP 1065 05/15/91 343.86 000045--MIDWEST-BUSINESS-PRODUGT 1066-05/15./91 9.6-7-68. 002380 MINNEGASCO INC 1067 05/15/91 1 , 138 . 86 -- 007159 NAPA AUTO PARTS 1068 05/15/91 11 . 13 - -002515 -NATIONAL BUSINESS FURNIT 1069 05/15/91 . _- . _._._._.__ 217 .00 = 002520 NATIONAL MOWER CO 1070 05/15/91 325 . 10 002680 NORTHERN STATES POWER ; ;: : 1071 05/15/91 6 , 683 . 36 007-043—NORTHERN--SPATES-POWER 072--05%15/-91 -2.-6-1— 005168 OHL/JOHN 1073 05/15/91 15 .00 71 007217 PARTS PLUS 1074 05/15/91 18.42 PERA ..--- --- 10-75-05/-15/-91 5328 002980 PROFESSIONAL PROCESSING . : -.. 1076 -05/15/91 .,. .. .. .. . ..732 .97 005098 .. _ R ..M -A..A 1077 05/15/91 10.00 _ 40-5'x-1-1 itANAL-LO/E-LARENC-E- 1078- 05/-15/91- =-=-.-.34. 59 003100 ROSEDALE CHEVROLET 1079 05/15/91 5 . 14 003315 SERCO LABORATORIES 1080 05/15/91 225 . 00 003460--SPRING-LAKE--PARK--LUMBER -1081--05/-15/-9 1- 523 . 24____-..___ =- 003485 ST TREAS .SURP PROP FUND 1082 05/15/91 45 .00 007180 STAC MFG & DIST 1083 05/15/91 7 .00 4-70-=SrPA14DARD-REG-ISTER--GOMPAN 1 094-05-/-1 A9 -,J-7A- 005163 STANDARD SPRING COMPANY 1085 05/15/91 25 .00 . 06298 STEVEN KNOWLTON 1086 05/15/91 50. 00 :---003490--- STREICHER'-S------- --- - -----1087-05/-15/91---- --220 . 96 003560 TRACY PRINTING 1088 05/15/91 696_.00 _ 008010 UNIFORMS UNLIMITED 1089 .05/15/91 1 , 270 . 05 002700—US-WEST-£OMMUNICAT-I-ONS 10 90-05115-/-9-1 5-12 83 003710 VAN 0 LITE INC 1091 05/15/91 19 .08 003502 VANDERHEYDEN/SUE 1092 05/15/91 79. 72 - 003700..-----VIKING-INDUSTRIAL -CENTER- -- -1093--05/-15/91 --_91 . 1 _. 003720 W W GENERATOR REBUILDERS 1094 05/15/91 54 .43 003725 WALTER HAMMOND COMPANY 1095 05/15/91 116 . 88 - --003735----WASTE MGMT ---- - - - 1096_05/15/_91_ -1.15....28 007154 WYCHOR II/JAMES J 1097 05/15/91 53 . 28 ------ --FIRS TAR-ST.--AN THONY CHECKING------------ -----------------------24 ,678..91 . .. ain t • HE e DATE : APPROVAL : April 12 , 1991 TO : Planning Commission Members FROM : Susan VanderHeyden, Assistant to the City Manager ITEM REZONING PETITION Forrest and Marty Harstad of Harstad Companies, 1900 Silver Lake Road, New Brighton, are petitioning the City to rezone the property at 3816 Foss Road, from Light Industrial to R-4 Multiple Family Residence District. Harstad's had previously petitioned the Planning Commission and City Council for a rezoning from LI to R-3 Townhomes. This request was approved on October 23, 1990. However, there was a problem concerning capacity of the proposed number of units for the lot. City staff has been working with the Harstad's to try to resolve this issue. To meet the capacity requirements of the zoning ordinance, the Harstad's would have had to reduce the proposed development to such an extent that it would not have been feasible. Therefore, the Harstad's have changed the proposed development to 2 eight-plex condominiums which fit under the zoning district of R-4. The previous rezoning was to be allowed on the condition that the development occurred, therefore, the present request is from LI to R-4. Date / Fee . CITY OF ST. ANTHONY Petition for Rezoning Applicant c r<� �, ;-���- i r{�.i�—�. � Phone Address 11+oC' J f)_v.I Gig- G :,J Status of applicant (owner, buyer, lessee, etc. ) ?: :•ice-�� Le/)gal description of property proposed for rezoning A,-,o Street Address Presently zoned jZ -3 %,,., , ,,;�Z.- CW P:A% �;:f �✓,� �\ Proposed zoning change to • 1. Attach to this petition a statement as to why this zoning change is requested. 2 . If an entire parcel of land is proposed to be rezoned, submit with this petition a map or plat showing the land proposed to be rezoned and all lands within 350 feet of its boundaries . 3. If a portion of a larger parcel of land is proposed to be rezoned, submit with this petition a preliminary plat prepared in accordance with Sections 330: 00 through and including 330 :20 of the St. Anthony Code of Ordinances. Signature ,of Applicant G 7 -CJ Sign ure, of Owner other tha applicant) • 03 - 19- 91A * 250 . 00 �K ��'iTl CITY OF ST. ANTHONY NOTICE OF HEARING REZONING AND PRELIMINARY PLAT TO WHOM IT MAY CONCERN: Notice is hereby given that there will be a public hearing by the Planning Commission of the City of St. Anthony on Tuesday, April 16, 1991. Public Hearings are held in the Council Chambers of the City Hall, 3301 Silver Lake Road (enter northeast corner of the building). The Planning Commission will meet to: 7:36 P.2N1. - Consider a request by Forrest and Marty Harstad of Harstad Companies, 1900 Silver Lake Road, New Brighton, for a rezoning of 3816 Foss Road from LI (light industrial) to R-4 (multiple dwelling). 7:46 P.M. - Consider a request by Forrest and Marty Harstad of Harstad Companies, 1900 Silver Lake Road, New Brighton, for preliminary plat approval for a sixteen unit condominium development to be located at 3816 Foss Road and described as Mounds View Acres Second Addition: all of Lot 3, and the North half of Lot 4, Block 11. Anyone wishing to be heard Mth reference to the above matter %will be heard at said time and place. Questions regarding this matter may be referred to the City Manager, 789-8881. Susan VanderHeyden Assistant to the City Manager Publish: St. Anthony Bulletin April 3, 1991 • �E •� �C zGfr,�G 3�r6 r�ss 1��;_� �'(H'f S✓ ;�?-> �.� j�f %�v�i.�-�'.iSc Si�'GC C�:..IrJC.--�I.✓r v.-,S %O Z, 41•�771 ��l'7 V.��.� �JJ �iC�r'— �d�vS�r�r� iT> /r'-��-i c= /,l���y c✓�� I �I I • PLANNING COMMISSION l MINUTES. October 16. 1990 • 1 CITY OF ST. ANTHONY 2 PLANNING COMMISSION MINUTES 4 OCTOBER 16, 1990 5 6 The meeting was called to order at 7:30 p.m. with the Pledge of Allegiance 7 led by Chairman '%`adden. R 9 ROLL CALL 10 1 1 Present: Faust. Murphy, Hansen, ' Sadden, Brownell, Werenicz 12 Absent: Franzese 13 14 Also present: Susan VanderHeyden, Assistant to the City Manager 15 16 SEPTEMBER 18, 1990 PLANNING COMMISSION MINUTES 17 18 Page 1, line 44: delete ' Motion carried unanimously." 19 Motion by Brownell, second by Hansen to approve the minutes of the 20 September 18, 1990 Planning Commission minutes. 21 Ylotion carried unanimously. 23 24 COMMISSIONER FAUST TO REPRESENT PLANNING COMMISSION AT 25 OCTOBER 23. 1990 CITY COUNCIL MEETING. 26 27 Commissioner Faust will attend the neat Council meeting. 28 29 PUBLIC HEARINGS: 30 1 FORREST AND MARTY HARSTAD FOR REZONING REQUEST ,F1 32 33 The hearing was opened at 7:35 with no one present reporting failure to 34 receive the notice of hearing or objecting to its content. 35 36 Assistant to the City Manager VanderHeyden reported the area is zoned for 37 light industrial. The lot has R-3 zoned property and Light Industrial. The 38 - only-phone call staff-reeeived was frroar'a-woman 'hoping to have-some-type— - - - 39 of townhome put in that area. Proposal is to put two buildings with eight 40 toa-nhomes each. If rezoning is approved,. Harstad will have to come back 41 with the full detail plan. Right now just to consider rezoning. Staff feels it is 42 a reasonable request. 43 44 Commissioner Murphy asked if any type of a needs analysis had been done 45 -and how this type of decision would effect the tax base. - ° - PLANNING COMMISSION 2 MINUTES, Octobcr 16, 1990 1 • 2 VanderHe, den reported that a developer would do this type of analysis 3 usually before building. There is nothing standing Vacant. 4 5 Brownell asked if the townhomes are for owner occupancy, therefore being 6 homesteaded, or if they are going to be rental. 7 8 The developer reported that they will be owner occupied. 9 10 The application requires that a map be submitted showing the land proposed 11 to be rezoned and all lands within 350 feet of its boundaries. 12 13. VanderHeyden said that there are two sides light industrial and two sides 14 residential 15 16 Chairman Madden questioned whether traffic Foss Road has been studied 17 and indicated the traffic is already heavy on the 30 foot wide residential 18 street. 19 20 Madden pointed out that the building on the vest side of the site is using the 21 south side of their property as a junk yard; and he recommended the City • 22 look into the matter. 23 24 He suggested that there could be access from Chandler Drive as well as Foss 25 Road to help the traffic problem because Chandler is much wider. Madden 26 questioned whether rezoning guaranteed that townhomes would be on the 27 property. 28 29 It was not determined which zoning provides the City with the greater 30 amount of revenue.when developed. 31 32 VanderHeyden said that Harstad was in the process of buying the property. 33 34 'Murphy discussed the question of the site development, considering the lot 35 area per unit.. 36 37 Hansen said that the number and size of units should wait for future 38 discussion after the rezoning. 39 40 Faust questioned whether the two residential homes.that are in light 41 industrial are owner occupied and if there is a plan to move them or rezone: • 42 They could conceivably be resold and resold. 43 44 Public hearing opened at 7:51. 45 1 PLANNING COMMISSION MINUTES, October 16, 1990 1 Forrest Harstad presented blueprints, photos and diagrams of his proposal 2 for the patio tovwnhomes. Their engineer found no conflicts with variances. 3 He said the market value would vary betn-een $59,900 and $79,900. 4 5 Harstad confirmed that the plan is the same as one in Coon Rapids. 6 7 Bruce 0 Brien, president of Toa�nhomes of St. Anthony, said that he a1-as 8 concerned that the area not be for industrial use. He said the toa'nhome 9 proposal is mostly favorable. Questions to the developer are with regard to 10 fire lanes, single car garages, parking and the amount of land available. 11 - 12 Madden clarified that the hearing was to approve rezoning only. O'Brien 13 would like to see the property rezoned regardless of the developer. 14 15 Aleda Nfuller, secretary/treasurer of the group asked if there was any 16 consideration of a west exit. 17 18 Harstad pointed out that there may be a grading problem making it 19 physically impossible for change in the roads. 20 21 Muller also asked if there were individual drivenray s. • 22 23 Harstad said there were three driveways. 24 25 Hearing closed at 8:15 p.m. 26 27 Werenicz said that he favors the rezoning. 28 29 Madden expressed concern about the traffic flo',w. He commented that each 30 residence is responsible for fire or six trips on the street per day. Supports 31 rezoning with a strong recommendation for consideration of access from the 32 west on Chandler Drive which is more capable of handling the traffic. 34 Hansen favors the rezoning and said the traffic could be an issue with light 35 industrial. 36 37 Murphy inquired about the history of the property. City staff was unsure. 3R 39 Brownell moved to recommend approval of the request for rezoning the 40 property at 3816 Foss Road from industrial to R'): and recommend that the 41 approval not be granted and made final until such time as a final plat plan is • 42 approved by the City Council for the rezoning. We find that this would be 43 the best and highest use for the property at this time. 44 PLANNING COMMISSION 4 MINUTES, October 16, 1990 1 Madden seconded and offered an amendment that the developer and the 2 City be encouraged to cooperatively investigate an access from Chandler to 3 this land. Brownell accepted the amendment. ! 4 ?Motion carried unanimously. 5 6 MISCELLANEOUS: 7 8 Planning Institutes: 9 VanderHe`•den informed the Commissioners that the information for the 10 Planning Institutes mould be included in the neat packets and they are 11 encouraged to attend--January 26, Brooklyn Park and !'larch 29, Earle Brown 12 Institute. 13 14 Hansen and Madden were reminded that November 30 is the deadline for 15 applications for the Planning Commission. 16 17 Motion by Hansen, second by Brownell to adjourn at 8:30. 18 Motion carried unanimously. 