CITY OF ST. ANTHONY
CITY COUNCIL WORK SESSION AGENDA
WEDNESDAY, MARCH 6, 1996
7:00 P.M.
Council Chambers
Page(s)
I. CALL TO ORDER.
II. ROLL CALL. - -
III. STORMWATER MANAGEMENT PLAN WITH DENNIS PALMER
OF BARR ENGINEERING . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 - 3
IV. PARKING REQUEST FOR PENROD LANE . . . . . . . . . . . . . . . . . . . . . . 4 - 5
V. TURN BACK ON SILVER LANE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6 - 7
• VI. UPGRADE OF WATER MAIN ON SILVER LAKE TERRACE . . . . . . . . . . . . . 8
VII. TRAFFIC STRIPING FOR PROPOSED SIGNAL AT 39TH AND
STINSON BOULEVARD . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9 - 14
VIII. REVIEW REQUEST FOR SEWER INSERT ON 36TH AVENUE NE . . . . . 15 - 21
IX. APACHE PLAZA UPDATE
X. CHANDLER PLACE UPDATE (3/12/96 agenda item) . . . . . . . . . . . . . . . 22 - 23
XI. CITY HALL/COMMUNITY CENTER UPDATE . . . . . . . . . . . . . . . . . . 24 - 30
XII. POSSIBLE AMENDMENTS TO TIF PLAN (3/26, 4/9 or
4/23 agenda item) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 31 - 38
XIII. MINNESOTA POLICE RECRUITMENT SYSTEM RESOLUTION
(3/12/96 agenda item) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 39 - 45
XIV. 1996 CDBG FUND ALLOCATION (3/12/96 agenda item) . . . . . . . . . . . . . 46 - 54
• XV. PROPOSED VOLUNTEER DINNER LIST/PROCLAMATION . . . . . . . . . 55 - 56
Council Work Session Agenda •
March 6, 1996
Page 2
XVI. OTHER BUSINESS:
A. City Manager conferences . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 57
B. Police car bids . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 58
C. Joint meeting with school . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 59
D. Letter regarding code violations . . . . . . . . . . . . . . . . . . . . . . . . . . 60 - 64
XVII. ADJOURNMENT.
NOTE: THE COUNCIL IS SCHEDULED TO MEET, AS A GROUP, WITH THE
GOAL SETTING FACILITATOR, ANNA MARAVELAS FROM
6:00 P.M. TO 7:00 P.M.
•
i
• 8300 Norman Center Dave 555 West 271h Street
Barr Minneapolis,MN 55437-1026 Hibbing,MN 55746
Phone:(612)832-2600 Phone:(218)262-3465
Engineering Company Fax: (612)832-2601 Fax: (218)262-3460
MEMORANDUM
To: Michael Mornson
City of St. Anthony Village
From: Denny Palmer
Subject: Drainage District 6
Date: February 26, 1996
Project: 23/27-467 DEP 102
This memo will summarize the key points of Barr's July 19, 1992 Stormwater Management
Analysis District 6 Drainage Basin for council review. I will attend the March 6 council work
session beginning at 7:00 p.m. to answer questions that the council may have regarding drainage
improvements in District 6.
• In 1991, St. Anthony engaged Barr to do an analysis of drainage problems in the city's drainage
District 6. Barr first prepared a computer model which simulated existing conditions of flooding
for an intense rainstorm whose probability of occurrence in any year was 1 percent. Alternative
scenarios of ponding, upgraded pipe capacity, diversion, and combinations of these alternatives
were considered to see how the flooding problem might best be relieved. On the basis of our
analysis, we were able to draw the following conclusions:
1. The flooding within District 6 is caused by storm sewers with inadequate capacity. Today's
standards for the construction of storm sewers call for additional capacity from low areas
for which there is no overland outlet. The existing systems were not provided with this
additional capacity.
2. To increase the capacity of the local storm sewers within District 6 would simply move the
flooding problem downstream to Kenzie Terrace and County Highway 88 because the
capacity of the County Road 88 storm sewer is not adequate to handle the increased flows
which would result from an improved storm sewer system within drainage District 6.
•
2327467\35075-1/KMH
I
To: Michael Mornson
From: Denny Palmer •
Subject: Drainage District 6
Date: February 26, 1996
Proiect: 23/27-467 DEP 102 Page 2
3. There is no capacity available in city of Minneapolis storm sewers to permit diversion of
enough storm flow to alleviate flooding in St. Anthony.
4. The practical alternatives for addressing the flooding problems in District 6 are limited.
a. Provide more outlet capacity, which would require augmenting storm sewer
capacity (building an additional pipe) all the way to the I-35 tunnel at the junction of
I-35`V and County Road 88. The estimated cost for such a solution was in the
neighborhood of$16 million.
b. Provide more storage volume in District 6 to hold the water until capacity was
available in existing downstream storm sewers. The estimated cost for this option was
in the neighborhood of$6 million and would have involved the conversion of valued
park land for stormwater purposes.
(Note: Combinations of increased capacity and storage volume were not considered •
because review disclosed that any alternative involving a combination of these
techniques included the most expensive aspects of both, and were therefore less feasible
than alternative "b".)
c. Do nothing and floodproof those structures which are most likely subject to flooding.
The estimated cost for this work was in the neighborhood of$1 million which was
expected to be provided from private rather than public sources.
As a result of the 1992 study, the council elected to pursue "no action/floodproofing" (alternative c)
option because they believed they had neither the resources nor the public support for either of the
structural alternatives (alternatives a and b).
Figure 2 in the pocket of the 1992 report depicts existing flooding conditions. Please refer to this
map to identify problem areas which are addressed by the stormwater storage option illustrated in
Figure 3, also in the pocket of the 1992 report. Figure 3 was prepared to document what we
•
2327467\35075-1/KMH
rr
3
• Michael n
From: Denny Palmer
Subject: Drainage District 6
Date: February 26, 1996
Project: 23/27-467 DEP 102 Page 3
believed to be the most feasible structural alternative to address flooding problems in District 6. I
will bring extra copies of Figures 2 and 3 with me to the March 6 work session.
It is my understanding that the city now wishes to consider whether there is public value in
acquiring approximately 61h acres in subwatershed 6A-5 (as shown on Figure 3 in the 1992 report)
without further commitment to the other ponds depicted on Figure 3. It is important to
understand that the improvements proposed on Figure 3 were based upon the presumption that if
improvements were to be made to the St. Anthony system, such improvements should be designed
in accordance with modern criteria (to accommodate a runoff event with a probability of occurrence
of 1 percent in any year). Certainly, limited improvement might result if the system shown on
Figure 3 were partially implemented. We did not analyze partial implementation and I cannot
quantify the improvement that partial implementation would yield,but I do offer these
observations.
• 1. This is the council's last opportunity to deal with storm drainage issues via structural
means. If a portion of this property is not acquired and reserved for flood storage purposes,
then even the alternative represented on Figure 3 of the 1992 report will no longer be
available to the city. In that case, to achieve any form of structural improvement will
probably involve additional floodplain evacuation (purchasing and removal of homes or
structures).
2. Partial implementation of the system depicted on Figure 3 will not achieve a level of
protection consisted with accepted design standards. I am unsure of the legal implications
that might be associated with doing the best you can do when it may be less than the
public may expect.
3. The only alternative for improving the flooding problem at Pahl Avenue is to provide some
storage to relieve the accumulation of the water, and the location in subwatershed 6A-5 is
the only available place for such storage. To develop such storage in subwatershed 6A-5
will require excavation and storm sewer improvements along Wilson Street.
•
2327467\35075-1/KMH
r t
•
MEMORANDUM
DATE: February 9, 1996
TO: Michael Mornson, City Manager
FROM: Larry Hamer, Public Works Director
ITEM: PARKING REQUEST FOR PENROD LANE
•
I have checked into the area of concern in the attached letter. It is very difficult
to plow and for emergency vehicles in the area due to parking on the roadway.
The parked cars are from Auto Traac and they park there every day.
RECOMMENDATION
Recommend the City install "no parking" signs on the east side of Penrod Lane
between Edgemere and 37th Avenue N.E., which should correct the problem
area.
•
January 25, 1996
TO : City of St. Anthony Village •
Larry Hamer
3301 Silver Lake Road
St . Anthony, Mn 55418
FROM: Residents at :
3101 Edgemere
3636 Penrod Ln.
3640 Penrod Ln.
RE: Changing the East side of Penrod Lane from Edgemere to 37th
Avenue NE to a NO Parking Zone .
The area described above makes driveway ingress and egress very
difficult and dangerous . Three dirveways dump into this area as
well as vehicles tunning off of 37th Ave onto Penrod and Penrod
traffic comming down a hill to 37th Avenue . This makes a small
area with poor visibility, on a hill, with many children, bicycles
and pedestrians,extremely narrow-especially durring -the winter.
Often there are 2 or 3 vehicles parked there all day producing
dangerous conditions for general neighborhood traffic, children,
bicycles , other pedestrians , and residents trying to get into and
out of there driveways .
It would be very helpful if this small stretch of the east side •
of Penrod between Edgemere and 37th Ave. could be a no parking
area . It would cause very little inconvience to parkers to park
around the corner. It would make St . Anthony a safer place .
Sincerely,
cc :
3101 Edgemere
3636 Penrod Ln
3640 Penrod Ln
•
l
r T 1
•
MEMORANDUM
DATE: February 15, 1996
TO: Mike Mornson, City Manager
FROM: Larry Hamer, Director of Public Works*
RE: Silver Lane NE Turnback
On February 14, 1996 Ramsey County informed me that Silver Lane was up for upgrade this
year for turnback to the City.
Silver Lane extends from Silver Lake Road to Stinson Boulevard. The turnback was generated
by the State turning roads over to the Counties and the Counties turning secondary roads over
to the Cities.
I have recommended that this road when turned back to the City go on Minnesota State Aid.
The County got a change in the MSA miles allegation for Cities to put them on without change
to a present dedication.
With the turnbacks the County gives the City the option of total reconstruction. The County
would pay $60,000 of the cost (approximately $500,000) and the City would pay the difference.
If the road is upgraded to a 25 year life the County will pay all the cost.
It would be better for the City if Silver Lane is dedicated MSA. If we had a total reconstruction
it would have to be enlarged at least 40 feet with variances on parking. The City would have
to come up with about $420,000. If it is upgraded it will stay the same size and be put on MSA
status on the rehab road.
The City must apply by the end of February 1996 for MSA status on this road in order to
receive maintenance and construction money allocations for 1996.
I recommend we overlay the road and put a MSA status on the road so the City can receive
assistance on the maintenance.
