Loading...
HomeMy WebLinkAboutPL AGENDA 10181988 (2) Meeting Sheet 100016 I IIIIII VIII VIII VIII VIII VIII I II III Box: 1s Folder: Document: PL AGENDA 10181988 • C 2 TY O F S T . ANTHONY P LANN 2 NG C OMM= S S 2 ON M 31 NUTS S O C TOB ER 1 8 , 1 9 8 8 1 The meeting was opened at 7: 35 P.M. with the Pledge of Allegiance led 2 by Chair Wagner. 3 ROLL CALL 4 Present for roll call: London, Brownell , Franzese, Wagner, Werenicz. 5 Absent: Hansen, Madden. 6 Also present: David Childs, City Manager 7 Sue VanderHeyden, Assistant to the City Manager 8 SEPTEMBER 20 1988 PLANNING COMMISSION MINUTES 9 Motion by Brownell, seconded by Werenicz to approve the September 20th 10 Commission minutes with the following changes: 11 Page 1, line 21: Substitute "Recommendation for" for "Recommended" . 12 Page 2 , line 9: Substitute "location" for 'llocations". 13 Page 3 , line 13: Delete "only" and substitute "indicate" for "in- d10 icated" . Page 3 , line 31: Substitute "usual" for "usually" . 16 Page 9, line 22: Correct typo to "changed in" . 17 Page 9, line 29: Substitute 11three14 for "two" and "raised" for 18 "spoke" . 19 Page 9 , line 30: Substitute "concerns" for "against" . 20 Motion carried unanimously. 21 Commissioner Brownell to Represent Planning Commission at Council's 22 October 25th Meeting 23 It was noted that it had been Chair Wagner who represented the Commis- 24 sion at the Council's September 27th meeting. 25 PUBLIC HEARINGS 26 Recommendation That Preliminary Plat for Evergreen Townhome Project be 27 Approved Subject to Resiting of Building #1 and Screening Railroad 28 Tracks 29 At 7:40 P.M. Chair Wagner opened the public hearing on the above by 30 reading aloud the Notice of Hearing which had been published in.. the 31 October 5th Bulletin and sent to all property owners of -record within 1 1 350 feet of the subject property. No one present reported failure to • receive the notice or objected to its content. 3 Staff Report 4 *Mr. Childs' October 10th memorandum advising that the preliminary 5 plat still showed a 10 foot sideyard setback between Unit #1 and its 6 west property line where an increase to 15 feet had been established as 7 one of the conditions under which the property would be rezoned from 8 single family .to townhome for this project; 9 *added that this condition could still be provided in the final plat 10 which cannot be approved until the final Redevelopment Agreement with 11 Evergreen Development can be completed, which he estimated would 12 probably be sometime in November; 13 *reiterated that he perceived the new platting addressed most of the 14 other Commission and Council concerns related to storm water storage and 15 the provision of an access easement to be negotiated with the owner of. 16 the landlocked Lot 5 in the Villella Subdivision if Mr. Nordahl can 17 work out similar easements with the owners of the three other lots 18 between his lot and the project property; 19 *indicated the developers had- redrawn their original plans to 20 establish a roadway next to the railroad tracks over which access 21 easements for those four properties could be negotiated between the developer and the property owners; 40 *reported Mr. Hoium of Evergreen had indicated he perceived units 1, 24 2, 3 , and 4 could be pushed at least five feet further from the west 25 property line than shown on the Preliminary Plat; 26 *told Commissioner Franzese there would still be 37 units in the 27 development but they had been distributed throughout 10 rather than 8 28 buildings to accommodate the number of prospective buyers who wanted 29 end units. 30 Plat Proponents 31 Vern Hoium, Evergreen President, and Vice President Ursula Sheehy, who 32 handles marketing, confirmed that there might be more reshuffling of 33 building siting to include pushing the building closest to western most 34 neighbor farther away from the dividing property lines; 35 *indicated the provision of a 32 foot roadway next to the railroad 36 tracks provided 100 foot building setback from the tracks which would 37 be necessary to get mortgage financing for the buildings closest to 38 the tracks. 39 Questions and Concerns of Neighbors 2 1 Curtis Nordahl, 3513 Skycroft Drive, whose concerns had previously been presented during the April 26th Council meeting, asked whether the street Evergreen intended to construct next to the railroad tracks would 4 be a 60 foot dedicated street or a private roadway. When told it 5 would be the latter, Mr. Nordahl said that constituted a basis for a 6 concern for him since he perceived the City had still not provided a 7 permanent remedy for his problem of having no access across the other 8 undeveloped lots between his own landlocked property and the property 9 now being developed. Mr. Nordahl indicated he thought the City should 10 not allow that development unless the street which was proposed was a 11 dedicated street. 