Loading...
HomeMy WebLinkAboutPL PACKET 02262018 If you would like to request special accommodations or alternative formats, please contact the City Clerk at 612-782-3313 or email city@savmn.com. People who are deaf or hard of hearing can contact us by using 711 Relay. Our Mission is to be a progressive and livable community, a walkable village, which is sustainable, safe and secure.         Call to Order. Pledge of Allegiance. Roll Call. Consideration, discussion, and possible action on all of the following items: I. Approval of the February 26, 2018 Planning Commission Meeting Agenda. (action requested) II. Approval of the October 23, 2017 Regular Planning Commission Meeting Minutes. III. Public Hearing. A. Consider a request from The Village, LLC for the following land use applications at 2501 Lowry Avenue  Request for a Planned Unit Development (PUD) preliminary development plan review and Re-Zoning Request.  Request for Preliminary Plat for The Village, LLC IV. Staff Reports. V. Other Business. VI. Community Forum. Individuals may address the City Council about any item not included on the regular agenda. Speakers are requested to come to the podium, sign their name and address on the form at the podium, state their name and address for the Clerk’s record, and limit their remarks to five minutes. Generally, the City Council will not take official action on items discussed at this time, but may typically refer the matter to staff for a future report or direct the matter to be scheduled on an upcoming agenda. VII. Information and Announcements. VIII. Adjournment. CITY OF SAINT ANTHONY VILLAGE PLANNING COMMISSION MEETING AGENDA FEBRUARY 26, 2018 COUNCIL CHAMBERS 7:00 PM CITY OF ST. ANTHONY 1 PLANNING COMMISSION MEETING 2 October 23, 2017 3 7:00 p.m. 4 5 CALL TO ORDER. 6 7 Chairperson Gondorchin called the meeting to order at 7:00 p.m. 8 9 PLEDGE OF ALLEGIANCE. 10 11 Chairperson Gondorchin invited the Commission and the audience to join him in the Pledge of 12 Allegiance. 13 14 ROLL CALL. 15 16 Commissioners Present: Chairperson Gondorchin, Commissioners Foster, Kalar, Larson, and 17 Papatola. 18 19 Absent: Commissioners Bartel and Westrick 20 21 Also Present: City Planner Breanne Rothstein 22 23 24 I. APPROVAL OF THE OCTOBER 23, 2017 PLANNING COMMISSION MEETING 25 AGENDA. 26 27 Motion by Commissioner Foster, seconded by Commissioner Kalar, to approve the October 23, 28 2017 Planning Commission agenda. 29 30 Motion carried 5-0. 31 32 II. APPROVAL OF THE SEPTEMBER 25, 2017 REGULAR PLANNING COMMISSION 33 MEETING MINUTES. 34 35 Commissioner Papatola noted on page 4 line 30 the speaker’s name is Perry Thorvig. 36 37 Motion by Commissioner Papatola, seconded by Commissioner Kalar, to approve the September 38 25, 2017 Regular Planning Commission Meeting Minutes as amended. 39 40 Motion carried 5-0. 41 42 Commission Kalar will represent the Planning Commission at the November 14, 2017 City 43 Council Meeting. 44 45 III. PUBLIC HEARING. 46 47 A. Consider a request for a conditional use permit to allow an adult daycare facility on 48 the property located at 2400 37th Avenue. 49 Planning Commission Regular Meeting Minutes October 23, 2017 Page 2 1 Chairperson Gondorchin opened the public hearing at 7:03 p.m. 2 3 City Planner Breanne Rothstein reviewed the application submitted by Isse Hussein, requesting a 4 Conditional Use Permit (CUP) to allow an adult day-care center located at 2400 37th Avenue NE. 5 The request is consistent with the intent of the Zoning Ordinance and the City’s Comprehensive 6 Plan. The property owner is Sadiq Punjani. The existing land use zoning is Commercial/Zoned 7 C – Commercial. The prior business on the property was a gas station. Ms. Rothstein provided a 8 description of the request. 9 10 Ms. Rothstein reviewed the CUP Criteria review: 11 12 -Use is one of the conditional uses specifically listed for the district in which the property is 13 located: Criterion Met. 14 15 -Use will not be detrimental to the health, safety or general welfare of persons residing or 16 working in the vicinity: Criterion Met 17 18 -Use will provide a service or facility which is in the interest of public convenience and will 19 contribute to the general welfare: Criterion Met. 20 21 Staff is recommending approval of the application, subject to the following conditions: 22 23 -The Applicant shall submit the appropriate plans and permits for review and approval before 24 beginning any construction or other alterations that requires a permit (i.e. building permit for any 25 interior work, sign permit, electrical permit, plumbing permit, etc.). 26 27 -Applicant receives a revised SAC determination, per the Met Council. 28 29 Chair Gondorchin stated he reviewed the MN Statute 245A-14 Family Adult Day Services. The 30 Applicant is proposing 40 residents attending the facilities which would allow for 36 square feet 31 per person. The Statute allows for 35 square feet per person not including staff. Ms. Rothstein 32 stated they have not evaluated if this request is consistent with the permit or not as that is the 33 Department of Health’s responsibility. The City does require a State Permit which would cover 34 all the requirements of the State for such a facility. Chair Gondorchin asked how many staff 35 personnel are required per attendee and the Statute states one adult may supervise up to eight 36 attendees. Chair Gondorchin asked if there were attendees with special needs are more 37 supervisory staff required. He also asked about the training and skill levels of the staff. 38 39 Commissioner Foster asked if the underground storage tanks from the gas station were removed 40 and was remediation done. He asked if there are any environmental issues that may be present. 41 Ms. Rothstein stated she believes the tanks were removed. She will have the Applicant confirm 42 that. 43 44 Commissioner Papatola asked if the Applicant is requesting renovation of the current structure 45 and not constructing a new structure. Ms. Rothstein stated that was correct. 46 Planning Commission Regular Meeting Minutes October 23, 2017 Page 3 1 The Applicant stated all tanks have been removed per the MN Department of Pollution Agency. 2 He described the process and noted all the work was completed and the property was given a 3 clean bill of health. 4 5 Mr. Isse Hussein, the applicant, responded to the questions posed. The County and State both 6 have many requirements. They have in place nurse, nutritionist, therapists, etc. Some of the 7 attendees will have one to one care. Chair Gondorchin asked how many staff members are 8 currently in place. Mr. Hussein stated so far there are four. All food will be catered but they have 9 a nutritionist. He stated all personnel are licensed by the State. 10 11 Commissioner Papatola asked Mr. Hussein about the permitting process. The Applicant stated 12 there are building permits required. Safety is the number one concern when designing an adult 13 day care. The State has a lot of stringent guidelines. The State comes and checks to make sure all 14 items are aligned. The State determines how many people can attend. The license is issued after 15 everything is checked. The square feet will be 1700. 16 17 Chair Gondorchin asked how many clients was the financial business criteria estimating. The 18 Applicant stated 17-21 would provide a good money-making operation. Low 20’s would be the 19 cutoff point. 20 21 Mr. Perry Thorvig asked the applicants to explain more about the hours of operation, the 22 population they plan to serve, how will clients get to the center and what will the client be 23 charged. He also asked what is meant by “taking care of them”. 24 25 Chair Gondorchin noted the documentation states the business will be operated six hours per 26 day. The Applicant corrected the hours of operation will be from 9:00 a.m. to 9:00 p.m. normal 27 operating hours or 9:00 a.m. – 8:00 p.m. There was a typo when stating six hours per day. It will 28 be open to everybody. He reviewed the goals and activities offered to make the client feel they 29 are contributing. Chair Gondorchin asked if they have any other facilities they operate and if so 30 what hours are those facilities. Mr. Hussein stated the normal hours are six hours a day and they 31 would be open from 9:00 a.m. to 7:00 p.m. The staff would only work 6-7 hours per day. Mr. 32 Hussein stated they offer senior care but not in a day care situation. Ms. Rothstein stated the 33 Commission can establish specific hours of operation in their recommendation. She would 34 recommend 9:00 a.m. to 7:00 p.m. which is consistent with other adult day care facilities she is 35 familiar with. Chair Gondorchin stated Mr. Thorvig had asked what “taking care” means. 36 37 The Applicant stated some of the clients may need special care and would receive one on one 38 care. Others would have one employee per eight clients. Commissioner Papatola asked if there 39 are specific standards of care mandated by the County or State. The Applicant stated there are 40 standards of care. All requirements will be met. 41 42 Chair Gondorchin asked if there were five dementia clients would they each receive one on one 43 care. Mr. Hussein stated he is not the one that would make some of the decisions. Each client 44 will have a care plan which the social worker or nurse would develop. The Applicant stated the 45 conditions/criteria will be in place and modified as to the number of s and clients that will be in 46 Planning Commission Regular Meeting Minutes October 23, 2017 Page 4 the building. The Department of Social Services is very stringent and will help determine the 1 care plans. The insurance companies are very stringent also. Chair Gondorchin asked about the 2 transportation plan. The Applicant stated in most cases individuals will be brought in by 3 someone or Mr. Hussein stated they will provide transportation. 4 5 Commissioner Foster stated through his job he deals with adult day cares. The center must 6 always have the correct ratio and it is part of their business plan. The ramification is loss of 7 license. He is confident the applicant understands what the requirements are and will strive to 8 meet them. 9 10 Chair Gondorchin closed the public hearing at 7:40 p.m. 11 12 Motion by Chairperson Kalar, seconded by Commissioner Foster, to recommend the City 13 Council approve a conditional use permit (CUP) to allow an adult day-care center, licensed 14 under M.S. Chapter 245A, and Minn. Rules at 2400 37th Avenue NE. 15 16 Motion carried 5-0. 17 18 IV. STAFF REPORTS – NONE. 19 20 V. OTHER BUSINESS – NONE. 21 22 VI. COMMUNITY FORUM. 23 24 Mr. Perry Thorvig asked about Lowry Grove. He heard today there is an RV parked on the 25 premises. He has heard about the re-establishment of a non-conforming use which is extremely 26 rare. He asked if the use is re-established will the City require adequate or new infrastructure on 27 the property prior to the time any seasonal RV’s or mobile homes are moved onto the site. Ms. 28 Rothstein stated it would depend on what the City Attorney advises. 29 30 VII. INFORMATION AND ANNOUNCEMENTS – NONE. 31 32 VIII. ADJOURNMENT. 33 34 Motion by Commissioner Papatola, seconded by Commissioner Foster, to adjourn the meeting at 35 7:45 p.m. 36 37 Motion carried 5-0. 38 39 40 Respectfully submitted, 41 Debbie Wolfe (TimeSaver Off Site Secretarial, Inc.) 42   MEMORANDUM           To:      St. Anthony Village Planning Commission  From:      Breanne Rothstein, AICP, City Planner        Date:      Planning Commission meeting on February 26, 2018           WSB Project No.  02170‐300  Request:  Preliminary PUD Development Plan and Preliminary Plat for The Village, LLC     GENERAL INFORMATION  Applicant:    The Village, LLC  Owners:    The Village, LLC  Location:    2501 Lowry Avenue  Existing Land Use:   Vacant    Zoning:     R‐1 Single‐Family Residential     Surrounding Land  North:  Low Density Residential / Zoned R‐1 ‐ Single Family Residential  Use / Zoning:  East:   High Density Residential/Planned Unit Development Kenzington Terrace  (ownership condos for seniors) are located immediately to the east (5 stories,  plus at grade garage (70 feet in height).  South:  High  Density  Residential  and  Commercial/Planned  Unit  Development   The Legacy (4 stories of rental, assisted living for seniors (48 feet), Walker Senior  Housing (3 stories of affordable rental, assisted living for seniors (36 feet),  and  Autumn Woods (3 stories general occupancy rental units (40 feet).     West:  Single‐Family Residential and Commercial in Minneapolis  BACKGROUND  The applicant for the proposal, The Village, LLC, with lead developer Continental Property Group,  purchased the Lowry Grove Manufactured Home Community on June 13, 2016. In the ensuing year, the  mobile home park, and the former and new property owners engaged in a series of State statutory  requirements for mobile home park closures. The Lowry Grove mobile home park formally closed on  June 30, 2017.  On October 24, 2016, the Planning Commission reviewed an initial Planned Unit Development (PUD)  sketch plan submission for the site from The Village, LLC. An Environmental Assessment Worksheet  (EAW) for the site was completed in November of 2016.  February 20, 2018  Page 2  On July 18, 2017, The Village, LLC submitted a series of land use applications for their proposed  redevelopment of the former Lowry Grove site that also included Bremer Bank. On October 10, 2017,  the City Council denied the request and adopted a resolution outlining their stated reasons.  On December 22, 2017, The Village, LLC submitted new applications and requests for a preliminary PUD  plan/rezoning, a preliminary plat, and a comprehensive plan amendment for the site. Their submission  was deemed incomplete at that time, due to changes in status of the purchase agreement over the  Bremer property.  On February 8, 2018, The Village, LLC submitted revised plan for preliminary plat and preliminary PUD  development plan for the site that excluded the Bremer Bank site. The application was deemed  complete by the city and is the subject of this review.    DESCRIPTION OF THE REQUEST     The Village, LLC has submitted the following requests with their land use application for the  redevelopment plan for 2501 Lowry Avenue:     Planned Unit Development (PUD) preliminary development plan review and Re‐Zoning  Request.   Preliminary Plat review for their re‐development plan for 2501 Lowry Avenue; a preliminary  plat submission must include certain required elements to be considered for complete review.  A detailed narrative from the developer was submitted and included as an attachment to this staff  report.    The site under re‐development consideration is approximately 15.4 acres located on the southwestern  edge of the city of St. Anthony at 2501 Lowry Avenue. The preliminary plat and PUD preliminary  development submittal proposes a residential redevelopment that includes several housing types and  styles; independent senior rental housing, assisted living senior housing, and general occupancy rental  housing. There are a total of 430 housing units proposed on the site, comprised of three buildings of  multifamily housing. While the floor plans currently show 414 units, the developer is requesting the  ability to re‐configure the floor plans and unit sizes and number within the current building footprints  proposed, up to a hard cap of 430 units. This results in 28 units per acre.    The independent senior building (Building A) is proposed to include approximately 61 units of studios, 1  bedrooms and 2 bedrooms and is 45.5 feet in height. Building B, consisting of assisted living senior  housing, is proposed to have approximately 128 units, which range in size from very small, memory care  units to larger 2 bedroom units. This building is proposed to be 45.5 feet in height. The general  occupancy rental building, Building C is proposed to have a mix of studio (approximately 77), 1  bedrooms (100), 2 bedrooms (36) and 3 bedrooms (12). Building C is proposed to be 44 feet in height.  These exact breakdowns are subject to change, based on final market studies and plans.    There are a total of 693 designated parking stalls proposed for the development. These include 407  enclosed parking stalls and 286 surface stalls.  The redevelopment proposal includes two stormwater  retention ponds proposed at grade. The City Engineer has reviewed the surface water management plan  and submitted comments in the attached memo. Trails are proposed throughout the development to  connect with existing sidewalks and to provide inter‐site recreational opportunities.  February 20, 2018  Page 3    The plan proposes to connect to the existing sewer, water, and stormwater facilities located under  Kenzie Terrace and Stinson Parkway.    ZONING GUIDANCE  The site is currently zoned R‐1 – Single Family, which is a zoning district that allows for detached  single family uses.  The applicant is requesting to rezone the site to Planned Unit Development  (PUD).  The intent of a PUD zoning designation is “to create a more flexible, creative, and efficient  approach to the use of land”, and may include a greater use variety and dimensional flexibility than  the underlying zoning district(s) would allow.    City Code section §152.203 (“ALLOWED USES”) stipulates that a PUD development plan may deviate  from the area’s underlying zoning and allowed uses, and that the uses defined in the final PUD  agreement take precedence:    “Uses within a PUD may include only those uses generally considered associated with the general  land use category shown for the area on the official Comprehensive Land Use Plan. However, in some  unique situations, the PUD may allow the approval of use or uses that are not listed as either  permitted or conditional uses in any underlying zoning district. The specific allowed uses and  performance standards for each PUD shall be delineated in an ordinance and development plan. The  PUD development plan shall identify all the proposed land uses, which shall become permitted uses if  the final development plan is approved.”    Upon review of the proposal, the only deviation found from the standards of the R‐4 Multiple Family  Residential district (the appropriate zoning district to review this property under, per the  Comprehensive Plan Guidance of Multi‐Family Residential) is the height of the buildings. Maximum  height in the R‐4 zoning district is 35 feet, and the maximum height of the proposed highest building  is 45.5 feet.    PRELIMINARY PUD DEVELOPMENT REVIEW  Staff deemed the preliminary plat submission complete after reviewing the submitted elements  against the required information listed in §151.02. The following summarizes the proposal for each  element of the preliminary plat and preliminary PUD site plan.    Housing Types and Massing/Height: The preliminary plat and PUD preliminary development  submittal proposes a residential redevelopment that includes multi‐family, general occupancy  housing, senior independent living, and senior assisted living. The table below summarizes the  housing types and massing for each segment of the proposed development.  Site Element Housing Type Total Units Height  Building A  Senior  independent  housing   61  3 story peaked roof,  31’5” to main eave,  45.5 feet total  February 20, 2018  Page 4  Building B  Senior housing  128  3 story peaked roof  31’5” to main eave,  45.5 feet total  Building C  Market‐rate  225  4 story flat roof, 44’  total  Total Units Proposed: 414 housing units on 15.37 acres  Overall Site Density: 26.95 units per acre    Buildings A and B, both proposed at three stories in height, are located north of the roadway that runs  through the site. Building C is proposed to have four stories, and fronts Kenzie Terrace, south of the  proposed on‐site roadway. Buildings A and B are proposed to be managed and operated by Ebenezer, a  senior home community. Building C is proposed to be constructed and operated by Continental Property  Group. The density proposed meets the Comprehensive Plan guidance for Multi‐Family Residential  properties.    Traffic, Streets and Access: The development plan proposes two main access points, one from Stinson  Boulevard and one from Kenzie Terrace. The roadway is included on the preliminary plat as Outlot A and  is proposed as private roadways. Access from the alley has been eliminated in the revised plan. A traffic  study was completed as a part of the Environmental Assessment Worksheet (EAW) review, and has been  updated. Hennepin County and the Minneapolis Park and Recreation Board (MPRB) have also reviewed  the proposal and have comments and requirements that will need to be met. Detailed  recommendations were included in that report and are incorporated here by reference. Notably, an  access easement is requested along the southwest corner of the property to accommodate eventual re‐ location of driveways away from the Lowry/Stinson intersection. It should be noted that city  requirements regarding access will match the permits issued by other agencies, since the MPRB and  Hennepin County have jurisdiction over these roads.    Parking: There are 693 total parking stalls proposed for this development. The table below summarizes  the parking type, stalls and area associated with each segment of the proposed development. The  parking proposal meets city code standards. An additional 37 “proof of parking” stalls are proposed, to  serve as additional parking, if needed.                    Landscaping: The plan provides a landscaping program exhibit as well and cross sections and the  separation of development from existing structures. Some trees are proposed to remain, especially  those along the property borders. No trees will be removed that exist on the Kenzington property or  Site Element Enclosed Parking  Stalls  Surface  Parking Stalls  Stalls per  unit  Building A  92 (underground)  34  2.06  Building B  77 (underground)  34  0.87  Building C  238 (underground)  218  2.03        TOTAL 407 stalls 286 stalls 693 total  February 20, 2018  Page 5  Park Board property (there is currently a row of trees along the Kenzington property and street trees  along Stinson Parkway. However, most trees are planned to be removed and replaced. A landscape  buffer is proposed along the northern and eastern edge of the property of evergreen trees. Staff finds  the landscaping plan satisfactory to meet buffer goals for those edges.    Streetscape/Urban Design: The site plan and preliminary plat shows street design, sidewalks and trails  incorporated into the project design. Setbacks shown on the site plan have been increased along Stinson  to a minimum of 90 feet, along the alley setbacks are a minimum of 66 feet and along Kenzington  Terrace property, a minimum of 65 feet. The revised plan has building orientation much more inside the  proposed development, with large setbacks from property boundaries to the north, east, and west. Staff  is requesting an evaluation of shifting the development another 20 feet away from the existing  Kenzington Terrace building since there is a development on the eastern side and not as close on the  western side of the development.    Trails/Sidewalks: The preliminary plat shows 5‐foot sidewalks integrated into the site design along all  internal roads, as well as an 8‐foot sidewalk trail running along the northern site perimeter. While there  is an existing sidewalk along both Stinson Blvd and Kenzie Terrace integrated into the project design,  there are no proposed enhancements to existing sidewalks. Staff is recommending a 6 foot sidewalk  instead of a 5 foot sitewide. Coordination with the Park Board to improve tripping hazards and ADA  issues along Stinson Parkway will be required, especially at the intersection of the proposed private  street.    Public Spaces/Parks: The preliminary site plan includes several private recreational amenities, including  an outdoor pool, patio, two plazas, a small dog run. The proposal also includes several indoor private  spaces. While all trails are proposed to be privately maintained, they will be open to the public to use.    Environmental Assessment Worksheet: A full report was completed for the analysis of the  environmental impacts, including infrastructure impacts, contamination, traffic, and permitting  required. The traffic report has been updated, per the revised site plan. Detailed information was  analyzed, and this report is available on the city’s website, or at city hall.    Environmental (Contamination): There is contamination on the site from the apparent spreading of oil  on dirt roads for dust control (historically), the location of a dry cleaner on the Bremer site, and the  siting of underground petroleum tanks (historical). The appropriate Response Action Plan has been  submitted and approved by appropriate agencies. The developer is intending to remediate all  environmental contamination on the site as a part of redevelopment. The EAW completed for this site  has listed the detailed permits and information related to this clean up effort.    Grading: Significant grading is required on this property for the accommodation of the development  proposal. The city engineer has reviewed the grading plan, and has submitted detailed comments in  their memo.    Stormwater Management: A stormwater management collection and treatment system is proposed  through a system of curbing, catch basins, underground conveyance, ponding, and bio‐retention. This  February 20, 2018  Page 6  includes traditional at grade ponds and below grade bio‐filtration systems. Detailed comments have  been submitted with the City Engineer’s memo.    Utilities: Public sanitary sewer and watermain extensions and hydrants are proposed as part of this  development. The infrastructure is proposed under private streets, with public easements over them.  Detailed comments on the utilities have been submitted with the City Engineer’s memo.    