Loading...
HomeMy WebLinkAboutRES 88-047 RESOLUTION ADOPTING SPECIAL ASSESSMENTS RELATING TO THE IMPROVEMENT OF ST. ANTHONY BOULEVARD BETWEEN THE BURLINGTON NORTHERN RAILROAD AND THE SOUTH CITY LIMIT LINE Meeting Sheet IIIIII VIII VIII VIII VIII VIII IIII IIII ioissa Box: 21 Folder: RES 1988 Document: RES 88-047 RESOLUTION ADOPTING SPECIAL ASSESSMENTS RELATING TO THE IMPROVEMENT OF ST. ANTHONY BOULEVARD BETWEEN THE BURLINGTON NORTHERN RAILROAD AND THE SOUTH CIN LIMIT LINE RESOLUTION 88- 047 A RESOLUTION ADOPTING SPECIAL ASSESSMENTS RELATING TO THE IMPROVEMENT OF ST. ANTHONY. BOULEVARD BETWEEN THE BURLINGTON NORTHERN RAILROAD BRIDGE AND THE SOUTH CITY LIMIT LINE WHEREAS, pursuant to proper notice duly given as required by law, the Council has met and heard and passed upon all objections to the proposed assessment for the improvement of St. Anthony Boulevard between the Burlington Northern Railroad Bridge and the south City Limit Line, NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF ST. ANTHONY, MINNESOTA: 1. Such proposed assessment, a copy of which is attached hereto and made a part hereof, is hereby accepted and shall constitute the special assessment against the lands named therein, and each tract of land therein included is hereby found to be benefited by the proposed improvement in the amount of the assessment levied against it. 2 . Such assessment shall be payable in equal annual installments extending over a period of 10- years, the f--first of the installments to be payable on or before the first Monday in January, 1990 and shall bear interest at the rate of 8 percent per annum from the date of the adoption of this assessment resolution. To the first installment shall be added interest on the entire assessment from the date of this resolution until December 31, 1989. To each subsequent installment when due shall be added interest for one year on all unpaid installments. 3 . The owner of any property so assessed may, at any time prior to certification of the assessment to the County Auditor, pay the whole of the assessment on such property, with interest accrued to the date of payment, to the City Treasurer, except that no interest shall be charged if the entire assessment is paid within 30 days from the adoption of this resolution; and the owner may, at any time thereafter, pay to the City Treasurer the entire amount of the assessment remaining unpaid, with interest accrued to December 31 of the year in which such payment is made. Such payment must be made before November 15 or interest will be charged through December 31 of the next succeeding year. • 4 . The City Clerk shall forthwith transmit a certified duplicate of this assessment to the County Auditor to be extended on the proper tax lists of the County, and such assessments shall be collected and paid over in the same manner as other Municipal taxes . Adop ed by the Council this J3# day of DeCeM,Le C- 19 Mayo City Clerkd Reviewed for administration: City Manager ST. ANTHONY ASSESSMENTS COST 9 TON ROAD (EXCL. CURB AND RESTORATION) $194,839. 57 • COST 5 TON ROAD (.EXCL. CURB AND RESTORATION) $100,302_21_ NET DIFFERENCE $94,537. 