1.2 He was told that only the street location and not its status as a 13 private street had been changed between the plan the Council had 14 accepted for a zoning change and the Preliminary Plat being presented 15 that evening primarily because there would not be enough room within the 16 project for a 60 foot street. 17 Mary Jo Points, 3914 Foss Road, Apartment 101, indicated she was present 18 to discuss several points of concern which she and other Mirror Lake 19 residents had about the project. She wanted to know: 20 *whether the Amoco Oil pipeline which ran under Mirror Lake also ran 21 under this property; 22 *if the fact that the developers were leaving a triangular piece of 3 land between the proposed jog in the street and the railroad meant they might be contemplating an egress onto Foss Road and through their project; 26 *who had authorized the. dumping of fill on this property which had 27 caused the nesting ducks to cross the road and to build their nests in 28 the Mirror Lake entryways instead; 29 *whether the City or whether the developers would be paying for 30 water, sewer, and fire protection for the townhomes and the streets 31 within the project. 32 Mrs. Points was assured that the Amoco Oil Co. , pipeline ran under the 33 Harstad property north of Silver Lane and east and north of the 34 project. Mr. Childs told her the Rice Creek Watershed District had 35 issued a permit to Ramsey County to dump the materials they had 36 removed from County Road "D" onto this property and said he expected 37 that once the developers remove that fill and provide ponding in that 38 area the wildlife will probably return to nest in the same area. He 39 also assured her and Hal Rogers, 4011 Fordham Drive, that the tax 40 increment financing the City was negotiating with the developers only 41 involved soil corrections and this developer, like any other developer, 42 would have to pay all the costs for any water or sewer line extensions 43 and for any interior streets on the property. • 3 Mr. Rogers was told copies of the Preliminary Plat would be made available for any residents who wanted one and Mr. Hoium told him the 3 developers had been able to negotiate soil corrections costs down to 4 about $273,000.00 which was a lot less than first anticipated. The 5 questioner was again assured that the final rezoning of the property 6 would not be done until after the Redevelopers Agreement has been 7 signed and the final platting for the property had been submitted for 8 Planning Commission review. The property would only be rezoned for 9 townhomes after the Council had approved both documents. 10 Richard D. Oertwich, 3408 Silver Lane, was assured that at least a 15 11 foot setback would be left between unit #1 and his property line which, 12 if his own residence was 12 or 13 feet from the lot line, would leave 13 about 30 feet between the two structures. Mr. Oertwich also wanted 14 assurance that some sort of screening would be provided between the two 15 properties. 16 The Chair reiterated that this was one of the conditions which had to 17 be met before the property would be rezoned and that setback would most 18 likely be included in the final plan which the City Manager expects to 19 have back for Commission review in about 30 days. 20 Mr. Childs indicated he would send out notices of not only the 21 Commission review of the final plan but also the meeting where the 22 Council would most likely be giving the third reading for adoption of 23 the ordinance which would rezone his property. 04 There was no response to the Chair's invitation for further comments. 25 Ms. Sheehy reported that many of the prospective buyers of the 26 townhomes had told her they had no objections to trains and since there 27 was a chance that line might be discontinued altogether, she wondered 28 why any screening of the tracks was necessary. She said one of the 29 persons who had reserved a unit had told her the railroad had replaced 30 the short tracks with long ones which left only the noise generated by 31 the engines to make that steep grade. Although the berming was no 32 longer considered necessary with the placement of the street. between the 33 structures and the railroad tracks, the general consensus was that 34 screening should remain a condition for rezoning the property. 