HomeMy WebLinkAboutRES 83-017 RESOLUTION AUTHORIZING THE MAYOR AND CITY MANAGER TO EXECUTE THE AGREEMENT BETWEEEN THE CITY OF ST. ANTHONY AND THE SALVATION ARMY FOR FEASIBILITY STUDY COSTS Meeting Sheet
IIIIIIVIIIVIIIVIIIVIIIVIIIIIIIIIII
iozsao
Box: 23
Folder: RES 1983
Document: RES 83-017 RESOLUTION AUTHORIZING THE MAYOR AND
CITY MANAGER TO EXECUTE THE AGREEMENT BETWEEEN THE CIN OF
ST. ANTHONY AND THE SALVATION ARMY FOR FEASIBILITY STUDY
COSTS
i
RESOLUTION 83-017
A RESOLUTION AUTHORIZING THE MAYOR AND
CITY MANAGER TO EXECUTE THE AGREEMENT BETWEEN
THE CITY OF ST. ANTHONY AND THE, SALVATION ARMY
FOR FEASIBILITY STUDY COSTS
WHEREAS , the Salvation Army Camp, whose .property lies within the
boundaries of the City of St. Anthony, has requested a feasibility
study to be made on drainage pr.oblems -on- their property; and
WHEREAS , the City of St. Anthony., as .the contracting agency, received
and submitted to the Salvation Army, a proposal for said feasibility
study from Short-Elliott-Hendrickson, Inc. ; and
WHEREAS , an Agreement is herewith submitted to the St. Anthony City
Council, between the City of St. Anthony and the Salvation Army, which
- Agreement delineates the costs and method payments therefor.
NOW, THEREFORE , BE IT RESOLVED, that the City Council of the City
of St. Anthony hereby authorizes the Mayor and City Manager to
execute the above-described Agreement between the City of St. Anthony
and the Salvation Army.
Adopted this ,�� day of 1983 .
O
Mayor
ATTEST: &L�/
City Clerk
Reviewed for administration:
City _Manager
�._
12,w 01'7
A G R E E M E N T
THIS AGREEMENT, made and entered into this day
of January, 1983, by and between the City of St. Anthony, a
Municipal corporation (hereinafter "St. Anthony") , First Party, and
The Salvation Army, an Illinois corporation duly qualified to
engage in business in the State of Minnesota, (hereinafter the
Army) , Second Pary,
WITNESSETH THAT WHEREAS St. Anthony .and Army have hereto-
fore entered into negotiations relative to the retention and
employment of consulting engineers for the production of a feasibility
study in respect of . the work and contemplated public improvements
relating to surface drainage as more fully described -in a certain
letter dated August 2, 1982 hereto attached as Exhibit "A" ,
NOW, THEREFORE, for and in consideration of the covenants
and agreements herein contained St. Anthony and- Army do hereby
agree .as follows:
1. That St. Anthony shall retain and. employ Short-
Elliott-Hendrickson, Inc. , Consulting Engineers for the purpose of
preparing and submitting. to St. Anthony a feasibility study in
respect of the contemplated surface drainage improvement to .lands and
thoroughfares as outlined in Exhibit"A" .
ir
2. That the Army shall pay for and to said engineers the
costs of :such feasibility study thus prepared and submitted as
specified in paragraph 1 hereof to the extent of such costs but in
no event more than the sum of Seven Thousand and no/100 ($7,000.00)
Dollars.
3. That in the event St. Anthony and -all necessary
muncpalities and state agencies accept such feasibility study and
procure plans and specifications for the further implementation and
commitment to-such drainage improvements and order such improvements
to be made then and in such an event the obligation of the Army to
pay for the costs of such feasibility study as above specified shall
cease and terminate and the cost thereof together with all other
• costs and charges incident to. the commencement or completion of -such
surface drainage project shall become a cost of development which shall
be .encompassed in .the overall cost delineated in a joint powers agreement
relating thereto to be consummated by appropriate muncipalities and
state agencies which St. Anthony will cause to be effected; and, in .
any event said project shall, after such improvements are so 'ordered,
be financed and funded in all respects through special assessments
or other project financing.
-.2
G
• - 4. It is further understood and agreed between the
parties hereto that in the event the Army shall have at any time
paid all or any part of the costs of such feasibility study as
herein contemplated, that upon ordering of said improvements by
St. Anthony with or without participating muncipalities or agencies,
that said sum or sums so advanced or paid shall be included in and
made part of the cost of said project as financed .and funded in
accordance with law .and be refunded to the Army by St. Anthony.
WITNESS the hands of the parties hereto this day and
year above written.
CITY OF T. ANTHONY: .
By:
or
Manager
- ge
-CONTRACTING AGENCY-
SALVATION ARMY, AN ILLINOIS CORPORATION:
By:
John W. Paton,, 2nd Vice President
By:
mes V. Davis, Secretary
SHORT
INC.
