Loading...
HomeMy WebLinkAboutRES 84-020 RESOLUTION AUTHORIZING THE MAYOR AND CITY MANAGER TO SIGN THE CONSTRUCTION COOPERATIVE AGREEMENT WITH HENNEPIN COUNTY REGARDING THE COUNTY ROAD "D" PROJECT Meeting Sheet IIIIIIVIIIVIIIVIIIVIIIVIIIIIIIIIII 102487 Box: 23 Folder: RES 1984 Document: RES 84-020 RESOLUTION AUTHORIZING THE MAYOR AND CIN MANAGER TO SIGN THE CONSTRUCTION COOPERATIVE AGREEMENT WITH HENNEPIN COUNTY REGARDING THE COUNTY ROAD "D" PROJECT • RESOLUTION 84-020 A RESOLUTION AUTHORIZING THE MAYOR AND CITY MANAGER TO SIGN THE CONSTRUCTION COOPERATIVE AGREEMENT WITH HENNEPIN COUNTY REGARDING THE M COUNTY ROAD "D" PROJECT WHEREAS, Ramsey County is preparing plans and specifications for Ramsey County Road "D" project, which construction will include portions located in the Hennepin County portion of the City of St. Anthony; and WHEREAS, the City of St. Anthony will share in the Hennepin County cost share of said project asset forth in the Construction Co operative Agreement No. PW 11-10-84 . NOW, THEREFORE, BE IT RESOLVED, that the Mayor and City Manager are hereby authorized to sign .the Construction Cooperative • Agreement No. PW 11-10-84 between the City of St-. Anthony and Hennepin County. Adopted this p day of AKA Li I 1984 . May r ATTEST: City Clerk Reviewed for administration: m, City Manager � C DEPARTMENT OF TRANSPORTATION = :p1N�-_.4 320 Washington Av. South FTHopkins, Minnesota 55343ES NNES� HENNEPIN LFU 935-3381 TTY 935-6433 March 8, 1984 Mr. David M. Childs, Manager City of St. Anthony 3301 Silver Lake Road - Minneapolis, Minnesota 55418 AGEEEMENT NO. PW 11-10-84 S.P. 62-619-04 & S.P. 27-693-01 CSAH 93 (37TH AVE. N.E. ) COUNTY PROJECT 7205 Dear Mr. Childs: Enclosed are two copies of a Construction Cooperative Agreement for the above referenced project for which arrangements are being made to call for bids. This project is being constructed by Ramsey County. • The agreement covers the cost sharing by Hennepin County and the City of St. Anthony for the portion of the project within Hennepin County. If the agreement is satisfactory, please have both copies signed by the .appropriate city officials and return them to this office. Upon completion of the remaining signatures by county officials, we will send you one fully executed copy for your. files. Also, please return a certified copy of the resolution authorizing the mayor and - to sign the agreement. -� e� If you have any questions concerning the agreement, please contact me'. Sin erel ern Gen ger E. Chief, sign vision VG/WGM: lar Enclosures HENNEPIN COUNTY an equal opportunity employer y<!- u Agreement No. PW 11-10-84 Hennepin County Project No. 7205 County State Aid Highway No. 93 • City of St. Anthony County of Hennepin CONSTRUCTION COOPERATIVE AGREEMENT AGREEMENT, Made and entered into this 'x_�day of ^Mam 19 Tly—, by �,C_ and between the County of Hennepin, a body politic and corporate under the laws of the State of Minnesota, hereinafter referred to as "Hennepin County" and the City of St. Anthony, a body politic and corporate under the laws of the State of Minnesota, hereinafter referred to as the ."City". WITNESSETH: WHEREAS, Ramsey County is preparing plans and specifications for construction of • Ramsey County Road "D" and Hennepin County State Aid Highway No. 93 between Beldon Drive and Interstate 35W west ramps. Said plans and specifications labelled and identified as S.P. 62-619-04 and S.P. 27-693-01 are by this reference