Loading...
HomeMy WebLinkAboutCC RES 96-020 RESOLUTION APPROVING THE SILVER LAKE CENTER COMMERCIAL REDEVELOPMENT ENVIRONMENTAL ASSESSMENT WORKSHEET (EAW) FINSING NO NEED FOR AN ENVIRONMENTAL IMPACT STATEMENT (EIS) Meeting Sheet IIIIIIVIIIVIIIVIIIVIIIVIIIIIII IIII 103284 Box: 26 Folder: RES 1996 Document: CC RES 96-020 RESOLUTION APPROVING THE SILVER LAKE CENTER COMMERCIAL REDEVELOPMENT ENVIRONMENTAL ASSESSMENT WORKSHEET (EAW) FINSING NO NEED FOR AN ENVIRONMENTAL IMPACT STATEMENT (EIS) • CITY OF ST. ANTHONY RESOLUTION 96-020 A RESOLUTION APPROVING THE SILVER LAKE CENTER COMMERCIAL REDEVELOPMENT ENVIRONMENTAL ASSESSMENT WORKSHEET (EAW) FINDING NO NEED FOR AN ENVIRONMENTAL IMPACT STATEMENT (EIS) WHEREAS, Minnesota Rules Part 4410.4300 Subp. 14 (B) requires that an EAW be prepared for construction of any commercial facility equal to or greater than 200,000 s.f. in a fourth class city; and WHEREAS, Minnesota Rules Part 4410.1700 Subp. 9 requires that multiple phases be considered as a single project; and WHEREAS, on January 10, 1996, an EAW was completed for a phased commercial redevelopment project known as Silver Lake Center, which is ultimately planned to include 306,000 s.f. of new/renovated retail space and would be located on the existing Apache Plaza site; and • WHEREAS, on January 10, 1996, copies of the EAW were distributed to all persons and agencies on the official Environmental Quality Board (EQB) mailing list and other interested parties; and WHEREAS, on January 15, 1996, the EAW was publicly noticed in the EQB Monitor, commencing the 30 day public comment period; and WHEREAS, on January 24, 1996, a press release was published in the St. Anthony Bulletin announcing the completion of the EAW, availability to interested parties, and process for submitting comments on the EAW; and WHEREAS, the 30 day comment period ended February 14, 1996, at 4:30 P.M. and the City of St. Anthony Village continued to accept comments after the closing; and WHEREAS, no negative comments were received during the public comment period. NOW, THEREFORE BE IT RESOLVED THAT: 1. The EAW was prepared in compliance with the procedures of the Minnesota Environmental Policy Act and Minnesota Rules, Parts 4410.100 to 4410.1700 (1993), 2. The EAW satisfactorily addressed all of the issues for which existing information could have been reasonably obtained, • Resolution 96-020 Page 2 3. Based on the criteria established in Minnesota Rules Part 4410.1700, the project does not have the potential for significant environmental effects, 4. The City makes a "Negative Declaration," and 5. An EIS is not required, and 6. The City Clerk is directed to maintain a Record of Decision including the Response to Comments on the EAW and to notify in writing the project proposer and the EQB. Adopted this z 7-& day of `F�-Ir u_re-^�Z , 1996. �12110APAA C� Mayor • ATTEST: City Clerk Reviewed for administration: City 4aiQer • RESPONSE TO COMMENTS, FINDINGS OF FACT, AND RECORD OF DECISION FOR THE SILVER LAKE CENTER COMMERCIAL REDEVELOPMENT ENVIRONMENTAL ASSESSMENT WORKSHEET (EAW) FEBRUARY 1996 RGU PROPOSER St. Anthony Village Ste. Marie Company Attn.: Mr. Mike Momson, City Manager Attn.: Ms. Mary Rothchild 3301 Silver Lake Road First Bank Place St. Anthony, MN 55418-1699 601 Second Ave. South (612) 789-8881 Minneapolis, MN 55402 (612) 973-2141 CONSULTANT Westwood Professional Services, Inc. Attn.: Mr. Jay Riggs 14180 West Trunk Highway 5 Eden Prairie, MN 55344 (612) 937-5150 • To be considered by the City of St. Anthony Village City Council on February 27, 1996 • CITY OF ST. ANTHONY VILLAGE RESPONSE TO COMMENTS, FINDINGS OF FACT, AND RECORD OF DECISION FOR THE SILVER LAKE CENTER COMMERCIAL REDEVELOPMENT ENVIRONMENTAL ASSESSMENT WORKSHEET (EAW) FEBRUARY 1996 TABLE OF CONTENTS Page INTRODUCTION ........................................................................................................................1 RESPONSETO COMMENTS....................................................................................................1 EAW Notification, Distribution, and Comment Period.........................................................1 • Comments Received and Response.................. ......................................................1 U.S. Army Corps of Engineers, Timothy Fell, January 17, 1996......................................... 