Phasing: After the final PUD approval, work will commence on the assisted senior living building as soon  as weather conditions will allow. Construction is expected to take approximately 18 months to complete  per building. As crews finish their particular subset of work, they will move to the independent senior  living building and then to the market rate building. The Village is hopeful to commence work at the end  of 2018 with an aggressive construction schedule to complete all three buildings by late 2020 or 2021.    Park Dedication Fees: Park dedication is required on all new subdivisions in St. Anthony. The amount of  land (or cash in‐lieu) will be determined at the time of final plat. All park dedication requests will need to  be reviewed by the Park Commission (March 5th). More details will be needed to determine appropriate  park dedication obligation and credit.    Development Agreements/Contracts: A series of development agreements and contracts will be  required for this project. These legal documents will be drafted and prepared at appropriate times  during the final plat/final development plan stage.    Other Agency/Department Requirements: In addition to city code requirements for the review and  consideration of a Planned Unit Development preliminary development plan, re‐zoning and subdivision  application, this re‐development is subject to many other jurisdictional requirements including the  following:    State Rules Governing Completion of an Environmental Assessment Worksheet (EAW). Due to its size  (over 375 attached units), State Rule 4410 requires preparation of an EAW to evaluate and identify  existing environmental conditions and identify the impacts of this proposed development with regard to  land use, soils, fish/wildlife, historical property, water resources, sewer, water, and transportation  infrastructure and any potential noise, odor, light, or visual impacts. This document has been completed  and several recommendations listed in this staff report are a result of this study.    Minnesota Pollution Control Agency. As part of the developer’s purchase of the property, Phase I and  Phase II Environment Assessments were completed and identified several sources of contamination on  the property, which will need to be properly handled and remediated through the process established  by the Minnesota Pollution Control Agency. Additionally, sanitary extension and construction permits  will also be needed. Copies of all required permits will be required to be submitted prior to final  approval of the development.    Minneapolis Park and Recreation Board. MPRB has submitted comments regarding the proposed  development, outlining the process and permits required. The land under which Stinson Parkway is built  is considered MPRB parkland, not right‐of‐way. Therefore, special review and provision must be made  for any upgrades or impacts to Stinson Parkway, given its designation as parkland and the MPRB  February 20, 2018  Page 7  jurisdiction. Copies of all required Park Board permits will be required to be submitted prior to final  approval of the development.    Mississippi Watershed Management Organization. This development will be subject to the rules of the  MWMO and the city regarding pollutant loading reduction, discharge rates and volumes, and flood  elevations. The city is the permitting agency for the MWMO.    Fire Department. The St. Anthony Fire Department reviewed the proposal according to the 2015  Minnesota State Fire Code (MSFC), based on the 2012 International Fire Code. They noted the following  points of consideration:    Access Roads:  Appear to be in compliance at this time. Concerns in regard to the bump outs  prior to turning into the parking lots as well as the surmountable curb in the center of the  complex road and concerning its size. That appears too large and trucks may not be able to  make the turn without potentially having to drive over it.    Hydrant spacing: Appears compliant along with distances to Fire Department Connections.   Building entrances: Indicated with Fire Department Connections appear compliant.  Garage  entrances are indicated.     When fire protection systems are designed early input from the fire department will make the  process much more efficient.   Considerations for each of the buildings cannot be addressed until detailed plans are submitted  for the actual buildings including fire protection systems.  A plan review process will occur for all  buildings and will reference the codes in force when the plans are submitted. As was discussed  in previous meetings, staff would like to see individual floor sprinkler shutoff’s as well as an  addressable alarm system.    Entry door added next to each underground garage door access with a key box installed as well.  This will provide direct entry access to the garage for any type of car fire, carbon monoxide  issue, trash fire, medical or other incident that takes place there.    Verification on the height of the overhang at the entry of the buildings. Consideration to height  of apparatus as well as ambulance need to be given.     Public Safety. The St. Anthony Police Department reviewed the proposal and noted the following points  of consideration:    The Village site project located at 2501 Lowry Avenue is forecast to be a max 430 unit site, or 28  units per acre.  The project site design includes a single boulevard style roadway. The project  includes two three story pitched roof buildings that will consist of independent senior living,  assisted senior living and memory care units. The site also contains a four story market rate  apartment building.   The site contains a single boulevard style roadway with no connections to  the alley.     Originally, concerns were raised with regard to access to the development off of Stinson  Boulevard and Kenzie Terrace, as well as egress from the development onto these streets.  An  exit/entry point off of Lowry Avenue would be very close to the intersection of Lowry Avenue  and Stinson Boulevard.  Vehicles leaving the development onto WB Lowry Avenue would have  low risk for accident.  Those leaving onto EB Lowry Avenue and Kenzie Terrace would present  February 20, 2018  Page 8  additional risk for vehicle, bicycle and pedestrian traffic.  Vehicle exit/entry off of Stinson  Boulevard would present minimal risk for area vehicle, bicycle and pedestrian traffic provided  entry/egress is limited to NB traffic only.  If a crossover to SB Stinson Boulevard is constructed,  the risk potential would increase.  It remains to be seen what influence the Minneapolis Park  Board will have in regards to traffic management on Stinson Boulevard.     The layout of outdoor parking at this development should be consistent with other area  developments.  It is recommended that the development allow for easy access for police patrol  cars, fire apparatus and local ambulance services.  Provisions for emergency vehicle access  should allow for easy access/egress to the property.  There should be continuity with regard to  pedestrian and vehicle circulation within the site, which will aid in police, fire and EMS response.   Turnarounds large enough to accommodate emergency vehicles and fire trucks should be  considered. Building entrances should be in close proximity to pedestrian walk ways and vehicle  parking areas.     On street neighborhood parking on Stinson Boulevard and surrounding side streets, in St.  Anthony and Minneapolis, may be impacted by a development of this size.  Care should be given  to future roadway design of Stinson Boulevard and Lowry Avenue/Kenzie Terrace.  On street  parking on Lowry Avenue should be avoided due to roadway design in that area.  Due care  should be taken in regard to a development of this size and existing residents as it pertains to  quality of neighborhood life concerns related to traffic, parking, noise and littering complaints.     The demands a 430‐unit site puts on the police department can be projected in two ways.  First,  a performance based approach to staffing that takes into account projected call load.  Second,  and more common, is the average ratio of full time officers per 1,000 residents.  The first, being  more accurate, would be appropriate to consider.  Seeing how this development will be phased  in over multiple years, it will be important to do yearly monitoring of calls for service to this site  when making staffing decisions.      Hennepin County Transportation. Hennepin County reviewed the proposal, providing notes on the site  plan. Detailed review and comments are included as an exhibit.    COMMUNITY INPUT TO DATE  There has been much interest in this proposal, starting almost two years ago and continuing to‐date.  Staff has received over 100 emails since the sketch plan phase. Additionally, staff has spoken with many  residents and concerned neighbors and has summarized the concerns as follows:   Concerns over the density and height of the proposal. The most common concern is the opinion  that the comprehensive plan should not be amended to accommodate this development and  that heights should be consistent with those around the site.   Concerns over the loss of affordable housing. People have expressed the need to retain/replace  affordable housing on the site.   Concerns over traffic and safety. People have stated the increase in traffic on Stinson Parkway  will reduce livability and increase congestion at key intersections.   Concerns regarding views for existing Kenzington Terrace residents. People have expressed  concern over the reduction in views from their units.   Concerns over tree removal.   February 20, 2018  Page 9   Concerns over school capacity and other public services.    Concerns over the handling and treatment of stormwater runoff.  The revised plans reduce the density of the project, which results in almost half the traffic and  population within the new proposal, increase the setbacks from property boundaries, and remove  access from the alley. The revised plans show significant landscape buffering and some tree  preservation, where practical. Stormwater management is located primarily in surface level ponds,  rather than underground storage.    STAFF RECOMMENDATION  Staff has completed a thorough review of the proposal and has the following comments and conditions  for the Preliminary PUD Development Plan and Preliminary Plat:   Setback from Kenzington Terrace Condos. Increase the setback from the property line by  approximately 20 feet, shifting the development to the west.   Vacation of Easement. There is currently a watermain easement through the site, which  will need to be vacated through a separate action accompanying a final plat.   Engineering Comments. The full City Engineer memo and stormwater management  memo are available as attachments and all changes should be made, per the memo to  the satisfaction of the city engineer.    Agency Comments. Park Board and Hennepin County permits shall be obtained and  permit requirements should be incorporated, as final approval by those agencies  requires.    Revised Traffic Study Recommendations.  All traffic mitigation efforts listed in the  revised traffic study shall be part of the conditions for approval, as permitted by other  regulating agencies (Park Board and Hennepin County).   Receipt of All Applicable Permits. All agency permits shall be obtained, and plans  approved prior to construction on the site.  In consideration of the above items, staff recommends that the Planning Commission take the following  actions:   Staff recommends approval of the preliminary PUD plan and preliminary plat, contingent on the  requirements and items listed in the staff report and its attachments.  SUGGESTED MOTION     The following actions are options for the Planning Commission to consider:  1) Motion to recommend approval of the preliminary PUD development plan and preliminary  plat, contingent upon the items listed in the staff report and its attachments;  February 20, 2018  Page 10    2) Motion to table action on the preliminary PUD development plan, and preliminary plat, based  on the submittal of additional information, as enumerated in the staff report;    3) Motion to recommend denial of the preliminary PUD development plan, and preliminary plat,  and direct staff to prepare a draft resolution declaring terms of the same.   ATTACHMENTS  1) Village LLC narrative  2) Graphic Site Plan  3) Landscape Boards  4) Village LLC Civil Plans  5) Traffic Study, updated  6) Village LLC Building Exhibits, with parking information  7) City Engineer Memo  8) Storm Water Management Memo  9) Hennepin County Transportation Comments  10) Formal letter from resident        January 26, 2018 Mayor Faust & Council Members c/o Mark Casey CITY OF SAINT ANTHONY VILLAGE 3301 Silver Lake Road Saint Anthony Village, Minnesota 55418 VIA HAND DELIVERY RE: Written Statement in Support of PUD Application Dear Mayor Faust and Council Members: Having reached what THE VILLAGE, LLC (“The Village”) believes to be a shared vision for redevelopment, it now submits a Planned Unit Development (“PUD”) Preliminary Development Plan application (and, together with its related applications and materials, the “Applications”) for redevelopment (“Project”) of 2501 Lowry Avenue NE, Saint Anthony, Minnesota (the “Property”). This letter is offered as written support for the Applications. In preparing the Applications, The Village scrapped its earlier plans and presents this entirely new concept. Understanding that a planned unit development must meet both The Village’s needs and the needs of the City of Saint Anthony Village (the “SAV”), The Village Project was rebuilt from square one to address the concerns raised in opposition to the original applications. We began at “square one” with the baseline understanding that density would be dramatically reduced. This required a completely different way of looking at potential designs. What evolved was a simpler design and greatly-reduced infrastructure. The revised design began with a single boulevard-style roadway, akin to Stinson Parkway. From there, architects refined the design to increase total parking (including adding significantly greater surface parking), reduce building heights, eliminate connections to the alley, reduce retaining wall use, and create deeper setbacks. The Project now includes two three-story, pitched-roof buildings to the north of the boulevard, used for independent senior living, assisted senior living and memory care units. A four-story, market rate apartment building rests south of the boulevard. We have detailed the current unit breakdown by building below. But because minor changes can occur as the final drawings are fully refined, The Village proposes a hard cap of 430 units on the Property, or 28 units per acre. You will also note that we have sought to balance the need for green space and the need for adequate parking. The Village believes that between the underground parking, the surface parking, and the street parking on the internal street there is sufficient parking for all uses in the Property. But it also recognizes that the demographics of each development and the parking needs of that demographic can vary dramatically between projects. To ensure that it has capacity if the reality of the Project proves more surface parking is necessary, The Village has built a buffer known as “proof of parking.” If The Village is correct and it has adequate parking, precious green space will be preserved. But in the event that more parking is needed, The Village has identified a location of 37 additional stalls that would be constructed upon triggering events set out in the master development agreement that will be entered into between the City and The Village as part of any PUD approval. Status of Bremer Property Before turning to the specifics of the Applications, a clarification is in order about the status of the Bremer Property. The Village had a fully executed purchase agreement allowing it to acquire the Bremer Property (the “Bremer PA”). The Bremer PA has expired. Additionally, The Village had previously reached a contingent agreement to eventually transfer the Bremer Property (and a portion of the Property) to Aeon (the “Aeon PA”). But the contingencies in the Aeon PA were not met, and the parties have agreed to cancel the Aeon PA. The Village never intended to take ownership of the Bremer Property or close on the Bremer PA. Instead, The Village expected to locate affordable housing on the Bremer Property as part of a mixed-use building. Discussions continue with Bremer while Bremer examines development options for the site. Within the Applications, The Village looks to include the Bremer Property in the redevelopment tax increment district to give the eventual developer all available flexibility. The Bremer Property is not included in the preliminary plat application. The eventual Bremer developer will receive the redevelopment tax increment designation and will have full control over the PUD process for the Bremer Property directly with the City. Project Summary A summary of the key components of the Project on the Property follows. Site Element Housing Type Total Units Height Ugd. Parking Surface Parking Building A Senior Ind. housing 61 3 story peaked roof 31’5” to main eave 92 34 Building B Senior housing 128 3 story peaked roof 31’5” to main eave 77 34 Building C Market- rate 225 4 story flat roof 44’ to facia 238 218 Total Units Proposed for 15.37 acres: 414 housing units 407 286 2501 Lowry Site Density: 26.94 units per acre The Proposal is a PUD, and the city has broad approval leeway to encourage development creativity that adds vitality to the city. The project however does not need much help in meeting the city’s already established multifamily guidelines. The Project’s Lot Coverage is projected to be 51.5% (including proof of parking). However, if we exclude the boulevard, that number falls to 47.1%. It is typical to exclude the boulevard for lot coverage calculations because the boulevard and the north and south sidewalks serve the public and the housing community. The 51.5% ratio also includes the swimming pool, gathering plaza, independent living patio and assisted living patio, and memory garden. These new outdoor spaces are landscaped and provide outdoor amenities for residents of the campus adding tremendous quality of life. If the pool and gathering plaza are excluded from these calculations, coverage drops further than 47.1%, which is excellent for a property of this size. The Project’s building-to-land ratio is 20.1% (22.3% if private road outlot is excluded), with the zoning max at 35%, the Project is well below the maximum. Compliance with Planning Principles In developing the Project, The Village paid special attention to the City’s five Planning Principles. We discuss each below. 1) The provision of affordable housing. The city has a history of including, requiring, and financially supporting the development of affordable housing in the community, and this commitment will continue; The Village remains committed to affordable housing’s role in the Project. Of the apartment units, 79 meet the standard for affordable housing at 80% of the Hennepin County area median income (“AMI”), which means that 35% of the apartment units qualify as affordable housing under U.S. Housing and Urban Development department standards. The Village also proposes that a third party develop the adjacent Bremer Property for affordable housing. The Village will not develop the Bremer Property. It will, however, help ensure the future ability to offer affordable housing by requesting inclusion in the redevelopment tax increment district (eligibility for which it would not enjoy on its own). The Bremer Property’s inclusion in the redevelopment district will provide maximum flexibility to its eventual developer. Lastly, after the City denied the original applications, The Village and the City met to give the City a voice for its vision and provide a meaningful feedback loop. During the meetings, the City pointed out that SAV’s HRA currently owns the 0.9-acre former bowling site (the “HRA Property”). To generate even greater affordable housing as part of the development, the City identified the HRA Property as a potential additional location for an affordable housing developer to construct housing at an affordability level that the City and community desire and that is financially possible. The Village agrees that locating additional affordable housing on the HRA Property in conjunction with the Project is logical and The Village looks forward to further discussions with all stakeholders to make maximal use of the HRA Property as a potential location for additional affordable housing. 2) Compatibility with surrounding land uses. It is important that new development match existing surrounding land uses in scale, height, and use; For many years, the City’s Comp Plan has designated the Property for high-density residential redevelopment. The Project appropriately balances that designation and the existing neighboring uses. As the Comp Plan correctly notes, “[b]ecause the City is fully developed, additional housing would have to occur through redevelopment… [and] the anticipated density for this higher density housing development is 25 to 40 units per acre.” The Village has worked to design a project close to the bottom of that range. The Project can now reasonably be constructed at 28 units per acre or less. Accordingly, The Village seeks approval for a project built at 28 units per acre, largely because in its experience, market dynamics and design considerations can lead to minor variations in unit mixes before the project’s conclusion. Rather than returning with a proposed amendment after the public process is complete, The Village requests a small density cushion now. The final PUD submission will detail the precise configuration and unit mix. Additionally, the Project was designed as high-density to fit the neighborhood. The design began with the boulevard-style street intended to compliment Stinson Parkway and dissuade users from viewing it as an option for “cut through.” Next, the Project recognizes neighboring uses: predominantly single family to the west and north, and high-density residential or commercial to the east and south. The resulting configuration sees two senior-living buildings located north of the project’s boulevard, with considerable setbacks from both the northern and western property lines and a three- story, pitched-roof design to more closely resemble a single-family home. The Village strategically located the market-rate building on the Property’s southern portion near existing high-density uses. Because it is market-rate, it is designed to appeal to the “renters-by-choice” demographic. These users demand that their apartment look and feel drastically different than a senior building. The architecture has a more modern feel as a result, featuring a flat roof and loaded with amenities, including a gathering area, pool, and dog run. The height was technically reduced to four stories, but it is lower than the peak of a three-story pitched roof. 3) Provision of adequate public infrastructure. All new development must provide appropriate infrastructure to manage water, sewer, runoff, streets, and access, and all other infrastructure needed to adequately serve itself and protect the surrounding community. The existing site is surrounded by public infrastructure available to serve the proposed, scaled back, development plan proposed. While the following paragraphs provide an overview, a more detailed engineering summary has been provided to touch on specific items that will be reviewed. As the proposed development relates to traffic and access, the internal roadway, vehicle and pedestrian access and ways of traverse have been designed for the proposed demand. The offsite transportation improvements are being re-analyzed to account for the updated unit number and uses, which will present recommendations for offsite improvements. The preliminary development plans have been reviewed with engineering and fire departments and their respective initial comments have been incorporated. The sanitary sewer adjacent to the site, located in the alley to the north, was determined in the previous submittals to be adequate to serve the development and that remains the case for this reduced density. Similarly, the domestic water supply is available to the south and west of the property to serve the development. As was the case in the previous proposals, following the preliminary approval of the proposed plan, the City will verify further improvements needed offsite to ensure adequate fire flows as required by proposed building types. Stormwater management has been an obstacle on the Property for many years. Nonetheless, the Project meets the City and MWMO requirements for rate control, water quality and freeboard. The proposed management system consists primarily of a collection system routing runoff to traditional surface ponds, and supplemental filtration, to treat and store the stormwater prior to discharging it at a rate no more than the current conditions discharge. You can find additional detailed engineering information in the submittal package attached on all of these items. 