CITY OF ST. ANTHONY
RESOLUTION 99-023
A RESOLUTION AUTHORIZING CALL FOR BIDS FOR
REPAIRS AT THE G.A.C. WATER FILTRATION PLANT
WHEREAS, after examining the St. Anthony G.A.C. water filtration plant, the engineering
firm of Rieke Carroll Muller Associates, Inc. identified items needing
maintenance repairs.
NOW, THEREFORE, BE IT RESOLVED, that the City Council of the City of St. Anthony
hereby authorizes Rieke Carroll Muller Associates, Inc. to prepare documents to call for bids
for drain tile installation and restoration and various inside repair work at the G.A.C. water
filtration plant.
• Adopted this �3"- day of Fe-bnu-a-r , 1999.
Mayor
ATTEST:
City Clerk
Reviewed by Administration:
Cityanager
•
February 4, 1999
•
Mr. Jay Hartman
Public Works Director
City of St. Anthony
3301 Silver Lake Road
St. Anthony,MN 55418
RE: Maintenance Work at the G.A.C.Water Filtration Plant
RCM File No. 10491.04
Dear Mr. Hartman:
We have submitted the Project Manual with necessary drawings bound in the back of the
Manual to Ms. Maureen Johnson at the MPCA. We are requesting that the State review and
approve the Contract Documents prior to advertising for bids to prevent misunderstandings
of RCM's interpretation of the various Federal Regulations. We have downloaded all the
Code of Federal Regulations that we assume relate to procurement of a construction contract
Ic III for this project.
rieke The Project Manual is setup for the City of St. Anthony to award two (2) construction
carroll contracts. One contract will be awarded for the drain tile installation and restoration with
muller
Wm
ociates, inc. anticipated final completion by May 30, 1999. Another contract will be awarded for the
neers inside work consisting ofceiling paint removal and replacement and floor cleaning,roughening
itects and recoating to be completed by April 30, 1999. Depending on the date of advertisement for
land surveyors
construction bids,these dates may need to be revised.
equal opportunity
employer On December 23, 1998, RCM sent a report to you outlining our findings after a visit to the
plant.In this report our estimated engineering costs were anticipated to be$9,500 for bidding
documents, securing bids, construction administration, inspection and testing. RCM is
virtually complete with the preparation of the bidding documents. The cost to date as of
January 30, 1999 has approached$7,200. We feel that in order to complete the documents
and services outlined we will need to update the budgeted fee from$9,500 to$12,500. This
is largely due to the requirements of the State and Federal agencies and administering two
construction contracts.
years Based upon our discussions last week,you asked how much Roger Larson should put in the
of budget. I indicated $60,000 to $65,000. The total construction cost estimate still is
build anticipated to be$48,340 plus $12,500 engineering yields at$60,840 total project cost.
communities
�.
I hope this meets with your approval.
If you have any questions please contact me at(612) 935-6901.
Sincerely,
10901 red circle dr RIEV CARROLL MULLER A IATES,INC.
*st office box 130
nnetonka, mn
5343-0130
(612)935-6901 fichard C. Potz
fax(612)935-8814 Project Manager
www.rcm-assoc.com
• February 16, 1999
Honorable Mayor and City Council
City of St. Anthony
3301 Silver Lake Road
St. Anthony,MN 55418
RE: Status Report
Request to Authorize for Bids for the G.A.C.Water Plant
Ceiling Paint Repair, Floor Repair and Ground Water Moisture Leakage
RCM File No. 10491.04
Dear Honorable Mayor and City Council:
RCM has looked at the G.A.C.filter plant,reviewed the construction specifications that were
used when the plant was built,talked to paint suppliers and contractors and prepared a report
to the Public Works Director on December 23, 1998.
Ic III
The report referenced indicated that a drain tile should be installed on the south,east and north
rieke side of the G.A.C. filter plant adjacent to the building wall. The drain tile will continue along
Carroll the slope of the east side of the water treatment plant building until the existing ground slope
muller
4 fineer
ociates, inc. allows the tile to empty. The G.A.C. floor discoloration from water seepage and carbon
s replacement operation is to be cleaned, roughened and recoated with a dark urethane finish.
itects The ceiling paint in the G.A.C.filtration plant is loose and falling off in places. The underside
land surveyors
of the ceiling deck will have to have the existing coating removed by non-abrasive blasting and
equal opportunity grinding, roughened and recoated with one coat of acrylic paint.
employer
RCM has prepared the Project Manual for these repairs and has submitted them to the MPCA
for their concurrence with the procurement of construction bids. The project will be bid in
li two parts. One part will be a contract for drain tile installation and the other part for floor and
ceiling repair.
The project cost for construction administration and engineering, testing and inspection
including contingencies is projected to be $65,000. Ninety percent of the project costs will
be paid for by USEPA funds which are being administered by the State of Minnesota
years Pollution Control Agency(MPCA).
of
helping If you have any questions or need additional information please call me at(612) 935-6901.
build
Sincerely,
RIEI�E CARROLL MULLEM ASSOCIATES, INC.
10901 red circle dr. 'chard C. Potz
053st office box 130 project Manager
nnetonka, lin43-0130
(612)935-6901 c: Jay Hartman, Public Works Director
fax(612)935-8814
www.rcm-assoc.com