_4 '96 11:11 PUBLIC WORKS—GARAGE P.2
100A
SITE CODE s IOOA STABLE RAMSEY COUNTY PUBLIC NORKS — TRAFFIC PASE3 1
Location SILVER LN-W CC LN TO Sit LK RD FILE: •
'eather s
Operator s 41 DATES 4/25/94
--------------------------
TINE MONDAY TUESDAY WEDNESDAY THURSDAY FRIDAY WEEKDAY SATURDAY SUNDAY WEEK
BEGIN 25 26 27 28 29 AVERAGE 30 1 AVERAGE
---------------------------------------------------------------------------------------------------------------------------------
12100 AN t 6 11 t t 8 t i 9
1:00 : 6 7 t t 6 t i 6
2100 t 2 2 t t 2 # t 2
3100 t 2 4 t t 3 t t 3
4100 t 4 5 t t 4 # 4
5:00 t 28 24 t # 26 t # 26
6i00 l 66 72 t t 69 t I 69
7:00 t 183 164 t t 173 t t 173
8:00 t 130 139 t t 134 t t 134
9100 t 116 117 t t 116 t t 116
10:00 t 123 131 t i 127 t t !27
11300 1 119 143 1 t 131 t t 131
12100 PN t 161 142 t t 151 t t 151
1100 155 167 t t 1 161 t t 161
2100 191 175 t t . t 183 i t 183
3:00 194 198 t t t 196 i t 196
4:00 217 270 t t t 243 t i 243
5100 200 223 t t t 211 i t 211
6100 159 169 1 t t 164 t t 164
7100 122 133 t t t 127 t t 127
8100 103 109 t t t 106 i t 106
9:00 75 67 i t t 71 t i 71
10:00 23 47 t t t 35 t # 35
11:00 17 16 t 1 i 16 t t 16
-----------------------------------------------------------—---------------------------------------------------------------------
70TALS 1456 2520 961 i t 2463 t i 2463
X AVG WAY 59.1 102.3 39.0 t t
X AVG DAY 59.1 102.3 39.0 t t # #
AN-PEAK HR t 7:00 1:00 t t 7:60 t t 7:00
VOLUME i 183 164 t t 173 t t 173
PN PEAK-HR 4:00 4:00 12:00 t t 4:00 t t 4:00
VOLUME 217 270 142 t t 243 t t 243
x /. d G =' ,;?&11 O a 7-
A/
A/ = ac�
MEMORANDUM
Date: February 27, 1996
To: Mike Mornson, City Manager
From: Larry Hamer, Director of Public Works
Re: Silver Lane and Silver Lake Terrace Water Break
The City experienced three water breaks in the 4" water line that services Silver Lake Terrace.
The water break was so bad that the City backhoe could not reach the pipe that needed repair.
A cave-in of ground material which was caused by a water break on the 4" line on Silver Lane
destroyed the pipe on Silver Lake Terrace. We stabilized the ground and replaced 74' out of
91' of cast iron pipe.
• The cost of material, equipment, labor (not counting City equipment and labor) was
approximately $15,933.00. The water breaks caused hardship for the residents on Silver Lake
Terrace. The line should be replaced the full length of Silver Lake Terrace with 4" ductal iron
pipe with a 4" hydrant at the end.
We need an engineered drawing to submit to the State Health Department. The line could be
replaced by the Public Works Department or a contractor. We may have to have a large
machine dig the excavation. If it is decided to contract out the job the Public Works Department
could put the road back. In any case I recommend that we put the road back.
It is estimated that the watermain replacement is about $23,100.00 for labor and equipment and
$5332.00 for the watermain.
I recommend that we replace the watermain with the City removing the asphalt for the contractor
and replacing the asphalt road with budget money.
l
CITY OF COLUMBIA HEIGHTS -r
590 40th Avenue N. E.
Columbia Heights, MN 55421-3878
(612) 782-2800
Mayor February 23, 1996
Joseph Sturdevant
Councilmembers
Donald G.Jolly
Bruce G.Nawrocki
Gary L.Peterson
Robert W.Ruettimann Mr. Larry Hamer
City Manager City of St. Anthony
Patrick Hentges 3301 Silver Lake Rd.
St. Anthony, MN 55418-1699
Subject: Traffic Striping for Proposed Signal Improvement at 39th and Stinson
Dear Larry:
Attached is a copy of a letter we received from BRW in conjunction with the signal
project at 39th and Stinson. We need to decide on a striping plan as this will affect
• phasing on the signals. My preference would be to go with the three-lane
configuration.
Please review the options and let us know of any concerns you would have with
going to the three-lane option. I suggest we discuss this over lunch, at your
convenience, as I owe you a lunch.
If you have any questions regarding these comments, please feel free to contact me
at 782-2880.
S;rel
Mark A. Winson, P.E.
Public Works Director/City Engineer
MAW Jb
96-100
Attachment
•
"SERVICE IS OUR BUSINESS" EQUAL OPPORTUNITY EMPLOYER
--_ '96 14:37 BRW IIt = -__.'..:{ , P.
---10 -- 2
r _ February 22, 1996
Ms. Kathy Young
is It W INC.. City of Columbia Heights Engineering
637 38th Avenue NE
Columbia Heights, MN 55421
SUBJECT: Proposed pavement marking options at Stinson Boulevard and 39th
Avenue NE
Dear Ms. Young:
As requested at our meeting on February 13, we have developed a sketch of the
pavement markings necussary to convert Stinson Boulevard and 39th Avenue to 3-lane
r sections. Both roadways are 44 feet curb face to curb facto. The existing striping on
Stinson Boulevard consiats of a double yellow stripe down the center of the road. The
roadway either operates as a narrow four-lane undivided roadway or as a wide two-lane
roadway. 39th Avenue has similar operations. •
�;1YJ11�� Several pavement marking alternatives including the three lane option are feasible for
the roadways,all of which would work to varying degrees of efficiency with the
proposed traffic signal at Stinson Boulevard and 39th Avenue NE. Four options have
been identified for your review:
1•Jf��J.1�
1. Use existing pavement marking
�r<<: 2. Convert Stinson Boulevard and 39th Avenue to a three lane section
3. Stripe;as four-lane undivided.
4. Leave striping;as is,but add right turn lanes on the south approach and east
approach of the Stinson Boulevard/39th Avenue
If options 2 or 3 are chosen, the roadway should be rvstripud for at least a few blocks to
provide some continuity to the section. On Stinson Boulevard,the three lane section
could be introduced just north of 39th Avenue,and could be continued all the way
through the 37th Avenue intersection. This revision in lane geometry at the 37th Avenue
intersection would greatly improve traffic operations at the intersection by providing a
left turn lane. Current signal operations at the intersection allow for protected/permitted
left turn operations. "Mt: protected portion of the phasing is undenitilized,because of
through vehicles in the left most lane arc blocking lutl:turn vehicles from making use of
the phase. The continuous left turn lane would also provide storage for the many
driveways in this section.
•
I
FEB 22 '96 14:38 BRW I�ICo "' .i. ,�• ` " `
. •3{yj:Li.Pviy •-- -., '-,`4:�'r'.`;.",�" .•w'.�Tiu: '{��` "•L.e.al _ _.(,'
1 I
• Ms. Kathy Young
February 22, 1996
Page 2 of 2
On 39th Avenue, the three lane section could be continued from 39th Avenue to the
Apache Plaza entrance.
If you would like to discuss the other options or if you have any questions or comments,
please call.
Sincerely,
Robert J. Green
Attachments
Delivered by Mail
Filc306OAO3
cc: 'Howard Preston
•
f
-= 2 '96 14:38 BRW INC. P.4
Silver Lake
u
z N •
Z 10.
z
Li
°D 100 P
N.E.
; R
o S l L V E'
z
J 39TH
ui
u AVE. �tor�
m J
T� 4 4 W
N.E. Q '
39-ri/ AVC a o suu
a
000 38th AVE. N.E.
Hart z
o
AVE. RAMSEY
d
_
H NNEP N
Pte.
27
Ld a t
cn
36 th
z z o
r�•
Sv�GEsTE4 G�vGr�/ oma'
rWAwe 44We s,Ecr
Q'J snol-wo 4XVerA4G -*,V
Ctn1 39T/1� ifW."IE
' FEB 22 '96 14:39 BRW INCo - • =
13
Typical Sp=,ng 32'
7�:�:cJ:' °rr'o• ^`cr'~ .ter' c��:�.�• vp; •To•�
�..;..�. ,r, ;A' Mrd :t'fi`° �`':`nr li:"'•. z„ .:�' F`i ��.+
• ,>�' t1 s t~:ti�o�"•,.;•. , ,�.r s^^�`�'' > > ,• '•° � .: Y X�h, tn�3`,S.F
S mar,., :y ^C1•+�ty7 O.
N > .".....'
e�-r e=s <7N
C---7 r.,:..r r,,,.•'7„>' .,,y a p
a-Typical rnulli-NOV.Iwo way myt,ng with ung4a tame,t•,wr.wey lett turn O,,n,f1UWjj.On,
b—Tvicaf multi-lane,two-way marking with rest-tou Iwter.
•Ia:�' �,Vpn:>.s""t'.�.;s�., •an �:t•^d,```r'�;��i.,<fi.' ,i�r!'�.� ."."n^`'• 's"e,. '''� w is fk t' .�>:!< .i:",r�'�
rr
Yr9,�ykr�r oaks-^ . MR:,�rE.',"o! ca vs.iZC• s !-."t;'>' ":` "'�''.
,jam y,;✓ �"€,M A%':.x• " s ;� !► x,. 3",u$w,,;s�;•,
75`
•Q. i—'7
e ;., L•
Fxt�� "� �:.:s ,.4 r.•�t�#+L'`� �ro � C
Figure 3-5. Typical mulUlane,two-way marking appllcaUons. 'Optional
N 4e Ottectlon of Trawl
tb
dTIoN A �5Nojs rwE
$7RIPIAJ6 f'oR 77'1 77�RE,E' L,�U� �F.crra�J
• �P;.,�,ae� /��°'�� e+e� LL�,'�+� T �'ark I
cov,QlC�.
EB 22 '96 1439 BRW INC. •_ _..,• _ _. 'cam .woup" f"VAM c+.N•ar.wv P.6
�Y•W1�1 M�� GiOY N �If� y� Y Ywr tr wY u�Yti�a�4.Y4. '
L
O
�. C5
• , N
_ T
ei
' N
� y
y
1
i
, � 6
I I �
r
,
' I i
,
cc)3v's.r-LLB,
1
r `� • 'T
•!•M•• Owi W'u a0 Lr1-: L1.11�Ia{
Insit conn@ Process Project
St Anthony Village
36th Ave. Project-Edwards to
Roosevet St Anthony, MN
February 13, 1996
. i
..i
7
I
I
1
3 insimLuF"M
A Subsidiary of Insitulorm Mid-Americe.
CENTRAL, INC.
February 13, 1996
St. Anthony Village
3301 Silver Lake Road
St. Anthony,MN 55418
ATTN: Mr. Larry Hamer
: RE: Insituform® Process Project:
36th Ave. Project-Edwards to
Roosevelt, St. Anthony, MN
Dear Mr. Hamer: •
The Insituform process was developed to provide a means of reconstructing existing pipe, conduit
i or passageways without extensive excavation. Some typical applications include:
1. Halting settlement by stopping infiltration of soil and bedding material which often
accompanies groundwater infiltration causing soil voids and shifting ground in gravity
pipelines.
2. Eliminating infiltration of groundwater through joints,breaks and missing sections of gravity
pipelines.
3. Increasing the capacity of existing pipelines by smoothing the interior surface and providing
smooth transitions over joints and protrusions.
4. Reducing maintenance and increasing capacity by reducing depositions and eliminating root
intrusions into gravity pipelines.
5. Protection of pipe from attack by corrosive chemical effluent and vapors.
6. Eliminating the exfiltration of pollutants and chemicals into surrounding groundwater
aquifers through joints and cracks in pipelines.