4) Protection of the environment. All development must meet all Federal, State, watershed district, and local requirements for environmental protection. The city will ensure all pollution and contamination is properly remediated. The Project is significantly scaled back from the 823-unit project. Notably, the environmental assessment worksheet for that initial project concluded it was not likely to result in significant environmental impact. The Village agrees that the Project must comply with all Federal, State, watershed district, and local requirements for environmental protection regulations. We believe it does meet—and, in many instances, exceeds—those thresholds. As has been noted elsewhere, environmental testing reveals that hazardous substances exist below ground on the Property. Specifically, the adjacent property and Property’s prior uses have contaminated the environment with fuel oil and gasoline, diesel range organics, various volatile organic compounds, asbestos, and tetrachloroethene. The Village has already fully remediated the asbestos contamination and, together with appropriate governmental authorities, will undergo further remediation as part of the redevelopment. The Property is already part of the Minnesota Pollution Control Agency (“MPCA”) Voluntary Investigation and Cleanup (“VIC”) program and has received MPCA approval for its Voluntary Response Action Plan (“VRAP”) to fully remediate contamination as part of the development. 5) A fair and open public process. When a formal application is received for development, the city will provide outlets for community discourse and discussion on the proposal. The Village has sought to ensure a fair and open public process. After developing the plans for the Project, The Village held open community meetings to discuss the design and receive feedback. It also agreed to engage smaller groups to address specific questions. It has met with the Minneapolis Park and Rec department, Hennepin County Public Works, the Fire Chief and Fire Marshall, and SAV’s engineer, all to gather as much input as possible to ensure the Project is truly a shared vision. In addition, the Applications will face the planning commission’s scrutiny and a full public hearing. Additional Considerations Staging & Process The Village seeks approval for its preliminary PUD application on the entire Project to get building dimensions approved and detail a shared vision for development. On receipt of that approval, The Village will work with staff on the terms of the master development agreement that is part of all PUD approvals. Once there is preliminary agreement on those terms, The Village will promptly submit for final PUD approval on the Project. The phasing plan for the Project is significantly more compact than the original plans. After the final PUD approval, work will commence on the assisted senior living building as soon as weather conditions will allow. Construction is expected to take approximately 18 months to complete per building. As crews finish their particular subset of work, they will move to the independent senior living building and then to the market rate building. The Village is hopeful to commence work at the end of 2018 with an aggressive construction schedule to complete all three buildings by late 2020 or 2021. Parking. Parking will be well-managed across the Project. Based on the experience of the selected senior living operator, the senior buildings are likely over parked. The independent living building provides 126 stalls for 61 units, even though it is unrealistic to expect that a 2 to 1 parking ratio is necessary to meet parking demand. For the assisted living (which includes a memory care component), the expectation is one parking stall for every 3 units plus 20 employee stalls. Despite that ratio, the Project provides 111 stalls for 128 assisted living units, an excess of 48 stalls above the highlight standard. When it comes to the market rate buildings, similar projects have generally been constructed with a 1.5 to 1.75 unit to parking stall ratio. But The Village is very committed to ensuring it has adequate parking. The market-rate building has 225 units (a total of 285 bedrooms). There are 238 below ground parking spaces and 181 surface stalls (without the proof of parking) for a parking ratio of 1.86. Sitting above market-average parking ratio, The Village finds the proposed parking adequate. As discussed above, however, The Village has built in an additional buffer of 37 stalls, that would be constructed if existing stalls proved to be inadequate, which would than slightly exceed a 2.0 unit to parking stall ratio. Open Space and Park Dedication An important component of the Project is that design choices were made to preserve a natural buffer along Stinson Parkway and along the northern and eastern property lines. By doing so, The Village seeks to save as many of the landmark trees in those areas as possible (upon further inspection some may show to be less than healthy and others cannot be saved due to the grading demands). Currently, The Village estimates that 17 such trees will be saved. In addition, the landscaping plan calls for the addition of new trees to enhance screening and enjoyment that comes from preserving such natural buffers. These areas will add to the trail system throughout the Project to create an open, park feel. Property Control. The Village has previously provided the City a copy of the deed for the Property. Continental - St. Anthony Site PlanSt. Anthony, MN St Anthony Village |Landscape ProgramDog ParkActivity NodesPatio & Pavilion St Anthony Village |Tree PreservaƟon Plan & Pedestrian CirculaƟon11225533418” Ash18” Maple36” Oak30” Oak36” Oak60” Oak(2)-12” Pine12” Ash12” Pine48” Oak24” Oak36” Oak(3)-36” Oak24” MapleExisting Tree Size & SpeciesActivity Node11Sidewalks & Walking TrailsSection Cut Location521129 St Anthony Village |Conceptual SecƟons11Senior Housing to Walking Trail to AlleySenior Housing 8’ Walking TrailAcƟvityNodeScreening/Buffer PlanƟngAlley ExisƟng GarageExisƟng House78’SƟnson BlvdParkwayProof of ParkingPublic SidewalkSidewalk DrainageSwaleMulƟ-ResidenƟal22MulƟ-ResidenƟal to SƟnson Blvd1”=20’1”=20’98’220’98’PLPL St Anthony Village |Conceptual SecƟonsProperty LineRetaining WallTree Replacement PlanƟngs-Over-story, Specimen, OrnamentalBlvd Trees Blvd TreesBlvd TreesPaƟo/Pavilion Stormwater Pondwith FountainsSenior Housing8’ Walking TrailKenzington CondominiumsExisƟngTreesStreet LighƟng15’Drive Lane8.5’Parking Lane5’SidewalkDrainage Swale44Typical Road SecƟon55Senior Assisted Living to Kenzington Condominiums33Property Line to Stormwater Pond1”=20’1”=20’1”=20’69’ ROW70’44’ 10”55’89’ 6”PL23.5’15’Drive Lane10’Median8.5’Parking Lane5’Sidewalk23.5’ St Anthony Village | Precedent Images1Village Park2MulƟ-ResidenƟal3Senior Housing G-101 COVER AND INDEX SHEET Drawn By: Issue Date: Project #:5005-0003 RAGTHE VILLAGE LLC DEVELOPMENTTHE VILLAGE, LLC1907 WAYZATA BLVD, SUITE 250M:\5005\0003\DESIGN\CAD\PLANSHEETS\g-101 Cover And Index Sheet.dwgDescription:Date:WAYZATA, MN 55391Issue #:ST. ANTHONY VILLAGE, MINNESOTA12/06/2017 1Issue #Prepared For:XX/XX/XXXXDESCRIPTIONISSUE #Sheet #: Sheet Title:1/25/2018 5:26:05 PMDate: I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY REGISTERED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. License #: WARNING: THE CONTRACTOR SHALL BE RESPONSIBLE FOR CALLING FOR LOCATIONS OF ALL EXISTING UTILITIES. THEY SHALL COOPERATE WITH ALL UTILITY COMPANIES IN MAINTAINING THEIR SERVICE AND/OR RELOCATION OF LINES. THE CONTRACTOR SHALL CONTACT GOPHER STATE ONE CALL AT 651-454-0002 AT LEAST 48 HOURS IN ADVANCE FOR THE LOCATIONS OF ALL UNDERGROUND WIRES, CABLES, CONDUITS, PIPES, MANHOLES, VALVES OR OTHER BURIED STRUCTURES BEFORE DIGGING. THE CONTRACTOR SHALL REPAIR OR REPLACE THE ABOVE WHEN DAMAGED DURING CONSTRUCTION AT NO COST TO THE OWNER. TWIN CITY AREA: 651-454-0002 TOLL FREE 1-800-252-1166 CALL BEFORE YOU DIG PROJECT LOCATION CITY: ST. ANTHONY VILLAGE COUNTY: HENNEPIN DISTRICT NO.: 3 INDEX OF SHEETS PROJECT LOCATION MAP G-101 COVER AND INDEX SHEET G-102 NOTES AND LEGEND C-101 PRELIMINARY PLAT C-102 EXISTING CONDITIONS C-103 EXISTING CONDITIONS C-104 PRELIMINARY SITE PLAN C-105 PRELIMINARY SITE PLAN NORTH C-106 PRELIMINARY SITE PLAN SOUTH C-301 PRELIMINARY GRADING PLAN C-302 PRELIMINARY GRADING PLAN NORTH C-303 PRELIMINARY GRADING PLAN SOUTH C-401 PRELIMINARY UTILITY PLAN C-402 PRELIMINARY UTILITY PLAN NORTH C-403 PRELIMINARY UTILITY PLAN SOUTH C-501 PRELIMINARY STORM SEWER PLAN C-502 PRELIMINARY STORM SEWER PLAN NORTH C-503 PRELIMINARY STORM SEWER PLAN SOUTH C-801 DETAILS L-100 PLANTING PLAN - OVERALL CONCEPT L-101 PLANTING PLAN - CONCEPT SOUTH L-102 PLANTING PLAN - CONCEPT EAST L-103 PLANTING PLAN - CONCEPT WEST THIS SET CONTAINS 22 SHEETS GOVERNING SPECIFICATIONS: 1.CITY ENGINEERS ASSOCIATION OF MINNESOTA (CEAM) STANDARD UTILITIES SPECIFICATIONS (LATEST EDITION) 2.THE MINNESOTA DEPARTMENT OF TRANSPORTATION "STANDARD SPECIFICATIONS FOR CONSTRUCTION" (LATEST EDITION). 3.ALL APPLICABLE FEDERAL, STATE, AND LOCAL LAWS AND ORDINANCES WILL BE COMPLETED WITHIN THE CONSTRUCTION OF THIS PROJECT. 4.ALL TRAFFIC CONTROL DEVICES SHALL CONFORM TO THE LATEST EDITION OF THE MINNESOTA MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES, INCLUDING THE LATEST FIELD MANUAL FOR TEMPORARY TRAFFIC CONTROL ZONE LAYOUTS. PROJECT VICINITY MAP PRELIMINARY PUD PLANS FOR THE VILLAGE LLC DEVELOPMENT CITY OF ST. ANTHONY VILLAGE HENNEPIN COUNTY, MINNESOTA JANUARY 2018 G-102 GENERAL NOTES AND LEGEND Drawn By: Issue Date: Project #:5005-0003 RAGTHE VILLAGE LLC DEVELOPMENTTHE VILLAGE, LLC1907 WAYZATA BLVD, SUITE 250M:\5005\0003\DESIGN\CAD\PLANSHEETS\G-102 General Notes And Legend.dwgDescription:Date:WAYZATA, MN 55391Issue #:ST. ANTHONY VILLAGE, MINNESOTA12/06/2017 1Issue #Prepared For:XX/XX/XXXXDESCRIPTIONISSUE #Sheet #: Sheet Title:1/25/2018 2:01:34 PMDate: I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY REGISTERED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. License #: WARNING: THE CONTRACTOR SHALL BE RESPONSIBLE FOR CALLING FOR LOCATIONS OF ALL EXISTING UTILITIES. THEY SHALL COOPERATE WITH ALL UTILITY COMPANIES IN MAINTAINING THEIR SERVICE AND/OR RELOCATION OF LINES. THE CONTRACTOR SHALL CONTACT GOPHER STATE ONE CALL AT 651-454-0002 AT LEAST 48 HOURS IN ADVANCE FOR THE LOCATIONS OF ALL UNDERGROUND WIRES, CABLES, CONDUITS, PIPES, MANHOLES, VALVES OR OTHER BURIED STRUCTURES BEFORE DIGGING. THE CONTRACTOR SHALL REPAIR OR REPLACE THE ABOVE WHEN DAMAGED DURING CONSTRUCTION AT NO COST TO THE OWNER. TWIN CITY AREA: 651-454-0002 TOLL FREE 1-800-252-1166 CALL BEFORE YOU DIG GOVERNING SPECIFICATIONS: 1.CITY ENGINEERS ASSOCIATION OF MINNESOTA (CEAM) STANDARD UTILITIES SPECIFICATIONS (LATEST EDITION) 2.THE MINNESOTA DEPARTMENT OF TRANSPORTATION "STANDARD SPECIFICATIONS FOR CONSTRUCTION" (LATEST EDITION). 3.ALL APPLICABLE FEDERAL, STATE, AND LOCAL LAWS AND ORDINANCES WILL BE COMPLETED WITHIN THE CONSTRUCTION OF THIS PROJECT. 4.ALL TRAFFIC CONTROL DEVICES SHALL CONFORM TO THE LATEST EDITION OF THE MINNESOTA MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES, INCLUDING THE LATEST FIELD MANUAL FOR TEMPORARY TRAFFIC CONTROL ZONE LAYOUTS. MINOR CONTOUR MAJOR CONTOUR CURB AND GUTTER EDGE OF PAVEMENT SANITARY MANHOLE SANITARY SEWER STORM SEWER WATERMAIN UNDERGROUND FIBER OPTIC CONCRETE SIDEWALK FENCE STORM MANHOLE STORM CATCH BASIN HYDRANT GATE VALVE LIGHT POLE EDGE OF VEGETATION GUARD RAIL FENCE RETAINING WALL ELECTRIC TRANSFORMER TRAFFIC SIGN DELINEATED WETLAND EDGE CURB AND GUTTER CONCRETE SIDEWALK BITUMINOUS PAVEMENT BITUMINOUS PATCHING ADA ACCESSIBLE ROUTE SANITARY CLEANOUT SANITARY SERVICE WATER SERVICE GATE VALVE STORM SEWER FLARED END SECTION CATCH BASIN/CBMH REMOVE BITUMINOUS PAVEMENT SAWCUT BITUMINOUS PAVEMENT REMOVE CURB AND GUTTER CLEARING AND GRUBBING REMOVE FENCE REMOVE BUILDING SILT FENCE ROCK CONSTRUCTION ENTRANCE RIPRAP INLET PROTECTION EROSION CONTROL BLANKET STORM MANHOLE REMOVE TREE REMOVE SANITARY SEWER/SERVICE REMOVE WATER MAIN/SERVICE FLARED END SECTION TREE SANITARY MANHOLE MNDOT SEED MIX 22-112 SOD PER LANDSCAPE PLANS MNDOT SEED MIX 33-262 MNDOT SEED MIX 34-262 MNDOT SEED MIX 35-241 SILT FENCE DITCH CHECK CULVERT PROTECTION REMOVE TRASH AND DEBRIS GRADING LEGEND SITE PLAN LEGENDEXISTING LEGEND UTILITY/STORM SEWER LEGEND EROSION CONTROL LEGEND REMOVALS LEGEND GENERAL LEGEND PROPOSED STORM SEWER PROPOSED CATCH BASIN PROPOSED MANHOLE 1.00% FL=9XX PROPOSED SPOT ELEVATION (ALL ELEVATIONS ARE TO FLOWLINE UNLESS OTHERWISE NOTED) ME=9XX TC=9XX MATCH EXISTING SPOT ELEVATION TOP OF CURB SPOT ELEVATION EOF=9XX EMERGENCY OVERFLOW SPOT ELEVATION HP=9XX HIGH POINT SPOT ELEVATION PROPOSED RIDGE / VALLEY / BREAKLINE PROPOSED SLOPE ARROW EXISTING STORM STRUCTURE EXISTING STORM SEWER EXISTING CONTOUR PROPOSED CONTOUR9XX FG=9XX FINISHED GRADE SPOT ELEVATION TW=9XX TOP OF WALL SPOT ELEVATION BW=9XX BOTTOM / TOE OF WALL SPOT ELEVATION PROPERTY LINE SETBACK LINE EASEMENT LINE CONSTRUCTION LIMITS BREMER BANK PARCEL 716.23 432.18S 01° 07' 07" E 3.02S 39°13'04" E1041.74ALLEY232.7610 0 . 0 0S 50° 4 6 ' 5 6 " WN 89°07'06" E947.205 6 4 . 0 6S 5 0 ° 3 3 ' 2 4 " WPARCEL 1PARCEL 2PARCEL 3KENZIE TERRACE (CO . RD . NO . 1 5 3 ) STINSON PARKWAY1027.85N 00°36'35" E ALLEY21BLOCK ONEOUTLOT ABLOCK TWO1137494 S.F.3.16 AC.191086 S.F.4.39 AC.274811 S.F.6.31 AC.N89°18'31"E295.01S0°06'35"E 225.89L=176.80R=851.73Δ=11°53'36"PROPOSEDDRAINAGE ANDUTILITY EASEMENT(25,725 S.F.)PROPOSEDDRAINAGE ANDUTILITY EASEMENT(48,669 S.F.)PROPOSED DRAINAGE & UTILITY EASEMENT OVERALL OF OUTLOT A1ƒ :Parcel 1:That part of the South 1/2 of the Northwest Quarter of Section 7, Township 29, Range 23, beginning at apoint in the South line of said Tract 100 feet East of the Southwest corner thereof; thence North 1079.8 feet;thence East parallel to the South line of said Quarter Section 1041.74 feet; thence South to center of StateHighway No. 63; thence southwesterly along said center line of State Highway No. 63 and St. Anthony andTaylor Falls Road to intersection of center line of said road with the South line of said Quarter Section;thence West along said latter line to the point of beginning, except that part thereof embraced in the South365 feet of the West 395 feet of the Southwest Quarter of the Northwest Quarter of said Section 7 andexcept the easterly 100 feet thereof.Except that part taken for highway purposes by the County of Hennepin as evidenced by Final Certificate,filed May 16, 1985, as Document No. 1652500.Parcel 2:That part of the following described property:The Easterly 100 feet of that part of the South half of the Northwest Quarter, Section 7, Township 29, Range23, beginning at a point in the South line of said Tract 100 feet East of the Southwest corner thereof, thenceNorth 1079.8 feet, thence East parallel to the South line of said quarter section 1041.74 feet; thence Southto center of State Highway No. 63; thence Southwesterly along said center line of State Highway 63 and St.Anthony and Taylor Falls Road to intersection of center line of said road with the South line of said quartersection; thence West along said latter line to the point of beginning,lying Westerly of the following described line and its Southerly extension,Beginning at a point on the North line of the above described Tract, distant 5.50 feet easterly of theNorthwest corner thereof, assumed bearing of said North line is North 89 degrees 24 minutes 53 secondsEast; thence South 01 degree 00 minutes 45 seconds East a distance of 486.65 feet, more or less, to theSouth line of the above described tract and there terminating.Parcel 3:That part of the Northwest Quarter of Section 7, Township 29, Range 23, described as commencing at apoint on the South line of said Northwest Quarter distant 100 feet Easterly from the Southwest corner of saidNorthwest Quarter; thence Northerly parallel with the West line of said Northwest Quarter to the South lineof MURRAY HEIGHTS ADDITION TO MINNEAPOLIS, being the actual point of beginning; thence Southerlyalong said parallel line to a point distant 1079.8 feet Northerly from said South line of the Northwest Quarter;thence on an assumed bearing of North 89 degrees 24 minutes 53 seconds East, parallel with the South lineof said Northwest Quarter a distance of 947.24 feet; thence North 01 degree 00 minutes 45 seconds East tosaid South line of MURRAY HEIGHTS ADDITION TO MINNEAPOLIS; thence Westerly along the lastdescribed line to the point of beginning.All situated in the County of Hennepin and State of Minnesota.Torrens PropertyBeing registered land as evidenced by Certificate of Title No. 10665952501 Lowry Avenue NE,St. Anthony, MN 55418WENCK ASSOCIATES INC.1800 PIONEER CREEK CENTERMAPLE PLAIN MN, 55359SURVEYS BASED ON ALTA/ACSM LAND TITLE SURVEY PREPARED BY PREMIERLAND SURVEYING, LLC, DATED JUNE 6, 2016 AND CERTIFICATE OF SURVEY BYCLARK ENGINEERING DATED MAY 3, 2010.THE VILLAGE LLC1907 WAYZATA BLVD. E. #250WAYZATA, MN 55391DECEMBER 20, 2017727$/$5($72%(3/$77(' 6) $& “2501 LOWRY AVENUE NE, ST. ANTHONY, MN 55418EXSTING IMPROVEMENTS AND UNDERLYING PROPERTY INFORMATION ARESHOWN LIGHTLY IN THE BACKGROUND.DRAINAGE AND UTILITY EASEMENTS SHOWN BEING FIVE FEET IN WIDTH ANDADJOINING SIDE LOT LINES, AND BEING 10 FEET IN WIDTH AND ADJOININGREAR LOT LINES, UNLESS OTHERWISE SHOWN.THE VILLAGE LLCDEVELOPMENTDrawn By:Issue Date:Project #:5005-0003RAGTHE VILLAGE LLC DEVELOPMENT THE VILLAGE, LLC 1907 WAYZATA BLVD, SUITE 250 M:\5005\0003\DESIGN\SURVEY\5005-0003preplat3.dwg Description:Date: WAYZATA, MN 55391Issue #:ST. ANTHONY VILLAGE, MINNESOTA 12/06/20171Issue # Prepared For: XX/XX/XXXX DESCRIPTION ISSUE #Sheet #:Sheet Title:1/25/2018 2:01:51 PM Date:I HEREBY CERTIFY THAT THIS PLAN,SPECIFICATION, OR REPORT WASPREPARED BY ME OR UNDER MYDIRECT SUPERVISION AND THAT I AM ADULY REGISTERED PROFESSIONALENGINEER UNDER THE LAWS OF THESTATE OF MINNESOTA.License #:WARNING:THE CONTRACTOR SHALL BE RESPONSIBLE FOR CALLING FOR LOCATIONS OF ALL EXISTING UTILITIES. THEY SHALLCOOPERATE WITH ALL UTILITY COMPANIES IN MAINTAINING THEIR SERVICE AND/OR RELOCATION OF LINES.THE CONTRACTOR SHALL CONTACT GOPHER STATE ONE CALL AT 651-454-0002 AT LEAST 48 HOURS IN ADVANCE FORTHE LOCATIONS OF ALL UNDERGROUND WIRES, CABLES, CONDUITS, PIPES, MANHOLES, VALVES OR OTHER BURIEDSTRUCTURES BEFORE DIGGING. THE CONTRACTOR SHALL REPAIR OR REPLACE THE ABOVE WHEN DAMAGED DURINGCONSTRUCTION AT NO COST TO THE OWNER.TWIN CITY AREA: 651-454-0002TOLL FREE 1-800-252-1166CALL BEFORE YOU DIGWENCK ASSOCIATES INC.1800 PIONEER CREEK CENTERMAPLE PLAIN MN, 55359C-101PRELIMINARYPLAT KEN ZI E T E R R A C E ( C O U N T Y R D 153)STINSON PARKWAYSOUTH LIE OF SW1/4 OF NW1/4 OF SEC. 7, T. 29, R. 23 EXISTING BUILDING (1056 S.F.)EXISTINGBUILDING(2923 S.F.)EAST LINE OF PARCEL 1CHAINLINK FENCE ON PROPERTY LINE EXIST . BLDG . (1663 S . F ) 100 100 SW COR OF SW1/4 OFWEST LINE OF SW1/4 OF NW1/4 OF SEC. 72020100 4 0 20 20 10101010 1010 10 10 20' DRAINAGE & UTILITY EASEMENT PER DOC. NO. 2447499 C LCHAIN LINK FENCE 0.6' WEST OF PROPERTY COR. WEST LINE OF KENZINGTON CONDOMINIUM PLAT AND EAST LINE OF PARCEL 2 BITU MI N O U S 7 STA L L S 3 STALLS4 STALLSBITUMINOUS CON C R E T E C U R B & G U T T E R CONCRETE CURB GUTTERALLEY 920 9 1 5 9 1 3 9 1 5 92092592 5 91 5 91 7 912 916.2916.6928.4930.9916.4918.4921.7926.2EXISTING 12" PLASTIC STORM PIPE EXISTING FLARED END SECTION INV=910.37 EXISTING 8" WATERMAIN EXISTING 8" WATERMAIN EXISTING 8" WATERMAIN APPROXIMATE EDGE OF PAVEMENT (TYP.) APPROXIMATE EDGE OF PAVEMENT (TYP.) APPROXIMATE EDGE OF PAVEMENT (TYP.) APPROXIMATE EDGE OF PAVEMENT (TYP.) C-102 EXISTING CONDITIONS Drawn By: Issue Date: Project #:5005-0003 RAGTHE VILLAGE LLC DEVELOPMENTTHE VILLAGE, LLC1907 WAYZATA BLVD, SUITE 250M:\5005\0003\DESIGN\CAD\PLANSHEETS\C-102 Existing Conditions.dwgDescription:Date:WAYZATA, MN 55391Issue #:ST. ANTHONY VILLAGE, MINNESOTA12/06/2017 1Issue #Prepared For:XX/XX/XXXXDESCRIPTIONISSUE #Sheet #: Sheet Title:1/25/2018 2:02:41 PMDate: I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY REGISTERED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. License #: WARNING: THE CONTRACTOR SHALL BE RESPONSIBLE FOR CALLING FOR LOCATIONS OF ALL EXISTING UTILITIES. THEY SHALL COOPERATE WITH ALL UTILITY COMPANIES IN MAINTAINING THEIR SERVICE AND/OR RELOCATION OF LINES. THE CONTRACTOR SHALL CONTACT GOPHER STATE ONE CALL AT 651-454-0002 AT LEAST 48 HOURS IN ADVANCE FOR THE LOCATIONS OF ALL UNDERGROUND WIRES, CABLES, CONDUITS, PIPES, MANHOLES, VALVES OR OTHER BURIED STRUCTURES BEFORE DIGGING. THE CONTRACTOR SHALL REPAIR OR REPLACE THE ABOVE WHEN DAMAGED DURING CONSTRUCTION AT NO COST TO THE OWNER. TWIN CITY AREA: 651-454-0002 TOLL FREE 1-800-252-1166 CALL BEFORE YOU DIG BENCHMARKS 1.HENNEPIN COUNTY MONUMENT AT STINSON PARKWAY & KENZIE TERRACE INTERSECTION, ELEVATION = 932.75 2.STORM SEWER MANHOLE (SOLID COVER) AT KENZIE TERRACE & ENTRANCE TO THE LEGACY OF ST ANTHONY/AUTUMN WOODS, RIM ELEVATION = 916.16 3.SANITARY SEWER MANHOLE AT WEST END OF ALLEYWAY, ELEVATION = 923.02 KEN ZI E T E R R A C E ( C O U N T Y R D 153)STINSON PARKWAYSOUTH LIE OF SW1/4 OF NW1/4 OF SEC. 7, T. 29, R. 23 EXISTING BUILDING (1056 S.F.)EXISTINGBUILDING(2923 S.F.)EAST LINE OF PARCEL 1CHAINLINK FENCE ON PROPERTY LINE EXIST . BLDG. (1663 S . F ) 100 100 SW COR OF SW1/4 OF NW1/4 OF SEC. 7, T. 29, R. 23WEST LINE OF SW1/4 OF NW1/4 OF SEC. 72020100 NW COR. OF SW1/4 OF NW1/4 OF SEC. 7 4 0 20 20 10101010 1010 101020' DRAINAGE & UTILITY EASEMENT PER DOC. NO. 2447499 C LCHAIN LINK FENCE 0.6' WEST OF PROPERTY COR. WEST LINE OF KENZINGTON CONDOMINIUM PLAT AND EAST LINE OF PARCEL 2 BITU MI N O U S 7 STAL L S 3 STALLS4 STALLSBITUMINOUS CON C R E T E C U R B & G U T T E R CONCRETE CURB GUTTERALLEY 920 9 1 5 9 1 3 9 1 5 92092592 5 91 5 91 7 912 NAVD88 VERTICAL DATUM 916.2916.6928.4930.9916.4918.4921.7926.2C-103 EXISTING CONDITIONS Drawn By: Issue Date: Project #:5005-0003 RAGTHE VILLAGE LLC DEVELOPMENTTHE VILLAGE, LLC1907 WAYZATA BLVD, SUITE 250M:\5005\0003\DESIGN\CAD\PLANSHEETS\C-103 Existing Conditions.dwgDescription:Date:WAYZATA, MN 55391Issue #:ST. ANTHONY VILLAGE, MINNESOTA12/06/2017 1Issue #Prepared For:XX/XX/XXXXDESCRIPTIONISSUE #Sheet #: Sheet Title:1/25/2018 2:03:31 PMDate: I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY REGISTERED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. License #: WARNING: THE CONTRACTOR SHALL BE RESPONSIBLE FOR CALLING FOR LOCATIONS OF ALL EXISTING UTILITIES. THEY SHALL COOPERATE WITH ALL UTILITY COMPANIES IN MAINTAINING THEIR SERVICE AND/OR RELOCATION OF LINES. THE CONTRACTOR SHALL CONTACT GOPHER STATE ONE CALL AT 651-454-0002 AT LEAST 48 HOURS IN ADVANCE FOR THE LOCATIONS OF ALL UNDERGROUND WIRES, CABLES, CONDUITS, PIPES, MANHOLES, VALVES OR OTHER BURIED STRUCTURES BEFORE DIGGING. THE CONTRACTOR SHALL REPAIR OR REPLACE THE ABOVE WHEN DAMAGED DURING CONSTRUCTION AT NO COST TO THE OWNER. TWIN CITY AREA: 651-454-0002 TOLL FREE 1-800-252-1166 CALL BEFORE YOU DIG BENCHMARKS 1.HENNEPIN COUNTY MONUMENT AT STINSON PARKWAY & KENZIE TERRACE INTERSECTION, ELEVATION = 932.75 2.STORM SEWER MANHOLE (SOLID COVER) AT KENZIE TERRACE & ENTRANCE TO THE LEGACY OF ST ANTHONY/AUTUMN WOODS, RIM ELEVATION = 916.16 3.SANITARY SEWER MANHOLE AT WEST END OF ALLEYWAY, ELEVATION = 923.02 SITE DATA AREA DEVOTED TO RESIDENTIAL-MANUFACTURED HOMES/RV'S 491,743 SF (11.289 AC) AREA SF (AC) COMMON SPACE N/A PUBLIC OPEN SPACE N/A STREETS 168,364 SF (3.865 AC) OFF-STREET PARKING/LOADING (14 STALLS)6,751 SF (0.155 AC) PID: 0702923230001 (VILLAGE PROPERTY SITE) AREA AND FLOOR AREA DEVOTED TO COMMERCIAL USES 1,663 SF (0.038 AC) AREA SF (AC) INDUSTRIAL OR OFFICE N/A TOTAL AREA OF PROPERTY 669,885 SF (15.378 AC) MULTI-RESIDENTIAL 1 FFE=923.00 GARAGE=912.00 ASSISTED SENIOR LIVING FFE=923.00 GARAGE=913.00 INDEPENDENT SENIOR LIVING FFE=927.00 GARAGE=917.00 MULTI-RESIDENTIAL 1 FFE=923.00 GARAGE=912.00 LOBBY AND COMMON AREA FFE=923.00 GARAGE=912.00 STORMWATER POND NWL=912.00 HWL=917.35 STORMWATER POND NWL=911.00 HWL=915.92 KEN ZI E T E R R A C E ( C O U N T Y R D 153)STINSON PARKWAY65.2'81.1'78.4'73.1'99' 97.9'22.6'70.7'20'76.7'85'66.9'89.9' 4 2 . 