19 20 Respectfully submitted, 21 22 Dorotby Fleming, 23 Commission Secretary Regular Council reefing 0 c-t.o e r--2 3, 1-5-15-0 - paSe Commissioner Faust was u in attendance re;reserlt ;r,g the Planning Co-r..ission. 2 He noted that the Planning CO-, '-,,i s 5 ion meeting minutes for Octo.er 116, 3 1990 were accurate. 4 5 1 . Herstad Companies , for 3.r26 Foss Road, rezoning request C While this request is only for rezoning at this time , members of the Planning 7 COMT.ission had expessed concerns for other facets Of this prop,;sed develop- a ment . It was noted that only one call had been received from a resident 9 who was concerned that this zoning be for residential developner.t. 10 11 Other concerns of the Coritissioners dealt with the units being cw.-,er/ 12 occupied and that another means of access be determined rather than It was noted that traffic on Fcss Road 13 being limited to jL;st Foss Road. include 14 is already heavy and there might be some traffic studies done to 15 Chandler Drive. 16 he ordinances will be reviewed by 17 Site development in relationship to the t be Is staff. CorTrissioner Faust stated that access on the west would nc 19 possible as Tracy Printing has a bjilding there and some of the area 20 is used by the Public Works Department and the Recycling Center. It was 21 noted that vehicular trips would decrease if this area is developed as 22 a residential area . Couricilmember Makowske inquired if the noise from 23 the City property could cause a problem. Co-=issioner Faust felt this 24 was unlikely and there was no concern expressed recarding the appearance 25 of this property. • 26 n interesting history. 27 Councilmember Marks recalled this area as having a n 28 He noted that although it was all zoned light industrial about twenty 29 years ago, it was being used in a residential manner. Some light irdvs- t trial a I was scattered b,.;t did not cause a problem ca!-Se Cf 30 red in the area W6 31 the type of businesses which are there. He stated that in this area is 32 Mirror Lake. which is sort of a residential centerpiece and there has been 33 a pathway put around it which is re-ularly used by residents from the area. 34 :ome phone calls requesting that this 35 Councilrr.e,-,.!>er Enrooth has received n the future. 36 R-3 zoning remain and not be considered for changing i 37 38 Mayor Ranallo stated a sirrilar situation developed at 33rd Avenue and 39 Stinson Boulevard where a property owner requested a residential zoning. 40 When the request was granted it was with the understanding that it would 41 not revert back to light industrial zoning even If this were to increase 42 the value of the property. 43 44 Motion by Enrooth, second by Wagner to follow the Planning Corrrission's C; recornendation which is to approve the request for rezoning for property at 3816 -Foss-.Road.-.fra.m .i.nduk�tr�i-aI to R-3; and -that the -approval- Is 46 47 granted and made final until such time as a final plat plan is approve d 48 by the City Counc I I for the rezoning. 49 50 An arnendment approved by the Planning Cor-,ni ss ion was not acted upon. Regular Co�r.ciI Meet irg 0cto�er 23, 1950 page 6 Motion carried uraninMusly 1 2 3 Forrest Farsted, the developer, showed the Council photos of other 4 similar developments his firm has completed. Councilr+em.er MakoMske 5 felt additional housing in this price range is quite excellent. G 7 a. Council Reports 6 None cf the Councilrner.. ers had reports. 9 10 Mayor Ranallo advised that the Village Fest Co-�;•ittee had held a Meeting 11 on Monday. October 22nd. 12 13 In view of the fact that only seven people attended the meting, some 14 expressed concern that the Village Fest would continue without m—re 15 com-munity and volunteer interest. The Mayor advised that another 16 meeting is scheduled for Noveml.:er 12th where officers and beardnem�ers 17 will be elected. 16 Chairperson, will contact co-raunity and civic 19 Tom Thorson, Village Fest 20 organizations as to their interest in having the festivities for oFe 21 or two days and whether they will financially support the Village Fest. 22 23 Mayor Ranallo inquired as to what the Councilnembers felt was the City's 24 role in the Village Fest retarding funding, seed norey and volunteers. 25 •26 Councilmem5er Enrocth advised that Tom Thorson may continue his involve.- merit one more year if enough co-L--lunity interest is received. It was 28 noted that when it was headed by the J.,ycess it was broadbased and had 29 considerate support. 30 31 The League of Minnesota Cities is planning its annual conference to e 32 held in Rochester, Minnesota in June of 1991 . The City recefevade aeflar 33 from Rochester' s Mayor, Chuck Haza.:,a, requesting the City p 9 34 for a grand march opening the Conference. Mayor Ranallo has discussed 35 having the school children work on an appropriate flag with Crystal 35 Neriwether, Couycft Marks the 37 logos. Councilnem e 33 flag. 39 40 Mayor Ranallo advised he has been requested to serve on the Project 13 41 Study Con-sittee. This committee will study the school facilities in the 42 community. Presently, the elementary school is at capacity and consideration 43 must be .given to moving students from Wilshire School to the Middle School . 44 Also,. the future of the building where the City offices are housed will be 4S discussed. The Mayor attended the Committee' s first meeting and he noted 46 the next meeting will be scheduled after the Referendum vote on November 47 6th. 48 49 C. City Manager's Report 50 . ai hon Ula e DATE : A P P R OVAL : April 12 1991 TO : Planning Commission Members FROM : Susan VanderHe den 2 TEM : PRELIMINARY PLAT APPROVAL I This is a request from Marty and Forrest Harstad of Harstad Companies, 1900 Silver Lake Road, New Brighton, for preliminary plat approval for a 16 unit (2 eight-plex) condominium development to be located at 3816 Foss Road. The parcel is approximately 1.3 acres and requires the rezoning from LI to R-4. In addition, the City's Comprehensive Plan calls for this property to be zoned and developed as multi-family residential. The preliminary plat has been reviewed by City staff and meets the requirements outlined by the applicable City Ordinances. • e, Date: Fee: CITY OF ST. ANTHONY Application for Subdivision/Plat Approval Applicant- TL-,-L" Phone # "'ddress -7� Status of Applicant (owner, buyer, renter , acer.t, etc . ) Present, Legal -Description of Property to be '_"%:'.'Lected /ILL- ,;Ir-- 'o—, 3 Proposed Legal Description of Property to be Affected Street Address Z'F14 Zoning District in Which Property is Located Specify any N=ecessary -rasements Area of the P!a Subd. .4er-I-E S N u--i'z e r of Parcels L-7_!1_1.1 S Attach a cozv of the proposed plat showing -he proposed name of the plat, the location within the City, the names of the present owners , the scale, the date of preparation, the northooint, surrounding property, all public utilities and easements and other such necessa-v information or documenta- tion as is requested by the City Manager or the subdivision/platting ordin- ance . DO NOT WRITE BELOW THIS LINE - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - FOR STAFF USE ONLY 1 . Fee calculation woo ammgiF $150 .00) 2. Conformance • to design criteria - -yes no Exceptions : -2,PI77 03 ' 19" 91 A 0 ai6iffla thou e TDAT]F- : 0 APPROVAL,; May 10 1991 TO = Mayor and Councilmembers FROM : Thomas D. Burt, City Manager 2TEM : RECYCLING CENTER There is stiff some abuse of the Recycling Center. There continues to be trash dropped at the site, yard waste, and miscellaneous junk. We are also having a problem with theft (black dirt). As staff, we have discussed relocating the drop off site closer to Chandler Drive. We would construct a gate on Chandler Drive and fence the recyclables so people could not enter the Public Works yard. This would limit our exposure to liability that we are now faced with. I recommend that we also utilize volunteers to man the Center. It may mean a reduction in hours at the Center until we get enough volunteers interested. ain thou I e DATE : APPROVAL,:—- _ _-- May 10, 1991 TO Mayor and Councilmembers FROM : Tbo{pas D. Burt City Manager ITEM : PAVEMENT MANAGEMENT SYSTEM STUDY The Interim Report, presented, to the City Council by the Road Task Force, recommended the City establish a formal Pavement Management System for all City streets. Staff has met with three engineering firms and recommends the firm of Braun Intertec Pavement, Inc. to prepare the study. Braun is a leader in pavement management and has performed similar studies for Golden Valley, Roseville, Eagan, Bloomington and Minneapolis. The pavement management system proposed will serve the City by supplying factual information and justification on needed road repairs and replacement. It will also be used as a budgeting tool to assist in the preparation of a five year capital improvements program. This will better enable the City to plan long range expenditures and identify future bonding needs. As part of the pavement management system report, Braun will also prepare an assessment policy for the City. The cost of the pavement management system and the assessment policy is $16,850. To keep the cost lower and to free the City from being dependent on one engineering firm, Braun will train City staff to conduct the condition survey and City staff will input the information into the software. Recommendation: Fund the study come from the City's road restoration fund balance. PROPOSAL FOR CITY OF SAINT ANTHONY PAVEMENT MANAGEMENT PROGRAM • March 1991 • Braun Intertec Pavement,Inc. BRAUN' 1404 Concordia Avenue St.Paul,Minnesota 55104.5309- NT E RT E C 612.644.2996 Fax:644.1045 r1cinee:s c..c S,ientis's Serving • tae 5✓ift on Nztr rot Environments March 12, 1991 Thomas D. Burt City Manager Saint Anthony Village 3301 Silver Lake Road St. Anthony, MN 55418 RE: Proposal Submittal for Pavement Management System Dear Mr. Burt; Enclosed please find our proposal for a Pavement Management System (PMS) for the City of Saint Anthony. We sincerely appreciate the opportunity to be of service to you and to the City of Saint Anthony. If you have any questions, please do not hesitate to contact us. Sincerely, BRAUN INTERTEC PAVEMENT, INC. David W. Janisch, P.E. Senior Project Engineer DWJ/bw • INTRODUCTION- • INTRODUCTION • Maintenance of a functioning street system is a major task for Saint Anthony Village. To maintain the street system in the most efficient manner, the Engineer must have at his disposal a complete inventory of the streets. This inventory should include detailed information regarding the composition and construction of the pavement, its use (including traffic volume), its present and past condition, plus a detailed record regarding all other affected structures such as curb and gutter, sanitary and storm severs, water and other utilities. This information forms the basis of a functioning pavement management system. This vast array of data is most valuable if it is stored in computer files allowing rapid and easy access. Not only does this pool of information make the Engineer's task of establishing a street maintenance program easier and more efficient, it can provide others such as the City council or the public with factual information regarding the status of the system of streets and related structures. In addition, it provides a sound foundation from which to project future needs. This enables the City to plan and prepare a budget for maintenance as it is required rather than responding to the highest current needs, often at higher costs. Without such a database and management system, the task of efficiently managing a pavement network is more difficult. Even the task of managing a small network is difficult since decisions may be dominated by individual opinions and awareness. Braun Intertec Pavement Inc. is a firm that was