Loading...
HomeMy WebLinkAboutCC PACKET 03272018 If you would like to request special accommodations or alternative formats, please contact the City Clerk at 612-782-3313 or email city@savmn.com. People who are deaf or hard of hearing can contact us by using 711 Relay. Our Mission is to be a progressive and welcoming Village that is walkable, sustainable and safe.       Call to Order.  Pledge of Allegiance. Roll Call. Consideration, discussion, and possible action on all of the following items: I. Approval of the March 27, 2018, City Council Meeting Agenda. (action requested.) II. Proclamations and Recognitions. A. Legislative Update by Senator Carolyn Laine and Representative Mary Kunesh-Podein. III. Consent Agenda. These items are considered routine and will be enacted by one motion. There will be no separate discussion of these items unless a Councilmember or citizen so requests, in which the item will be removed from the Consent Agenda and placed elsewhere on the agenda. A. Approval of March 13, 2018, City Council meeting minutes. (pp.1-7) B. Licenses and Permits. (pp.9) C. Claims. (pp.11-13) IV. Public Hearing. 2018 Street & Utility Improvement Project (pp.15-30) A. Resolution 18-025 a resolution Ordering Improvements for the 2018 Street and Utility Improvements. Todd Hubmer, City Engineer presenting. (pp.31) B. Resolution 18-026 a resolution Adopting and Confirming Assessments for the 2018 Street and Utility Improvements. Todd Hubmer, City Engineer presenting. (pp.33-34) C. Resolution 18-027 a resolution Awarding a Bid for the 2018 Street and Utility Improvements. Todd Hubmer, City Engineer presenting. (pp.35) D. Resolution 18-028 a resolution Providing for the Sale of $2,705,000 General Obligation Improvement Bonds, Series 2018A. Stacie Kvilvang, Ehlers & Associates presenting. (pp.37-48) V. Reports from Commission and Staff. A. Resolution 18-029 a resolution Approving a Request to Keep 4 Chickens in an R-1 Zoning District at 2513 30th Avenue NE. Breanne Rothstein, City Planner presenting. (pp.49-54) B. Resolution 18-030 a resolution approving the PUD preliminary development plan/PUD Rezoning, and preliminary plat related to The Village, LLC Project located at 2501 Lowry Avenue. Breanne Rothstein, City Planner presenting. (pp.55-182) CITY OF ST. ANTHONY VILLAGE CITY COUNCIL MEETING AGENDA MARCH 27, 2018 7:00 p.m. If you would like to request special accommodations or alternative formats, please contact the City Clerk at 612-782-3313 or email city@savmn.com. People who are deaf or hard of hearing can contact us by using 711 Relay. Our Mission is to be a progressive and welcoming Village that is walkable, sustainable and safe. VI. General Business of Council. A. Resolution 18-031 a resolution In Support of the “Mayor’s Challenge for Water Conservation”. Mark Casey, City Manager presenting. (pp.183-184) B. St. Anthony Police Department Annual Report. (no action requested) Jon Mangseth, Police Chief presenting. (pp.185-193) VII. Reports from City Manager and Council members. VIII. Community Forum Individuals may address the City Council about any item not included on the regular agenda. Speakers are requested to come to the podium, sign their name and address on the form at the podium, state their name and address for the Clerk’s record, and limit their remarks to five minutes. Generally, the City Council will not take official action on items discussed at this time, but may typically refer the matter to staff for a future report or direct the matter to be scheduled on an upcoming agenda. IX. Information and Announcements X. Adjournment. CITY OF ST. ANTHONY 1 CITY COUNCIL REGULAR MEETING MINUTES 2 MARCH 13, 2018 3 4 CALL TO ORDER. 5 6 Mayor Faust called the meeting to order at 7:00 p.m. 7 8 PLEDGE OF ALLEGIANCE. 9 10 Mayor Faust invited the Council and audience to join him in the Pledge of Allegiance. 11 12 ROLL CALL. 13 14 Present: Mayor Faust, Councilmembers Gray, Jenson, Randle, and Stille. 15 Absent: None. 16 Also Present: City Manager Mark Casey, Liquor Operations Manager Mike Larson, Police Chief 17 Jon Mangseth, Fire Chief Mark Sitarz 18 19 20 CONSIDERATION, DISCUSSION, AND POSSIBLE ACTION ON ALL OF THE FOLLOWING 21 ITEMS. 22 23 I. APPROVAL OF MARCH 13, 2018 CITY COUNCIL MEETING AGENDA. 24 25 Motion by Councilmember Gray, seconded by Councilmember Jenson, to approve the City 26 Council Meeting Agenda of March 13, 2018 as presented. 27 28 Motion carried 5-0. 29 30 II. PROCLAMATIONS AND RECOGNITIONS. 31 32 A. Presentation by Ramsey County Sheriff, Chief Deputy Frazer. 33 34 Chief Deputy Frazer provided a summary of what is going on in the Sheriff’s office. He stated 35 2017 was a busy year and over 100 employees were hired. The Sheriff is committed to be a 36 diversity hiring with 60% or higher for diversity. The annual Hot Dog with a Deputy events will 37 start within the next few weeks. Other initiatives are partnering for SWAT services with various 38 Cities within the County. It has been a good year with a lot of change with the addition of 100 39 new employees. 40 41 Councilmember Stille stated he has heard it is difficult getting candidates. Chief Deputy Frazer 42 stated they have not had problems getting candidates. 43 44 Mayor Faust stated he spoke with the Police Chief and the Fire Chief and there have been no 45 issues with the Sheriff’s Department. He thanked Chief Deputy Frazer for the model he portrays 46 to everyone. 47 48 49 1 City Council Regular Meeting Minutes March 13, 2018 Page 2 III. CONSENT AGENDA. 1 2 B. Approval of February 27, 2018, City Council Meeting Minutes. 3 C. Licenses and Permits. 4 D. Claims. 5 6 Motion by Councilmember Jenson, seconded by Councilmember Gray, to approve the Consent 7 Agenda items. 8 9 Motion carried 5-0. 10 11 IV. PUBLIC HEARINGS - NONE. 12 13 V. REPORTS FROM COMMISSION AND STAFF - NONE. 14 15 VI. GENERAL BUSINESS OF COUNCIL. 16 17 A. St. Anthony Liquor Operations Annual Report. 18 19 Liquor Operations Manager Mike Larson presented a PowerPoint annual report for 2017. He 20 noted there are two convenient locations. Mr. Larson reviewed the Mission Statement and 21 Vision Statement along with the value of municipal liquor operation revenue. Mr. Larson 22 reviewed the five-year sales history, 2017 monthly sales trend, 5-year profit history, 10-year 23 profit history, sales by category, gross profit percentage by category. Comparisons and 24 benchmarks and Sunday sales were reviewed. The 2017 accomplishments and liquor operations 25 presentation from October 2017 were summarized. The 2017 events were Spring Beer Sampling 26 Event, Spring and Holiday Wine Events and Multiple Samplings on Fridays and Saturdays. They 27 were the Official Release Store for Goose Island Bourbon County Stout. Planning for 2018 28 include dealing with legislative issues, low cost building improvements, and technology/point of 29 sale improvements. Mr. Larson referred residents to the website www.savmn.com. The entire 30 annual report can also be found on the website. 31 32 Councilmember Jenson asked how morale is in the stores. Mr. Larson stated morale is fine even 33 though sales have decreased. All employees were involved in trying to increase foot traffic in the 34 door. 35 36 Councilmember Randle asked about the samplings. Mr. Larson stated they are very well attended 37 and they do very good business during those events. It’s a community gathering where many 38 wines and beers can be sampled. 39 40 Councilmember Stille stated he is inspired by the culture and ideas to gain business that are 41 being implemented. 42 43 Councilmember Gray asked if the stores are unprofitable on Sundays and what is seen at other 44 stores. Mr. Larson stated some stores have elected not to open on Sundays due to lower sales in 45 2 City Council Regular Meeting Minutes March 13, 2018 Page 3 the northern cities. The metro stores are not losing money on Sundays but they are not getting 1 rich. They are starting to notice people are doing their weekly shopping on Sundays. 2 3 Mayor Faust stated the operation is still profitable and brings cash into the community. He is 4 impressed with the turn-ratio. To recycle 14 tons of cardboard is amazing. Mayor Faust thanked 5 Mr. Larson for his service to the community. 6 7 Councilmember Randle commented $200,000 in revenue at 14% labor is great. 8 9 B. Resolution 18-023; a Resolution Authorizing Ramsey County Sheriff’s Special Weapons 10 and Tactics Team Joint Powers Agreement. 11 12 Police Chief Jon Mangseth presented a resolution to authorize personnel from the St. Anthony 13 Police Department to join the Ramsey County Sheriff’s Special Weapons and Tactics Team 14 (“RC-SWAT” or “Team”). RC-SWAT will act to coordinate efforts to develop and provide joint 15 responses to critical incidents or high-risk entries where there is a risk of criminal violence, 16 occurring within the St. Anthony Police Departments authorized jurisdiction. 17 18 The East Metro Special Weapons and Tactics Team was originally created to provide this 19 coordinated response to critical incidents. Due to continued struggles to dedicate sufficient 20 numbers of personnel to this team, by current member agencies, the East Metro SWAT Board of 21 Directors elected to contact the Ramsey County Sheriff’s Office about the potential to join their 22 SWAT team. This will greatly aid in our ability to coordinate efforts to develop and provide joint 23 responses to critical incidents or high-risk entries where there is a risk of criminal violence in the 24 jurisdictions we serve as well as those jurisdictions that are supported by RC-SWAT. 25 26 The Ramsey County Sheriff’s Office (“RCSO”) shall provide a budget for basic operations of 27 RC-SWAT. Beginning with the 2019 fiscal year, the RCSO will assess each Party an annual fee 28 to cover training and other operational expenses related to the RC-SWAT. These fees will fall in 29 line with fees that have been paid for services received through participation with East Metro 30 SWAT. 31 32 Councilmember Stille stated he recalls one time when the SWAT team was in St. Anthony. Chief 33 Mangseth stated there were six call-outs within the county with none in St. Anthony. 34 35 Councilmember Jenson asked if there is a call-out how many officers does St. Anthony provide. 36 Chief Mangseth stated two operators and one negotiator. When they are off duty they are on-call. 37 38 Councilmember Stille asked if this has any dealings with the collaborative reform and Chief 39 Mangseth stated it is separate. 40 41 Motion by Councilmember Gray, seconded by Councilmember Randle, to approve Resolution 42 18-023; a Resolution Authorizing Joint Powers Agreement for the Ramsey County Special 43 Weapons and Tactics Team (RC-SWAT). 44 45 Motion Carried 5-0. 46 3 City Council Regular Meeting Minutes March 13, 2018 Page 4 1 C. Resolution 18-024; a Resolution Authorizing Participation in the 2018 – 2019 GreenCorp 2 Program. 3 4 City Manager Casey reviewed a resolution to participate in Minnesota GreenCorp. Minnesota 5 GreenCorp is an AmeriCorp Program coordinated by the Minnesota Pollution Control Agency 6 (MPCA). The goal of MN GreenCorp is to preserve and protect Minnesota’s environment while 7 training a new generation of environmental professionals. 8 9 The City of St. Anthony applied each year since 2012 and was awarded a GreenCorp member for 10 the 2012 – 2013 and 2015 – 2016 program years. With the assistance of the GreenCorp member, 11 the City has established several sustainable programs that will continue to benefit the City for 12 many years to come. The GreenCorp member would be compensated by the MPCA and St. 13 Anthony would be responsible for supervision and office space. 14 15 This resolution is to authorize staff to submit an application to be a GreenCorp host site for the 16 2018 – 2019 program year. 17 18 Mayor Faust noted Nick went to work for Burnsville and Kristin is in Woodbury. These were the 19 previous GreenCorp members who worked in St. Anthony. 20 21 Councilmember Stille asked if Mr. Casey has time for the supervision. Mr. Casey responded the 22 Public Works Director, Jay, would be the immediate supervisor. 23 24 Councilmember Jenson asked if St. Anthony has a strong probability of getting one and Mr. 25 Casey stated there are more applicants and it’s more competitive every year. Mr. Casey stated 26 this is a state-wide program and there are 25 members placed. 27 28 Motion by Councilmember Stille, seconded by Councilmember Jenson, to approve Resolution 29 18-024; a Resolution Authorizing Participation in the 2018 – 2019 GreenCorps Program. 30 31 Motion Carried 5-0. 32 33 D. St. Anthony Fire Department Annual Report. 34 35 Fire Chief Mark Sitarz provided the St. Anthony Fire Department 2017 Annual Report. Chief 36 Sitarz reviewed the Fire Department Divisions. There are currently 27 Active Firefighters, 4 to 37 be sworn, 3 rookies in training, and 2 part-time code enforcement employees. There are currently 38 7 women on the department. Chief Sitarz reviewed Operations, Total Calls for Service, Call 39 Breakdown, Dollar Loss from Fire, Fire Investigations, Operations Summary, Training, Fire 40 Inspections, Fire Marshal, Fire Prevention/Public Education, Code Enforcement (Housing), Code 41 Enforcement – Rental, Emergency Management, and Outcomes. Chief Sitarz cited details of 42 some of the calls. St. Anthony Fire Department far exceeds the number of required training 43 hours. In 2017 2900 members of the public received the Fire Department message. Chief Sitarz 44 talked about Firefighter Isaac Davis. The 43-page full report is available on the City’s website. 45 46 4 City Council Regular Meeting Minutes March 13, 2018 Page 5 Councilmember Jenson commented on the number of service calls with 2 full time people on 1 duty. He thanked Chief Sitarz and the entire department. 2 3 Councilmember Stille asked how the response time has changed over the years. Chief Sitarz 4 stated there are more calls and the department is close to the 2½ minute time. 5 6 Councilmember Gray asked what the difference was being in the center of the City. Chief Sitarz 7 stated it is a benefit and positive change. 8 9 Councilmember Randle asked about the false alarms and asked if there is cost to a business or 10 apartment for false alarms. Chief Sitarz stated there is no cost. It is communicated during shift 11 change and if there’s two or more calls in 24 hours they will be proactive in solving the problem. 12 13 Councilmember Stille asked about active shooter training in conjunction with the Police 14 Department. He stated it must be a benefit of knowing the members of the Police Department. 15 Chief Sitarz stated the relationship between the departments is very good. 16 17 Mayor Faust stated moving the fire station was a much-contested issue within the City but as 18 soon as it was moved and the benefits realized, it changed the minds of those opposed. The 19 department is well trained and would do well in crisis situations. Lives are saved. Mayor Faust 20 stated there are a lot of volunteers with varied full-time positions. Chief Sitarz mentioned some 21 of the positions held by the volunteers. Mayor Faust thanked Chief Sitarz and the entire 22 department. 23 24 VII. REPORTS FROM CITY MANAGER AND COUNCIL MEMBERS. 25 26 The City Manager had no report. 27 28 Councilmember Gray had no report. 29 30 Councilmember Randle stated he attended the Park Commission Meeting last evening. 31 32 Councilmember Jenson stated on February 28 he attended the Affordable Housing Meeting. 33 34 Councilmember Stille stated on March 12, he attended the Nominating Committee for Metro 35 Cities for the 19-person board. He attended a Euro-Cocktail event last night with Mayor Faust 36 and City Manager Casey. 37 38 Mayor Faust stated today he gave a presentation to the Chamber of Commerce and then to the 39 Mississippi Water Management Organization for its bi-monthly meeting. They received a clean 40 audit. 41 42 VIII. COMMUNITY FORUM. 