made a part hereof; and WHEREAS, That portion of. said County State Aid Highway .No. 93, included in said Ramsey County plans, located between Beldon Drive and the easterly limits of Hennepin County (Engineers Station 5+10 to Engineers Station 26+29.72) is hereinafter known and referred to as Hennepin County Project No. 7205. Said Hennepin County Project 7205 lies within the corporate limits of the City; and -WHEREAS, Hennepin County and Ramsey County are negotiating a construction cooperative agreement covering County cost participation in a contract to be let by Ramsey County for construction of said Hennepin County Project 7205; and • -1- • WHEREAS', The estimated Hennepin County cost share for the construction of said Hennepin County Project No. 7205 is $499,398.65, and WHEREAS, A portion of the aforementioned Hennepin County cost share is subject to reimbursement by the City in accordance with Hennepin County's standard division of cost policy for construction of highways within corporate limits of municipalities, said reimbursement and the Hennepin County cost share is shown in EXHIBIT A attached hereto and, made a. part hereof; and_ WHEREAS, It is contemplated that the work be carried out by the parties hereto under the provisions of M.S. Sec. 162. 1.7, Subd. 1. NOW THEREFORE, IT IS HEREBY AGREED: ' I Ramsey County or its agents under the proposed agreement with Hennepin County, will advertise for bids for the work and construction of the aforesaid Project No. 7205, receive and open bids pursuant to said advertisement and enter into a contract with the successful bidder at the unit prices specified in the bid of such bidder, according to law in such case provided for counties. The Contract will be in form and will include the plans and specifications prepared by Ramsey County or its agents. LI Said .agreement also requires that Ramsey County administer the contract and inspect the construction of the contract work contemplated herewith. However, the City Engineer of St. Anthony shall cooperate with the Ramsey County Engineer and his staff • at their request to the extent necessary, but will have no responsibility for the supervision of the work. -2- • III Hennepin County or its agents shall acquire all rights of way, permits and/or easements required for the construction of said project No. 7205. The final cost of all rights of way, permits and/or easements required for the construction of said project plus all costs incurred by Hennepin County in acquiring said rights of way, permits and/or easements shall be apportioned 50 percent to Hennepin County and 50 percent to the City of St.. Anthony— The right of way costs incurred as described herein shall include all acquisition costs including, but not limited to, any and all damages occurring to any person or persons, including private utilities, in relocating or removing or adjusting main conduits or other structures located in or upon the land taken and within the present right of way; or damage in procuring such right of way, whether such damage is caused • by the Counties or the City in the performance of such contract with respect to the improvement of County State Aid Highway No. 93, as shown on the plans for Hennepin County Project No. 7205. Hennepin County will periodically, as parcels are acquired, prepare and submit to the City itemized accounts showing right of way and acquisition costs incurred by Hennepin County. The City share of