® ® CONSULTING ENGINEERS
ST- PAIL, Mln`ESOTA • CHIPPEWA FALLS,VASCONSIN
August 2, • 1982 RE: ST. ANTHONY, MINNESOTA
SALVATION ARMY CAMP DRAINAGE
OUR FILE NO. 81071
4
City of St. Anthony
3301 Silver Lake Road
St. tnthony, Mn. 55418
Actel!L ion: Mr. Larry Hamer,
Director of Public Works -
Pursuant to our recent. conference with Mr. Larry. Hamer, Director of
Public' Works, we are pleased to submit herewith our proposal for
engineering services for investigation, study and report of surface
drainage to the Salvation -Army Camp property in St. Anthony. This
drai 'm ge is a product of surface runoff from areas within the cities
of New Brighton and Columbia Heights. Subject surface drainage flows
overland on Ramsey County Road "E" in combination- with a limited
'amou:it of existing storm sewer which drains Anoka County Road 2
intersection. We are advised that this work will be performed for St .
Anthony, New Brighton, Columbia Heights, Ramsey County and Anoka
County ; authority being embraced in an inter-municipal agreement with
St . Anthony functioning as the contracting agency therefor. If the
project sloes not proceed to plans and specifications, St. Anthony will
-.he entire cost of the study.. If the stu.ly results in plans and
Pt-cif- cations being ordered, a ;oint powors agreement shall be
r_;lLered with all municipalities and counties participating.
The specific area of study is the properl-y owned by the Salvation
Atrry. all within St. Anthony. bounded on the east by .Silver Lake Road,
was'- -)f. Stinson Boulevard, South by Silver. :,a=:e and on the north by -
Ral�iis•�y County Rodd "E" . The st:)ay i 1 i ,l.;c i nc.:.ude Stinson Blvd.
fvutt- C::)unty Road "-E" to the 0;_1 ur:,bi:: Heights beach 'at Silver
Lake. The drainage problems ceLat.ing t,o this pt;rtion of Stinson
P.oulevard and the Salvation Arc::_ Camp wi 1 i iue i+;c l uded in the study.
Our pT-oposed engineering sery=ces c:o:lsist of the investigation and
study of surface drainage including the Sal.,.ation Army property. The
investigation shall include the consideration Army
underground
conveyance. The discharges read: ir.cs the Saillat ion Army property will
l,e studied together with the capac:itles of individual existin•3 ponding
100 GOPHER Bl Il nl\G • =" E i�T l IiTIE ( '\4E)4 ROW • �T Pel 1 VI♦\ESOT•\ iiir • PHO M 6121
City of St: Anthony
August 2, 1982
Page 2
areas. The ' engineering services also would provide a basis for
coordination between all designated representatives of St. 'Anthony,
Columbia Heights, New Brighton, Ramsey County, the Salvation Army,
Rice Creek Watershed District and Anoka County, as required.
The foregoing study is to be presented in a bound report form with
complete discussion, preliminary drawings, substantiating data, design
basis and calculations together with cost estimates for the proposed
facilities; including suggested apportionment of cost to each
participating and affected unit' .of government. The drainage problems
relating to Stinson Boulevard will be dealt with in a separate section
of the report such that such data can be easily identified.
Our compensation for the above services shall be on the basis of 2.30
times payroll cost, mileage and out of pocket expenses. The hourly
charge-out rate shall be based upon the attached schedule.
The estimated cost on the foregoing basis for services of this
proposal will not exceed $7,000.
Under- this proposal, St. Anthony agrees to make available to us and
furnish us with all existing improvement information in the way of
mapst records, plans, contours, profile studies, etc. which 'are
available in response to work undertaken herein, including such
information as may be pertinent and necessary from Columbia Heights,
New Brighton, Ramsey County and Anoka County.
It is to be specifically understood that engineering services in this
proposal do not include the cost of laboratory analysis, the cost of
boundary surveys or underground exploration of the subsurface
conditions. These items wil be furnished on request and our actual,
cost therefore.
It is to be understood that in signing this, proposal we are authorized
to proceed only with the work outlined herein. No work in conjunction
with plans and specifications will be undertaken without further
authorization.
It is to be specifically understood that i•f we are authorized to make
this study and report that work shall commence as soon as weather
permits and be completed within 90 days thereafter unless the scope of
the work is enlarged and/or another completion date is mutually agreed
on.
a
j
- City of St. Anthony
• .,August 2, ' 1982
Page 3
In summary, we shall consider this_ proposal an. agreement between us
upon its acceptance by you and your notification in writing to proceed.
therewith.
Respectfully .submitted,
SHORT-ELLIOTT-HENDRICKSON, INC.
Wilbur a enow,
Vice President
gfc
Accepted' this day of
CITY OF ANTHONY,�, MINNESOTA
BY:
Mayor
it J
1
BY: d n
nager