Elimination of pressure leaks in waterlines b sealing pinholes,joints and cracks. •
. 7. E p Y
4510 West 77th Street- Edina,MN 55435 - (612)835-1006
800-325-1159- Fax(612)896-1044
l �
Mr. Larry Hamer
February 13, 1996
Page 2
8. Strengthening the existing pipe by the manufacturing of a tight fitting Insitupipe®within the
old; bridging joints, cracks and disconnected pipes into a single continuous conduit.
Briefly, here are just a few of the benefits realized from the reconstruction of pipelines using the
Insituform process:
Virtually eliminates excavation problems - depending on the type of pipe or passageway to be
reconstructed(sewers,drains,or conduits) excavation can virtually be eliminated. Existing access
,71 (sewer manholes)is usually sufficient. Side connections can generally be'reinstated' by cutting out
', from within. Bends can be negotiated.
Restores full size capacity - reduces maintenance - this tight fitting pipe is continuous over pipe
joints, openings and faults, the capacity is nearly always increased. The smoothness also reduces
depositions because there are no places for deposition to form, thereby reducing maintenance.
Builds corrosion resistant pipe-resists chemical attack-various thermosetting resins can be selected
• to resist the corrosive effects of the effluent.
Builds a continuous nine-(a new pipe within the old) -this pipe bridges breaks and missing sections
of pipe eliminating infiltration or exfiltration or loss of product in pressure pipes. Insituform fits
tightly and bridges disconnected pipes into a single continuous pipe.
Reconstructs unusual shaped pipes without loss of capacity -elliptical, egg shaped, flat bottom
' horseshoe or rectangular conduits can be reinstated to their existing shape by this tight fitting pipe.
Accomplishes these things in sizes from 4 inches to 8 feet in diameter - Insitupipes have been
constructed to these sizes and may be applicable to those beyond.
Builds or repairs pressure pipes -the thermosetting nature of the resins used yield three dimensional
cross linking; strength in both tensions and compression and high flexural modulus. The result is
a cast-in-place pressure pipe. Few, if any, such field constructed pipes can compare in strength.
J Solves difficult jobs - in addition to negotiating bends, it is possible to reconstruct with the
Insituform process, remote sections inaccessible to wheeled vehicles (e.g. inside buildings). In
addition to being installed without excavation,Insitupipes have been installed where access to only
one end is feasible (vertical wells). Also, it is possible to reconstruct only a portion of a pipeline or
pipelines with reducers.
_r
Mr. Larry Hamer •
February 13, 1996
Page 3
Easy. safe and reliable - the inversion process effortlessly places the Insitutube® against the pipe
wall without friction. The buoyant effect of the water suspends uninverted flexible pipe in a
frictionless media enabling the Insitutube to traverse long distances between openings. The
Insitutube is propelled by the weight of water in the inversion tube. It snakes itself through
misaligned pipe and around bends,pushing groundwater aside. In manually accessible pipe, it can
eliminate the need for workers to enter,thereby doing the same job easier and safer.
Solves stringent time restraints-preparation time is reduced by eliminating street openings, and risk
of damage to other utilities. Insituform can generally be installed and completed in less on-the-job
time than any other method.
1' The Insituform process offers more convenience to commerce and public -little inconvenience is
caused to the public, commercial business or existing utility operations because excavations are
generally eliminated. Little work space is needed for installation. This alone means less restrictions
on access to property and shops and greater assurance of safety.
Longevity-for normal applications such as gravity sewers, service life of Insitupipe can be expected •
' to approach fifty years. Service life of Insitupipe is a function of the temperature,pressure, velocity
and chemical and abrasive properties of the materials being carried.
Custom -EnQineered- Insitutubes are custom-engineered to optimize total life performance using
time-proven formulas. These take into account requirements for diameter, length and condition of
pipe, flow rates,temperature, pressure and corrosion of the materials being carried.
We believe the Insituform process would be ideally suited for your pipeline reconstruction project
based on the experience gained in utilizing the process for over 20 million feet of sewers and other
pipelines in various geographical areas of the United States.
Per your request we are pleased to submit the following proposal for the above referenced project:
Item (1) Manhole 432-431-428
Furnish and install approximately 521 lineal feet of 9 inch diameter Insitupipe with
a minimum nominal wall thickness of 0.282 inches and reinstatement of 7 service
connections.
i
Lump Sum — $ 25,800
The above price is based upon work to be performed in conjunction with other work
in the area at our convenience. is
:J
3• Mr. Larry Hamer
February 13, 1996
Page 4
PROPOSAL INCLUSIONS
j * Certificate of insurance with standard coverage
' * Mobilization and demobilization
* Pipeline cleaning
* Preliminary video and service connection identification
* Bypass pumping
Insitutube wetout, inversion,curing and finishing
* As-built video inspection and video tape
* Traffic control
* Coordination with project residents and businesses
* Reopening of all service connections (service connections will be left sealed only upon
written direction from the Owner, and, in such event, Owner will indemnify and hold
Contractor harmless from all backup claims arising therefrom)
• PROPOSAL EXCLUSIONS
The prices stated in this proposal do not include the following items. If provided by Contractor, the
cost will be charged as extras; otherwise these items will be furnished by Owner at no cost to
Contractor:
* Premiums for special insurance coverage requirements
j * Water from a fire hydrant or other high volume source within a convenient distance from
each inversion location, or, if not available, a water truck and operator
* Water meter charge or deposit
* Point repairs
* Manhole rehabilitation and/or replacement
* Protruding service taps affecting job quality or internal equipment access
* Dewatering(rarely required)
* Disposal site for debris resulting from cleaning
* Removal and disposal of any hazardous or toxic materials encountered during the project
* Installation of clean-outs, if required, for special bypass pumping requirements for
businesses
* Construction access easements
D
Mr. Larry Hamer •
February 13, 1996
Page 5
LIMITED WARRANTY
_ IN LIEU OF ALL OTHER EXPRESSED OR IMPLIED WARRANTIES, INCLUDING
WARRANTIES OF MERCHANTABILITY AND FITNESS FOR A PARTICULAR PURPOSE,
CONTRACTOR AGREES TO CORRECT ANY DEFECTS IN THE MATERIALS OR SERVICES
PROVIDED BY CONTRACTOR WHICH ARE BROUGHT TO THE ATTENTION OF
CONTRACTOR WITHIN ONE YEAR FOLLOWING COMPLETION OF CONTRACTOR'S
WORK, PROVIDED OWNER AFFORDS CONTRACTOR SUITABLE ACCESS AND
WORKING CONDITIONS TO ACCOMPLISH SUCH CORRECTION.
MUTUAL RELEASE OF CONSEQUENTIAL DAMAGES.
:.i Neither party shall be liable to the other for consequential damages relating to or arising out of the
Contract.
OTHER TERMS
* Payment due within thirty days of completion of the project •
* Partial monthly payments may be requested
* Prices stated are in effect for ninety days from the date of this proposal.
After your review of this proposal, should you and/or your designee desire additional information
please feel free to give us a call at(612)472-1692.
..i
If this proposal is acceptable,please sign and return two copies to me. As soon as we return a fully
executed copy to you,we can move ahead with the project.
We appreciate your interest in the Insituform process and giving us the opportunity to quote on your
} pipeline rehabilitation needs.
.Jt
Sincerely,
INSITUFORM CENTRAL, INC.
i
1 •` J Bob Ratz, Sales Representative
zl
• Mr. Larry Hamer
February 13, 1996
Page 6
Owner Acceptance: Contractor Acceptance:
St. Anthony Village Insituform Central, Inc.
by: by:
Signature Signature
Title
itle
Date
Date
FEB-12-96 KION 11 :38 SAGE COMPANY FAX NO. 6125819348
• Owners-Usn"ers
•RIISIDENTIALAPARTMWTS
•HEALTH CARE FACILITIES
•RETIREMENT CENTERS
•COMMERCIAL PROPERTIES
3AC3 F.
SAGE COMPANY
February 9, 1996 PHONE(Qi2)6 1AA200 9 FAX(612)691-9848'MN as�o6
Mr.Michael lvlornson
City Manager
St Anthony Village
3301 Silver Lake Road
St. Anthony,MN 55418-699
RE: City of St.Anthony Multi-Family Housing
Revenue Bonds -$5,960,000
(St. Anthony Nursing Home Project/Chandler Place)
• Dear Michael:
As indicated in our January 26th letter, we intend to refund the above referenced Bf d Issue rth the is
extend the term of the Bonds to December 1,2025. The purpose of this letter is o
we have discussed with the City regarding the conditions under which the City will agree to
cooperate with such a refunding transaction. We understand that the City staff will recommend that
the City agree to the following terms and conditions.
As you know,the City and St.Anthony Nursing Home Limited Partnership("Partnership')are the
parties to a Development Agreement dated December 1, 1995 ("Agreement"). One aspect of the
Agreement deals with a$700,000 loan from the City's Housing and Redevelopment Authority to
the Partnership (the"TIF Loan'D.
The terms we have discussed(which we would like the City to formally approve) are as follows:
1. The City will adopt appropriate resolutions
to facilitate efunding at the earliest
possible time and fully cooperate throughout process;
2. The Partnership will, at the closing of that refunding, pay the Obligee on the TIF
Loan$500,000 plus either a Letter of Credit in the amount of$100,000("Letter of
Credit')or an additional cash deposit of ��ec(rued inCash terest thereon.eposit) in xchange for
We further
• a full satisfaction of the TIF Loan together
understand that all documentation relating to the TIF loan will be satisfied at closing.
a wCARmoRRESPov.ErmRs%i oom74"ORNsON.WPO
P. 02/03' '
'
1111 11 :39 SAGE 1OMP11i' hnX NJ, 6125919041 1, 11101
W.Michael Monson
February 9, 1996
Page No.Two
3. The proceeds of the Letter of Credit(or the Cash Deposit, as the case may be)will
be payable to the City (or in the case of the Cash Deposit, will be retained by the
City) in the event that the Partnership, or an affiliate thereof, fails to complete the
= _ proposed expansion to the St. Anthony Health Center ("Expansion') within a
reasonable period of time. Upon completion of that Expansion,the Letter of Credit
(or,if the Partnership has elected to make the Cash Deposit,then the Cash Deposit)
will be returned to the Partnership.
4. That portion of the proceeds of the TIF Loan which is not paid to the City will be
returned to the Partnership as reimbursement to the Partnership of TIF related
expenses incurred in connection with the original Project or the Expansion. We •
understand that all unpaid interest will be forgiven. The City will fully cooperate in
the Partnership's efforts to document the reimbursement of appropriate IIF expenses
to the Partnership.
5. While we have discussed the issue of Title II real estate tax treatment,the City and
the Partnership agree that the Partnership's right to file for Title 11 tax treatment will
be a decision made wholly by the Partnership free of any restrictions imposed by the
City.
We appreciate your continued cooperation throughout this project and look forward to completing
a successful refunding transaction. Please confirm the City's formal approval of these terms so that
we may move forward.
VPosepph
truly yours,
Gcr�
L.Guertin
General Manager
Health Care Facilities
av4cARE=RREspou rERs11D9OV40MRNSON.WPD
r ,
MEMORANDUM
DATE: February 22, 1996
TO: Mayor and Councilmembers
FROM: Michael Mornson, City Manager
ITEM: FINANCIAL SUMMARY FOR NEW CITY
HALL/COMMUNITY CENTER - UPDATE
Building Revenues
Bond proceeds $2,650,000
City's cash $1.250.000
Total $3,900,000
Building Cost
• Base Bid $3,151,900
Architectural & special consultants $ 230,000
Demolition $ 160,984
Bond cost $ 30,000
Contingency $ 327.116
Total $3,900,000
Contingency Costs (to date)
Contingency cost approved to date -- $4,862.