1 Ramsey Soil and Water Conservation District, Tom Peterson, January 31, 1996............... 1 Minnesota Historical Society, Britta Bloomberg, February 2, 1996......................................2 Minnesota Department of Natural Resources, Thomas W. Balcom, February 14, 1996.....2 Minnesota Department of Health, Patricia Bloomgren, February 14, 1996.........................2 Minnesota Pollution Control Agency, Paul Hoff, February 16, 1996....................................3 FINDINGSOF FACT..................................................................................................................4 ProjectDescription ...............................................................................................................4 ProposedProject.................................................................................................................4 Site Description and Existing Conditions.............................................................................5 Criteria Used in Deciding Whether the Project has the Potential for Significant EnvironmentalEffects...........................................................................................................5 Criteria A: Type, Extent, and Reversibility Of Environmental Effects..................................5 Criteria B: Cumulative Potential Effects of Related or Anticipated Future Projects............7 Criteria C: Extent to Which the Environmental Effects are Subject to Mitigation................7 Criteria D: Extent to Which Environmental Effects can be Anticipated and Controlled.......8 RECORDOF DECISION............................................................................................................9 • RESPONSE TO COMMENTS, FINDINGS OF FACT, AND RECORD OF DECISION SILVER LAKE CENTER COMMERCIAL REDEVELOPMENT ENVIRONMENTAL ASSESSMENT WORKSHEET(EAW) • INTRODUCTION The Ste. Marie Company(SMC) is proposing a phased redevelopment of Apache Plaza in the City of St. Anthony Village, Minnesota. An Environmental Assessment Worksheet(EAW)was prepared pursuant to Minnesota Rules 4410.4300 Subp. 14(B). The EAW, comments received on the EAW, and other pertinent materials have been reviewed in accordance to Minnesota Rules 4410.1700 in order to determine if the proposed project has the potential for significant environmental effects. The following includes responses to all of the comments received by the City of St. Anthony Village(City), Findings of Fact supporting the decision, and the Record of Decision indicating an Environmental Impact Statement(EIS) is not necessary for this project. RESPONSE TO COMMENTS EAW Notification, Distribution, and Comment Period In accordance with Minnesota Rules 4410.1500, the EAW was completed and distributed on January 10, 1996 to all persons and agencies on the official Environmental Quality Board(EQB) mailing list and other interested parties. The notification was published in the EQB Monitor on January 15, 1996, initiating the 30-day public comment period. The comment period ended on February 14, 1996. • Comments Received and Response U.S. Army Corps of Engineers. Timothy Fell January 17 1996 The Corps confirmed that the project is not within the regulatory jurisdiction of the Corps of Engineers. Response: So noted for the record. The project proposer and the RGU appreciate the Corps' prompt response. Ramsey Soil and Water Conservation District, Tom Peterson January 31 1996 The Ramsey SWCD stated that, "based on the information contained in the EAW and discussions with Ramsey County Public Works Personnel and Rice Creek Watershed District staff, it appears, with the addition of four storm water management ponds, that the redevelopment plan may be an improvement over current stormwater management conditions at the site." SWCD staff recommended that the Rice Creek Watershed District's ponding requirements be utilized for ponding design, and, if at all possible and feasible, that the ponds be maximized to improve nutrient removal. The SWCD also stated that soil erosion and sediment control during project construction will be critical. Response: It is the intent of the project proposers to minimize the short and long-term downstream water quality impacts associated with this project to the extent practicable. As stated in the EAW, modeling results indicate the project will reduce peak runoff rates from the existing conditions