said costs shall become due and payable within thirty (30) days after submittal. Takings in excess of that required for the roadway construction will only be accomplished if the parties hereto mutually agree that said excess takings are desirable. The cost of any such excess taking will be shared 50% Hennepin County - 50% City and all costs and receipts from rental or sales after acquisition will also be shared on the same basis. • -3- • The estimated right of way expenses described herein are indicated in said EXHIBIT A attached hereto. IV The City shall reimburse Hennepin County for its share in the contract construction costs of said Hennepin County Project No. 7205 and the total final contract construction costs shall be apportioned as set forth in the Division of Cost statement in said EXHIBIT A attached hereto. It is further agreed that the amounts shown in EXHIBIT A are based upon estimated quantities at estimated unit prices and that the unit prices set forth in the contract with the successful bidder and the final quantities as measured by the Ramsey County Engineer shall govern in computing the total final contract construction cost for apportioning the cost of said project according to the provisions of this paragraph. • V In addition to payment of the City's proportionate share of the contract construction and right of way costs, the City also agrees to pay to. Hennepin County a sum equal to thirteen percent (13%) of the amount computed as the City's share of the said contract construction costs, it being understood that said additional payment by the City is its proportionate share of all engineering costs incurred in connection with the work performed within the corporate limits of the City on this project. VI Within sixty (60) days after an award by Ramsey County to the successful bidder, the City shall deposit with the Hennepin County Treasurer, ninety percent (90%) of the estimated City share in the contract construction and engineering costs for said -4- • project No. 7205. Said estimated City share shall be based on actual contract unit prices for estimated quantities shown in the plans. The remaining ten percent (10%) is to be paid to Hennepin County upon the completion of said project and submittal to the City of the Final Estimate for the project showing the City's final share in the contract construction and engineering costs. Upon payment of the Final Estimate to the successful bidder, any amount remaining as a balance in the deposit account will be returned to the City; likewise any amount due Hennepin County by the City upon payment of the Final Estimate shall then be paid by the City as its final payment for the construction and engineering cost of this project. • VII Hennepin County reserves the right not to issue any permits for a period of five (5) years after completion of the project for any service cuts in the roadway surfacing of the County Highway included in this project for any installation of underground utilities which would be considered as new work; service cuts shall be allowed for the maintenance and repair of any existing underground utilities. VIII It is agreed that Hennepin County, at its expense, shall place all necessary no parking signs and'the City, at its expense, shall provide the enforcement for the prohibition of on-street parking within its corporate limits on that portion of County State Aid Highway No. 93 constructed under this project. -5- • Any