43 44 5 City Council Regular Meeting Minutes March 13, 2018 Page 6 Ms. Kate Martin, 2513 30th Avenue NE, stated a study is being done by the University of 1 Minnesota (Ed Goetz). He has interviewed a number of the residents and herself and will be 2 contacting the Council for interviews. She encouraged Council to participate. 3 4 Mr. Dave Ote, 3313 Croft Drive, stated he has four questions. He asked if the former Lowry 5 Grove residents are being consulted on the re-development plans of Lowry Grove, will it be 6 affordable for them, and are they still homeless. He also asked what St. Anthony is doing to keep 7 in contact with them. Mr. Ote asked about the relationship with Falcon Heights and the insurance 8 for incidents incurring within Falcon Heights and whether the same agreement is in place for 9 Lauderdale. He asked about the integrity of the voting process and what is being done to ensure 10 the integrity. He also asked about the SWAT agreement and who is in charge when situations 11 happen in St. Anthony. 12 13 Ms. Joan Peterson, 3200 Hilldale, asked about a complaint filed about the Council retreat. She 14 asked how much the complaint cost the taxpayers and how will we benefit from that complaint. 15 16 Chief Mangseth stated the SWAT command would be established similar to the East Metro 17 SWAT. St. Anthony patrols would be on the scene and funnel information to the Command 18 Center led by Ramsey County. Chief Mangseth would also be included and all would be 19 involved in safety at the scene. 20 21 Mayor Faust stated Ramsey County handles all elections for St. Anthony with a paper backup. 22 The paper ballots are counted to make sure they are the same as the electronic voting. 23 24 Councilmember Stille stated on the retreat, Nancy Robinett asked the Commissioner to give an 25 advisory opinion. The three issues were the location of the meeting, the availability of materials, 26 and the dinner that was held. Ms. Robinett withdrew her request and resubmitted with additional 27 information. He indicated the Council took this very seriously, the City responded, and the costs 28 thus far is $15,000 - $20,000. 29 30 Mayor Faust stated the contract with Falcon Heights was ended on July 13, 2017. There was no 31 indication that Falcon Heights was going to do anything in the contract. Four officers had been 32 allocated to the cities. St. Anthony needed more protection as the City incurred many additional 33 costs. The contract was for $674,000. Falcon Heights now has agreement with the County for 34 over $1 million. Mayor Faust stated the Lauderdale contract will be reviewed in the future and a 35 risk analysis will need to be done. 36 37 Mayor Faust stated he has not been contacted for an interview regarding Lowry Grove and he 38 will not do an interview until the deal is done as he will not risk litigation with the developer or 39 another group. 40 41 IX. INFORMATION AND ANNOUNCEMENTS – NONE. 42 43 X. ADJOURNMENT. 44 45 Mayor Faust adjourned the meeting at 8:40 p.m. 46 6 City Council Regular Meeting Minutes March 13, 2018 Page 7 1 Respectfully submitted, 2 Debbie Wolfe 3 TimeSaver off Site Secretarial, Inc. 4 5 6 7 Mayor 8 ATTEST: 9 City Clerk 10 11 12 7 THIS PAGE LEFT INTENTIONALLY BLANK 8 Saint Anthony Village DATE: March 27, 2018 Approved: TO: Mayor and Councilmembers FROM: License Clerk ITEM: License and Permits for Approval: General Contractors Licenses: Big G Construction, Mounds View, MN Kraus Anderson Construction, Minneapolis, MN Mechanical Licenses: American Air Supply, Elk River, MN Marks Plumbing Service, Plymouth, MN Bench License: Applicant: U S Bench 9 THIS PAGE LEFT INTENTIONALLY BLANK 10 City of St Anthony Village CITY OF ST ANTHONY CHECK REGISTER Page: 1 Check Issue Dates: 3/9/2018 - 3/28/2018 Mar 21, 2018 03:36PM Vendor Number Payee Check Number Check Issue Date Amount 12180 ARVIG CONSTRUCTION 98 03/28/2018 249.00 10252 CENTERPOINT ENERGY 99 03/28/2018 15,978.92 11186 PAETEC 100 03/28/2018 204.93 11740 XCEL ENERGY 101 03/28/2018 25,597.59 10710 ICMA RETIREMENT TRUST 34628 03/09/2018 1,675.00 11792 INTERNATIONAL UNION LOCAL #49 34629 03/09/2018 414.00 11793 LAW ENFORCEMENT LABOR SERVICES 34630 03/09/2018 833.00 10002 LOCAL UNION IAFF #3486 34631 03/09/2018 357.30 11738 WSB & ASSOCIATES, INC.34632 03/14/2018 9,258.50 12600 LILLESTOL, ADAM 34633 03/16/2018 141.68 10008 AA BATTERY CO 34634 03/28/2018 16.50 10011 ABLE HOSE & RUBBER LLC 34635 03/28/2018 44.10 10039 AIRGAS USA LLC 34636 03/28/2018 44.71 11992 AMERICAN FLAGPOLE & FLAG CO 34637 03/28/2018 242.80 10092 APACHE GROUP 34638 03/28/2018 1,059.30 10098 ARAMARK 34639 03/28/2018 358.89 1100 ARTISIAN BEER COMPANY 34640 03/28/2018 6,806.33 10116 ASPEN WASTE SYSTEMS INC 34641 03/28/2018 153.30 10159 BEISSWENGER'S 34642 03/28/2018 63.59 1013 BELLBOY CORPORATION 34643 03/28/2018 5,913.83 1014 BELLBOY CORPORATION 34644 03/28/2018 259.45 1035 BERNICK'S BEVERAGE & VENDING 34645 03/28/2018 4,920.60 11883 BIG RIVER GROUP LLC 34646 03/28/2018 1,000.00 12602 BINDER LIFT LLC 34647 03/28/2018 613.95 2009 BLACK STACK BREWING 34648 03/28/2018 189.00 8544 BOURGET IMPORTS 34649 03/28/2018 450.50 10188 BRAKE & EQUIPMENT WAREHOUSE 34650 03/28/2018 334.67 1018 BREAKTHRU BEVERAGE MN BEER 34651 03/28/2018 20,442.92 1011 BREAKTHRU BEVERAGE MN WINE & SPIRITS 34652 03/28/2018 7,149.31 1009 BREAKTHRU BEVERAGE MN WINE & SPIRITS 34653 03/28/2018 1,523.61 2014 BROKEN CLOCK BREWING 34654 03/28/2018 240.00 1114 CANNON RIVER WINERY 34655 03/28/2018 144.00 1017 CAPITOL BEVERAGE SALES 34656 03/28/2018 8,351.31 10263 CENTURYLINK 34657 03/28/2018 481.67 12596 CINTAS 34658 03/28/2018 1,058.07 10293 CITY OF ROSEVILLE 34659 03/28/2018 1,213.01 10292 CITY OF ROSEVILLE 34660 03/28/2018 1,358.48 10299 CITY OF ST. PAUL 34661 03/28/2018 458.00 10306 CITY WIDE WINDOW SERVICE INC 34662 03/28/2018 85.50 10308 CLAREY'S SAFETY EQUIPMENT 34663 03/28/2018 371.41 10338 CONNELLY ELECTRONICS 34664 03/28/2018 6,938.39 1042 CRYSTAL SPRINGS ICE 34665 03/28/2018 288.59 10375 DALCO 34666 03/28/2018 284.73 10417 DISCOUNT STEEL, INC.34667 03/28/2018 16.06 1063 DOMACE VINO 34668 03/28/2018 2,360.00 12606 DVS RENEWAL 34669 03/28/2018 11.00 10461 EHLERS & ASSOCIATES, INC.34670 03/28/2018 1,920.00 10468 ELECTRO WATCHMAN INC 34671 03/28/2018 662.48 1030 FLAHERTY'S HAPPY TYME COMPANY 34672 03/28/2018 114.00 10526 FLEETPRIDE 34673 03/28/2018 147.52 10573 GOODIN COMPANY 34674 03/28/2018 45.54 1032 GRAPE BEGINNINGS, INC.34675 03/28/2018 320.75 10588 GRAPHIC SPECIALTIES, INC.34676 03/28/2018 38.35 Auto Pay Auto Pay Auto Pay Auto Pay 11 City of St Anthony Village CITY OF ST ANTHONY CHECK REGISTER Page: 2 Check Issue Dates: 3/9/2018 - 3/28/2018 Mar 21, 2018 03:36PM Vendor Number Payee Check Number Check Issue Date Amount 1021 GREAT LAKES COCA COLA 34677 03/28/2018 801.52 10642 HENN CNTY INFO TECH DEPT 34678 03/28/2018 3,093.26 1019 HOHENSTEIN'S, INC 34679 03/28/2018 6,764.90 10684 HOME DEPOT CREDIT SERVICES 34680 03/28/2018 267.93 12480 HP INC 34681 03/28/2018 1,206.81 2013 INBOUND BREWCO 34682 03/28/2018 499.00 1027 INDEED BREWING COMPANY 34683 03/28/2018 947.00 12105 INTERSTATE ALL BATTERY CENTER 34684 03/28/2018 234.41 12315 IRC RETAIL CENTERS SALO PARK 34685 03/28/2018 5,624.64 12313 IRC RETAIL CENTERS SLV LIQ 34686 03/28/2018 4,569.66 1016 JJ TAYLOR DISTRIBUTING 34687 03/28/2018 15,400.59 1102 JOHNSON BROTHERS 34688 03/28/2018 9,150.69 1004 JOHNSON BROTHERS LIQUOR CO.34689 03/28/2018 19,350.13 1005 JOHNSON BROTHERS LIQUOR COMPANY.34690 03/28/2018 8,108.90 1006 JOHNSON BROTHERS LIQUOR COMPANY.34691 03/28/2018 4,301.81 1044 JOHNSON BROTHERS LIQUOR COMPANY.34692 03/28/2018 2,830.71 2012 JUNKYARD BREWING 34693 03/28/2018 426.00 12603 KAMPA, BARBARA 34694 03/28/2018 50.00 12605 KAUN, GRAHAM &34695 03/28/2018 109.60 10797 KONICA MINOLTA BUSINESS 34696 03/28/2018 195.09 10816 LANGUAGE LINE SERVICES 34697 03/28/2018 12.00 10857 LMCIT % BERKLEY ADMINISTRATORS 34698 03/28/2018 205.71 10861 LOFFLER COMPANIES - 131511 34699 03/28/2018 292.69 2010 LUPULIN BREWING 34700 03/28/2018 645.00 1022 M. AMUNDSON LLP 34701 03/28/2018 860.61 11985 MANSFIELD OIL COMPANY 34702 03/28/2018 11,792.03 10932 METROPOLITAN COUNCIL 34703 03/28/2018 282.37 10939 MIDWAY FORD 34704 03/28/2018 813.27 10963 MINNEAPOLIS SAW COMPANY INC 34705 03/28/2018 9.65 1051 NEW FRANCE WINE COMPANY 34706 03/28/2018 988.48 11163 OFFICE DEPOT 34707 03/28/2018 209.19 12112 OREILLY AUTO PARTS 34708 03/28/2018 5.40 11185 PACE ANALYTICAL SERVICES, INC.34709 03/28/2018 2,245.00 1012 PAUSTIS & SONS 34710 03/28/2018 1,941.49 12604 PERRON, TOM & SARAH 34711 03/28/2018 55.14 1001 PHILLIPS WINE & SPIRITS 34712 03/28/2018 1,564.22 1002 PHILLIPS WINE & SPIRITS 34713 03/28/2018 5,092.46 11215 PIONEER RIM AND WHEEL CO.34714 03/28/2018 72.46 12541 POLSON, MARK 34715 03/28/2018 595.00 12601 RAMSEY COUNTY ENVIRONMENTAL 34716 03/28/2018 112.08 11366 SAM'S CLUB 34717 03/28/2018 62.22 11397 SHARROW LIFTING PRODUCTS 34718 03/28/2018 109.80 11411 SIMON, SANDY 34719 03/28/2018 41.63 11412 SIMPLEXGRINNELL 34720 03/28/2018 666.98 1024 SOUTHERN GLAZER'S OF MN 34721 03/28/2018 2,227.76 1008 SOUTHERN GLAZER'S OF MN 34722 03/28/2018 2,394.69 1026 SOUTHERN GLAZER'S OF MN 34723 03/28/2018 29,922.62 1036 SOUTHERN GLAZER'S OF MN 34724 03/28/2018 158.56 11452 ST ANTHONY CHAMBER OF COMMERCE 34725 03/28/2018 135.00 11453 ST ANTHONY FIRE RELIEF ASSN 34726 03/28/2018 660.00 11485 STATE OF MINNESOTA DEPARTMENT 34727 03/28/2018 225.00 11495 STILLE/RANDY 34728 03/28/2018 85.97 11566 TIMESAVER OFF SITE SECRETARIAL 34729 03/28/2018 489.05 12 City of St Anthony Village CITY OF ST ANTHONY CHECK REGISTER Page: 3 Check Issue Dates: 3/9/2018 - 3/28/2018 Mar 21, 2018 03:36PM Vendor Number Payee Check Number Check Issue Date Amount 11585 TRACE ANALYTICS, INC.34730 03/28/2018 372.00 11612 TWIN CITY JANITOR SUPPLY 34731 03/28/2018 222.60 11626 U.S. BANK (PURCHASING CARD)34732 03/28/2018 4,905.51 11637 UNITED ELECTRIC COMPANY 34733 03/28/2018 88.56 12298 VAN IWAARDEN ASSOCIATES 34734 03/28/2018 1,050.00 1025 VINOCOPIA 34735 03/28/2018 600.96 11933 WIMACTEL INC 34736 03/28/2018 45.00 1034 WINE COMPANY/THE 34737 03/28/2018 747.70 1038 WINE MERCHANTS INC 34738 03/28/2018 1,326.44 11738 WSB & ASSOCIATES, INC.34739 03/28/2018 6,050.50 11740 XCEL ENERGY 34740 03/28/2018 156.06 Grand Totals: 297,677.65 13 THIS PAGE LEFT INTENTIONALLY BLANK 14 701 Xenia Avenue South | Suite 300 | Minneapolis, MN 55416 | (763) 541-4800 Building a legacy – your legacy. Equal Opportunity Employer | wsbeng.com K:\010507-000\Admin\Resolutions\LTR-hmcc-031618.docx March 19, 2018 The Honorable Mayor, City Council and Staff c/o Mark Casey, City Manager City of St. Anthony Village 3301 Silver Lake Road NE St. Anthony Village, MN 55418-1603 Re: 2018 Street and Utility Improvement Project City of St. Anthony Village, MN WSB Project No. R-010507-000 Dear Honorable Mayor, City Council, and Staff: Following this letter are three resolutions for your consideration at the March 27, 2018, Council Meeting. The three resolutions for your consideration are: I.A Resolution Ordering Improvements This resolution states that the Council has completed the public hearing process and orders the project to be completed. II.A Resolution Adopting and Confirming Assessments for the 2018 Street and Utility Improvements Included in the Council packet are the assessments that have been calculated in accordance with the City’s street assessment policy for the 2018 Street and Utility Improvement Project. This resolution declares the amount to be assessed at $649,878.74 and outlines the assessment process in accordance with Minnesota Statutes Chapter 429. III.A Resolution Awarding a Bid for 2018 Street and Utility Improvements This resolution awards the contract for the 2018 street reconstruction project to the lowest bidder. A tabulation of these bidders, as well as the low bidder of Kuechle Underground with a bid amount of $2,282,930.11, can be seen in the Council packet. If you have any questions, I will be present at the March 27, 2018, Council Meeting to discuss those with you or please call me at 763-287-7182. Sincerely, Todd E. Hubmer, PE City Engineer Attachments 15 THIS PAGE LEFT INTENTIONALLY BLANK 16 2018 Street & Utility Improvement Project Public Hearing March 27, 2018 Project Location Macalaster Drive (37th Ave NE to RR tracks) Foss Road (37th Ave NE to Chandler Dr) Highcrest Road (37th Ave NE to terminate) 17 Sanitary Sewer System Improvements Water System Improvements 18 Drainage System Improvements Street Improvements 19 Street Improvements Street Improvements Total Parking Stalls: 49 20 Street Improvements Erosion Improvements Erosion Improvements Location 21 Erosion Improvements Central Park Water Reuse Retrofit 22 Common Resident Concerns •Trees /Restoration •Access to homes and businesses maintained with exception of: –Utility Installation in front of home –Wet weather –Curb and driveway installation •Special needs / events •Sprinkler systems / Invisible fencing •Private Utilities –CenterPoint Energy Gas Line Replacement Common Resident Concerns •Temporary water service •Driveway replacement –Replacing entire driveway? Reimbursement policy •Sump pump connections •Mail / Garbage service 23 Project Costs / Funding Breakdown 2018 STREET AND UTILITY IMPROVEMENT PROJECT City of Saint Anthony Village, Minnesota Project Costs and Proposed Funding Proposed Improvements Special Assessments City Costs Total Street Reconstruction $457,300 $1,166,500 $1,623,800 Sanitary Sewer Improvements $0 $337,500 $337,500 Water Main Improvements (1)$53,100 $332,400 $385,500 Storm Sewer Improvements (2)$105,700 $119,800 $225,500 Mirror Lake Erosion Improvements $33,800 $0 $33,800 Central Park Water Reuse $0 $198,400 $198,400 Total **$649,900 $2,154,600 $2,804,500 1. Replacement of curb stops are assessed 100% of the actual cost. 2. Local drainage improvements. ** This project anticipates issuing 429 public improvement bonds or general obligation bonds. The difference to be paid from Sanitary Sewer, Water, and Storm Water Utility Funds. Assessment Calculations City Policy for Street and Local Drainage Improvements: •Up to 32-foot wide, 9-ton design roadway •35% assessed to residential (R-3) •50% assessed to light industrial (L1), commercial (C) and high density residential (R-4) •Calculated using lineal feet of street frontage •City funds pay remaining cost 24 Method for Determining Front Footage Method for Determining Front Footage 25 Assessed Parcels Financing Assessments •One time assessment notice sent in May 2018 •Assessments paid over 15 year period Option Deadline 1. Pay-off full assessment November 30, 2018 (1st year) to avoid interest November 14 (every year after) 2. Partial payment November 1, 2018 (1st year) 3. Apply directly to Property Tax Automatic if above options are not exercised If applied to taxes… 15 year payback 2% over the true interest cost (not known until bonds are sold) 26 27 •Council Authorize Feasibility June 13,2017 (1st of 8 meetings) •Council Accept Feasibility August 22, 2017 (2nd of 8 meetings) •1st Public Info Meeting September 13, 2017 (3rd of 8 meetings) •2nd Public Info Meeting November 29, 2017 (4th of 8 meetings) •Council Approve Plans December 12, 2017 (5th of 8 meetings) •Receive Bids/Compute Assessments February 13, 2018 (6th of 8 meetings) Project Schedule 28 Project Schedule –cont’d •3rd Public Info Meeting March 7, 2018 (7th of 8 meetings) •Public Hearing/Award Contract March 27, 2018 (8th of 8 meetings) •Award Sale of Bonds April 2018 •Begin Construction (After Memorial Day)May/June 2018 •Substantial Completion September 2018 •Final Paving June 2019 Email / Text Notifications Sign up to receive weekly email updates and notifications regarding the 2018 Street & Utility Improvement Project by visiting the project webpage located under the tab on the City’s website at http://www.savmn.com 29 Questions 30 CITY OF ST. ANTHONY VILLAGE STATE OF MINNESOTA RESOLUTION 18-025 A RESOLUTION ORDERING IMPROVEMENTS FOR THE 2018 STREET AND UTILITY IMPROVEMENTS WHEREAS, a