for both the interim and ultimate redevelopment proposal. The results • predict a 26 percent reduction in phosphorus runoff from the 54-acre tributary watershed(a PAGE 1 RESPONSE TO COMMENTS, FINDINGS OF FACT, AND RECORD OF DECISION SILVER LAKE CENTER COMMERCIAL REDEVELOPMENT ENVIRONMENTAL ASSESSMENT WORKSHEET(EAW) • small portion of the drainage area is outside the subject property)followingthe construction o .f the first three ponds (Phase ]). The inclusion of the fourth basin will result in further stormwater discharge rate reductions and will provide a 45 percent total reduction in phosphorus discharge relative to existing conditions. All stormwater ponding will meet or exceed RC WD permitting standards. As stated in the E4 W, all site grading and erosion control activities are subject to Rice Creek Watershed District (RCWD) and National Pollutant Discharge Elimination System (NPDES) permits and will comply with pertinent requirements as described in the required Grading and Erosion Control Plan which will likely incorporate multiple Best Management Practices (BMP). Because the site lacks steep slopes and numerous BMPs will be implemented, significant adverse impacts from construction-related sediment and erosion are not expected. Minnesota Historical Society, Britta Bloomberg, February 2, 1996 The Minnesota Historical Society indicated that the probability of unknown historical or archeological properties being present on the site is low, and therefore the"no" response to question 26a is appropriate. Response: So noted for the record. The project proposer and the RGU appreciate confirmation of the accuracy of the EAW with respect to Item 26a. • Minnesota Department of Natural Resources, Thomas W. Balcom, February 14, 1996 The DNR stated"we have no comments to offer at this time. Preparation of an EIS is not required in our opinion." Response: So noted for the record. Minnesota Department of Health. Patricia Bloomgren, February 14, 1996 The MDH offered the following comments: 1. Please remember that any new [water supply] wells must be installed by a licensed well contractor and meet all other requirements. Response: The site is and will continue to be connected to the City of St. Anthony Village public Water Supply. And, as such, no new water supply wells will be installed.. 2. Any unused, unsealed wells (including monitoring wells) must be sealed by a licensed well contractor and, in accordance with Minnesota Rules, brought into operating conditions. A site evaluation is recommended to specifically determine if any unused, unsealed wells(s)exist on this property. Particular attention should be given to the area where a farmstead might have been located. • PAGE 2 RESPONSE TO COMMENTS, FINDINGS OF FACT, AND RECORD OF DECISION SILVER LAKE CENTER COMMERCIAL REDEVELOPMENT ENVIRONMENTAL ASSESSMENT WORKSHEET(EAW) • Response: When MPCA requirements are monitoring ed, the three satisfied, g wells located behind the New Market building will be abandoned in accordance with all applicable local, state, and federal regulations. If circumstances require, the monitoring wells may be abandoned and relocated in order to accommodate building demolition and site redevelopment. As stated in the EA W, if any abandoned wells or septic fields associated with the abandoned farmstead are encountered during site redevelopment, these systems will be properly abandoned. 3. Please be aware that removal of friable asbestos-containing materials and materials that will become friable during removal must be performed by companies licensed by the MDH. In addition, the mandatory safe work practices must be used to do the removal. Response: As stated in the EA W, all asbestos materials will be removed from the buildings demolished during redevelopment excluding Category 1 non friable materials. The MPCA and U.S Environmental Protection Agency(EPA) will be notified prior to building demolition, all activities will be conducted by licensed contractors, and all applicable rules and regulations will be followed. Minnesota Pollution Control Agency, Paul Hoff, February 16, 1996 The MPCA stated"the information provided appears to properly identify the potential environmental effects of the project and appropriate mitigation. The MPCA does not recommend the preparation of an Environmental Impact Statement." The MPCA also noted that"Phase 1 grading . . . will require the • construction of temporary stormwater storage before construction is started." Response: So noted for the record. Temporary stormwater storage will be incorporated into the grading and erosion control plan and the project will comply with NPDES requirements. • PAGE 3 RESPONSE TO COMMENTS, FINDINGS OF FACT, AND RECORD OF DECISION SILVER LAKE CENTER COMMERCIAL REDEVELOPMENT ENVIRONMENTAL ASSESSMENT WORKSHEET(EAW) • FINDINGS OF FACT Project Description Proposed Project The Silver Lake Center Commercial Redevelopment involves redevelopment of Apache Plaza, and is ultimately planned to include 306,600 s.f of new/renovated retail space and four stormwater ponds. Initiating in spring of 1996, Phase I will include partial demolition of the existing mall, construction of a 75,200 s.f supermarket, development of two lots, and installation of three stormwater ponds. The table below summarizes the proposed redevelopment. Development Summary Building Acreage Parking Proposed Use Phase Area(s.f) (a x.) Stalls Cub Foods 1 75,200 9.23 553 Cub Foods Addition 2+ 12,600 01 0 Home Improvement 2+ 74,000 11.40 300 Department Store 2+ 80,0002 7.48 400 Retail or Restaurant 1 7,500 1.14 59 • Retail or Gas/Conv./Car Wash 1 7,500 1.51 25 Retail 2+ 7,800 0.73 30 Video 2+ 7,000 1.08 77 Oil Chane 2+ 4,000 1.10 29 Pet Supply 2+ 22,000 3.14 110 —Liquor 2+ 9,000 0.89 55 New Market Lot ? 0 4.96 0 Stormwater Ponds A-C 1 0 1.09 0 Stormwater Pond D 2 0 2.41 0 Pond Landscaping 1-2+ 0 2.68 0 306,600 48.843 1638 1 This use is proposed to occur within the 9.23-acre Cub Foods site. 2 Approximately 60,000 s.f of the Department Store building includes renovation of existing facilities. 3 Combine this lot acreage with the existing uses (First Bank, Taco Bell, and Tires Plus -- approximately 1.96 acres)to obtain the total site area of 50.8 acres. Minnesota Rules 4410.4300 Subp. 14(B)state that the mandatory EAW threshold for"construction of a new or expansion of an existing industrial, commercial, or institutional facility" in a fourth class city is 200,000 square feet(s.f.). Because 60,000 s.f. of the proposed project is renovation of an existing facility, this multi-phased project involves the construction of new commercial space totaling 246,600 • s.f This exceeds the mandatory EAW threshold by 46,600 s.f. PAGE 4 RESPONSE TO COMMENTS, FINDINGS OF FACT, AND RECORD OF DECISION SILVER LAKE CENTER COMMERCIAL REDEVELOPMENT ENVIRONMENTAL ASSESSMENT WORKSHEET (EAW) • Site Description and Existing Conditions The site is located in the Southwest Quarter of Section 31,Township 30 North, Range 23 West, Ramsey County, City of St. Anthony village, Minnesota. The site encompasses 50.8 acres and is dominated by the Apache Plaza building, parking lot, and associated buildings. An abandoned health club is located directly north of the main Apache Plaza building. Only approximately 142,400 s.f of pervious surface exists on the site, which predominantly includes an area of mowed grass along the north-western portion of the property. A strip center called Apache New Market Plaza is located southwest of the main mall building. In addition, a Tires Plus, Taco Bell, First Bank, and additional paved parking areas are located along the Silver Lake Road frontage. Criteria Used in Deciding Whether the Project has the Potential for Significant Environmental Effects Criteria A: Type, Extent. and Reversibility Of Environmental Effects According to Minnesota Rules 4410.1700 Subp. 7 (A)the first factor that the City must consider is the "type, extent, and reversibility of environmental effects." The City's findings are set forth below. 1. Project Site. The site is an existing mall with extremely limited pervious area. A number of "environmental conditions"outlined in the EAW were observed on the site. In response to these • observed conditions, a number of studies and remediation actions have been conducted. Accordingly, all of the known environmental conditions have been addressed adequately in accordance with MPCA and other state and local standards. 2. Fish, Wildlife, and Ecologically Sensitive Resources. The proposed project will not have a negative impact on habitat or natural resources. The proposed stormwater management practices will likely improve habitat in Silver Lake. 3. Water Resources. No direct impacts to water resources are proposed. Indirect downstream impacts are discussed below. 