Loading...
HomeMy WebLinkAboutCC RES 98-043 RESOLUTION RECEIVING AN ENGINEERING REPORT AND AUTHORIZING FOR BIDS RELATING TO REHABILITATION AND RECOATING OF AN ELEVATED WATER STORAGE TANK Meeting Sheet IIIIIIVIIIVIIIVIIIVIIIVIIIIIIIIIII 103165 BOX: 26 Folder: RES 1998 Document: CC RES 98-043 RESOLUTION RECEIVING AN ENGINEERING REPORT AND AUTHORIZING FOR BIDS RELATING TO REHABILITATION AND RECOATING OF AN ELEVATED WATER STORAGE TANK • CITY OF ST. ANTHONY RESOLUTION 98-043 A RESOLUTION RECEIVING AN ENGINEERING REPORT AND AUTHORIZING A CALL FOR BIDS RELATING TO REHABILITATION AND RECOATING OF AN ELEVATED WATER STORAGE TANK WHEREAS, following direction from the St. Anthony City Council, an engineering report was prepared and submitted by Rieke Carroll Muller Associates, Inc. relating to the feasibility of rehabilitating and recoating the City's existing elevated water storage tank. NOW, THEREFORE, BE IT RESOLVED, that the City Council of the City of St. Anthony hereby authorizes the rehabilitation and recoating of the existing elevated water storage tank as presented in the report by Rieke Carroll Muller Associates, Inc. and authorizes the advertisement for bids for the project. • Adopted this l o? day of l�/L�l , 1998. Mayor ATTEST: City Clerk Reviewed for administration. City ger • • February 18, 1998 Mr. Mike Morrison City of St. Anthony 3301 Silver Lake Road St. Anthony,MN 55418-1699 Re: Proposal for Engineering Services Recoating of Elevated Water Storage Tank St. Anthony,MN RCM File No. 10456.00 Dear Mr. Morrison: Rieke Carroll Muller Associates, Inc. (RCM) appreciates the opportunity to provide the City of St.Anthony with this proposal to prepare an engineering report which will identify the scope of work needed to rehabilitate and recoat the City's elevated water storage tank. Preparation of the report will include collection,review and analysis of available information as well as a site survey of the present coating system and structure to determine their condition. The site survey Ic I]] will be a visual inspection both inside and outside the tank and samples of the existing coating system will be collected so that we can identify the proper preparation work and develop the carrdata necessary for specifying a compatible coating system. The report will also include Carroll �' p �g p g Y p muller estimated construction costs for the project,including welding and miscellaneous repairs. wociates, inc. gineers architects Once the report has been completed by RCM and approved by the City,project specifications land surveyors can be prepared to encompass the repairs and recoating details identified in the report. equal opportunity employer RCM proposes to provide this report to the City of St. Anthony for a lump sum fee of$4,800, including expenses. RCM understands that the City intends to have its new logo painted on the tower. Recognizing that the new logo is a different color from the old one,it may be necessary to change the base color of the tower to more closely complement the color of the new logo. RCM recommends that the City select a color combination and logo placement scheme to be used with the tower recoating. To assist the City with its selection process,we can provide a representative color palette and a schematic representation of the tower with the new logo. years Please call us if you have questions. helpingof build Sincerely, communities RIEKE CARROLL MULL ASSOCIATES,INC. l L/ chard C. Potz Har(y Koutsoumbos,P.E. innetonka, 01 red circle dr. Project Manager Vice President t office box 130 mn 55343-0130 (612)935-6901 ma L. laassen,P.E. fax(612)935-8814 President/CEO www.rcm-assoc.com