resolution of the City Council adopted on the 23th day of February 2018, fixed a date for Council hearing on the proposed improvements: Street & Utility Reconstruction  Macalaster Drive NE from 37th Avenue NE to the railroad tracks  Foss Road from 37th Avenue NE to Chandler Drive NE  Highcrest Road NE north of 37th Avenue NE Backyard Drainage Improvements  Drainage from the parking lot serving the apartments located at 3727 Foss Road, 3721 Foss Road, and 3713 Foss Road outletting to Mirror Lake. Water Reuse Retrofit  Central Park Splash Pad WHEREAS, ten days' mailed notice and two weeks' published notice in advance of said hearing was given and the hearing was held thereon on the 27th day of March 2018, at which time all persons desiring to be heard were given an opportunity to be heard thereon, NOW, THEREFORE, BE IT RESOLVED, that the City Council of the City of St. Anthony Village approve such improvements as are hereby ordered in the Council Resolution. Adopted this 27th day of March, 2018. _____________________________ Jerome O Faust, Mayor ATTEST:____________________________ Nicole Miller, City Clerk Reviewed for administration: ______________________________ Mark Casey, City Manager 31 THIS PAGE LEFT INTENTIONALLY BLANK 32 CITY OF ST. ANTHONY VILLAGE STATE OF MINNESOTA RESOLUTION 18-026 A RESOLUTION ADOPTING AND CONFIRMING ASSESSMENTS FOR THE 2018 STREET AND UTILITY IMPROVEMENTS 1. The amount proper and necessary to be specially assessed at this time for various public improvements is 35% (low density residential) and 50% (high density residential, commercial and industrial) assessable as follows: Years First Year Levy First Year Collectible Assessed 15 2018 2019 $649,878.74 For improvements to the following: Street & Utility Reconstruction  Macalaster Drive NE from 37th Avenue NE to the railroad tracks  Foss Road from 37th Avenue NE to Chandler Drive NE  Highcrest Road NE north of 37th Avenue NE Backyard Drainage Improvements  Drainage from the parking lot serving the apartments located at 3727 Foss Road, 3721 Foss Road, and 3713 Foss Road outletting to Mirror Lake. against every assessable lot, piece, or parcel of land affected thereby has been duly calculated upon the basis of benefits, without regard to cash valuation, in accordance with the provisions of Minnesota Statutes, Chapter 429, and notice has been duly published, as required by law that this Council would meet to hear, consider and pass upon all objections, if any, and said proposed assessment has at all time since its filing been open for public inspection and an opportunity has been given to all interested persons to present their objections if any, to such proposed assessments. 2. This Council, having heard and considered all objections so presented, finds that each of the lots, pieces and parcels of land enumerated in the proposed assessment was and is specially benefited by the construction of said improvement in not less than the amount of the assessment set opposite the description of each such lot, piece and parcel of land respectively, and such amount so set out is hereby levied against each of the respective lots, pieces and parcels of land therein described. 3. The proposed assessments are hereby adopted and confirmed as the proper special assessments for each of said lots, pieces and parcels of land respectively, and the assessment against each parcel, together with interest at the rate calculated at 2% over the interest cost per annum on the bonds to be issued by the City for said improvement, accruing on the full amount thereof unpaid, shall be a lien concurrent with general taxes upon parcel and all thereof. The total amount of each such assessment not pre-paid shall be payable in equal annual principal installments extending over a period of years, as indicated in each case. The first of said installments, together with interest on the entire 33 S:\1Council Meetings\2018\03272018\Resolution 18-026 - Adopting Confirming Assessments.docx assessment for the period of January 1, 2018 through December 31, 2018 will be payable with general taxes for the levy year of 2018 collectible in 2019, and one of each of the remaining installments, together with one year’s interest on that and all other unpaid installments, will be payable with general taxes for each consecutive year thereafter until the entire assessment is paid. 4. The owner of any property so assessed may, at any time prior to certification, make payments (partial or full) towards the balance owed. The owner may, at any time after certification, pay the whole of the assessment, with interest accrued to the date of payment, except that no interest be charged if the entire assessment is paid by November 30th of the assessment year. 5. The City Clerk shall, as soon as may be, prepare and transmit to the County Auditor a certified duplicate of the assessment roll, with each installment and interest on each unpaid assessment set forth separately, to be extended upon the property tax lists of the County and the County Auditor shall thereafter collect said assessment in the manner provided by law. Adopted this 27th day of March, 2018. _____________________________ Jerome O Faust, Mayor ATTEST:____________________________ Nicole Miller, City Clerk Reviewed for administration: ______________________________ Mark Casey, City Manager 34 CITY OF ST. ANTHONY VILLAGE STATE OF MINNESOTA RESOLUTION 18-027 A RESOLUTION AWARDING A BID FOR THE 2018 STREET AND UTILITY IMPROVEMENTS WHEREAS, pursuant to an advertisement for bids for the improvement as shown on the plan for the above-referenced project, bids were received, opened and tabulated according to law, and the following bids were received complying with the advertisement: Contractor Total Bid 1 Kuechle Underground $2,282,930.11 2 Ryan Contracting Company $2,352,212.20 3 R.L. Larson Excavating, Inc. $2,474,563.10 4 Northdale Construction Co., Inc. $2,569,886.06 5 Northwest Asphalt, Inc. $2,580,366.99 6 Meyer Contracting, Inc. $3,170,173.29 WHEREAS, it appears that Kuechle Underground of Kimball, MN is the lowest responsible bidder, NOW, THEREFORE, BE IT RESOLVED, by the City Council of the City of St. Anthony Village that: 1. The Mayor and City Manager are hereby authorized and directed to enter into a contract with Kuechle Underground in the amount of $2,282,930.11 in the name of the City of St. Anthony Village, Minnesota for the improvement outlined in the above-referenced project according to the plans and specifications, therefore, approved by the City Council and on file in the office of the City Clerk. 2. The Engineer, WSB & Associates, Inc., is hereby authorized and directed to return forthwith to all bidders the deposits made with their bids, except that the deposits of the successful bidder and the next two lowest bidders shall be retained until a contract has been signed. Adopted this 27th day of March, 2018. ____________________________ Jerome O Faust, Mayor ATTEST:____________________________ Nicole Miller, City Clerk Reviewed for administration: ______________________________ Mark Casey, City Manager 35 THIS PAGE LEFT INTENTIONALLY BLANK 36 March 27, 2018 Pre-Sale Report for City of St. Anthony, Minnesota $2,705,000 General Obligation Improvement Bonds, Series 2018A           Prepared by: Stacie Kvilvang, CIPMA Senior Municipal Advisor And James Lehnhoff, Municipal Advisor And Shelly Eldridge, CIPMA Senior Municipal Advisor 37   Presale Report City of St. Anthony, Minnesota March 27, 2018 Page 1 Executive Summary of Proposed Debt Proposed Issue: $2,705,000 General Obligation Improvement Bonds, Series 2018A Purposes: The purpose of the proposed issue is to finance the 2018 road reconstruction projects in the City. Debt service will be paid from tax levy and special assessments. The City intends to levy a total of $649,900 in special assessments to benefitting property owners, of which $64,990 (10%) is anticipated to be collected in pre-paid assessments (the pre-paid assessments reduced the Bond amount accordingly). The remaining $584,910 of special assessments will be collected in years 2019 to 2033 at a rate of 2% over the True Interest Costs of the Bonds. Annual assessments are paid on an equal principal basis. Authority: The Bonds are being issued pursuant to Minnesota Statutes, Chapter(s):  429 – Improvement Bonds  475 – General Bonding Authority Because the City is assessing at least 20% of the project costs, the Bonds can be a general obligation without a referendum and will not count against the City’s debt limit. The Bonds will be general obligations of the City for which its full faith, credit and taxing powers are pledged. Term/Call Feature: The Bonds are being issued for a 16-year term. Principal on the Bonds will be due on February 1 in the years 2020 through 2034. Interest is payable every six months beginning February 1, 2019. We have capitalized interest in the amount of approximately $54,466 to pay interest costs until adequate tax and special assessment funds are received. The Bonds maturing on and after February 1, 2027 will be subject to prepayment at the discretion of the City on February 1, 2026 or any date thereafter. Bank Qualification: Because the City is expecting to issue no more than $10,000,000 in tax exempt debt during the calendar year, the City will be able to designate the Bonds as “bank qualified” obligations. Bank qualified status broadens the market for the Bonds, which can result in lower interest rates. Rating: The City’s most recent bond issues were rated AA by Standard & Poor’s. The City will request a new rating for the Bonds. If the winning bidder on the Bonds elects to purchase bond insurance, the rating for the issue may be higher than the City’s bond rating in the event that the bond rating of the insurer is higher than that of the City.  38   Presale Report City of St. Anthony, Minnesota March 27, 2018 Page 2 Basis for Recommendation: Based on our knowledge of your situation, your objectives communicated to us, our advisory relationship as well as characteristics of various municipal financing options, we are recommending the issuance of general obligation bonds as a suitable financing option for the following reasons: - This coincides with the City’s past practices to finance this type of project with this type of debt issue - This is the most overall cost-effective option that still maintains future flexibility for the repayment of debt. Method of Sale/Placement: In order to obtain the lowest interest cost to the City, we will competitively bid the purchase of the Bonds from local and national underwriters/banks. We have included an allowance for discount bidding equal to 1.200% of the principal amount of the issue. The discount is treated as an interest item and provides the underwriter with all or a portion of their compensation in the transaction. If the Bonds are purchased at a price greater than the minimum bid amount (maximum discount), the unused allowance may be used to lower your borrowing amount. Premium Bids: Under current market conditions, most investors in municipal bonds prefer “premium” pricing structures. A premium is achieved when the coupon for any maturity (the interest rate paid by the issuer) exceeds the yield to the investor, resulting in a price paid that is greater than the face value of the bonds. The sum of the amounts paid in excess of face value is considered “reoffering premium.” The amount of the premium varies, but it is not uncommon to see premiums for new issues in the range of 2.00% to 10.00% of the face amount of the issue. This means that an issuer with a $2,000,000 offering may receive bids that result in proceeds of $2,040,000 to $2,200,000. If this Bond issue receives a premium bid, the City may choose to reduce the size of the issue or increase the net proceeds for the project when the sale is awarded. The adjustments may slightly change the true interest cost of the original bid, either up or down. You have the choice to limit the amount of premium in the bid specifications. This may result in fewer bids, but it may also eliminate large adjustments on the day of sale and other uncertainties. Review of Existing Debt: We have reviewed all outstanding indebtedness for the City and find that there are no refunding opportunities at this time. We will continue to monitor the market and the call dates for the City’s outstanding debt and will alert you to any future refunding opportunities. 39   Presale Report City of St. Anthony, Minnesota March 27, 2018 Page 3 Continuing Disclosure: Because the City has more than $10,000,000 in outstanding debt (including this issue) and this issue is over $1,000,000, the City will be agreeing to provide certain updated Annual Financial Information and its Audited Financial Statement annually as well as providing notices of the occurrence of certain reportable events to the Municipal Securities Rulemaking Board (the “MSRB”), as required by rules of the Securities and Exchange Commission (SEC). The City is already obligated to provide such reports for its existing bonds, and has contracted with Ehlers to prepare and file the reports. Arbitrage Monitoring: Because the Bonds are tax-exempt obligations/tax credit obligations, the City must ensure compliance with certain Internal Revenue Service (IRS) rules throughout the life of the issue. These rules apply to all gross proceeds of the issue, including initial bond proceeds and investment earnings in construction, escrow, debt service, and any reserve funds. How issuers spend bond proceeds and how they track interest earnings on funds (arbitrage/yield restriction compliance) are common subjects of IRS inquiries. Your specific responsibilities will be detailed in the Signature, No-Litigation, Arbitrage Certificate and Purchase Price Receipt prepared by your Bond Attorney and provided at closing. You have retained Ehlers to assist you with compliance with these rules. Risk Factors: Special Assessments: We have assumed $64,990 of pre-paid special assessments (10% of the total special assessment amount) and we have assumed that the remaining $584,910 of assessments are levied as projected. If the City receives a significantly higher amount of pre-paid assessments or does not levy the assessments, the City may need to increase the levy portion of the debt service to make up for lower interest earnings than the expected assessment interest rate. Other Service Providers: This debt issuance will require the engagement of other public finance service providers. This section identifies those other service providers, so Ehlers can coordinate their engagement on your behalf. Where you have previously used a particular firm to provide a service, we have assumed that you will continue that relationship. For services you have not previously required, we have identified a service provider. Fees charged by these service providers will be paid from proceeds of the obligation, unless you notify us that you wish to pay them from other sources. Our pre-sale bond sizing includes a good faith estimate of these fees, so their final fees may vary. If you have any questions pertaining to the identified service providers or their role, or if you would like to use a different service provider for any of the listed services please contact us. Bond Attorney: Dorsey & Whitney LLP Paying Agent: Bond Trust Services Corporation Rating Agency: Standard & Poor's Global Ratings (S&P) 40   Presale Report City of St. Anthony, Minnesota March 27, 2018 Page 4 This presale report summarizes our understanding of the City’s objectives for the structure and terms of this financing as of this date. As additional facts become known or capital markets conditions change, we may need to modify the structure and/or terms of this financing to achieve results consistent with the City’s objectives. 