CITY OF ST. ANTHONY VILLAGE
RESOLUTION 03 -081
A RESOLUTION RELATING TO THE NORTHWEST QUADRANT
REDEVELOPMENT PROJECT,APPROVING THE PRELIMINARY
DEVELOPMENT PLAN AND THE PRELIMINARY DEVELOPMENT
PLAT FOR THE ENTIRE PROJECT AREA AND THE FINAL
DEVELOPMENT PLAN AND FINAL PLAT FOR THE RETAIL AREA
WHEREAS, in August, 2003,Apache Redevelopment, LLC, submitted a Planned Unit Development
(PUD)application to the City and consultants Dahlgren Shardlow and Uban(DSU); and
WHEREAS, after review, said application was found to be complete(see attached DSU document
dated August 28, 2003); and
WHEREAS, on September 16,2003,the St. Anthony Planning Commission held a public hearing on
the preliminary development plan and preliminary plat for the entire project area and the
final development plan and final plat for the retail portion of the Northwest Quadrant
area; and
WHEREAS, the following conditions and findings were presented to the Planning Commission by
DSU(document dated September 8, 2003 attached hereto):
• Findings of Fact:
1. Consistency with the Comprehensive Plan
The proposed PUD is consistent with the City's Comprehensive Plan. The Comprehensive Plan
identifies the Apache Plaza area as a commercial redevelopment opportunity and states that the
City desires to take an active role in guiding its design. The Comprehensive Plan includes a
Commercial Mixed Use land use plan category, which is applied to all property in the PUD
area. This designation allows for retail uses as well as light industrial, office, warehouse, and
residential uses and maintains the maximum amount of flexibility that an outmoded site such as
Apache Plaza requires for redevelopment.
2. Consistency with Zoning
The subject property is currently zoned Commercial. The application for PUD approval requests
a change in zoning from Commercial to a PUD District. At the most basic level, the
Comprehensive Plan designates commercial mixed use, so the PUD zoning provides the means
by which to approve the mixed use. The Planned Unit Development section of the Zoning
Ordinance allows for the implementation of a flexible development program, including the
following aspects:
a. Variety: Within a comprehensive site design concept, a mixture of land uses, housing
• types and densities.
•
The proposed PUD contains this variety of elements.
b. Sensitivity: Through the departure from the strict application of required setbacks, yard
areas, lot sizes, minimum house sizes, minimum requirements and other performance
standards associated with traditional zoning, a PUD can maximize the development
potential of land while remaining sensitive to its unique and valuable natural
characteristics.
The PUD District will allow the development of a mixed-use urban village that departs
from the strict application of dimensional and performance standards found in
traditional zoning districts. As a result, the PUD will restore natural features and open
space into the subject property and creates links to the surrounding community, through
opportunities for trail and transit connections.
c. Efficiency: The consolidation of areas for recreation and reductions in street lengths and
other utility-related expenses.
The redevelopment will boast an impressive central parkfacility that will act as the focal
point of the development and a strong amenity for the whole St. Anthony community.
• This integrated system of open space throughout the development will fulfills both
aesthetic and functional purposes. The network will serve to connect the various elements
of the development to each other and will also help foster connections at the edges of the
development with the rest of the community.
d. Density Transfer: The project density may be clustered, basing density on a number of
units per acre in place of specific lot dimensions.
The subject property contains approximately 45.05 acres of land. The proposed PUD
includes approximately 662 dwelling units,for an overall density of 14.69 dwelling units
per acre. This density is being clustered in the western portion of the property, in the
form of townhomes, apartments and urban flats.
e. District Integration: The combination of uses which are allowed in separate zoning
districts, such as mixed residential uses to allow densities and unit types to be varied
within the project; mixed residential uses with increased density based upon the greater
sensitivity of PUD projects to regulation; and mixed land uses with the integration of
compatible land uses within the project.
The proposed PUD includes a mix of residential density and unit types, in proximity to
open space, retail uses, and transit opportunities. The inhabitants of the residential
portion of the property, along with the citizens of St. Anthony in general, will be able to
• take advantage of the commercial, transit, and open space uses on the site.