established to provide agencies with the expertise and tools necessary to establish a functional Pavement Management System. This project is very similar to others we at Braun Intertec Pavement Inc., have completed for other • municipalities. Our role in assisting these communities has ranged from very comprehensive to relatively minor. We have what we feel is the perfect combination of pavement management services: 1)experienced and qualified staff, and 2)user friendly computer software. Our assistance to the City of Saint Anthony will be to: determine the specific needs of the City provide and install the necessary computer programs and establish the database train city personnel; they will be trained to do all of the tasks involved in developing and maintaining a pavement management database provide necessary original forms and manuals to record street surface condition and other relevant data provide specialized surveys and evaluation for pavement surface distress as well as train city personnel to perform these surveys on-their own • assist city staff in preparing a long range maintenance schedule with emphasis on timely rehabilitation - provide required services as needed from time to time for special tasks and to update the system to keep it current with technology • Develop an appropriate assessNent policy for the City based on the results of the long range maintenance needs. • Present the results of all of the above to the City Council and general public. • • STAFF QUALIFICATIONS • BACKGROUND OF BRAUN INTERTEC STAFF For this project, the Project Manager will be Mr. David W. Janisch, P.E. Mr. Janisch will be the primary contact to the city throughout the project. Mr. Janisch has been r project manager on similar projects throughout his career. The computer software which will be implemented on the city's computers was written by Mr. Janisch. His role in this project would be to organize the field crew, supervise the data collection, meet with and train city staff, modify the software, and analyze and present the findings of the study. Mr. Janisch has considerable experience in this area and was the Assistant City Engineer for the City of Roseville, MN during the time Roseville implemented its Pavement Management Program. Other Braun Intertec Pavement staff who will be assisting on this project will be Mr. Benjamin Worel, and Mr. Guy Kohlnhofer. The role that each will play in the project depends on whether the City decides to have Braun Intertec collect the surface condition data or simply train City staff to do so. It is anticipated that Mr. Worel will be the field representative in charge of collecting the City's pavement condition data. Both Mr. Worel and Mr. Kohlnhofer have been project managers during the surface condition data collection of this type for other cities involving hundreds of miles of pavement. Most recently Mr. Kohlnhofer was in charge of the data collection for the City of Oakdale, MN and Mr. Worel for the City of Minneapolis Parks Department. Resumes of each of these persons is found on the following page. • DAVID W. JANISCH, P.E. Title: Senior Project Engineer EDUCATION: B.S. in Civil Engineering University of Minnesota 1981 PROFESSIONAL REGISTRATION: Minnesota PROFESSIONAL MEMBERSHIPS: Minnesota Surveyors and Engineers Society American Public Works Association SUMMARY EXPERIENCE Mr. Janisch was an employee in the Research and Development Office of the Minnesota Department of Transportation from 1978 to 1981 while attending the University of Minnesota. He operated a Model 2000 Road Rater and developed the computer software used by Mn/DOT to analyze the deflection data. Upon gradation from the University of Minnesota, Mr. Janisch worked as a project engineer for Midwest Pavement Management from 1982 to 1986. His responsibilities included deflection testing with a Model 2000 Road Rater and analyzing deflection data. Mr. Janisch developed a computerized pavement management program which was implemented in the cities of Roseville, Moorhead and Golden Valley, Minnesota. In 1986 Mr. Janisch began working for the City of Roseville as its Assistant City Engineer. He was in charge of six full time and four part time employees and was responsible for city street, sewer and water construction. He was selected as Roseville's 1987 Public Works Outstanding Supervisor. With his efforts, Roseville became one of the first cities in Minnesota to incorporate the results of a pavement management program into the city policies for street maintenance and reconstruction. Mr. Janisch joined Braun Pavement Technologies, Inc. in April of 1988. He brings to the company practical municipal experience relating to pavement management and the use of deflection testing in designing new city streets. KEY WORK EXPERIENCE Mr. Janisch developed a computerized pavement management program written in Turbo PascalT"" which can keep track of over 200 data items for every section of pavement. This program can then produce reports which can prioritize a street system based on any of the criteria selected. This program has been implemented or used in several cities in Minnesota. The City of Roseville was able to completely modify their street maintenance and reconstruction policy using this program. Mr. Janisch did all the computer programming and- made many presentations to city and county engineers as well as city council and city =-residents.:=Mr. Janisch also trained Roseville street department personnel in how to perform detailed surface condition ratings-and record the data. - Mr. Janisch has assisted several communities in implementing a pavement management program. • Those cities-he-has-worked with-include: - -- - - ---_--- -- - Bloomington, MN Minneapolis Parks Department Cedar Falls, IA Moorhead, MN Champlin, MN Oakdale, MN Eagan, MN Roseville, MN Golden Valley, MN Mr. Janisch developed a computerized overlay design program which is based on deflection information gathered with Braun's Model 2000 Road Rater. This program is based on Mn/DOT developed relationships as well as the AASHTO 'Interim Guide for the Design of Pavement Structures". This program has been used to analyze data from nearly all of the 87 counties in the State of Minnesota. As part of the Strategic Highway Research Program (SHRP), Which is a national pavement research project, Mr. Janisch is the Data Manager. His duties include overseeing the data entry, and report generation into the Regional Information Management System (RIMS). RIMS is the database used by SHRP for data storage and retrieval. PROFESSIONAL EXPERIENCE Senior Project Engineer: Braun Pavement Technologies, Inc. April 1988-Present Assistant City Engineer: City of Roseville, Minnesota February 1986-April 1988 Project Engineer/ Midwest Pavement Management, Inc. • Computer Analyst: February 1982-February 1986 SELECTED PRESENTATIONS 'Pavement Distress', 1990 Bituminous Conference 'Latex Modified Asphalts', 1987 Bituminous Conference 'Computer Applications in Public Works", 1987 City Engineers Conference 'Roseville's Experience with Pavement Management, 1987 Minnesota Public Works Association Conference "Computerized Pavement Management, 1986 Minnesota Public Works Association Conference 'Pavement Management and Computers", 1986 Local Government Information Systems Public Works Computer Seminar 'Pavement Management', 1984 Minnesota Public Works Association Conference 'New Developments', 1989 Minnesota Public Works Association Conference in Pavement Management • 'Pavement Distress% 1990 Bituminous Conference BENJAMIN J. WOREL Staff Engineer • EDUCATION: B.S. in Civil Engineering University of Minnesota, 1989 SUMMARY EXPERIENCE Mr. Worel is involved in all facets of Braun Pavement Technologies, Inc. Primarily he is working on the Strategic Highway Research Program (SHRP) project.This involves the data management of the North Central Region states/provinces and operating a nondestructive testing device with the Model 8000 Falling Weight Deflectometer. Mr. Worel is responsible for data entry/retrieval from the regional data base. The regional data base (known as RIMS) uses the structural query language (SQL) to obtain reports and analyze the data. The RIMS software was written using the data.base software known as 'ORACLE'. Mr. Worel is familiar with SQL commands and uses them to obtain data from RIMS. Mr. Worel is involved in operating a Falling Weight Deflectometer (FWD) for SHRP. This FWD testing utilizes his knowledge in MSDOS software and ability to operate sophisticated equ.ipment in the field. This data is collected and entered into RIMS. Mr. Worel also has conducted surface condition distress surveys for both rigid and flexible pavements to establish pavement maintenance/rehabilitation alternatives and help implement pavement management system. s • J GUY W. KOHLNHOFER Staff Engineer EDUCATION: B.S. in Civil Engineering South Dakota State University, 1988 PCI Inspector Training Course Pavement Condition Index (PCI) endorsed by Federal Aviation Administration (FAA) and described in Advisory Circular 150/5380-6 SUMMARY EXPERIENCE Mr. Kohinhofer is currently an operator of the Model 8000 Falling Weight Deflectometer (RNID), nondestructive testing equipment. He utilizes a NEC computer for the collection of data and a Compaq pc for data analysis and graphics. Mr. Kohinhofer has conducted surface distress surveys on flexible pavements in order to establish pavement maintenance/rehabilitation alternatives and schedules. He has analyzed this data in order to give load and overlay recommendations to cities and counties. SIMILAR PROJECTS • SIMILAR PROJECTS PERFORMED BY BRAUN The following project summaries review relevant experience of the Braun Intertec Pavement, Inc. team members. PROJECT 1: Pavement Management System Development for the City of Golden Valley, MN PRINCIPAL: Mr. Lukanen, P.E., Mr. Janisch, P.E. SPONSOR: Engineering Department, City of Golden Valley, MN CONTACT: Lowell Odland, P.E. 612-593-8000 In this project, Braun Intertec Pavement, Inc. developed and implemented a computerized pavement management system for the city's street network. A software program, Pavement Management Program (PMP), was written to manage data input, analysis and to generate reports. PROJECT 2: Pavement -Management System Development for the City of Roseville, MN PRINCIPAL: Mr. Lukanen, P.E., Mr. Janisch, P.E. SPONSOR: Engineering Department, City of Roseville, MN • CONTACT: Steve Gatlin, P.E. 612-490-2220 Utilized PMP as the backbone of their systematic approach to managing pavements. A customized version was adapted to Roseville applications. The results of this work were presented to the city council and public, and led to a major revision in city policy regarding street maintenance and rehabilitation. PROJECT 3: Pavement Management System Development for the City of Moorhead, MN PRINCIPAL: Mr. Lukanen, P.E., Mr. Janisch, P.E. SPONSOR: Engineering Department, City of Moorhead, MN CONTACT: Herbert Reimer, P.E. 218-299-5301 The city utilized PMP as the basis for their pavement management system. The program was customized to adapt.to-specific municipal requests. - - _._. ._.a __ _...._....... I PROJECT 4: Pavement Management System Development for the City of Bloomington, MN PRINCIPAL: Mr. Lukanen, P.E., Mr. Janisch, P.E. SPONSOR: Engineering Department, City of Bloomington, MN CONTACT: Charles Honchell, P.E., 612-881.5811 In this project, Braun Intertec Pavement, Inc. developed and implemented a computerized pavement management system for the city's street network. The city is currently using the software to develop a long-range rehabilitation program. PROJECT 5: Pavement Management System Development for the City of Eagan, MN PRINCIPAL: Mr. Lukanen, P.E., Mr. Janisch, P.E. SPONSOR: Engineering Department, City of Eagan, MN CONTACT: Thomas