41   Presale Report City of St. Anthony, Minnesota March 27, 2018 Page 5 Proposed Debt Issuance Schedule Pre-Sale Review by City Council: March 27, 2018 Distribute Official Statement: Week of April 9, 2018 Conference with Rating Agency: Week of April 16, 2018 City Council Meeting to Award Sale of the Bonds: April 24, 2018 Estimated Closing Date: May 15, 2018 Attachments Sources and Uses of Funds Proposed Debt Service Schedule Resolution Authorizing Ehlers to Proceed with Bond Sale Ehlers Contacts Municipal Advisors: Stacie Kvilvang (651) 697-8506 James Lehnhoff (651) 697-8552 Shelly Eldridge (651) 697-8504 Disclosure Coordinator:Charissa Brookley (651) 697-8573 Financial Analyst: Alicia Gage (651) 697-8551 The Official Statement for this financing will be mailed to the City Council at their home address or e-mailed for review prior to the sale date. 42 City of St Anthony, Minnesota $2,705,000 General Obligation Bonds, Series 2018A Assumes Current Market BQ AA Rates plus 25bps Sources & Uses Dated 05/15/2018 | Delivered 05/15/2018 Sources Of Funds Par Amount of Bonds $2,705,000.00 Prepaid Assessments 64,990.00 Total Sources $2,769,990.00 Uses Of Funds Total Underwriter's Discount (1.200%)32,460.00 Costs of Issuance 44,000.00 Deposit to Capitalized Interest (CIF) Fund 54,465.78 Deposit to Project Construction Fund 2,638,200.00 Rounding Amount 864.22 Total Uses $2,769,990.00 Series 2018A GO Imp Bonds | SINGLE PURPOSE | 3/22/2018 | 10:29 AM 43 City of St Anthony, Minnesota $2,705,000 General Obligation Bonds, Series 2018A Assumes Current Market BQ AA Rates plus 25bps Debt Service Schedule Date Principal Coupon Interest Total P+I CIF Net New D/S Fiscal Total 05/15/2018 ------- 02/01/2019 --54,465.78 54,465.78 (54,465.78)-- 08/01/2019 --38,296.25 38,296.25 -38,296.25 - 02/01/2020 165,000.00 2.050%38,296.25 203,296.25 -203,296.25 241,592.50 08/01/2020 --36,605.00 36,605.00 -36,605.00 - 02/01/2021 165,000.00 2.150%36,605.00 201,605.00 -201,605.00 238,210.00 08/01/2021 --34,831.25 34,831.25 -34,831.25 - 02/01/2022 165,000.00 2.250%34,831.25 199,831.25 -199,831.25 234,662.50 08/01/2022 --32,975.00 32,975.00 -32,975.00 - 02/01/2023 170,000.00 2.300%32,975.00 202,975.00 -202,975.00 235,950.00 08/01/2023 --31,020.00 31,020.00 -31,020.00 - 02/01/2024 170,000.00 2.500%31,020.00 201,020.00 -201,020.00 232,040.00 08/01/2024 --28,895.00 28,895.00 -28,895.00 - 02/01/2025 170,000.00 2.600%28,895.00 198,895.00 -198,895.00 227,790.00 08/01/2025 --26,685.00 26,685.00 -26,685.00 - 02/01/2026 175,000.00 2.750%26,685.00 201,685.00 -201,685.00 228,370.00 08/01/2026 --24,278.75 24,278.75 -24,278.75 - 02/01/2027 180,000.00 2.850%24,278.75 204,278.75 -204,278.75 228,557.50 08/01/2027 --21,713.75 21,713.75 -21,713.75 - 02/01/2028 180,000.00 2.950%21,713.75 201,713.75 -201,713.75 223,427.50 08/01/2028 --19,058.75 19,058.75 -19,058.75 - 02/01/2029 185,000.00 3.050%19,058.75 204,058.75 -204,058.75 223,117.50 08/01/2029 --16,237.50 16,237.50 -16,237.50 - 02/01/2030 190,000.00 3.150%16,237.50 206,237.50 -206,237.50 222,475.00 08/01/2030 --13,245.00 13,245.00 -13,245.00 - 02/01/2031 190,000.00 3.200%13,245.00 203,245.00 -203,245.00 216,490.00 08/01/2031 --10,205.00 10,205.00 -10,205.00 - 02/01/2032 195,000.00 3.300%10,205.00 205,205.00 -205,205.00 215,410.00 08/01/2032 --6,987.50 6,987.50 -6,987.50 - 02/01/2033 200,000.00 3.400%6,987.50 206,987.50 -206,987.50 213,975.00 08/01/2033 --3,587.50 3,587.50 -3,587.50 - 02/01/2034 205,000.00 3.500%3,587.50 208,587.50 -208,587.50 212,175.00 Total $2,705,000.00 -$743,708.28 $3,448,708.28 (54,465.78)$3,394,242.50 - Significant Dates Dated 5/15/2018 First Coupon Date 2/01/2019 Yield Statistics Bond Year Dollars $24,378.56 Average Life 9.012 Years Average Coupon 3.0506659% Net Interest Cost (NIC)3.1838157% True Interest Cost (TIC)3.1873566% Bond Yield for Arbitrage Purposes 3.0296216% All Inclusive Cost (AIC)3.4054495% IRS Form 8038 Net Interest Cost 3.0506659% Weighted Average Maturity 9.012 Years Series 2018A GO Imp Bonds | SINGLE PURPOSE | 3/22/2018 | 10:29 AM 44 City of St Anthony, Minnesota $2,705,000 General Obligation Bonds, Series 2018A Assumes Current Market BQ AA Rates plus 25bps Debt Service Schedule Date Principal Coupon Interest Total P+I CIF Net New D/S 105% of Total Assessments Levy/(Surplus) 02/01/2019 --54,465.78 54,465.78 (54,465.78)---- 02/01/2020 165,000.00 2.050%76,592.50 241,592.50 -241,592.50 253,672.13 69,409.32 184,262.81 02/01/2021 165,000.00 2.150%73,210.00 238,210.00 -238,210.00 250,120.50 67,381.64 182,738.86 02/01/2022 165,000.00 2.250%69,662.50 234,662.50 -234,662.50 246,395.63 65,353.94 181,041.69 02/01/2023 170,000.00 2.300%65,950.00 235,950.00 -235,950.00 247,747.50 63,326.26 184,421.24 02/01/2024 170,000.00 2.500%62,040.00 232,040.00 -232,040.00 243,642.00 61,298.56 182,343.44 02/01/2025 170,000.00 2.600%57,790.00 227,790.00 -227,790.00 239,179.50 59,270.88 179,908.62 02/01/2026 175,000.00 2.750%53,370.00 228,370.00 -228,370.00 239,788.50 57,243.20 182,545.30 02/01/2027 180,000.00 2.850%48,557.50 228,557.50 -228,557.50 239,985.38 55,215.50 184,769.88 02/01/2028 180,000.00 2.950%43,427.50 223,427.50 -223,427.50 234,598.88 53,187.82 181,411.06 02/01/2029 185,000.00 3.050%38,117.50 223,117.50 -223,117.50 234,273.38 51,160.12 183,113.26 02/01/2030 190,000.00 3.150%32,475.00 222,475.00 -222,475.00 233,598.75 49,132.44 184,466.31 02/01/2031 190,000.00 3.200%26,490.00 216,490.00 -216,490.00 227,314.50 47,104.76 180,209.74 02/01/2032 195,000.00 3.300%20,410.00 215,410.00 -215,410.00 226,180.50 45,077.06 181,103.44 02/01/2033 200,000.00 3.400%13,975.00 213,975.00 -213,975.00 224,673.75 43,049.38 181,624.37 02/01/2034 205,000.00 3.500%7,175.00 212,175.00 -212,175.00 222,783.75 41,021.68 181,762.07 Total $2,705,000.00 -$743,708.28 $3,448,708.28 (54,465.78)$3,394,242.50 $3,563,954.63 $828,232.56 $2,735,722.07 Significant Dates Dated 5/15/2018 First Coupon Date 2/01/2019 Yield Statistics Bond Year Dollars $24,378.56 Average Life 9.012 Years Average Coupon 3.0506659% Net Interest Cost (NIC)3.1838157% True Interest Cost (TIC)3.1873566% Bond Yield for Arbitrage Purposes 3.0296216% All Inclusive Cost (AIC)3.4054495% Series 2018A GO Imp Bonds | SINGLE PURPOSE | 3/22/2018 | 10:29 AM 45 City of St Anthony, Minnesota $584,910 General Obligation Bonds, Series 2018A Assessments 2.00% over TIC - Equal Principal Assessments Date Principal Coupon Interest Total P+I 12/31/2019 38,994.00 5.200%30,415.32 69,409.32 12/31/2020 38,994.00 5.200%28,387.64 67,381.64 12/31/2021 38,994.00 5.200%26,359.94 65,353.94 12/31/2022 38,994.00 5.200%24,332.26 63,326.26 12/31/2023 38,994.00 5.200%22,304.56 61,298.56 12/31/2024 38,994.00 5.200%20,276.88 59,270.88 12/31/2025 38,994.00 5.200%18,249.20 57,243.20 12/31/2026 38,994.00 5.200%16,221.50 55,215.50 12/31/2027 38,994.00 5.200%14,193.82 53,187.82 12/31/2028 38,994.00 5.200%12,166.12 51,160.12 12/31/2029 38,994.00 5.200%10,138.44 49,132.44 12/31/2030 38,994.00 5.200%8,110.76 47,104.76 12/31/2031 38,994.00 5.200%6,083.06 45,077.06 12/31/2032 38,994.00 5.200%4,055.38 43,049.38 12/31/2033 38,994.00 5.200%2,027.68 41,021.68 Total $584,910.00 -$243,322.56 $828,232.56 Significant Dates Filing Date 1/01/2019 First Payment Date 12/31/2019 Series 2018A GO Imp Bonds | SINGLE PURPOSE | 3/22/2018 | 10:29 AM 46 CITY OF ST. ANTHONY VILLAGE STATE OF MINNESOTA RESOLUTION 18-028 Council Member _________________ introduced the following resolution and moved its adoption: Resolution Providing for the Sale of $2,705,000 General Obligation Improvement Bonds, Series 2018A A. WHEREAS, the City Council of the City of St. Anthony, Minnesota has heretofore determined that it is necessary and expedient to issue the City's $2,705,000 General Obligation Improvement Bonds, Series 2018A (the "Bonds"), to finance the 2018 street reconstruction projects in the City; and B. WHEREAS, the City has retained Ehlers & Associates, Inc., in Roseville, Minnesota ("Ehlers"), as its independent municipal advisor for the Bonds in accordance with Minnesota Statutes, Section 475.60, Subdivision 2(9); NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of St. Anthony, Minnesota, as follows: 1. Authorization; Findings. The City Council hereby authorizes Ehlers to assist the City for the sale of the Bonds. 2. Meeting; Proposal Opening. The City Council shall meet at 7:00 p.m. on April 24, 2018, for the purpose of considering proposals for and awarding the sale of the Bonds. 3. Official Statement. In connection with said sale, the officers or employees of the City are hereby authorized to cooperate with Ehlers and participate in the preparation of an official statement for the Bonds and to execute and deliver it on behalf of the City upon its completion. The motion for the adoption of the foregoing resolution was duly seconded by City Council Member _______________________ and, after full discussion thereof and upon a vote being taken thereon, the following City Council Members voted in favor thereof: and the following voted against the same: 47 Whereupon said resolution was declared duly passed and adopted. Adopted this 27th day March, 2018. _____________________________ Jerome O. Faust, Mayor ATTEST:____________________________ Nicole Miller, City Clerk Reviewed for administration: ______________________________ Mark Casey, City Manager   48   MEMORANDUM           To:      St. Anthony Village City Council  From:      Breanne Rothstein, AICP, City Planner      Date:      March 20, 2018     City Council Regular Meeting for March 27, 2018      WSB Project No.  011104‐000  Request: Request to keep four (4) chickens in an R‐1 Zoning District at 2513 30th  Avenue    RECOMMENDATION  Staff received an inquiry from the Applicants on March 4th requesting information about what they  needed to do in order to be able to have chickens on their property. They were directed to provide a site  plan showing the location and dimensions of the proposed enclosure on the property, as well as a  written request to the City Council in the form of a letter.  The Applicants provided a written request and a diagram on March 4th showing the location and  dimensions of the chicken coop in relation to their property. In these materials, the Applicants state that  the coop will be located along the western edge of the property and will run parallel to a 5’ chain link  fence. The coop will be a total of 16 square feet (4’x4’) of wood materials and stained brown like the  property owner’s existing shed. The coop will have an attached run of 48 square feet; 4 inches of the 12  inch long run will be located under the elevated coop.   CITY CODE RELATED TO REQUEST  Title IX General Regulations, Chapter 91 Animals, Section § 91.56 KEEPING OF CERTAIN ANIMALS  states  that “No person may keep swine, cattle, horses, goats, or more than 2 dogs or 3 dogs allowed under §  91.01 through 91.05 or fowl, within the city nearer than 500 feet to any human habitation or platted  land, without approval of the City Council. The City Council may, before approving or denying any  request for approval, request a report from the Health Officer concerning the effect on public health.”  REQUESTED ACTION  Staff has reviewed the request, and recommends approval of the request.  1. Motion to adopt a resolution approving the request to keep 4 chickens on the property  located at 2513 30th Avenue.  2. Motion to deny the request for chickens at 2413 30th Avenue, and direct staff to prepare a  resolution declaring terms of the same.  In the event the City Council chooses denial of the  request, it should clearly state its reasons for the denial recommendation and direct staff to  prepare a resolution.    49 Page 2    ATTACHMENTS  Exhibit A:  Request Letter and Enclosure Diagram  Exhibit B:  Resolution of Approval   50 March 4, 2018    St. Anthony Village City Council  3301 Silver Lake Road  St. Anthony Village MN 55418    Dear Council Members,    I am writing to request a permit to keep 4 chickens at our home located at 2513 30th Avenue.      The coop will be located along the western edge of our property line and would run parallel to  a 5' chain link fence.  It would be made using the same materials and stain as our shed.  The  coop will be a total of 16 sf (4'X4') and there will be an attached run with 48 sf (4' of the 12' run  will be under the elevated coop).    I  have included a sketch of the backyard, including the coop placement, a rough sketch of the  coop design, and a photo of our shed for reference.    Sincerely,    Rick Dallmeyer  51 52 53 54 CITY OF ST. ANTHONY VILLAGE HENNEPIN COUNTY, MINNESOTA RESOLUTION 18-029 RESOLUTION TO APPROVE A REQUEST TO KEEP FOUR (4) CHICKENS IN AN R-1 ZONING DISTRICT AT 2513 30TH AVENUE WHEREAS, staff received a request from Rick Dallmeyer for permission to keep chickens on their property located at 2513 30th Avenue; and WHEREAS, the City of St. Anthony Code of Ordinances, Section 91.56, Keeping of Certain Animals, specifies that livestock, including fowl, require approval from the City Council; and WHEREAS, Rick Dallmeyer have submitted a written request for approval from the City Council, as outlined in Subsection 91.56, to approve their request to keep chickens; and WHEREAS, Rick Dallmeyer have submitted a diagram showing the dimensions and placement of the enclosure that will house the chickens in relation to their property; and WHEREAS, Hennepin County Environmental Health Division has stated that this matter is within the City’s jurisdiction and authority; and NOW THEREFORE BE IT RESOLVED that the City Council of the City of St. Anthony Village approves the request to keep four (4) chickens in an R-1 Zoning District at 2513 30th Avenue. Adopted this 27th day March, 2018. _____________________________ Jerome O. Faust, Mayor ATTEST:____________________________ Nicole Miller, City Clerk Reviewed for administration: ______________________________ Mark Casey, City Manager   MEMORANDUM           To:      Honorable Mayor, City Council, and City Manager  From:      Breanne Rothstein, AICP, City Planner        Date:      City Council meeting on March 27, 2018          WSB Project No.  02170‐300  Request:  Preliminary PUD Development Plan and Preliminary Plat for The Village, LLC     GENERAL INFORMATION  Applicant:    The Village, LLC  Owners:    The Village, LLC  Location:    2501 Lowry Avenue  Existing Land Use:   Vacant    Zoning:     R‐1 Single‐Family Residential     Surrounding Land  North:  Low Density Residential / Zoned R‐1 ‐ Single Family Residential  Use / Zoning:  East:   High Density Residential/Planned Unit Development Kenzington Condos  (ownership condos for seniors) are located immediately to the east (5 stories,  plus at grade garage (70 feet in height).  South:  High  Density  Residential  and  Commercial/Planned  Unit  Development   The Legacy (4 stories of rental, assisted living for seniors (48 feet), Walker Senior  Housing (3 stories of affordable rental, assisted living for seniors (36 feet),  and  Autumn Woods (3 stories general occupancy rental units (40 feet).     West:  Single‐Family Residential and Commercial in Minneapolis  BACKGROUND  The applicant for the proposal, The Village, LLC, with lead developer Continental Property Group,  purchased the Lowry Grove manufactured home park property at 2501 Lowry Avenue on June 13, 2016.  In the ensuing year, the manufacturedhome park, and the former and new property owners engaged in  a series of state statutory requirements for manufacturedhome park closures. The Lowry Grove  manufacturedhome park formally closed on June 30, 2017.  On October 24, 2016, the Planning Commission reviewed an initial Planned Unit Development (PUD)  sketch plan submission for the site from The Village, LLC. An Environmental Assessment Worksheet  (EAW) for the site was completed in November 2016.  On July 18, 2017, The Village, LLC submitted a series of land use applications for their proposed  redevelopment of the former Lowry Grove site that also included the adjacent Bremer Bank site. On  55 February 20, 2018  Page 2  October 10, 2017, the City Council denied the request and adopted a resolution outlining their stated  reasons.  