35 Sketches of ' the individual units were shown to the residents with the 36 proponents indicating the exterior would be maintenance free vinyl 37 siding. 38 The Chair closed the hearing at 8:13 P.M. but reopened it at 8:14 P.M. 39 when Mr. Nordahl requested he be given an opportunity of making a 40 formal statement of his concerns about the project. 41 His presentation included repetition of his position on the issue as 42 stated in his letter to the City Manager, copies of which had been 43 provided the Council before their April 26th meeting. That position was that by allowing Lot 5 of the Villella addition to be developed 4 1 with a need for access, the City had undertaken the responsibility for meeting that need. 3 Mr. Nordahl reiterated his opposition to developing the land on Silver 4 Lane without provision of a 60 foot dedicated street through the 5 property to provide access to Silver Lane for his and other landlocked 6 properties within 500 feet of the proposed development. He said he 7 seriously doubted whether access could ever be provided off Fordham 8 Drive and perceived the owners of those other properties should be just 9 as concerned as he is about the issue. 10 He told the Chair the original plot for Lot 5 and Lot 4 on .which he had 11 built had never anticipated access for Lot 5 through Lot 4. He said 12 he purchased Lot 4 in 1971 and built a house right in the center of it. 13 He said he purchased Lot 5 in 1978 as "a separate plotted and surveyed 14 City lot indicating a proposed road easement shown on the lot survey 15 and intended to develop that lot as a separate parcel . " His statement 16 insisted that at no time since 1967 when the lots were plotted as the 17 Villella Addition were lots 4 and 5 ever considered as one or was access 18 for Lot 5 .ever considered through Lot 4 . 19 Mr. Childs indicated the document he had seen for the Nordahl lot had 20 shown what could have been the bottom half of a cul du sac but there 21 were no lots of record north. of . that property which indicated any 22 continuation of that roadway. He reiterated that all of the properties 23 next to any such dedicated street would be assessed for the . costs of 4 the street. Mr. Nordahl said he found it hard to believe that considering the value of buildable lots in St. Anthony, owners of, the undeveloped property north of him wouldn't welcome the opportunity of 27 having access opened to them. The Chair pointed out that apparently 28 some of the owners of property on Fordham .Drive were opposing having an 29 access across the back of their property. 30 Mr. Childs summarized their testimony at the Council meeting, 31 indicating the owners of some. of the abutting lots had indicated 32 opposition to a dedicated road across their property. 33 Mr. Hoium interjected at this point that Mr. Nordahl's Lot 5 was at 34 least 500 feet south of the subject property with three intervening lots 35 between. He said when those lots are developed the discussion this 36 evening would be appropriate, but without that, he perceived the 37 question to be "moot" . The Evergreen President indicated that was the 38 reason they were willing to provide an access easement for those 39 intervening lots with, of course, the costs of street maintenance being 40 negotiated with each owner as lots were developed. 41 Ms. Sheehy reiterated that any structure on those lots would have to 42 be built 100 feet away from the tracks to get mortgage financing. Mr. 43 Nordahl said it was possible the owners could finance the construction 44 independently and concluded "I'd gamble on selling a house there very 45 easily" and pointed out that the Evergreen marketing executive had just indicated the "charm of having a train. " He then read the March 3 , 1967 5 1 letter he had received from Comstock and Davis, the original surveyor for his property, which referred to the road easement for Lot 5 which referred to the easement feeding the 11 lots straight north of him in 4 Mounds View Addition as being "accepted by the City of St. Anthony and 5 the Planning Commission, which indicated a clear intent to access 6 Villella Addition, Lot 5 from Silver Lane to the North. " 7 Mr. Holum told Mr. Nordahl that he had spent an hour and a half of the 8 Council's time April 26th giving the same testimony after which the 9 Council had told him that the Evergreen property development would have 10 no effect on his property. Mr. Nordahl indicated he did not agree with 11 that assumption but believed instead that "what's happening now is 12 contrary to what was done in 1967 when my lot was created. " He again 13 conceded that the bottom half of a cul du sac shown on the survey of 14 Lot 5, Villella Addition was not shown on any of Mounds View Acres, 15 Second Addition surveys, but reiterated that the survey language had 16 caused him to assume access would be provided to his property. 