4. Water Use. The site will be connected to the St. Anthony Village public water supply. The demand per day will be typical of retail/commercial developments of this sort and is expected that the quantity of water used will be approximately 32,232 gallons per day on a maximum potential average daily basis. No adverse effects on public water supply are anticipated. 5. Water-related Land Use Management Districts. No special shoreland districts apply. 6. Soils. The site's soils are compatible for the proposed uses. 7. Erosion and Sedimentation. All site grading and erosion control activities are subject to Rice Creek Watershed District(RCWD)and National Pollutant Discharge Elimination System (NPDES) permits and will comply with pertinent requirements as described in the required Grading • and Erosion Control Plan which will incorporate multiple Best Management Practices (BMP). PAGE 5 RESPONSE TO COMMENTS, FINDINGS OF FACT, AND RECORD OF DECISION SILVER LAKE CENTER COMMERCIAL REDEVELOPMENT ENVIRONMENTAL ASSESSMENT WORKSHEET(EAW) • Because the site lacks steep slopes and BMPs will be implemented, significant adverse impacts from construction-related sediment and erosion are not expected. 8. Water Quality-Surface Water Runoff. The project will reduce peak runoff rates and improve runoff water quality relative to existing conditions. Modeling results predict a 26 percent reduction in phosphorus runoff from the 54-acre tributary watershed(a small portion of the drainage area is outside the subject property) following the construction of the first three ponds (Phase 1). The inclusion of the fourth basin will result in further stormwater discharge rate reductions and will provide a 45 percent total reduction in phosphorus discharge relative to existing conditions. All stormwater ponding will meet or exceed RCWD permitting standards and significant, negative downstream impacts are not anticipated. 9. Water Quality-Wastewaters. Wastewater will be typical of developments of this sort and the estimated maximum potential wastewater production is 31,963 gallons per day. All wastewater will be conveyed to the City's sanitary sewer system and no adverse impacts are anticipated. 10. Ground Water- Potential for Contamination. Although some groundwater beneath the southwest portion of the site is known to contain low levels of petroleum contaminants from an off- site source, the proposed project is not expected to increase the potential for future releases of contaminants that could impact groundwater below the site because (1) substantial site cleanup has and will occur as a direct result of this redevelopment, (2) the majority of the site will be covered by impervious surfaces, (3)the proposed underground storage tanks will be installed and monitored • in accordance with MPCA standards, and (4)all wastewater will be conveyed to the sanitary sewer system. 11. Solid Wastes; Hazardous Wastes; Storage Tanks. It is anticipated that solid waste generation will be typical of developments of this sort. The maximum potential solid waste generation for the ultimate development will likely be in the range of 1,000 to 1,500 tons per year. Source separation will be encouraged by the St. Anthony Village for the restaurants and retail businesses to be constructed on the site and these businesses will be expected to take advantage of recycling programs to reduce costs for solid waste trucking and disposal. Three to five USTs may be installed during site redevelopment. Appropriate measures to minimize environmental risks associated with solid wastes, hazardous wastes, and storage tanks are proposed. 12. Traffic. The proposed project will have no significant impact on the regional roadway system surrounding the project or on the signalized intersections near the project. The minor impacts to the local, unsignalized intersections will not cause significant environmental risks. 13. Air Quality. No significant impacts are expected. 14. Adverse visual impacts. No significant visual nuisances are expected. 