On December 22, 2017, The Village, LLC submitted new applications and requests for a preliminary PUD  plan/rezoning, a preliminary plat, and a comprehensive plan amendment for the site. Their submission  was deemed incomplete at that time, due to changes in the status of the purchase agreement for the  Bremer property, and The Village, LLC was properly informed of this.  On January 26, 2018, The Village, LLC submitted a revised plan for preliminary plat and preliminary PUD  development plan for the site that excluded the Bremer Bank site. The application was deemed  complete by the city and is the subject of this report.  The Planning Commission held a public hearing on February 26, took public testimony on the revised  plan, reviewed the proposal, and recommended, 7 to 0, to approve the preliminary plat and preliminary  PUD development plan, subject to the conditions in the staff report, and adding a condition to evaluate  the intersection at 27th Avenue. The Planning Commission also approved, 7 to 0, a supplemental motion  recommending that the City Council strongly consider tying financial tax incentives for this development  to affordable housing and requiring that housing being included for families and in each building within  the development.    DESCRIPTION OF THE REQUEST     The Village, LLC has submitted the following requests with their land use application for the  redevelopment plan for 2501 Lowry Avenue:     Planned Unit Development (PUD) preliminary development plan review and Re‐Zoning  Request.     Preliminary Plat review for their re‐development plan for 2501 Lowry Avenue.  A detailed narrative from the developer was submitted and is included as an attachment to this staff  report.    The site under redevelopment consideration is the former manufactured home park property, which  consists of approximately 15.4 acres located on the southwestern edge of the city of St. Anthony at 2501  Lowry Avenue. The preliminary plat and PUD preliminary development submittal proposes a residential  redevelopment that includes several housing types and styles: independent senior rental housing;  assisted living senior housing; and general occupancy rental housing. There are a total of 430 housing  units proposed on the site, comprised of three buildings of multifamily housing. While the floor plans  currently show 414 units, the developer is requesting authorization to reconfigure the floor plans and  unit sizes and number within the current building footprints proposed in order to increase the number  of proposed units up to a hard cap of 430 units. The reconfiguration would result in 28 units per acre.    The independent senior building (Building A) is proposed to include approximately 61 studio, 1‐bedroom  and 2‐bedrooms units and to be 45.5 feet in height. Building B, consisting of assisted living senior  housing, is proposed to have approximately 128 units, which range in size from very small, memory care  units to larger 2‐bedroom units. This building is proposed to be 45.5 feet in height. The general  occupancy rental building (Building C) is proposed to have a mix of studio (approximately 77), 1‐ 56 February 20, 2018  Page 3  bedroom (100), 2‐bedroom (36) and 3‐bedroom (12) units. Building C is proposed to be 44 feet in  height. These exact breakdowns are subject to change, based on final market studies and plans.    There are a total of 693 designated parking stalls proposed for the development. These include 407  enclosed parking stalls and 286 surface stalls.  The redevelopment proposal includes two stormwater  retention ponds proposed at grade. The city engineer has reviewed the surface water management plan  and submitted comments in the attached memo. Trails are proposed throughout the development to  connect with existing sidewalks and to provide intra‐site recreational opportunities.    The plan proposes to connect to the existing sewer, water, and stormwater facilities located under  Kenzie Terrace and Stinson Parkway.    ZONING GUIDANCE  The site is currently zoned R‐1 – Single Family, which is a zoning district that allows for detached  single family uses.  The applicant is requesting to rezone the site to Planned Unit Development  (PUD).  The intent of a PUD zoning designation is “to create a more flexible, creative, and efficient  approach to the use of land”, and may include a greater use variety and dimensional flexibility than  the underlying zoning district(s) would allow.    City Code Section 152.203 (“ALLOWED USES”) stipulates that a PUD development plan may deviate  from the area’s underlying zoning and allowed uses, and that the uses defined in the final PUD  agreement take precedence:    “Uses within a PUD may include only those uses generally considered associated with the general  land use category shown for the area on the official Comprehensive Land Use Plan. However, in some  unique situations, the PUD may allow the approval of use or uses that are not listed as either  permitted or conditional uses in any underlying zoning district. The specific allowed uses and  performance standards for each PUD shall be delineated in an ordinance and development plan. The  PUD development plan shall identify all the proposed land uses, which shall become permitted uses if  the final development plan is approved.”    Upon review of the proposal, the only deviation found from the standards of the R‐4 Multiple Family  Residential district (the appropriate zoning district to review this property under, per the  Comprehensive Plan Guidance of Multi‐Family Residential) is the height of the buildings. Maximum  height in the R‐4 zoning district is 35 feet, and the maximum height of the proposed highest building  is 45.5 feet.    PRELIMINARY PUD DEVELOPMENT REVIEW  Staff deemed the preliminary plat submission complete after reviewing the submitted elements  against the required information listed in Section 151.02. The following summarizes the proposal for  each element of the preliminary plat and preliminary PUD site plan.    Housing Types and Massing/Height: The preliminary plat and PUD preliminary development  submittal proposes a residential redevelopment that includes multi‐family, general occupancy  57 February 20, 2018  Page 4  housing, senior independent living, and senior assisted living. The table below summarizes the  housing types and massing for each segment of the proposed development.  Site Element Housing Type Total Units Height  Building A  Senior  independent  housing   61  3 story peaked roof,  31’5” to main eave,  45.5 feet total  Building B  Senior housing  128  3 story peaked roof  31’5” to main eave,  45.5 feet total  Building C  Market‐rate  225  4 story flat roof, 44’  total  Total Units Proposed: 414 housing units on 15.37 acres  Overall Site Density: 26.95 units per acre    Buildings A and B, both proposed at three stories in height, would b located north of the roadway that  runs through the site. Building C is proposed to have four stories, and would front Kenzie Terrace, south  of the proposed on‐site roadway. Buildings A and B are proposed to be managed and operated by  Ebenezer, a senior home community. Building C is proposed to be constructed and operated by  Continental Property Group. The density proposed meets the Comprehensive Plan guidance for Multi‐ Family Residential properties.    Traffic, Streets and Access: The development plan proposes two main access points, one from Stinson  Boulevard and one from Kenzie Terrace. The roadway is included on the preliminary plat as Outlot A and  is proposed as a private roadway. Access from the alley has been eliminated in the revised plan. A traffic  study was completed as a part of the EAW review, and has been updated. Hennepin County and the  Minneapolis Park and Recreation Board (MPRB) have also reviewed the proposal and issued a report  containing comments and requirements that will need to be met. Detailed recommendations were  included in that report and are incorporated here by reference. Notably, an access easement is  requested along the southwest corner of the property to accommodate eventual re‐location of  driveways away from the Lowry/Stinson intersection. It should be noted that city requirements  regarding access will match the permits issued by other agencies, since the MPRB and Hennepin County  have jurisdiction over these roads.    Parking: There are 693 total parking stalls proposed for this development. The table below summarizes  the parking type, stalls and area associated with each segment of the proposed development. The  parking proposal meets city code standards. An additional 37 “proof of parking” stalls are proposed, to  serve as additional parking, if needed.  Site Element Enclosed Parking  Stalls  Surface  Parking Stalls  Stalls per  unit  Building A  92 (underground)  34 2.06  Building B  77 (underground)  34 0.87  58 February 20, 2018  Page 5              Landscaping: The plan provides a landscaping program exhibit as well as cross sections and the  separation of development from existing structures. Some trees are proposed to remain, especially  those along the property borders. No trees on the Kenzington property or MPRB property will be  removed (there is currently a row of trees along the Kenzington property and street trees along Stinson  Parkway). However, most trees within the site are proposed to be removed and replaced. A landscape  buffer is proposed along the northern and eastern edge of the property of evergreen trees. Staff finds  the landscaping plan satisfactory to meet buffer goals for those edges.    Streetscape/Urban Design: The site plan and preliminary plat shows street design, sidewalks and trails  incorporated into the project design. Setbacks shown on the site plan have been increased along Stinson  to a minimum of 90 feet.  Along the alley setbacks are proposed at a minimum of 66 feet and along  Kenzington Condos property, a minimum of 65 feet. The revised plan proposes building orientation  concentrated much more inside the proposed development, with large setbacks from property  boundaries to the north, east, and west. Staff is requesting an evaluation of shifting the development  another 20 feet away from the existing Kenzington building since there is a development on the eastern  side and not as close on the western side of the development.    Trails/Sidewalks: The preliminary plat shows 5‐foot sidewalks integrated into the site design along all  internal roads, as well as an 8‐foot sidewalk trail running along the northern site perimeter. While there  is an existing sidewalk along both Stinson Blvd and Kenzie Terrace integrated into the project design,  there are no proposed enhancements to existing sidewalks. Staff is recommending a 6‐foot sidewalk  instead of a 5‐foot sidewalk sitewide. Coordination with the MPRB to improve tripping hazards and  Americans with Disabilities Act issues along Stinson Parkway will be required, especially at the  intersection of the proposed private street.    Public Spaces/Parks: The preliminary site plan includes several private recreational amenities, including  an outdoor pool, patio, two plazas, and a small dog run. The proposal also includes several indoor  private spaces. While all trails are proposed to be privately maintained, they will be open to the public  to use.    Environmental Assessment Worksheet: A full report was completed for the analysis of the  environmental impacts, including infrastructure impacts, contamination, traffic, and permitting  required. The traffic report has been updated, per the revised site plan. Detailed information was  analyzed, and this report is available on the City’s website, or at City Hall.    Environmental (Contamination): There is contamination on the site from the apparent historical  spreading of oil on dirt roads for dust control, the location of a former dry cleaner on the Bremer site,  Building C  238 (underground)  218 2.03        TOTAL 407 stalls 286 stalls 693 total  59 February 20, 2018  Page 6  and the historical siting of underground petroleum tanks. The appropriate Response Action Plan has  been submitted and approved by appropriate agencies. The developer is intending to remediate all  environmental contamination on the site as a part of redevelopment. The EAW completed for this site  has listed the detailed permits and information related to this cleanup effort.    Grading: Significant grading is required on this property for the accommodation of the development  proposal. The city engineer has reviewed the grading plan and provided detailed comments in the  attached memorandum.    Stormwater Management: A stormwater management collection and treatment system is proposed  through a system of curbing, catch basins, underground conveyance, ponding, and bio‐retention. This  includes traditional at grade ponds and below grade bio‐filtration systems. Detailed comments have  been submitted with the city engineer’s memorandum.    Utilities: Public sanitary sewer and watermain extensions and hydrants are proposed as part of this  development. The infrastructure is proposed under private streets, with public easements over them.  Detailed comments on the utilities have been submitted with the city engineer’s memorandum.    Phasing: After the final PUD approval, work will commence on the assisted senior living building as soon  as weather conditions will allow. Construction is expected to take approximately 18 months per building  to complete. As crews finish their particular subset of work, they will move to the independent senior  living building and then to the market‐rate building. The Village, LLC hopes to commence work at the  end of 2018 with an aggressive construction schedule to complete all three buildings by late 2020 or  during 2021.    Park Dedication Fees: Park dedication is required on all new subdivisions in St. Anthony. The amount of  land and cash in‐lieu contribution will be determined at the time of final plat and included in the  Development Agreement. The Park Dedication submittal was reviewed by the Park Commission at its  meeting on March 12 and a recommendation was made to accept cash‐in‐lieu of public parkland  dedication, with credit for public park infrastructure, trails, and the value of the land for an 8 foot public  trail easement along the public trail.    Development Agreements/Contracts: A series of development agreements and contracts will be  required for this project, including the payment of appropriate sewer, water, and park dedication fees.  These legal documents will be drafted and prepared at appropriate times during the final plat/final  development plan stage.    Other Agency/Department Requirements: In addition to city code requirements for the review and  consideration of a PUD preliminary development plan, re‐zoning and subdivision application, this  redevelopment is subject to many other jurisdictional requirements including the following:    State Rules Governing Completion of an EAW. Due to its size (over 375 attached units), Minnesota Rule  4410 requires preparation of an EAW to evaluate and identify existing environmental conditions and to  identify the impacts of this proposed development with regard to land use, soils, fish/wildlife, historical  60 February 20, 2018  Page 7  property, water resources, sewer, water, and transportation infrastructure, as well as any potential  noise, odor, light, or visual impacts. This document has been completed and several of its  recommendations are included in this report.    Minnesota Pollution Control Agency (MPCA). As part of the developer’s purchase of the property,  Phase I and Phase II Environmental Assessments were completed, which identified several sources of  contamination on the property that will need to be properly handled and remediated through the  process established by the MPCA. Additionally, sanitary extension and construction permits will also be  needed. Copies of all required permits will be required to be submitted prior to final approval of the  development.    