•
3. Consistency with NW Quadrant Redevelopment Plan
In 2000, the City of St. Anthony Village began to proactively pursue a planning process for the
redevelopment of the "Northwest Quadrant" of the City, an area of approximately 250 acres
extending from Silver Lane on the north, Silver Lake Road on the east, the railroad tracks north
of 37th Avenue on the south and Stinson Road on the west. The city appointed a twenty-six
member project steering committee comprised of local residents to meet regularly with the city
and its planning consultants and provide input and direction to the process. The role of the
steering committee was to:
• Represent a broad cross-section of community opinion;
• Serve as the primary working group for the Northwest Quadrant planning project;
• Serve as the sounding board and reaction panel for the consultants and the City Council;
• Review, comment and advise the Planning Commission and City Council on key issues, plan
alternatives, and policy questions.
The City hired planning, redevelopment, and fiscal consultants to assist in the creation of a plan
and selection of a qualified developer. In July 2001, the City adopted the Northwest Quadrant
• Redevelopment Plan for the entire 250 acres that incorporated the planning goals. The goals of
the planning process included:
• Involving the community in determining the best type of redevelopment for the northwest
section of the city;
• Redeveloping a mostly vacant,market-obsolete, first generation regional mall facility;
• Determining the most cost effective method of redevelopment for Apache Plaza: demolition,
clean-up and site preparation versus adaptive reuse;
• Exploring innovative and watershed-wide techniques for surface water management to
improve Silver Lake's condition;
• Providing additional employment opportunities for residents within walking distance of
transit and other uses;
• Determining the housing needs of the city, in particular, for life cycle and affordable housing;
• Increasing opportunities for transit use and providing more amenities to encourage walking
and biking;
• Working cooperatively with adjacent and/or affected units of government;
• Developing a trail system around Silver Lake to provide public open space.
The Plan included a Master Framework Plan to illustrate the overall vision for redevelopment of
the area and to provide acceptable site planning and design principles and standards to guide the
design of all features of the site and create a consistent character for the site that would be
• compatible with surrounding development.
Planning for the NW Quadrant culminated in a developer selection process in early 2002. This
development team has created the Village at St. Anthony Preliminary Development Plan for the
subject area. The PUD Plan as been guided by the NW Quadrant Master Framework Plan and
complies with its guiding principles, as described below.
a. Identity, Character and Diversity: The Northwest Quadrant should develop with
extraordinary identity, character and diversity. It should create places and uses that are
known throughout the community and region as outstanding and interesting examples of
planning and design.
The Village at St. Anthony creates a village character by establishing a main street
commercial area, complete with ornamental lighting and pedestrian friendly streets and
sidewalks; and by including high quality residential buildings flanked by trees and placed
adjacent to narrow streets.
b. Integration with Community: The new development conceived for the site is unlike most
of the existing building stock in the village and the redevelopment area is physically
separated from the community to a significant degree. Each of these factors will make it
challenging to physically integrate the new development into the community. Creating the
• feeling that the new neighborhood is part of the community will be an important
consideration.
A development of the size and nature of the Village at St. Anthony benefits greatly from
possessing a number of governing design elements that identify each component of the
project as being part of the same new neighborhood. These common features come in the
form of related architectural treatments, streetscape elements, and site planning
guidelines. The Village at St. Anthony Design Framework Manual sets forth the vision for
the overall design and character of the Village at St. Anthony. The Manual contains
guidelines for site design, architecture, streetscape, signs, lighting and landscaping that
have guided the design of the Preliminary Development and will continue to steer the
implementation phases of development. The Manual should be used as a tool by the City
to evaluate design elements and as a resource for landowners to achieve a consistent
design character and level of quality; it is not the intent of the Manual to require future
improvements to be exactly like the samples shown.
Another way of integrating the PUD into the community will be through the use of the
retail and open space elements by citizens that don't work or live in the development.
The PUD will encourage residents from other parts of St. Anthony to frequent the new
development to take advantage of the new commercial opportunities and the new open
space connections.
• c. Integration of Uses Remaining In and Around Development Area: In order to maximize
•
the potential for redevelopment on the mall site certain additional properties will need to
be included in the project.