36 CITY 5 TON ROAD COST (1/2) COST 5 TON ROAD $50, 151. 11 GOLF COURSE 5 TON ROAD( 1/4) COST 5 TON ROAD $25,075.55 CEMETARY 5 TON ROAD (1/4) COST 5 TON ROAD $25,075.55 ENGINEERING COSTS $33,466.00 CONSTRUCTION TESTING COSTS $6,801 .00 ------------ TOTAL ENGINEERING & TESTING COSTS $40,267.00 CITY ENG & TEST COST (1/2) COST $20, 133;50 GOLF COURSE ENG & TEST COST ( 1/4) COST $10,066. 75 CEMETARY ENG & TEST COST (1/4) COST $10,066. 75 GOLF COURSE CURB ASSESSMENT $21 ,352.20 CEMETARY CURB ASSESSMENT $21 ,214. 15 +++++++++++++++++++++++++++++++++++++++++++++++++++++++.++++++++++++++++++++++++++++++ INDIVIDUAL ASSESSMENT TOTALS • GOLF COURSE ROAD COST $25,075.55 GOLF COURSE ENG & TEST COST $10,066.75 GOLF COURSE CURB COST $21 ,352.20 ------------ TOTAL GOLF COURSE $56,494.50 2748 $20.56 per foot CEMETARY ROAD COST $25,075. 55 CEMETARY ENG & TEST COST $10,066. 75 CEMETARY CURB COST $21 ,214. 15 ------------ TOTAL CEMETARY $56,356.45 2726 $20.67 per foot NET DIFFERENCE .I'N 5 & 9 TON- ROAD $94,537.36 CITY ENG & TEST COST $20, 133.50 CITY 5 TON ROAD COST $50, 151 . 11 ------------ TOTAL CITY $164,821 .97 r • TOTAL GOLF COURSE SIDE --------------------------------------------------------------- UNIT PROJECT PROJECT ITEM DESCRIPT UNIT PRICE TOTAL COST --------------------------------------------------------------- Rmv Conc Curb LF $1 . 10 2732 $3,005. 20 Rmv B624 C & G LF . $1 . 10 16 $17. 60 Rmv 8" Strm Sew LF $5.05 33 $166.65 Rmv Bit Pavm 't BY $1 . 10 153. 2 $168. 52 Rmv Catchbasin EA $75.00" 2 $150.00 Saw. Bit Pavm 't LF $2. 45 68.5 $167. 83 Topsoil Borrow (LV) CY $7.60 194. 25 $1 ,476. 30 Conc C & G 8618 LF $4.05 2617 $10,598.85 Conc C & G B624 LF $7.60 10 $76. 00 Conc Drive Apron CY $135.00 29.4 $3,969.00 Sodding SY $1.50 1037.5 $1 ,556.25 • ----------- SUB TOTAL GOLF COURSE $21 ,352. 20 • CEMETARY SIDE ----------------------------------------------------------------- UNIT PROJECT PROJECT ITEM DESCRIPT UNIT PRICE TOTAL COST . ------------------------------------------------=---------------- Rmv Conc Curb LF $1 . 10 2711 $2,9B2. 10 Rmv 8624 C & G LF $1 . 10 15 $16.50 Rmv 8" Strm Sew LF $5.05 33 $166.65 Rmv Pit Pavm't' SY $1 . 10 140 $154.00 Rmv Catchbas-in -EA $75.00 2 $150.00 Saw Pit -PavmIt LF $2. 45 50 $122.50 - Topsoil Borrow (LV) CY $7.60 194.25 $1 ,476.30 Conc C & G P6.18 LF $4.05 2597 $10,517.85 Conc C & G B624 LF $7.60 10 $76.00 Conc Drive Apron CY $135.00 29. 6 $3,996. 00 Soddinq SY $1 . 50 1037. 5 $1 ,556. 25 • ----------- SUP TOTAL CEMETARY $21 ,214. 15 • 5 TON ROAD COST ---------------------------------------=--------------------- UNIT PROJECT PROJECT ITEM OESCRIPT UNIT PRICE TOTAL COST ------------------------------------------------------------- Mobilization LS $9,525.00 1 $95525.00 Field Office EA $2, 175.00 1 $2, 175. 00 Unclass Excav CY $3.95 669:48 $2,644.44 Geotextile Fabric SY $0.70 11246.60 $7,872. 20 Aggr Class 5 TON $5. 15 37.23.46 $19, 175.82 Bit Mtr '1 /Mix TON $140.00 48. 30 $6,762. 00 Base Course TON $8.60 929:24 $7,991.46 - - Bit Mtr ' l/Mix TON $140. 00 45. 30 $6,342.00 Wearing Course Mixtu TON $15. 75 809.09 $12,743. 17 Tack Coat GAL $1 . 