HomeMy WebLinkAboutCC WORKSESSION PACKET 12042017
Work Session Agenda
Monday, December 4, 2017
4:30 p.m.
Food will be available beginning at 4:00 p.m.
1. 2018 Street and Utility Reconstruction Project. Jay Hartman, Public Works Director and
Todd Hubmer, City Engineer presenting
2. Planning Commission Interviews
3. Adjournment
City of St. Anthony
CITY COUNCIL WORK SESSION
City Council Chambers
Minutes
October 30, 2017
Present:
Mayor & Council. Jerry Faust, Mayor; Hal Gray, Councilmember; Randy Stille, Councilmember; and Jan Jenson,
Councilmember.
Absent:
None
Staff:
Mark Casey, City Manager; Jay Hartman, Public Works Director; Shelly Rueckert, Finance Director; Charlie Yunker,
Assistant to the City Manager; Jon Mangseth, Police Chief; Mark Sitarz, Fire Chief; Mike Larson, Liquor Operations
Manager; Kevin Morelli, Assistant Liquor Operations Manager; Bill Haugen, Stores Manager; James Taylor, Liquor
Clerk and Chris Morke, Liquor Clerk.
Consultants:
Todd Hubmer, City Engineer – WSB
Guests:
Paul Kaspszak, MMBA Executive Director and Gary Buysse, MMBA President
Call to Order:
Meeting called to order by Mayor Faust at 7:00 p.m.
Liquor Forum:
Staff and guests presented.
Capital Improvement Plan:
Staff presented the 2018 ‐ 2034 Capital Funds. By consensus of the mayor and council, the plan was approved.
2018 Utility Rates:
Staff presented a memo including spreadsheet exhibits. By consensus of the mayor and council, staff was directed
to bring the 2018 utility rates to a future city council meeting.
Small Cell Ordinance:
Staff presented a memo including draft changes and model ordinance. By consensus of the mayor and council,
staff was directed to bring the small cell ordinance additions to the right of way ordinance to a future city council
meeting.
2018 Fee Schedule:
Staff presented proposed changes to the 2018 fee schedule. By consensus of the mayor and council, staff was
directed to bring the 2018 fee schedule to a future city council meeting.
Salo Visitors:
Staff informed the mayor and council of tour and lunch scheduled for Friday, November 3, 2017.
Adjourn:
The meeting adjourned at 8:54 p.m.
Minutes respectfully submitted by Mark Casey, City Manager.
1. 2018 Street & Utility Reconstruction Project
3727
3745
3757
3743
3753
3749 3751
3759
3747
3739
SCALE IN FEET
0
H:
30 60NWSB
WSB PROJECT NO.:
SWALE TO MIRROR LAKE
11/21/17010507-000 MIRROR LAKEFIGURE - 4
RIPRAP SWALE TO STORM
SEWER INLET
PATCH BITUMINOUS SURFACE
AND CONSTRUCT BITUMINOUS
FLUME
FOSS ROAD
1'
2'
10'
12" CLASS 2 RIP RAP WITH
IMPERVIOUS LINER
EXISTING STORM SEWER
INLET STRUCTURE
3839
3720
382438203808
3727372137133509
3405 3720
SCALE IN FEET
0
H:
30 60NWSB
WSB PROJECT NO.:
FOSS ROAD
11/21/17010507-000
FOSS ROAD
FOSS ROAD
60' RIGHT OF WAY
60' RIGHT OF WAY 30' BACK TO BACK
R20'
R30'
R30'
B618 CURB
B618 CURB
15 PARKING STALLS
7 PARKING STALLS 4 PARKING STALLS
13 PARKING STALLS 4 PARKING STALLS
6 PARKING STALLS37TH AVENUEC
H
A
N
D
L
E
R
D
R
I
V