17 Mr. Childs indicated he perceived Evergreen's willingness to provide an 18 access easement across their project was only the first step towards 19 providing that access with the rest to follow with the development of 20 the intervening lots between Mr. Nordahl's Lot 5 and the project. 21 Mr. Nordahl said he didn't perceive "access off Fordham Drive would ever 22 be in the cards" and that was why he perceived "there had to be a 23 dedicated street in the plat plan for the townhome project or, 4 otherwise, end up with landlocked property. " Chair Wagner disputed this assertion that there would never be an access off Fordham, telling Mr. Nordahl he believed "things could change. " He told the protestor that 27 all of the same statements of his position had been clearly reported in 28 the kpril 26th minutes and although the Planning Commission had concern 29 about his property being buildable, they agreed with the Council that 30 since it was not even adjacent to the townhome project, his problems 31 were not germane to the plat before them that evening. 32 Commissioner Franzese indicated she perceived it was now up to Mr. 33 Nordahl to communicate with his neighbors to the north who could. give 34 him an easement if they wanted. She felt his success in getting access 35 was dependent on that rather than on the City's course of action on 36 property 500 feet away from him. She pointed out that by allowing 37 the townhome project the City was not creating his problem. 38 Mr. Nordahl said he talked to Mr. Reid who was willing to develop his 39 property in the manner which was discussed with access from the north, 40 but the other property owner "is not approachable. " 41 Chair Wagner indicated the minutes would reflect Mr. Nordahl's request 42 for a dedicated street as well as the fact that Evergreen has offered 43 to negotiate an access easement across their property when the 44 intervening lots are developed. 46 The hearing was closed at 8: 38 P.M. 6 Commission Recommendation 2 Motion by Franzese, seconded by Brownell to recommend the Council 3 approve the Preliminary Plat dated September 9, 1988, for the 37 unit 4 townhome project proposed to be constructed by the Evergreen Development 5 corporation on the parcel legally described as Lots 1 , 2, and 3 , Block 6 4, Mounds View Acres, Ramsey County, MN and Block 2, Mounds View Acres, 7 Ramsey County, MN generally described as a vacant parcel 4.85 acres in 8 size located east of Fordham Drive, south of Silver Lane and west of 9 the Soo Line Railroad tracks. The Commission recommends approval be 10 conditioned upon: 11 1. Detailed plans from the developer to include screening rather than 12 berming along the railroad track; provision of no less than a 15 foot 13 sideyard setback along the west property line adjacent to Building #1 14 with trees and shrubbery to be provided in that same area. 15 2. Drainage subject to City engineering approval. 16 In recommending approval of the Preliminary Plat, it is noted that the 17 developer offered to negotiate a shared cost access easement over the 18 street closest to the railroad tracks for the future development of Lot 19 5, Villella Subdivision. 20 Motion carried unanimously. Commissioner Brownell stated that he perceived the motion was fair to Mr. Nordahl because the City would still be able to have something to 23 say about how the intervening lots would be developed. 24 Commission Concurs with Extension of Minnesota Scientific's Permit 25 Deadline Until April, 1989 26 At 8:48 P.M. the Chair opened the public hearing on the above request -27 by reading the notice of the hearing which had been published in the 28 October 5th Bulletin and sent to all property owners of record within 29 350 feet of the subject property. No one present reported failure to 30 receive the notice or objected to its content. 31 Request: 32 *from Minnesota Scientific conveyed by the September 19th letter from 33 Donatelle Properties, 401 County Road E-2 West, New Brighton; 34 *for an extension of the deadline of October 31, 1988 which had 35 been imposed by the Council when they granted a conditional use permit 36 for a temporary office trailer at 3839 Chandler Drive. 