20 236. 00 $285.60 Granular Bedng CY $8. 10 35.91 $290.87 6" Pert Drain Pipe LF $9. 10 136.00. $1 ,237.60 12" RC Pipe LF $35. 35 64.00 $2,262. 40 Rmv Conc P.avm't SY $1 . 45 9471.00 $13,732. 95 Bale Check EA $5.95 42.00 $249. 90 Pavm't Marking LS $335.00 1 . 00 $335. 00 Traffic Control Devi LS $3,000,00 1 .00 $3,000.00 Saar Bit Pavm't LF $2. 45 64.00 $156. 80 • Const CB Dsgn N EA $880.00 4 $3,520.00 ------------ -.SUB TOTAL .5 TON ROAD 1100,302.21 ST ANTHONY ASSESSMENT RCM NO. 861019-01 • TOTAL SECTION A COST --------------------------------------------------------------- -UNIT PROJECT PROJECT ITEM DESCRIPT UNIT PRICE TOTAL COST ---------------- ---------------------------------------------- Mobilization LS $9,525.00 1 $9,525.00 Field Office EA $2, 175. 00 1 $2, 175.00 Rmv Conc Curb LF $1 . 10 5443 $5,987. 30 Rmv B624 C & G LF $1 . 10 31 $34. 10 Rmv 8" Strm Sew LF $5.0.5 66 $333. 30 Rmv Conc Pavm't - - SY -- $1.45 94.71 - $13,73.2.95 = _ - Rmv Bit Pavm't SY $1 . 10 321.6 $353.76 Rmv Catchbasin ' EA $75.00.' 4 $300.00 Saw Bit Pavm't LF $2. 45 182.5 $447. 13 Unclass Excav CY $3. 95 7699 $30,411.05 Topsoil Borrow (LV) CY $7.60 388.5 $2,952.60 Geotextile Fabric SY $0. 70 11246 #7,872.20 Aggr Class 3 TON $4. 30 8397.6 $36, 109.68 Aggr Class 5 TON $5. 15 7446.92 $38,351 .64 Bit Mtr ' 1 /Mix TON $14-0.00 84.5 $11 ,830.00 Binder Course TON $8.65 709 $6, 132.85 Base Course TON $8.60 929.24 $7,991 . 46 Bit Mtr '1/Mix TON $140. 00 45.3 $61342.00 • Wearing Course Mixtur TON $1.5. 75 . 809.09 $12,743. 17 Tack Coat GAL $1 . 20 475 $570.00 Granular Bedng CY $8. 10 35.91 $290.87 6" Perf Drain Pipe LF $9. 10 136 $1 ,237.60 12" RC Pipe LF $35. 35 64 $2,262.40 Const CB Dsgn N EA 5880.00 4 $3,520. 00 Conc C & G B618 LF $4.05 5213 $21 , 112.65 Cont C & G B624 LF $7.60 20 $152.00 Conc C & G B6 LF $7.05 $0.00 Conc Drive Apron CY $135. 00 59 $7,965.00 Bale Check EA $5.95 42 $249._90 Sodding SY $1 . 50 2075 $3, 112.50 Pavm't Marking LS $335.00 1 $335.00 Traffic Control Devic LS $3,000. 00 ' 1 $3,000.00 ------------ SUB TOTAL SECTION "A" $237,433. 11 • 9 TON ROAD COST • --------------------------------------------------- UNIT PROJECT PROJECT ITEM DESCRIPTUNIT PRICE TOTAL COST --------------------------------------------------- Mobilization LS $9,525.00 1 $9.525.00 Field Office EA $2, 175. 00 1 $2, 175.00 Unclass Excav CY $3.95 7699 $30,411 .05 Geotextile Fa SY $0. 70 11246 $7,872.20 Aggr Class -3 TON $4. 30 8397.6 . $36, 109.68 Aggr Class 5 TON $5. 15 7446. 92 . $38,351 .64 -Bit Mtr ' l-Mix TON $140. 00 84.5 $11 ,830.00 Binder Course TON $8. 65 709 $6, 132.85 Base Course .TON $8. 60 929. 24 $7,991 .46 Bit Mtr ' l /Mix TON $140. 00 45. 3 $6,342.00 Wearing. .Cours . TON $15. 75 809.09 $12,743. 17 Tack Coat GAL $1. 20 475 $570.00 Granular Bedn CY $8. 10 35. 91 $290.87 6" Perf Drain LF $9. 10 136 $1 ,237.60 12" RC Pipe LF $35.35 64 $2,262.40 Const CB Dsgn EA $880. 00 4 $3,520-.00 Rmv Conc Pavm SY $1 .45 9471 $13,732.95 Bale Check EA $5. 95 42 $249.90 • Pavm't Markin LS $335. 00 1 $335.00 Traffic Contr LS $3,000. 0.0 1 $3,000.00 Saw Bit Pavm' LF $2.45 64 $156.80 ------------ SUB TOTAL. 9 TON ROAD $194,839.57