HomeMy WebLinkAboutCC RES 96-045 RESOLUTION RECEIVING REPORT AND ORDERING PLANS AND SPECIFICATIONS Meeting Sheet IIIIIIVIIIVIIIVIIIVIIIVIIIIIIIIIII 103306 Box: 26 Folder: RES 1996 Document: CC RES 96-045 RESOLUTION RECEIVING REPORT AND ORDERING PLANS AND SPECIFICATIONS • CITY OF ST. ANTHONY RESOLUTION 96-045 A RESOLUTION RECEIVING REPORT AND ORDERING PLANS AND SPECIFICATIONS WHEREAS, pursuant to resolution of the Council adopted June 10, 1996 a report was prepared by Rieke Carroll Muller and Associates, Inc. with reference to the improvement of Roosevelt Street, between 35th Avenue NE and 37th Avenue NE; and, 35th Avenue NE, between Stinson Boulevard and Harding Street by reconstruction of the roadways and utilities. WHEREAS, the report provides information regarding whether the proposed project is necessary, cost-effective, and feasible. NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of St. Anthony that: 1) The Council will consider the improvement of such streets in accordance with • the report and the assessment of abutting property for all or a portion of the cost of the improvement pursuant to Minnesota Statutes, Chapter 429 at an estimated total cost of the improvement of$709,500.00. 2) Rieke Carroll Muller and Associates, Inc. is hereby designated as the engineer for this improvement. They shall prepare plans for making such improvement. Adopted this q day of „r rL_ , 1996. Mayor ATTEST: City Clerk Reviewed for administration: City Manager • July 1, 1996 • Mr. Larry Hamer Public Works Director City of St. Anthony 3301 Silver Lake Road St. Anthony, MN 55418 RE: Street Project Cost Analysis Dear Mr. Hamer: Per your request, we have analyzed the construction costs for recent street projects in the City of St. Anthony. Actual construction costs for the 1994 and 1995 projects in St. Anthony were $443,000 and $643,000, respectively. These costs translate to $143.40 and $160.75 per linear foot of constructed street, respectively. The increase in lineal foot cost for the 1995 project can be attributed mainly to the fact that a substantial quantity of storm sewer was included. For reference purposes, we also analyzed a number of similar projects in other communities, to show more clearly how costs have changed over time. In performing our cost analysis, we Ic III evaluated 7 major construction items: rieke carroll 1. Common Excavation muller fates, inc. 2. Class 5 Aggregate Base 3. Bituminous Base Course Wi7neers sury 4. Bituminous Wear Course ects land surveyors 5. B618 Curb and Gutter equal opportunity 6. 6" Dip Watermain employer 7. 12" RCP Storm Sewer The following table shows unit prices for these 7 items over the past 8 years. Year of Construction Item Unit 1988 1989 1990 1991 1992 1993 1994 1995 Common CY 3.95 0.50 1.20 4.00 4.00 1.90 4.00 4.80 years Excavation Class 5 Aggregate Ton 5.15 8.00 8.00 7.00 7.50 6.00 6.80 7.45 helping Base build communitiesBituminous Base Ton 15.64 22.41 22.13 20.26 22.00 20.50 22.80 25.60 Bituminous Wear Ton 24.90 23.87 27.68 23.84 24.00 22.75 26.50 29.00 B618 Curb & LF 4.05 4.85 5.50 5.50 5.15 4.80 5.60 6.10 Gutter 6" DIP Watermain LF 11.50 12.00 13.50 10.75 16.00 16.00 16.95 17.80 12" RCP Storm LF 35.35 19.00 20.00 15.80 16.00 28.50 18.50 22.90 40901 red circle drive Sewer box 130 minnetonka, minnesota 55343-0130 (612) 935-6901 fax (612) 935-8814 • Mr. Larry Hamer July 1, 1996 Page 2 While unit prices for these items tend to fluctuate from project to project (as well as year to year), the overall trend has been upward, particularly for bituminous pavement, curb and gutter and watermain. Increases in both labor and material costs have resulted in higher unit prices for these items. For a 30-foot wide street, which is comparable to a typical street in St. Anthony, the average cost per linear foot has been as follows: 1988 1989 1990 1991 1992 1993 1994 1995 $128.80 $127.80 $137.30 $138.30 $149.60 $135.40 $157.20 $174.20 For the period from 1988 to 1995, construction cost per linear foot has increased 35% according to our available records. The publication, Engineering News Record, has developed a Construction Cost Index (CCI) which is used to track construction costs for 20 metropolitan areas around the country since 1907. The index for Minneapolis has changed from 4494.16 in December 1987 to 5909.05 in December 1995, a 31% increase over that period of time. If you have any questions or wish to discuss this information further, do not hesitate to call us. • Sincerely, RIEKE CARROLL MULLER ASSOCIATES, INC. A&Wtl. hVW� Robert L. Moberg, P.E. Project Manager RLM/bam •