5 ' 9' TYP. 22'23.5'23.5'24'15'23.5'10' 18' 9' TYP.30'10'8.5'8.5'19'TYP.9'TYP. 19' TYP. 10' 23.5' 2 4 '24' PATIO PLAZAPATI O PLAZA PROOF OF PARKING 37 STALLS PATIO 22'22'22'22'22'15'8.5'19'TYP.9' TYP.19'TYP.23.5' 1 2 ' 12' WIDE LEFT TURN LANE 6' WIDE TRAIL 6' WIDE TRAIL 8' WIDE TRAIL EXISTING TREE TO REMAIN (TYP.) 5' WIDE SIDEWALK 5' WIDE SIDEWALK 5' WIDE SIDEWALK 5' WIDE SIDEWALK 5' WIDE SIDEWALK 5' WIDE SIDEWALK 5' WIDE SIDEWALK CONSTRUCTION LIMITS (TYP.) CONSTRUCTION LIMITS (TYP.) 3 0 ' 3 0 ' 20' 20'20'20'20' 20' 12' WIDE RIGHT TURN LANE 6 0 ' 5 ' DOG PARK LIGHT POLE (TYP.) CROSSWALK (TYP.) RETAINING WALL23'C-104 SITE PLAN Drawn By: Issue Date: Project #:5005-0003 RAGTHE VILLAGE LLC DEVELOPMENTTHE VILLAGE, LLC1907 WAYZATA BLVD, SUITE 250M:\5005\0003\DESIGN\CAD\PLANSHEETS\C-104 Site Plan.dwgDescription:Date:WAYZATA, MN 55391Issue #:ST. ANTHONY VILLAGE, MINNESOTA12/06/2017 1Issue #Prepared For:XX/XX/XXXXDESCRIPTIONISSUE #Sheet #: Sheet Title:1/25/2018 2:04:12 PMDate: I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY REGISTERED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. License #: WARNING: THE CONTRACTOR SHALL BE RESPONSIBLE FOR CALLING FOR LOCATIONS OF ALL EXISTING UTILITIES. THEY SHALL COOPERATE WITH ALL UTILITY COMPANIES IN MAINTAINING THEIR SERVICE AND/OR RELOCATION OF LINES. THE CONTRACTOR SHALL CONTACT GOPHER STATE ONE CALL AT 651-454-0002 AT LEAST 48 HOURS IN ADVANCE FOR THE LOCATIONS OF ALL UNDERGROUND WIRES, CABLES, CONDUITS, PIPES, MANHOLES, VALVES OR OTHER BURIED STRUCTURES BEFORE DIGGING. THE CONTRACTOR SHALL REPAIR OR REPLACE THE ABOVE WHEN DAMAGED DURING CONSTRUCTION AT NO COST TO THE OWNER. TWIN CITY AREA: 651-454-0002 TOLL FREE 1-800-252-1166 CALL BEFORE YOU DIG SITE ANALYSIS TABLE EXISTING ZONING R1 SINGLE FAMILY RESIDENTIAL LOT AREA “6) “$& TOTAL BUILDING AREA “6)  GREENSPACE SUMMARY IMPERVIOUS AREA (INCL. BLDG AND POND) PROPOSED PERVIOUS AREA BL. 1 LT. 1 - IND. LIVING PARKING STALLS SUMMARY RAMP PARKWAY BL. 2 LT. 1 - MULTI RES. SETBACK SUMMARY BUILDING EAST 30' WEST NORTH PROPOSED ZONING PUD - PLANNED UNIT DEVELOPMENT 20' 20' 20' SOUTHEAST “6) $& BL. 1 LT. 2 - AST. LIVING SOUTHWEST 20' INTERNAL 0' ADA 30 TOT 4 30 115 61 4 5 0 61 STANDARD SURFACE ADDITIONAL PROOF STALLS 37 37 0 TOTAL PARKING COUNT RAMP SURFACE 0 0 0 0 “6) $& 88 86 231 4 4 7 126 124 358 405 273 15 13 706 PROPERTY LINE SITE LEGEND SETBACK LINE EASEMENT LINE PROPOSED CURB AND GUTTER BITUMINOUS PAVEMENT CONCRETE SIDEWALK PAVEMENT. CONSTRUCTION LIMITS KEN ZI E T E R R A C E ( C O U N T Y R D 153)STINSON PARKWAYMULTI-RESIDENTIAL 1 FFE=923.00 GARAGE=912.00 ASSISTED SENIOR LIVING FFE=923.00 GARAGE=913.00 INDEPENDENT SENIOR LIVING FFE=927.00 GARAGE=917.00 MULTI-RESIDENTIAL 1 FFE=923.00 GARAGE=912.00 LOBBY AND COMMON AREA FFE=923.00 GARAGE=912.00 STORMWATER POND NWL=911.00 HWL=915.92 65.2'81.1'78.4'73.1'99' 70.7'76.7'85'66.9'89.9' 9' TYP. 22'23.5'23.5'24'15'23.5'10' 18' 9' TYP.30'10'8.5'8.5'19'TYP.9'TYP. 19' TYP.30.5' 10' 23.5' 2 4 '24' PROOF OF PARKING 37 STALLS 22'22'22'22'15'8.5'19'TYP.9' TYP.19'TYP.23.5' EXISTING TREE TO REMAIN (TYP.) 5' WIDE SIDEWALK 1 1 1 1 11 1 1 1 1 1 1 1 5 55 5 5 5 5 R15'R15'R5' R3'R3 ' R 1 0 'R2'R3'R5'R 3 ' R3'R1 0 'R10'R10'R10'R10'R3 'R10'R5'R3'R10'R3'R2 ' R 4 0 'R3'R2 0 ' R 1 5 ' R5' R5' R5'R15'R 1 5 'R20'R 3 'R3'R3' R32' R12'R10'R10'R3'R3'R20'R10'R3'35.23' 21.16' R3'R5'R1 5 'R3'R3'R10'R 1 0 'R5' R10'R3'R3' R34' R1 0 'R3'R25'R25'R3'R 3 'R10'R3'R3' R3'R3'R3'R10'R12'R32'R3' R3'R10'R 3 'R3'R15'R 5 'R5'R15'R5'R3' 18'18'25'5 5 2 3 2 2 3 2 2 3 1 9' TYP. 9' TYP.19'TYP.R30'R3'R3'R3'6 6 6 6 6 6 6 6 6 6 6 11 11 11 11 8 8 8 8 26 26 26 26 17 18 18 18 R10' R3' 16 16 16 1616 16 19 19 19 19 19 19 14 14 14 14 14 14 14 14 15 15 15 15 15 15 15 15 15 15 10 10 10 22 22 22 22 22 22 22 22 PAR FITNESS NODE (TYP. OF 8)27 27 27 27 5 ' 27 20' 3 0 '20'20'20' 30 20 3020 20 20 2020 20 20 29 29 29 29 3 28 31 31 31 31 31 31 31 31 31 31 31 31 31 31 31 31 32 3232 32 6 0 '22'23'C-105 SITE PLAN NORTH Drawn By: Issue Date: Project #:5005-0003 RAGTHE VILLAGE LLC DEVELOPMENTTHE VILLAGE, LLC1907 WAYZATA BLVD, SUITE 250M:\5005\0003\DESIGN\CAD\PLANSHEETS\C-105 Site Plan North.dwgDescription:Date:WAYZATA, MN 55391Issue #:ST. ANTHONY VILLAGE, MINNESOTA12/06/2017 1Issue #Prepared For:XX/XX/XXXXDESCRIPTIONISSUE #Sheet #: Sheet Title:1/25/2018 2:04:53 PMDate: I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY REGISTERED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. License #: WARNING: THE CONTRACTOR SHALL BE RESPONSIBLE FOR CALLING FOR LOCATIONS OF ALL EXISTING UTILITIES. THEY SHALL COOPERATE WITH ALL UTILITY COMPANIES IN MAINTAINING THEIR SERVICE AND/OR RELOCATION OF LINES. THE CONTRACTOR SHALL CONTACT GOPHER STATE ONE CALL AT 651-454-0002 AT LEAST 48 HOURS IN ADVANCE FOR THE LOCATIONS OF ALL UNDERGROUND WIRES, CABLES, CONDUITS, PIPES, MANHOLES, VALVES OR OTHER BURIED STRUCTURES BEFORE DIGGING. THE CONTRACTOR SHALL REPAIR OR REPLACE THE ABOVE WHEN DAMAGED DURING CONSTRUCTION AT NO COST TO THE OWNER. TWIN CITY AREA: 651-454-0002 TOLL FREE 1-800-252-1166 CALL BEFORE YOU DIG PROPERTY LINE SITE LEGEND SETBACK LINE EASEMENT LINE PROPOSED CURB AND GUTTER BITUMINOUS PAVEMENT CONCRETE SIDEWALK PAVEMENT. 3 2 1 4 5 6 7 8 9 10 11 12 13 14 15 B612 CURB AND GUTTER B612 TIP-OUT CURB AND GUTTER MOUNTABLE CURB AND GUTTER 2' WIDE CONCRETE VALLEY GUTTER BITUMINOUS PAVEMENT 5' WIDE CONCRETE SIDEWALK 6' WIDE CONCRETE TRAIL 8' WIDE BITUMINOUS TRAIL CONCRETE DRIVEWAY APRON MATCH INTO EXISTING PAVEMENT MATCH INTO EXISTING CURB AND GUTTER MATCH INTO EXISTING SIDEWALK PATCH BITUMINOUS PAVEMENT 16 17 KEYNOTE LEGEND 18 19 20 21 22 23 24 25 26 27PARALLEL PARKING STALLS - 22' X 8.5' TYP. STANDARD PARKING STALL - 9' X 18' TYP. ADA PARKING STALLS WITH ACCESS AISLE & CURB RAMP PLAZA - SEE ARCH. AND LANDSCAPE PLANS PATIO - SEE ARCH. AND LANDSCAPE PLANS PROPERTY LINE RETAINING WALL W/ RAILING. SEE ARCH. FOR RAILING FENCE - SEE LANDSCAPING PLANS 4" STRIPING DOG PARK TOT LOT/COMMUNITY AREA ADA PEDESTRIAN RAMP GARAGE ENTRANCE BUILDING SETBACK LOT LINE DECORATIVE PAVEMENT SEE LANDSCAPE PLANS RAILING - SEE ARCH. PLANS STREET LIGHT CROSSWALK 28 29 30 31 32 MULTI-RESIDENTIAL 1 FFE=923.00 GARAGE=912.00 MULTI-RESIDENTIAL 1 FFE=923.00 GARAGE=912.00 LOBBY AND COMMON AREA FFE=923.00 GARAGE=912.00 STORMWATER POND NWL=912.00 HWL=917.35 PROOF OF PARKING 97.88'22.57'20'4 2 . 4 7 '9'TYP. 19' TYP. 30.5' 23.5' 22'3'23.5' 1 2 ' 12' WIDE LEFT TURN LANE 5' WIDE SIDEWALK 1 1 5 R2 0 ' R10'R3'R3' R34' R1 0 'R3'R25'R25'2 6 6 6 7 7 11 11 11 26 26 17 18 16 16 19 19 19 14 14 14 15 15 10 10 2 5 ' 27 3020 20 20 20 2320 20 KENZI E T E R R A C E ( C O U N T Y R D 1 5 3 )STINSON PARKWAYC-106 SITE PLAN SOUTH Drawn By: Issue Date: Project #:5005-0003 RAGTHE VILLAGE LLC DEVELOPMENTTHE VILLAGE, LLC1907 WAYZATA BLVD, SUITE 250M:\5005\0003\DESIGN\CAD\PLANSHEETS\C-106 Site Plan South.dwgDescription:Date:WAYZATA, MN 55391Issue #:ST. ANTHONY VILLAGE, MINNESOTA12/06/2017 1Issue #Prepared For:XX/XX/XXXXDESCRIPTIONISSUE #Sheet #: Sheet Title:1/25/2018 2:33:23 PMDate: I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY REGISTERED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. License #: WARNING: THE CONTRACTOR SHALL BE RESPONSIBLE FOR CALLING FOR LOCATIONS OF ALL EXISTING UTILITIES. THEY SHALL COOPERATE WITH ALL UTILITY COMPANIES IN MAINTAINING THEIR SERVICE AND/OR RELOCATION OF LINES. THE CONTRACTOR SHALL CONTACT GOPHER STATE ONE CALL AT 651-454-0002 AT LEAST 48 HOURS IN ADVANCE FOR THE LOCATIONS OF ALL UNDERGROUND WIRES, CABLES, CONDUITS, PIPES, MANHOLES, VALVES OR OTHER BURIED STRUCTURES BEFORE DIGGING. THE CONTRACTOR SHALL REPAIR OR REPLACE THE ABOVE WHEN DAMAGED DURING CONSTRUCTION AT NO COST TO THE OWNER. TWIN CITY AREA: 651-454-0002 TOLL FREE 1-800-252-1166 CALL BEFORE YOU DIG PROPERTY LINE SITE LEGEND SETBACK LINE EASEMENT LINE PROPOSED CURB AND GUTTER BITUMINOUS PAVEMENT CONCRETE SIDEWALK PAVEMENT. 3 2 1 4 5 6 7 8 9 10 11 12 13 14 15 B612 CURB AND GUTTER B612 TIP-OUT CURB AND GUTTER MOUNTABLE CURB AND GUTTER 2' WIDE CONCRETE VALLEY GUTTER BITUMINOUS PAVEMENT 5' WIDE CONCRETE SIDEWALK 6' WIDE CONCRETE TRAIL 8' WIDE BITUMINOUS TRAIL CONCRETE DRIVEWAY APRON MATCH INTO EXISTING PAVEMENT MATCH INTO EXISTING CURB AND GUTTER MATCH INTO EXISTING SIDEWALK PATCH BITUMINOUS PAVEMENT 16 17 KEYNOTE LEGEND 18 19 20 21 22 23 24 25 26 27 28 29 30 PARALLEL PARKING STALLS - 22' X 8.5' TYP. STANDARD PARKING STALL - 9' X 18' TYP. ADA PARKING STALLS WITH ACCESS AISLE & CURB RAMP PLAZA - SEE ARCH. AND LANDSCAPE PLANS PATIO - SEE ARCH. AND LANDSCAPE PLANS PROPERTY LINE RETAINING WALL W/ RAILING. SEE ARCH. FOR RAILING FENCE - SEE LANDSCAPING PLANS 4" STRIPING DOG PARK TOT LOT/COMMUNITY AREA ADA PEDESTRIAN RAMP GARAGE ENTRANCE BUILDING SETBACK LOT LINE DECORATIVE PAVEMENT SEE LANDSCAPE PLANS RAILING - SEE ARCH. PLANS STREET LIGHT CROSSWALK 31 32 KEN ZI E T E R R A C E ( C O U N T Y R D 153)STINSON PARKWAYMULTI-RESIDENTIAL 1 FFE=923.00 GARAGE=912.00 ASSISTED SENIOR LIVING FFE=923.00 GARAGE=913.00 INDEPENDENT SENIOR LIVING FFE=927.00 GARAGE=917.00 MULTI-RESIDENTIAL 1 FFE=923.00 GARAGE=912.00 LOBBY AND COMMON AREA FFE=923.00 GARAGE=912.00 STORMWATER POND NWL=912.00 HWL=917.35 STORMWATER POND NWL=911.00 HWL=915.92 922 924 920 918 924926920 922 920 918 9229249289209109109 1 0 910918920 922 9 2 0 91892 0 910910910 9229249 2 6 920922924926 5 . 0 : 1 4.7 :1 4 . 3 : 13.7:13.8:15.9:1 4.8:1 5.5:1 3:1 3:14.6:14.2%2. 6% 2 . 0%2.5%3:1 3:1 3 : 1 3:13:1 2.6%5.9:17.5:16.6:1 6.4:1 5.2:14.7:16.0:112.9:12.0%1. 3 % 8.9%5.0%1.7 % 2.2% 3. 3%3.6%3.0%3.7%3.0%4.6% 3.5%3.3%6.5 %6.3%11.4%5.5% 2 . 1%3.3%4.1%10.9%13.6%4.8:1918 9 1 6 922 916 914 2 . 1% 914 918 916 916 920 920 916918 922 92091892091892091892292892692 4 9 1 8 9 1 8 EOF=17.58 EOF=17.50 EOF=17.43 EOF=17.50 EOF=17.37 23.5%4.4:1 EOF=18.90 EOF=25.50 EOF=21.909223. 7 %922EOF=21.90 EOF=23.50926 920 10:110:13:110:13:110:110:1 10 : 1 10:13:13:13:1 EOF=16.00922PATIO EL=923.00 PATIO EL=927.00 PATIO EL=923.00PATIOEL=927.00EOF=17.30 EOF=17.41 EOF=22.30 EOF=22.54 9 2 0 EOF=20.32 EOF=19.68 EOF=19.75 EOF=22.30 EOF=19.89 EOF=19.91 EOF=19.88 EOF=16.90 EOF=17.79 EOF=16.39 EOF=16.84 EOF=16.31 EOF=16.31 C-301 GRADING PLAN Drawn By: Issue Date: Project #:5005-0003 RAGTHE VILLAGE LLC DEVELOPMENTTHE VILLAGE, LLC1907 WAYZATA BLVD, SUITE 250M:\5005\0003\DESIGN\CAD\PLANSHEETS\C-301 Grading Plan.dwgDescription:Date:WAYZATA, MN 55391Issue #:ST. ANTHONY VILLAGE, MINNESOTA12/06/2017 1Issue #Prepared For:XX/XX/XXXXDESCRIPTIONISSUE #Sheet #: Sheet Title:1/25/2018 2:06:43 PMDate: I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY REGISTERED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. License #: WARNING: THE CONTRACTOR SHALL BE RESPONSIBLE FOR CALLING FOR LOCATIONS OF ALL EXISTING UTILITIES. THEY SHALL COOPERATE WITH ALL UTILITY COMPANIES IN MAINTAINING THEIR SERVICE AND/OR RELOCATION OF LINES. THE CONTRACTOR SHALL CONTACT GOPHER STATE ONE CALL AT 651-454-0002 AT LEAST 48 HOURS IN ADVANCE FOR THE LOCATIONS OF ALL UNDERGROUND WIRES, CABLES, CONDUITS, PIPES, MANHOLES, VALVES OR OTHER BURIED STRUCTURES BEFORE DIGGING. THE CONTRACTOR SHALL REPAIR OR REPLACE THE ABOVE WHEN DAMAGED DURING CONSTRUCTION AT NO COST TO THE OWNER. TWIN CITY AREA: 651-454-0002 TOLL FREE 1-800-252-1166 CALL BEFORE YOU DIG PROPERTY LINE GRADING LEGEND SETBACK LINE EASEMENT LINE PROPOSED STORM SEWER PROPOSED CATCH BASIN PROPOSED MANHOLE 1.00% FL=9XX PROPOSED SPOT ELEVATION (ALL ELEVATIONS ARE TO FLOWLINE UNLESS OTHERWISE NOTED) ME=9XX TC=9XX MATCH EXISTING SPOT ELEVATION TOP OF CURB SPOT ELEVATION EOF=9XX EMERGENCY OVERFLOW SPOT ELEVATION HP=9XX HIGH POINT SPOT ELEVATION PROPOSED RIDGE / VALLEY / BREAKLINE PROPOSED SLOPE ARROW EXISTING STORM STRUCTURE EXISTING STORM SEWER EXISTING CONTOUR PROPOSED CONTOUR9XX NOTE: SEE C-501 STORM SEWER PLAN FOR STORM SEWER DESIGN DETAILS FG=9XX FINISHED GRADE SPOT ELEVATION TW=9XX TOP OF WALL SPOT ELEVATION BW=9XX BOTTOM / TOE OF WALL SPOT ELEVATION CONSTRUCTION LIMITS EOF FLOW ARROW KEN ZI E T E R R A C E ( C O U N T Y R D 153)STINSON PARKWAYMULTI-RESIDENTIAL 1 FFE=923.00 GARAGE=912.00 ASSISTED SENIOR LIVING FFE=923.00 GARAGE=913.00 INDEPENDENT SENIOR LIVING FFE=927.00 GARAGE=917.00 MULTI-RESIDENTIAL 1 FFE=923.00 GARAGE=912.00 LOBBY AND COMMON AREA FFE=923.00 GARAGE=912.00 STORMWATER POND NWL=911.00 HWL=915.92 922 918 920 918 924926920 922 920 918 922924918920 922 920918922 9229209 2 0 910910910 922922924926 3.7:13.8:12 . 0%2.5%3:1 3:1 3 : 1 3:13:1 2.6%9.1:17.5:16.6:1 6.4:1 19.1%21.2%16.8%7.7%2.0%0. 7%5.8%8.5% 1.7 % 2.2% 3. 3%3.6%3.0%3.7%3.0%4.6% 3.5%3.3%6.5 %6.3%11.4%9.5 % 2 . 1%3.3%4.1%12.1%918 9 1 6 922 916 914 2 . 1% 914918916 920 918 922 920918920918920918922926928926 928 9269289 2 4 9 1 8 9 1 8 918EOF=17.58 920924926 EOF=25.80 EOF=25.50 EOF=22.30 EOF=23.50 1.9%2.1%2.0% 2.0% 2.1% 2. 0 % EOF=17.30 EOF=17.50 EOF=17.43 EOF=17.50 EOF=17.37 1.4% 2 . 1%2.4%11.4%7.8:18.4%4.8% 3.5%2.0% 1.9% 2.0% 2.7 % 920 922 4 . 3% FG=17.62 FG=23.47 FG=23.92 FG=21.22 FG=24.99 FG=24.38 CONCRETE STEPS 2.4%1.4%4.5% 2.8% FG=24.87 12.2% 1 0 . 2 % 3.4%18.1%15.3% 8. 9 % FG=23.97 FG=17.51 FG=16.60 FG=17.00 RETAINING WALL TW=23.00 BW=17.00 BW=19.89 BW=20.97BW=21.80 BW=17.00 TW=21.86 TW=21.47 TW=24.00 TW=22.30 RETAINING WALL BW=12.00 BW=16.24 BW=20.00 BW=20.00 BW=16.61 BW=12.00 BW=13.00 BW=13.85 BW=13.42 BW=13.00 BW=15.67 BW=15.54BW=17.05 BW=17.05 TW=20.50 TW=18.39 TW=22.50 TW=22.50 TW=21.62 TW=21.00 TW=18.00 TW=19.17 TW=18.26 TW=17.55 TW=17.55 TW=18.32 TW=19.39 TW=20.00 RETAINING WALL RETAINING WALL RETAINING WALL RETAINING WALL RETAINING WALL RETAINING WALL BW=17.50 BW=15.71 BW=12.00 BW=12.00 BW=13.68 BW=15.45 BW=17.00 TW=19.00 TW=18.30 TW=18.00 TW=17.50 TW=18.54 TW=19.84TW=21.008.1%FG=27.00 FG=26.00 FG=25.00 FG=22.00 FG=22.00 FG=18.00 BW=18.00 BW=18.00 BW=24.00 BW=27.00 TW=27.00 TW=27.00 TW=27.00TW=27.00 FG=27.00 FG=26.00 FG=26.00 FG=24.00 FG=23.00 FG=26.13 FG=27.00 FG=27.00 FG=27.00 FG=27.00 FG=27.00 FG=27.00 FG=27.00 FG=27.00 FG=23.00 FG=23.00 FG=22.50 FG=18.00 FG=18.00 FG=22.00 FG=22.00 FG=20.00 FG=20.00FG=23.00FG=23.00 FG=23.00 FG=23.00 FG=23.00 FG=23.00 FG=20.00 FG=20.00FG=18.00 FG=22.50 FG=23.00 FG=23.00 FG=23.00 FG=23.00 FG=22.50 FG=22.50 FG=23.00 FG=23.00 FG=23.00 FG=21.00 1 0 : 1 3: 110:13:110:13:1EOF=16.00 FG=23.00 FG=23.00 FG=23.00 FG=23.00 BW=20.00 BW=20.00 BW=20.00 BW=20.00 BW=20.00 BW=20.00 BW=20.00 TW=23.00 TW=23.00 TW=23.00 TW=23.00 TW=23.00 TW=23.00 TW=23.00 TW=23.00 BW=20.002.0%4.0%EOF=21.90 EOF=17.70 EOF=20.32 EOF=22.54 EOF=19.68 EOF=19.75 EOF=22.30 EOF=19.89 EOF=16.39 EOF=16.84 EOF=17.79 EOF=19.88 EOF=19.91 EOF=16.90 EOF=16.31 EOF=16.31 C-302 GRADING PLAN NORTH Drawn By: Issue Date: Project #:5005-0003 RAGTHE VILLAGE LLC DEVELOPMENTTHE VILLAGE, LLC1907 WAYZATA BLVD, SUITE 250M:\5005\0003\DESIGN\CAD\PLANSHEETS\C-302 Grading Plan North.dwgDescription:Date:WAYZATA, MN 55391Issue #:ST. ANTHONY VILLAGE, MINNESOTA12/06/2017 1Issue #Prepared For:XX/XX/XXXXDESCRIPTIONISSUE #Sheet #: Sheet Title:1/25/2018 2:07:45 PMDate: I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY REGISTERED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. License #: WARNING: THE CONTRACTOR SHALL BE RESPONSIBLE FOR CALLING FOR LOCATIONS OF ALL EXISTING UTILITIES. THEY SHALL COOPERATE WITH ALL UTILITY COMPANIES IN MAINTAINING THEIR SERVICE AND/OR RELOCATION OF LINES. THE CONTRACTOR SHALL CONTACT GOPHER STATE ONE CALL AT 651-454-0002 AT LEAST 48 HOURS IN ADVANCE FOR THE LOCATIONS OF ALL UNDERGROUND WIRES, CABLES, CONDUITS, PIPES, MANHOLES, VALVES OR OTHER BURIED STRUCTURES BEFORE DIGGING. THE CONTRACTOR SHALL REPAIR OR REPLACE THE ABOVE WHEN DAMAGED DURING CONSTRUCTION AT NO COST TO THE OWNER. TWIN CITY AREA: 651-454-0002 TOLL FREE 1-800-252-1166 CALL BEFORE YOU DIG PROPERTY LINE GRADING LEGEND SETBACK LINE EASEMENT LINE PROPOSED STORM SEWER PROPOSED CATCH BASIN PROPOSED MANHOLE FL=9XX PROPOSED SPOT ELEVATION (ALL ELEVATIONS ARE TO FLOWLINE UNLESS OTHERWISE NOTED) ME=9XX TC=9XX MATCH EXISTING SPOT ELEVATION TOP OF CURB SPOT ELEVATION EOF=9XX EMERGENCY OVERFLOW SPOT ELEVATION HP=9XX HIGH POINT SPOT ELEVATION PROPOSED RIDGE / VALLEY / BREAKLINE EXISTING CONTOUR PROPOSED CONTOUR9XX NOTE: SEE C-501 STORM SEWER PLAN FOR STORM SEWER DESIGN DETAILS FG=9XX FINISHED GRADE SPOT ELEVATION TW=9XX TOP OF WALL SPOT ELEVATION BW=9XX BOTTOM / TOE OF WALL SPOT ELEVATION 1.00%PROPOSED SLOPE ARROW EXISTING STORM STRUCTURE EXISTING STORM SEWER CONSTRUCTION LIMITS EOF FLOW ARROW MULTI-RESIDENTIAL 1 FFE=923.00 GARAGE=912.00 MULTI-RESIDENTIAL 1 FFE=923.00 GARAGE=912.00 LOBBY AND COMMON AREA FFE=923.00 GARAGE=912.00 STORMWATER POND NWL=912.00 HWL=917.35 9269 2 8 9209109 1 0 9 1 0 9109189109229249 2 6 9209104.8:14 . 3 : 1 4. 7 : 13.7:13.8:15.9:1 4.8:1 5.5:1 10:1 3:14.7:13 3 . 3%3:10. 7% 4.0% 8.5%5.0%3.5%3.3%7. 3 % 9.5 %12.1%4.1%4.8:1916 914 FG=22.50 FG=22.50 FG=20.00 FG=22.50 FG=23.00 FG=23.00 FG=23.00 FG=23.00 FG=23.00 FG=21.00FG=23.00FG=23.00FG=23.00 TW=19.00 TW=21.00 TW=23.00 TW=23.00 TW=23.00 TW=23.00 TW=23.00 TW=23.00 TW=23.00 TW=23.00 TW=23.00 BW=20.00 BW=20.00 BW=20.00 BW=20.00 BW=20.00 BW=20.00 BW=20.00 BW=20.00 BW=20.00 BW=12.00 BW=12.00 BW=12.00 BW=12.00 BW=13.68 BW=15.71 BW=17.50 BW=16.64 BW=15.45 BW=16.78 TW=19.84 TW=18.54 TW=17.61TW=18.00 TW=18.15 TW=18.30 FG=20.00 FG=21.00 FG=21.00 EOF=21.90 0.1%2.8% EOF=21.90 2.0%2.0%FG=24.38 FG=26.52 FG=30.93 FG=17.00 FG=16.60 TW=26.03 BW=20.00BW=26.00 BW=19.39 BW=26.73 TW=26.73 TW=25.20TW=27.37 BW=22.50 TW=26.00 FG=20.00 FG=20.00 10:1 10:110:110:110:13:13:13:13:12.6:14.2:14.4:1 2.0% EOF=18.9011.7%TW=19.27 TW=17.00 TW=17.00 TW=19.27 BW=19.27 BW=16.25 BW=15.50 BW=19.27 RETAINING WALL 1.9% 1.9% EOF=16.31 EOF=16.31 EOF=16.90 RETAINING WALL BW=12.50 BW=12.50 TW=16.86 TW=16.87 11.4:1 4.5:1 3.7: 1 KENZI E T E R R A C E ( C O U N T Y R D 1 5 3 )STINSON PARKWAYC-303 GRADING PLAN SOUTH Drawn By: Issue Date: Project #:5005-0003 RAGTHE VILLAGE LLC DEVELOPMENTTHE VILLAGE, LLC1907 WAYZATA BLVD, SUITE 250M:\5005\0003\DESIGN\CAD\PLANSHEETS\C-303 Grading Plan South.dwgDescription:Date:WAYZATA, MN 55391Issue #:ST. ANTHONY VILLAGE, MINNESOTA12/06/2017 1Issue #Prepared For:XX/XX/XXXXDESCRIPTIONISSUE #Sheet #: Sheet Title:1/25/2018 2:08:36 PMDate: I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY REGISTERED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. License #: WARNING: THE CONTRACTOR SHALL BE RESPONSIBLE FOR CALLING FOR LOCATIONS OF ALL EXISTING UTILITIES. THEY SHALL COOPERATE WITH ALL UTILITY COMPANIES IN MAINTAINING THEIR SERVICE AND/OR RELOCATION OF LINES. THE CONTRACTOR SHALL CONTACT GOPHER STATE ONE CALL AT 651-454-0002 AT LEAST 48 HOURS IN ADVANCE FOR THE LOCATIONS OF ALL UNDERGROUND WIRES, CABLES, CONDUITS, PIPES, MANHOLES, VALVES OR OTHER BURIED STRUCTURES BEFORE DIGGING. THE CONTRACTOR SHALL REPAIR OR REPLACE THE ABOVE WHEN DAMAGED DURING CONSTRUCTION AT NO COST TO THE OWNER. TWIN CITY AREA: 651-454-0002 TOLL FREE 1-800-252-1166 CALL BEFORE YOU DIG PROPERTY LINE GRADING LEGEND SETBACK LINE EASEMENT LINE PROPOSED STORM SEWER PROPOSED CATCH BASIN PROPOSED MANHOLE 1.00% FL=9XX PROPOSED SPOT ELEVATION (ALL ELEVATIONS ARE TO FLOWLINE UNLESS OTHERWISE NOTED) ME=9XX TC=9XX MATCH EXISTING SPOT ELEVATION TOP OF CURB SPOT ELEVATION EOF=9XX EMERGENCY OVERFLOW SPOT ELEVATION HP=9XX HIGH POINT SPOT ELEVATION PROPOSED RIDGE / VALLEY / BREAKLINE PROPOSED SLOPE ARROW EXISTING STORM STRUCTURE EXISTING STORM SEWER EXISTING CONTOUR PROPOSED CONTOUR9XX NOTE: SEE C-501 STORM SEWER PLAN FOR STORM SEWER DESIGN DETAILS FG=9XX FINISHED GRADE SPOT ELEVATION TW=9XX TOP OF WALL SPOT ELEVATION BW=9XX BOTTOM / TOE OF WALL SPOT ELEVATION CONSTRUCTION LIMITS EOF FLOW ARROW MULTI-RESIDENTIAL 1 FFE=923.00 GARAGE=912.00 ASSISTED SENIOR LIVING FFE=923.00 GARAGE=913.00 INDEPENDENT SENIOR LIVING FFE=927.00 GARAGE=917.00 MULTI-RESIDENTIAL 1 FFE=923.00 GARAGE=912.00 LOBBY AND COMMON AREA FFE=923.00 GARAGE=912.00 STORMWATER POND NWL=912.00 HWL=917.35 STORMWATER POND NWL=911.00 HWL=915.92 KEN ZI E T E R R A C E ( C O U N T Y R D 153)STINSON PARKWAYFIRE DEPARTMENT CONNECTION FIRE DEPARTMENT CONNECTION HYDRANT HYDRANT HYDRANT HYDRANT HYDRANT HYDRANT HYDRANT HYDRANT HYDRANT CONNECT TO EX. WATERMAIN CONNECT TO EX WATERMAIN MH - 8 MH - 7 MH - 6 MH - 5 MH - 4 MH - 3 MH - 2 MH - 1 STRUCTURE - (16) CONNECT TO EXISTING 24" SANITARY SEWER CORE DRILL AND FILL W/ WATERTIGHT BOOT INV-902.10 REMOVE 266 LF OF 9" VCP SANITARY SEWER AND REPLACE WITH 24" PVC CONNECT TO EXISTING SANITARY SEWER 10" DIP WATERMAIN W/ POLYWRAP 8" DIP WATERMAIN W/ POLYWRAP 6" DIP WATERMAIN W/ POLYWRAP 6" DIP WATERMAIN W/ POLYWRAP WATER SERVICE 10' MIN. SEPARATION 10' MIN. SEPARATION 10' MIN. SEPARATION 10' MIN. SEPARATION 10' MIN. SEPARATION VALVE VALVE VALVE VALVE VALVE VALVE CLEANOUT CLEANOUT CLEANOUT CLEANOUT FIRE DEPARTMENT CONNECTION HYDRANT C-401 UTILITY PLAN Drawn By: Issue Date: Project #:5005-0003 RAGTHE VILLAGE LLC DEVELOPMENTTHE VILLAGE, LLC1907 WAYZATA BLVD, SUITE 250M:\5005\0003\DESIGN\CAD\PLANSHEETS\C-401 Uitlity Plan.dwgDescription:Date:WAYZATA, MN 55391Issue #:ST. ANTHONY VILLAGE, MINNESOTA12/06/2017 1Issue #Prepared For:XX/XX/XXXXDESCRIPTIONISSUE #Sheet #: Sheet Title:1/25/2018 2:09:15 PMDate: I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY REGISTERED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. License #: WARNING: THE CONTRACTOR SHALL BE RESPONSIBLE FOR CALLING FOR LOCATIONS OF ALL EXISTING UTILITIES. THEY SHALL COOPERATE WITH ALL UTILITY COMPANIES IN MAINTAINING THEIR SERVICE AND/OR RELOCATION OF LINES. THE CONTRACTOR SHALL CONTACT GOPHER STATE ONE CALL AT 651-454-0002 AT LEAST 48 HOURS IN ADVANCE FOR THE LOCATIONS OF ALL UNDERGROUND WIRES, CABLES, CONDUITS, PIPES, MANHOLES, VALVES OR OTHER BURIED STRUCTURES BEFORE DIGGING. THE CONTRACTOR SHALL REPAIR OR REPLACE THE ABOVE WHEN DAMAGED DURING CONSTRUCTION AT NO COST TO THE OWNER. TWIN CITY AREA: 651-454-0002 TOLL FREE 1-800-252-1166 CALL BEFORE YOU DIG PROPERTY LINE UTILITY LEGEND SETBACK LINE EASEMENT LINE EXISTING SANITARY SEWER EXISTING / PROPOSED STORM SEWER EXISTING SANITARY STRUCTURE PROPOSED SANITARY SEWER PROPOSED WATERMAIN EXISTING WATERMAIN PROPOSED SANITARY STRUCTURE PROPOSED HYDRANT PROPOSED FIRE DEPARTMENT CONNECTION MULTI-RESIDENTIAL 1 FFE=923.00 GARAGE=912.00 ASSISTED SENIOR LIVING FFE=923.00 GARAGE=913.00 INDEPENDENT SENIOR LIVING FFE=927.00 GARAGE=917.00 MULTI-RESIDENTIAL 1 FFE=923.00 GARAGE=912.00 LOBBY AND COMMON AREA FFE=923.00 GARAGE=912.00 STORMWATER POND NWL=911.00 HWL=915.92 KEN ZI E T E R R A C E ( C O U N T Y R D 153)STINSON PARKWAY926 926 926 928 920 916916 918 9189229229249 2 4 91 8 920 918 918 922 922924926 920920 922 920 918 922924920914 9 1 6 9 1 8 920914914916916918 922918920 922 920918922 9229209 2 0 910910918918918918 914916 9 1 8 918 914 91 6 910 FIRE DEPARTMENT CONNECTION FIRE DEPARTMENT CONNECTION FIRE DEPARTMENT CONNECTION HYDRANT HYDRANT HYDRANT HYDRANT HYDRANT HYDRANT HYDRANT HYDRANT CONNECT TO EX WATERMAIN MH - 8 RIM=921.49 NE INV=911.34 MH - 7 RIM=919.84 SW INV=910.33 E INV=910.23 MH - 6 RIM=918.40 W INV=909.52 SE INV=909.42 MH - 5 RIM=917.15 NW INV=908.79 SE INV=908.69 MH - 4 RIM=916.33 NW INV=907.91 NE INV=907.81 MH - 3 RIM=917.04 SW INV=907.03 N INV=906.93 MH - 2 RIM=917.64 S INV=906.05 N INV=905.95 MH - 1 OUTSIDE DROP RIM=924.95 W INV=907.28 S INV=905.07 E INV=904.97 252 L F O F 1 0" P V C @ 0. 4 0 % 177 LF OF 10" PVC @ 0 . 4 0 % 14 2 L F O F 1 0 " P V C @ 0 . 4 5 % 2 0 8 LF OF 1 0 " PVC @ 0 . 3 8%220 LF OF 10" PVC @ 0.40%266 LF OF 24" PVC @ 1.08%194 LF OF 10" PV C @ 0.40 %220 LF OF 10" PVC @ 0.40%CONNECT TO EXISTING 24" SANITARY SEWER CORE DRILL AND FILL W/ WATERTIGHT BOOT INV=902.10 REMOVE 266 LF OF 9" VCP SANITARY SEWER AND REPLACE WITH 24" PVC CONNECT TO EXISTING SANITARY SEWER GRAVITY CONNECTION FOR MAIN LEVEL AND ABOVE. GARAGE LEVEL TO BE PUMPED SANITARY SERVICE 2% SLOPE WATERMAIN CROSSING MAINTAIN 2' SEPARATION GRAVITY CONNECTION FOR MAIN LEVEL AND ABOVE. GARAGE LEVEL TO BE PUMPED GRAVITY CONNECTION FOR MAIN LEVEL AND ABOVE: GARAGE LEVEL TO BE PUMPED SANITARY SERVICE 2% SLOPE FULL GRAVITY CONNECTION SANITARY SERVICE 2% SLOPE SANITARY SERVICE 2% SLOPE WATERMAIN CROSSING MAINTAIN 2' SEPARATION WATER SERVICE CROSSING MAINTAIN 2' SEPARATION WATERMAIN CROSSING MAINTAIN 2' SEPARATION WATERMAIN CROSSING MAINTAIN 2' SEPARATION 10" DIP WATERMAIN W/ POLYWRAP 10' MIN SEPARATION WATERMAIN CROSSING MAINTAIN 2' SEPARATION 10' MIN SEPARATION 10' MIN SEPARATION 10' MIN SEPARATION 6" DIP WATERMAIN W/ POLYWRAP 10" DIP WATERMAIN W/ POLYWRAP 10" DIP WATERMAIN W/ POLYWRAP 6" DIP WATERMAIN W/ POLYWRAP 6" DIP WATERMAIN W/ POLYWRAP 6" DIP WATERMAIN W/ POLYWRAP 10" DIP WATERMAIN W/ POLYWRAP 8" DIP WATERMAIN W/ POLYWRAP 8" DIP WATERMAIN W/ POLYWRAP VALVE VALVE VALVE VALVE VALVE CLEANOUT CLEANOUT CLEANOUT CLEANOUT VALVE VALVE C-402 UTILITY PLAN NORTH Drawn By: Issue Date: Project #:5005-0003 RAGTHE VILLAGE LLC DEVELOPMENTTHE VILLAGE, LLC1907 WAYZATA BLVD, SUITE 250M:\5005\0003\DESIGN\CAD\PLANSHEETS\C-402 Uitlity Plan North.dwgDescription:Date:WAYZATA, MN 55391Issue #:ST. ANTHONY VILLAGE, MINNESOTA12/06/2017 1Issue #Prepared For:XX/XX/XXXXDESCRIPTIONISSUE #Sheet #: Sheet Title:1/25/2018 2:10:02 PMDate: I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY REGISTERED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. License #: WARNING: THE CONTRACTOR SHALL BE RESPONSIBLE FOR CALLING FOR LOCATIONS OF ALL EXISTING UTILITIES. THEY SHALL COOPERATE WITH ALL UTILITY COMPANIES IN MAINTAINING THEIR SERVICE AND/OR RELOCATION OF LINES. THE CONTRACTOR SHALL CONTACT GOPHER STATE ONE CALL AT 651-454-0002 AT LEAST 48 HOURS IN ADVANCE FOR THE LOCATIONS OF ALL UNDERGROUND WIRES, CABLES, CONDUITS, PIPES, MANHOLES, VALVES OR OTHER BURIED STRUCTURES BEFORE DIGGING. THE CONTRACTOR SHALL REPAIR OR REPLACE THE ABOVE WHEN DAMAGED DURING CONSTRUCTION AT NO COST TO THE OWNER. TWIN CITY AREA: 651-454-0002 TOLL FREE 1-800-252-1166 CALL BEFORE YOU DIG PROPERTY LINE UTILITY LEGEND SETBACK LINE EASEMENT LINE EXISTING SANITARY SEWER EXISTING / PROPOSED STORM SEWER EXISTING SANITARY STRUCTURE PROPOSED SANITARY SEWER PROPOSED WATERMAIN EXISTING WATERMAIN PROPOSED SANITARY STRUCTURE PROPOSED HYDRANT PROPOSED FIRE DEPARTMENT CONNECTION MULTI-RESIDENTIAL 1 FFE=923.00 GARAGE=912.00 MULTI-RESIDENTIAL 1 FFE=923.00 GARAGE=912.00 LOBBY AND COMMON AREA FFE=923.00 GARAGE=912.00 STORMWATER POND NWL=912.00 HWL=917.35 920914914916916918 9229249 2 6 926926 928 920910910 910 920 922 920912914916918 918910HYDRANT HYDRANT CONNECT TO EX. WATERMAIN MH - 4 RIM=916.33 NW INV=907.91 NE INV=907.81 208 LF OF 1 0 " PVC @ 0 . 