Storm water $ 17,000
*Oce furniture $ 15,000
Storage space $ 20,000
Asbestos removal $ 50,000
*Tennis courts $ 34,000
Playground area $ 20,000
Wall in Commons area $ 20.000
Total $ 176,000
* Currently, there is $34,000 budgeted in our Capital Equipment Fund for tennis courts
and $15,000 for office furniture.
The $5,000 for the score board has not been included.
J
ANTHONYUTY OF ST. •
ST. ANTHONY CITY HALL & COMMUNITY CENTER
MAYOR CLARENCE RANALLO
CITY COUNCIL MEMBERS RICHARD ENROOTH
JEROME FAUST
DOROTHY FLEMING
GEORGE MARKS
GEORGE WAGNER
CITY MANAGER MICHAEL MORNSON
ARCHITECTS: WILUAMS/O•BRIEN ASSOCIATES, INC. •
CONTRACTOR: GRAUS CONSTRUCTION
1996
TEL No . Feb 13 96 13 : 27 No .C
r . z e
WILLIAMS/O'BRIEN ASSOCIATES, INC. ARCHITECTS/PLANNERS 1111 3rd AVE. S. MPLS, MN 55404
TELEPHONE: (612) 338.8981 FAX: (612) 338-8982
F&K UIJIJ @ gm
RE: St. Anthony City Hall & Community Center
DATE: 2/13/96
FROM:LIZ HERRMANN
TO:MIKE MORNSON
PP: 1
Mike-
In answer to your question this morning, there Is no curtain currently specified for the gym.
Also, due to the fact that the gym is an assembly occupancy, If the City does wish to add a dividing
curtain, we will also need to add two exits in order to meet code requirements.
I sc�sS
• FACILITY USAGE
COMMUNITY CENTER
CITY OF ST. ANTHONY
The Community Center belongs to the residents of St. Anthony. The meeting
rooms, the gymnasium and the facilities of the Community Center are the City of
St. Anthony's greatest assets. Providing groups and organizations an opportunity
to utilize these facilities is an important part of using our resources to the fullest.
The City of St. Anthony will be responsible for coordinating rental and scheduling
use of the Community Center facilities. Fees will be charged for using the facilities
when appropriate. These fees help to cover the cost of maintaining the facilities
that are beyond normal operating and maintenance costs. A schedule of fees and
when they will be charged is listed below.
Procedures
1 . Obtain a facility usage form from the City of St. Anthony by calling 789-
8881 or stopping by the City Hall, 3301 Silver Lake Road, St. Anthony.
2. File the application with the City as soon as possible to insure that the
facilities are available for your use on the date of your event. The scheduling
is
of all events are on a first come basis.
3. The applicant/organization agrees to assume all responsibility for damage or
liability of any kind and further agrees to hold the City or the School District
harmless from any liability and/or expense in connection with the use of the
Community Center facilities under this agreement. The City may require the
applicant/organization to furnish a certificate of insurance to guarantee the
conditions of this agreement or any liability incurred by it. Payment of any
fees is required when the application is filed with the City.
4. Cancellations must be made 72 hours in advance of the scheduled event.
Notices received later than 72 hours will be subject to 50% of the rental rate
as a cancellation fee.
5. The City of St. Anthony reserves the right to cancel any reservation should
the need arise. Cancellation would result if an emergency condition is
declared. Instances of an emergency might include the institution of state
energy conservation regulations, closure of the facilities due to the eminent
possibility of dangerous weather conditions or a public health threat, or the
immediate need for a public hearing. Should cancellations occur for the
above-stated reasons, the City would try to find other accommodations or
• reschedule.
z �
Rules
Mutual consideration and respect are needed in order to provide usage of the •
Community Center. The following rules exist to protect these facilities that are
owned by the City and its residents. They will be adhered to when using these
facilities.
1 . Regularly scheduled and publically noticed activities of the City shall have
first priority in the use of the Community Center facilities.
2. City equipment (i.e., audio-visual equipment, chairs, tables, etc.) is available
but must be requested at the time of the application for use of the facilities.
The appropriate fees will be charged.
3. It is the renting organization's responsibility to clean up the facility being
used. There will be additional charges for take down and clean up if the
renting organization does not fulfill their obligations in returning the room to
its original order.
4. All activities must be supervised by an adult, (21 years or older). Applicants
must supply additional special supervision that they require, i.e., police
protection, parking lot attendants.
5. The renter is liable for personal injury or property damage. •
6. Soft-soled shoes will be worn on the gymnasium floor.
7. Decorations must be fireproof. Putting materials on the floors, walls or other
structures of the building must be reviewed with City Staff and listed on the
application.
8. Facility usage permits shall be cancelled for just cause.
Rental Fees
Applicants/Organizations desiring the use of the facilities are classified into the
following categories:
Class A: School organizations, community groups or not for profit individuals
providing services or activities for the youth of I.S.D. #282, non-profit community
groups and local civic organizations (i.e., Chamber of Commerce, Kiwanis). Certain
circumstances may require fees.
Class B: Political groups and religious/church organizations. School
organizations other than SANB I.S.D. #282, community groups or not for profit
individuals providing service for activities for non-resident youth, non-profit •
comminity groups and local civic organizations that are located in St. Anthony.
Class C: Commercial and business organizations.
. ain thoue
� illa
City Hall/Community Center
Facility Reservation Form
Current Date
Home Day
Name Phone Phone
Address
Name of Group or Organization
Class A: School organizations, community groups or not for profit individuals providing services or activities for the youth of
I.S.D. #282, non-profit community groups and local civic organizations, i.e., Chamber of Commerce, Kiwanis.
Certain circumstances may require fees.
Class B: Political groups and religious/church organizations. School organizaitons other than SANB ISD #282, community
groups or not for profit individuals providing service for activities for non-resident youth, non-profit community
groups and local civic organizations that are not located in the City of St. Anthony.
Class C: Commercial and business organizations.
*ate(s) Wanted Day(s) Sun Mon Tue Wed Thur Fri Sat
Room Requested Fee
Council Chambers Gymnasium
Kitchen Community Meeting Rooms
Which one?
Key Deposit Fee (refundable upon return of key) Fee
I hereby certify that I am an agent of the above named group or organization and am authorized
to accept in their name the responsibility for observance of the rules and regulations of the City
of St. Anthony. In accepting this arrangement, rentee agrees to assume all responsibility for
damage or liability of any kind of further agrees to hold the City of St. Anthony and its
representatives harmless from any liability and/or expense in connection with the use of the City
Hall/Community Center facilities. In addition, rentee accepts full responsibility to clean the
rented space after rentee's use.
�ignature of Responsible Person Total Fee
3301 Silver Lake Road, St. Anthony, Minnesota 55418-1699 Phone (612) 789-8881 FAX(612) 781-9323
30
Community Services and School activities are paid for with the lease between the •
City and the School District, therefore, there will be no charge for their activities
under Class A. The Sports Boosters charge for janitorial services is made up with
their $10,000 contribution.
Council Chambers
Class Fee
A $15.00/Hour
B $35/Hour*
C $100/Hour
Gymnasium
Class Fee
A $25.00 Maintenance Fee (4 hrs. of
useage)
B $30.00/Hour (Large)
B $20.00/Hour (Small)
C $50.00/Hour (Large)
C $35.00/Hour (Small)
Kitchen
Class Fee •
A $15.00/Hour
B $20.00/Hour
C $30.00/Hour
Community Meeting Rooms
Class Fee
A No Charge
B $10.00/Hour
C $20.00/Hour
Additional Personnel
The need for additional personnel will be determined by the City at the time of the
permit application. *No extra charge will be made for custodians at times when
they are regularly on duty.
Custodial $31 .00/0 .5)Hour
$41 .00/(double-time)Hour
$51 .00/Hour Holiday Pay
•
3 �
• STAFF REPORT
DATE: February 9, 1996
TO: Mayor and Councilmembers
FROM: Michael Mornson, City Manager
ITEM: VACANT LOT ADJACENT TO CUSTOM INDUSTRIAL
PRODUCTS
Ken Solie and Jerry Cowan, two local developers, are requesting up to $233,000 in TIF to
assist them in the construction of a 30,000 square foot commercial facility. This facility
would serve two tenants who would provide a minimum of 30 jobs. The facility would have a
value of$1.2 million and a tax bill of$60,000 per year, compared to the estimated taxes of
$5,000. This $60,000 per year is approximately the same amount of taxes that the Custom
Industrial Products building is bringing in. In addition, they will also need a public hearing
for subdivision and one for an expectant variance request.
• Policy Iml2act
The City's policy states that the City can provide up to $10,000 in assistance for each
$100,000 increase in value and $5,000 for every job created or retained.
$1.2 million in value = $120,000
30 jobs 150.000
$270,000
The City has approximately $500,000 in the fund balance from the Chandler and Kenzie TIF
districts. I would propose the City use those funds for this redevelopment, as we did for
American Monarch and the two townhouse projects. The benefits of this are: (1) no bond
sale; (2) no TIF district created; (3) no LGA penalty; and, most importantly, (4) the City,
School and County benefit immediately.
To be able to provide the funding for this development, the City will need to conduct a public
hearing to amend our budget. I have attached the activities that are currently permitted to
utilize TIF funds. Since we are going through the hearing, we may want to add or delete to
the plan.
• PIease let me know within the next 30 days, if there are any changes you would like to see in
the TIF plan.
3z
VILLAGE PROPERTIES 2500-39th Avenue NE
Mpis. MN 55 +21
February 8 , 1996
Mike Mornson
City Manager
City of St . Anthony
3301 Silver Lake Road
St . Anthony, MN 55418
• Dear Mike :
Our company recently purchased the property located
at 2801 37th Avenue NE . Along with the purchase of this
property, we acquired the land to the east up to the Amoco
station on Silver Lake Road . The area from the existing
parking lot to the east property line is approximately
65 , 000 square feet . Additional land to the north is
available for lease from CP Rail as needed to supplement
the site .
We have been contacted by Systec , a local company
currently located on Chandler Drive . They have been given
notice to vacate their current space in approximately one
year to allow for expansion of their neighbor and current
landlord , Marshall Manufacturing . Systec is a $ 3 . 0
million company with 20 employees . They want to stay in
St . Anthony but will have to move from the City if
• suitable space is not available . Systec, has given us a
Letter of Intent to lease a minimum of 10 , 000 square feet
3
.LL-A :iew facility located on the subject parcel . A
drawing of the parcel and an approximate building foot
print is attached. •
Our company is proposing to build a 30 , 000 square
feet industrial building to accommodate Systec and up to
three new light manufacturing businesses .
We have reviewed our proposed construction with two
contractors experienced in industrial property
construction and have been advised that the principal
construction concern is the existing soil condition . We
understand that the site was used for disposal of street
or highway demolition debris and that it is likely that
this would need to be completely removed to Permit
construction . Without comprehensive soil testing the
exact cost of the coil correction work cannot be
determined . However , our contractors estimate a worst
case cost to be $ 175 , 000 . We are asking City assistance
for this amount to achieve a buildable site .