Minneapolis Park and Recreation Board. MPRB has submitted comments regarding the proposed  development, outlining the process and permits required. The land under which Stinson Parkway is built  is considered MPRB parkland, not right‐of‐way. Therefore, special review and provision must be made  for any upgrades or impacts to Stinson Parkway, given its designation as parkland under MPRB  jurisdiction. Copies of all required MPRB permits will be required to be submitted prior to final approval  of the development.    Mississippi Watershed Management Organization (MWMO). This development will be subject to the  rules of the MWMO and the city regarding pollutant loading reduction, discharge rates and volumes,  and flood elevations. The city is the permitting agency for the MWMO.    Fire Department. The St. Anthony Fire Department reviewed the proposal according to the 2015  Minnesota State Fire Code, based on the 2012 International Fire Code They have the following  commentswhich are quoted in full:    Access Roads:  Appear to be in compliance at this time. Concerns in regard to the bump outs  prior to turning into the parking lots as well as the surmountable curb in the center of the  complex road and concerning its size. That appears too large and trucks may not be able to make  the turn without potentially having to drive over it.    Hydrant spacing: Appears compliant along with distances to Fire Department Connections.   Building entrances: Indicated with Fire Department Connections appear compliant.  Garage  entrances are indicated.     When fire protection systems are designed early input from the fire department will make the  process much more efficient.   Considerations for each of the buildings cannot be addressed until detailed plans are submitted  for the actual buildings including fire protection systems.  A plan review process will occur for all  buildings and will reference the codes in force when the plans are submitted. As was discussed in  previous meetings, staff would like to see individual floor sprinkler shutoff’s as well as an  addressable alarm system.    Entry door added next to each underground garage door access with a key box installed as well.  This will provide direct entry access to the garage for any type of car fire, carbon monoxide issue,  trash fire, medical or other incident that takes place there.    Verification on the height of the overhang at the entry of the buildings. Consideration to height  of apparatus as well as ambulance need to be given.     61 February 20, 2018  Page 8  Public Safety. The St. Anthony Police Department reviewed the proposal and noted the following points  of consideration, also quoted in full:    The Village site project located at 2501 Lowry Avenue is forecast to be a max 430 unit site, or 28  units per acre.  The project site design includes a single boulevard style roadway. The project  includes two three story pitched roof buildings that will consist of independent senior living,  assisted senior living and memory care units. The site also contains a four story market rate  apartment building.   The site contains a single boulevard style roadway with no connections to  the alley.     Originally, concerns were raised with regard to access to the development off of Stinson  Boulevard and Kenzie Terrace, as well as egress from the development onto these streets.  An  exit/entry point off of Lowry Avenue would be very close to the intersection of Lowry Avenue and  Stinson Boulevard.  Vehicles leaving the development onto WB Lowry Avenue would have low  risk for accident.  Those leaving onto EB Lowry Avenue and Kenzie Terrace would present  additional risk for vehicle, bicycle and pedestrian traffic.  Vehicle exit/entry off of Stinson  Boulevard would present minimal risk for area vehicle, bicycle and pedestrian traffic provided  entry/egress is limited to NB traffic only.  If a crossover to SB Stinson Boulevard is constructed,  the risk potential would increase.  It remains to be seen what influence the Minneapolis Park  Board will have in regards to traffic management on Stinson Boulevard.     The layout of outdoor parking at this development should be consistent with other area  developments.  It is recommended that the development allow for easy access for police patrol  cars, fire apparatus and local ambulance services.  Provisions for emergency vehicle access  should allow for easy access/egress to the property.  There should be continuity with regard to  pedestrian and vehicle circulation within the site, which will aid in police, fire and EMS response.   Turnarounds large enough to accommodate emergency vehicles and fire trucks should be  considered. Building entrances should be in close proximity to pedestrian walk ways and vehicle  parking areas.     On street neighborhood parking on Stinson Boulevard and surrounding side streets, in St.  Anthony and Minneapolis, may be impacted by a development of this size.  Care should be given  to future roadway design of Stinson Boulevard and Lowry Avenue/Kenzie Terrace.  On street  parking on Lowry Avenue should be avoided due to roadway design in that area.  Due care  should be taken in regard to a development of this size and existing residents as it pertains to  quality of neighborhood life concerns related to traffic, parking, noise and littering complaints.     The demands a 430‐unit site puts on the police department can be projected in two ways.  First,  a performance based approach to staffing that takes into account projected call load.  Second,  and more common, is the average ratio of full time officers per 1,000 residents.  The first, being  more accurate, would be appropriate to consider.  Seeing how this development will be phased  in over multiple years, it will be important to do yearly monitoring of calls for service to this site  when making staffing decisions.      Hennepin County Transportation. Hennepin County reviewed the proposal, providing notes on the site  plan. Detailed review and comments are included as an exhibit.    COMMUNITY INPUT TO‐DATE  62 February 20, 2018  Page 9  There has been much interest in the proposed redevelopment of this site, starting almost two years ago  and continuing to‐date. Staff has received over 100 emails since the initial sketch plan phase.  Additionally, staff has spoken with many residents and concerned neighbors and has summarized the  concerns as follows:   Concerns over the density and height of the proposal. The most common concern is the opinion  that the comprehensive plan should not be amended to accommodate this development and  that heights should be consistent with those around the site.   Concerns over the loss of affordable housing. People have expressed the need to retain/replace  affordable housing on the site.   Concerns over traffic and safety. People have stated the increase in traffic on Stinson Parkway  will reduce livability and increase congestion at key intersections.   Concerns regarding views for existing Kenzington Condos residents. People have expressed  concern over the reduction in views from their units.   Concerns over tree removal.    Concerns over school capacity and other public services.    Concerns over the handling and treatment of stormwater runoff.  The revised plans reduce the density of the project, which results in almost half the traffic and  population within the new proposal, increase the setbacks from property boundaries, and remove  access from the alley. The revised plans show significant landscape buffering and some tree  preservation, where practical. Stormwater management is located primarily in surface level ponds,  rather than underground storage.    RECOMMENDATION  The Planning Commission held a public hearing on February 26, took public testimony on the revised  plan, reviewed the proposal, and recommended 7 to 0 to approve the preliminary plat and preliminary  PUD development plan, subject to the conditions in the staff report, and adding one condition to  evaluate the intersection at 27th Avenue. The Planning Commission also, approved 7 to 0, a  supplemental motion to recommend that the City Council strongly consider tying financial tax incentives  for this development to affordable housing and requring that housing be included for families and in  each building within the development.  Staff has completed a thorough review of the proposal and has the following comments and conditions  for the Preliminary PUD Development Plan and Preliminary Plat:   Setback from Kenzington Condos. Increase the setback from the property line by  approximately 20 feet, shifting the development to the west.   Vacation of Easement. There is currently a watermain easement through the site, which  will need to be vacated through a separate action accompanying a final plat.   Engineering Comments. All changes contained in the attached city engineer and  stormwater management memoranda should be made to the satisfaction of the city  engineer.   63 February 20, 2018  Page 10   Agency Comments. MPRB and Hennepin County permits shall be obtained and permit  requirements should be incorporated, as final approval by those agencies requires.    Revised Traffic Study Recommendations.  All traffic mitigation efforts listed in the  revised traffic study shall be part of the conditions for approval, as permitted by other  regulating agencies (MPRB and Hennepin County).   Receipt of All Applicable Permits. All other agency permits shall be obtained, and plans  approved prior to construction on the site.  In consideration of the above items, staff recommends that the City Council take the following actions:   Motion to adopt a resolution approving the preliminary PUD plan and preliminary plat,  contingent on the requirements and items listed in the Resolution.  SUGGESTED MOTION     The following actions are options for the City Council to consider:  1) Motion to adopt a resolution, approving the preliminary PUD plan and preliminary plat,  contingent on the requirements and items listed in the Resolution and in the staff report.  2) Motion to table action on the preliminary PUD development plan and preliminary plat, based on  the submittal of additional information, as enumerated in the staff report;    3) Motion to deny the preliminary PUD development plan and preliminary plat and to direct staff  to prepare a draft resolution declaring terms of the same, based on the findings of the City  Council.      ATTACHMENTS  1) Resolution  2) Village LLC narrative  3) Graphic Site Plan  4) Landscape Boards  5) Village LLC Civil Plans  6) Traffic Study, updated  7) Village LLC Building Exhibits, with parking information  8) City Engineer Memo  9) Storm Water Management Memo  10) Hennepin County Transportation Comments  11) Revised site plan (one page)  12) Traffic memo regarding 27th Avenue        64 Southern Gateway Redevelopment Project CITY COUNCIL MEETING MARCH 27, 2018 Process To Date 6/2016: Applicant purchased Lowry Grove 10/2016: Developer submitted sketch plan 1/2017: Environmental Assessment Worksheet conducted 6/2017: Manufactured home community closed 7/2017: Application for development submitted 10/2017: City Council denied development request 12/2017: New application submitted, deemed incomplete 2/2018: The Village, LLC submitted revised plans excluding Bremer Bank site 2/2018: The Village, LLC submitted revised plans excluding Bremer Bank site 2/26/2018: Planning Commission held public hearing and recommended approval 7 to 0, with conditions 3/27/2018: City Council consideration 65 Applications Submitted Developer Request for: Planned Unit Development (PUD) preliminary development plan review and re-zoning request Preliminary plat review for their redevelopment plan for 2501 Lowry Avenue Proposal Details Site: 15.4 acres Location: Southwestern edge of the city of St. Anthony @ 2501 Lowry Ave Use: Residential Type: Independent senior rental housing, assisted living senior housing, general occupancy rental housing Units: 414 (up to 430) in three buildings Density: 28 dwelling units/acre 66 Proposal Details Building A:Independent Senior Building 61 units including studios, 1 bedrooms, and 2 bedrooms Height: 45.5 feet Building B:Assisted Senior Living 128 units, including small memory care units up to 2 bedroom units Height: 45.5 feet Building C:General Occupancy 225 units including studios, 1 bedroom, 2 bedrooms, and 3 bedrooms Height: 44 feet Proposal Details Parking: 693 designated parking stalls (407 enclosed, 286 surface) Stormwater: 2 retention ponds at grade Trails throughout site will connect with existing sidewalks 67 Proposal Details Proposal Details 68 Proposal Details Changes from Last Plan Exclusion of Bremer Bank site due to expiration of purchase agreement Increased surface parking Reduced building heights No connection to alley Deeper setbacks Reduced retaining wall use 69 Contingencies Further analysis of 27th Avenue (Planning Commission addition) Setback from Kensington Terrace Condos. Increase the setback from the property line by approximately 20 feet, shifting the development to the west. Vacation of Easement. There is currently a watermain easement through the site, which will need to be vacated through a separate action accompanying a final plat. Engineering Comments. The full City Engineer memo and stormwater management memo are available as attachments and all changes should be made, per the memo to the satisfaction of the city engineer. Agency Comments. Park Board and Hennepin County permits shall be obtained and permit requirements should be incorporated, as final approval by those agencies requires. Revised Traffic Study Recommendations. All traffic mitigation efforts listed in the revised traffic study shall be part of the conditions for approval, as permitted by other regulating agencies (Park Board and Hennepin County). Receipt of All Applicable Permits. All agency permits shall be obtained, and plans approved prior to construction on the site. 70 Recommendation Planning Commission met on February 27, 2018, held a public hearing, took testimony, and recommended approval of the preliminary PUD plan and preliminary plat, contingent on the requirements and items listed in the staff report and its attachments, and further analysis of 27th Avenue. Planning Commission made a second motion that any city financial assistance be used for the development of affordable, family housing throughout the development. Park Commission met on March 12, 2018, reviewed the park dedication request, and recommended approval of cash-in-lieu, with credit for trail construction and land under the trail Next Steps March 27 -City Council Consideration Spring 2018 -If approved, final plat submission Spring 2018 –TIF consideration Summer 2018 -Development agreement 71 THIS PAGE LEFT INTENTIONALLY BLANK 72 CITY OF ST. ANTHONY VILLAGE RESOLUTION 18-030 A RESOLUTION APPROVING THE PUD PRELIMINARY DEVELOPMENT PLAN/PUD REZONING, AND PRELIMINARY PLAT RELATED TO THE VILLAGE, LLC PROJECT LOCATED AT 2501 LOWRY AVENUE WHEREAS, on January 26, 2018, the City of St. Anthony Village received a request from the Applicant, The Village, LLC, for the following applications (“Application”):  Rezoning request/Planned Unit Development Preliminary Development Plan request to change the zoning of the site from R1 – Single Family Residential (at 2501 Lowry Avenue) to Planned Unit Development (PUD);  Preliminary Plat request; The property comprising the site is legally described in Exhibit A (the “Property”), addressed at 2501 Lowry Avenue. WHEREAS, the Property is currently guided by the Comprehensive Plan as High Density Residential; and WHEREAS, the St. Anthony Village’s zoning district needs to be consistent with the City’s Comprehensive Plan allowing for a 25 to 40 units per acre; and WHEREAS, the Planned Unit Development re-zoning is an appropriate zoning district to utilize for the review of this project, given its High Density Residential land use guidance, unique and varied site surroundings, and due to involving a larger re-development area with more than one parcel; and WHEREAS, the re-development should be evaluated as a complete development, consistent with past practices; and WHEREAS, the Comprehensive Plan is the city’s guiding document, approved in 2008, and reviewed in accordance with State Statute by the Metropolitan Council; and WHEREAS, on February 26, 2018 the Planning Commission held a public hearing regarding the proposals, took public testimony, reviewed the Application, and took the action related to the Application to recommend approval of the preliminary PUD development plan and preliminary plat, contingent upon the items listed in the staff report and its attachments, and that further study be completed on 27th Avenue. (7 to 0) 73 NOW, THEREFORE BE IT RESOLVED, that the City Council of the City of St. Anthony Village approves the Applications, with the following contingencies:  Setback from Kensington Condos. Increase the setback from the property line by approximately 20 feet, shifting the development to the west.  