3 8%194 LF OF 10" PV C @ 0.40 % 10' MIN SEPARATION 10" DIP WATERMAIN W/ POLYWRAP 10" DIP WATERMAIN W/ POLYWRAP VALVE VALVE KENZI E T E R R A C E ( C O U N T Y R D 1 5 3 )STINSON PARKWAYHYDRANT C-403 UTILITY PLAN SOUTH Drawn By: Issue Date: Project #:5005-0003 RAGTHE VILLAGE LLC DEVELOPMENTTHE VILLAGE, LLC1907 WAYZATA BLVD, SUITE 250M:\5005\0003\DESIGN\CAD\PLANSHEETS\C-403 Uitlity Plan South.dwgDescription:Date:WAYZATA, MN 55391Issue #:ST. ANTHONY VILLAGE, MINNESOTA12/06/2017 1Issue #Prepared For:XX/XX/XXXXDESCRIPTIONISSUE #Sheet #: Sheet Title:1/25/2018 2:10:42 PMDate: I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY REGISTERED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. License #: WARNING: THE CONTRACTOR SHALL BE RESPONSIBLE FOR CALLING FOR LOCATIONS OF ALL EXISTING UTILITIES. THEY SHALL COOPERATE WITH ALL UTILITY COMPANIES IN MAINTAINING THEIR SERVICE AND/OR RELOCATION OF LINES. THE CONTRACTOR SHALL CONTACT GOPHER STATE ONE CALL AT 651-454-0002 AT LEAST 48 HOURS IN ADVANCE FOR THE LOCATIONS OF ALL UNDERGROUND WIRES, CABLES, CONDUITS, PIPES, MANHOLES, VALVES OR OTHER BURIED STRUCTURES BEFORE DIGGING. THE CONTRACTOR SHALL REPAIR OR REPLACE THE ABOVE WHEN DAMAGED DURING CONSTRUCTION AT NO COST TO THE OWNER. TWIN CITY AREA: 651-454-0002 TOLL FREE 1-800-252-1166 CALL BEFORE YOU DIG PROPERTY LINE UTILITY LEGEND SETBACK LINE EASEMENT LINE EXISTING SANITARY SEWER EXISTING / PROPOSED STORM SEWER EXISTING SANITARY STRUCTURE PROPOSED SANITARY SEWER PROPOSED WATERMAIN EXISTING WATERMAIN PROPOSED SANITARY STRUCTURE PROPOSED HYDRANT PROPOSED FIRE DEPARTMENT CONNECTION MULTI-RESIDENTIAL 1 FFE=923.00 GARAGE=912.00 ASSISTED SENIOR LIVING FFE=923.00 GARAGE=913.00 INDEPENDENT SENIOR LIVING FFE=927.00 GARAGE=917.00 MULTI-RESIDENTIAL 1 FFE=923.00 GARAGE=912.00 LOBBY AND COMMON AREA FFE=923.00 GARAGE=912.00 STORMWATER POND NWL=912.00 HWL=917.35 STORMWATER POND NWL=911.00 HWL=915.92 KEN ZI E T E R R A C E ( C O U N T Y R D 153)STINSON PARKWAY92492692 6 920 916916 918 9189229229249 2 4 91 8 922924926 920920 922 920 918 922924920914 9 1 6 9 1 8 9 2 2 926926926 928 9209109 1 0 9 1 0 9 1 0 920 920912914916918 918920 922 920918922922920 9 2 0 910910914916 9 1 8 918 914 91 6 910 9 2 4 9 2 6 924924 924910920 924 92 4 920 918 920 920920 922 920 918 918 920922924926 STRUCTURE - (16) STRUCTURE - (14) STRUCTURE - (46) STRUCTURE - (28) STRUCTURE - (30) STRUCTURE - (22) STRUCTURE - (62) STRUCTURE - (47) STRUCTURE - (61) STRUCTURE - (15) STRUCTURE - (59) STRUCTURE - (60) STRUCTURE - (49)STRUCTURE - (50) STRUCTURE - (52) STRUCTURE - (54) STRUCTURE - (32) STRUCTURE - (55) STRUCTURE - (51) STRUCTURE - (19) STRUCTURE - (24)STRUCTURE - (33) STRUCTURE - (37) STRUCTURE - (18) STRUCTURE - (58) STRUCTURE - (25) STRUCTURE - (38) STRUCTURE - (40) STRUCTURE - (57) STRUCTURE - (53) STRUCTURE - (63) STRUCTURE - (65) STRUCTURE - (41) STRUCTURE - (64) STRUCTURE - (39) STRUCTURE - (36) STRUCTURE - (17) STRUCTURE - (21) STRUCTURE - (29) STRUCTURE - (92) STRUCTURE - (72) STRUCTURE - (89) STRUCTURE - (88) STRUCTURE - (90) STRUCTURE - (69) RIPRAP CLASS III (NO LIMESTONE) RIPRAP CLASS III (NO LIMESTONE) CONSTRUCTION LIMITS (TYP.) CONSTRUCTION LIMITS (TYP.) BAY FILTER 15'X25' STRUCTURE - (95) CONNECT TO EXISTING STORM SEWER EOF=17.50 EOF=17.58 EOF=17.41 EOF=17.30EOF=23.50 EOF=17.43 EOF=20.32 EOF=22.54 EOF=25.50 EOF=19.68 EOF=17.50 EOF=17.37 EOF=19.75 EOF=22.85 EOF=19.89 EOF=16.39 EOF=16.00 EOF=16.84 EOF=17.79 EOF=19.88 EOF=19.91EOF=22.30 EOF=16.90 EOF=16.31 EOF=16.31 EOF=21.90 EOF=21.90 EOF=18.90 C-501 STORM SEWER PLAN Drawn By: Issue Date: Project #:5005-0003 RAGTHE VILLAGE LLC DEVELOPMENTTHE VILLAGE, LLC1907 WAYZATA BLVD, SUITE 250M:\5005\0003\DESIGN\CAD\PLANSHEETS\C-501 Storm Sewer Plan.dwgDescription:Date:WAYZATA, MN 55391Issue #:ST. ANTHONY VILLAGE, MINNESOTA12/06/2017 1Issue #Prepared For:XX/XX/XXXXDESCRIPTIONISSUE #Sheet #: Sheet Title:1/25/2018 2:11:38 PMDate: I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY REGISTERED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. License #: WARNING: THE CONTRACTOR SHALL BE RESPONSIBLE FOR CALLING FOR LOCATIONS OF ALL EXISTING UTILITIES. THEY SHALL COOPERATE WITH ALL UTILITY COMPANIES IN MAINTAINING THEIR SERVICE AND/OR RELOCATION OF LINES. THE CONTRACTOR SHALL CONTACT GOPHER STATE ONE CALL AT 651-454-0002 AT LEAST 48 HOURS IN ADVANCE FOR THE LOCATIONS OF ALL UNDERGROUND WIRES, CABLES, CONDUITS, PIPES, MANHOLES, VALVES OR OTHER BURIED STRUCTURES BEFORE DIGGING. THE CONTRACTOR SHALL REPAIR OR REPLACE THE ABOVE WHEN DAMAGED DURING CONSTRUCTION AT NO COST TO THE OWNER. TWIN CITY AREA: 651-454-0002 TOLL FREE 1-800-252-1166 CALL BEFORE YOU DIG PROPERTY LINE STORM SEWER LEGEND SETBACK LINE EASEMENT LINE PROPOSED STORM SEWER PROPOSED STORM SEWER STRUCTURE EXISTING STORM STRUCTURE EXISTING STORM SEWER EXISTING CONTOUR PROPOSED CONTOUR9XX PROPOSED 6" PVC DRAINTILE MULTI-RESIDENTIAL 1 FFE=923.00 GARAGE=912.00 ASSISTED SENIOR LIVING FFE=923.00 GARAGE=913.00 INDEPENDENT SENIOR LIVING FFE=927.00 GARAGE=917.00 MULTI-RESIDENTIAL 1 FFE=923.00 GARAGE=912.00 LOBBY AND COMMON AREA FFE=923.00 GARAGE=912.00 STORMWATER POND STORMWATER POND NWL=911.00 HWL=915.92 KEN ZI E T E R R A C E ( C O U N T Y R D 153)STINSON PARKWAY92492692 6 920 916916 918 9189229229249 2 4 91 8 922924926 920920 922 920 918 92292492091 4 9 1 6 9 1 8 9 2 2 9 1 0 9 1 0 9 1 0 920 920912914916918 918920 922 920918922 9229209 2 0 910910914916 9 1 8 918 914 91 6 910 9 2 4 910924 92 4 920 918 920 920920 922 920 918 918 920922924926 RIPRAP CLASS III (NO LIMESTONE) RIPRAP CLASS III (NO LIMESTONE) CONSTRUCTION LIMITS (TYP.) CONSTRUCTION LIMITS (TYP.) STRUCTURE - (14) RIM=922.02 N INV=914.05 NE INV=914.05 SE INV=914.05 STRUCTURE - (46) RIM=922.25 N INV=915.37 S INV=915.37 STRUCTURE - (30) RIM=920.03 N INV=915.22 S INV=915.22 STRUCTURE - (22) RIM=919.76 E INV=914.93 N INV=914.93 SW INV=914.93 STRUCTURE - (62) RIM=922.47 NW INV=913.91 SW INV=913.91 STRUCTURE - (47) RIM=919.82 N INV=916.21 W INV=916.21 STRUCTURE - (61) RIM=920.67 N INV=912.68 SE INV=912.68 STRUCTURE - (15) RIM=922.26 NW INV=912.56 E INV=912.56 STRUCTURE - (59) RIM=922.06 E INV=915.61 S INV=915.61 STRUCTURE - (60) RIM=923.62 E INV=913.56 NE INV=913.56 S INV=913.56 STRUCTURE - (49) RIM=919.42 S INV=914.81 W INV=914.81 STRUCTURE - (50) RIM=919.64 NE INV=913.44 STRUCTURE - (52) RIM=918.67 E INV=914.41 NE INV=914.41 SW INV=914.41 STRUCTURE - (54) RIM=915.80 W INV=913.78 E INV=913.78 STRUCTURE - (32) RIM=917.72 SW INV=913.38 STRUCTURE - (55) RIM=916.21 W INV=913.07 S INV=913.07 E INV=913.07 STRUCTURE - (51) RIM=917.49 NE INV=912.41 SE INV=912.31 STRUCTURE - (19) RIM=915.63 W INV=912.44 S INV=912.44 STRUCTURE - (24) RIM=917.72 NE INV=913.10 SW INV=913.10 SE INV=913.00 STRUCTURE - (33) RIM=916.88 SW INV=912.88 STRUCTURE - (37) RIM=916.55 N INV=908.94 SW INV=911.00 STRUCTURE - (18) RIM=916.20 E INV=914.68 STRUCTURE - (58) RIM=916.77 N INV=911.30 W INV=912.00 S INV=911.30 STRUCTURE - (25) RIM=916.72 NW INV=912.60 NE INV=912.60 SW INV=912.50 STRUCTURE - (38) RIM=916.73 SW INV=909.50 NE INV=909.50 STRUCTURE - (40) RIM=916.64 S INV=912.50 STRUCTURE - (57) RIM=916.62 N INV=911.79 S INV=911.79 STRUCTURE - (53) RIM=916.09 NE INV=911.72 STRUCTURE - (63) RIM=916.06 SW INV=911.28 NE INV=911.18 STRUCTURE - (65) RIM=916.06 SW INV=911.66 NW INV=911.66 NE INV=911.56 STRUCTURE - (41) RIM=916.00 NE INV=912.00 STRUCTURE - (64) SW INV=911.00 STRUCTURE - (39) RIM=916.04 NW INV=908.51 N INV=911.91 SW INV=910.88 STRUCTURE - (36) S INV=909.20 STRUCTURE - (21) N INV=911.00 29 LF OF 15" RCP @ 0.50% 180 LF OF 15" HDP E @ 0 . 5 0 % 128 LF OF 21" HDPE @ 0.51% 60 LF OF 24" RCP @ 0.50% 93 LF OF 12" RCP @ 0.42%58 LF OF 21" RCP @ 0.50% 56 LF OF 12" RCP @ 0.50%57 LF OF 12" RCP @ 0.50% 1 2 6 L F O F 1 5 " RCP @ 0 . 5 2% 53 LF OF 12" RCP @ 0.50% 114 LF OF 12" RCP @ 1.75% 37 LF OF 12" RCP @ 1.34% 29 LF OF 12" RCP @ 2.00% 56 LF OF 12" RCP @ 2.00% 22 LF OF 15" RCP @ 0.67% 257 LF O F 1 8 " R C P @ 0 . 5 0 % 133 LF OF 30" RCP @ 0.39% 60 LF OF 12" RCP @ 0.58% 12 LF OF 15" RCP @ 0.76% 61 LF OF 18" RCP @ 0.66% 12 LF OF 12" RCP @ 0.49% 141 LF OF 15" HDPE @ 0 . 5 0 % 120 LF OF 21 " H D P E @ 0 . 5 2 %97 LF OF 21" RCP @ 0.50%172 LF OF 12" HDPE @ 0.50%90 LF OF 36" RCP @ 0.40%69 LF OF 15" RCP @ 0.50% 37 LF OF 18" RCP @ 0.50% 57 LF OF 18" RCP @ 0.50% 85 LF O F 3 0" R C P @ 0. 3 9 % STRUCTURE - (92) N INV=912.00 35 LF OF 15" RCP @ 2.00% STRUCTURE - (72) RIM=921.19 NE INV=914.08 W INV=914.08 STRUCTURE - (89) RIM=924.59 N INV=914.75 S INV=914.75 STRUCTURE - (88) RIM=920.32 S INV=916.64 W INV=916.64 131 LF O F 3 0 " R C P @ 0 . 4 0 % 50 LF OF 12" PVC @ 2.00% 206 LF OF 12" HDPE @ 0.50%88 LF OF 12" PVC @ 2.00%83 LF OF 12" PVC @ 1.99%65 LF OF 12" PVC @ 1.93%130 LF OF 36" RCP @ 0.40%140 LF OF 12" HDPE @ 0.50%EOF=17.50 EOF=17.58 EOF=17.41 EOF=17.30 EOF=23.50 EOF=17.43 EOF=20.32 EOF=22.54 EOF=25.50 EOF=19.68 EOF=17.50 EOF=17.37 EOF=19.75 EOF=22.85 EOF=19.89 EOF=16.00 EOF=16.39 EOF=16.84 EOF=17.79 EOF=19.88 EOF=19.91 EOF=22.30 EOF=16.90 EOF=16.31 EOF=16.31 EOF=21.90 EOF=18.90 TRENCH DRAIN TRENCH DRAIN TRENCH DRAIN TRENCH DRAIN STRUCTURE - (69) RIM=916.80 SW INV=909.00 NE INV=909.00 SE INV=909.00 17 LF OF 12" RCP @ 2.81% C-502 STORM SEWER PLAN NORTH Drawn By: Issue Date: Project #:5005-0003 RAGTHE VILLAGE LLC DEVELOPMENTTHE VILLAGE, LLC1907 WAYZATA BLVD, SUITE 250M:\5005\0003\DESIGN\CAD\PLANSHEETS\C-502 Storm Sewer Plan North.dwgDescription:Date:WAYZATA, MN 55391Issue #:ST. ANTHONY VILLAGE, MINNESOTA12/06/2017 1Issue #Prepared For:XX/XX/XXXXDESCRIPTIONISSUE #Sheet #: Sheet Title:1/25/2018 2:12:38 PMDate: I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY REGISTERED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. License #: WARNING: THE CONTRACTOR SHALL BE RESPONSIBLE FOR CALLING FOR LOCATIONS OF ALL EXISTING UTILITIES. THEY SHALL COOPERATE WITH ALL UTILITY COMPANIES IN MAINTAINING THEIR SERVICE AND/OR RELOCATION OF LINES. THE CONTRACTOR SHALL CONTACT GOPHER STATE ONE CALL AT 651-454-0002 AT LEAST 48 HOURS IN ADVANCE FOR THE LOCATIONS OF ALL UNDERGROUND WIRES, CABLES, CONDUITS, PIPES, MANHOLES, VALVES OR OTHER BURIED STRUCTURES BEFORE DIGGING. THE CONTRACTOR SHALL REPAIR OR REPLACE THE ABOVE WHEN DAMAGED DURING CONSTRUCTION AT NO COST TO THE OWNER. TWIN CITY AREA: 651-454-0002 TOLL FREE 1-800-252-1166 CALL BEFORE YOU DIG PROPERTY LINE STORM SEWER LEGEND SETBACK LINE EASEMENT LINE PROPOSED STORM SEWER PROPOSED STORM SEWER STRUCTURE EXISTING STORM STRUCTURE EXISTING STORM SEWER EXISTING CONTOUR PROPOSED CONTOUR9XX PROPOSED 6" PVC DRAINTILE MULTI-RESIDENTIAL 1 FFE=923.00 GARAGE=912.00 MULTI-RESIDENTIAL 1 FFE=923.00 GARAGE=912.00 LOBBY AND COMMON AREA FFE=923.00 GARAGE=912.00 STORMWATER POND NWL=912.00 HWL=917.35 9 2 2 926926926 928 9209109 1 0 9 1 0 920 918 9189109 2 4 9 2 6 924924 924910920 189 LF OF 36" RCP @ 0.24% 45 LF OF 36" RCP @ 0.28% 67 LF OF 12" RCP @ 1.53% 57 LF OF 12" RCP @ 0.50% 1 2 6 L F O F 1 5 " RCP @ 0 . 5 2% 53 LF OF 12" RCP @ 0.50% 114 LF OF 12" RCP @ 1.75% 37 LF OF 12" RCP @ 1.34% 29 LF OF 12" RCP @ 2.00% 56 LF OF 12" RCP @ 2.00% 12 LF OF 12" RCP @ 0.49%90 LF OF 36" RCP @ 0.40%37 LF OF 36" RCP @ 0.33% 37 LF OF 18" RCP @ 0.50% 57 LF OF 18" RCP @ 0.50% 35 LF OF 15" RCP @ 2.00% RIPRAP CLASS III (NO LIMESTONE)130 LF OF 36" RCP @ 0.40%193 LF OF 12" R CP @ 0.76 % STRUCTURE - (16) RIM=919.54 W INV=912.12 NE INV=912.12 STRUCTURE - (28) RIM=919.64 W INV=909.91 NE INV=912.00 N INV=912.00 STRUCTURE - (61) RIM=920.67 N INV=912.68 SE INV=912.68 STRUCTURE - (15) RIM=922.26 NW INV=912.56 E INV=912.56 STRUCTURE - (60) RIM=923.62 E INV=913.56 NE INV=913.56 S INV=913.56 STRUCTURE - (37) RIM=916.55 N INV=908.94 SW INV=911.00 STRUCTURE - (38) RIM=916.73 SW INV=909.50 NE INV=909.50 STRUCTURE - (40) RIM=916.64 S INV=912.50 STRUCTURE - (53) RIM=916.09 NE INV=911.72 STRUCTURE - (63) RIM=916.06 SW INV=911.28 NE INV=911.18 STRUCTURE - (65) RIM=916.06 SW INV=911.66 NW INV=911.66 NE INV=911.56 STRUCTURE - (41) RIM=916.00 NE INV=912.00 STRUCTURE - (64) SW INV=911.00 STRUCTURE - (39) RIM=916.04 NW INV=908.51 N INV=911.91 SW INV=910.88 S INV=909.20 STRUCTURE - (17) SW INV=912.00 STRUCTURE - (29) E INV=910.20 STRUCTURE - (92) N INV=912.00 STRUCTURE - (69) RIM=916.80 SW INV=909.00 NE INV=909.00 SE INV=909.00 BAY FILTER 15'X25' STRUCTURE - (95) RIM=918.17 SW INV=910.98 W INV=910.98 NE INV=910.98 CONNECT EX. STORM PIPE EOF=16.90 EOF=16.31 EOF=16.31 EOF=21.90 EOF=21.90 EOF=18.90 TRENCH DRAIN TRENCH DRAIN 17 LF OF 12" RCP @ 2.81% KENZI E T E R R A C E ( C O U N T Y R D 1 5 3 )STINSON PARKWAYC-503 STORM SEWER PLAN SOUTH Drawn By: Issue Date: Project #:5005-0003 RAGTHE VILLAGE LLC DEVELOPMENTTHE VILLAGE, LLC1907 WAYZATA BLVD, SUITE 250M:\5005\0003\DESIGN\CAD\PLANSHEETS\C-503 Storm Sewer Plan South.dwgDescription:Date:WAYZATA, MN 55391Issue #:ST. ANTHONY VILLAGE, MINNESOTA12/06/2017 1Issue #Prepared For:XX/XX/XXXXDESCRIPTIONISSUE #Sheet #: Sheet Title:1/25/2018 2:13:37 PMDate: I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY REGISTERED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. License #: WARNING: THE CONTRACTOR SHALL BE RESPONSIBLE FOR CALLING FOR LOCATIONS OF ALL EXISTING UTILITIES. THEY SHALL COOPERATE WITH ALL UTILITY COMPANIES IN MAINTAINING THEIR SERVICE AND/OR RELOCATION OF LINES. THE CONTRACTOR SHALL CONTACT GOPHER STATE ONE CALL AT 651-454-0002 AT LEAST 48 HOURS IN ADVANCE FOR THE LOCATIONS OF ALL UNDERGROUND WIRES, CABLES, CONDUITS, PIPES, MANHOLES, VALVES OR OTHER BURIED STRUCTURES BEFORE DIGGING. THE CONTRACTOR SHALL REPAIR OR REPLACE THE ABOVE WHEN DAMAGED DURING CONSTRUCTION AT NO COST TO THE OWNER. TWIN CITY AREA: 651-454-0002 TOLL FREE 1-800-252-1166 CALL BEFORE YOU DIG PROPERTY LINE STORM SEWER LEGEND SETBACK LINE EASEMENT LINE PROPOSED STORM SEWER PROPOSED STORM SEWER STRUCTURE EXISTING STORM STRUCTURE EXISTING STORM SEWER EXISTING CONTOUR PROPOSED CONTOUR9XX PROPOSED 6" PVC DRAINTILE ℄ 15' THRU LANE 15' THRU LANE 8.5' PARKING LANE8.5' PARKING LANE5' CONC. WALK 5' CONC. WALK 1V:3H S L O P E M A X 1V:3H S L O P E M A X 1V:3H S L O P E M A X 1V:3H S L O P E M A X 23.5'23.5' 1 C-801 TYPICAL PARKWAY SECTION NOT TO SCALE PLAN VIEW 48" SECTION VIEW DETAIL A-A 14" STEEL PLATE PLAN VIEW EL=916.74 8" EL=911.00 48" INLET EL=916.00 EL=916.74 PROFILE VIEW 5" FLOW OUTLET INLET OUTLET PLAN VIEW 48" SECTION VIEW DETAIL A-A 14" STEEL PLATE PLAN VIEW EL=920.19 6" EL=912.00 48" INLET EL=918.00 EL=920.19 PROFILE VIEW 5" FLOW OUTLET INLET OUTLET 2 C-801 OUTLET CONTROL STRUCTURE (OCS) NORTH POND (STRUCTURE 37) NOT TO SCALE 3 C-801 OUTLET CONTROL STRUCTURE (OCS) SOUTH POND (STRUCTURE 28) NOT TO SCALE 1/4"x1" FLAT STEEL SEE DETAIL A-A FOUR (4) 1/2 IN. DIA.-13 UNC HEX HEAD STAINLESS STEEL BOLTS WITH NUTS AND WASHERS #5 SMOOTH BAR @ 4 IN. O.C. EACH WAY INV=911.00INV=908.94 CLASS 5 AGGREGATE BASE WATERTIGHT WEIR GROUT BOTTOM OF STRUCTURE ORIFICE WATERTIGHT WEIR 1/4"x1" FLAT STEEL SEE DETAIL A-A FOUR (4) 1/2 IN. DIA.-13 UNC HEX HEAD STAINLESS STEEL BOLTS WITH NUTS AND WASHERS #5 SMOOTH BAR @ 4 IN. O.C. EACH WAY INV=912.00INV=909.91 CLASS 5 AGGREGATE BASE WATERTIGHT WEIR GROUT BOTTOM OF STRUCTURE ORIFICE WATERTIGHT WEIR ORIFICEORIFICE NWL 3:1 MA X S L O P E 10:1 POND SLOP E 3:1 MA X S L O P E IMPERMEABLE LINER 4 C-801 TYPICAL POND SECTION NOT TO SCALE 1'1'PROPERTYLINEPROPERTYLINE10' F-F 69' OUTLOT A LANDCAPE MEDIAN ℄ LIGHT POLE C-801 DETAILS Drawn By: Issue Date: Project #:5005-0003 RAGTHE VILLAGE LLC DEVELOPMENTTHE VILLAGE, LLC1907 WAYZATA BLVD, SUITE 250M:\5005\0003\DESIGN\CAD\PLANSHEETS\C-801 DETAILS.dwgDescription:Date:WAYZATA, MN 55391Issue #:ST. ANTHONY VILLAGE, MINNESOTA12/06/2017 1Issue #Prepared For:XX/XX/XXXXDESCRIPTIONISSUE #Sheet #: Sheet Title:1/25/2018 2:14:07 PMDate: I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY REGISTERED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. License #: KEN ZI E T E R R A C E ( C O U N T Y R D 153)STINSON PARKWAYMULTI-RESIDENTIAL 1 FFE=923.00 GARAGE=912.00 ASSISTED SENIOR LIVING FFE=923.00 GARAGE=913.00 INDEPENDENT SENIOR LIVING FFE=927.00 GARAGE=917.00 MULTI-RESIDENTIAL 1 FFE=923.00 GARAGE=912.00 LOBBY AND COMMON AREA FFE=923.00 GARAGE=912.00 STORMWATER POND NWL=912.00 HWL=917.35 STORMWATER POND NWL=911.00 HWL=915.92 PATIO EL=923.00 PATIO EL=927.00 PATIO EL=923.00PATIOEL=927.00L-100 PLANTING PLAN - OVERALL CONCEPT Drawn By: Issue Date: Project #:5005-0003 RAGTHE VILLAGE LLC DEVELOPMENTTHE VILLAGE, LLC1907 WAYZATA BLVD, SUITE 250M:\5005\0003\DESIGN\CAD\PLANSHEETS\L-101 Planting Plan.dwgDescription:Date:WAYZATA, MN 55391Issue #:ST. ANTHONY VILLAGE, MINNESOTA12/06/2017 1Issue #Prepared For:XX/XX/XXXXDESCRIPTIONISSUE #Sheet #: Sheet Title:1/26/2018 12:42:30 AMDate: I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY REGISTERED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. License #: WARNING: THE CONTRACTOR SHALL BE RESPONSIBLE FOR CALLING FOR LOCATIONS OF ALL EXISTING UTILITIES. THEY SHALL COOPERATE WITH ALL UTILITY COMPANIES IN MAINTAINING THEIR SERVICE AND/OR RELOCATION OF LINES. THE CONTRACTOR SHALL CONTACT GOPHER STATE ONE CALL AT 651-454-0002 AT LEAST 48 HOURS IN ADVANCE FOR THE LOCATIONS OF ALL UNDERGROUND WIRES, CABLES, CONDUITS, PIPES, MANHOLES, VALVES OR OTHER BURIED STRUCTURES BEFORE DIGGING. THE CONTRACTOR SHALL REPAIR OR REPLACE THE ABOVE WHEN DAMAGED DURING CONSTRUCTION AT NO COST TO THE OWNER. TWIN CITY AREA: 651-454-0002 TOLL FREE 1-800-252-1166 CALL BEFORE YOU DIG PLANTING LEGEND OVERSTORY TREE ORNAMENTAL TREE CONIFEROUS TREE CONIFEROUS SHRUB DECIDUOUS SHRUB L - 101 L - 103 L - 102 EXISTING TREE MULTI-RESIDENTIAL 1 FFE=923.00 GARAGE=912.00 MULTI-RESIDENTIAL 1 FFE=923.00 GARAGE=912.00 LOBBY AND COMMON AREA FFE=923.00 GARAGE=912.00 STORMWATER POND NWL=912.00 HWL=917.35 PATIO EL=923.00 PATIO EL=923.00 Af Af Af Af Co Co Co Qb Qb Qb Af Af Af Co Af Af Af Co Co Qb Qb Qb Qb Af PATIO/PAVILION WATER FOUNTAIN WATER FOUNTAIN DOG RUN PROOF OF PARKING ENTRY PLAZA CONCRETE PATH PAVED PATH CONCRETE PATH CONCRETE RETAINING WALL Af Af EXISTING BREMER BANK SITE DECORATIVE PAVEMENT MEDIAN Af L-101 PLANTING PLAN - CONCEPT SOUTH Drawn By: Issue Date: Project #:5005-0003 RAGTHE VILLAGE LLC DEVELOPMENTTHE VILLAGE, LLC1907 WAYZATA BLVD, SUITE 250M:\5005\0003\DESIGN\CAD\PLANSHEETS\L-101 Planting Plan.dwgDescription:Date:WAYZATA, MN 55391Issue #:ST. ANTHONY VILLAGE, MINNESOTA12/06/2017 1Issue #Prepared For:XX/XX/XXXXDESCRIPTIONISSUE #Sheet #: Sheet Title:1/26/2018 12:44:14 AMDate: I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY REGISTERED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. License #: WARNING: THE CONTRACTOR SHALL BE RESPONSIBLE FOR CALLING FOR LOCATIONS OF ALL EXISTING UTILITIES. THEY SHALL COOPERATE WITH ALL UTILITY COMPANIES IN MAINTAINING THEIR SERVICE AND/OR RELOCATION OF LINES. THE CONTRACTOR SHALL CONTACT GOPHER STATE ONE CALL AT 651-454-0002 AT LEAST 48 HOURS IN ADVANCE FOR THE LOCATIONS OF ALL UNDERGROUND WIRES, CABLES, CONDUITS, PIPES, MANHOLES, VALVES OR OTHER BURIED STRUCTURES BEFORE DIGGING. THE CONTRACTOR SHALL REPAIR OR REPLACE THE ABOVE WHEN DAMAGED DURING CONSTRUCTION AT NO COST TO THE OWNER. TWIN CITY AREA: 651-454-0002 TOLL FREE 1-800-252-1166 CALL BEFORE YOU DIG PLANTING LEGEND OVERSTORY TREE ORNAMENTAL TREE CONIFEROUS TREE CONIFEROUS SHRUB DECIDUOUS SHRUB EXISTING TREE FOUNDATION PLANTING KEN ZI E T E R R A C E ( C O U N T Y R D 153) ASSISTED SENIOR LIVING FFE=923.00 GARAGE=913.00 MULTI-RESIDENTIAL 1 FFE=923.00 GARAGE=912.00 LOBBY AND COMMON AREA FFE=923.00 GARAGE=912.00 STORMWATER POND NWL=911.00 HWL=915.92 PATIO EL=923.00 PATIO EL=927.00 PATIO EL=923.00 Ac Pg PATIO EL=923.00 PATIO EL=927.00 PATIO EL=923.00 Af Af Co Co Af Af Af Co Co Co Co Co Co Co Qb Qb Qb Qb Qb Qb Qb Qb Qb Qb Qb Af Af Qb Af Af Qb ENTRY PLAZA Af Pg Pg Ac Ac Pg Ac Ac Pg Pg AcAcAcAcPgPgPgPg Ac Ac Ac DECORATIVE PAVEMENT MEDIAN ACTIVITY NODE ACTIVITY NODE WATER FOUNTAIN EXISTING TREELINE ACTIVITY NODE Af Af L-102 PLANTING PLAN - CONCEPT EAST Drawn By: Issue Date: Project #:5005-0003 RAGTHE VILLAGE LLC DEVELOPMENTTHE VILLAGE, LLC1907 WAYZATA BLVD, SUITE 250M:\5005\0003\DESIGN\CAD\PLANSHEETS\L-101 Planting Plan.dwgDescription:Date:WAYZATA, MN 55391Issue #:ST. ANTHONY VILLAGE, MINNESOTA12/06/2017 1Issue #Prepared For:XX/XX/XXXXDESCRIPTIONISSUE #Sheet #: Sheet Title:1/26/2018 12:44:52 AMDate: I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY REGISTERED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. License #: WARNING: THE CONTRACTOR SHALL BE RESPONSIBLE FOR CALLING FOR LOCATIONS OF ALL EXISTING UTILITIES. THEY SHALL COOPERATE WITH ALL UTILITY COMPANIES IN MAINTAINING THEIR SERVICE AND/OR RELOCATION OF LINES. THE CONTRACTOR SHALL CONTACT GOPHER STATE ONE CALL AT 651-454-0002 AT LEAST 48 HOURS IN ADVANCE FOR THE LOCATIONS OF ALL UNDERGROUND WIRES, CABLES, CONDUITS, PIPES, MANHOLES, VALVES OR OTHER BURIED STRUCTURES BEFORE DIGGING. THE CONTRACTOR SHALL REPAIR OR REPLACE THE ABOVE WHEN DAMAGED DURING CONSTRUCTION AT NO COST TO THE OWNER. TWIN CITY AREA: 651-454-0002 TOLL FREE 1-800-252-1166 CALL BEFORE YOU DIG PLANTING LEGEND OVERSTORY TREE ORNAMENTAL TREE CONIFEROUS TREE CONIFEROUS SHRUB DECIDUOUS SHRUB EXISTING TREE FOUNDATION PLANTING STINSON PARKWAYMULTI-RESIDENTIAL 1 FFE=923.00 GARAGE=912.00 INDEPENDENT SENIOR LIVING FFE=927.00 GARAGE=917.00 MULTI-RESIDENTIAL 1 FFE=923.00 GARAGE=912.00 LOBBY AND COMMON AREA FFE=923.00 GARAGE=912.00 PATIO EL=927.00 PATIO EL=923.00PATIOEL=927.00PATIO EL=927.00 PATIO EL=923.00PATIOEL=927.00Af Co Co Co Af Af Af Co Co Co Co Co Co Co Co Qb Qb Qb Qb Qb Qb Af Af Qb Qb Qb Qb Qb Qb Af Af PROOF OF PARKING ENTRY PLAZA PAVED PATH Af Pg Ac Ac Ac Ac PgPgPgPg Ac DECORATIVE PAVEMENT MEDIAN ACTIVITY NODE ACTIVITY NODE ACTIVITY NODE PAVED PATH ACTIVITY NODE ACTIVITY NODE Af Af Af Af ENTRY PLAZA L-103 PLANTING PLAN - CONCEPT WEST Drawn By: Issue Date: Project #:5005-0003 RAGTHE VILLAGE LLC DEVELOPMENTTHE VILLAGE, LLC1907 WAYZATA BLVD, SUITE 250M:\5005\0003\DESIGN\CAD\PLANSHEETS\L-101 Planting Plan.dwgDescription:Date:WAYZATA, MN 55391Issue #:ST. ANTHONY VILLAGE, MINNESOTA12/06/2017 1Issue #Prepared For:XX/XX/XXXXDESCRIPTIONISSUE #Sheet #: Sheet Title:1/26/2018 12:45:29 AMDate: I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY REGISTERED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. License #: WARNING: THE CONTRACTOR SHALL BE RESPONSIBLE FOR CALLING FOR LOCATIONS OF ALL EXISTING UTILITIES. THEY SHALL COOPERATE WITH ALL UTILITY COMPANIES IN MAINTAINING THEIR SERVICE AND/OR RELOCATION OF LINES. THE CONTRACTOR SHALL CONTACT GOPHER STATE ONE CALL AT 651-454-0002 AT LEAST 48 HOURS IN ADVANCE FOR THE LOCATIONS OF ALL UNDERGROUND WIRES, CABLES, CONDUITS, PIPES, MANHOLES, VALVES OR OTHER BURIED STRUCTURES BEFORE DIGGING. THE CONTRACTOR SHALL REPAIR OR REPLACE THE ABOVE WHEN DAMAGED DURING CONSTRUCTION AT NO COST TO THE OWNER. TWIN CITY AREA: 651-454-0002 TOLL FREE 1-800-252-1166 CALL BEFORE YOU DIG PLANTING LEGEND OVERSTORY TREE ORNAMENTAL TREE CONIFEROUS TREE CONIFEROUS SHRUB DECIDUOUS SHRUB EXISTING TREE FOUNDATION PLANTING SOUTHEN GATEWAY (THE VILLAGE LLC) REVISED TRAFFIC STUDY CITY OF SAINT ANTHONY WSB PROJECT NO. 2170-300 Revised Traffic Study Southern Gateway (The Village LLC) For: City of Saint Anthony Village 3301 Silver Lake Road Saint Anthony, MN 55418 February 19, 2018 Prepared By: WSB & Associates, Inc. 701 Xenia Ave. South, Suite 300 Minneapolis, MN, 55416 (763) 541-4800 (763) 541-1700 (Fax) SOUTHERN GATEWAY (THE VILLAGE LLC) 02/19/2018 REVISED TRAFFIC STUDY CITY OF SAINT ANTHONY WSB PROJECT NO. 2170-300 PAGE i CERTIFICATION I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly registered professional engineer under the laws of the State of Minnesota. Charles T. Rickart, P.E. Date: February 19, 2018 Reg. No. 26082 SOUTHERN GATEWAY (THE VILLAGE LLC) 02/19/2018 REVISED TRAFFIC STUDY CITY OF SAINT ANTHONY WSB PROJECT NO. 2170-300 PAGE ii Table of Contents INTRODUCTION / BACKGROUND ............................................................................ 1 EXISTING CONDITIONS ............................................................................................... 5 TRAFFIC PROJECTIONS ............................................................................................. 10 TRAFFIC IMPACT ANALYSIS .................................................................................... 19 CONCLUSIONS / RECOMMENDATIONS ................................................................ 25 Figures / Tables Figure 1 – Project Location ........................................................................................ 2 Figure 2 – Project Area ................................................................................................ 3 Figure 3 – Development Site ...................................................................................... 4 Figure 4 – Existing AM and PM Peak Hour Traffic (1) ....................................... 8 Figure 5 – Existing AM and PM Peak Hour Traffic (2) ....................................... 9 Figure 6 – No-Build 2030 AM and PM Peak Hour Traffic (1) ....................... 13 Figure 7 - No-Build 2030 AM and PM Peak Hour Traffic (2) ........................ 14 Figure 8 – Build 2018 AM and PM Peak Hour Traffic (1) .............................. 15 Figure 9 - Build 2018 AM and PM Peak Hour Traffic (2) .............................. 16 Figure 10 - Build 2030 AM and PM Peak Hour Traffic (1) ............................ 17 Figure 11 - Build 2030 AM and PM Peak Hour Traffic (2) ............................ 18 Figure 12 – Level of Service Ranges ..................................................................... 20 Table 1 – Crash Summary ........................................................................................... 7 Table 2 – Site Development Traffic Generation ............................................... 10 Table 3 – Trip Generation Comparison .............................................................. 11 Table 4 – Traffic Volume Summary ...................................................................... 12 Table 5 – Existing Level of Service Summary .................................................... 21 Table 6 – 2030 No Build Level of Service Summary ....................................... 22 Table 7 – Build Level of Service Summary ......................................................... 