Colbert, P.E., 612-454-8100 In this project, Braun Intertec Pavement, Inc. developed and implemented a computerized pavement management system for the city's street network. The city uses the program to assist in the development of its 5-year Capital Improvement Program. • PROJECT 6: Pavement Management System Development for the City of Champlin, MN PRINCIPAL: Mr. Lukanen, P.E., Mr. Janisch, P.E. SPONSOR: Engineering Department, City of Champlin, MN CONTACT: Jack Bittle, P.E., 612-421-1955 In this project, Braun Intertec Pavement, Inc. developed and implemented a computerized pavement management system for the city's street network. The results of the initial study led to the establishment of a fund to be used for overlays in future years. PROJECT 7: Pavement Management System Development for the City of Minneapolis Parks Dept. PRINCIPAL- Mr. Lukanen, P.E., Mr. Janisch, P.E. - -- SPONSOR: Minneapolis City Parks Department v CONTACT: Dennis Ryan, P.E., 612-348-2220 • In this project, Braun Intertec Pavement, Inc. developed and implemented a computerized pavement management system for the Parks Department's street network. PROJECT 8: Pavement Management System Development for the City of Oakdale, MN PRINCIPAL: Mr. Lukanen, P.E., Mr. Janisch, P.E. SPONSOR: Engineering Department, City of Oakdale, MN CONTACT: Brian Bachmeier, P.E. 612-739-5086 In this project, Braun Intertec Pavement, Inc. developed and implemented a computerized pavement management system for the city's street network. The city used the program to determine its seal coat needs for all its roadways. PROJECT 9: Rehabilitation Choices Manual and Workshops, LRRB Inv. 645 PRINCIPAL: Mr. Orthmeyer, P.E. SPONSOR: Minnesota Local Road Research Board CONTACT: Gabriel Bodoczy, P.E. 612-296-4925 This study involved conducting workshops around the State of Minnesota on the topic of pavement rehabilitation choices. The workshops concentrated on the thought process involved when choosing a pavement rehabilitation. The participants were taught how to recognize pavements' distress, the probably causes of the distress and common rehabilitation procedures for its repair. As a companion tot he workshops, an extensive manual was prepared and is now being reviewed by the advisory committee. This manual, which includes over 100 photographs of pavement distress, is intended for use by cities and counties within Minnesota. These manuals will be the ones provided to the city as part of this project. PROJECT 10: Pavement Management Program for the City of Milwaukee, WI PRINCIPAL: Mr. Lukanen, P.E. SPONSOR: Engineering Department, City of Milwaukee, WI CONTACT: Mr. John A. Erickson, P.E. 414-278-2400 Braun Intertec Pavement, Inc.was a subcontractor on this project. Our role was to conduct and analyze deflection testing on approximately 1,300 miles of city street. AS part of the city's pavement management program, a deflection test was conducted at 600 foot intervals throughout the city. The data was analyzed for in-place strength of both the pavement layers and the underlying subgrade soil.This information was then incorporated into the city's computerized --pavement-management=program developed by-Austin Research Engineers; Austin,Texas...:.__---=---=_� • PROJECT 11: Development of Pavement Life Prediction Models PRINCIPAL: Mr. Lukanen, P.E. SPONSOR: Minnesota Department of Transportation CONTACT: Mr. Loren Hill, P.E. 612-297-2579 This study involved the development of prediction models for four pavement types. The project involved the statistical analysis of fourteen years of condition data. Individual models were developed for three levels of traffic and three levels of soils strength for each of the four pavement types. The prediction models were based on the predicted growth of the distresses and future condition indices were calculated from the projected distresses. The models have been incorporated into the Mn/DOT pavement management system. This type of work will be done to develop pavement deterioration curves for the city as part of this proposal. • • SCOPE OF SERVICES • SCOPE OF SERVICES • The following tasks will be performed as part of our Scope of Services for the City of Saint Anthony. Task 1• Develop Pavement Management Parameters with City Staff The first step in establishing a pavement management system for the City of Saint Anthony would be to meet with City staff and develop the parameters to be used in the program. This would involve identifying pieces of information desired to be stored in the computer software, as well as field information to be collected during the surface condition surveys. Our experience in other municipalities indicates that this results in approximately 250 pieces of information being stored for every block of street. In particular, information such as curb and gutter type and condition, the presence of sidewalks or bike paths along the roadways, the condition of manholes, gate valves, and catch basins are data which can easily be collected during the surface condition survey. This information is also invaluable to the City when determining which pavements are of higher priority than others. Because our program was written by our own staff modifications to the data can be easily made. This results in the City obtaining a software package which truly is its own upon completion of the project. The main purpose of Task 1 will be to identify how the Saint Anthony pavement management program will be unique unto itself. Task 2: Review Progress with City Staff The progress of the project will be reviewed with staff approximately every week. During the field data collection, staff will be notified daily as to the whereabouts of the crew, as well as the status • and anticipated date of.completion. Monthly reports will be submitted to the City detailing the current status of the project and the anticipated date of completion. Task 3: Initialize Database The database will be initialized using the parameters determined in Task 1. Initializing the database involves determining each street segment, obtaining its length and width, and entering the data. The initial data entry will be done by Braun Intertec staff. Subsequent data entry (such as Pavement Condition) may be done by the City, if desired. We recommend that the data be collected and organized by block of street. While other methods could be used, we have found that the block-by-block approach is understood by everyone most easily. The current version of PMP is capable of storing over 250 pieces of information for each individual block of street. The program is certainly not limited to 250 items, but by the amount of data storage available to the City. PMP was written in a modular format which allows for the addition of desired files. Unnecessary files can also be eliminated with minimal effort. For the City of Saint Anthony it is anticipated that approximately 7 data files will be used to store the information. These files will be similar to the following: 1. General File • 2. Pavement Condition File 3. As-Built File 4. Traffic File 5. Maintenance File 6. Utility File 7. Summary File Task 4: Develop Analysis Format Because we want the program to truly be the City of Saint Anthony's, as opposed to being a generic software program, we will develop unique analysis formats which relate specifically to Saint Anthony. This will involve developing pavement deterioration curves based on actual Saint Anthony.data. These curves are then used to predict anticipated pavement decay. Curves will also be developed which will note the impact of the various types of maintenance on City streets. Typically curves will be developed for crack sealing, patching, seal coating, and overlays alone . and in combination with each other. These curves are then used to predict the impact of performing certain types of maintenance on city streets. Task 5: Produce program code. The program will be user friendly with a number of help screens available. The program was written by Braun Intertec Pavement Inc. staff using Borland International's TURBO PASCAL. We feel that by using a high level language rather than a database software package that we are capable of achieving maximum flexibility. Our program is not bound by the restrictions of other software. TURBO PASCAL is also very fast and the compiled source code occupies a minimum • of disk storage space. The report generation portion of PMP will allow the City to generate customized reports based on several combinations of parameters. This includes sending the output to a computer file for importing into a graphics program or CADD system. All of the appropriate safeguards are built into the program to minimize entry errors as much as possible. Each entry is scanned for proper format and content as well as appropriate range checking. Data is automatically backed up upon exiting of the program. As the data is being entered, it is automatically stored on disk once the information is completed. Several items, such as the section length, width and surface type, are stored in more than one file. This information is automatically updated in any file which needs to refer to it by entering it into a single file. The program is capable of both storing and analyzing maintenance information. With this information and the condition information, maintenance strategies can be analyzed to determine the most cost effective procedure. Based on life cycle costs, budgets can be prepared with a number of different time spans which will consider rehabilitation of the appropriate sections of roadway. As condition information is collected over the years certain trends will develop which will be unique to the City. The program will use the past condition information to help in predicting future condition. This allows for information which is unique to the City of Saint Anthony to be taken into account when developing maintenance strategies. The program will be expandable to allow for typical maintenance used by the City of Saint Anthony along with anticipated costs and expected life. This information can be updated in the future with current techniques and costs. The program will be modified so that all of the items identified in Task 1 will be included. Examples of the software data screens, reports, and graphs produced with the results are included in the Appendix. Task 6: Perform Surface Condition Surveys and/or Train City Staff Braun Intertec Pavement Inc. will work closely with Saint Anthony staff during training and collection of the surface condition information. We have done surface condition ratings on hundreds of miles of pavements both in Minnesota and throughout the country. We are also experienced in training city personnel on the collection of pavement surface distress information. Certain criteria will be developed after discussing with city staff regarding how to deal with intersections. The rating system we used is similar to the one endorsed by the American Public Works Association known as PAVER. The rating system measures actual quantities of cracking and distress rather than applying some type of numerical rating. Each type of distress is identified and measured along with its severity. A numerical rating is then calculated by the computer.for use in prioritizing the streets. In the City's Request for Proposal it was indicated that the surface condition surveys may be done entirely by the Consultant or entirely by Consultant trained city staff. We have given estimates for both types of data collection and entry in the cost estimate portion of the proposal. Task 7: Installation and Office Training The software developed through the above tasks will be installed on the City's computer system. This will involve installing the software, providing users manuals, and training office staff on the use of