CITY OF ST. ANTHONY
RESOLUTION 93-043
A RESOLUTION APPROVING MAIER STEWART &
ASSOCIATES, INC. AS ENGINEERS FOR THE 1994
STREET CONSTRUCTION IMPROVEMENTS
WHEREAS, the City of St. Anthony desires to continue with the City's Pavement
Management Program during 1994 with selected street construction
improvements; and
WHEREAS, Maier Stewart & Associates, Inc. has submitted a proposal to perform
engineering services for said improvements.
NOW, THEREFORE, BE IT RESOLVED, that the City Council of the City of St. Anthony
hereby approves Maier Stewart & Associates to perform the engineering services for the
City's 1994 street construction improvements.
• Adopted this :P-01 day of 4 , 1993.
Mayor
ATTEST:
City Clerk
Reviewed for administration:
City Manager
/ CONSULTING ENGINEERS
� Inc.Maier Stewart & Associates
June 29, 1993
File No: 900-020-00
Mr. Larry Hamer
Director of Public Works
St. Anthony Village
3301 Silver Lake Road
St. Anthony, MN 55418
RE: ENGINEERING SERVICES
1994 STREET CONSTRUCTION IMPROVEMENTS
ST. ANTHONY VILLAGE
Dear Mr. Hamer:
Thank you for the opportunity to meet with you and submit a proposal for your 1994 construction
improvement projects. We understand the 1994 construction program to be the following projects
as based on your meeting with me and site review. As we understand the basis for selecting the
streets is their deteriorated condition and the desire to complete improvements to that area of town
before moving onto the rest of the community. These projects also keep the construction costs at
around $500,000 in size.
Proposed Reconstruction Surface Tyne Length
feet
1. 32nd Avenue NE, from Rankin Road to Bituminous 1,280
Silver Lake Road
2. Hilldale Avenue NE, from Rankin Road to Bituminous 1.280
to Silver Lake Road
Total Length (Reconstruction) 2,560 ft.
Proposed Overlay Surface Tyne Le>
(feet)
1. Croft Drive, from 32nd Avenue NE to Bituminous 660
33rd Avenue NE
490-2901.jun
9800 SHELARD PARKWAY,SUITE 102,MINNEAPOLIS,MINNESOTA 55441 612-546-0432
1959 SLOAN PLACE,SUITE 200,ST.PAUL,MINNESOTA 55117 612-774-6021 • Equal Opportunity Employer
i Engineering Services
�I June 29, 1993
Page Two
2. Skycroft Drive, from 32nd Avenue NE Bituminous 660
33rd Avenue NE
3. 31st Avenue NE, from Rankin Road to Bituminous 1,280
Silver Lake Road
4. Rankin Road, from 32nd Avenue NE to Bituminous 680
33rd Avenue NE
5. 32nd Avenue NE, from Croft Drive Bituminous 660
Rankin Road
Total Length (Overlay) 3,940 ft.
The scope of work for these projects would be as follows:
Reconstruction
1. Remove and replace curb and gutter.
2. Remove and replace surfacing with seven-ton per axle bituminous streets, thirty-two feet
wide from back of curb to back or curb.
3. Remove and replace storm sewer as necessary.
4. Replace water main.
5. New driveway aprons - cut driveways to match new grade. Match existing width and
material.
6. No sanitary sewer replacement. City to televise. Repair on own.
7. Restoration and resigning as necessary.
8. No sidewalk is proposed.
Overlay
1. Crack sealing and patching by City.
2. Repair curb and gutter as necessary.
3. Mill edge of bituminous both sides to match concrete gutter.
4. 1/ 1/2" bituminous overlay on all streets listed, twenty-six feet wide from face of gutter to
face of gutter.
The scope of engineering services for these projects is proposed as follows (costs are identified
based on a total construction cost of$550,000.00 for reconstruction and overlay improvements for
the work described above):
490.2901.jun
• Engineering Services
June 29, 1993
Page Three
Estimated
Task Cost
1. Feasibility Studies Prepared $ 6,930.00
(Projects to be assessed per State Statute 429)
2. Public Information Hearings 2,310.00
3. Soil Testing Report 2,000.00
4. Prepare Contract Documents (Plans & Specs) 27,720.00
5. Receipt of Proposals 950.00
6. Assessment Roll Preparation 3,500.00
7. Contract Submittals 575.00
8. Progress Meetings 1,560.00
• 9. Final Acceptance 575.00
10. Record Drawings 950.00
11. Construction Staking 16,500.00
12. Full Time Resident Inspection $22,000.00
Not-To-Exceed Engineering Costs $85,570.00
It is assumed that no right-of-way or easement acquisition is needed for these improvements. If,
during the course of the project, the scope of work changes the engineering costs would change
and we would prvide a revised not-to-exceed cost in writing for city consideration. The schedule
for the upcoming 1994 projects is broken down as follows:
•
490-2901.jun
• Engineering Services
June 29, 1993
Page Four
PROJECT SCHEDULE
Action Date
City Council Orders Feasibility Studies July 20, 1993
City Council Receives Feasibility Studies September 14, 1993
City Council Orders Preparation of Plans and Specifications September 14, 1993
Neighborhood Meetings Held for Reconstruction Projects Only November, 1993
City Council Approves Plans and Specifications and Authorizes December 14, 1993
Advertisement for Bids
City Council Receives Bids February 8, 1994
Hold Public Improvement Hearing February 22, 1994
Hold Assessment Hearing February 22, 1994
(wait 30-day legal appeal period)
Award Construction Contract March 22, 1994
Begin Construction May, 1994
Complete Construction August, 1994
Please note that the schedule indicates that the bidding period for the improvements would be in
January and February, 1994. The City may realize some cost savings by bidding this time of year,
as opposed to bidding the project later in the year. As in the 1993 street project, we have
proposed neighborhood meetings to get the residents involved early in the process. Again, we are
also proposing that the project be bid prior to a public improvement hearing on the project. This
provides for hard costs not just estimates so people have a real sense of the true costs of the
projects. Finally, we have shown the assessment hearing the same night as the public
improvement hearing. This allows the City Council to determine the extent of objection to the
project prior to the award of a construction contract.
We would be pleased to preset this proposal to the City Council at your earliest convenience.
Yours very truly,
MAIER STEWART & ASSOCIATES, INC.
Thomas J. Madigan, P.E.
Vice President
•
490-2901.jun