E
31' RIGHT OF WAY 29' RIGHT OF WAY
12.83' THRU LANE 12.83' THRU LANE
2.50%
CONCRETE VALLEY
GUTTER (TYP.)2.50%
R/W C R/WL
9' PARKING6' CONC. WALK
2.50%2.50%
9' PARKING1'5'3'3'
FIGURE - 2
REMOVE
PAVEMENT
MARKINGS
49 PARKING STALLS
REMOVE OBSTRUCTION
3605 3804
SCALE IN FEET
0
H:
30 60NWSB
WSB PROJECT NO.:
HIGHCREST ROAD
11/21/17010507-000
HIGHCREST ROAD
B618 CURB
24' FACE TO FACE 30' RIGHT OF WAY
3 PARKING STALLS
37TH AVENUE15' RIGHT OF WAY 15' RIGHT OF WAY
12' TO FACE
OF CURB
12' TO FACE
OF CURB
B618 CONCRETE
CURB AND GUTTER
B618 CONCRETE
CURB AND GUTTER
VARIES
R/W C R/WL
VARIES
2.50%2.50%
FIGURE - 3
SURMOUNTABLE CURB AND
REFLECTIVE CHEVRON
3105
3201
3015 3720
3101
3201
3205
32003208
3113
3109
SCALE IN FEET
0
H:
30 60NWSB
WSB PROJECT NO.:
MACALASTER DRIVE
11/21/17010507-000
R143.4'
R20'
R29'12'
12'6'
30' TOE TO TOE B618 CURB
SURMOUNTABLE CURB
(CUL-DE-SAC ONLY)
MACALASTER DRIVE
60' RIGHT OF WAY37TH AVENUE30' RIGHT OF WAY 30' RIGHT OF WAY
12' THRU LANE 12' THRU LANE
B618 CONCRETE CURB
AND GUTTER, TYP.
2.50%
VARIES
R/W C R/WL
VARIES
2.50%
6'
FIGURE - 1
PIPE BURST 4"
SANITARY SEWER
SERVICE LINE
0+00
1
+
0
0
2+003+004+005+006+007+0
0
8+00 9+00 10+00
SCALE IN FEET
0
H:
30 60NWSB
WSB PROJECT NO.:
SPLASH PAD WATER RE-USE
11/21/17010507-000
SILVER LAKE ROAD
SPASH PADFIGURE - 5
4" HDPE DIRECTIONALLY
DRILLED FORCEMAIN
CENTRAL PARK
CONNECT TO EXISTING
CATCH BASIN
CONSTRUCT LIFT
STATION AND
WET WELL
2. Planning Commission Interviews
Commission Interviews
Monday, December 4, 2017
Total Grand
Total
Planning Commission (Ranked Choice Voting‐1 through 12)
5:00 pm Amber Stock
1 2 3 4 5 6 7 8 9 10 11 12
5:15 pm Juli Thompson
1 2 3 4 5 6 7 8 9 10 11 12
5:30 pm Robert Hanson
1 2 3 4 5 6 7 8 9 10 11 12
5:45 pm Donald Jensen
1 2 3 4 5 6 7 8 9 10 11 12
6:00 pm Christopher Wagner
1 2 3 4 5 6 7 8 9 10 11 12
6:15 pm Bibi Nomo Neumann
1 2 3 4 5 6 7 8 9 10 11 12
6:30 pm Paul Morita
1 2 3 4 5 6 7 8 9 10 11 12
6:45 pm Dan Payne
1 2 3 4 5 6 7 8 9 10 11 12
7:00 pm Natalie Synhavsky
1 2 3 4 5 6 7 8 9 10 11 12
7:15 pm Thomas Deegan
1 2 3 4 5 6 7 8 9 10 11 12
7:30 pm William Risse
1 2 3 4 5 6 7 8 9 10 11 12
7:45 pm Meridith Socha
1 2 3 4 5 6 7 8 9 10 11 12
Process:
We open the applications to all residents. All applicants are being interviewed tonight. The chosen applicants will be
appointed by the City Council. You will receive a phone call either way.
Questions for the Planning Commission:
1. The Planning Commission requires a commitment on the fourth Monday of each month, along with potential of
various workshops and attendance at some Council meetings. Do you foresee any problems attending these
meetings on a regular basis?
2. Please explain your interest in serving on the Planning Commission.
3. What do you see is the fundamental role of the Planning Commission?
4. What is the one thing that would make St. Anthony Village a better place to live?
5. Have you served on other boards or commissions? Please describe those experiences.