the pavement management software. As mentioned previously, the program will be user friendly which allows it to be used by someone with every little experience in pavements, database software, or engineering details. Typically the data are entered by clerical staff in the street or engineering departments. Task 8: Develop Long-Range Maintenance Recommendations Long-range maintenance recommendations will be given based on the results of the surface condition surveys and the subsequently developed pavement decay curves. This report will detail which blocks of street are recommended for receiving certain types of rehabilitation based on their cost, benefit, and expected life. All of the reports generated will be done using the pavement management software and can be duplicated by City staff in the future. Task 9: Develop a City Assessment Policy " The results of the long range maintenance recommendations will be used to develop a citywide assessment policy. It is anticipated that contacts will be made with many municipalities to research any assessment policies they may have in place. Once all the data have been received, a preliminary assessment policy will be presented to the City Manager for discussion. Once this policy is refined and felt to meet the City's needs, a formal policy will be drafted for review by the - -council. The policy will also be reviewed by the City Attorney to determine its legality. • Task 10: Present Recommendations to City Council and Public The results of the long-range maintenance recommendations listed in Task 8 and 9 will be presented to the city council and public to provide for better understanding within the community. We have found that if the public and council understand the principles behind the program, that implementing the results of a study based on this program is much more easily done. • SCHEDULE • CITY OF SAINT ANTHONY, MN TIME SCHEDULE BY TASK FOR THE DEVELOPMENT OF A PAVEMENT MANAGEMENT SYSTEM WEEK NUMBER TASK DESCRIPTION 1 2 3 4 5 6 7 6 9 10 11 12 1. Develop Pavement Management parameters with CitY S tal ....... . ...... ....... ...................... ................................... 2. Review Progress with City Staff ........... ............. 3. Initialize Database ............. ................ . ... .. .. ....... ................... ............ ........... ... .. ... .. . 4. Develop Analysis Format ...... . ..... .... ......... . . . ...... . ................. ....... 5. Produce Program Code 6. Perform Surface Condition Surveys and/or Train City Staff ....... . .... .......................... .......... ....... ... .. 7. Installation &Office Training ... ....... .............X.:-X ....... ...... 8. Develop Long Range Maintenance Recommendations 9. Develop Citywide Assessment Policy ............ . 10. Present Recommendations to City Council and Public ESTIMATED COSTS • COST ESTIMATE FOR CITY OF SAINT ANTHONY, MN PAVEMENT MANAGEMENT PROGRAM FIELD WORK OPTION 1' OPTION 22 SURFACE CONDITION SURVEYS 5,940 0 TRAINING CITY STAFF TO DO CONDITION SURVEYS 1,800 1,800 MOBILIZATION & TRAVEL THROUGHOUT THE CITY 300 100 OFFICE WORK DATA ENTRY 1,600 750 SOFTWARE MODIFICATIONS 3,000 3,000 PREPARATION OF USER MANUALS 1,500 1,500 TRAINING OF OFFICE STAFF ON SOFTWARE USE 550 550 LONG-RANGE MAINTENANCE RECOMMENDATIONS 2,600 2,600 • DEVELOP CITY ASSESSMENT POLICY 6,000 6,000 PRESENTATIONS TO CITY COUNCIL AND PUBLIC 550 550 TOTALS 23,840 16,850 ' Option 1 is for Braun Intertec Pavement, Inc. to conduct surface condition surveys on all 33 miles of city street, enter the data collected, and train City staff to conduct surface condition surveys. 2 Option 2 is for Braun Intertec Pavement, Inc. to train City staff to do condition surveys and have City staff enter the data collected. �ENCINEERS t ARCHITECTS■PLANNERS February 15, 1991 RE: ST. ANTHONY, MINNESOTA PAVEMENT MANAGEMENT STUDY P.C. NO. 1905-93 Mr. Thomas D. Burt, City Manager City tvi St.., Aiitiiviiy 3301 Silver Lake Road St. Anthony, MN 55418 Dear Mr. Burt: As you requested, we have estimated the engineering time required to provide the City of St. Anthony with a Comprehensive Pavement Management Study. We have already furnished you with a schematic which depicts the steps required to complete the study and the services which will be provided. We feel these services will fit the needs of the City of St. Anthony for a pavement management system. In summary, the study would be compiled in the following steps: 1. All of the streets catalogued and inventoried in January, 1980 will be listed on the computer. 2. The Director of Public Works will furnish SEH with an updated maintenance history for all the pavements and the annual maintenance cost. 3. The inventory established on the computer will provide a listing of the streets in either alphabetical or numerical order complete with history data compiled from existing records. 4. A field rating survey would be . conducted by our personnel accompanied by City personnel if desired to visually rate all the pavements which are classified as City streets.__. This .- does not include county roads, - - -- - state trunk ' 'Highways --or - private streets. The field rating survey will also include rating of the various types of curbs within the City, driveway aprons and carriage walks within City right-of-way. • SHORT ELLIOTT HENDRIC*ON WC. l,RwI,ESO.A ;� City of St. Anthony • February 15, 1991 Page n2 5 . An engineering review will be conducted to determine the composite field rating for each street segment and prioritization. A structural analysis will be conducted as well as traffic analysis and required pavement section for a projected timetable . 6 . Recommendations will be provided for both maintenance and capital improvements . 7 . A capital improvement program for a designated period of time will be provided. This program will be separated into two segments; maintenance and capital improvements . 8 . A City map designating the recommendations will be prepared. 9 . A fully bound report will be submitted to the City Council at the conclusion of the study. The study will consist of all the City streets included in the January, 1980 study. This street network consists of bituminous surfaced streets only. Concrete streets will not be rated and catalogued as a part of this study. Ile have included a computer printout of the basic steps in the study and an estimate of the hours for each discipline of personnel involved in the study. We have also included the cost of the study. We estimate that the cost would be approximately $14, 195 . We are submitting this information to you for your review and study as requested. As we discussed earlier with you, we feel that a Pavement Management Study will enhance the infrastructure maintenance for the City of St. Anthony and provide a budgeting tool . A pave- ment management system will also save money for the City in their street maintenance program by readily providing the information required to make more intelligent and timely decisions about pavements and their maintenance requirements. We have included a list of our pavement management clients for your information. These clients have implemented the pavement management process to different degrees . Ile will furnish references and a more detailed description of each project upon request. is City of St. Anthony February 15, 1991 Page #3 SEH has provided pavement management services to the following clients: o City of North St. Paul o City of Cumberland o City of St. Anthony o City of Arden Hills o City of Oakdale o City of Bayport o City of Nora o City of Vadnais Heights o City of Roseville o City of Lino Lakes o City of Plymouth o City of Stillwater We are pleased to have the opportunity to submit this information to you and are willing to discuss pavement management systems with the Council at any time or answer any questions that may arise after reviewing this information. . Sincerely, ichard E. Moore, P.E. REM/cih Enclosure cc: Larry Hamer, Director of Public Works • 02/15/91 PROJECT WORD ST-ANTHONY, MINNESOTA PRINCIPAL MANAGER REIMBURSABLE TECH PROCESSING COMPUTOR PAVEMENT MANAGEMENT EXPENSES ESTIMATED ENGINEERING COSTS HOURS AMOUNT HOURS AMOUNT HOURS AMOUNT HOURS AMOUNT HOURS AMOUNT ------------------ AMOUNT TOTAL ------------------ ------------------ - ----------------- ------------------ - ----------------- ------------ 1 PRE-PROJECT MEETING WITH CITY STAFF 2 176.40 0.5 15.90 5.00 197.30 2 INPUT ORIGINAL DATA INTO DATABASE 2 140.80 6 190.80 6 120.00 451.60 3 CONDUCT PAVEMENT CONDITION SURVEY COLLECT DATA 1 88.20 4 281.60 16 534.40 INPUT DATA 1 70.40 16 534.40 60.00 964.20 3 INSTALL PMS SOFTWARE 4 281.60 4 133.60 16 320.00 924.80 PAVEMENT MANAGER SOFTEWARE 5.00 420.20 R-BASE SOFTWARE 1,000.00 1,000.00 500.00 500.00 4 TAILOR SOFTWARE TO CITY'S NEEDS/REPORT 2 176.40 20 1,408.00 40 1,336.00 2 63.60 40 800.00 3,784.00 5 TRAIN CITY STAFF ON USE OF PMS PROGRAM 16 1,126.40 16 534.40 10.00 1,670.80 6 EVALUATE DATA/MAKE RECOMMENDATIONS 4 352.80 20 1,408.00 12 400.80 8 160.00 10.00 2,331.60 6 REVIEW RESULTS WITH CITY STAFF 2 176.40 5.00 181.40 7 PREPARE STUDY REPORT WITH MAP 1 88.20 8 563.20 8 267.20 4 127.20 8 160.00 - 1,205.80 8 PRESENT RESULTS OF STUDY TO COUNCIL 2 176.40 1 33.40 209.80 9 PUBLIC INFORMATIONAL MEETING 4 352.80 352.80 TOTAL ESTIMATED COST 1,587.60 5,280.00 3,774.20 397.50 1,560.00 1,595.00 14,194.30 / CONSULTING ENGINEERS � Maier Stewart & Associates Inc. January 31 , 1991 File No: 900-060-00 Mr. Tom Burt City Mar:ager St. Anthony Village 3301 Silver Lake Road SL. Arltl'!or iy, MN 5-410 RE: PROPOSAL TO PROVIDE ENGINEERING SERVICES FOR A PAVEMENT EVALUATION PROGRAM AND ASSESSMENT POLICY Dear Mr. Burt: Thank you for the opportunity to submit a proposal to provide engineering services for a pavement evaluation program and assessment policy for St. Anthony Village. Based upon our meeting of 1/29/91 , we would propose the following services: PAVEMENT EVALUATION PROGRAM Task Assignment Hours 1. Complete survey and inspection Project Engineer 16 of all City streets and alleys Inspector 100 a. ) Includes up to 4 meetings with staff for input. D. ) Streets will be evaluated as good-fair-poor, based upon a definable criteria for each class of road. 2. Review all existing plans to Staff Engineer 40 establish a block by block history and accounting of public facilities if available (road width & thickness, curb type, water main size and location, sidewalk size and location, storm sewer size and location as well as a history of surface improvements) . 1959 SLOAN PLACE, ST. PAUL. MINNESOTA 55117 612.774-6021 Equal Opportunity Employer CITY OF ST. ANTHONY JANUARY 31 , 1991 PAGE TWO PAVEMENT EVALUATION PROGRAM (cost. ) Task Assignment Hours 3. Evaluate draft report with City Project Engineer 24 and prepare a report with maps Clerical 10 of street ratings. a. ) Includes book of information on streets and alleys block by block. 4. Complete final report to City Project Engineer 16 including a 5-year Capital Staff Engineer 8 Improvement Program and Clerical 10 financing alternatives. a. ) Includes up to 6 meetings with staff, citizen com- mittees, and City Council . (Additional meetings would be billed on an hourly basis. ) b. ) Provide 20 copies of report to City - additional copies can be provided at $20 per copy. TOTAL HOURS FOR PAVEMENT MANAGEMENT EVALUATION 240 ASSESSMENT MANUAL Task Assignment Hours 1. Review existing assessment Project Engineer 4 policies with City staff. 2. Prepare preliminary draft of Project Engineer 16 manual . 