37 Staff Report 7 1 *Mr. Childs' October 14th memorandum giving the background history of the permit to which he had attached copies of the pertinent August 18 , 1987 Planning Commission and august 25, 1987 Council minutes; 4 *reiterated that the Council had imposed an earlier deadline than 5 the Commission had recommended, perceiving that the actual lease date 6 at that time was more an appropriate deadline and anticipating that 7 Minnesota Scientific could always come back for an extension if they 8 were not able to move before the end of October; 9 *reported the company would be moving into Donatelle office space in 10 New Brighton, but because the current lease held by someone else on that it space doesn't terminate until the end of December, and it appears 12 renovation and remodeling would delay Minnesota Scientific's moving 13 until at least the end of March, the city is now being requested to 14 extend the deadline until that time; 15 *recalled that only one of all the residents who had been notified of 16 the August, 1987, Commission hearing had attended that meeting. The 17 primary concern of William G. Graff., 3824 Foss Road, at that hearing 18 had been that "when Minnesota Scientific moved out of St. Anthony, the 19 trailer be removed at the same time and the ground underneath be 20 returned to its original state" ; 21 *said he hadn't heard from any of the neighbors since the October 4th 22 notice (Chair Wagner reported Commissioner Madden had talked to Mr. and 23 Mrs. Graff and reported the neighbors had no objections to extending the deadline. The applicant had also talked to them with the same response. ) 26 Proponents• 27 Bruce LeVahn, President of Minnesota Scientific', said his request had 28 been accurately reported in the Donatelle letter and it had only been 29 because of the press of business at this time, that the October 31st 30 deadline date had been overlooked. 31 Mr. LeVahn reported further that: 32 *there are 'seven people working in the detached facility now and it 33 would be a great inconvenience for them not to be allowed to keep the 34 facility until they moved; 35 *reported Minnesota Scientific had been negotiating a lease with 36 Donatelle Properties for the last six months and couldn't move when 37 their lease with that company ran out; 38 *his f jrm had been negotiating with Donatelle Properties for the last 39 six months to lease space in one of their New Brighton buildings and. 40 uncertainty whether the space they wanted would be available had 41 prevented them from signing a lease before this time; 8 1 *he was now certain that space would be available by April. Chuck Donatelle, 4008 Macalaster Drive, was present to affirm the 3 statements he and his brother, Michael, who was also present, had made 4 in their letter applying for the extension. 5 No one else spoke to the issue and the Chair closed the hearing at 8:52 6 P.M. 7 Commission Recommendation: 8 Motion by Brownell , seconded by Werenicz to recommend that the City 9 Council grant the request from Minnesota Scientific, Inc. , 3839 10 Chandler Drive, for an extension of the existing special use permit #14- 11 87 which would allow the company to retain the existing temporary 12 mobile office on the east side of the building at that location until 13 April 1, 1989 or upon the date the company vacates the property , if 14 that is sooner. The conditions which the Council had imposed on the use 15 of this facility with their motion of approval August 25, 1987 would 16 remain in effect with this extension. 17 Motion carried unanimously. 18 NEW BUSINESS 19 Commissioners Impressed with Master Plan for the Future of the Silver 0 Lake Camp Copies of the Plan had been duplicated in the Commission agenda packet 22 and provided reference points for the discussion of a 20 year plan for 23 the camp by Dale Westberg, Director of the Salvation Army Camp, and Lt. 24 Colonel Harry Smith, Divisional Commander of the Northern Division of 25 the Salvation Army, both of whom reside on the camp grounds at 2950 26 West County Road E in St. Anthony. 27 Staff Report: 28 *Mr. Childs'. October 14th memorandum reporting on the immediate plans 29 of the proposal and the St. Anthony Recreation Open Space Ordinance, 30 which requires that "all structures be constructed of a material and of 31 a design which is compatible with the natural environment as determined 32 by the Planning Commission and Council and which conforms with 33 applicable codes. " 34 Mr. Westberg told the Commissioners the Salvation Army plans: 35 *to reopen the stone pillared northwest entrance to the camp which 36 has remained an historic landmark in St. Anthony since the camp opened 37 in 1921; 38 *to repave the road coming into the camp and add a new parking area which would accommodate about 80 cars; 9 *to construct a new administration building at the crown of the hill just south of that area so access to the camp can be controlled and 3 guests greeted from the office; 4 *to relocate the work area to the camp perimeter where it would be 5 less visible to the guests and would provide greater safety for the 6 camp. This would require the construction of a new vehicle/construc- 7 tion/maintenance building to replace the existing building. 