modification of the above parking restriction shall not be made without first obtaining a resolution from the Hennepin County Board of Commissioners permitting said modification. IX All records kept by the City and Hennepin County with respect to this project shall be subject to examination by the representatives of each party hereto. X It is agreed that the City shall remove and replace all City owned signs that are within the construction limits of this project, all at City expense. XI It is further agreed that each party to this agreement shall not be responsible or liable to the other or to any other person or persons whomsoever for any claims, damages, actions, or causes of actions of any kind or character arising out of or by reason of the performance of any work or part hereof by the other as provided herein; and each party further agrees to defend at its sole cost and expense any action or proceeding commenced for the purpose of asserting any claim of whatsoever character arising in connection with or by virtue of performance of its own work as provided herein. It is agreed that the City will be included as a named insured under the liability insurance policy required to be provided by the Contractor performing the work under said Project No. 7205. • -6- • XII It is further agreed that any and all employees of the City and all other person engaged by the City in the performance of any work or services required or provided for herein to be performed by the City shall not be considered employees of Hennepin County, and that any and all claims that may or might arise under the Worker's Compensation Act or the .Unemployment Compensation Act of the State of Minnesota on behalf of said employees while so engaged and any and all claims made by any third parties as a consequence of any act or omission on the part of said employees while so engaged on any of the work or services provided to be rendered herein shall in no way be the obligation or responsibility of Hennepin County. Also, any and all employees of Hennepin County and all other person engaged by Hennepin County in the performance of any work or services required or provided for herein to be performed by Hennepin County shall not be considered employees of the • City, and that- any and all claims that may or might arise under the Worker's Compensation Act or the Unemployment Compensation Act of the State of Minnesota on behalf of said employees while so engaged and any and all claims made by any third parties as a consequence of. any act or omission on the part of said employees while so engaged on any of the work or services provided to be rendered herein shall in no way be the obligation or responsibility of the City. XIII The provisions of M.S. 181.59 and of any applicable local ordinance relating to civil rights and discrimination and the affirmative action policy statement of Hennepin County shall be considered a part of this agreement as though fully set forth herein. • -7- XIV Should the Counties of Hennepin and Ramsey fail to enter into the construction cooperative agreement mentioned on page one of this agreement, then in that' .event, this agreement between Hennepin County and the City shall be null and void. • • -8- s • IN TESTIMONY WHEREOF, The parties hereto have caused this agreement to be executed by their respective duly authorized officers as of the day and year first above written. CITY OF ST. ANTHONY (Seal) By iayor Date: • .. z„r•. 