3. Review draft manual . Project Engineer 12 (Includes up to 6 meetings Clerical 8 with staff, citizen committees, and City Council . ) 4. Complete final draft of manual . Project Engineer 8 (Provide 20 copies to City - Clerical 12 Additional copies can be provided at $20 per copy. ) TOTAL HOURS FOR ASSESSMENT MANUAL 60 40 CITY OF ST. ANTHONY • JANUARY 31 , 1991 PAGE THREE We would propose to complete the pavement evaluation phase by May 15, 1991 . Once authorized, we would begin the research work over the remaining winter months. We would recommend that the actual pavement evaluation not be completed until the street surfaces are clear of snow and ice; hence, the May completion date. The assessment manual phase can be substantially completed over the winter months. Once the methods of financing capital improvement projects have been established, the manual can be completed. The final completion date would then track along with the pavement evaluation phase on 5/15/91. Based upon the work tasks outlined above, we would propose to complete the pavement evaluation phase for a not-to-exceed cost of $13,500. The assessment manual phase would be completed for a not-to-exceed cost of $3,300. Yours very truly, MAIER STEWART AND ASSOCIATES, INC. Thomas Madigan,o as J. na gan, P. E. Project Engineer TJM/km ain th0 ilia e DATE : APPROVAL May 6, 1991 TO . Mayor and Councilmembers FROM Larry Hamer, Public Works Director ITEM r ROAD MATERIALS QUOTATIONS Blacktop Two quotations were received: Midwest Asphalt and T. A. Schifsky & Son Recommendation: Award summer mix to low bidder Midwest Asphalt, Hopkins Award winter mix to low bidder T. A. Schifsky & Son, North St. Paul Concrete Two quotations were received: Flittie Redi-Mix and Wyatt Ready Mix • Recommendation: Award to low bidder, Wyatt Ready Mix, Blaine Oil One quotation was received: Koch Materials Co. Recommendation: Award to Koch Materials Co., St. Paul Aggregate One quotation was received: Barton Sand & Gravel Recommendation: Award to Barton Sand & Gravel, Maple Grove Water Department Supplies Two quotations were received: Water Products and Davies Water Equipment Recommendation: Award to low bidder in all categories, Water Products, Eden Prairie • • CITY OF ST. ANTHONY QUOTATION FOR BLACKTOP Notice is hereby given, that the City Manager of the City of St. Anthony, Minnesota will receive sealed quotations up to 12:00 noon, Friday,.April 26, 1991, for blacktop, in accordance %kith the State of Minnesota specifications for A.C. Fine Mix, A.C. Course Mix, i I.C. Fine 'Mix and M.C. Course Mix, as specified below, at the City Hall, 3301 Silver Lake Road, Minneapolis, MN 55418. ITE?%1 A: (Specifications for A.C. Fine 'Mix) 1. FOB City, price per ton 2. Pickup City equipment quotation price per ton ITEM B: (Specifications for A.C. Course Mix) 1. FOB City, price per ton 2. Pickup City equipment quotation price per ton • ITE.N1 C: (Specifications for >\4.C. Fine Mix) (c UO 1. FOB Citti price per ton 2. Pickup City equipment �� 00 quotation price per ton ITEM D: (Specifications for M.C. Course Mix) CO 1. FOB City, price per ton 2. Pickup City equipment 60 quotation price per ton •�� Quotations received will be opened by the City Manager at the time and date specified above. No quotations will be considered unless sealed and filed with the City Manager. Please indicate "Quotation" on the outside of the envelope. 'S Signature of Offi/ Company • Name and Address of.Firm Quoting • CITY OF ST. ANTHONY QUOTATION FOR BLACKTOP April 12, 1991 Notice is hereby given that the City Manager of the City of St. Anthony, Minnesota will receive sealed quotations up to 12:00 noon, Friday, April 26, 1991,.for blacktop, in accordance writh the State of Minnesota specifications for A.C. Fine Mix, A.C. Course Mix, M.C. Fine Mix and M.C. Course Mix, as specified below, at the City Hall, 3301 Silver Lake Road, Minneapolis, MN 55418. ITEM A: (Specifications for A.C. Fine Mix) 1. FOB City, price per ton No Bid 2. Pickup City equipment quotation price per ton $19.95 ITD\1 B: (Specifications for A.C. Course Mix) 1. FOB City, price per ton No Bid 2. Pickup City equipment $19.60 quotation price per ton • ITEM C: (Specifications for M.C. Fine Mix) 1. FOB City, price per ton No Bid 2. Pickup City equipment quotation price per ton No Bid ITEM D: (Specifications for M.C. Course Mix) 1. FOB City, price per ton No Bid 2. Pickup City equipment quotation price per ton No Bid Quotations received will be opened by the City Manager at the time and date specified above. No quotations will be considered unless sealed and filed with the City Manager. Please indicate "Quotation" on the outside of the envelope. Midwest Asphalt Corporation P. O. Box 5477 Hopkins, MN 55343 Signature of Officer of C pany • Name and Address of Firm Quoting Plant location: 1400 Old Hwy. 8, New Brighton, MN 636-3707 • CITY OF ST. ANTHONY QUOTATION FOR AGGREGATE Notice is hereby given that the City Manager of the City of St. Anthony, Minnesota, will receive sealed quotations up to 12:00 noon, Friday, April 26, 1991, for an annual contract for the supplying of aggregate as specified below, at the City Hall, 3301 Silver Lake Road, Minneapolis, ININ 55418. SPECIFICATIONS: Aggregates should conform to ITE?N1 3138 and ITEM 3127 of the Minnesota Highway Specification ?Manual. QU._\TITIES: ITEMS: 1. 1,500 tons (more or less) sand 2. 1.500 tons (more or less) Class 5 aggregate 3. 15,000 gallons of RC 800 ITEM 1. Quote price per ton FOB maintenance yard at 3801 Chandler Drive • �J ITEM 1. Quote price per ton pickup our equipment ITEM 2. Quote price per ton FOB maintenance yard at 3501 Chandler Drive ITEI\1 2. Quote price per ton pickup our equipment ITEM 3. Quote price per ton FOB maintenance yard at 3801 Chandler Drive ITEM 3. Quote price per ton pickup our equipment Quotations received will be opened by the City Manager at the time and date specified above. No quotations will be considered unless sealed and filed with the City Manager. Please indicate "Quotation" on the outside of the envelope. Si/gnature of fficer of Company Name and Address of Firm Quoting CITY OF-ST. ANTHONY QUOTATION FOR OIL Notice is hereby given that the City Manager of the City of St. Anthonv, Minnesota "vill receive sealed quotations up to 12:00 noon, Friday, April 26, 1991, for supplying of the materials specified below, at the City Hall, 3301 Silver Lake Road, Minneapolis, MN 5541S. MATERIALS: 15,000 gallons of RC 800 (more or less) ., I ITEN1 1. $.8000 Pickup RC 800. i ITEM 2. $.8248 Deliver RC 800. Quotations received will be opened by the City Manager at the time and date specified above. No quotations will be considered unless sealed and filed with the City Manager. Please indicate "Quotation" on the outside of the envelope. Koch Materials Company, A Division of Koch Fuels, Inc. 778 Otto Avenue, St. Paul, MN 55102 Name and Address of Firm Quoting Signature 00/officer of Company Greg Johnson • CITY OF ST. ANTHONY QliOTATION FOR CONCRETE Notice is hereby given that the Citv Manager of the City of St. Anthony, ?Minnesota, will receive sealed quotations up to 12:00 noon, Friday, April 26, 1991, for an annual contract for the supplying of concrete as specified below, at the City Hall, 3301 Silver Lake Road, Minneapolis, MN >j41S. SPECIFICATIONS: Concrete should conform to the Minnesota Highway specifications Manual, concrete to • be used for street maintenance. ITEM: 1. Per yard delivered on location in the City of St. Anthony. $52.00 2. Mini-load delivered. $107.00 - Fora 1 yard load delivered Quotations received will be opened by the City Manager at the time and date specified above. No quotations will be considered unless sealed and filed with the City Manager. Please indicate "Quotation" on the outside of the envelope. Flittie Redi-Mix, Inc. 2610 Marshall Street N.E. Minneapolis, MN. 55418 Name and Address of Firm Quoting • President ig ture of fficer of Company • CITY OF ST. ANTHONY QUOTATION FOR CONCRETE Notice is hereby given that the City Manager of the City of St. Anthony, Minnesota, will receive sealed quotations up to 12:00 noon, Friday, April 26, 1991, for an annual contract for the suppl}1ng of concrete as specified below, at the City Hall, 3301 Silver Lake Road, :Minneapolis, MN 55418. SPECIFICATIONS: Concrete should conform to the Minnesota Highway specifications Manual, concrete to be used for street maintenance. • I TEM: 1. Per vard delivered on location in the SEE ATTACHED PRICE City of St. Anthony. INFORMATION 2. Mini-load delivered. Quotations received will be opened by the City Manager at the time and date specified above. No quotations will be considered unless sealed and filed with the City Manager. Please indicate "Quotation" on the outside of the envelope. WYATT READY MIX 8502 CENTRAL,-AVENUE N : E . BLAINE;. -MN-.-5.54.34 . Name a 'ddress of Firm Quotin • _ / Sign�ture fficer of C pany C.(`TY OF ST . ANTHONY 3301 SILVER LAKE ROAD BID DATE: APRIL 26TH 1991 ST . ANTHONY , MN . 55,-F18 WYATT READY MIX (Wyatts) is pleased to quote and deliver to you (Purchaser ) the total requirements of Ready Mix Concrete for the project • referred to below , at the following base prices , subject to the terms and conditions stated below and on the REVERSE SIDE , and subject to verification that job specifications are not inconsistent with our approved mixes : PROJECT: ANNUAL CONCRETE CONTRACT LOCATION : VARIOUS LOCATIONS - CITY Mix Description W/C Minimum S1ump ,Delivered Price # - Mix Design Ratio Cemt . Content Ran Re Per Cubic Yd . 2 316 4" AGG . 3A32M 52 . 50 � I CONCRETE MISCELLANEOUS : WINTER SERVICE (NOV . 1-APR . 1 ) 60-70 F concrete temp . $ 4 . 00 per yd CALCIUM CHLORIDE 17 $ 1 . 00 per yd . NON CHLORIDE-NON CORROSIVE ACCELERATOR-DARASET $ per oz . SUPERPLASTICIZER-PLANT ADDED $ per oz . SUPERPLASTICIZER-JOB ADDED $ per ya . POLYPROPYLENE FIBERS $ per yd . ALL WHEEL DRIVE units (FWD) , if requested $ per yd . POSTED ROAD CHARGE ( FEB. 1 - MAY 15) $ per ld . SPLIT LOAD CHARGE ( 2 OR MORE LOCATIONS) $ 40 . 00 per loc OVERTIME DELIVERY (AFTER 3 : 30 P .M. )/SATURDAY DELIVERY $ 5 . 00 per yd 0 TRUCK TIME in excess of 5 minutes per yard unloading $ 50 . 00 per hr . PART LOAD (42 yds or less)Price avail . upon request . ( 1 yd/ $50.00, 2 yds/ $45.00, 3 yds/$40.00, 4 yds/$35.00 PLANT HOURS are 7 : 30 - 4 :00 Monday through Friday . Price for deliveries outside of these hours will be furnished upon request . TERMS NET 30 days . SALES TAX is based on $14 per yard trucking and is not included in the above prices . DISCOUNT of 1 . 00 per cubic yard for payment by the 15th of the month following delivery . FINANCE CHARGE of 12% PER MONTH ON ACCOUNTS 30. DAYS OR MORE PAST DUE. PRICES will remain in effect for the length of the project or until 4-1-92 The terms and conditions of this proposal are only those expressly written and appearing herein and in the "General Terms and Conditions of Sale" attached hereto . There are no oral conditions or terms in connec- tion with this proposal or with any contract or agreement resulting therefrom and , therefore, no modification , amendment , change or assignment will be recognized , acknowledged or will be in any way binding in c=on-nection therewith -in -writing and -duly signed and -M- approved by authorized representanives of the Purchaser and of Wyatt Ready Mix . This bid will be considered accepted upon signature or delivery of Ready Mix Concrete and will be void in not accepted by 1 Purchaser Wyat heady M ' x � - • Date : / / BID# Date : . .9�_ 2,Z- i CONCRETE PRICES Concrete Dispatch - 612-688-9520 . Fiber Reinforcement - $8.00 per CN CONCRETE PRICES •Granite - $9.00 extra per yard (Per Cubic Yard) • Lightweight Structural Concrete 3/4"or tai" Gravel Mixes (Prices On Request) �� Cement Only ���� 4.00 Bag .. ...$47.40 TERMS: $1.00 per cubic yard cash discount for payment 4.25 Bag .. . 48.35 by 15th of month following delivery.NET:30 Days.A finance charge of 11/240 per month on 4.50 Bag .............. 49.30 accounts 30 days or more past due. 4.75 Bag .............. 50.25 5.00 Bag .............. 51.20 An additional charge of$4.00 per cubic yard is made for winter 5.25 Bag .............. 