RESOLUTION 99-021
A RESOLUTION AUTHORIZING WSB & ASSOCIATES, INC.
TO PREPARE A FEASIBILITY STUDY RELATING TO
SILVER POINT PARK
BE IT RESOLVED, that the City Council of the City of St. Anthony, in its continuing efforts
toward flood mitigation for the City of St. Anthony, hereby authorizes the engineering firm of
WSB & Associates, Inc., to prepare a feasibility study on the capacity of the Silver Point Park
expansion possibilities, referencing Options 1, 2, and 3 in their memo to the St. Anthony
Council dated February 2, 1999 and attached hereto.
• Adopted this �' day of , 1999.
Mayor
ATTEST: nX,,:1�
City Clerk 11
Reviewed by Administration: 4 1/ j hL
City Manager
- B.A.Mittelsceadt,P.E.
350 Westwood Lake Office Bret A.Weiss,P.E.
IIGy�B 8441 Wayzata Boulevard Peter R.Willenbring,P.E.
Minneapolis, MN 55426 Donald W Sterna,P.E.
Ronald B.Bray,P.E.
• 612-541-4800
&Associates, Inc. FAX 541-1700
Memorandum
To: Honorable Mayor, City Council and Staff
City of St.Anthony
From: Todd E. Hubmer,P.E.
Peter R. Willen bring,P.E.
Date: February 2, 1999
Re: Response to Questions Relating to Silver Point Park
WSB Project No. 1065.40
We have prepared the following answers to the questions you requested in your memo from
January 27, 1999.
1. What is the difference in price of the pipes for Wilson -36"versus a 72"?
• Preliminarily,it is anticipated that the cost to construct the 72-inch system from 29''Avenue
to 27' Avenue would be at a minimum of$700,000 over the cost for the existing storm
sewer system in Wilson Street. Furthermore,this system would not be in alignment with the
downstream storm sewer at 27h Avenue,and conflicts with other utilities will be a significant
issue.
2. What is the capacity of the Silver Point Park expansion possibilities?
Attached,please find a figure showing three possible options for expanding Silver Point Park
improvements, as previously discussed. These options are as follows:
• Option No. 1: Acquire four homes and easements for three properties immediately
south of Silver Point Park. This option would provide an additional 2.44 acres of
land for storm water storage. This option would add 15 acre-feet to the 24 acre-feet
of storm water storage now proposed with Silver Point Park.
• Option No. 2: Acquires six homes and easements over three backyard areas
immediately south of Silver Point Park. In addition,Trillium Park could be utilized
and reconfigured along with the frontage road to provide storm water storage. This
option provides an additional 5.34 acres of land for storm water storage. This option
• could provide approximately an additional 27 acre-feet of storm water storage.
M i n n e a p o l i s • S t . C l o u d FAWPWIMI065.40\020299-hme.wpd
Infrastructure Engineers Planners
EQUAL OPPORTUNITY EMPLOYER
Honorable Mayor, City Council and Staff
• City of St.Anthony
February 2, 1999
Page 2
• Option No. 3: Acquire six homes south of Silver Point Park and along the frontage
road of County Road (CR) 88. This option provides approximately 4.27 acres for
storm water storage. This option also utilizes the existing frontage road and Trillium
Park for storm water storage. It is estimated that approximately 20 acre-feet of
additional storm water storage could be provided within this area.
3. If the large pipes (72") have 100 year flood protection, how much smaller can the pipes
be without decreasing the flood protection in Alternative No. 1, as stated by D. Palmer?
As indicated by Mr. Palmer, an overland/overflow route does exist along Wilson Street to
29th Avenue. From there,water continues south to the alley north of St. Anthony Boulevard,
proceeding to the east,then south along the parcel the City has acquired on the north side of
St.Anthony Boulevard. It is anticipated that if the overland/overflow route was maximized,
the pipe sizes upstream of St. Anthony Boulevard and Wilson Street may be reduced by one
or maybe two sizes.
Maximizing the overland rate would require special structures to be constructed in the
vicinity of St. Anthony Boulevard or Pahl Avenue to collect this water and convey it to the
• storm water storage area. This option would increase the risk of damage to homes in the
Pahl Avenue and St. Anthony Boulevard areas by routing significant volumes of water
overland.
4. How much wetter will Silver Point Park get if the Harding Pond is not completed?
Silver Point Park will be subject to inundation for rain storm events greater than one inch in
24 hours. In addition, for those storm events such as the one-year, two-year, and five-year
rainfall events, water will pond to greater depths for longer periods of time.
S. What, if any, are the situations that would cause Roseville's water to back up into Silver
Point Park?
The City of Roseville storm water connection north of County Road C has a drainage area
of approximately 17 acres with two ponding locations prior to discharging into the City of
St. Anthony system with an 18-inch RCP. The volume of runoff and rate at which runoff
leaves the Roseville site is anticipated to have a minimal affect on the performance of the
City of St. Anthony's storm sewer system tributary to District 6.
If you have any further questions, I will be available at your February 2"d Task Force Meeting to
discuss these issues with you.
nm
F\WPWM]065 40\020299-hmc wpd
Honorable Mayor, City Council and Staff
• City of St.Anthony
February 2, 1999
Page 4
If you have any further questions, I will be available at your February 2"d Task Force Meeting to
discuss these issues with you.
run
•
•
F\WPWIM1065 40\020299-hmc wpd
`y; � '.Gai ` n�� � *t4� + aa •� +3t ,. Tr ,�_,
' Y3 ' INe
Of-W.
, 24 �qar CyPVN 'L� fit
0
IM
. .'-'" hrN�.,.,�';ts j"�;X.4'���.,�.'"a;�3`,'y? it���^•'�.'"" .`'. �r°,�`r^_"'_7; ���"'�-,t'� .-' '�',�' �..•'` \ns ^'L> -�?.i" / / / /
u � /
�/! / CJ.
r•"
'v. w i�"W, 4a��xi 4���t��``" a '�r^r`G�ia��`� �7�,1•: �''-�� '45 /
St
OR,
4'rljp; we�'.1"S1ni" 'b' 4
tom'r`�S,a
mgN
A"M -1011M
M N22,08
g�NEM
r
a / /
\ LANDSCAPING—a:
C
o sr, 00
OPTION 1 2.44 AC
\ OPTION 2 5.34 AC
OPTION 3 4.27 AC
&W Waalvrow Lake once St. Anthony, Minnesota
9"1 Weyzab Bmievaro
WSB Mkneapoh,MN 55128
a�ss4»eoo
FAX 541-17M Silver Point Park Expansion Options
INFRASTRUCTURE - ENGINEERS - PLANNERS
MB Project No. 1065.30