9u And: 11 11�YyVU.X Ct`y Manager Date: COUNTY OF HENNEPIN ATTEST: C" By: erk of the County Board T Ch an of its County Board 064 Date: '5-Az Date: And: Upon proper execution, this agreement Associat Co a y Administrator will be legally valid and binding. and County E gineer By: L`-✓ �C� ���' Date: Assistant County Attorn y Date: RECOMMENDED FOR APPROVAL Approv cWi to execution _ Q By: 4—" By: Director, Department of Transportation Assistant County Attorney Date: • Date: �� yj E x r� � ewt- A � • . PAGE NO.. 1 102/29/84 JnB tin. 205 COST ESTIMATE FPR C.S.A,H. Nn. 93 pRnJ. Nn. ?poli ITEM ITEM APPROXTMATF UNIT NUMAER DESCRIPT16N QUANTTTY UNIT PRICE AMOUNT 20121'.50t MOBILIZATION .22 LU""P SUM 800010,00 17620.00' 2101.502 CLEARING t58.0M TRFE 83.00 13114,04 2101 .507 GRUBBING 145.010 TREE 50.(00 725P.0�' 2t04r5at REMOVE CURB AND GUTTER 11RV.►,0m ON FT 1 .50 1770,00 ; 2100.501 REMOVE CuRR 370,00 LIN FT 1 .Sa 555.00' 2104x501 REMOVE PIPE C11L.VERT 50.0A LIN FT 4,501 225,90 2104rSolPENOVE PIPE CULVERT 333,001 LIN FT 6,OP 1998.00 2104.503 REMOVE SIDEWALK 140.AP SG FT .60 84.01n 2104r54S RFMOVE CONCRETE PAVEMENT A49o(Ao SW YD 2.85 2419,65 2104.509 REM. CATCH BASINS nR S1:iRFACE DvAIN S.UM EACH 150.0 ! 758.V1A 2104x521 SALVAGF CHAIN LINK FENCE 2JS,00 LIN FT loop 215,00 2104x521 SALVAGF WOOD RAIL FENCE 60.09 LIN FT 1 ,10 60.Am 2104.5?l SALVAGF w00D PRIVACY FENCE 160,001 LIN FT i.Q9 16001?? 2104..523 SALVAGE HYDRANT 1 .09 EACH 400.A0 49V,00 2105SolCOMMON EXCAVATION (P) 26731 .He� CU YD 1.85 4905209 2105x523 COMMON BMRROW (Lv) 437?,UM CU YD 3.25 t42?+9.A" 2105x525 TOPSOIL BORROW (LV) 6?5,MM CU Yn 5.25 3281 .25 2t3P.501 WATER 42,00 !0001? GAL 12.00 SA4.00 2211x5911 AGGREGATE BASE CLASS 3 5(495.00 TON 4.Sm 22927,50 2211,501 AGGREGATE RASE CLASS 4 3921 ,00 TON I1151" 17194.50 2211.x5A1 AGGREGATE RASE CLASS 6 4541 ;00 TON 6.25 28381 .25 230fxSol 7 1/2" NON•RFTNFORCED CONC. PAV'T 553.00 SO YD 6.AA 3318,01 ' 2301 .St1 STRUCTURAL CONCRETE 115.00 CU YO 40.NP 46A0.0A 231011529 REINFORCEMENT AAPS 244,@M POUNn .?fA 170.80 0301x604 SAWCUT CONCRETE PAVF,MENT 6011 .00 LIN FT 1.60 96t.6n 2331..504 SIT MATERIAL. FOR MTXTURE 175.00+ TON 170.00+ 24750.00 23310SW8 WEARING COURSE. MIXT. FOR ENTRANCES 88.00 TON 20.49 1760000 2331x510 BINDER CnuRSE MIXT11RF 945.00 TON 9.94 9402.75 2331x514 BASE COURSF MIXTURF 2727,001 TON 9.80 26724.60 033.1x601 IIT. MAT'L FOR TFMP SURFACING 1942.OM SO YO 2.90 5631.80 0331 .6913 SAWC11T BITUMINOUS PAVEMENT SURFACE 837,00 LIN FT 1 .501 1255.50 2357x502 BIT MATERIAL FOR TACK COAT 1624.OM GAL 1.25 2030,00 2361x504 ASPHALT CEMENT 46.00 TON 17H,NP 782000M 2361 .509 WEARING COURSE MIXTURE 654.00 TON 19.0 ' 12426.0 ' 0427_x607 TI"!hCR MALL 938.090 SO FT 6.30 5909.40 2503x541 15 RC PIPE SEWER CL TV DES 3906 1562,00 LIN FT 24.50+ 38269.Na 2503.541 18 RC PIPE SEWER DESIGN W6 1256.00 LIN FT 27.OP 33912.00 2503.541 21 RC PIPE SEWER OFSI'GN 3n 0b 127.0+0 LIN FT 30.001 3810,00 OSO4. 602 INSTALL HYDRANT 1 .00 EACH 455.0fA 455.00' 05N4�6P7 6" VALVE BOX A'RD ASSFMNLY 1 ,00 ASSEMPLY 4501.0F 45P.a�" 2506.5013 CONST MANHOLES DESIGN A OR F 10.30 EACH ta00.WP 1PPQ10.W� ' E #T 'A PAGE N0 , 2 P2/2P/84 JnB N0. 