52.15 service between October 15th and April 30th. 5.50 Bag .............. 53.10 Concrete admixes are priced as follows: sacktreated 5.75 Bag .............. 54.05 Water reducers 6 retarder•351 per sack treated 6.00 Bag .............. 55.00 Test Cylinders-12.00 each 6.25 Bag ...... ....... 55.95 Calcium chrome.t%-Si.75 per yard 6.50 Bag .............. 56.90 2%-$3.50 per yard 6.75 Bag .............. 57.85 Special quotations on projects of 200 yards and greater upon 7.00 Bag .............. 58.80 request. Our COMMITMENT to You 7.25 Bag .............. 59.75 is CONCRETE 7.50 Bag ...... . ..... 60.70 Saturday or overtime delivery ...............add$5.00tyd. St. Paul City Mixes Prices listed are for delivery in full loads except for the comple- - ------- - 3Y36C ................$57.10 tion of a pour.Part-load charges up to and including 41/2 cubic 3842C ................ 52.00 yards shall be charged at the following rates: 3Y26C ................ 53.45 I cubic yard........................ .... ....... 550.00 2cubic yards.............. . .....................$45.00 3ubbic yards............... ......................540.00 Exposed Aggregate Mix 4 cubic yards.............. ......... .. .........535.00 -- ...No Delivery Char 3/t,.g 1h.. .............$57.90 4�h or more............._._....-.... pa CONTRACTORS Regular plant hours are from 7:30 AM to 3:30 PM Strength Only Mixes Monday through Friday. Prices for deliveries outside of these PRICE LIST 1t/t"& 3/4"Gravel with hours can be furnished by request. Fly Ash&Water Reducer APRIL 1, 1991 - -- We charge$50.00 per hour for unloading time in excess of 5 2000#.................$46.50 minutes per cubic yard. Prices will be increased accordingly 2500#................. 48.40 with cement price increases. 3000#................. 50.20 NOTE: Materials will be separated from the'transportation. 3500#................. 52.10 Sates tax applicable to materials only. Transportation Will be 4000#................. 54.00 charged at$14.00 per cubic yard.Tax is not included in prices. 4500#................. 55.90 Posted Road Charge(March 1-May 15)add$40.00 per load. 5000#................. 59.80 SALES b MAIN OFFICE All wheel drive units or front discharge,if requested-$1.75 per Strength - W Gravel Top Coat Mixes CN. All sales subject to state and local taxes,to be paid by CEMSTONE PRODUCTS COMPANY Cement Fly Ash 8 purchaser. 2025 CENTRE POINTE BLVD.,SUITE 300 Only Water Reducer Split-load rates will be based on the amount of truck lime. MENDOTA HEIGHTS,MN 55120 2500# .....$51.20 .....$50.20 Mdltional cement,fly ash,water reducers or any other concrete additives will 612-688-9292 3000# ..... 53.10 ..... 52.10 be supplied and quoted upon request as an add on cost to mix designs.In dd- FAX:612.688-0124 3500# ..... 55.00 ..... 54.00 terent than original mix design as provided for by specifications or by WYATT READY MIX 4000# ..... 56.90 ..... 55.90 customer order). 8502 CENTRAL AVENUE,N.E. 4500# ..... 58.80 ..... 57.80 SAND & GRAVEL DISPATCH BLAINE, MN 55434 5000# ..... 60.70 ..... 59.70 612.774-7575 612.784-3512 Prices subject to change without notice. FAX:612-784-1918 Prices do not Include any lax. sonu r CITY OF ST. ANTHONY QUOTE FOR WATER DEPARTIMENT SUPPLIES FOR 1990 (1) Prices shall be a firm quote for entire calendar year of 1990, excluding manufacturing price increases, which must be verified upon request. (2) Quotes must be returned to Larry Hamer, Public Works Director, 3301 Silver Lake Road, St. Anthony, MN 55418 by Friday, April 1-6, 1991. (3) Quotes must be signed by company official authorized to make such quotes. (4) Quotes can be based on their approximate amounts. (5) Quantities stated are apprcximate, i.e., "more or less". (a) T%venty (20) Nvatermain repair clamps. (b) Hydrants (as needed for accident replacement and replacement of Nvood hydrants as they malfunction). (e) Two hundred (200) 5/5" "pater meters. k-a�a-x-xa-xa-x-x7aaa-v-v,-x��► Watermain Repair Clamps (Smith) Price Each Blain or Equal 54,•,,/o 5e 2rlas " z 38 4WP4 U4."p -&-We 12" full circle, 12.10-13.20 -- 15" N%idth /0400 10" full circle, 11.04-11.44 -- 15" Nvidth /039- 00 10" full circle with Corp. 11.04-11.44 -- 15" width Cl. 00 8" full circle with Corp. 8.99-9.39 -- 12-1/2" %vidth r 5.o0 8" full circle, 8.99-9.39 -- 20" width S" full circle, 8.99-9.39 -- 15" width �� 00 8" full circle;-8.99-9.39 =- 12-1/2" width 6" full circle with corp. 6.S4-7.2.1 -- 12-1/2" width 6" full circle, 6.54-7.2.1 -- 15" width 00 • 6" full circle, 6.84-7.24 -- 20" width qq•00 4" full circle with corp. 4.74-5.15 -- 12.1/2" width l 00 4" full circle, 5.74-5.15 -- 12-1/2" width 43. 6-0 • 1" copper to copper flare (9. 15 1" curb stop flare, o-ring seal 7,3.50 1" corp flare I o.95 1" stand pipe with 5-113" rod + caps-arch pattern, 6'-7-1/2' adjustable DO Water Hvdrants - Waterous Onlv Pacer stele, 16" breakoff - St. Anthony's new spec. S' bury depth 89. 00 S.6' bury depth 910-00 . 9' bury depth CM 9.6' bury depth =�10•DO N'e'ater Meters 5/S" meters shall be full standard size, as a Rockwell Sr. or Trident #S, magnetic drive with bronze case and cast iron frost bottom. Meter shall be calibrated in cubic feet and be the newest model available. 5/8 X 3/4 cu ! - 501- 02 s2.7I 3/4 X 3/4 Total Watermain repair clamp cost qqz .5,0 Total Water Hydrant cost 3, Total Water meter cost CIZ• 0 TOTAL COST Al,710. 1 COMPANY Jahn Herbert Selrog ADDRESS (5 ( �L 5'1*kC_T Water Products Company f ,� 15801 W. 78th 5 Ed�/ r�'Yrl2(�, MITI 45$_ ' ' Eden Prairie, MN 55344 Aut orized Signature V • CITY OF ST. ANTHONY QUOTE FOR WATER DEPARTIMENT SUPPLIES FOR 1990 (1) Prices shall be a firm quote for entire calendar year of 1990, excluding manufacturing price increases, which must be verified upon request. (2) Quotes must be returned to Larry Hamer, Public Works Director, 3301 Silver Lake Road, St. Anthony, Vii. 55418 by Friday, April 26, 1991. (3) Quotes must be signed by company official authorized to make such quotes. (4) Quotes can be based on their approximate amounts. (5) Quantities stated are approximate, i.e., "more or less". (a) Twenty (20) watermain repair clamps. (b) Hydrants (as needed for accident replacement and replacement of wood hydrants as they malfunction). i (c) Two hundred (200) 5/8" water meters. Watermain Repair Clamps (Smithy Price Each Blain or Equal ------ 12" full circle, 12.10-13.20-- 15" width 137.00 10" full circle, 11.04-11.44 -- 15" width 119.00 10" full circle with corp. 11.04-11.44 -- 15" width 143.50 8" full circle with corp. 8.99-9.39 -- 12-1/2" width 98.50 8" full circle, 8.99-9.39 -- 20" width 125.00 8" full circle, 8.99-9.39 -- 15" width 90.00 8" full circle, 8.99-9.39 -- 12-1/2" width 74.00 6" full circle with corp. 6.84-7.24 -- 12-1/2" width 87.50 6" full circle, 6.84-7.24 -- 15" width 75.00 6" full circle, 6.84-7.24 -- 20" width 106.00 i 4" full circle with corp. 4.74-5.15 -- 12-1/2" width 81.00 4" full circle, 5.74-5.15 -- 12-1/2" width 56.00 1" copper to copper flare 7.85 1" curb stop flare, o-ring seal 25.70 1" corp flare 11.25 1" stand pipe with 5-113" rod + caps-arch pattern, 6'-7-1/2' adjustable \Water Hvdrants - Waterous Onlv Pacer style, 16" breakoff - St. Anthony's new spec. S' bury depth 870.00 8.6' bury depth 890.00 9' bury depth 905.00 9.6' bury depth 923.00 Water Meters 5/S" meters shall be full standard size, as a Rockwell Sr. or Trident #8, magnetic drive with bronze case and cast iron frost bottom. Meter shall be calibrated in cubic feet and be the newest model available. 5,18 X 3/4 37.50 3/4.X 3/4 64.00 Total Watermain repair clamp cost ------ Total Water Hydrant cost ------ Total Water meter cost ------ TOTAL COST ------ COMPANY Davies Water Equipment Company ADDRESS 4010 Lake Breeze Avenue Mpls. , MN 55429 ! Aa Authorized Signature • CITY OF ST. ANTHONY RESOLUTION 91-026 A RESOLUTION APPROVING A COOPERATIVE AGREEMENT FOR A DRAINAGE SYSTEM CAPACITY STUDY AND AUTHORIZING THE MAYOR AND CITY MANAGER TO EXECUTE SAID AGREEMENT ON BEHALF OF THE CITY WHEREAS, the findings of a Preliminary study indicate that a, system capacity study is- warranted of the existing drainage capabilities of Drainage District No. 6. BE IT RESOLVED, that the City Council of the City of St. Anthony hereby approves the cooperative agreement between Hennepin County and the City of St. Anthony for a Drainage System Capacity Study (attached hereto); and BE IT FURTHER RESOLVED, that the City Council of the City of St. Anthony hereby authorizes the Mayor and City Manager to execute said agreement on behalf of the City. • Adopted this day of 11991. Mayor ATTEST: City Clerk Reviewed for administration: City Manager • Agreement No. PW 46-10-91 County State Aid Highway No. 88 • City of St. Anthony County of Hennepin COOPERATIVE AGREEMENT FOR PARTICIPATION IN A DRAINAGE SYSTEM CAPACITY STUDY AGREEMENT, Made and entered into this day of 19 by and between the County of Hennepin, a body politic and corporate under the laws of the State of Minnesota, hereinafter referred to as the "County" and the City of St. Anthony, a body politic and corporate under the laws of the State of Minnesota, hereinafter referred to as the "City" . WITNESSETH: WHEREAS, The City, through its agent Barr Engineering Company, has performed a preliminary study of the existing drainage capabilities of a watershed known as Drainage District No. 6 in which County State Aid Highway No. 88 is located; and • WHEREAS, The findings of said preliminary study indicate that a system capacity study is warranted to identify cost effective options for solving existing drainage problems within said Drainage District No. 6; and WHEREAS, The estimated cost of said System Capacity Study is between $15,000 and -$20,000; and WHEREAS, The City has requested the County participate in the funding of said Study for cost effective options, and WH REAS, Hennepin County Resolution No. 91-4-403, approved April 23 1991 authorized the preparation of a cooperative agreement between the City of St. Anthony and Hennepin County for said System Capacity Study in which the County's participation is to be .$5,000_or. less;.