Additional basic site preparation work and utility •
installation will total an estimated $ 58 , 000 . This
expense is necessary to prepare the site for final
construction and City assistance is also requested in this
amount . Two versions of a project cost summary are
attached . Version A includes the requested City
assistance . Version B includes no City assistance . It is
anDarent that the project cannot proceed without St .
Anthony participation .
Our company will contribute equity in the amount of
$212 , 500 in land value and cash , financing approximately
$850 , 000 . We expect a market value for real estate taxes
purposes of approximately $ 1 . 2 million.
The benefits to the City for its participation
include:
1 . The retention of 20 jobs at Systec .
•
2 . Assuming new companies similar to Systec , a:.
Tonal 20 to 40 new jobs would be created in the
• City.
3 . The addition of $ 1 . 2 million to the tax base- , '
resulting in additional real estate taxes of
approximately $60 , 000 .
4 . A contribution to the continuing redevelopment of
the Apache Plaza area into a viable economic region.
The feasibility of the proposed development is
contingent on a final determination of soil conditions and
correction costs . With the City ' s agreement to proceed as
herein proposed, we will start immediately with testing .
If the conditions are significantly different than
expected, our request will be terminated or modified as
appropriate .
Our preliminary development schedule includes
construction start in early summer with occupancy planned
• for the fall of 1996 .
Sinc r
Kenneth Solie
•
• �;1L1111aIi� -• - 1
• 0 AD 1 •
RAI L -4 Val11InIl-;i1111:tlit:t�ltttit 1
6' C-L FENCE
AROUND PROPANE =
12" P`c_�` TANK AREAS R 3 9 0 4 g g 1
' 3
I
6,,06 ' 2S '
CBft/N
LIN�-
X ri
p MON. w N
7 BIT. SURF. w 2
- 1^I "` -PER
UTILITY
LOT o
I PER DOC. 3p000sf d
0
g (D L: 0 1
30' UTILITY EASEMENT— —A P a C z
R DOC NO.994578.32 I I O
P
10138.4
\ � ` ~ - - - - - •- - •- - - -- -- - 626.50 -
STORM MH -- - - - - - - - - - - •-- � �
641.50 ••
o
7S
M
NOTE: EXISTING BUILDING ENCROACHES 4.66'
\C i \ E V ON PRH .'E UTILITY EASEMENT
• DESCRIBFD IN DOC. NO. 14,97g�9
•
Property Taxes:
Commercial Property Valued at $1,200,000
1) Fiscal Disparities $ 8,814.60
2) School 369203.36
3) County 209740.08
4) City 139378.62
5) Other Districts 21,692.40
Total $ 81,829.06
3 -7
MEMORANDUM
DATE: December 13, 1995
TO: Mayor and Councilmembers
FROM: Michael Mornson, City Manager
ITEM: STATUS UPDATE ON TIF
Following is an update on the TIF plan and expenditures that were recently
approved by the City Council on June 27, 1995.
The total approved was $5,110,000 and is summarized as follows:
Expenditure
• Activity Authorized Project Status
Evergreen Twin Homes $150,000 Construction underway. $12,500 paid to
(12), min. value $175,000 developer upon issuance of certificate of
occupancy per unit. 12 X 12,500 =
$150,000.
Gregory Redevelopment $350,000 Construction underway. $165,000 paid
(18), townhomes valued at to developer. $95,000 remaining to be
$175,000 paid upon completion of 10-14 units.
$90,000 remaining for future redevelop-
ment of additional properties.
American Monarch $125,000 Industrial Custom Products located in
Industrial Custom Products building. $125,000 paid out.
Community Center $3,000,000 $2,650,000 bonds issued. Construction
underway.
Autumn Woods Project $500,000 No activity.
• Apache Plaza $300,000 No activity.
Clark Station $30,000 No activity.
-3
TIF Update •
December 13, 1995
Page 2
Lowry Grove $500,000 No activity.
Bowling Alley $60,000 No money spent, however, an office
retail business has located there.
St. AnthonyShopping Area $35,000 No activity.
Vacant lots on Silver Lake Road $60,000 No activity.
Money authorized to date--- ---$4,205,000
Money not authorized— -----$1,575,000
Total---------------------------$5,780,000
Interest on bond $1 million is the difference between $5.1 million and $5.7
million, •
Once again the benefits of setting up TIF in this manner are:
• No LGA loss
• Will not have to issue bonds
• Will not have to put property in the district
Following represents the status of the existing TIF districts:
District
IM Type Increment Terminates
*Chandler Housing $240,000 per year 2010
*Kenzie Terrace Housing $461,910 debt until 1999 2008
Evergreen Housing $50,000 2001
Walbon Housing $35,000 debt until 2001 2011
Apache Plaza Commercial --- 2018
*The Chandler and Kenzie Terrace districts are the districts the City is using for the $5,100,000 in
expenditures.
Chandler and Kenzie Terrace Districts have a fund balance as of December 31,
1994 of$1.1 million.
•
MEMORANDUM
DATE: February 9, 1996
TO: Mayor and Councilmembers
FROM: Michael Mornson, City Manager
ITEM: MPRS LAWSUIT UPDATE
• Following is an update on the MPRS lawsuit.
(1) The group has until March 1st to submit to finding 14 and 15 of the
court order. Those were findings relating to Affirmative Action.
(2) Each City has to adopt a resolution on damage payment.
I will put this resolution on the February 27th Council agenda. I plan to have
Bill Soth review the resolution prior to February 27th.
Both of these lawsuits started before the City policed Lauderdale and Falcon
Heights, so we do not have to include them in the cost of damages. If you have
any concerns about this matter, please feel free to contact me.
•
"1 Cj
KENNEDY & GRAVEN
CHARTERED
Q
torneys at Law CORRINE H.THOMsoy470 Pillsbury Center,Minneapollc,Minnesota 55402 JAMES J.TAOMSONBERT A.ALSOP (612)337.9300 LARRY J.
HOMSONWERTHE2M
BRUCE M.BATTERSON
BONNIE L-WILKINS
RONALD H.BATTY
STEPHEN J.BUBUL Facsimile(612)337.9310 JOE Y.YANG
JOHN B.DEAN DAVID L.GRAVEN(iS/L•l 91)
DANIEL J.GREENSWEIG
DAVID J.KENNEDY
CHARLES L.LEFEVERE OF COUNSEL
N
ARLSO
ROBERT C.C
JOHN M.LEFEVRE,JR. WRITER'S DIRECT DIAL ROBERT L.DAVIDSONRLSO
ROBERT J.LINDALL (611)337.9215 WELLINGTON H.LAW
ROBERT C.LONG C
JAMES M.STROMMEN URTIS A.PEARSON
T.JAY SALMEN
MEMORANDUM
TO: City Managers,Administrators,Attorneys and Chiefs of Police of Defendant Cities
in Starks & Fields v. MPRS, et al.
FROM: Charles L. LeFevere (7
DATE: February 9, 1996
• RE: Response to the Order of Judge Solum Relating to Hiring Commitment and
Affirmative Action Programs
The purpose of this memorandum is to provide you with an update on the obligation of the
defendant cities and the MPRS to respond to Order No. 4 on page 7 of Judge Solum's order of
November 6, 1995 in the Starks & Fields case. Order No. 4 requires the defendants to submit
detailed plans or programs for the implementation of Findings No. 14 and 15 on pages 5 and 6
of the order.
I. EXTENSION OF TIME
At our request, Judge Solum has granted an extension of time to provide the requested
information to the court, until March 1, 1996. It was somewhat more difficult than I had
expected to convince the court to grant us an extension. Therefore, it would be prudent
to regard March 1 as an absolute deadline.
Mel Harris tells me that he will have a completed draft of the affirmative action program
to us by February 14, 1996. We will immediately transmit a copy of that draft to the
cities for their review, comment and consideration. Given the shortness of time between
the completion of Mel's project and the court's deadline, it is essential that the cities
review the document as soon as possible.
• If anof the cities Iles have not yet provided information to Mel, that information must be
provided as soon as possible.
CLL100209
NP110-2
-=f 1
• February 9, 1996
Page 2
To date, I have received word from two cities, Mendota Heights and Brooklyn Park, that
they will be submitting their own individual affirmative action programs to the court.
II. RESOLUTION ON DAMAGES
On December 29, 1995, I forwarded to all of the defendant cities a draft resolution
relating to the allocation of damages among the defendant cities. The formula described
in the resolution was recommended to the MPRS board by its executive committee. I
received a few comments about the form and format of the resolution, and those
recommendations have been incorporated in the attached, revised resolution. Therefore,
I submit the attached resolution for consideration for adoption by each of the defendant
cities.
I would appreciate it if you could provide me with a copy of the adopted resolution for
your city once the council has decided. If the city council declines to approve the
resolution, I would appreciate being notified of that as well.
III. POCOP PROGRAM
On January 31, 1993, at the invitation of the State Department of Public Safety,
representatives of a number of the defendant cities attended a meeting at the Rosemount
community center about the Police Officer Career Opportunities Program (POCOP). The
State Department of Public Safety and the cities of St. Paul and Minneapolis have entered
into a joint powers agreement for the training of police officers. The program which is
run under this joint powers agreement is referred to as POCOP.
As many of you will recall, until the late '70s, cities hired police officers who were then
sent to a police academy for their law enforcement training. The law was then changed
to require a two-year community college program of an approved law enforcement
curriculum, followed by the POST board examination. POCOP is a return to the older
system. The joint powers organization contracts with community colleges to put on what
is essentially a police academy for the Department of Public Safety and participating
cities. POCOP has extended an invitation to the defendant cities in the Starks & Fields
lawsuit to participate in an upcoming POCOP program.
This program requires the city to hire candidates as police officers and send them to the
academy. The academy is a course of study of between four and five months. The cost
to the city would be the tuition which is approximately $3,500 plus whatever salary is
paid to the police officer during the academy period. The next POCOP class is scheduled
to begin on September 3, 1996 to end during December, with graduation in early January.
• It will be given at the Rosemount community center.
CLL100209
MP110-2
4z
February 9, 1996 •
Page 3
The POCOP program has had one class in the past and the participating cities were very
successful in recruiting and training minority police officers. The primary advantage of
the program is that it accelerates the certification process from two years to four months.
Because of this, it greatly expands the pool of potential minority candidates. Cities are
currently effectively limited to the pool of applicants who have completed, or are about
to complete, the two-year community college program in law enforcement. Under the
POCOP program, a city can recruit from a substantially larger minority candidate pool.
For example, a city might recruit a minority candidate with a BA degree, hire him or her
as a police officer and have the candidate qualified and certified in just over four months.
We have been advised that the assistance of the State Department of Employee Relations
will be available to assist cities in recruiting minority candidates for this program.
I understand that the City of Plymouth has already reserved two spots in the upcoming
POCOP class.
I urge you to seriously consider participating in this program if it is consistent with your
police officer hiring needs. I believe that it would be very helpful to be able to represent
to the court in our submittal on March 1, 1996 that a number of cities have made a •
commitment to participate in this program.