Vacation of Easement. There is currently a watermain easement through the site, which will need to be vacated through a separate action accompanying a final plat.  Engineering Comments. The full City Engineer memo and stormwater management memo are available as attachments and all changes should be made, per the memo to the satisfaction of the city engineer.  Agency Comments. Park Board and Hennepin County permits shall be obtained and permit requirements should be incorporated, as final approval by those agencies requires.  Revised Traffic Study Recommendations. All traffic mitigation efforts listed in the revised traffic study shall be part of the conditions for approval, as permitted by other regulating agencies (Park Board and Hennepin County).  Receipt of All Applicable Permits. All other agency permits shall be obtained, and plans approved prior to construction on the site; And based on a review of the complete record and the findings contained in this Resolution which include: (1) The use districts are protected by the Application; (2) Orderly development and redevelopment is promoted by this Application; (3) The proposal does provide adequate light, air, and access to property; (4) The proposal prevents overcrowding of land and undue concentration of structures by regulating land, buildings, yards, and densities; and (5) The Rezoning Request/Planned Unit Development Preliminary Development Plan request and the Preliminary Plat are consistent with the Comprehensive Plan. Adopted this 27th day March, 2018. _____________________________ Jerome O. Faust, Mayor ATTEST:____________________________ Nicole Miller, City Clerk Reviewed for administration: ______________________________ Mark Casey, City Manager 74 EXHIBIT A Parcel 1: That part of the South 1/2 of the Northwest Quarter of Section 7, Township 29, Range 23, beginning at a point in the South line of said Tract 100 feet East of the Southwest corner thereof; thence North 1079.8 feet; thence East parallel to the South line of said quarter section 1041.74 feet; thence South to center of State Highway No. 63; thence southwesterly along said center line of State Highway No. 63 and St. Anthony and Taylor Falls Road to intersection of center line of said road with the South line of said quarter section; thence West along said latter line to the point of beginning, except that part thereof embraced in the South 365 feet of the West 395 feet of the Southwest Quarter of the Northwest Quarter of said Section 7 and except the easterly 100 feet thereof. Except that part taken for highway purposes by the County of Hennepin as evidenced by Final Certificate, filed May 16, 1985, as Document No. 1652500. Parcel 2: That part of the following described property: The Easterly 100 feet of that part of the South half of the Northwest Quarter, Section 7, Township 29, Range 23, beginning at a point in the South line of said Tract 100 feet East of the Southwest corner thereof, thence North 1079.8 feet, thence East parallel to the South line of said quarter section 1041.74 feet; thence South to center of State Highway No. 63; thence Southwesterly along said center line of State Highway 63 and St. Anthony and Taylor Falls Road to intersection of center line of said road with the South line of said quarter section; thence West along said latter line to the point of beginning, lying Westerly of the following described line and its Southerly extension, Beginning at a point on the North line of the above described Tract, distant 5.50 feet easterly of the Northwest corner thereof, assumed bearing of said North line is North 89 degrees 24 minutes 53 seconds East; thence South 01 degree 00 minutes 45 seconds East a distance of 486.65 feet, more or less, to the South line of the above described tract and there terminating. Parcel 3: That part of the Northwest Quarter of Section 7, Township 29, Range 23, described as commencing at a point on the South line of said Northwest Quarter distant 100 feet Easterly from the Southwest corner of said Northwest Quarter; thence Northerly parallel with the West line of said Northwest Quarter to the South line of MURRAY HEIGHTS ADDITION TO MINNEAPOLIS, being the actual point of beginning; thence Southerly along said parallel line to a point distant 1079.8 feet Northerly from said South line of the Northwest Quarter; thence on an assumed bearing of North 89 degrees 24 minutes 53 seconds East, parallel with the South line of said Northwest Quarter a distance of 947.24 feet; thence North 01 degree 00 minutes 45 seconds East to said South line of MURRAY HEIGHTS ADDITION TO MINNEAPOLIS; thence Westerly along the last described line to the point of beginning. All situated in the County of Hennepin and State of Minnesota. Torrens Property Being registered land as evidenced by Certificate of Title No. 1066595 2501 Lowry Avenue NE, St. Anthony, MN 55418 75 THIS PAGE LEFT INTENTIONALLY BLANK 76 January 26, 2018 Mayor Faust & Council Members c/o Mark Casey CITY OF SAINT ANTHONY VILLAGE 3301 Silver Lake Road Saint Anthony Village, Minnesota 55418 VIA HAND DELIVERY RE: Written Statement in Support of PUD Application Dear Mayor Faust and Council Members: Having reached what THE VILLAGE, LLC (“The Village”) believes to be a shared vision for redevelopment, it now submits a Planned Unit Development (“PUD”) Preliminary Development Plan application (and, together with its related applications and materials, the “Applications”) for redevelopment (“Project”) of 2501 Lowry Avenue NE, Saint Anthony, Minnesota (the “Property”). This letter is offered as written support for the Applications. In preparing the Applications, The Village scrapped its earlier plans and presents this entirely new concept. Understanding that a planned unit development must meet both The Village’s needs and the needs of the City of Saint Anthony Village (the “SAV”), The Village Project was rebuilt from square one to address the concerns raised in opposition to the original applications. We began at “square one” with the baseline understanding that density would be dramatically reduced. This required a completely different way of looking at potential designs. What evolved was a simpler design and greatly-reduced infrastructure. The revised design began with a single boulevard-style roadway, akin to Stinson Parkway. From there, architects refined the design to increase total parking (including adding significantly greater surface parking), reduce building heights, eliminate connections to the alley, reduce retaining wall use, and create deeper setbacks. The Project now includes two three-story, pitched-roof buildings to the north of the boulevard, used for independent senior living, assisted senior living and memory care units. A four-story, market rate apartment building rests south of the boulevard. We have detailed the current unit breakdown by building below. But because minor changes can occur as the final drawings are fully refined, The Village proposes a hard cap of 430 units on the Property, or 28 units per acre. 77 You will also note that we have sought to balance the need for green space and the need for adequate parking. The Village believes that between the underground parking, the surface parking, and the street parking on the internal street there is sufficient parking for all uses in the Property. But it also recognizes that the demographics of each development and the parking needs of that demographic can vary dramatically between projects. To ensure that it has capacity if the reality of the Project proves more surface parking is necessary, The Village has built a buffer known as “proof of parking.” If The Village is correct and it has adequate parking, precious green space will be preserved. But in the event that more parking is needed, The Village has identified a location of 37 additional stalls that would be constructed upon triggering events set out in the master development agreement that will be entered into between the City and The Village as part of any PUD approval. Status of Bremer Property Before turning to the specifics of the Applications, a clarification is in order about the status of the Bremer Property. The Village had a fully executed purchase agreement allowing it to acquire the Bremer Property (the “Bremer PA”). The Bremer PA has expired. Additionally, The Village had previously reached a contingent agreement to eventually transfer the Bremer Property (and a portion of the Property) to Aeon (the “Aeon PA”). But the contingencies in the Aeon PA were not met, and the parties have agreed to cancel the Aeon PA. The Village never intended to take ownership of the Bremer Property or close on the Bremer PA. Instead, The Village expected to locate affordable housing on the Bremer Property as part of a mixed-use building. Discussions continue with Bremer while Bremer examines development options for the site. Within the Applications, The Village looks to include the Bremer Property in the redevelopment tax increment district to give the eventual developer all available flexibility. The Bremer Property is not included in the preliminary plat application. The eventual Bremer developer will receive the redevelopment tax increment designation and will have full control over the PUD process for the Bremer Property directly with the City. 78 Project Summary A summary of the key components of the Project on the Property follows. Site Element Housing Type Total Units Height Ugd. Parking Surface Parking Building A Senior Ind. housing 61 3 story peaked roof 31’5” to main eave 92 34 Building B Senior housing 128 3 story peaked roof 31’5” to main eave 77 34 Building C Market- rate 225 4 story flat roof 44’ to facia 238 218 Total Units Proposed for 15.37 acres: 414 housing units 407 286 2501 Lowry Site Density: 26.94 units per acre The Proposal is a PUD, and the city has broad approval leeway to encourage development creativity that adds vitality to the city. The project however does not need much help in meeting the city’s already established multifamily guidelines. The Project’s Lot Coverage is projected to be 51.5% (including proof of parking). However, if we exclude the boulevard, that number falls to 47.1%. It is typical to exclude the boulevard for lot coverage calculations because the boulevard and the north and south sidewalks serve the public and the housing community. The 51.5% ratio also includes the swimming pool, gathering plaza, independent living patio and assisted living patio, and memory garden. These new outdoor spaces are landscaped and provide outdoor amenities for residents of the campus adding tremendous quality of life. If the pool and gathering plaza are excluded from these calculations, coverage drops further than 47.1%, which is excellent for a property of this size. The Project’s building-to-land ratio is 20.1% (22.3% if private road outlot is excluded), with the zoning max at 35%, the Project is well below the maximum. Compliance with Planning Principles In developing the Project, The Village paid special attention to the City’s five Planning Principles. We discuss each below. 1) The provision of affordable housing. The city has a history of including, requiring, and financially supporting the development of 79 affordable housing in the community, and this commitment will continue; The Village remains committed to affordable housing’s role in the Project. Of the apartment units, 79 meet the standard for affordable housing at 80% of the Hennepin County area median income (“AMI”), which means that 35% of the apartment units qualify as affordable housing under U.S. Housing and Urban Development department standards. The Village also proposes that a third party develop the adjacent Bremer Property for affordable housing. The Village will not develop the Bremer Property. It will, however, help ensure the future ability to offer affordable housing by requesting inclusion in the redevelopment tax increment district (eligibility for which it would not enjoy on its own). The Bremer Property’s inclusion in the redevelopment district will provide maximum flexibility to its eventual developer. Lastly, after the City denied the original applications, The Village and the City met to give the City a voice for its vision and provide a meaningful feedback loop. During the meetings, the City pointed out that SAV’s HRA currently owns the 0.9-acre former bowling site (the “HRA Property”). To generate even greater affordable housing as part of the development, the City identified the HRA Property as a potential additional location for an affordable housing developer to construct housing at an affordability level that the City and community desire and that is financially possible. The Village agrees that locating additional affordable housing on the HRA Property in conjunction with the Project is logical and The Village looks forward to further discussions with all stakeholders to make maximal use of the HRA Property as a potential location for additional affordable housing. 2) Compatibility with surrounding land uses. It is important that new development match existing surrounding land uses in scale, height, and use; For many years, the City’s Comp Plan has designated the Property for high-density residential redevelopment. The Project appropriately balances that designation and the existing neighboring uses. As the Comp Plan correctly notes, “[b]ecause the City is fully developed, additional housing would have to occur through redevelopment… [and] the anticipated density for this higher density housing development is 25 to 40 units per acre.” The Village has worked to design a project close to 80 the bottom of that range. The Project can now reasonably be constructed at 28 units per acre or less. Accordingly, The Village seeks approval for a project built at 28 units per acre, largely because in its experience, market dynamics and design considerations can lead to minor variations in unit mixes before the project’s conclusion. Rather than returning with a proposed amendment after the public process is complete, The Village requests a small density cushion now. The final PUD submission will detail the precise configuration and unit mix. Additionally, the Project was designed as high-density to fit the neighborhood. The design began with the boulevard-style street intended to compliment Stinson Parkway and dissuade users from viewing it as an option for “cut through.” Next, the Project recognizes neighboring uses: predominantly single family to the west and north, and high-density residential or commercial to the east and south. The resulting configuration sees two senior-living buildings located north of the project’s boulevard, with considerable setbacks from both the northern and western property lines and a three- story, pitched-roof design to more closely resemble a single-family home. The Village strategically located the market-rate building on the Property’s southern portion near existing high-density uses. Because it is market-rate, it is designed to appeal to the “renters-by-choice” demographic. These users demand that their apartment look and feel drastically different than a senior building. The architecture has a more modern feel as a result, featuring a flat roof and loaded with amenities, including a gathering area, pool, and dog run. The height was technically reduced to four stories, but it is lower than the peak of a three-story pitched roof. 3) Provision of adequate public infrastructure. All new development must provide appropriate infrastructure to manage water, sewer, runoff, streets, and access, and all other infrastructure needed to adequately serve itself and protect the surrounding community. The existing site is surrounded by public infrastructure available to serve the proposed, scaled back, development plan proposed. While the following paragraphs provide an overview, a more detailed engineering summary has been provided to touch on specific items that will be reviewed. 