-.and WHEREAS, It is contemplated that said work be carried out by the parties hereto under the provisions of M.S. SEC. 162.17, Subd. 1 and SEC. 471.59. • -1- Agreement No. PW 46-10-91 NOW THEREFORE, IT IS HEREBY AGREED: • I The County will participate in the costs of the hereinbefore mentioned System Capacity Study to identify cost effective options for solving existing drainage problems within said Drainage District No. 6. II The City or its agents shall be responsible to ensure that all work and services required for the completion of said System Capacity Study are in accordance with any and all applicable laws, regulations and guidelines related to location, design, safety, flood control and environment. III The City or its agents shall be responsible for the collection of any and all data required to complete said Study. IV All plans, designs, reports and specifications prepared in accordance herewith • shall be prepared by or under the direct supervision of a professional engineer or land surveyor, as applicable, registered in the State of Minnesota, and said plans, designs, reports and specifications shall be certified by him as required by law. V At the request of the County, the City or its agents shall furnish the County with any working copies of any plans, designs or reports at any time during the study process. VI The County retains the right to at any time review and comment on the plans, designs or reports of the City or its agents in regards to their effect on the drainage of the roadway and right of way corridor of County State Aid Highway No. 88. VII The City shall be responsible for the accuracy of the work of its agents and shall ensure that all necessary revisions or corrections resulting from errors and omissions on the part of the City or its agents are promptly made without additional • compensation by the County. Acceptance of the work by the County shall in no way -2- Agreement No. PW 46-10-91 • relieve the City or its agents of the responsibility for subsequent corrections of any such errors or omissions and also the clarification of any ambiguities. VIII Upon completion of said System Capacity Study, the City shall furnish the County with three (3) copies of the completed report. IX The County shall reimburse the City for a portion of the costs of the herein agreed Study. Said County reimbursement shall be Five Thousand Dollars and No Cents ($5,000.00) . The City shall invoice the County for reimbursement. Said invoice shall include a copy of any invoices submitted to the City by its agents for work performed in accordance with this agreement and totaling at least $5,000.00. Invoices will be checked by Hennepin county and payments will be made in full , without retainage within forty-five (45) days of receipt. X All records kept by the City and the County with respect to this project shall be subject to examination by the representatives of each party hereto. XI It is understood that the $5,000.00 reimbursement to the City provided for herein is for the County's total share of said System Capacity Study for solving existing drainage problems within said Drainage District No. 6 in the vicinity of County State Aid Highway No. 88. Nothing herein shall be construed as a commitment by the County to participate in the construction costs of any improvements implemented as a result of said Study. XII • It is further agreed that each party to this agreement or their agents shall not be responsible or liable to the other or to any other person whomsoever for any -3- Agreement No. PW 46-10-91 claims, damages, actions, or causes of actions of any kind or character arising out of• or by reason of the performance of any work or part hereof by the other as provided herein; and each party further agrees to defend at its sole cost and expense any action or proceeding commenced for the purpose of asserting any claim of whatsoever character arising in connection with or by virtue of performance of its own work as provided herein. XIII It is further agreed that any and all employees of the City and all other persons engaged by the City in the performance of any work or services required or provided herein to be performed by the City or its agents shall not be considered employees of the County, and that any and all claims that may or might arise under the Worker's Compensation Act or the Unemployment Compensation Act of the State of Minnesota on behalf of said employees while so engaged and any and all claims made by any third parties as a consequence of any act or omission on the part of. said employees while so engaged on any of the work or services provided to be rendered herein shall in no way be the obligation or responsibility of the County. Also, any and all employees of the County and all other persons engaged by the County in the performance of any work or services required or provided for herein to be performed by the County shall not be considered employees of the City or its agents, and that any and all claims ,that may or might arise under the Worker's Compensation Act or the Unemployment Compensation Act of the State of Minnesota on behalf of said employees while so .engaged and any and all claims made by any third parties as a consequence of any act or omission on the part of said employees while so engaged on any of the work or services provided to be rendered herein shall in no way be the obligation or responsibility of the City or its agents. 0 XIV The provisions of M. 5. ,181.59 and of any applicable local ordinance relating to civil rights and discrimination and the affirmative action policy statement of Hennepin County shall be considered a part of this agreement -as--though fully set -forth herein. • -4- w��� Agreement No. PW 46-10-91 IN TESTIMONY WHEREOF, The parties hereto have caused this agreement to be executed by their respective duly authorized officers as of the day and year first above written. CITY OF ST. ANTHONY (Seal ) By: Mayor Date: And: Manager Date: COUNTY OF HENNEPIN ATTEST: • By: By: Clerk of the County Board Chairman of its County Board Date: Date: And: Upon proper execution, this agreement Associate County Administrator will legally valid and bindi g. and County Engineer r, By Date: Assist nt County Attorney ` Date: RECOMMENDED FOR APPROVAL Approved as to execution By: By: Director, Department of Public Works Assistant County Attorney Date: Date: T ain 'ho u ills a R DAE � APP OVA`/.� May 10 , 1991 TO : Mayor and Councilrnembers FROMs Thomas D. Burt, City Manager I T EM z ORDINANCE REGULATING USE OF SILVER LAKE The Silver Lake Homeowners Association has requested' the City to adopt a speed limit for the lake. The attached ordinance has been reviewed by the City Attorney and his comments have been included with the ordinance. This ordinance will require three readings and will also require Columbia Heights to adopt the same ordinance. Once final adoption of the ordinance is done, the Department of Natural Resources Commissioner will review the ordinance to determine if the speed limit is valid. CITY OF ST. ANTHONY ORDINANCE 1991-003 AN ORDINANCE REGULATING THE SURFACE USE OF THE WATER OF SILVER LAKE LOCATED WITHIN THE BOUNDARIES OF THE CITY OF ST. ANTHONY; AMENDING THE 1973 CODE OF ORDINANCES TO ADD A NEW SECTION 1500:00 The City Council of the City of St. Anthony, Minnesota, ordains: Section 1. The 1973 Code of Ordinances is amended to add a new Section 1500:00 to read as follows: Section 1: PURPOSE, INTENT AND APPLICATION: As authorized by M.S. § 378.32 (459.20), Subdivision 1 as now in effect and as hereafter amended, this Ordinance is enacted for the purpose and with the intent to control and regulate the use of the waters of Silver Lake in Ramsey County, Minnesota, said bodies of water being located within the boundaries of St. Anthony, to.promote its fullest use and enjoyment by the public in general and the citizens of St. Anthony in particular; to insure safety for persons and property in connection with the use of said waters; to harmonize and integrate the varying uses of said waters; and to promote the general health, safety and welfare of the citizens of St. Anthony, Minnesota. Section 2: ADOPTION AND INCORPORATION BY REFERENCE OF MINNESOTA WATERS AND WATERCRAFT SAFETY LAWS, AND BOAT AND WATER SAFETY RULES PROMULGATED BY THE MINNESOTA DEPARTMENT OF NATURAL RESOURCES: The Minnesota Waters and Watercraft Safety Laws, M.S. § 361.01-361.29, as they now exist and are hereafter amended by the State of Minnesota Department of Natural Resources, Minn. Rules parts 6110.0100-.2300 as the same now exist and are hereafter amended, are hereby adopted, incorporated herein by reference, and made a part hereof as if set forth in their entirety. At least three copies of said Waters and Watercraft Safety Laws and Boat and Water Safety Rules and Regulations, so adopted, shall be marked as official copies and filed in the office of the City Auditor along with this Ordinance. Section 3: VIOLATIONS OF THE MINNESOTA WATERS AND WATERCRAFT SAFETY LAWS, AND BOAT AND WATER SAFETY RULES PROMULGATED BY THE MINNESOTA DEPARTMENT OF NATURAL RESOURCES: Any person violating the Minnesota Waters and Watercraft Safety Laws, and the Boat and Water Safety Rules and Regulations promulgated by the Minnesota Department of Natural Resources, adopted and incorporated herein by reference, shall be guilty of a misdemeanor. 2 Section 4: RESTRICTIONS DURING CERTAIN HOURS: Between the hours of 8:00 A.M. and 11:00 A.M. and .between the hours of 3:00 P.M. and 7:00 P.M. on each and every day of the week, no motorboat shall be operated at a speed in excess of five (5) miles per hour. At all other times during each and every day of the week, motorboats shall be subject to no speed limit and may be operated at unrestricted speeds. Section 5: DIRECTION OF TRAVEL DURING UNRESTRICTED SPEED TIMES: During the hours in which unrestricted operating speeds are permitted, all motorboats shall travel and be operated in a counterclockwise direction around Silver Lake. Section 6: NONSANCTIONED RACING PROHIBITED: Racing, that is the participation of two (2) or more operators of motorboats operating their motorboats in a competition of speed, shall be prohibited on the waters of Silver Lake unless the same takes place as part of a scheduled or public race, regatta, tournament or other competition or exhibition duly sanctioned by the county sheriff pursuant to Section 361.20 of the Minnesota Statutes, as amended. Section 7: ENFORCEMENT: The enforcement of this Ordinance shall be the primary responsibility of the Ramsey County Sheriff's Department, and the City of St. Anthony's peace officers. Other licensed peace officers including Conservation Officers of the Department of Natural Resources of the State of Minnesota are also authorized. Section 8: All authorized Resource Management, Emergency and Enforcement Personnel, while acting in the performance of their assigned duties are exempt from the foregoing restrictions. Section 9: EFFECTIVE DATE: This Ordinance shall be in effect from and after the date of its passage and publication. First Reading: May 14, 1991 Second Reading: Adopted: Mayor ATTEST: City Clerk Published in the St. Anthony Bulletin on the day of 1991. DORSEY & WHITNEY A Pw erw cxa x�r Ircvrm�o I'xoreas�o.a Couvux.nows 350 PARE AVENUE 2200 FIRST BANK PLACE°EAST 201 FIRST AVENUE,S.rr., SUITE 340 NEW TORS.NEW YORK 1002E ROCHESTER.MINNESOTA 55902 (212)415-9200 MINNEAPOLIS. MINNESOTA 55402-1498 '507)288-3156 1330 CONNECTICUT AVENUE.N.W. (612) 340-2600 - WASHINGTON.D.C.20036 TELEX 29-0605 1200 FIRST INTERSTATE CENTER (202)857-0700 FAX(612)340-2868 BILLINGS,MONTANA 59103 3 GRACECHURCH STREET (406)252-3800 LONDON EC3V OAT,ENGLAND - 44-71-929-3334 201 DAVIDSON BVILDLNG _ 36.RUE TRONCHET � �R. S GREAT FALLS,MONTANA 59401 75009 PARIS.FRANCE (406)727-3632 33-1-42-66-59-49 (6=)340-2M9 - 45,RUE DE TREVES 127 EAST FRONT STREET 8-1040 BRUSSELS,BELGIDM 32-2-238-78-11 MISSOLLA,MONTANA 59802 (406)721-6025 May 8, 1991 Via TELECOPIER Mr. Thomas D. Burt City Manager City of St. Anthony 3301 Silver Lake Road St. Anthony, Minnesota 55418 Re: Proposed Ordinance Regulating the Use of Silver Lake Dear Tom: I have reviewed the .proposed ordinance which you sent to,me to regulate the use of Silver Lake by power boats, and have the following comments: 1. The following should be added to the title: AMENDING THE 1973 CODE OF ORDINANCES TO ADD A NEW SECTION 1 0.u't7 2. The first paragraph should read as follows: The City Council of.the City of St. Anthony, Minnesota, ordains: Section 1. The 1973 Code of Ordinances is amended to add a new Section j '-:-` to read as follows: 3. The sections should be numbered to fit into the Code at the appropriate location. 4. In Section 2, in the middle of line 5, after the word "hereafter", you should insert the word "amended". i . DoRsEY & WHITNEY • Mr. Thomas D. Burt May 8, 1991 Page 2 5. In Section 3, at the end, you should delete "subject of the penalties and punishment hereinafter provided", and insert "guilty of a misdemeanor." 6. In Section 4, in line 1, I would recommend changing the word "During" to "between", and in line 2 before "3:00 P.M.", insert "between the hours of." 7. Section 9 can be deleted, since these are the penalties for a misdemeanor. 8. I assume that this is based upon some form submitted to you by the DNR If not, I would recommend that you get from them a proposed form of ordinance and see how it compares. If you have any further questions on this, please let me know. Very,trMy yours, liam R. Soth WRS:gle i