Not all of the properties included in the Preliminary Development Plan will necessarily
be included in the final redevelopment, as depicted. The Plan shows redevelopment
occurring on sites adjacent to the Apache Mall property itself. All uses along the west
side of Silver Lake Rd from the railroad tracks north to Silver Lane are shown as being
redeveloped. The Plan also shows those uses located on the east side of Stinson Blvd
from 37th Ave NE to 39th Ave NE and along both sides of 39th east of Stinson, which in
fact may not be immediately developed. Uses that would not be redeveloped include the
Apache office building at the corner of Stinson Blvd and Silver Lane, the Equinox
apartment complex and the Cub food store.
The Cub food store serves as the focal point for a commercial hub north of the new east-
west roadway. The new discount retail store will serve as the focal point for a
commercial hub south of the new east-west roadway. These uses will be grouped to
create a sense of closure and space, rather than a strip of separate buildings and parking
lots.
• Access to the existing Equinox apartment complex may ultimately tie into the street grid
pattern, and attempts will be made to connect and integrate these apartments with the
rest of the development, although the existing garage structures effectively fence them in,
providing a stark edge rather than an inviting opening. The garages may be able to be
screened or softened with extensive landscaping or other elements of the streetscape.
All other businesses and buildings that will not be redeveloped will be integrated into the
overall development plan through the use of landscaping, lighting, coordinated access
points, signage, and other means.
d. Use of Existing Access Points: The regional mall heritage of the site has provided it with
two signalized and two non-signalized entrances. In reforming the interior automotive
circulation system first consideration should be given to maintaining these four entrances
as the primary and secondary access points to the site.
The redevelopment area currently has a very poor circulation pattern. In order to
maximize the potential for the core area of the site, a new central roadway has been
designed, traversing the site east-west. This new street links the existing signalized
intersections of Silver Lake Rd and Stinson Blvd with 39th Avenue NE. It also maintains
access along Silver Lake Rd north of the Taco Bell, and along Stinson Blvd at 38`h
Avenue (for the residential portion, only).
• e. Development of Roadway Spine Through Site (39th Avenue Extension): In order to
•
maximize the potential for the core land-locked area of the site a new major east-west
roadway traversing the site will be required. This new street can begin and end at the
signalized intersections of both Silver Lake Rd and Stinson Blvd with 39th Avenue NE.
As stated in item d, a new central roadway has been designed, traversing the site east-
west. This new street links the existing signalized intersections of Silver Lake Rd and
Stinson Blvd with 39th Avenue NE and will connects commercial, residential, and park
uses and provides access into commercial parking lots and residential streets. The
roadway will also have an important symbolic value providing a gateway entrance point
in the new development, and will visually tie together the various land uses along it.
f. Reintroduction of Grid Within Site: The site is large enough to require an internal
network of streets to provide sufficient access to residents and visitors. A network or grid
will insure numerous alternatives for automobile traffic throughout the site and provide
convenient spacing for pedestrian movement.
An internal network of streets has been designed to provide sufficient access to residents
and visitors. The primary route through the site is the site is the parkway along 39Th
Avenue NE. This boulevard will provide connections between commercial, residential
• and park uses for vehicles, pedestrians, and bicyclists. It will serve as the principal
village street, encouraging pedestrian movement and calmed traffic. Gateways into the
development and access roadways leading to parking lots and service areas will include
landscaping, lighting and pedestrian amenities. Connections into the residential areas
will be made through Parkway. Secondary residential streets will provide access to the
residential parking lots and underground garages.
g. Sidewalks and Pedestrian/Bicycle Paths: Integral to the function of this new
neighborhood is the development of an integrated system of sidewalks, pedestrian paths
and bicycle paths.
Bicycles will be accommodated on the network of neighborhood and village type streets
that will be created as part of the redevelopment. Bicycle racks will be provided at key
locations. All streets will accommodate pedestrian movement either with sidewalks,
trails, or wide village-type streetscape areas. In addition, pedestrian connections to the
existing Cub Foods store and to the proposed discount retailer will also be provided.
h. Transit Linkages: The site should offer the opportunity to enhance existing transit service
in a number of ways. The addition of a significant number of residents to the site has the
potential to increase ridership over current levels if adequate facilities are provided, while
the extension 39th Avenue as a new central parkway will offer a cleaner, more direct
• route through the site.
•
The Apache Plaza site is currently served by MetroTransit bus routes 4, 25, and 801.