20S ITEM ITEM APPROXIMATF )NTT NUMSER nESCRIPTIRN 00ANTITY UNIT PRICE AMOUNT 2506'509 CONCSTRUCT CATCH BASIN DESIGN 8Pw2 8.00 EACH A5N.0A 60100,0m 25060504 CONST CATCH 9ASINS DESIGN LP4.4 1 .00 EACH 12a0.AA 1200.0 + 2506,509 CONST CATCH BASINS DESIGN Lp4.5 6.AM EACH 0100M 78�Ip.0p ' 2506.509 CONST CATCH BASINS DESIGN LP4.6 1 .p0 EACH 13510.dP 1350.00 2506;511 RECONSTRUCT MANHOLES 5.00 LIN FT i65.ea 825.A� 2506,516 CASTING ASSEMBLIES 1'.010 EACH 250.00 25o+.Ao+ 2506,521 INSTALL CASTINGS 1 :00 FACH 175.0A 175.Ao+ 2506'522 ADJUST FRAME AND RING CASTINGS 3.09 EACH 175.00 525.00 2521,591 4" CONC. WALK FOR MEDIANS 1179.00 SO FT 1.SR !76.8.50 2531..5011 CONIC C AND G DESIGN gbt2 444.00 LIN FT 5.45 2419.80 2531 ,501 CONC C AND G DESIGN 8624 3906.0M LIN FT S965 2206A.90 2531,5(42 CONC CURB DESIGN V6 861 .00 LIN FT 5.AA 43M5.00 2531,507 6 CONC DRIVEWAY PAVEMENT 385.0A SO YC 19.00 7315.0p 0557..603 INSTALL WOODRAIL FENCE 60.00 LIQ! FT 1.50 90.00 0557,603 INSTALL WOOD PRIVACY FENCE 160.00 LIN FT 2.25 360.09 0557,603 INSTALL CHAIN -LINK FENCE 215.00 LIN FT 3.75 8016.25 0563,601 TRAFFIC CONTROL .22 LUMP SUM 220m0.90 4840000 0564,602 PAVEMENT MESSAGE LT. ARROW 1 .0P FACH 8a.isp �1P.(0P N564.603 4" SnL. LINE YEL. POLYMER PREFMn 14A0.9I01 LIN FT 1 ,5ol 222NOO 0564,603 4" SbL. LINE YEL, EPnXY 6760!.00 LIN FT 037 25P11 .2M N564,603 4" SOL. LINE wHT. FPDXY 65.00 LIN FT .37 24.01F 0564..603 4" SPOKEN LINE WHITE EPnXY 250.01 LIN FT .37 42.50 0564r603 24" SOLID LINE WHITE EPDXY 66.0a LIN FT 4.25 280.50 2565,511 FULL T ACT T CnmTRnL SIG. SYS. A .50 SIG SYS eg0a0.0a 42SP0.00 2575,505 SODDING 7505.00 SG YD 1 .AG1 7595.00 el a elm 2575.531 COMM. FERT. ANALYSIS 12®12.12 .3q TON 3A0.0a 98,65 SUBTOTAL 494398.65 TOTAL ESTIMATED COST 499348.65 • DIVISION OF COST EXHIBIT A CSAH 93 PAGE 3 OF' 3 FRON_9ELDON DRIVE TO EAST COUNTY LINE -(HIGHCREST ROAD),_ _ HENNEPIN COUNTY PROJECT 7205, S.P. 27-693-01 C TOTAL % COST % COST j ESTIMATED ESTIMATED ESTIMATED HENNEPIN 'HENNEPIN CITY OF CITY OF ITEM UNIT QUANTITY UNIT COST COST COUNTY COUNTY ST. ANTHONY ST. ANTHONY °( CONCRETE CURB 8 GUTTER. DESIGN 8624 LIN. FT. 2655 $ 5.65 $ 15.000.75 50 $ 7,500.38 50 $ 7,500.37 .I (ON 37TH AVE. ONLY) "� STORM SEWER (CATCH BASINS AND LEADS) { DESIGN SP-2-C.B. NOS. 101,102.106.107, EACH 8 850.00 6.800.00 50. 3.400.00 50 3.400.00 120.121.122.133 DESIGN LP4-4 -. C.B. NO. 112 EACH 1 1.200.00 1.200.00 50 600.00 50 600.00 1 DESIGN LP.4-6 - C.B. NOS. 105.113.119. EACH 6 1.300.00 7.800.00 50 3.900.00 50. ` 3,900.00 i i 124.127.131 ! DESIGN LP4-6 - C.B. NO. 117 EACH 1 1.350.00 1.350.00 50 675.00 50 675.00 - 150 REINFORCED CONCRETE PIPE LIN. FT. 591 24.50 14.479.50 50 7.239.75 50 7.239.75 k STORM SEWER (NON-PARTICIPATING) (1) 8.567.87 - 100 8.561.87 TIMBER WALL SQ. FT. 938 6.30 5.909.40 50 2.954.70 50 2.954.70 FULL TRAFFIC-ACTUATED TRAFFIC CONTROL SYSTEM 0.5 85.000.00 42.500.00 50 21.250.00 50 .-21.250.00 SIGNAL SYSTEM A Is 6" VALVE BOX ANO.ASSEMBLY ASSEMBLY 1 450.00 450.00 0 100 450.00 V SUBTOTAL $104.057.52 $47.519.83 $56.537.69 i BALANCE OFCONSTRUCTION _5395.341,13 $ 95.341.13 F TOTAL ESTIMATED COST FOR'CONTRACT.ITEMS $499.398.65 $442.B6O,96_ $56.537.69 i PLUS 13% FOR ENGINEERING 8 CONTRACT ADMINISTRATION (SUB-TOTAL) 7.349.90 s LESS 76.74% FEDERAL PARTICIPATION FOR'ALL 0NTRACT ITEMS EXCEPT 36.466.71 STORM SEWER (NON-PARTICIPATING) AND' 6' VALVE BOX AND ASSEMBLY RIGHT OF WAY 255,000.00 50 127.500.00 S0 127,500.00 ! TOTAL ESTIMATED COST - ST. ANTHONY'S ;. $154.920.88 (1) BASED ON THE RATIO OF CONTRIBUTING'AREAS WITH STATE AID FUNDS AND INPLACE OUTFALL LINES CREDITED AS SHOWN IN MN/DOT'S HYDRAULIC HEMO DATED SEPTEMBER 27. 1982. a ', AMOUNT IS EQUAL TO 3.1% OF TOTAL STORM SEWER COST FOR PROJECT ON RAMSEY CR 'D' FROM SILVER LAKE ROAD TO CLEVELAND AVENUE j AWH:lar 2/10/84