15. Compatibility with Plans. The proposed project is consistent with existing zoning and no conflicts with adjacent land uses are anticipated. • PAGE 6 RESPONSE TO COMMENTS, FINDINGS OF FACT, AND RECORD OF DECISION SILVER LAKE CENTER COMMERCIAL REDEVELOPMENT ENVIRONMENTAL ASSESSMENT WORKSHEET(EAW) • Criteria B: Cumulative Potential Effects of Related or Anticipated Future Projects According to Minnesota Rules 4410.1700 Subp. 7 (B)the second factor the City must consider is the "cumulative potential effects of related or anticipated future projects." The City's findings are set forth below. As stated in the EAW, project proposers are not speculating about the ultimate development of the 4.96 acre lot to be located in the southwest corner of the site(currently occupied by the New Market building). All of this area is incorporated into the proposed stormwater management plan. Due to the small size of this lot, no additional or cumulative environmental impacts associated with its development are anticipated. Criteria C: Extent to Which the Environmental Effects are Subiect to Mitigation According to Minnesota Rules 4410.1700 Subp. 7 (C)the third factor the City must consider is the "extent to which the environmental effects are subject to mitigation by ongoing public regulatory authority." The City's findings are set forth below. The following permits and approvals are required for this project: Unit of Government Type of Application • St. AnthonyVillage Building Permit St. AnthonyVillage Preliminary and Final Plat St. AnthonyVillage Demolition Permit St. AnthonyVillage Grading Permit St. AnthonyVillage Municipal Water Connection Permit St. AnthonyVillage Parking Lot License St. AnthonyVillage Sanitary Sewer Connection Permit St. AnthonyVillage Setback Variance for Cub Foods Store MPCA NPDES/General Storm Water Permit MPCA Utility Extension MN Dept. of Health Water Main Extension Rice Creek Watershed District Grading and Stormwater Management As noted under Criteria A above, the potential environmental effects associated with this project are not significant and/or effectively mitigated in accordance with all applicable rules and regulations (including, but not limited to the permits and approvals included in the table above). Accordingly,the City finds that the potential environmental effects of the project are"subject to mitigation by ongoing public regulatory authority"and an EIS need not be prepared. • PAGE 7 RESPONSE TO COMMENTS, FINDINGS OF FACT, AND RECORD OF DECISION SILVER LAKE CENTER COMMERCIAL REDEVELOPMENT ENVIRONMENTAL ASSESSMENT WORKSHEET(EAW) • Criteria D: Extent to Which Environmental Effects can be Anticipated and Controlled According to Minnesota Rules 4410.1700 Subp. 7 (D)the final factor the City must consider is the "extent to which environmental effects can be anticipated and controlled as a result of other environmental studies undertaken by public agencies or the project proposer, or of EIS's previously prepared on similar projects." The City's findings are set forth below. 1. The proposed project is similar to other commercial redevelopment projects within fully-developed urban areas. Other projects of similar scope with similar stormwater management plans and BMPs generally reduce off-site environmental impacts relative to existing conditions. 2. The EAW currently contains or references all of the known studies that would likely provide information or guidance regarding environmental effects which can be anticipated and controlled. 3. Because the proposed project only surpasses the mandatory EAW threshold by 46,600 square feet, no EIS that addresses a similarly sized project was available. 4. The City finds that the environmental effects of the project can be anticipated and controlled as a result of environmental review and permitting processes for similar projects. • • PAGE 8 RESPONSE TO COMMENTS, FINDINGS OF FACT, AND RECORD OF DECISION SILVER LAKE CENTER COMMERCIAL REDEVELOPMENT ENVIRONMENTAL ASSESSMENT WORKSHEET(EAW) • RECORD OF DECISION Based on the EAW, the response to comments, and the Findings of Fact, the City of St. Anthony Village, the RGU for this environmental review, concludes the following: 1. The EAW was prepared in compliance with the procedures of the Minnesota Environmental Policy Act and Minnesota Rules, Parts 44 10.1000 to 4410.1700 (1993), 2. The EAW satisfactorily addressed all of the issues for which existing information could have been reasonably obtained, 3. Based on the criteria established in Minnesota Rules Part 4410.1700, the project does not have the potential for significant environmental effects, 4. The City makes a"Negative Declaration,"and 5. An EIS is not required. • PAGE 9