If you would like further information about the program, I would encourage you to
contact Mr. John Edwards at the State Department of Public Safety. Additionally, I
understand that grant money is available through the POST board for participation in this
program. I would suggest that, if you are interested in the POST board grant program,
you contact the POST board directly.
cc: Mel Harris
Larry Thompson
•
CLL100209
MP110-2
43
• CITY OF ST. ANTHONY
COUNTY OF HENNEP N/RAMSEY
STATE OF MINNESOTA
RESOLUTION NO. 96-021
RESOLUTION APPROVING ALLOCATION OF DAMAGES
AND AUTHORIZING PAYMENT THEREOF
BE IT RESOLVED by the City Council of the City of St. AnthonyMinnesota (City)
as follows:
Section 1. Background.
1.1. The City of St. Anthony (hereinafter referred to as the "City") is a defendant in
the cases of Starks v. Minneapolis Police Recruitment System, et al.; Hennepin County District
Court File No. EM93-219, and Fields v. Minnesota Police Recruitment System, et al.; District
Court File No. EM93-218.
1.2. The Court has concluded in said actions that the defendants violated Minnesota
• Statutes, Chapter 363, the Minnesota Human Rights Act, in the administration of the Minnesota
Police Recruitment System (MPRS) testing process for entry level police officers employment
screening and that defendants are obligated to pay certain damages and penalties.
1.3. In its order dated November 6, 1995, the Court determined that the defendant cities
are obligated to pay $156,688 in damages for lost wages and emotional distress.
1.4. The Court has also determined that the MPRS, a joint powers organization of which
the City is a member, or was a member at the time the actions were commenced, is obligated to
pay each of the two plaintiffs punitive damages in the amount of $8,500.
1.5. The Court has not yet made a determination as to the award of plaintiffs' costs,
disbursements, and attorneys' fees.
1.6. The Court also determined that the unlawful discrimination by the defendants can
reasonably be remedied in part by paying a statutory penalty in the amount of $300,000 to the
state of Minnesota, or in lieu of such penalty establishing a reasonable minority race hiring
commitment satisfactory to the Court. In the event a hiring commitment is submitted to the
Court which is found to be satisfactory, it may be that the payment of a statutory penalty will
not be required.
1.7. The MPRS has proposed that the payment of monetary damages to the plaintiffs
• described above in paragraph 1.3, punitive damages described above in paragraph 1.4 and
plaintiffs' costs, disbursements and attorneys' fees be allocated among the parties on the
following basis:
CLL98335
MP110-2 1
-4_4
20% of such costs would be divided equally among the 36 city defendants. 80% of such •
damages would be divided pro rata on the basis of the population served by the cities police
departments as of the time the actions were commenced in January of 1993. Such population
would be determined on the basis of Metropolitan Council estimates for cities in the metropolitan
area. For communities outside of the metropolitan area the population would be determined by
the State Demographer's estimates. For communities with service contracts under which police
service is provided to other municipalities, the populations of such other municipalities would
be included in the computation of population served.
Sec. 2. Findings.
2.1. It is in the best interest of the City to reach mutual agreement on the allocation of
damages.
2.2. The allocation proposed by the MPRS is found to be fair and reasonable, and
consent thereto is in the best interest of the City.
Sec. 3. Approvals and Authorizations.
3.1. The allocation for payment of damages,penalties,costs,disbursements and attorneys'
fees described above is hereby approved.
3.2. The City consents and agrees to payment of its share of such damages, penalties, •
costs, disbursements and attorneys' fees in accordance with the allocation formula described
above.
Finance
3.3. The City Manager and Director are authorized and directed to make
payment for the City's share of final judgment of such expenses in accordance with the agreed
upon allocation.
3.4. This resolution does not amend any previous agreement among the defendant cities
for allocation of defense costs and defendants' attorneys fees; and nothing herein shall be deemed
to be an agreement as to allocation of any statutory penalties which may be awarded in the
future.
3.5. This resolution constitutes only an agreement between and among all cities which
are defendants in the above-referenced actions which consent and agree to the allocation formula
described above by adoption of substantially similar resolutions. Nothing herein shall be deemed
an admission of responsibility or a liability in any action for contribution by any city which has
not consented to such allocation or a waiver by the City of any rights, claims, demands, or causes
of action for contribution by the City against any city which has not agreed to such allocation.
•
CLL98335 2
MF110-2
Adopted by the City Council of the City of St. Anthony, this day of
1996.
Mayor
ATTEST:
City Clerk
Reviewed for administration:
City Manager
•
• CITY OF ST. ANTHONY
NOTICE OF HEARING
1996 URBAN HENNEPIN COUNTY COMMUNITY
DEVELOPMENT BLOCK GRANT PROGRAM
Notice is hereby given that the City of St. Anthony, in cooperation with Hennepin County,
pursuant to Title I of the Housing and Community Development Act of 1974, as amended, is
holding a public hearing on Tuesday, March 12, 1996, at 7:05 P.M. in the City of St.
Anthony Council Chambers, City Hall, 3301 Silver Lake Road, St. Anthony, MN.
The public hearing is on the housing and community development needs and priorities of the
City and Urban Hennepin County and the City's proposed use of the 1996 Urban Hennepin
County Community Development Block Grant Program planning allocation of$16,723.
In addition, during the July 1, 1996 to June 30, 1997 program year, it is estimated that no
additional program income from locally funded CDBG activities will be available to the City.
• The City of St. Anthony is proposing to undertake the following activities with 1996 Urban
Hennepin County CDBG funds starting on or about July 1, 1996.
Activity Budge
1. Single Family Housing Rehabilitation $10,035
2. Senior Citizens Program $ 3,344
3. Removal of architectural barriers to play areas and
upgrade play equipment in parks to ADA standards $ 3,344
$16,723
Subsequent increases or decreases in the community planning allocation or the budget of any
funded activity by the greater of$10,000 or 50 percent of the activity budget or change in
activity location, beneficiary, or purpose is considered a substantial change and pursuant to
Urban Hennepin County policy will be subject to the amendment process.
For additional information on the priorities, proposed activities, level of funding and program
performance, contact the City of St. Anthony at 789-8881 or the Hennepin County Office of
Planning and Development at 541-7080.
The public hearing is being held pursuant to MS 471.59.
•
Published in the St. Anthony Bulletin: February28, 1996
-4 -7
CITY OF ST. ANTHONY
RESOLUTION 96-022 •
A RESOLUTION APPROVING PROJECTED USE OF
FUNDS FOR 1996 URBAN HENNEPIN COUNTY COMMUNITY
DEVELOPMENT BLOCK GRANT PROGRAM
WHEREAS, the City of St. Anthony, through execution of a Joint Cooperation Agreement
with Hennepin County, is cooperating in the Urban Hennepin County
Community Development Block Grant Program; and
WHEREAS, the City of St. Anthony has developed a proposal for the use of Urban
Hennepin County CDBG funds made available to it, and held a public hearing
on March 12, 1996, to obtain the views of citizens on local and Urban
Hennepin County housing and community development needs and priorities the
City's proposed use of$16,723 from the 1996 Urban Hennepin County
Community Development Block Grant.
BE IT RESOLVED, that the City Council of the City of St. Anthony approves the following
projects for funding from the Urban Hennepin County Community Development Block Grant
Program and authorizes submittal of the proposal of Hennepin County for review and inclusion
in the 1996 Urban Hennepin County Community Development Block Grant Program. •
Prpjec Budget
1. Single Family Housing Rehabilitation $10,035
2. Senior Citizens Program $ 3,344
3. Removal of architectural barriers to play
areas and upgrade play equipment to ADA standards $ 3.344
$16,723
BE IT FURTHER RESOLVED, that the City Council hereby authorizes and directs the Mayor
and City Manager to execute the Subrecipient Agreement and any required Third Party Agreement
on behalf of the City.
Adopted this day of , 1996.
Mayor
ATTEST:
City Clerk •
Reviewed for administration:
City Manager
1996
URBAN HENNEPIN COUNTY CDBG PROGRAM
REQUEST FOR FUNDING
(Use one form per project)
A. GENERAL INFORMATION
1. Community: City of St. Anthony
2. Project Name: Single Family Housing Rehabilitation
3. Contact Person/ Phone No. Hennepin County Staff
B. PROJECT DATA
1. Funding Request $ 10,035
2. Is this request to fund an existing CDBG-FUNDED project? Yes X No
3. Leveraged Funds: Amount $ Source
(To what extent does project leverage additional public or private funds/firm commitment?)
4. Project Location: Address Citywide X
• (Attach map.)
5. Project Description: (Describe the protect in as much detail as possible and identify what, if
any, alternative funding sources have been considered for this project)
This project is for single family housing rehabilitation activities for
low and moderate incomes in St. Anthony. Please see Hennepin County Housing
Rehabilitation Project description.
6. Urban County Priorities: Using the list provided, identify what priority(ies) the project will
meet. (Note: If a proposed project is a low Urban County priority, you must explain why it
has a higher priority in your community.)
• This is a "high" priority project for the rehabilitation of existing units
for low to moderate income residents.
7. Anticipated results/accomplishments projects will have. (ie; number of persons/households
to be assisted/served, number of housing units to be rehabilitated/built, etc.) •
8. If applicable, describe how project will assist community in achieving Metropolitan Livable
Communities Act goals.
Pay assisting residents in needed repairs, the project will assist the
community to maintain its affordable housing stock.
9. Implementation Schedule: (For the time period 7-1-96 to 12-31-97, identify the major
project tasks to be performed and when they will occur.)
Date
Task Month/Date
•
10. Budget: (Specify total project budget by major project component--i.e., administration,
planning, construction, acquisition, direct grants, public service.)
BUDGET/SOURCE OF FUNDS
Component CDBG Other (identify)
Single Family Housing Rehabilitation $ 10,035 $
Project Budget $ 10,035 $
Total Project Budget $ 10,035
•
. SD
1996
• URBAN HENNEPIN COUNTY CDBG PROGRAM
REQUEST FOR FUNDING
(Use one form per project)
A. GENERAL INFORMATION
1. Community: City of St. Anthony
2. Project Name: Senior Citizens Program
3. Contact Person/ Phone No. Kim Moore-Sykes, 789-8881
B. PROJECT DATA
1. Funding Request $ 3,344
2. Is this request to fund an existing CDBG-FUNDED project? Yes X No
3. Leveraged Funds: Amount $ Source
(To what extent does project leverage additional public or private funds/firm commitment?)
4. Project Location: Address Citywide X
(Attach map.)
• 5. Project Description: (Describe the project in as much detail as possible and identify what, if
any, alternative funding sources have been considered for this project)
The project will pay for a portion of the Senior Citizen Program
coordinator's salary. This funding will allow for the maintenance and
expansion of activities targeted specifically for senior citizens.
6. Urban County Priorities: Using the list provided, identify what priority(ies) the project will
meet. (Note: If a proposed project is a low Urban County priority, you must explain why it
has a higher priority in your community.)
• The Senior Citizen Program project has a high priority need level as
noted in the Urban Hennepin County Five Year Priority Needs Summary.
5
1996
• URBAN HENNEPIN COUNTY CDBG PROGRAM
REQUEST FOR FUNDING
(Use one form per project)
A. GENERAL INFORMATION
1. Community: City of St. Anthony
2. Project Name: Upgrade,play area of Shamrock Park to ADA accessibility standards
3. Contact Person/ Phone No. Kim Moore-Sykes, 789-8881
B. PROJECT DATA
1. Funding Request $ 3,344
2. Is this request to fund an existing CDBG-FUNDED project? Yes X No
3. Leveraged Funds: Amount $ Source
(To what extent does project leverage additional public or private funds/firm commitment?)