Routes 4 and 25 connect the site to downtown Minneapolis and to the City of New
Brighton and Northtown Mall (respectively). Route 801 connects the site by limited stop
to Rosedale Mall and to the Brookdale Transit Center, which serves cities west of the
river. The Village at St. Anthony will continue to accommodate these three routes with
stops along 39th Avenue, which will provide an easier crossing of the site for routes 4
and 25.
i. Development of Key Central Open Space/Network of Open Spaces: The development of
a high amenity central open space approximately in the center of the redevelopment site is
considered to be a key early implementation step. The creation of a key central open
space is just one of the elements required to assure a high level of pedestrian friendliness
and an inviting atmosphere.
The redevelopment will boast an impressive central parkfacility that will act as the focal
point of the development and a strong amenityfor the whole St. Anthony community. In
addition to the new east-west parkway, it is a major organizing element of the interior of
the site. Removal of the shopping center will alter the current image of the site and the
development of the park facility will be a focal point for the new development. Leading
• away from the park will be a series of trails, sidewalks and connected open spaces that
will link the site internally and enhance connections with the surrounding neighborhoods.
This integrated system of open spaces throughout the development fulfills both aesthetic
and functional purposes. The network will serve to -connect the various elements of the
development to each other and will also help foster connections at the edges of the
development with the rest of the community.
j. Silver Lake Water Quality: The water quality of Silver Lake is a critical issue to the
neighborhoods surrounding the lake and redevelopment on this site should do its part to
preserve and improve that water quality through careful handling of storm water and
enhancements to the surface water management system.
The development will directly contribute to the improvement of water quality in nearby
Silver Lake. Currently, a portion of the Apache Plaza Mall roof and parking lot drains
directly into pipes and into Silver Lake without treatment. Some of the ponds on site
right now are too small to offer very much treatment. As proposed in the PUD, all of the
drainage will be directed into ponds that are redesigned and expanded to meet the Rice
Creek Watershed District's standard of 60% phosphorus removal. The City has also
submitted a grant application to Rice Creek to fund a chemical treatment cell in a
segment of the pond that would remove almost all of the phosphorus. (This grant is
pending.)
• The park and open space system is also designed to function as a storm water treatment
•
and retention basin. This pond will be surrounded by green spaces which will provide
additional treatment of stormwater routed from parking lot areas through the buffer and
into the stormwater treatment basins.
As a condition of approval, the developer will be required to obtain a National Pollution
Discharge Elimination System (NPDES) permit and a Rice Creek Watershed District
(RCWD) permit. The NPDES is regulated by the Minnesota Pollution Control Agency
and includes guidelines and requirements that the developer will follow to reduce
sediment discharge off the construction site. The RCWD reviews development and
grading plans through their permitting process. The developer will be detailing the
erosion control plans for the site through these permitting processes.
k. Integration of Stormwater Management into Open Space Network: The open space
network will serve as the location of an integrated stormwater management system that
will connect through the site, which can be built up during the different phases of the
redevelopment, as long as it is planned and well integrated as a whole.
The redevelopment area will include an open space that will function as an integrated
stormwater management system connected through the site. The network is not planned
is
as an upfront implementation step, as is the central park, but rather will be phased and
integrated as the site develops. Where possible, stormwater will be kept above ground
and open to the air, in ponds, fountains, and other water features that will allow for
maximum penetration of surface water into the ground and maximum benefit as an
amenity to existing and future development.
1. Site Planning/Building Characteristics: The NW Quadrant Redevelopment Plan included
a Master Framework Plan to illustrate the overall vision for redevelopment of the area
and to provide acceptable site planning and design principles and standards to guide the
design of all features of the site and create a consistent character for the site that would be
compatible with surrounding development.
Building on the Master Framework Plan, the Village at St. Anthony includes a Design
Framework Manual specific to this development site. A development of the size and
nature of the Village at St. Anthony benefits greatly from possessing a number of
governing design elements that idents each component of the project as being part of
the same new neighborhood. These common features come in the form of related
architectural treatments, streetscape elements, and site planning guidelines.
This Manual sets forth the vision for the overall design and character of the Village at St.
Anthony. The Manual contains guidelines for site design, architecture, streetscape,
• signs, lighting and landscaping that have guided the design of the Preliminary
Development Plan and will continue to steer the implementation phases of development.