23 SOUTHERN GATEWAY (THE VILLAGE LLC) 02/19/2018 REVISED TRAFFIC STUDY CITY OF SAINT ANTHONY WSB PROJECT NO. 2170-300 PAGE 1 INTRODUCTION / BACKGROUND A Traffic Impact Study, dated November 11, 2016, was completed for The Village LLC development as part of the Environmental Assessment Worksheet (EAW) process. The purpose of the study was to determine the potential transportation impacts for the redevelopment of the existing 15-acre, 200 unit manufactured home/RV park community, located in the northeast quadrant of the intersection of Kenzie Terrace (CR 153) and NE Stinson Parkway in the City of St Anthony. Figure 1 and Figure 2 show the project location and project area. The development was originally proposed to include five, 3 to 5 story multi-unit buildings with a mix of apartments, senior living, and continuing care uses consisting of approximately 800 units and; 37, 2- to 3-story townhome units. After input from the public and elected officials, the development team is now proposing a revised, less intense, development plan. The new plan now includes 225 market rate apartments; 61 senior living units; and, 128 assisted living units. The proposed site plan is shown on Figure 3. Based on the revised plan the transportation impacts of the existing and proposed traffic conditions were evaluated for the NE Stinson Parkway and Kenzie Terrace (CR 153)/Lowry Avenue corridors including the following intersections: • St Anthony Blvd at NE Stinson Pkwy • St Anthony Blvd at Silver Lake Blvd (CR 136) / Kenzie Terrace (CR 153) • St Anthony Blvd at New Brighton Blvd (CR 88) • NE Stinson Pkwy at 27th Avenue • NE Stinson Pkwy at 26th Avenue • NE Stinson Pkwy at Lowry Ave / Kenzie Terrace (CR 153) • Kenzie Terrace (CR 153) at Lowry Grove Entrance • Kenzie Terrace (CR 153) at Wilson Street • Kenzie Terrace (CR 153) at Autumn Woods/Kenzington Apartments The Traffic Engineering Review and Analysis in this Study was conducted to determine the impacts the site would have on the area traffic operations, lane geometry/traffic control and access. The following sections of this report outline the findings of this study including: • Documentation of existing traffic conditions in the area, and; • Projecting future traffic for the proposed development, and; • Determining lane configuration needs at the primary driveways and intersections in the area, and; • Developing conclusions and recommendations with respect to the existing and future roadway needs and configurations at area intersections and/or roadways. SOUTHERN GATEWAY (THE VILLAGE LLC) 02/19/2018 REVISED TRAFFIC STUDY CITY OF SAINT ANTHONY WSB PROJECT NO. 2170-300 PAGE 2 SOUTHERN GATEWAY (THE VILLAGE LLC) 02/19/2018 REVISED TRAFFIC STUDY CITY OF SAINT ANTHONY WSB PROJECT NO. 2170-300 PAGE 3 SOUTHERN GATEWAY (THE VILLAGE LLC) 02/19/2018 REVISED TRAFFIC STUDY CITY OF SAINT ANTHONY WSB PROJECT NO. 2170-300 PAGE 4 SOUTHERN GATEWAY (THE VILLAGE LLC) 02/19/2018 REVISED TRAFFIC STUDY CITY OF SAINT ANTHONY WSB PROJECT NO. 2170-300 PAGE 5 EXISTING CONDITIONS A. Land Use The existing land use in the study area consists primarily of single family and multi-family residential, office commercial and retail uses. B. Roadway Characteristics Stinson Parkway is a north/south “A” Minor Arterial extending from 40th Avenue on the north, in Columbia Heights to E Hennepin Avenue in the City of Minneapolis. Stinson Parkway south of St Anthony Blvd, adjacent to the proposed site is a Minneapolis Park Board street and has a typical 95 foot urban cross section with one lane in each direction, a parking bay and a raised grass median. Traffic signal control is provided at the Lowry Ave/Kenzie Terrace (CR 153) intersection. All other intersections are Stop Sign controlled. A 25mph speed limit is posted on Stinson Parkway south of St Anthony Blvd. Kenzie Terrace (CR 153) is a east/west “B” Minor Arterial extending from where it changes to Lowry Avenue at Stinson Parkway to where it changes to Silver Lake Road at St Anthony Parkway. Kenzie Terrace (CR 153) has a primary 64 foot two-lane urban cross section with a center left turn lane and a raised concrete median. It provides access to the multi-family apartments and businesses adjacent to the roadway with median breaks at several driveways. Traffic signal control is provided at the Stinson Parkway, Autumn Woods/Kenzington Apartments and St Anthony Blvd intersections. All other intersections are Stop Sign controlled. Signed and marked pedestrian crossings are provided at Stenson Parkway, at the Lowry Grove entrance, at Autumn Woods/Kenzington Apartments entrance, at 27th Avenue and at St Anthony Blvd. A 30mph speed limit is posted on Kenzie Terrace (CR 153). The lane configurations at each of the study area intersections are as follows: St Anthony Blvd at NE Stinson Pkwy – All Way Stop Control NB Stinson Pkwy – one left/through/right, one parking lane SB Stinson Pkwy – one left/through/right, one parking lane WB St Anthony Blvd – one left/through/right EB St Anthony Blvd – one left/through/right St Anthony Blvd at Silver Lake Rd (CR 136) / Kenzie Terrace (CR 153) – Traffic Signal Control: NW St Anthony Blvd – one left, one through, one free right turn lane SE St Anthony Blvd – one left, one through/free right lane SW Silver Lake Rd – one left, one through, one through/free right turn lane NE Kenzie Terrace – one left, two through, one right SOUTHERN GATEWAY (THE VILLAGE LLC) 02/19/2018 REVISED TRAFFIC STUDY CITY OF SAINT ANTHONY WSB PROJECT NO. 2170-300 PAGE 6 St Anthony Blvd at New Brighton Blvd (CR 88) – Traffic Signal Control: NW St Anthony Blvd – one left, one through, one right SE St Anthony Blvd – one left, one through, one free right SW New Brighton Blvd – one left, two through, one right NE New Brighton Blvd – one left, two through, one free right NE Stinson Pkwy at 27th Avenue – All Way Stop Control: NB Stinson Pkwy – one left/through/right SB Stinson Pkwy – one left/through/right WB 27th Avenue – one left/through/right EB 27th Avenue – one left/through/right NE Stinson Pkwy at 26th Avenue – Side Street Stop Control: NB Stinson Pkwy – one left/through/right SB Stinson Pkwy – one left/through/right WB 26th Avenue – one left/through/right EB 26th Avenue – one left/through/right NE Stinson Pkwy at Lowry Ave / Kenzie Terrace (CR 153) – Traffic Signal Control: NB Stinson Pkwy – one left, one through/right SB Stinson Pkwy – one left, one through/right WB Kenzie Terrace – one left, one through, one right EB Lowry Ave – one left/through, one right Kenzie Terrace (CR 153) at Lowry Grove Entrance – Side Street Stop Control: SB Lowry Grove Entrance – one left/through/right WB Kenzie Terrace – one left/through, one through/right EB Kenzie Terrace – one left, one through/right Kenzie Terrace (CR 153) at Wilson Street – Side Street Stop Control: NB Wilson Street – one left/through/right WB Kenzie Terrace – one left, one through, one through/right EB Kenzie Terrace – one left/through, one through/right Kenzie Terrace (CR 153) at Autumn Woods/Kenzington Apartments – Traffic Signal Control: NB Autumn Woods – one left/through/right SB Kenzington Apts – one left/through/right WB Kenzie Terrace – one left, one through, one through/right EB Kenzie Terrace – one left, one through, one through/right The existing roadway geometrics including the intersection traffic control, is shown on Figure 4 and Figure 5. SOUTHERN GATEWAY (THE VILLAGE LLC) 02/19/2018 REVISED TRAFFIC STUDY CITY OF SAINT ANTHONY WSB PROJECT NO. 2170-300 PAGE 7 C. Traffic Volumes AM and PM peak hour turning movements and daily counts were conducted during the week of October 10th, 2016. These counts were used as the existing baseline conditions for the area. Figure 4 and Figure 5 shows the existing intersections that were analyzed as part of this, with the existing 2016 AM and PM peak hour and traffic volumes. D. Crash Data The crash data included with this study was obtained using the Minnesota Crash Mapping Analysis Tool (MnCMAT) developed by MnDOT. The database includes crashes reported to MnDOT by local law enforcement agencies. The crash data presented are for the years of 2013-2015. The MnCMAT database does not provide access to the original handwritten crash reports which contain some details that are not represented in the MnCMAT database. Crashes that resulted in damages under $1000 may not be included in the database results as well. The results indicate that the intersections of St Anthony Blvd at New Brighton Blvd, Stinson Blvd at 27th Street and Stinson Blvd at 26th Street have calculated accident and/or severity rates above the MnDOT Metro and Statewide averages. A summary of the existing crash data is shown in Table 1. Table 1 – Crash Summary Intersection 2013 2014 2015 Total Crashes PD PI PD PI PD PI St Anthony Blvd at Stinson Pkwy 1 0 0 0 0 0 1 St Anthony Blvd at Kenzie Terrace 2 0 2 0 2 0 6 St Anthony Blvd at New Brighton Blvd 4 2 4 1 3 2 16 Stinson Blvd at 27th Street 1 0 0 0 1 1 3 Stinson Blvd at 26th Street 0 1 0 0 0 0 1 Stinson Blvd at Lowry Ave/Kenzie Terrace 0 0 3 2 1 2 8 Kenzie Terrace at Lowry Grove Entrance 0 0 0 0 0 0 0 Kenzie Terrace at Wilson Street 0 0 0 0 0 0 0 Kenzie Terrace at Autumn Wood/Apartments 0 1 0 0 0 0 1 SOUTHERN GATEWAY (THE VILLAGE LLC) 02/19/2018 REVISED TRAFFIC STUDY CITY OF SAINT ANTHONY WSB PROJECT NO. 2170-300 PAGE 8 SOUTHERN GATEWAY (THE VILLAGE LLC) 02/19/2018 REVISED TRAFFIC STUDY CITY OF SAINT ANTHONY WSB PROJECT NO. 2170-300 PAGE 9 SOUTHERN GATEWAY (THE VILLAGE LLC) 02/19/2018 REVISED TRAFFIC STUDY CITY OF SAINT ANTHONY WSB PROJECT NO. 2170-300 PAGE 10 TRAFFIC PROJECTIONS In order to analyze the lane configuration and traffic control needs, projected traffic volumes were determined for the area. Projected 2019 and 2030 traffic volumes were determined based on proposed anticipated future development land use in the area and the City’s current Transportation Plan. The following sections outline the traffic generation from the study area, as well as the traffic distribution and projected traffic volumes. A. Traffic Generation Traffic growth in the vicinity of a proposed site will occur between existing conditions and any given future year due to other development within the region. This background growth must be accounted for and included in future year traffic forecasts. Reviewing the historical traffic counts in the area, traffic has stayed somewhat constant or dropped in the past few years. However, in order to account for some background growth in traffic the Metropolitan Travel Demand model projection factor of 0.15% per year was used to project traffic from the 2016 counts to the 2019 and 2030 analysis years. The estimated trip generation from the Southern Gateway (revised Village LLC) development project is shown in Table 2. The trip generation used to estimate the proposed site traffic is also based on rates for other similar land uses as documented in the Institute of Transportation Engineers Trip Generation Manual, 10th Edition. The table shows the weekday AM and PM peak hour trip generation for the proposed development. Table 2 - Estimated Southern Gateway Development Site Trip Generation Planned Use Dwelling Units ADT AM Peak PM Peak Total In Out Total In Out Total In Out Apartments 225 1487 743 744 114 30 84 141 86 55 Senior Living 61 203 102 101 12 4 8 16 9 7 Townhomes 128 473 236 237 38 24 14 76 29 47 Total 414 2163 1081 1082 164 58 106 233 124 109 Source: Institute of Transportation Engineers Trip Generation Manual, 10th Edition As discussed previously the proposed Southern Gateway Development is less intense than the original The Village LLC Development. Table 3 below shows a comparison of the traffic generation that would be anticipated from the existing Mobile Home Park, assuming it fully developed; the original The Village LLC Development, and; the revised Southern Gateway Development. SOUTHERN GATEWAY (THE VILLAGE LLC) 02/19/2018 REVISED TRAFFIC STUDY CITY OF SAINT ANTHONY WSB PROJECT NO. 2170-300 PAGE 11 Table 3 - Site Trip Generation Comparison Option Use Size (Units) ADT AM Peak Hour PM Peak Hour Existing Mobile Home Park 200 1298 82 118 The Village LLC Development Apartments 500 3154 249 293 Senior Living 100 319 20 26 Continuing Care Retirement Community 200 640 47 85 Townhomes 37 271 23 27 Total 837 4384 339 431 Southern Gateway Development Apartments 225 1487 114 141 Senior Living 61 203 12 16 Assisted Living 128 473 38 76 Total 414 2163 164 233 B. Traffic Distribution Area generated trips were distributed to the adjacent roadway system based on several factors including: • Previous traffic and transportation studies in the area. • Anticipated origins and destinations for specific land use (i.e. location of commercial uses in relationship to residential). • Existing travel patterns and future roadway connections. Based on these parameters the following general traffic distribution was used to distribute the projected traffic volumes in the study area: • 5% to/from the north on Stinson Blvd (CR 27) • 4% to/from north on Silver Lake Rd (CR 136) • 5% to/from northeast on New Brighton Blvd (CR 88) • 5% to/from southeast on St Anthony Blvd • 20% to/from southwest on New Brighton Blvd (CR 88) • 50% to/from south on Stinson Blvd • 6% to/from west on Lowry Ave • 1% to/from west on 26th Ave • 1% to/from west on 27th Ave • 3% to/from west on St Anthony Blvd SOUTHERN GATEWAY (THE VILLAGE LLC) 02/19/2018 REVISED TRAFFIC STUDY CITY OF SAINT ANTHONY WSB PROJECT NO. 2170-300 PAGE 12 C. Projected Traffic Volumes Traffic forecasts were prepared for the year 2019 which is the year after the initial phase the proposed development is anticipated to be completed and for the 2030 conditions the Comprehensive Plan year which represents the full development of the area. The traffic forecasts were prepared by adding the projected annual background traffic growth and the projected non-development traffic growth to the existing 2016 traffic counts to determine the “No-Build” traffic conditions. It was determined that with the minimal increase in background traffic the 2019 no- build condition would be similar to the existing 2016 conditions, therefore it was not included in the analysis. The proposed development traffic was then added to the no-build traffic conditions to determine the 2019 and 2030 Build traffic conditions. As a worst case condition it was assumed that the entire site would be developed for the 2019 build condition. Figures 6 - 11 show the projected 2030 no-build, 2019 build and 2030 Build AM and PM peak hour traffic volumes. During the preparation of the previous Traffic Study concerns were raised with the amount of traffic on adjacent roadways, specifically; Stinson Parkway north and south of Kenzie Terrace (CR 153) and Lowry Avenue west of Stinson Parkway. Table 4 below shows the summary of the existing and projected traffic volumes. Table 4 – Traffic Volume Summary Location Existing 2016 2030 No-Build 2030 Build 2040 ADT ADT AM Peak PM Peak ADT AM Peak PM Peak ADT AM Peak PM Peak Stinson Pkwy - South of Kenzie Tr 8,000 698 1,053 8,200 716 1,078 9,500 806 1,203 11,500 Stinson Pkwy - North of Kenzie Tr 6,000 463 697 6,150 476 734 6,350 534 797 7,250 Lowry Ave - West of Stinson Pkwy 7,000 793 1,117 7,150 812 1,142 7,300 820 1,153 8,100 SOUTHERN GATEWAY (THE VILLAGE LLC) 02/19/2018 REVISED TRAFFIC STUDY CITY OF SAINT ANTHONY WSB PROJECT NO. 2170-300 PAGE 13 SOUTHERN GATEWAY (THE VILLAGE LLC) 02/19/2018 REVISED TRAFFIC STUDY CITY OF SAINT ANTHONY WSB PROJECT NO. 2170-300 PAGE 14 SOUTHERN GATEWAY (THE VILLAGE LLC) 02/19/2018 REVISED TRAFFIC STUDY CITY OF SAINT ANTHONY WSB PROJECT NO. 2170-300 PAGE 15 SOUTHERN GATEWAY (THE VILLAGE LLC) 02/19/2018 REVISED TRAFFIC STUDY CITY OF SAINT ANTHONY WSB PROJECT NO. 2170-300 PAGE 16 SOUTHERN GATEWAY (THE VILLAGE LLC) 02/19/2018 REVISED TRAFFIC STUDY CITY OF SAINT ANTHONY WSB PROJECT NO. 2170-300 PAGE 17 SOUTHERN GATEWAY (THE VILLAGE LLC) 02/19/2018 REVISED TRAFFIC STUDY CITY OF SAINT ANTHONY WSB PROJECT NO. 2170-300 PAGE 18 SOUTHERN GATEWAY (THE VILLAGE LLC) 02/19/2018 REVISED TRAFFIC STUDY CITY OF SAINT ANTHONY WSB PROJECT NO. 2170-300 PAGE 19 TRAFFIC IMPACT ANALYSIS Existing and/or forecasted traffic operations were evaluated for the intersections and driveway in the study area. The analysis was conducted for the following scenarios: 1. Existing 2016 2. Projected 2019 Build 3. Projected 2030 No-Build 4. Projected 2030 Build This section describes the methodology used to assess the operations and provides a summary of traffic operations for each scenario. A. Methodology The intersections in the corridor were evaluated during the AM and PM peak hours using Synchro/SimTraffic micro simulation software. The results are derived from established methodologies documented in the Highway Capacity Manual (HCM) 2010. The software was used to evaluate the characteristics of the roadway network including lane geometrics, turning movement volumes, traffic control and signal timing. In addition, the signal timing parameters for future year conditions were optimized using Synchro. This information was then transferred to SimTraffic (the traffic simulation model) to estimate average peak hour vehicle delays and queues. One of the primary measures of effectiveness used to evaluate intersection traffic operations, as defined in the HCM, is Level of Service (LOS) – a qualitative letter grade, A – F, based on seconds of vehicle delay due to a traffic control device at an intersection. By definition, LOS A conditions represent high quality operations (i.e., motorists experience very little delay or interference) and LOS F conditions represent very poor operations (i.e., extreme delay or severe congestion). Figure 12 depicts a graphical interpretation of delay times that define level of service. The delay thresholds are lower for un-signalized intersections than signalized intersections due to the public’s perception of acceptable delays for different traffic controls as indicated in the HCM. In accordance with the Minnesota Department of Transportation (MnDOT) guidelines, this analysis used the LOS D/E boundary as an indicator of acceptable traffic operations. SOUTHERN GATEWAY (THE VILLAGE LLC) 02/19/2018 REVISED TRAFFIC STUDY CITY OF SAINT ANTHONY WSB PROJECT NO. 2170-300 PAGE 20 Figure 12: Level of Service Ranges for Signalized and Un-signalized Intersections Existing Level of Service Summary Table 5 - 2016 Existing Conditions shown below, summarizes the existing LOS at the primary intersections and driveways in the study area assuming the current lane geometry, traffic control and 2016 traffic volumes. The analysis results show that all intersection and driveways are operating at an overall LOS C or better during both the weekday AM and PM peak hours except the intersection of St Anthony Blvd at New Brighton Blvd which is operating at a LOS D during the PM Peak Hour. All movements are also operating at LOS C or better, except the following which are at LOS D or worse: • AM Peak Hour o NW left turn from St Anthony Blvd to New Brighton Blvd – LOS D o NW thru on St Anthony Blvd at New Brighton Blvd – LOS D • PM Peak Hour o NB left from New Brighton Blvd to St Anthony Blvd – LOS D o NB thru on New Brighton Blvd at St Anthony Blvd – LOS D o SB left from New Brighton Blvd to St Anthony Blvd – LOS D o SB thru on New Brighton Blvd to St Anthony Blvd – LOS D o SE left from St Anthony Blvd to New Brighton Blvd – LOS D o NW left turn from St Anthony Blvd to New Brighton Blvd – LOS E o NW thru on St Anthony Blvd at New Brighton Blvd – LOS D 80 55 35 20 10 LOS A LOS B LOS C LOS D LOS E LOS F Not CongestedCongested50 35 25 10 LOS A LOS B LOS C LOS D LOS E LOS F Not CongestedCongested15 Signalized Intersection Unsignalized IntersectionControl Delay per Vehicle (sec.)Control Delay per Vehicle (sec.)SOURCE: Level of Service thresholds from the Highway Capacity Manual, 2000. SOUTHERN GATEWAY (THE VILLAGE LLC) 02/19/2018 REVISED TRAFFIC STUDY CITY OF SAINT ANTHONY WSB PROJECT NO. 2170-300 PAGE 21 Table 5: 2016 Existing Conditions Level of Service Summary Intersection AM Peak Hour PM Peak Hour LOS Overall Delay (sec/veh) LOS Overall Delay (sec/veh) St Anthony Blvd at Stinson Pkwy A (B) 8.9 C (C) 15.7 St Anthony Blvd at Kenzie Ter B (C) 16.2 B (C) 14.6 St Anthony Blvd at New Brighton Blvd B (D) 16.1 D (E) 39.9 Stinson Blvd at 27th Street A (A) 6.5 A (B) 8.9 Stinson Blvd at 26th Street A (A) 1.8 A (B) 2.4 Stinson Blvd at Lowry Ave/Kenzie Ter B (C) 14.4 C (C) 21.3 Kenzie Ter at Lowry Grove Entrance A (A) 0.4 A (B) 0.7 Kenzie Ter at Wilson Street A (A) 1.1 A (A) 1.5 Kenzie Ter at Autumn Wood/Apt B (C) 13.7 B (B) 13.9 A (A) – Overall LOS (Worst Movement LOS) Forecasted Traffic Operations A capacity and LOS analysis was completed for the study area intersections and driveways for 2019 which is the year after the proposed initial development would be completed and for the 2030 condition which represents the 20-year design timeframe assumed to be full development of the area. It was determined that with the minimal increase in background traffic the 2019 no-build condition would be similar to the existing 2016 conditions, therefore it was not included in the analysis. The results of the analysis are discussed below. Table 6 – 2030 No Build Level of Service Summary, shows that all intersection and driveways are operating at an overall LOS C or better in 2030 during both the weekday AM and PM peak hours with the existing intersection geometrics and traffic control, except the intersection of St Anthony Blvd at New Brighton Blvd which is operating at a LOS D during the PM Peak Hour. All movements are also operating at LOS C or better, however, with the increase in traffic, some movements will be operating at LOS D or worse including the following: • AM Peak Hour o NW left from St Anthony Blvd to New Brighton Blvd – LOS D o NW thru on St Anthony Blvd at New Brighton Blvd – LOS D SOUTHERN GATEWAY (THE VILLAGE LLC) 02/19/2018 REVISED TRAFFIC STUDY CITY OF SAINT ANTHONY WSB PROJECT NO. 2170-300 PAGE 22 • PM Peak Hour o NB left from New Brighton Blvd to St Anthony Blvd – LOS E o NB thru on New Brighton Blvd at St Anthony Blvd – LOS D o SB left from New Brighton Blvd to St Anthony Blvd – LOS E o SB thru on New Brighton Blvd at St Anthony Blvd – LOS D o SE left from St Anthony Blvd to New Brighton Blvd – LOS D o NW left from St Anthony Blvd to New Brighton Blvd – LOS F o NW thru on St Anthony Blvd at New Brighton Blvd – LOS F o NW right from St Anthony Blvd to New Brighton Blvd – LOS E Table 6: 2030 No Build Condition Level of Service Summary Intersection AM Peak Hour PM Peak Hour LOS Overall Delay (sec/veh) LOS Overall Delay (sec/veh) St Anthony Blvd at Stinson Pkwy A (B) 9.5 C (C) 15.9 St Anthony Blvd at Kenzie Ter B (C) 18.4 B (D) 15.0 St Anthony Blvd at New Brighton Blvd B (D) 17.7 D (F) 45.7 Stinson Blvd at 27th Street A (A) 6.7 A (B) 9.0 Stinson Blvd at 26th Street A (B) 2.9 A (C) 4.7 Stinson Blvd at Lowry Ave/Kenzie Ter B (C) 18.2 D (E) 36.5 Kenzie Ter at Lowry Grove Entrance A (A) 0.6 A (B) 0.8 Kenzie Ter at Wilson Street A (B) 2.7 A (B) 3.0 Kenzie Ter at Autumn Wood/Apt B (C) 13.8 B (C) 14.3 A (A) – Overall LOS (Worst Movement LOS) Table 7 – Projected Build Level of Service Summary, shows that, similar to the no-build conditions, all intersection and driveways will be operating at an overall LOS C or better in 2019 and 2030 during both the weekday AM and PM peak hours with the existing intersection geometrics and traffic control, except the intersection of St Anthony Blvd at New Brighton Blvd which is operating at a LOS D during the PM Peak Hour. All movements are also operating at LOS C or better, however, with the increase in traffic, some movements will be operating at LOS D or worse including the following: • 2019 o NB left from New Brighton Blvd to St Anthony Blvd, PM – LOS D o NB thru on New Brighton Blvd at St Anthony Blvd, PM – LOS D o SB left from New Brighton Blvd to St Anthony Blvd, PM – LOS E o SB thru on New Brighton Blvd at St Anthony Blvd, PM – LOS D o SE left from St Anthony Blvd to New Brighton Blvd, PM – LOS D o NW left from St Anthony Blvd to New Brighton Blvd, AM - LOS D, PM – LOS E o NW thru on St Anthony Blvd at New Brighton Blvd, PM – LOS E o NW right from St Anthony Blvd to New Brighton Blvd, PM – LOS D SOUTHERN GATEWAY (THE VILLAGE LLC) 02/19/2018 REVISED TRAFFIC STUDY CITY OF SAINT ANTHONY WSB PROJECT NO. 2170-300 PAGE 23 • 2030 o NB left from New Brighton Blvd to St Anthony Blvd, PM – LOS E o NB thru on New Brighton Blvd at St Anthony Blvd, PM – LOS D o SB left from New Brighton Blvd to St Anthony Blvd, PM – LOS E o SB thru on New Brighton Blvd at St Anthony Blvd, PM – LOS D o SE left from St Anthony Blvd to New Brighton Blvd, PM – LOS D o NW left from St Anthony Blvd to New Brighton Blvd, AM - LOS D, PM – LOS F o NW thru on St Anthony Blvd at New Brighton Blvd, AM – LOS D, PM – LOS F o NW right from St Anthony Blvd to NE Brighton Blvd, PM – LOS E Table 7: Build Condition Level of Service Summary Intersection 2019 2030 AM Peak Hour PM Peak Hour AM Peak Hour PM Peak Hour LOS Delay (sec/veh) LOS Delay (sec/veh) LOS Delay (sec/veh) LOS Delay (sec/veh) St Anthony Blvd at Stinson Pkwy A (B) 9.5 C (C) 15.7 A (B) 9.6 C (C) 16.0 St Anthony Blvd at Kenzie Ter B (C) 17.3 B (C) 14.7 B (C) 18.5 B (D) 15.1 St Anthony Blvd at New Brighton Blvd B (D) 16.1 D (E) 40.0 B (D) 18.1 D (F) 46.0 Stinson Blvd at 27th Street A (A) 6.6 A (B) 8.9 A (A) 6.8 A (B) 9.1 Stinson Blvd at 26th Street A (A) 2.3 A (C) 3.7 A (B) 2.9 A (C) 4.8 Stinson Blvd at Lowry Ave/Kenzie B (C) 16.3 D (E) 32.8 B (C) 18.4 D (E) 36.9 Kenzie Ter at Lowry Grove Entrance A (A) 0.4 A (B) 0.7 A (A) 0.6 A (B) 0.8 Kenzie Ter at Wilson Street A (B) 1.9 A (B) 2.1 A (B) 2.8 A (B) 3.2 Kenzie Ter at Autumn Wood/Apt B (C) 13.5 B (B) 14.0 B (C) 13.9 B (C) 14.4 A (A) – Overall LOS (Worst Movement LOS) SOUTHERN GATEWAY (THE VILLAGE LLC) 02/19/2018 REVISED TRAFFIC STUDY CITY OF SAINT ANTHONY WSB PROJECT NO. 2170-300 PAGE 24 Vehicle Queuing Analysis A queuing analysis for the existing and future 2019 and 2030 conditions was conducted, evaluating the anticipated vehicle queues with the build traffic conditions. The analysis was conducted using the SimTraffic simulation software. The results found that during both the weekday AM and PM peak hours in 2019 and 2030 several movements were identified that would exceed turn lane storage. These include the following movements: • Southwest bound Silver Lake Road left turn to St Anthony Blvd will back up past existing turn storage length. • Northeast bound Kenzie Terrace right turn to St Anthony Blvd will back up past the existing right storage length. • Northwest bound St Anthony Blvd right turn and left turn to New Brighton Blvd will back up past the existing turn lane storage length. • North bound Stinson Parkway left turn to Lowry Ave will back up past the existing turn lane storage length. • West bound Lowry Avenue left turn to Stinson Parkway will back up past the existing turn lane storage length. • East bound Kenzie Terrace right turn to Stinson Parkway will back up past the existing turn lane storage length. SOUTHERN GATEWAY (THE VILLAGE LLC) 02/19/2018 REVISED TRAFFIC STUDY CITY OF SAINT ANTHONY WSB PROJECT NO. 2170-300 PAGE 25 CONCLUSIONS / RECOMMENDATIONS Based on the analysis documented in this Study, WSB has concluded the following: • The proposed Southern Gateway (revised The Village LLC) development is anticipated to consist of 414 total units (200 multi-family apartment residential units, 61 senior living units and 128 assisted living units). Access from the site will be through driveway connections to Stinson Blvd at 26th Street and to Kenzie Terrace at the existing Lowry Grove entrance. • The proposed Southern Gateway (revised The Village LLC) development is anticipated to generate an additional 2,163 daily trips, 164 AM peak trips and 233 PM peak trips. The new Southern Gateway development generates less than half of what the previous development (The Village LLC) development was anticipated to generate. • Existing traffic operations analysis shows that all intersection and driveways are operating at an overall LOS C or better during both the weekday AM and PM peak hours except the intersection of St Anthony Blvd at New Brighton Blvd which is operating at a LOS D during the PM Peak Hour. There will be some movements that will be operating at LOS D or LOS E. • Intersection traffic operations for the future 2030 no-build condition show that all intersection and driveways will operate at an overall LOS C or better during both the weekday AM and PM with the existing intersection geometrics and traffic control, except the intersection of St Anthony Blvd at New Brighton Blvd which is operating at a LOS D during the PM Peak Hour. With the increase in traffic, some movements will be operating at LOS D or LOS E. • Intersection traffic operations for the future build condition show that, assuming the addition of Southern Gateway development traffic, all intersection and driveways will be operating at an overall LOS C or better in 2019 and 2030 during both the weekday AM and PM peak hours with the existing intersection geometrics and traffic control, except the intersection of St Anthony Blvd at New Brighton Blvd which is operating at a LOS D during the PM Peak Hour. With the increase in traffic, some movements will be operating at LOS D, LOS E or LOS F. • Based on the vehicle queuing analysis for the existing and future traffic conditions for weekday AM and PM peak hours several locations were identified that would exceed existing turn lane storage lengths. SOUTHERN GATEWAY (THE VILLAGE LLC) 02/19/2018 REVISED TRAFFIC STUDY CITY OF SAINT ANTHONY WSB PROJECT NO. 2170-300 PAGE 26 • The Traffic Study evaluated condition for the years 2016 (existing), 2019 and 2030. Based on the analysis four intersections were identified with capacity or vehicle queueing impacts associated with the development of the proposed site. These intersections include: 1. St Anthony Blvd at Kenzie Terrace/New Brighton Blvd (CR 88) 2. St Anthony Blvd at Silver Lake Rd(CR 136)/Kenzie Terrace (CR 153) 3. Kenzie Terrace (CR 153)/NE Lowry Ave at NE Stinson Parkway 4. Kenzie Terrace (CR 153) at Proposed Site Access/Wilson Street Based on the analysis mitigation improvements are recommended for 2019 with the proposed development and by 2030 as the area continues to develop. These recommendations include: 2019 with Southern Gateway Development: 1. Request Hennepin County to optimize the signal time and coordination between the St Anthony Blvd intersections at New Brighton Blvd (CR 88) and Silver Lake Rd (CR 136)/Kenzie Terrance (CR 153). 