4. Project Location: Address Shamrock Park Citywide
(Attach map.)
•
S. Project Description: (Describe theJ ro'ect in as much detail tail as possible and identify what, if
any, alternative funding sources have been considered for this project)
Hard surface area to swing set for wheel chair accessibility at
Shamrock Park.
6. Urban County Priorities: Using the list provided, identify what priority(ies) the project will
meet. (Note: If a proposed project is a low Urban County priority, you must explain why it
has a higher priority in your community.)
• The proposed project of removing the architectural barriers to the playground
equipment to meed ADA standards is described as "high priority needs" level in
the Urban Hennepin County Five Year Priority Needs Summary under the "Accessibility
Needs" category.
7. Anticipated results/accomplishments projects will have. (ie; number of persons/households
to be assisted/served, number of housing units to be rehabilitated/built, etc.) •
:t is anticipated that this improvement to Shamrock Park will make it
more accessible to children with special accommodation needs.
8. If applicable, describe how project will assist community in achieving Metropolitan Livable
Communities Act goals.
N/A
9. Implementation Schedule: (For the time period 7-1-96 to 12-31-97, identify the major
project tasks to be performed and when they will occur.)
Date
Task Month/Date
Shamrock Park retrofit June, 1996
•
10. Budget: (Specify total project budget by major project component--i.e., administration,
planning, construction, acquisition, direct grants, public service.)
BUDGET/SOURCE OF FUNDS
Component CDBG Other (identify)
Shamrock Park $ 3,344 $ City funds
Project Budget $ 3,344 $ Unknown
Total Project Budget $ 3,344
•
• PROPOSED VOLUNTEER February, 1996
DINNER LIST
Planning Commission
James Gondorchin
Rosemary Franzese Doug Bergstrom
Christopher Makowske Richard Horst
George Thompson John Delmonico
Police Reserves
Matt Steen Jody Bodway
Dick Hopperstad Bob Nehring
Jeremy Sroga Scot Rollie
Shane Justin Anthony Breitbarth
Gary Myrick Penny Owen
Brett Letourneau Jeffrey Spiess
•
Sports Boosters VillageFest
Jim Kozarek Steve and Nancy Bartz
Michael Peterson Mike and Michelle Jacobs
Village Gardeners Public Health Officer
Norma Gunderson Dr. William Carr
St. Anthony Orchestra Chamber of Commerce
Michael Pouchak Joe Welle
Lions Kiwanis
• R, Dale Gunderson
S �
Attorney Auditor Prosecuting Attorney •
Bill Soth Stu Bonniwell 95
50th Anniversary Committee
Tom and Bonnie Brever
Father Francis Kittock, Father James Burns, Pastor Glenn Seefeldt, Deacon Don DeWall,
Reverend Dennis Alexander
Mike Mornson, Larry Hamer, Dick Engstrom, Dick Johnson, Roger Larson, Don Perry, Kim
Moore-Sykes
•
Council
Clarence Ranallo, Dick Enrooth, George Marks, George Wagner, Jerry Faust
5 �
ain tehou
ills
PROCLAMATION DRAFT
WHEREAS, Volunteers have enriched the life of our community through their concern,
commitment and generosity of spirit; and
WHEREAS, Volunteers are an essential component of that quality of life as they serve the
health, education, recreation, social service, environmental and cultural needs of
our community; and
WHEREAS, Volunteers of all ages and from all backgrounds are stepping forward to meet and
to solve the increasingly complex problems that have confronted our community;
and
WHEREAS, Individuals and groups serving as volunteers have impacted our community through
service to others; and
WHEREAS, Recognition should be given to volunteers involved in all contributions which serve
their fellow citizens and communities.
NOW, THEREFORE, 1, Clarence J. Ranallo, Mayor of the City of St. Anthony, and on behalf of
the St. Anthony City Council, do hereby proclaim the week of April 21-27, 1996 to be
VOLUNTEER RECOGNITION WEEK
in St. Anthony Village. As we continue to face the challenges and opportunities of our society,
1 call on all citizens of the City to sustain and increase St. Anthony's voluntary spirit now andfor
the future. o ether we can serve the City and serve it well.
Mayor
Date
•
3301 Silver Lake Road, St. Anthony, Minnesota 55418-1699 Phone (612) 789-8881 FAX(612) 781-9323
• City Manager's Conferences
► May 8 - 10 -- Brainerd
City Managers' State Conference
► June 11 - 14 -- Rochester
League of Minnesota Cities/Association of Metropolitan Municipalities
Conference
► October 6 - 11 -- Washington, DC
City Managers' National Conference
OR
► December 6 - 11 -- San Antonio
National League of Cities Conference
•
•
•
im FORD SUPERIO
R FORD INC.
• •• NORTH
MINNEAPOLIS, MINN. 55442. 1423
559-9111 • •• O•
..
SERIAL N
• �-
"T UART,BILL
. . . CITY Of ST. ANTHONY VEHICLE SALES —1— _ _m
CITY-STATE ST. ARTHONY mm 55418
"•/IY:'i'•X• Wit;•AYr•
PURCHASE
ORDER N• 3826
PAYMENT DUE ON DELIVERY
A-.•:1! :1.cA;.�it'�t
'rF r „ass ! , i� •. _� t-� ':f+•'�•�:v, �_fj
CAR DEAL NO.
LICENSE&TITLE
WARRANTY FEE
•
TOTAL • i
18,558.00
�r1
USED CAR ALLOWANCE 18,558.00
r
/J
i� .K!..4. •yet.++•.�::K�4. 'ff'�.
..+Y...._ r l • �•�t!"•tom+•i���y Y�•-ti•-,'(`•~•77r•Y
�'
.I.. .cry:- � .�- • -�y/:
y-cA:.:Gt••�-f:i•;j-cA;•`Ga•-�•f7
�.,.//:1•F •,:.y ' .•til-j.f:,I•.:'.Yi
1`c A:".`.it•.�A-f:1 t�:.•[A:'.`G l•�A.f:1
S9
DRAFT
CITY OF ST. ANTHONY
JOINT CITY COUNCIL/SCHOOL BOARD MEETING
TUESDAY MARCH 19, 1996
SCHOOL BOARD MEETING ROOM
6:00 P.M. - 7:15 P.M.
I. BARRY KINSEY, SCHOOL BOARD CHAIR PRESENTS CITY
COUNCIL WITH SCHOOL UPDATE.
II. CLARENCE RANALLO, MAYOR PRESENTS SCHOOL BOARD
WITH CITY UPDATE.
III. OTHER DISCUSSIONS. (Tour of some of the construction
work, time permitting.)
IV. ADJOURNMENT.
•
•
2917 33rd Avenue N.E.
St. Anthony, Minnesota 55418
February 20, 1996
Mr. Michael Mornson, City Manager
ST. ANTHONY VILLAGE
3301 Silver Lake Road
St. Anthony,Minnesota 55418-1699
Dear Mr. Mornson,
Thank you for your letter of January 24, 1996. I have been intending to contact
the City since we managed to avoid foreclosure November 30, 1995. As part of
our refinance, a$10,000.00 construction fund has been established by our lender
• to assist us in completing our home construction.
Following receipt of your letter,Mr. Rolf Widlund of SCANDINAVIAN HOME
CONSTRUCTION was hired to complete our garage construction. In response to
your letter I asked Mr. Widlund to contact the City Offices to advise Mr. Hamer
that we were making plans to proceed with our construction, and I'm told that he
has recently had one or two conversations with Mr. Hamer or the building
inspector about our construction plans. Mr. Widlund hopes to begin the
completion of our garage within the month and anticipates that construction may
take less than a month,weather permitting.
Unfortunately, completion of the garage will consume almost the entire
$10,000.00 construction fund so the remaining work to be completed on our house
will have to be done mostly by us,with perhaps some volunteer help. This will
obviously take longer than would be required by a professional builder, never the
less I feel all work could be satisfactorily completed within the terms of a six
month building permit.
Of equal concern is the threatening tone of the letter from the City Prosecutors,
Foster, Ojile,Wentzell and Brever. Perhaps this is partly due to the date of the
letter allegedly sent by you on January 17, 1996. Your letter which we received is
dated January 24, 1996 possibly giving the City Prosecutors the impression that
more time had elapsed
•
than was actually the case. In any event, please be assured that it has been no
pleasure for us to be living in an unfinished house for the past six years, and we are
intensely interested in finishing our construction as quickly as resources and energy
permit. If the City Prosecutors have any further concerns, our attorney Mr. Mark
McCullough of Skaar and McCullough invites them to contact him at 333-1511.
Sincerely,
James B. Pirino
Encl. •
cc: Mr. Mark McCullough
Attorney At Law
Post Script: During our telephone conversation earlier today I indicated that our
builder,Mr. Widlund, had spoken with Mr. Larry Hamer, however my wife tells
me that Mr. Widlund said he had spoken with the building inspector. Please
accept my apology if this error on my part has caused any confusion.
*bSCANDINAVIAN HOME CONSTRUCTION, INC.
"SCANDINA V1.4N CRAFI SMAIVSIYIP"
PHONE : ( 612 ) 439-1727 --PROPOSAL-- 1422 Hwy 35/ 64
Houlton , MI 54082
Submitted to: Jim Pirin o Date: 1/5/96
Address : 2917 - 33rd Ave. NE Job: Garage at
Address: St. Anthony Village, MN : 2917 - 33rd Ave. NE
Phone: 788-2862 : St . Anthony Village, MN
WE HEREBY SUBMIT specifications and estimate for: 22-0 X 24-0 garage at
the above address as follows :
Building permit
Use existing footing
Remove 4" existing block and add 6" concrete block `,
528 sf concrete slab '
Treated plates with sill sealer for insulation
2" X 4" stud walls, 16" o.c.
14" microlam header for garage door
7/16" OSB wall sheating
Finish off existing gable end
Manufactured hip trusses per plan
1/2" OSB roof sheating, 15# felt, shingle to match existing home
Cedar 1" X 6" or 1" X 8" lap siding with 2" X 4" cedar corner trim
WP
ar trim around garage door
ply and install 16 '-0" X 7 '-0" steel panel garage door and 1/2 hp
garage door .opener
EXTRA OPTIONS: \ ��
Electric work/fixture allowance. . . . . . . . . . Ami- - - $375 .00
Brick, 30" high. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .ADD - $1,296.00
�AF-----------------------------------------------------------------------
WE PROPOSE hereby, to furnish material and labor - complete in accordance 1`V4
= with above specifications, for the sum of: --NINE THOUSAND NINE HUNDRED
�� AND NO/100-------------------------------------Dollars( $9,960.00 ,r
'�Y�MENT to be made as follows: $1,000.00 down when proposal is accepted ,q,-5
$3, 500 .00 when work begins; :$3,500 .00 when job is roughed in;
balance upon completion.
ALL material is guaranteed to be as specified. All work to be completed
in a workmanlike manner according to standard practices. Any alteration
or deviation from above specifications involving extra costs will be
executed only upon written orders, and will become an extra charge over
and above the estimate. All agreements contingent upon strikes,
accidents or delays beyond our control. Owner to carry fire, tornado,
and other necessary insurance.