8 The Camp Director indicated these projects were estimated to cost the 9 Salvation Army about $350,000 and would be started as soon as City 10 approval is given. He then went over the portions of the Master Plan 11 which would be undertaken as soon as funding is available to "move the 12 camp into the 21st Century. " He said all improvements were planned to 13 get the best use of the land which is available; not to damage the 14 environment; and to maintain what is almost a "wilderness type setting 15 in a metropolitan area where the type of services the Salvation Army 16 provides are very much in demand. " 17 Mr. Westberg indicated the Master Plan was the third plan which had 18 been presented over the years. The first was drawn in 1970 to 19 revitalize the camp and bring it up to the current standards of that 20 time. In 1980 another plan to re-affirm that the camp was going in the 21 direction the Salvation Army wanted it to go, was presented for City 22 approval. Now in the midst of the Salvation Army's capital campaign, 23 the camp officials wanted to take a fresh look at the changes in camping trends and they wanted to be ready to respond to those changes to meet the needs of the campers 65% of whom are now adults. They also 26 wanted to increase the efficiencies of the camp so. as to rely less on 27 outside subsidies to offer the facilities and services for the camp's 28 guests. 29 The Camp Director reported the majority of their weekend guests stayed 30 only from Friday to Saturday night and only about a third stayed over 31 until Sunday. Use of the camp by children is mainly during the summer. 32 From September to May or June, 95% of the guests are adult groups from 33 around the metropolitan area and even from around the nation. 34 Mr. Westberg gave a rapid run through of the plans he had submitted for 35 Commission review. He told the Chair the camp officials had been 36 turning St. Anthony children away from fishing from the bridge between 37 the main camp and Kiwanis Island because of the difficulties involved 38 in distinguishing who are campers and who aren't. . Colonel Smith 39 recounted several incidents which had .occurred which resulted in more 40 stringent regulations necessary to meet the camp's responsibility for 41 the safety of the children entrusted to their care. He said he liked 42 the idea of having a special open house day for St. Anthony residents 43 to visit the camp as well as school sponsored visits throughout the 44 year, especially during the week when other groups aren't using the 45 camp facilities. 10 1 Mr. Westberg pointed out that there were several groups of parochial school children who participated in planned day activities in the camp now and he perceived the staff would welcome the same type of activities 4 for school children in the St. Anthony/New Brighton School District as 5 well. 6 The Camp Director told Commissioner Brownell the new buildings would 7 have wood construction with rough cedar siding. The administration 8 building would also have natural rock trim. The architect had even 9 changed the construction of the maintenance building from steel to wood 10 frame to better fit into the natural environment of the camp. The goal 11 is to put all utilities underground to provide better visuals of the 12 camp. He promised to bring the plans to staff as soon as they are 13 available from the architect. 14 Commission Recommendation 15 Motion by Werenicz, seconded by Franzese to recommend Council approval 16 of the long range building plans for land use and facilities development 17 contained in the Salvation Army's Master Plan for the Silver Lake Camp 18 in St. Anthony. The Commission has reviewed the building materials to 19 be used in the facilities and found them to be in keeping with the 20 natural environment of the camp and recommends that each project be 21 reviewed by City staff to assure that they meet all current building 22 codes and regulations. Oi Motion carried unanimously. ADJOURNMENT 25 An informal progress update on various City projects was given by Mr. 26 Childs before the following: 27 Motion by Brownell, seconded by Franzese to adjourn the meeting at 28 9:50 P.M. -29 1 Motion carried unanimously. 30 Respectfully submitted, 31 Helen Crowe, Secretary 32 :cjk 11