• CITY OF ST. ANTHONY
RESOLUTION 91-035
A RESOLUTION REGARDING PARTICIPATION OF THE CITY OF
ST. ANTHONY IN A STORM WATER PROGRAM WITH THE
CITY OF MINNEAPOLIS
WHEREAS, the City of Minneapolis is concerned about the quality of storm water which
is being discharged to rivers and lakes within its city limits; and
WHEREAS, the City of Minneapolis has proposed that if the outfall structure is within
Minneapolis' city limits, then the entire area which contributes to that
drainage system should be permitted,independent of ownership of storm drain
or jurisdiction of drainage area; and
WHEREAS, approximately 593 acres of St. Anthony discharges into the Mississippi River
within the City limits of Minneapolis and is approximately 1.2% of the total
Minneapolis drainage area; and
WHEREAS, it is agreed by both cities that St. Anthony may choose to become a co-
applicant with Minneapolis and, in addition, that co-applicant does not imply
co-permittee.
NOW, THEREFORE, BE IT RESOLVED, that the City of St. Anthony desires to become
a co-applicant in a storm water program with the City of Minneapolis.
BE IT FURTHER RESOLVED, that the City of St. Anthony desires to decide at a later
date whether to become a co-permittee with the City of Minneapolis or to negotiate a
separate permit with the Minnesota Pollution Control Agency.
Adopted this day of , 1991.
Mayor
ATTEST:
City Clerk
• Reviewed for administration:
City an-ager
• City of Minneapolis
U.S.EPA STORM WATER REGULATIONS
Meeting with City of St. Anthony
July 31, 1991
St. Anthony's Concerns
1. Whether St. Anthony should (or must) be part of Minneapolis' Storm Water Program
2. Distribution of cost among co-applicants
3. Total cost to St. Anthony - for permit application and after issuance of permit
4. If St. Anthony agrees to be co-applicant or co-permittee, then what information must
be prepared to add to permit application?
1. Minneapolis' Premise of Area to be Permitted
* Minneapolis is concerned about the quality of storm water which is being discharged
to Rivers and Lakes within the city limits.
* If the outfall structure is within the City Limits of Minneapolis, then the entire area
which contributes to that drainage system should be permitted, independent of
ownership of storm drain or jurisdiction of drainage area. The MPCA has verbally
accepted this concept.
* Approximately 593 acres of St. Anthony drains through the Hennepin County and
MnDOT storm drains and tunnel which discharges to the Mississippi River at I-35W
within the City Limits of Minneapolis.
• * The St. Anthony drainage area is approximately 1.2% of the total Minneapolis
drainage area
2. Distribution of Cost Participation Among Co-Applicants
* Calculation based on a simple percentage of total drainage area.
* Total storm water runoff drainage area of Minneapolis is still being calculated.
Preliminary estimate is 35,000 acres.
3. Total Cost to St. Anthony
* St. Anthony may choose to file a separate application or become a co-applicant with
Minneapolis.
* Co-Applicant does not imply Co-Permittee. St. Anthony may be a co-applicant with
Minneapolis, and decide at a later date to negotiate a separate permit with the MPCA.
* Cost for permit application:
Minneapolis has estimated a cost of$200,000 to $500,000 to put together the
permit application (in 1991 and 1992).
* Cost to meet conditions in permit:
In 1992, it is the responsibility of the co-applicants to propose programs (and
estimate the cost) which will improve the quality of storm water runoff.
Typical programs may include an increased frequency of street sweeping,
regulation/enforcement of fertilizers, construction of containment/treatment
ponds, emergency spill response procedures, methods to detect and eliminate
illegal connections to the storm drains, etc. The final cost to St. Anthony is
dependent on which programs it chooses to implement.
_ • 1
r
City of Minneapolis
• U.S.EPA STORM WATER REGULATIONS
Meeting with City of St. Anthony
July 31, 1991
4. Information Required from St. Anthony if a Party to Part I of the Minneapolis Application
* Detail is outlined in the Minneapolis Work Plan, dated February 1, 1991
* Application is due to the MPCA on November 18, 1991. The following information
should be completed no later than October 1 in order for Minneapolis to complete the
application package.
* Description of legal authority which St. Anthony has to control discharges to storm
sewers. Should include a summary of insufficient authorities and historical use of
authority.
* Summary of land use, population, and runoff coefficient for area of St. Anthony
which is subject to the application. Land use map which is superimposed on a storm
sewer map is preferred.
* Map of drainage area locating the following:
Operating and closed landfills
Facilities which discharge to the storm sewers which have an NPDES permit
Major structural controls within storm sewer system
Parks, open space, and recreation areas
* Description of existing Management Programs
Flood control programs
Watershed Management Organizations
Emergency Spill Response Procedures
Street Sweeping
Erosion Control Requirements
* Summary of funds/budget available for completion of Part II of the permit application
• 2
BEST MANAGEMENT PRACTICES
City of Minneapolis
June 10, 1991
PROBLEMS SOURCES POSSIBLE SOLUTIONS
Sediment Winter Maintenance of Streets New methods for application of sand and salt to streets
Construction erosion Construction of grit chambers at all discharge structures
Regular cleaning of storm sewers and grit chambers
Inspection and enforcement of erosion control requirements
Diversion of snowmelt to sanitary sewers
Nutrients: Fertilizers Education
Phosphorus Lawn Clippings/Leaves Regulation of fertilizer content
Nitrogen Construction erosion Licensing of fertilizer applicators
Proper disposal of grass clippings and leaves
Improved street sweeping/cleaning
Construction of grit chambers at all discharge structures
Regular cleaning of grit chambers and storm sewers
Inspection and enforcement of erosion control requirements
Oil and Grease Illegal dumping Field screening for detection of illegal discharges (including weekend
Street runoff inspections)
Enforcement of discharges to storm sewer system
Penalties
Improved street cleaning/sweeping
Organics Animal Waste Improved street sweeping/cleaning
Lawn Clippings/Leaves Education
Litter Enforcement
Construction of litter skimmers at all discharge structures
Metals: Illegal Discharges from Industry Field screening for detection of illegal discharges
Lead Industry Runoff Enforcement of EPA storm water permit requirements
Zinc Winter Maintenance of Streets New methods for application of sand and salt to streets
Copper Auto Emissions Improved street sweeping/cleaning
Diversion of snowmelt/runoff to sanitary sewers
Toxic Chemicals Fertilizers Regulation of fertilizer content
Industry runoff Licensing of fertilizer applicators
Tires Enforcement of EPA storm water permit requirements
Field screening for illegal discharges
Improved street sweeping/cleaning
Bacteria Animal Waste Require pet owners to pick-up animal waste
Improved street sweeping/cleaning
CITY OF MINNEAPOLIS
PUBLIC WORKS DEPARTMENT
E-PA STORM WATER REGULATIONS Date: 12/28/90
MUNICIPAL PERMIT - WORK PLAN Prepared by: JXP & JNB
MILESTONES 1991 1992
J F M A M J i 1A S 0 N D J F M A M J J A S 0 N DI
:i Part I System Inventory
A Agreement With Copermitties
I
B Research Legal Authorities
C Prepare Topographic Maps
w
D Characterize Discharges
E Research Management Programs
F Establish Budget for Part II
Assemble Application
Submit to MPGA
Part II - Establish Programs
A Research Legal Authorities
B Characterize Discharges ..........
010,
C lEstablish Management Programs
D Estimate Impact of Programs
E Establish Budget for Programs
Assemble Application
Submit to MPCA