O
The intent of the guidelines is to establish a level of quality for the all of the design
elements within the development. The Manual provides representative photos and
graphics of landscaping, lighting, signage, and other design elements, based on local and
national sources that illustrate the quality that is to be achieved at the Village at St.
Anthony. This manual should be used as a tool by the City to evaluate design elements
and as a resource for landowners to achieve a consistent design character and level of
quality. It is not the intent of this manual to require future improvements to be exactly
like the samples shown.
4. Consistency with Livable Communities Objectives
This project directly complies with the following Livable Communities objectives:
• The development creates connected places that support auto, pedestrian, and bike travel, are
linked to transit, and will build capacity for future transit.
• The development balances residential, commercial, workplace, and public/green spaces
within and adjacent to the site.
• The development maximizes the potential of existing infrastructure, buildings, facilities and
Odevelopment centers,particularly along existing transportation corridors.
• The development expands housing options, especially close to jobs.
• The development fosters distinctive community places and promotes community identity.
• The development considers the natural environment, including restoring natural features and
managing stormwater.
5. Consistency with Smart Growth Objectives
The overall NW Quadrant area was selected as one of six Opportunity Sites for the Metropolitan
Council's Smart Growth Twin Cities initiative to promote a new and sustainable model for
growth in the metropolitan area. The principles upon which the smart growth initiative are based
include planning for compact and mixed land use patterns that are sensitive to the environment
and that offer greater transportation choices, designing human scale communities with people's
needs and preferences foremost in mind, and creating community-based plans and designs using
innovative public involvement methods. The City of St. Anthony Village opportunity site was
selected because it offers the potential to develop a mixed-use community of neighborhood scale
and to serve as a regional model for redirecting obsolete retail sites to meet contemporary needs.
The Village at St. Anthony PUD meets these objectives.
0 That the Planning Commission recommend that the City Council approve the application for the
Village at St. Anthony PUD Preliminary Development Plan and Preliminary Plat, as well as the
Final Development Plan and Final Plat of Subdivision for the r6tail portion of the PUD, subject
to the following conditions of approval:
i
1. The PUD shall be developed in accordance with the following exhibits, which are
incorporated by reference to the Village at St. Anthony PUD:
a. PUD General Concept Plan and Preliminary Plat Submission, dated August 8, 2003
b. Design Framework Manual, dated August 19, 2003
c. Final Development Plan Site Plan, dated September 3, 2003
d. Final Development Plan Watermain and Sanitary Sewer Plan, dated September 3, 2003
e. Final Development Plan Storm Sewer Plan, dated September 3, 2003
f. Final Development Plan Finish Grade Plan, dated September 3, 2003
g. Final Landscape Plan, dated September 3, 2003
h. Final Plat, dated September 3, 2003
2. The PUD shall be developed in accordance with a Planned Unit Development Agreement, to
be entered into by the City and the developer.
3. The developer shall provide an Erosion Control Plan, subject to the review and approval by
the City Engineer,prior to recordation of the Final Plat.
4. The developer shall secure an NPDES Permit,prior to recordation of the Final Plat.
5. The developer shall secure a Rice Creek Watershed District Permit, prior to recordation of
• the Final Plat.
WHEREAS, in addition to the conditions and findings set forth above and listed in the attached DSU
document dated September 8,2003,the Planning Commission recommended Council
approval of the condition"that the applicant or a related entity purchase the property
known as the CUB Foods Store property"as stated in the attached letter from Malkerson
Gilland Martin LLP,dated September 16,2003 (CUB Foods Store project property
condition).
NOW,THEREFORE,BE IT RESOLVED that the City Council of the City of St. Anthony hereby
approves the Preliminary Development Plan and Preliminary Plat for the entire project area and the Final
Development Plan and Final Plat for the retail portion of the Northwest Quadrant Redevelopment,as
presented at a public hearing on September 16, 2003 to the St. Anthony Planning Commission and as set
forth in the documents attached hereto, and specifically adopts the findings and conditions of approval
presented to the Planning Commission by DSU and the Cub Foods Store project property condition.
Adopted this day of 2003.
Mayor
ATTEST: �
City Clerk