7W ,/ �/' ' **NOTE-This proposal may be withdrawn
NTRACTOR by us if not accepted within 10 days
CCEPTjANCE OF PROPOSAL--The above prices, specifications and conditions
are satisfactory and are hereby accepted. You are authorized to do the
work a sp cif�ied. Payment will be made as outlined above.
OWNERS
,�. • .v,t..> DATE
Page 1 of 1 ewrwnwt STAT[ cnc•a
..... .. ..........r..a1/• _ 1I/`I:A/C L•Tlt R/1wLl/:/1 —Ah— T_
ain tehou 3
� illa
Administrative Offices
3301 Silver Lake Road, St. Anthony, Minnesota 55418-1699
(612) 789-8881 FAX (612) 781-9323
January 24, 1996
Mr. James B. Piri.no
2917 - 33rd Avenue N.E.
St. Anthony, MN 55418
Mr. Pirino:
• The City Council has directed me to inquire about your time frame for the construction of
your garage as well as the completion of code violations. The latter are listed in letters from
Duane Grace dated June 10, 1994 and April 3, 1992 (both letters are submitted for your
review).
To apply for a building permit for the garage and the completion of the code violations, you
may arrange for an appointment through Larry Hamer. As you know, the City uses the
services of Duane Grace for building inspections. If you would like a re-inspection of the
property, please call for an appointment at 789-8881.
The City wants to know your time frame to complete the garage and to bring the code
violations in compliance.
If you have any questions, please feel free to contact me.
Sincere y,
M ael rnson
• City Manager
64
Fos=, OpLE, WE1vT'nu & BREvER, LLc
• ATTORNEYS AT LAW
Thomas E. Brever Suite 201 Anthony Place
Joseph A.Wentzell' 2855 Anthony Lane So.
Michael E. Ojile St.Anthony, MN 55418
Robert J. Foster
Steven P.Carlson, of Counsel Telephone:(612)789.1331
Fax:(612)789.2109
February 14, 1996 Also Admitted in Texas
Mr. James B. Pirino
2917 33rd Avenue NE
St. Anthony, MN 55418
Dear Mr. Pirino:
As you may be aware, our office serves as the City Prosecutors for the City of St. Anthony. On
or about January 17, 1996 you received a letter from Michael Morrison, the City Manager of St.
Anthony, requesting that you contact the City with regard to construction of your garage, as well
as the completion of work necessary to remove code violations on your homestead. A copy of
• that letter is attached for your reference.
Mr. Momson has informed me that you have not contacted the City with regard to his letter.
This is to put you on notice that, if you have not contacted either myself or the City within the
next seven days to commence the process of completing your garage and removing the code
violations, we have been authorized by the City Council to take whatever steps are available
under the St. Anthony Village ordinances to enforce compliance. This will be your last written
notice before code compliance actions are commenced.
The City Council views this as an extremely serious matter and I would therefore strongly urge
that you take action to come into compliance immediately.
Si y s,
7
ert J. Oster
RJF:dk
cc: Michael Mornson
St. Anthony City Manager
•
•1 CITY OF ST. ANTHONY
2 CITY COUNCIL WORK SESSION MINUTES
3 February 6, 1996
4 I. CALL TO ORDER.
5 Mayor Ranallo called the meeting to order at 7:OOPM.
6 II. ROLL CALL.
7 Councilmembers Present: Ranallo, Marks, Enrooth, Wagner and Faust.
8 Also present: Michael Morrison, City Manager; Richard Engstrom, Police Chief;
9 Police Officers Dan Johnson and Ron Lehner; Kim Moore-Sykes, Management
10 Assistant; and Mike Miller, Chandler Place.
11 III. INTRODUCTION OF TWO NEWLY-HIRED POLICE OFFICERS BY
12 POLICE CHIEF ENGSTROM.
13 Police Chief Engstrom introduced and introduced police officers Dan Johnson and
14 Ron Lehner to the City Council. Officer Johnson has completed his first year with
15 the City; and Officer Lehner has been with the City since November, 1993.
16 IV. PROSECUTING ATTORNEY ARRANGEMENTS WITH CHIEF
�7 ENGSTROM.
8 Chief reported his willingness to continue the contract with Foster, Ojile, Wentzel
19 & Brever for another year. The Council directed the City Manager to work on a
20 contract between the City and Foster, et al.
21 V. 1995 POLICE REPORT BY CHIEF ENGSTROM.
22 The Chief reported on the preliminary statistics of the Department's activities for
23 1995.
24
25 V. EXISTING POLICE CONTRACTS WITH FALCON HEIGHTS AND
26 LAUDERDALE.
27 The City Manager reported that both Lauderdale and Falcon Heights would like the
28 City to draft a contract proposal by April for their review. The Council will
29 review the current contract from any changes and/or revisions.
30 VI. MPRS LAWSUIT.
31 The City Manager reported to the Council that the attorneys representing the cities
32 in this lawsuit will be meeting with the judge regarding compliance with his order.
33 The City Manager updated the Council on the proposed affirmative action plan that
34 is being drafted in compliance with the judge's order.
35 VII. CHANDLER PLACE DEVELOPMENT.
16 Mike Miller, with the assistance of two representatives of FirstBank, presented a
7 request for Tax Increment Financing in order to construct his addition to Chandler
1 Place. Mr. Miller described the proposed addition to the Council as well as the
2 proposed replatting of the property to accommodate both the addition and the •
3 financing of the addition. Mr. Miller informed that City Council that his
4 refinancing plans and the construction plans of the addition are contingent upon
5 approval by the State of the nursing home expansion request he has submitted.
6 VIII. COMMUNITY CENTER ISSUES.
7 a. Financial. The City Manager reported on the Cost Allocation Schedule for
8 the City Hall/Community Center as submitted by Springstead, Inc. He also
9 discussed the joint resolution between the City and ISD 282, whereby the
10 School District will provide annual payments for the costs related to the
11 operation, maintenance and debt service on the space they requested in the
12 new building which commence in 1997 and end in 2016.
13 b. Facility Use Plan. The City Manager presented to the Council the proposed
14 facilities use plan and scheduling procedure. He reported that this plan
15 would only involve the gymnasium, community meeting rooms and council
16 chamber.
17 C. Change Order for Sewer System Work. James O'Brien of Williams/O'Brien,
18 updated the Council on proposed change orders, the plaque, and the
19 proposed sloping for stormwater run-off along 33rd Avenue and Silver Lake
20 Road. There was discussion about the possibility of have a sidewalk; MSA •
21 funds may be available for the construction of a sidewalk.
22 IX. APACHE PLAZA UPDATE.
23 The City Manager updated the City Council on the vacation of the City's
24 easements at Apache with the exception of the stormwater sewer easements. This
25 issue will be on the 2/13 Council Meeting agenda. The Manager also reported that
26 the Negative Declaration of the EAW and final plat approval will be on the 2/27
27 Council Meeting agenda. The City Manager summarized Jerry Gilligan's memo
28 regarding the request for TIF by Ste. Marie Corporation. He also informed the
29 Council of the meeting on 2/28 with the Rice Creek Watershed District. The
30 Mayor indicated that he will accompany the City Manager to that meeting.
31 X. STORMWATER MANAGEMENT PLAN.
32 The City Manager reported on the City's stormwater management plan. As
33 indicated in the analysis provided to the City Council, there are no solutions to the
34 problem that would not be costly. Taking no action would not cost the City any
35 money but damage from flooding is always possible. The Manager reported that
36 many residents in the District 6 area have successfully flood-proofed their houses by
37 various means. Water in the streets clears shortly after the rain stops. Another
38 alternative is to create ponding areas to collect the run-off, but this could mean
39 property acquisition, which is expensive and converting a City park into a ponding
40 area. Possible sites were discussed. •
•
1 XI. VACANT LOT BY INDUSTRIAL CUSTOM PRODUCTS AND OTHER
2 MISCELLANEOUS DEVELOPMENT OPPORTUNITIES.
3 Jerry Cowan and Ken Solie of Village Properties have proposed to subdivide the
4 Industrial Custom Products property in order to construct another light industrial
5 building, which they will lease out. The City Manager also indicated that they
6 may request TIF assistance from the City for soil corrections on the site. Road
7 construction debris was stored there years ago.
8 Tim Mezzenga, owner of Tracy Print, has submitted a proposal for an addition to
9 his business. The City Manager reported that Mr. Mezzenga also requested to be
10 able to purchase some property from the City that is adjacent to his own. He
11 submitted plans to the City and met with the Public Works Director, Management
12 Assistant and City Manager to discuss proposal. The City Manager also reported
13 that the Staff will continue to work with Mr. Mezzenga regarding his plans.
14 XII. LEGISLATIVE UPDATE ON TAXES AND OTHER LEGISLATIVE ISSUES.
15 The City Manager reported that there are several issues that are being considered by
16 the State Legislature, including changes to the property tax system; a freeze on the
R 17 amount that a city collect as taxes; changes to the Truth in Taxation process;
18 placing a freeze on salaries for City Managers; and providing a community the
�9 ability to recall its mayor.
20 XIII. METROPOLITAN LIVABLE COMMUNITY UPDATE.
21 The City Manager reported that the Metropolitan Council will be holding an
22 informational meeting on February 16 in Woodbury. He informed the Council
_ 23 that the Management Assistant and the Planning Commission Chair will attend the
24 afternoon session, which is for communities that are more fully developed. He also
25 indicated that the City will need to put together an action plan by June 30, 1996.
26 XIV. LETTER ON CODE VIOLATIONS.
27 The City Manager reported on the status of the letter on code violations. It was
28 agreed to allow 30 days to comply with the items cited in the letter.
29 XV. LETTER FROM NORTHWEST YOUTH AND FAMILY.
30 The City Manager reported on a letter dated January 11, 1996 in which Kay
31 Andrews of Northwest Youth and Family Services requested $5,000 in support of
32 their programs.
33 XVI. SCHNITZER IRON & METAL CLEAN-UP SITE.
34 The City Manager reported on the status of the Schnitzer Clean-Up issue. He
35 reviewed the Responsible Parties Agreement and indicated that the City Attorney
36 will be at the February 13th meeting.
07 XVII. GOAL SETTING RETREAT UPDATE.
T
1 The City Manager reviewed the meeting schedule with the Council. •
2 XVIII.VOLUNTEER LIST; SELECT DATE.
3 The City Council reviewed the proposed volunteer dinner list. The Council
4 decided to schedule the Volunteer Dinner for April 25. The Mayor asked that
5 Connie should look into the availability of several restaurants for the event.
6 XIX. OTHER BUSINESS.
7 a. The City Manager reported that Minnesota Swim and Aga Kahn will be put
8 on a month-to-month lease.
9 b. The City Manager reported that the letter to Columbia Heights regarding
10 their efforts to reduce run-off into Silver Lake was sent.
11 C. The City Manager reported that the first reading for a proposed ordinance
12 change to clarify water and sewer charges will be on February 13th.
13 d. The next worksession will be on Wednesday, March 6, 1996 at 7:00 p.m. due
14 to Tuesday, March 5th being caucus night in Minnesota and no meetings
15 may be held.
16 e. Board of Review will be held on April 9th at 6:30 p.m.
17 XX. ADJOURNMENT.
18 The worksession was adjourned at 10:25 p.m.
•
19 Respectfully submitted,
20 Kim Moore-Sykes,
21 Management Assistant
•