2. Lengthen the northwest bound left turn lane from St Anthony Blvd to southbound New Brighton Blvd (CR 88) from 125 feet to 225 feet. 3. Lengthen the southwest bound left turn from Silver Lake Rd (CR 136) to southeast St Anthony Blvd from 100 feet to 175 feet. 4. Lengthen the westbound left turn from Kenzie Terrace (CR 153) to southbound NE Stinson Parkway when the Bremer Bank Building site is redeveloped. 5. Lengthen the northbound left turn from NE Stinson Parkway to westbound NE Lowry Ave from 150 feet to 250 feet. 6. At the proposed site driveway at Wilson St on Kenzie Terrace (CR 153) provide: a. Two lanes exiting the site (one left turn and one through/right lane) b. Left turn lane from Kenzie Terrace (CR 153) into the site c. Right turn lane from Kenzie Terrace (CR 153) into the site 2030 with Future Area Development: 1. Consider a dual lane roundabout or other traffic control improvements for the St Anthony Blvd intersections at New Brighton Blvd (CR 88) and Silver Lake Rd (CR 136)/Kenzie Terrance (CR 153). 2. Consider a roundabout or other traffic control improvements at the intersection of Kenzie Terrace (CR 153)/NE Lowry Ave at NE Stinson Parkway. The Village LLC Development - Parking Analysis1.25.20181/31/31/31/31/31/3AL/MC ratios111123IL/MK/AF ratiosTotal Unit CountStalls Required/UnitTotal Parking DemandCommentStudioAlcove1 BR1+Den2BR3BRIndependent (IL) Senior612122IL0016142454108Assisted (AL/MC) Senior1281/363includes 20 staffAL/MC9018125063Market Rate (MR)2252450MR0799807236285635456Surface ParkingGarage ParkingTotal ParkingAvail.-Code DemandIndependent (IL) Senior34921264Assisted (AL/MC) Senior347711148Market Rate (MR)2182384566693PARKING DEMAND PER CITY ORDINANCEPARKING AVAILABILITYIncludes proof of parking on west sideCommentPARKING DEMAND ANALYSIS BY BEDROOM QUANTITY kaas wilson architectsUnit DataThe Village, LLCResidential Unit MixName Count Gross Area17059-Continental-St.Anthony-Market RateUnit 0-18 639 ft²Unit 0-28 619 ft²Unit 0-361 616 ft²Unit 1-160 740 ft²Unit 1-240 824 ft²Unit 2-112 1,113 ft²Unit 2-38 1,369 ft²Unit 2-54 1,357 ft²Unit 2-64 1,085 ft²Unit 2-78 1,206 ft²Unit 3-18 1,382 ft²Unit 3-24 1,282 ft²17059-Continental-St.Anthony-Market Rate: 225 225Grand total: 414414Residential Unit MixName Count Gross Area17059-Continental-St.Anthony-Independent SeniorUnit 1-0 25.59 704 ft²Unit 1-1 25.57 795 ft²Unit 1.5-03 1,128 ft²Unit 1.5-11 1,134 ft²Unit 1.5-22 1,048 ft²Unit 1.5-36 1,071 ft²Unit 1.5-43 1,179 ft²Unit 2-03 1,406 ft²Unit 2-16 1,259 ft²Unit 2-23 1,364 ft²Unit 2.5-012 1,606 ft²Unit 2.5-16 1,432 ft²17059-Continental-St.Anthony-Independent Senior: 6161Residential Unit MixName Count Gross Area17059-Continental-St.Anthony-Assisted SeniorUnit 0-1 1611 434 ft²Unit 1-0 2434 711 ft²Unit 1-1 2413 651 ft²Unit 1-2 242 650 ft²Unit 1-3 242 762 ft²Unit 1.5-0 3229 928 ft²Unit 1.5-1 End3 937 ft²Unit 1.5-1 End-22 886 ft²Unit 1.5-2 321 868 ft²Unit 2-1 E34.6+10 1,139 ft²Unit 2-2 35.55 1,105 ft²Unit MC 0-0 161 612 ft²Unit MC 0-1 161 533 ft²Unit MC 0-2 161 471 ft²Unit MC 0-3 165 434 ft²Unit MC 0-4 164 494 ft²Unit MC 0-5 161 509 ft²Unit MC 1-0 27.51 755 ft²Unit MC 1-1 Corner2 776 ft²17059-Continental-St.Anthony-Assisted Senior: 128 128 46,191 ft²Area777623456789757473727170696766636261605958575611121314151755545352515049483837363534333231302928272625242322212019101816474645444342414039SD_1261SD_1273SD_12831SD_1272ELEVELEV LOBBYTRASHELEVELEV LOBBYTRASHGARAGE DRSTAIRSTAIRSD_1281SD_1274UNEXCAVATED646568kaas wilson architectsThe Village, LLCAssisted Senior Garage Level Plan1/16" = 1'-0"1Level -1 776 ft²Unit MC 1-1 Corner755 ft²Unit MC 1-0 27.5776 ft²Unit MC 1-1 Corner2,195 ft²MC Restaurant/Activity1,249 ft²Kitchen2,498 ft²Restaurant877 ft²Club Room981 ft²Lobby746 ft²Elev/Util/Stor1,139 ft²Unit 2-1 E34.6+711 ft²Unit 1-0 24711 ft²Unit 1-0 24434 ft²Unit 0-1 161,850 ft²Office1,139 ft²Unit 2-1 E34.6+434 ft²Unit 0-1 16928 ft²Unit 1.5-0 32SD_1261SD_1263SD_1273SD_1271SD_12832454434 ft²Unit MC 0-3 16494 ft²Unit MC 0-4 16494 ft²Unit MC 0-4 16471 ft²Unit MC 0-2 16509 ft²Unit MC 0-5 16711 ft²Unit 1-0 24928 ft²Unit 1.5-0 32928 ft²Unit 1.5-0 32711 ft²Unit 1-0 24711 ft²Unit 1-0 24711 ft²Unit 1-0 24928 ft²Unit 1.5-0 32711 ft²Unit 1-0 24711 ft²Unit 1-0 24937 ft²Unit 1.5-1 End1,105 ft²Unit 2-2 35.5928 ft²Unit 1.5-0 32928 ft²Unit 1.5-0 32711 ft²Unit 1-0 24928 ft²Unit 1.5-0 32651 ft²Unit 1-1 24711 ft²Unit 1-0 24651 ft²Unit 1-1 24651 ft²Unit 1-1 24434 ft²Unit MC 0-3 16494 ft²Unit MC 0-4 164,792 ft²Corridor271 ft²Stair271 ft²Stair271 ft²Stair434 ft²Unit MC 0-3 16434 ft²Unit MC 0-3 16434 ft²Unit MC 0-3 16494 ft²Unit MC 0-4 16533 ft²Unit MC 0-1 16612 ft²Unit MC 0-0 16271 ft²StairSD_1272865 ft²SupportColor Legend1BR1BR+D2BRStudioMC 1BRMC StudioCirculationCommonsMC CommonsCalculating...SD_1281SD_1274SD_1262kaas wilson architectsThe Village, LLCAssisted Senior First Floor Plan 434 ft²Unit 0-1 16711 ft²Unit 1-0 24711 ft²Unit 1-0 241,139 ft²Unit 2-1 E34.6+928 ft²Unit 1.5-0 321,139 ft²Unit 2-1 E34.6+1,139 ft²Unit 2-1 E34.6+868 ft²2-Story Lobby434 ft²Library434 ft²Visiting Physician816 ft²Wellness1,353 ft²Community Room542 ft²Small Activity1,105 ft²Unit 2-2 35.5SD_1261SD_1263SD_1273SD_1271SD_128324Color Legend1BR1BR+D2BRStudioCirculationCommonsCalculating...54949 ft²Area732 ft²Area937 ft²Unit 1.5-1 End711 ft²Unit 1-0 241,105 ft²Unit 2-2 35.5928 ft²Unit 1.5-0 32928 ft²Unit 1.5-0 32711 ft²Unit 1-0 24928 ft²Unit 1.5-0 32651 ft²Unit 1-1 24928 ft²Unit 1.5-0 32650 ft²Unit 1-2 24711 ft²Unit 1-0 24928 ft²Unit 1.5-0 32651 ft²Unit 1-1 24711 ft²Unit 1-0 24928 ft²Unit 1.5-0 32711 ft²Unit 1-0 24928 ft²Unit 1.5-0 32711 ft²Unit 1-0 24928 ft²Unit 1.5-0 32711 ft²Unit 1-0 24434 ft²Unit 0-1 16434 ft²Unit 0-1 16651 ft²Unit 1-1 24928 ft²Unit 1.5-0 32711 ft²Unit 1-0 241,139 ft²Unit 2-1 E34.6+4'-8"16'-4"17'-8"434 ft²Unit 0-1 16651 ft²Unit 1-1 24711 ft²Unit 1-0 24711 ft²Unit 1-0 24762 ft²Unit 1-3 24886 ft²Unit 1.5-1 End-2SD_1272657 ft²Support271 ft²Stair271 ft²Stair271 ft²Stair271 ft²Stair767 ft²Area4,724 ft²CorridorSD_1281SD_1274SD_1262kaas wilson architectsThe Village, LLCAssisted Senior Second Floor Plan 1,139 ft²Unit 2-1 E34.6+1,139 ft²Unit 2-1 E34.6+928 ft²Unit 1.5-0 32711 ft²Unit 1-0 241,105 ft²Unit 2-2 35.51,139 ft²Unit 2-1 E34.6+1,139 ft²Unit 2-1 E34.6+711 ft²Unit 1-0 24711 ft²Unit 1-0 24434 ft²Unit 0-1 16434 ft²Unit 0-1 16SD_1261SD_1263SD_1273SD_1271SD_12832454937 ft²Unit 1.5-1 End1,105 ft²Unit 2-2 35.5928 ft²Unit 1.5-0 32928 ft²Unit 1.5-0 32711 ft²Unit 1-0 24928 ft²Unit 1.5-0 32651 ft²Unit 1-1 24928 ft²Unit 1.5-0 32650 ft²Unit 1-2 24711 ft²Unit 1-0 24711 ft²Unit 1-0 24928 ft²Unit 1.5-0 32651 ft²Unit 1-1 24711 ft²Unit 1-0 24928 ft²Unit 1.5-0 32711 ft²Unit 1-0 24928 ft²Unit 1.5-0 32711 ft²Unit 1-0 24928 ft²Unit 1.5-0 32711 ft²Unit 1-0 24434 ft²Unit 0-1 16434 ft²Unit 0-1 16651 ft²Unit 1-1 24868 ft²Unit 1.5-2 32651 ft²Unit 1-1 24651 ft²Unit 1-1 24928 ft²Unit 1.5-0 32711 ft²Unit 1-0 24711 ft²Unit 1-0 24658 ft²Support651 ft²Unit 1-1 24434 ft²Unit 0-1 16886 ft²Unit 1.5-1 End-2762 ft²Unit 1-3 24928 ft²Unit 1.5-0 32928 ft²Unit 1.5-0 32SD_1272271 ft²Stair271 ft²Stair270 ft²Stair271 ft²Stair766 ft²Support4,716 ft²CorridorColor Legend1BR1BR+D2BRStudioCirculationCommonsCalculating...SD_1281SD_1274SD_1262kaas wilson architectsThe Village, LLCAssisted Senior Third Floor Plan 4.1CMU4.2Brick4.3Brick Soldier Course4.4Stone Sill5.1Aluminum Deck Rail7.1CFB Lap Siding, Color 17.2CFB Shake Siding, Color 28.1Prefinished PTAC Grille, Color TBD8.2Prefinished Metal Magic Pak Grille, Color TBDEXTERIOR MATERIALS KEY7.3CFB Panel, Color 37.4CFB Trim, Color 3Level 1100'-0"Level 2111'-1 7/8"Level -189'-4"Level 3122'-3 3/4"Truss Brg.131'-4 7/8"Site Plan932'-0"31'-4 7/8"7.27.37.17.27.34.47.34.34.34.17.47.48.2Level 1100'-0"Level 2111'-1 7/8"Level 3122'-3 3/4"Truss Brg.131'-4 7/8"7.27.14.24.37.47.3Level 1100'-0"Level 2111'-1 7/8"Level 3122'-3 3/4"Truss Brg.131'-4 7/8"Site Plan932'-0"7.37.47.17.24.24.34.48.27.3Level 1100'-0"Level 2111'-1 7/8"Level 3122'-3 3/4"Truss Brg.131'-4 7/8"?7.17.27.2??4.47.37.4Level 1100'-0"Level 2111'-1 7/8"Level 3122'-3 3/4"Truss Brg.131'-4 7/8"7.27.37.47.14.24.34.47.37.4kaas wilson architectsThe Village, LLCAssisted Senior Exterior Elevations1/8" = 1'-0"1South Elevation1/8" = 1'-0"2Southwest End Bay Elevation1/8" = 1'-0"3Southwest Elevation1/8" = 1'-0"4Main Entry West Elevation1/8" = 1'-0"5NorthwestElevation 4.1CMU4.2Brick4.3Brick Soldier Course4.4Stone Sill5.1Aluminum Deck Rail7.1CFB Lap Siding, Color 17.2CFB Shake Siding, Color 28.1Prefinished PTAC Grille, Color TBD8.2Prefinished Metal Magic Pak Grille, Color TBDEXTERIOR MATERIALS KEY7.3CFB Panel, Color 37.4CFB Trim, Color 3Level 1100'-0"Level 2111'-1 7/8"Level 3122'-3 3/4"Truss Brg.131'-4 7/8"7.17.47.27.37.34.24.34.47.4Level 1100'-0"Level 2111'-1 7/8"Level 3122'-3 3/4"Truss Brg.131'-4 7/8"Site Plan932'-0"31'-4 7/8"7.27.37.14.24.34.37.44.47.48.2Level 1100'-0"Level 2111'-1 7/8"Level 3122'-3 3/4"Truss Brg.131'-4 7/8"Site Plan932'-0"31'-4 7/8"7.17.37.37.37.44.24.34.37.27.28.2Level 1100'-0"Level 2111'-1 7/8"Level 3122'-3 3/4"Truss Brg.131'-4 7/8"Site Plan932'-0"7.17.27.47.37.34.24.34.4kaas wilson architectsThe Village, LLCAssisted Senior Exterior Elevations1/8" = 1'-0"1Northwest End Bay Elevation1/8" = 1'-0"2North Elevation - 11/8" = 1'-0"3North Elevation - 21/8" = 1'-0"4Northeast End Bay Elevation Level 1100'-0"Level 2111'-1 7/8"Level 3122'-3 3/4"Truss Brg.131'-4 7/8"Site Plan932'-0"7.27.37.47.17.34.24.34.47.4Level 1100'-0"Level 2111'-1 7/8"Level 3122'-3 3/4"Truss Brg.131'-4 7/8"Site Plan932'-0"7.37.47.27.27.37.47.14.24.34.47.4Level 1100'-0"Level 2111'-1 7/8"Level 3122'-3 3/4"Truss Brg.131'-4 7/8"Site Plan932'-0"7.27.27.37.37.37.14.24.34.47.4Level 1100'-0"Level 2111'-1 7/8"Level 3122'-3 3/4"Truss Brg.131'-4 7/8"Site Plan932'-0"7.17.27.38.27.47.44.34.24.1CMU4.2Brick4.3Brick Soldier Course4.4Stone Sill5.1Aluminum Deck Rail7.1CFB Lap Siding, Color 17.2CFB Shake Siding, Color 28.1Prefinished PTAC Grille, Color TBD8.2Prefinished Metal Magic Pak Grille, Color TBDEXTERIOR MATERIALS KEY7.3CFB Panel, Color 37.4CFB Trim, Color 3kaas wilson architectsThe Village, LLCAssisted Senior Exterior Elevations1/8" = 1'-0"1Southeast End Bay Elevation1/8" = 1'-0"2Southeast Elevation1/8" = 1'-0"3Northeast Elevation1/8" = 1'-0"4East Elevation 32,746 ft²Garage31'-0"SD_5001SD_5011SD_5002SD_50036'-8"32,746 ft²GarageSD_5004SD_50142468135710111214131517192116182022232527242628293031323334363839353740414243444645474951485052545658606264666869707274767880828486889092918987858381797775737153555759616365679SD_0051200 ft²Stair210 ft²StairGarage Dr.BIKESBIKESTRASHkaas wilson architectsThe Village, LLCIndependent Senior Garage Plan1/16" = 1'-0"1Level -1 patio2,683 ft²Commons1,606 ft²Unit 2.5-01,606 ft²Unit 2.5-01,617 ft²CommonsSD_5001SD_5011SD_5013SD_5012SD_5002SD_50031,128 ft²Unit 1.5-01,406 ft²Unit 2-01,259 ft²Unit 2-11,259 ft²Unit 2-11,364 ft²Unit 2-2704 ft²Unit 1-0 25.5704 ft²Unit 1-0 25.51,071 ft²Unit 1.5-31,071 ft²Unit 1.5-31,606 ft²Unit 2.5-01,606 ft²Unit 2.5-01,179 ft²Unit 1.5-4704 ft²Unit 1-0 25.51,432 ft²Unit 2.5-11,432 ft²Unit 2.5-1795 ft²Unit 1-1 25.5SD_5004SD_5014SD_005123'-7"276 ft²Stair276 ft²Stair2,355 ft²CorridorGARDENPLAZAColor Legend1 BR + DEN1BR2BR2BR+DCirculationCommonskaas wilson architectsThe Village, LLCIndependent Senior First Floor Plan1/16" = 1'-0"1Level 11,069 ft1,069 ft 2,356 ft²Corridor1,048 ft²Unit 1.5-21,432 ft²Unit 2.5-1SD_5001SD_5011SD_5013SD_5012SD_5002SD_50031,259 ft²Unit 2-11,259 ft²Unit 2-11,606 ft²Unit 2.5-01,606 ft²Unit 2.5-01,128 ft²Unit 1.5-01,364 ft²Unit 2-2704 ft²Unit 1-0 25.5704 ft²Unit 1-0 25.51,071 ft²Unit 1.5-31,071 ft²Unit 1.5-31,179 ft²Unit 1.5-4704 ft²Unit 1-0 25.51,432 ft²Unit 2.5-11,406 ft²Unit 2-01,606 ft²Unit 2.5-01,606 ft²Unit 2.5-0795 ft²Unit 1-1 25.5795 ft²Unit 1-1 25.5795 ft²Unit 1-1 25.51,634 ft²CommonsSD_5004SD_5014SD_0051276 ft²Stair276 ft²StairColor Legend1 BR + DEN1BR2BR2BR+DCirculationCommonskaas wilson architectsThe Village, LLCIndependent Senior Second Floor Plan1/16" = 1'-0"1Level 2 2,359 ft²Corridor1,179 ft²Unit 1.5-41,432 ft²Unit 2.5-1SD_5001SD_5011SD_5013SD_5012SD_5002SD_5003107'-8"704 ft²Unit 1-0 25.51,364 ft²Unit 2-21,259 ft²Unit 2-11,259 ft²Unit 2-11,406 ft²Unit 2-01,071 ft²Unit 1.5-31,071 ft²Unit 1.5-31,606 ft²Unit 2.5-01,606 ft²Unit 2.5-0704 ft²Unit 1-0 25.5795 ft²Unit 1-1 25.5704 ft²Unit 1-0 25.5795 ft²Unit 1-1 25.51,128 ft²Unit 1.5-01,606 ft²Unit 2.5-01,606 ft²Unit 2.5-01,432 ft²Unit 2.5-1SD_5004SD_50141,048 ft²Unit 1.5-21,134 ft²Unit 1.5-1795 ft²Unit 1-1 25.5SD_0051276 ft²Stair276 ft²Stair496 ft²CommonsColor Legend1 BR + DEN1BR2BR2BR+DCirculationCommonskaas wilson architectsThe Village, LLCIndependent Senior Third Floor Plan1/16" = 1'-0"1Level 3 Level 1100'-0"Level 2111'-1 7/8"Level 3122'-3 3/4"Truss Brg.131'-4 7/8"Site Plan932'-0"7.17.24.27.38.27.37.47.48.24.34.3Level 1100'-0"Level 2111'-1 7/8"Level 3122'-3 3/4"Truss Brg.131'-4 7/8"Site Plan932'-0"7.47.18.27.27.27.37.44.34.38.24.3Level 1100'-0"Level 2111'-1 7/8"Level 3122'-3 3/4"Truss Brg.131'-4 7/8"Site Plan932'-0"7.37.27.28.24.2Level 1100'-0"Level 2111'-1 7/8"Level 3122'-3 3/4"Truss Brg.131'-4 7/8"Site Plan932'-0"7.37.27.18.27.34.24.34.34.17.44.1CMU4.2Brick4.3Brick Soldier Course4.4Stone Sill5.1Aluminum Deck Rail7.1CFB Lap Siding, Color 17.2CFB Shake, Color 28.2Prefinished Metal Magic Pak Grille, Color TBDEXTERIOR MATERIALS KEY7.3CFB Panel, Color 37.4CFB Trim, Color 3kaas wilson architectsThe Village, LLCIndependent Senior Exterior Elevations1/8" = 1'-0"1Elevation 31/8" = 1'-0"2Elevation 11/8" = 1'-0"3Elevation 21/8" = 1'-0"4Elevation 4 Site Plan932'-0"7.27.47.37.28.24.27.2Level 1100'-0"Level 2111'-1 7/8"Level 3122'-3 3/4"Truss Brg.131'-4 7/8"Site Plan932'-0"7.47.17.27.47.44.3Level 1100'-0"Level 2111'-1 7/8"Level 3122'-3 3/4"Truss Brg.131'-4 7/8"Site Plan932'-0"7.27.38.27.47.14.2Level 1100'-0"Level 2111'-1 7/8"Level -189'-4"Level 3122'-3 3/4"Truss Brg.131'-4 7/8"7.47.27.17.34.28.24.14.34.3kaas wilson architectsThe Village, LLCIndependent Senior Exterior Elevations1/8" = 1'-0"1Elevation 51/8" = 1'-0"2Elevation 61/8" = 1'-0"3Elevation 71/8" = 1'-0"4Elevation 8 79,415 ft²Garage572 ft²Trash360 ft²Trash360 ft²Trash180 ft²Elevator220 ft²Elevator180 ft²Elevator190 ft²Stair A194 ft²Stair B194 ft²Stair CC C CCCCSD_5001CCCCCCCSD_5002BIKEHVACHVACSchema 1 LegendCirculationCommonkaas wilson architectThe Village, LLCMarket Rate Building Garage Floor Plan1/16" = 1'-0"1Level -1 140 ft²Stair D280 ft²Stair B740 ft²Unit 1-1740 ft²Unit 1-12,125 ft²Common2,265 ft²Common261 ft²Stair A616 ft²Unit 0-3616 ft²Unit 0-3619 ft²Unit 0-21,382 ft²Unit 3-1824 ft²Unit 1-2824 ft²Unit 1-2616 ft²Unit 0-3639 ft²Unit 0-15,330 ft²Corridor1,369 ft²Unit 2-3740 ft²Unit 1-11,369 ft²Unit 2-3740 ft²Unit 1-1740 ft²Unit 1-1740 ft²Unit 1-1740 ft²Unit 1-1198 ft²Trash220 ft²Elevator117 ft²Trash1,085 ft²Unit 2-6824 ft²Unit 1-21,357 ft²Unit 2-5740 ft²Unit 1-1616 ft²Unit 0-3616 ft²Unit 0-3824 ft²Unit 1-2639 ft²Unit 0-1117 ft²Trash619 ft²Unit 0-21,382 ft²Unit 3-1261 ft²Stair C824 ft²Unit 1-21,282 ft²Unit 3-2190 ft²Elevator190 ft²Elevator616 ft²Unit 0-3616 ft²Unit 0-3616 ft²Unit 0-3616 ft²Unit 0-3616 ft²Unit 0-3740 ft²Unit 1-1616 ft²Unit 0-3SD_5001616 ft²Common824 ft²Unit 1-2824 ft²Unit 1-21,113 ft²Unit 2-11,113 ft²Unit 2-11,206 ft²Unit 2-7740 ft²Unit 1-1740 ft²Unit 1-1740 ft²Unit 1-1740 ft²Unit 1-11,206 ft²Unit 2-7740 ft²Unit 1-1824 ft²Unit 1-2740 ft²Unit 1-11,113 ft²Unit 2-1SD_5002SD_50110SD_5019SD_5018SD_5017SD_5016SD_5015SD_5014SD_5013SD_5012SD_5011SD_5005SD_5004PLAZAPOOLLANSCAPEPUTTING616 ft²Unit 0-3616 ft²Unit 0-3Schema 1 Legend1 BR2 BR3BRCirculationCommonSTUDIOkaas wilson architectThe Village, LLCMarket Rate Building First Floor Plan1/16" = 1'-0"1Level 1 190 ft²Elevator117 ft²Trash619 ft²Unit 0-21,382 ft²Unit 3-1261 ft²Stair A616 ft²Unit 0-3616 ft²Unit 0-3824 ft²Unit 1-2824 ft²Unit 1-2639 ft²Unit 0-1616 ft²Unit 0-31,369 ft²Unit 2-3740 ft²Unit 1-11,369 ft²Unit 2-3740 ft²Unit 1-1740 ft²Unit 1-1740 ft²Unit 1-1740 ft²Unit 1-1280 ft²Stair B616 ft²Unit 0-33,150 ft²Corridor220 ft²Elevator198 ft²Trash740 ft²Unit 1-1740 ft²Unit 1-1616 ft²Unit 0-3140 ft²Stair D824 ft²Unit 1-21,085 ft²Unit 2-61,357 ft²Unit 2-5740 ft²Unit 1-1616 ft²Unit 0-3616 ft²Unit 0-3639 ft²Unit 0-1824 ft²Unit 1-2117 ft²Trash619 ft²Unit 0-21,382 ft²Unit 3-1261 ft²Stair C824 ft²Unit 1-21,282 ft²Unit 3-2190 ft²Elevator616 ft²Unit 0-3616 ft²Unit 0-3616 ft²Unit 0-3616 ft²Unit 0-3616 ft²Unit 0-3616 ft²Unit 0-3740 ft²Unit 1-1SD_5001824 ft²Unit 1-2824 ft²Unit 1-2740 ft²Unit 1-1740 ft²Unit 1-1740 ft²Unit 1-1740 ft²Unit 1-1740 ft²Unit 1-1740 ft²Unit 1-1824 ft²Unit 1-21,206 ft²Unit 2-71,206 ft²Unit 2-71,113 ft²Unit 2-11,113 ft²Unit 2-11,113 ft²Unit 2-1SD_5002SD_50110SD_5019SD_5018SD_5017SD_5016SD_5015SD_5014SD_5013SD_5012SD_5011SD_5005SD_50041,885 ft²Corridor121'-7 7/16"TWO STORY SPACE616 ft²Unit 0-3616 ft²Unit 0-3616 ft²Unit 0-3Schema 1 Legend1 BR2 BR3BRCirculationCommonSTUDIO9'-4"14'-8"kaas wilson architectThe Village, LLCMarket Rate Second Floor Plan1/16" = 1'-0"1Level 2 261 ft²Stair A616 ft²Unit 0-3616 ft²Unit 0-3117 ft²Trash619 ft²Unit 0-21,382 ft²Unit 3-1190 ft²Elevator824 ft²Unit 1-2639 ft²Unit 0-1824 ft²Unit 1-2616 ft²Unit 0-31,369 ft²Unit 2-31,369 ft²Unit 2-3740 ft²Unit 1-1740 ft²Unit 1-1740 ft²Unit 1-1740 ft²Unit 1-1740 ft²Unit 1-1740 ft²Unit 1-1280 ft²Stair B616 ft²Unit 0-35,330 ft²Corridor198 ft²Trash616 ft²Unit 0-3824 ft²Unit 1-2824 ft²Unit 1-21,357 ft²Unit 2-51,085 ft²Unit 2-6616 ft²Unit 0-3616 ft²Unit 0-3639 ft²Unit 0-1117 ft²Trash619 ft²Unit 0-21,382 ft²Unit 3-1261 ft²Stair C824 ft²Unit 1-21,282 ft²Unit 3-2824 ft²Unit 1-2740 ft²Unit 1-1190 ft²Elevator824 ft²Unit 1-2616 ft²Unit 0-3616 ft²Unit 0-3616 ft²Unit 0-3616 ft²Unit 0-3616 ft²Unit 0-3220 ft²Elevator824 ft²Unit 1-2824 ft²Unit 1-2824 ft²Unit 1-2740 ft²Unit 1-1740 ft²Unit 1-1616 ft²Unit 0-3SD_5001824 ft²Unit 1-21,113 ft²Unit 2-11,113 ft²Unit 2-11,206 ft²Unit 2-7740 ft²Unit 1-1740 ft²Unit 1-1740 ft²Unit 1-1740 ft²Unit 1-11,206 ft²Unit 2-7740 ft²Unit 1-1824 ft²Unit 1-2740 ft²Unit 1-11,113 ft²Unit 2-1SD_5002SD_50110SD_5019SD_5018SD_5017SD_5016SD_5015SD_5014SD_5013SD_5012SD_5011SD_5005SD_5004616 ft²Unit 0-3616 ft²Unit 0-3616 ft²Unit 0-3Schema 1 Legend1 BR2 BR3BRCirculationCommonSTUDIOkaas wilson architectThe Village, LLCMarket Rate Third Floor Plan1/16" = 1'-0"1Level 3 198 ft²Trash616 ft²Unit 0-3616 ft²Unit 0-3616 ft²Unit 0-3616 ft²Unit 0-3616 ft²Unit 0-3616 ft²Unit 0-3740 ft²Unit 1-1740 ft²Unit 1-1220 ft²Elevator5,330 ft²Corridor616 ft²Unit 0-3280 ft²Stair B740 ft²Unit 1-1740 ft²Unit 1-1740 ft²Unit 1-1740 ft²Unit 1-11,369 ft²Unit 2-3740 ft²Unit 1-11,369 ft²Unit 2-3616 ft²Unit 0-3639 ft²Unit 0-1117 ft²Trash619 ft²Unit 0-21,382 ft²Unit 3-1261 ft²Stair A616 ft²Unit 0-3616 ft²Unit 0-3824 ft²Unit 1-2824 ft²Unit 1-2190 ft²Elevator824 ft²Unit 1-2616 ft²Unit 0-3824 ft²Unit 1-2824 ft²Unit 1-21,357 ft²Unit 2-51,085 ft²Unit 2-6740 ft²Unit 1-1824 ft²Unit 1-21,282 ft²Unit 3-2117 ft²Trash616 ft²Unit 0-3616 ft²Unit 0-3639 ft²Unit 0-1619 ft²Unit 0-21,382 ft²Unit 3-1261 ft²Stair C824 ft²Unit 1-2190 ft²Elevator824 ft²Unit 1-2824 ft²Unit 1-2824 ft²Unit 1-2740 ft²Unit 1-1SD_5001824 ft²Unit 1-21,113 ft²Unit 2-11,113 ft²Unit 2-11,206 ft²Unit 2-7740 ft²Unit 1-1740 ft²Unit 1-1740 ft²Unit 1-1740 ft²Unit 1-11,206 ft²Unit 2-7740 ft²Unit 1-1824 ft²Unit 1-2740 ft²Unit 1-11,113 ft²Unit 2-1SD_5002SD_50110SD_5019SD_5018SD_5017SD_5016SD_5015SD_5014SD_5013SD_5012SD_5011SD_5005SD_5004616 ft²Unit 0-3616 ft²Unit 0-3616 ft²Unit 0-3Schema 1 Legend1 BR2 BR3BRCirculationCommonSTUDIOkaas wilson architectThe Village, LLCMarket Rate Fourth Floor Plan1/16" = 1'-0"1Level 4 Level 1100'-0"Level 2111'-1 7/8"Level -189'-4"Level 3122'-3 3/4"Level 4133'-5 5/8"Truss Brg.142'-6 3/4"Site Plan932'-0"7.17.24.35.15.27.27.28.24.24.4Site Plan932'-0"4.27.17.28.27.25.25.17.24.34.44.1Level 1100'-0"Level 2111'-1 7/8"Level 3122'-3 3/4"Level 4133'-5 5/8"Truss Brg.142'-6 3/4"Site Plan932'-0"7.17.25.14.37.24.35.24.4Site Plan932'-0"7.17.25.17.25.24.34.24.44.1Architectural Rockface CMU - Color TBD4.2Brick Masonry - Color TBD4.3Brick Soldier Course - Color TBD4.4Stone Still - Color TBD5.1Aluminum Deck Rail - Color TBD7.1Cement Fiber Lap Siding - Color TBD7.2Cement Fiber Panel Siding - Color TBD8.2Prefinished Metal Magic Pak Grille, Color TBDEXTERIOR MATERIALS KEY5.2Metal Panel Cladding - Color TBDkaas wilson architectThe Village, LLCMarket Rate Building Exterior Elevations3/32" = 1'-0"1Elevation - North 13/32" = 1'-0"2Elevation - Northeast3/32" = 1'-0"4Elevation - Northwest - Stinson3/32" = 1'-0"5Elevation - West - Stinson Site Plan932'-0"7.15.18.24.44.34.27.25.27.27.24.14.4Site Plan932'-0"7.25.15.27.24.44.34.24.14.4Site Plan932'-0"5.27.27.27.24.44.34.27.18.25.1Site Plan932'-0"7.18.27.25.14.24.34.4Level 1100'-0"Level 2111'-1 7/8"Level 3122'-3 3/4"Level 4133'-5 5/8"Truss Brg.142'-6 3/4"Site Plan932'-0"7.27.27.24.44.34.27.15.27.27.25.1Site Plan932'-0"5.27.28.27.15.17.24.44.34.27.2Site Plan932'-0"7.27.15.14.44.34.28.2Site Plan932'-0"5.27.27.27.18.24.14.44.34.25.1Site Plan932'-0"7.25.14.44.34.25.27.2Site Plan932'-0"5.27.24.44.37.27.14.27.25.25.14.1Architectural Rockface CMU - Color TBD4.2Brick Masonry - Color TBD4.3Brick Soldier Course - Color TBD4.4Stone Still - Color TBD5.1Aluminum Deck Rail - Color TBD7.1Cement Fiber Lap Siding - Color TBD7.2Cement Fiber Panel Siding - Color TBD8.2Prefinished Metal Magic Pak Grille, Color TBDEXTERIOR MATERIALS KEY5.2Metal Panel Cladding - Color TBDkaas wilson architectThe Village, LLCMarket Rate Building Exterior Elevations3/32" = 1'-0"1Elevation - West End - South3/32" = 1'-0"2Elevation - West End- East3/32" = 1'-0"3Elevation - West End - North3/32" = 1'-0"4Elevation - Interior Courtyard - East 13/32" = 1'-0"5Elevation - Interior Courtyard - East 23/32" = 1'-0"6Elevation - Interior Courtyard - South3/32" = 1'-0"7Elevation - Interior Courtyard - West 23/32" = 1'-0"8Elevation - East End - North3/32" = 1'-0"9Elevation - East End - West3/32" = 1'-0"10Elevation - East End - South                                                                                            178 East 9th Street, Suite 200 | St. Paul, MN 55101 | (651) 286-8450     Building a legacy – your legacy. Equal Opportunity Employer | wsbeng.com  S:\1Planning Commission\2018\02262018\Village Development - Plan Review - 021318-engineer.docx February 13, 2018 Ms. Traci Tomas Continental Property Group Re: The Village LLC Development St. Anthony Village, MN Preliminary PUD Plan Review WSB Project No. 02170-300 Dear Ms. Tomas: We have reviewed the development plan submittal received on January 29, 2018, for the above referenced project. Plans have been prepared by Wenck Associates, dated January 26, 2017 and include the storm water management plan, preliminary plat, site plan, grading plan, sanitary sewer, water, and storm utility plans. We have the following comments and recommendations for this preliminary PUD Plan review. General 1. Prior to the start of any construction, permits will need to be obtained and submitted to the city from the following agencies: a. MPCA Construction General Permit b. MPCA Sanitary Sewer Extension Permit c. MnDOH Watermain Extension Permit 2. Prior to the start of any construction, project approval will need to be obtained and submitted to the city from the following agencies: a. Hennepin County (access and traffic control associated with Kenzie Terrace/ CR 153) b. Minneapolis Park Board (access and traffic control associated with Stinson Parkway) 3. An operations and maintenance component will be required to ensure that the stormwater treatment facilities will be maintained long term. The declarations must at a minimum include the following: a. Annual inspection and reporting to the city b. Maintenance of all erosion control measures including, but not limited to: rip rap, storm sewer outlets, catch basin inlets, etc. (annual documentation required) c. Verification of system drawdowns with 48 hours (annual documentation required) d. Removal of sediment, trash and debris (annual documentation required) Cover Sheet and Project Notes 1. Reference the most recent edition (2018) of the City of St. Anthony’s General Specifications and Standard Detail Plates for Street and Utility Construction as a governing specification. Preliminary Plat 1. Remove the erroneous line within the 15’ drainage and utility easement along Kenzie Terrace. Mr. Ward  January 15, 2018  Page 2   S:\1Planning Commission\2018\02262018\Village Development - Plan Review - 021318-engineer.docx 2. Simplify the drainage and utility easements around the ponds and along the west side of the development by squaring them off and combining them with nearby and adjacent drainage and utility easements. 3. Provide an easement for the shared hydrant service lead crossing over between both lots 1 and 2 of block 1. Existing Conditions, Erosion, and Sediment Control 1. Submit erosion control plans with final plat/construction plan submittal. Site Plan 1. Provide 6’ wide concrete walks per City standards where 5’ concrete walks are currently shown. 2. Show necessary removals for the installation of the proposed utilities along Kenzie Terrace/ CR 153. Grading Plan 1. Structural calculations for the proposed retaining walls greater than 4.0’ in height need to be submitted for review prior to construction of the walls. The submittal will need to include: a. Certification of a qualified MN licensed professional b. Soil boring logs and geotechnical recommendation for support c. Identify the type of material for the wall and design details d. Provide details of the wall construction e. Provide a safety railing or fence above the wall 2. Driveway ramps into the buildings should not exceed 10%. 3. The outdoor patios and plazas with the buildings do not appear to have any slope. How will surface drainage be accomplished? 4. The NWL of the southwestern stormwater pond is the same elevation as the Multi-residential 1 garage floor (912.0). 5. The HWL of both ponds exceed the garage levels of the connected buildings. 6. Demonstrate how the proposed improvements accommodate for the current ground water elevations. 7. There are areas where the slopes shown do not meet the minimum required 2% or exceed the maximum allowed 3:1. 8. The driveway elevations at the top of the ramps need to be raised to achieve a minimum 1’ freeboard above the adjacent road’s EOF. Sanitary Sewer and Watermain 1. There appears to be a conflict between the storm sewer and sanitary sewer service to the assisted senior living facility. Mr. Ward  January 15, 2018  Page 3   S:\1Planning Commission\2018\02262018\Village Development - Plan Review - 021318-engineer.docx 2. Provide 4” thickness of insulation at watermain and storm sewer crossings where storm sewer and drainage structures provide less than 3.5 feet of cover (not 2.0’) over the watermain. 3. Verify an 8” watermain as proposed will provide adequate fire flow and pressure to serve the number of units and building elevations being proposed. 4. Water and sanitary sewer connections to buildings must conform to the plumbing code as interpreted by the local building officials. 5. The applicant shall include a drain tile system behind the curbs to convey sump pump discharge from the units as detailed in the City Standard Specifications. 6. The proposed 24” pipe between Ex. Structure 16 and MH 1 appears to be oversized assuming it is proposed to take the existing 9” line from the west and the proposed 10” line from the development. 7. Due to the depth, this pipe should be shown as SDR 26 with the construction plans and the adjacent storm sewer should be shown as being impacted with construction. 8. Provide for granular bedding for installed utility pipe in unsuitable materials per the applicable City standard detail plate. 9. Show and call out the size and material of the existing waterlines where the development is connecting on the west and south. 10. The Independent Senior Living facility is shown with an 8” DIP service while the other facilities were shown with 6” DIP services. Was this done by design? 11. Provide 45-degree bends in lieu of 90-degree bends near the western connection with the existing watermain. 12. Place a hydrant at the original proposed location along Kenzie Terrace near the connection to the existing watermain on the south side of the development. The main can be capped/plugged at that point. Detail Sheet 1. Include all applicable standard detail plates from the most recent edition (2018) of the City of St. Anthony’s General Specifications and Standard Detail Plates for Street and Utility Construction for project construction. Thank you for the opportunity to provide comments on this project. If you have any questions, please do not hesitate to contact me at 763-287-7182. Sincerely, WSB & Associates, Inc. Todd Hubmer, PE City Engineer 701 Xenia Avenue South | Suite 300 | Minneapolis, MN 55416 | (763) 541-4800 Building a legacy – your legacy. Equal Opportunity Employer | wsbeng.com C:\Users\jabramson\FROM KP\Joey's Projects Transfer\St Anthony Village\SAV - The Village LLC Stormwater Management Review Memo - 02-16-2018.docx Memorandum To: Breanne Rothstein From: Joey Abramson Cc: Todd Hubmer Date: February 16, 2018 Re: The Village LLC Development Stormwater Management Review WSB has reviewed the stormwater management memorandum produced by Wenck for the above project dated January 26, 2018. The review has found that the project complies with applicable freeboard and rate control stormwater management regulations. The applicant needs to provide updated information related to water quality treatment. See comments below. Comments on the stormwater management plan include the following: - Ponds should be labeled on the plans to correspond to the IDs in the report and models: North Pond should include “1P” and South Pond should include “2P” - The EOF for Pond 2P (south) is noted to be “18.90” on the plans, but is noted as 919.0 in the stormwater management report. - The report notes that the proposed development will achieve 65% TP loading reduction (page 1) but the table indicates that 72% removals will be achieved. Revise for consistency. - It should be considered that unless the BayFilter is capable of removing dissolved phosphorus from stormwater, its efficacy will likely be reduced from 50% removal if it is downstream of the sedimentation ponds. This is because those ponds already remove a large portion of the particulate phosphorus. Applicant must provide clarification on the BayFilter removal abilities or provide updated calculations for removals. BREMER BANK PARCEL 716.23 432.18S 01° 07' 07" E 3.02S 39°13'04" E1041.74ALLEY232.76100.00S 50°46'56" WN 89°07'06" E947.20564.06S 50°33'24" WPARCEL 1PARCEL 2PARCEL 3KENZIE TERRACE(CO. RD. NO. 153)STINSON PARKWAY1027.85N 00°36'35" EALLEY21BLOCK ONEOUTLOT ABLOCK TWO1137494 S.F.3.16 AC.191086 S.F.4.39 AC.274811 S.F.6.31 AC.N89°18'31"E295.01S0°06'35"E 225.89L=176.80R=851.73Δ=11°53'36"PROPOSEDDRAINAGE ANDUTILITY EASEMENT(48,669 S.F.)PROPOSED DRAINAGE & UTILITY EASEMENT OVERALL OF OUTLOT AN0°06'31"W 311.67Parcel 1:That part of the South 1/2 of the Northwest Quarter of Section 7, Township 29, Range 23, beginning at apoint in the South line of said Tract 100 feet East of the Southwest corner thereof; thence North 1079.8 feet;thence East parallel to the South line of said Quarter Section 1041.74 feet; thence South to center of StateHighway No. 63; thence southwesterly along said center line of State Highway No. 63 and St. Anthony andTaylor Falls Road to intersection of center line of said road with the South line of said Quarter Section;thence West along said latter line to the point of beginning, except that part thereof embraced in the South365 feet of the West 395 feet of the Southwest Quarter of the Northwest Quarter of said Section 7 andexcept the easterly 100 feet thereof.Except that part taken for highway purposes by the County of Hennepin as evidenced by Final Certificate,filed May 16, 1985, as Document No. 1652500.Parcel 2:That part of the following described property:The Easterly 100 feet of that part of the South half of the Northwest Quarter, Section 7, Township 29, Range23, beginning at a point in the South line of said Tract 100 feet East of the Southwest corner thereof, thenceNorth 1079.8 feet, thence East parallel to the South line of said quarter section 1041.74 feet; thence Southto center of State Highway No. 63; thence Southwesterly along said center line of State Highway 63 and St.Anthony and Taylor Falls Road to intersection of center line of said road with the South line of said quartersection; thence West along said latter line to the point of beginning,lying Westerly of the following described line and its Southerly extension,Beginning at a point on the North line of the above described Tract, distant 5.50 feet easterly of theNorthwest corner thereof, assumed bearing of said North line is North 89 degrees 24 minutes 53 secondsEast; thence South 01 degree 00 minutes 45 seconds East a distance of 486.65 feet, more or less, to theSouth line of the above described tract and there terminating.Parcel 3:That part of the Northwest Quarter of Section 7, Township 29, Range 23, described as commencing at apoint on the South line of said Northwest Quarter distant 100 feet Easterly from the Southwest corner of saidNorthwest Quarter; thence Northerly parallel with the West line of said Northwest Quarter to the South lineof MURRAY HEIGHTS ADDITION TO MINNEAPOLIS, being the actual point of beginning; thence Southerlyalong said parallel line to a point distant 1079.8 feet Northerly from said South line of the Northwest Quarter;thence on an assumed bearing of North 89 degrees 24 minutes 53 seconds East, parallel with the South lineof said Northwest Quarter a distance of 947.24 feet; thence North 01 degree 00 minutes 45 seconds East tosaid South line of MURRAY HEIGHTS ADDITION TO MINNEAPOLIS; thence Westerly along the lastdescribed line to the point of beginning.All situated in the County of Hennepin and State of Minnesota.Torrens PropertyBeing registered land as evidenced by Certificate of Title No. 10665952501 Lowry Avenue NE,St. Anthony, MN 55418WENCK ASSOCIATES INC.1800 PIONEER CREEK CENTERMAPLE PLAIN MN, 55359SURVEYS BASED ON ALTA/ACSM LAND TITLE SURVEY PREPARED BY PREMIERLAND SURVEYING, LLC, DATED JUNE 6, 2016 AND CERTIFICATE OF SURVEY BYCLARK ENGINEERING DATED MAY 3, 2010.THE VILLAGE LLC1907 WAYZATA BLVD. E. #250WAYZATA, MN 55391DECEMBER 20, 2017TOTAL AREA TO BE PLATTED = 669,816 S.F. (15.38 AC.) ±2501 LOWRY AVENUE NE, ST. ANTHONY, MN 55418EXSTING IMPROVEMENTS AND UNDERLYING PROPERTY INFORMATION ARESHOWN LIGHTLY IN THE BACKGROUND.DRAINAGE AND UTILITY EASEMENTS SHOWN BEING FIVE FEET IN WIDTH ANDADJOINING SIDE LOT LINES, AND BEING 10 FEET IN WIDTH AND ADJOININGREAR LOT LINES, UNLESS OTHERWISE SHOWN.THE VILLAGE LLCDEVELOPMENTDrawn By:Issue Date:Project #:5005-0003RAGTHE VILLAGE LLC DEVELOPMENTTHE VILLAGE, LLC1907 WAYZATA BLVD, SUITE 250M:\5005\0003\DESIGN\SURVEY\5005-0003preplat3.dwgDescription:Date:WAYZATA, MN 55391Issue #:ST. ANTHONY VILLAGE, MINNESOTA12/06/20171Issue #Prepared For:XX/XX/XXXX DESCRIPTION ISSUE #Sheet #:Sheet Title:1/25/2018 2:01:51 PMDate:I HEREBY CERTIFY THAT THIS PLAN,SPECIFICATION, OR REPORT WASPREPARED BY ME OR UNDER MYDIRECT SUPERVISION AND THAT I AM ADULY REGISTERED PROFESSIONALENGINEER UNDER THE LAWS OF THESTATE OF MINNESOTA.License #:WARNING:THE CONTRACTOR SHALL BE RESPONSIBLE FOR CALLING FOR LOCATIONS OF ALL EXISTING UTILITIES. THEY SHALLCOOPERATE WITH ALL UTILITY COMPANIES IN MAINTAINING THEIR SERVICE AND/OR RELOCATION OF LINES.THE CONTRACTOR SHALL CONTACT GOPHER STATE ONE CALL AT 651-454-0002 AT LEAST 48 HOURS IN ADVANCE FORTHE LOCATIONS OF ALL UNDERGROUND WIRES, CABLES, CONDUITS, PIPES, MANHOLES, VALVES OR OTHER BURIEDSTRUCTURES BEFORE DIGGING. THE CONTRACTOR SHALL REPAIR OR REPLACE THE ABOVE WHEN DAMAGED DURINGCONSTRUCTION AT NO COST TO THE OWNER.TWIN CITY AREA: 651-454-0002TOLL FREE 1-800-252-1166CALL BEFORE YOU DIGWENCK ASSOCIATES INC.1800 PIONEER CREEK CENTERMAPLE PLAIN MN, 55359C-101PRELIMINARYPLATAccess Easement for futuresite access when BremerBank Site RedevelopsAccess Easement for futuresite access when BremerBank Site RedevelopsNeed to dedicateadditional right ofway fully coversidewalk andboulevard in right ofwayNeed to dedicateadditional right ofway fully cover rightturn lane, sidewalkand boulevard inright of wayNeed corner cutsto accommodateradii, signage, etcwithin theintersectionNeed sighteasement (Note thespelling is sight, notsite) to cover sightdistance forvehicles comingaround the curve C-104SITE PLANDrawn By:Issue Date:Project #:5005-0003RAGTHE VILLAGE LLC DEVELOPMENTTHE VILLAGE, LLC1907 WAYZATA BLVD, SUITE 250M:\5005\0003\DESIGN\CAD\PLANSHEETS\C-104 Site Plan.dwgDescription:Date:WAYZATA, MN 55391Issue #:ST. ANTHONY VILLAGE, MINNESOTA12/06/20171Issue #Prepared For:XX/XX/XXXXDESCRIPTIONISSUE #Sheet #:Sheet Title:1/25/2018 2:04:12 PMDate:I HEREBY CERTIFY THAT THIS PLAN,SPECIFICATION, OR REPORT WASPREPARED BY ME OR UNDER MYDIRECT SUPERVISION AND THAT I AM ADULY REGISTERED PROFESSIONALENGINEER UNDER THE LAWS OF THESTATE OF MINNESOTA.License #:WARNING:THE CONTRACTOR SHALL BE RESPONSIBLE FOR CALLING FOR LOCATIONS OF ALL EXISTING UTILITIES. THEY SHALLCOOPERATE WITH ALL UTILITY COMPANIES IN MAINTAINING THEIR SERVICE AND/OR RELOCATION OF LINES.THE CONTRACTOR SHALL CONTACT GOPHER STATE ONE CALL AT 651-454-0002 AT LEAST 48 HOURS IN ADVANCE FORTHE LOCATIONS OF ALL UNDERGROUND WIRES, CABLES, CONDUITS, PIPES, MANHOLES, VALVES OR OTHER BURIEDSTRUCTURES BEFORE DIGGING. THE CONTRACTOR SHALL REPAIR OR REPLACE THE ABOVE WHEN DAMAGED DURINGCONSTRUCTION AT NO COST TO THE OWNER.TWIN CITY AREA: 651-454-0002TOLL FREE 1-800-252-1166CALL BEFORE YOU DIGSITE ANALYSIS TABLEEXISTING ZONING R1 SINGLE FAMILY RESIDENTIALLOT AREA±669,585 SF (±15.4 AC)TOTAL BUILDING AREA±134,593 SF (20.1%)GREENSPACE SUMMARYIMPERVIOUS AREA (INCL. BLDG AND POND)PROPOSEDPERVIOUS AREABL. 1 LT. 1 - IND. LIVINGPARKING STALLS SUMMARY RAMPPARKWAYBL. 2 LT. 1 - MULTI RES.SETBACK SUMMARY BUILDINGEAST30'WESTNORTHPROPOSED ZONING PUD - PLANNED UNIT DEVELOPMENT20'20'20'SOUTHEAST±378,084 SF (8.68 AC)BL. 1 LT. 2 - AST. LIVINGSOUTHWEST20'INTERNAL0'ADA30TOT4301156145061STANDARDSURFACEADDITIONAL PROOF STALLS37 370TOTAL PARKING COUNTRAMP SURFACE0000±291,501 SF (6.69 AC)8886231447126124358405 273 15 13 706PROPERTY LINESITE LEGENDSETBACK LINEEASEMENT LINEPROPOSED CURB AND GUTTERBITUMINOUS PAVEMENTCONCRETE SIDEWALK PAVEMENT.CONSTRUCTION LIMITSNeed to removeexisting drivewayapron and placefull height curb andgutterNeed to close offmedianLength of Left TurnLane appears tooshort, need toextendWe stronglyencourage parking beremoved within thefunctional area of theintersectionHas autoturn beenrun to determinevehicle movements& radii work?(besides fire trucks)Need to submit turnlane design details(Examples includecross slopes,pavement Designmatching theexisting, striping,signing, storm, etc) C-105SITE PLANNORTHDrawn By:Issue Date:Project #:5005-0003RAGTHE VILLAGE LLC DEVELOPMENTTHE VILLAGE, LLC1907 WAYZATA BLVD, SUITE 250M:\5005\0003\DESIGN\CAD\PLANSHEETS\C-105 Site Plan North.dwgDescription:Date:WAYZATA, MN 55391Issue #:ST. ANTHONY VILLAGE, MINNESOTA12/06/20171Issue #Prepared For:XX/XX/XXXXDESCRIPTIONISSUE #Sheet #:Sheet Title:1/25/2018 2:04:53 PMDate:I HEREBY CERTIFY THAT THIS PLAN,SPECIFICATION, OR REPORT WASPREPARED BY ME OR UNDER MYDIRECT SUPERVISION AND THAT I AM ADULY REGISTERED PROFESSIONALENGINEER UNDER THE LAWS OF THESTATE OF MINNESOTA.License #:WARNING:THE CONTRACTOR SHALL BE RESPONSIBLE FOR CALLING FOR LOCATIONS OF ALL EXISTING UTILITIES. THEY SHALLCOOPERATE WITH ALL UTILITY COMPANIES IN MAINTAINING THEIR SERVICE AND/OR RELOCATION OF LINES.THE CONTRACTOR SHALL CONTACT GOPHER STATE ONE CALL AT 651-454-0002 AT LEAST 48 HOURS IN ADVANCE FORTHE LOCATIONS OF ALL UNDERGROUND WIRES, CABLES, CONDUITS, PIPES, MANHOLES, VALVES OR OTHER BURIEDSTRUCTURES BEFORE DIGGING. THE CONTRACTOR SHALL REPAIR OR REPLACE THE ABOVE WHEN DAMAGED DURINGCONSTRUCTION AT NO COST TO THE OWNER.TWIN CITY AREA: 651-454-0002TOLL FREE 1-800-252-1166CALL BEFORE YOU DIGPROPERTY LINESITE LEGENDSETBACK LINEEASEMENT LINEPROPOSED CURB AND GUTTERBITUMINOUS PAVEMENTCONCRETE SIDEWALK PAVEMENT.321456789101112131415B612 CURB AND GUTTERB612 TIP-OUT CURB AND GUTTERMOUNTABLE CURB AND GUTTER2' WIDE CONCRETE VALLEY GUTTERBITUMINOUS PAVEMENT5' WIDE CONCRETE SIDEWALK6' WIDE CONCRETE TRAIL8' WIDE BITUMINOUS TRAILCONCRETE DRIVEWAY APRONMATCH INTO EXISTING PAVEMENTMATCH INTO EXISTING CURB AND GUTTERMATCH INTO EXISTING SIDEWALKPATCH BITUMINOUS PAVEMENT1617KEYNOTE LEGEND18192021222324252627PARALLEL PARKING STALLS - 22' X 8.5' TYP.STANDARD PARKING STALL - 9' X 18' TYP.ADA PARKING STALLS WITH ACCESS AISLE & CURB RAMPPLAZA - SEE ARCH. AND LANDSCAPE PLANSPATIO - SEE ARCH. AND LANDSCAPE PLANSPROPERTY LINERETAINING WALL W/ RAILING. SEE ARCH. FOR RAILINGFENCE - SEE LANDSCAPING PLANS4" STRIPINGDOG PARKTOT LOT/COMMUNITY AREAADA PEDESTRIAN RAMPGARAGE ENTRANCEBUILDING SETBACKLOT LINEDECORATIVE PAVEMENT SEE LANDSCAPE PLANSRAILING - SEE ARCH. PLANSSTREET LIGHTCROSSWALK2829303132With existing curbbeing integral totravel lanepavement, fullconcrete panelmust be replacedwhen CB is moved.With existing curbbeing integral totravel lanepavement, fullconcrete panelmust be replacedwhen CB is moved.Right of way shouldcover to 1' behindback of sidewalk6' boulevard C-106SITE PLANSOUTHDrawn By:Issue Date:Project #:5005-0003RAGTHE VILLAGE LLC DEVELOPMENTTHE VILLAGE, LLC1907 WAYZATA BLVD, SUITE 250M:\5005\0003\DESIGN\CAD\PLANSHEETS\C-106 Site Plan South.dwgDescription:Date:WAYZATA, MN 55391Issue #:ST. ANTHONY VILLAGE, MINNESOTA12/06/20171Issue #Prepared For:XX/XX/XXXX DESCRIPTION ISSUE #Sheet #:Sheet Title:1/25/2018 2:33:23 PMDate:I HEREBY CERTIFY THAT THIS PLAN,SPECIFICATION, OR REPORT WASPREPARED BY ME OR UNDER MYDIRECT SUPERVISION AND THAT I AM ADULY REGISTERED PROFESSIONALENGINEER UNDER THE LAWS OF THESTATE OF MINNESOTA.License #:WARNING:THE CONTRACTOR SHALL BE RESPONSIBLE FOR CALLING FOR LOCATIONS OF ALL EXISTING UTILITIES. THEY SHALLCOOPERATE WITH ALL UTILITY COMPANIES IN MAINTAINING THEIR SERVICE AND/OR RELOCATION OF LINES.THE CONTRACTOR SHALL CONTACT GOPHER STATE ONE CALL AT 651-454-0002 AT LEAST 48 HOURS IN ADVANCE FORTHE LOCATIONS OF ALL UNDERGROUND WIRES, CABLES, CONDUITS, PIPES, MANHOLES, VALVES OR OTHER BURIEDSTRUCTURES BEFORE DIGGING. THE CONTRACTOR SHALL REPAIR OR REPLACE THE ABOVE WHEN DAMAGED DURINGCONSTRUCTION AT NO COST TO THE OWNER.TWIN CITY AREA: 651-454-0002TOLL FREE 1-800-252-1166CALL BEFORE YOU DIGPROPERTY LINESITE LEGENDSETBACK LINEEASEMENT LINEPROPOSED CURB AND GUTTERBITUMINOUS PAVEMENTCONCRETE SIDEWALK PAVEMENT.321456789101112131415B612 CURB AND GUTTERB612 TIP-OUT CURB AND GUTTERMOUNTABLE CURB AND GUTTER2' WIDE CONCRETE VALLEY GUTTERBITUMINOUS PAVEMENT5' WIDE CONCRETE SIDEWALK6' WIDE CONCRETE TRAIL8' WIDE BITUMINOUS TRAILCONCRETE DRIVEWAY APRONMATCH INTO EXISTING PAVEMENTMATCH INTO EXISTING CURB AND GUTTERMATCH INTO EXISTING SIDEWALKPATCH BITUMINOUS PAVEMENT1617KEYNOTE LEGEND18192021222324252627282930PARALLEL PARKING STALLS - 22' X 8.5' TYP.STANDARD PARKING STALL - 9' X 18' TYP.ADA PARKING STALLS WITH ACCESS AISLE & CURB RAMPPLAZA - SEE ARCH. AND LANDSCAPE PLANSPATIO - SEE ARCH. AND LANDSCAPE PLANSPROPERTY LINERETAINING WALL W/ RAILING. SEE ARCH. FOR RAILINGFENCE - SEE LANDSCAPING PLANS4" STRIPINGDOG PARKTOT LOT/COMMUNITY AREAADA PEDESTRIAN RAMPGARAGE ENTRANCEBUILDING SETBACKLOT LINEDECORATIVE PAVEMENT SEE LANDSCAPE PLANSRAILING - SEE ARCH. PLANSSTREET LIGHTCROSSWALK3132Right of way shouldcover to 1' behindback of sidewalkwith 6' boulevardRemove curb cutand replace withfull height curb andgutterRemove curb cutand replace withfull height curb andgutterRemove existingmarked crosswalk,without ADA rampsit is out ofcompliance. If acrossing is desired,discuss more withHennepin CountyDiscuss withHennepin Countymaximum widthallowable forprivate entrance.New entranceneeds to meetsight distance(horizontal andvertical) C-301GRADINGPLANDrawn By:Issue Date:Project #:5005-0003RAGTHE VILLAGE LLC DEVELOPMENTTHE VILLAGE, LLC1907 WAYZATA BLVD, SUITE 250M:\5005\0003\DESIGN\CAD\PLANSHEETS\C-301 Grading Plan.dwgDescription:Date:WAYZATA, MN 55391Issue #:ST. ANTHONY VILLAGE, MINNESOTA12/06/20171Issue #Prepared For:XX/XX/XXXXDESCRIPTIONISSUE #Sheet #:Sheet Title:1/25/2018 2:06:43 PMDate:I HEREBY CERTIFY THAT THIS PLAN,SPECIFICATION, OR REPORT WASPREPARED BY ME OR UNDER MYDIRECT SUPERVISION AND THAT I AM ADULY REGISTERED PROFESSIONALENGINEER UNDER THE LAWS OF THESTATE OF MINNESOTA.License #:WARNING:THE CONTRACTOR SHALL BE RESPONSIBLE FOR CALLING FOR LOCATIONS OF ALL EXISTING UTILITIES. THEY SHALLCOOPERATE WITH ALL UTILITY COMPANIES IN MAINTAINING THEIR SERVICE AND/OR RELOCATION OF LINES.THE CONTRACTOR SHALL CONTACT GOPHER STATE ONE CALL AT 651-454-0002 AT LEAST 48 HOURS IN ADVANCE FORTHE LOCATIONS OF ALL UNDERGROUND WIRES, CABLES, CONDUITS, PIPES, MANHOLES, VALVES OR OTHER BURIEDSTRUCTURES BEFORE DIGGING. THE CONTRACTOR SHALL REPAIR OR REPLACE THE ABOVE WHEN DAMAGED DURINGCONSTRUCTION AT NO COST TO THE OWNER.TWIN CITY AREA: 651-454-0002TOLL FREE 1-800-252-1166CALL BEFORE YOU DIGPROPERTY LINEGRADING LEGENDSETBACK LINEEASEMENT LINEPROPOSED STORM SEWERPROPOSED CATCH BASINPROPOSED MANHOLE1.00%FL=9XXPROPOSED SPOT ELEVATION(ALL ELEVATIONS ARE TO FLOWLINE UNLESSOTHERWISE NOTED)ME=9XXTC=9XXMATCH EXISTING SPOT ELEVATIONTOP OF CURB SPOT ELEVATIONEOF=9XXEMERGENCY OVERFLOW SPOT ELEVATIONHP=9XXHIGH POINT SPOT ELEVATIONPROPOSED RIDGE / VALLEY / BREAKLINEPROPOSED SLOPE ARROWEXISTING STORM STRUCTUREEXISTING STORM SEWEREXISTING CONTOURPROPOSED CONTOUR9XXNOTE: SEE C-501 STORM SEWER PLAN FOR STORM SEWERDESIGN DETAILSFG=9XXFINISHED GRADE SPOT ELEVATIONTW=9XXTOP OF WALL SPOT ELEVATIONBW=9XXBOTTOM / TOE OF WALL SPOT ELEVATIONCONSTRUCTION LIMITSEOF FLOW ARROWRemove existingstructure, extendthe pipe, and placenew structureoutside of curb linewithin entrance.Storm sewerconnection ratesmust not exceedexisting flows.County permitrequired for stormconnection.Need to move CBto new curb lineand remove oldMove pipe runoutside of proposedright of wayMove outside ofproposed right ofwayMove outside ofproposed right ofwayMove outside ofproposed right ofway L-100PLANTING PLAN -OVERALL CONCEPTDrawn By:Issue Date:Project #:5005-0003RAGTHE VILLAGE LLC DEVELOPMENTTHE VILLAGE, LLC1907 WAYZATA BLVD, SUITE 250M:\5005\0003\DESIGN\CAD\PLANSHEETS\L-101 Planting Plan.dwgDescription:Date:WAYZATA, MN 55391Issue #:ST. ANTHONY VILLAGE, MINNESOTA12/06/20171Issue #Prepared For:XX/XX/XXXX DESCRIPTION ISSUE #Sheet #:Sheet Title:1/26/2018 12:42:30 AMDate:I HEREBY CERTIFY THAT THIS PLAN,SPECIFICATION, OR REPORT WASPREPARED BY ME OR UNDER MYDIRECT SUPERVISION AND THAT I AM ADULY REGISTERED PROFESSIONALENGINEER UNDER THE LAWS OF THESTATE OF MINNESOTA.License #:WARNING:THE CONTRACTOR SHALL BE RESPONSIBLE FOR CALLING FOR LOCATIONS OF ALL EXISTING UTILITIES. THEY SHALLCOOPERATE WITH ALL UTILITY COMPANIES IN MAINTAINING THEIR SERVICE AND/OR RELOCATION OF LINES.THE CONTRACTOR SHALL CONTACT GOPHER STATE ONE CALL AT 651-454-0002 AT LEAST 48 HOURS IN ADVANCE FORTHE LOCATIONS OF ALL UNDERGROUND WIRES, CABLES, CONDUITS, PIPES, MANHOLES, VALVES OR OTHER BURIEDSTRUCTURES BEFORE DIGGING. THE CONTRACTOR SHALL REPAIR OR REPLACE THE ABOVE WHEN DAMAGED DURINGCONSTRUCTION AT NO COST TO THE OWNER.TWIN CITY AREA: 651-454-0002TOLL FREE 1-800-252-1166CALL BEFORE YOU DIGPLANTING LEGENDOVERSTORY TREEORNAMENTAL TREECONIFEROUS TREECONIFEROUS SHRUBDECIDUOUS SHRUBL - 101L - 103L - 102EXISTING TREEVerify intersectionsight distance toensure sightdistance is notobstructed bylandscapingVerify intersectionsight distance toensure sightdistance is notobstructed bylandscapingVerify horizontalcurve sightdistance to ensuresight distance isnot obstructed bylandscaping   Breanne Rothstein  City of Saint Anthony Village  3301 Silver Lake Road  St. Anthony, MN 55418  planner@savmn.com      Members of the St. Anthony City Council and Planning Commission,    St. Anthony is a great place to live, work and play. Part of making St. Anthony a better community is  planned growth. As residents we want the community to grow and thrive; we just want it to be done in  a way that protects our community, our environment and our quality of life.    I grew up in this City and now as a baby boomer returned to settle in as the golden years approach.   I  am a second‐generation resident/owner of the Kenzington Condominium and concerned with the  proposed development by The Village, LLC. The development proposes the building 70 feet from my  unit.  As my unit and the other 40 units on the west side of the building, the proposed alignment will  leave many homeowners in a very dark mood.   Dating back to the 19th century, there were laws to  prevent a neighbor from going ahead with construction if it blocks out sunshine. It is frustrating to see  that that this could happen to us.   I would hope as residents of St. Anthony yourself, that you would  give consideration to the location of the building and the impact it would have to block light.  St.  Anthony is known for its suburban structure not urban.   A community where you can enjoy more space  and have a bigger area for a backyard or garden.      Not to mention the value of our property of the building significantly altering our view.   This proposed  development is set to deliberately block our views. A blocked view would make the home worth less and  we all want increased property value not decreased.     Thank you for considering all aspects of this proposed development carefully in the best interest for the  City and its current and future residents.    Karen Hanson  2601 Kenzie Terrace #417  St. Anthony, MN 55418    kmhanson074@gmail.com  651‐485‐6011