81 As the proposed development relates to traffic and access, the internal roadway, vehicle and pedestrian access and ways of traverse have been designed for the proposed demand. The offsite transportation improvements are being re-analyzed to account for the updated unit number and uses, which will present recommendations for offsite improvements. The preliminary development plans have been reviewed with engineering and fire departments and their respective initial comments have been incorporated. The sanitary sewer adjacent to the site, located in the alley to the north, was determined in the previous submittals to be adequate to serve the development and that remains the case for this reduced density. Similarly, the domestic water supply is available to the south and west of the property to serve the development. As was the case in the previous proposals, following the preliminary approval of the proposed plan, the City will verify further improvements needed offsite to ensure adequate fire flows as required by proposed building types. Stormwater management has been an obstacle on the Property for many years. Nonetheless, the Project meets the City and MWMO requirements for rate control, water quality and freeboard. The proposed management system consists primarily of a collection system routing runoff to traditional surface ponds, and supplemental filtration, to treat and store the stormwater prior to discharging it at a rate no more than the current conditions discharge. You can find additional detailed engineering information in the submittal package attached on all of these items. 4) Protection of the environment. All development must meet all Federal, State, watershed district, and local requirements for environmental protection. The city will ensure all pollution and contamination is properly remediated. The Project is significantly scaled back from the 823-unit project. Notably, the environmental assessment worksheet for that initial project concluded it was not likely to result in significant environmental impact. The Village agrees that the Project must comply with all Federal, State, watershed district, and local requirements for environmental protection regulations. We believe it does meet—and, in many instances, exceeds—those thresholds. As has been noted elsewhere, environmental testing reveals that hazardous substances exist below ground on the Property. Specifically, 82 the adjacent property and Property’s prior uses have contaminated the environment with fuel oil and gasoline, diesel range organics, various volatile organic compounds, asbestos, and tetrachloroethene. The Village has already fully remediated the asbestos contamination and, together with appropriate governmental authorities, will undergo further remediation as part of the redevelopment. The Property is already part of the Minnesota Pollution Control Agency (“MPCA”) Voluntary Investigation and Cleanup (“VIC”) program and has received MPCA approval for its Voluntary Response Action Plan (“VRAP”) to fully remediate contamination as part of the development. 5) A fair and open public process. When a formal application is received for development, the city will provide outlets for community discourse and discussion on the proposal. The Village has sought to ensure a fair and open public process. After developing the plans for the Project, The Village held open community meetings to discuss the design and receive feedback. It also agreed to engage smaller groups to address specific questions. It has met with the Minneapolis Park and Rec department, Hennepin County Public Works, the Fire Chief and Fire Marshall, and SAV’s engineer, all to gather as much input as possible to ensure the Project is truly a shared vision. In addition, the Applications will face the planning commission’s scrutiny and a full public hearing. Additional Considerations Staging & Process The Village seeks approval for its preliminary PUD application on the entire Project to get building dimensions approved and detail a shared vision for development. On receipt of that approval, The Village will work with staff on the terms of the master development agreement that is part of all PUD approvals. Once there is preliminary agreement on those terms, The Village will promptly submit for final PUD approval on the Project. The phasing plan for the Project is significantly more compact than the original plans. After the final PUD approval, work will commence on the assisted senior living building as soon as weather conditions will allow. Construction is expected to take approximately 18 months to complete per building. As crews finish their particular subset of work, they will move to the independent senior living building and then to the market rate building. The Village is hopeful to commence work at the end of 2018 with 83 an aggressive construction schedule to complete all three buildings by late 2020 or 2021. Parking. Parking will be well-managed across the Project. Based on the experience of the selected senior living operator, the senior buildings are likely over parked. The independent living building provides 126 stalls for 61 units, even though it is unrealistic to expect that a 2 to 1 parking ratio is necessary to meet parking demand. For the assisted living (which includes a memory care component), the expectation is one parking stall for every 3 units plus 20 employee stalls. Despite that ratio, the Project provides 111 stalls for 128 assisted living units, an excess of 48 stalls above the highlight standard. When it comes to the market rate buildings, similar projects have generally been constructed with a 1.5 to 1.75 unit to parking stall ratio. But The Village is very committed to ensuring it has adequate parking. The market-rate building has 225 units (a total of 285 bedrooms). There are 238 below ground parking spaces and 181 surface stalls (without the proof of parking) for a parking ratio of 1.86. Sitting above market-average parking ratio, The Village finds the proposed parking adequate. As discussed above, however, The Village has built in an additional buffer of 37 stalls, that would be constructed if existing stalls proved to be inadequate, which would than slightly exceed a 2.0 unit to parking stall ratio. Open Space and Park Dedication An important component of the Project is that design choices were made to preserve a natural buffer along Stinson Parkway and along the northern and eastern property lines. By doing so, The Village seeks to save as many of the landmark trees in those areas as possible (upon further inspection some may show to be less than healthy and others cannot be saved due to the grading demands). Currently, The Village estimates that 17 such trees will be saved. In addition, the landscaping plan calls for the addition of new trees to enhance screening and enjoyment that comes from preserving such natural buffers. These areas will add to the trail system throughout the Project to create an open, park feel. Property Control. The Village has previously provided the City a copy of the deed for the Property. 84 85 Continental - St. Anthony Site PlanSt. Anthony, MN86 St Anthony Village |Landscape ProgramDog ParkActivity NodesPatio & Pavilion87 St Anthony Village |Tree PreservaƟon Plan & Pedestrian CirculaƟon11225533418” Ash18” Maple36” Oak30” Oak36” Oak60” Oak(2)-12” Pine12” Ash12” Pine48” Oak24” Oak36” Oak(3)-36” Oak24” MapleExisting Tree Size & SpeciesActivity Node11Sidewalks & Walking TrailsSection Cut Location52112988 St Anthony Village |Conceptual SecƟons11Senior Housing to Walking Trail to AlleySenior Housing8’ Walking TrailAcƟvityNodeScreening/Buffer PlanƟngAlley ExisƟng GarageExisƟng House78’SƟnson BlvdParkwayProof of ParkingPublic SidewalkSidewalk DrainageSwaleMulƟ-ResidenƟal22MulƟ-ResidenƟal to SƟnson Blvd1”=20’1”=20’98’220’98’PLPL89 St Anthony Village |Conceptual SecƟonsProperty LineRetaining WallTree Replacement PlanƟngs-Over-story, Specimen, OrnamentalBlvd TreesBlvd TreesBlvd TreesPaƟo/PavilionStormwater Pondwith FountainsSenior Housing8’ Walking TrailKenzington CondominiumsExisƟngTreesStreet LighƟng15’Drive Lane8.5’Parking Lane5’SidewalkDrainage Swale44Typical Road SecƟon55Senior Assisted Living to Kenzington Condominiums33Property Line to Stormwater Pond1”=20’1”=20’1”=20’69’ ROW70’44’ 10”55’89’ 6”PL23.5’15’Drive Lane10’Median8.5’Parking Lane5’Sidewalk23.5’90 St Anthony Village | Precedent Images1Village Park2MulƟ-ResidenƟal3Senior Housing91 G-101 COVER AND INDEX SHEET Drawn By: Issue Date: Project #:5005-0003 RAGTHE VILLAGE LLC DEVELOPMENTTHE VILLAGE, LLC1907 WAYZATA BLVD, SUITE 250M:\5005\0003\DESIGN\CAD\PLANSHEETS\g-101 Cover And Index Sheet.dwgDescription:Date:WAYZATA, MN 55391Issue #:ST. ANTHONY VILLAGE, MINNESOTA12/06/2017 1Issue #Prepared For:XX/XX/XXXX DESCRIPTIONISSUE #Sheet #: Sheet Title:1/25/2018 5:26:05 PMDate: I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY REGISTERED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. License #: WARNING: THE CONTRACTOR SHALL BE RESPONSIBLE FOR CALLING FOR LOCATIONS OF ALL EXISTING UTILITIES. THEY SHALL COOPERATE WITH ALL UTILITY COMPANIES IN MAINTAINING THEIR SERVICE AND/OR RELOCATION OF LINES. THE CONTRACTOR SHALL CONTACT GOPHER STATE ONE CALL AT 651-454-0002 AT LEAST 48 HOURS IN ADVANCE FOR THE LOCATIONS OF ALL UNDERGROUND WIRES, CABLES, CONDUITS, PIPES, MANHOLES, VALVES OR OTHER BURIED STRUCTURES BEFORE DIGGING. THE CONTRACTOR SHALL REPAIR OR REPLACE THE ABOVE WHEN DAMAGED DURING CONSTRUCTION AT NO COST TO THE OWNER. TWIN CITY AREA: 651-454-0002 TOLL FREE 1-800-252-1166 CALL BEFORE YOU DIG PROJECT LOCATION CITY: ST. ANTHONY VILLAGE COUNTY: HENNEPIN DISTRICT NO.: 3 INDEX OF SHEETS PROJECT LOCATION MAP G-101 COVER AND INDEX SHEET G-102 NOTES AND LEGEND C-101 PRELIMINARY PLAT C-102 EXISTING CONDITIONS C-103 EXISTING CONDITIONS C-104 PRELIMINARY SITE PLAN C-105 PRELIMINARY SITE PLAN NORTH C-106 PRELIMINARY SITE PLAN SOUTH C-301 PRELIMINARY GRADING PLAN C-302 PRELIMINARY GRADING PLAN NORTH C-303 PRELIMINARY GRADING PLAN SOUTH C-401 PRELIMINARY UTILITY PLAN C-402 PRELIMINARY UTILITY PLAN NORTH C-403 PRELIMINARY UTILITY PLAN SOUTH C-501 PRELIMINARY STORM SEWER PLAN C-502 PRELIMINARY STORM SEWER PLAN NORTH C-503 PRELIMINARY STORM SEWER PLAN SOUTH C-801 DETAILS L-100 PLANTING PLAN - OVERALL CONCEPT L-101 PLANTING PLAN - CONCEPT SOUTH L-102 PLANTING PLAN - CONCEPT EAST L-103 PLANTING PLAN - CONCEPT WEST THIS SET CONTAINS 22 SHEETS GOVERNING SPECIFICATIONS: 1. CITY ENGINEERS ASSOCIATION OF MINNESOTA (CEAM) STANDARD UTILITIES SPECIFICATIONS (LATEST EDITION) 2. THE MINNESOTA DEPARTMENT OF TRANSPORTATION "STANDARD SPECIFICATIONS FOR CONSTRUCTION" (LATEST EDITION). 3. ALL APPLICABLE FEDERAL, STATE, AND LOCAL LAWS AND ORDINANCES WILL BE COMPLETED WITHIN THE CONSTRUCTION OF THIS PROJECT. 4. ALL TRAFFIC CONTROL DEVICES SHALL CONFORM TO THE LATEST EDITION OF THE MINNESOTA MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES, INCLUDING THE LATEST FIELD MANUAL FOR TEMPORARY TRAFFIC CONTROL ZONE LAYOUTS. PROJECT VICINITY MAP PRELIMINARY PUD PLANS FOR THE VILLAGE LLC DEVELOPMENT CITY OF ST. ANTHONY VILLAGE HENNEPIN COUNTY, MINNESOTA JANUARY 2018 92 G-102 GENERAL NOTES AND LEGEND Drawn By: Issue Date: Project #:5005-0003 RAGTHE VILLAGE LLC DEVELOPMENTTHE VILLAGE, LLC1907 WAYZATA BLVD, SUITE 250M:\5005\0003\DESIGN\CAD\PLANSHEETS\G-102 General Notes And Legend.dwgDescription:Date:WAYZATA, MN 55391Issue #:ST. ANTHONY VILLAGE, MINNESOTA12/06/2017 1Issue #Prepared For:XX/XX/XXXXDESCRIPTIONISSUE #Sheet #: Sheet Title:1/25/2018 2:01:34 PMDate: I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY REGISTERED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. License #: WARNING: THE CONTRACTOR SHALL BE RESPONSIBLE FOR CALLING FOR LOCATIONS OF ALL EXISTING UTILITIES. THEY SHALL COOPERATE WITH ALL UTILITY COMPANIES IN MAINTAINING THEIR SERVICE AND/OR RELOCATION OF LINES. THE CONTRACTOR SHALL CONTACT GOPHER STATE ONE CALL AT 651-454-0002 AT LEAST 48 HOURS IN ADVANCE FOR THE LOCATIONS OF ALL UNDERGROUND WIRES, CABLES, CONDUITS, PIPES, MANHOLES, VALVES OR OTHER BURIED STRUCTURES BEFORE DIGGING. THE CONTRACTOR SHALL REPAIR OR REPLACE THE ABOVE WHEN DAMAGED DURING CONSTRUCTION AT NO COST TO THE OWNER. TWIN CITY AREA: 651-454-0002 TOLL FREE 1-800-252-1166 CALL BEFORE YOU DIG GOVERNING SPECIFICATIONS: 1. CITY ENGINEERS ASSOCIATION OF MINNESOTA (CEAM) STANDARD UTILITIES SPECIFICATIONS (LATEST EDITION) 2. THE MINNESOTA DEPARTMENT OF TRANSPORTATION "STANDARD SPECIFICATIONS FOR CONSTRUCTION" (LATEST EDITION). 3. ALL APPLICABLE FEDERAL, STATE, AND LOCAL LAWS AND ORDINANCES WILL BE COMPLETED WITHIN THE CONSTRUCTION OF THIS PROJECT. 4. ALL TRAFFIC CONTROL DEVICES SHALL CONFORM TO THE LATEST EDITION OF THE MINNESOTA MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES, INCLUDING THE LATEST FIELD MANUAL FOR TEMPORARY TRAFFIC CONTROL ZONE LAYOUTS. MINOR CONTOUR MAJOR CONTOUR CURB AND GUTTER EDGE OF PAVEMENT SANITARY MANHOLE SANITARY SEWER STORM SEWER WATERMAIN UNDERGROUND FIBER OPTIC CONCRETE SIDEWALK FENCE STORM MANHOLE STORM CATCH BASIN HYDRANT GATE VALVE LIGHT POLE EDGE OF VEGETATION GUARD RAIL FENCE RETAINING WALL ELECTRIC TRANSFORMER TRAFFIC SIGN DELINEATED WETLAND EDGE CURB AND GUTTER CONCRETE SIDEWALK BITUMINOUS PAVEMENT BITUMINOUS PATCHING ADA ACCESSIBLE ROUTE SANITARY CLEANOUT SANITARY SERVICE WATER SERVICE GATE VALVE STORM SEWER FLARED END SECTION CATCH BASIN/CBMH REMOVE BITUMINOUS PAVEMENT SAWCUT BITUMINOUS PAVEMENT REMOVE CURB AND GUTTER CLEARING AND GRUBBING REMOVE FENCE REMOVE BUILDING SILT FENCE ROCK CONSTRUCTION ENTRANCE RIPRAP INLET PROTECTION EROSION CONTROL BLANKET STORM MANHOLE REMOVE TREE REMOVE SANITARY SEWER/SERVICE REMOVE WATER MAIN/SERVICE FLARED END SECTION TREE SANITARY MANHOLE MNDOT SEED MIX 22-112 SOD PER LANDSCAPE PLANS MNDOT SEED MIX 33-262 MNDOT SEED MIX 34-262 MNDOT SEED MIX 35-241 SILT FENCE DITCH CHECK CULVERT PROTECTION REMOVE TRASH AND DEBRIS GRADING LEGEND SITE PLAN LEGENDEXISTING LEGEND UTILITY/STORM SEWER LEGEND EROSION CONTROL LEGEND REMOVALS LEGEND GENERAL LEGEND PROPOSED STORM SEWER PROPOSED CATCH BASIN PROPOSED MANHOLE 1.00% FL=9XX PROPOSED SPOT ELEVATION (ALL ELEVATIONS ARE TO FLOWLINE UNLESS OTHERWISE NOTED) ME=9XX TC=9XX MATCH EXISTING SPOT ELEVATION TOP OF CURB SPOT ELEVATION EOF=9XX EMERGENCY OVERFLOW SPOT ELEVATION HP=9XX HIGH POINT SPOT ELEVATION PROPOSED RIDGE / VALLEY / BREAKLINE PROPOSED SLOPE ARROW EXISTING STORM STRUCTURE EXISTING STORM SEWER EXISTING CONTOUR PROPOSED CONTOUR9XX FG=9XX FINISHED GRADE SPOT ELEVATION TW=9XX TOP OF WALL SPOT ELEVATION BW=9XX BOTTOM / TOE OF WALL SPOT ELEVATION PROPERTY LINE SETBACK LINE EASEMENT LINE CONSTRUCTION LIMITS 93 BREMER BANK PARCEL 716.23 432.18S 01° 07' 07" E 3.02S 39°13'04" E1041.74ALLEY232.7610 0 . 0 0S 50° 4 6 ' 5 6 " WN 89°07'06" E947.205 6 4 . 0 6S 5 0 ° 3 3 ' 2 4 " WPARCEL 1PARCEL 2PARCEL 3KENZ IE TERRACE (CO . RD . NO . 1 5 3 ) STINSON PARKWAY1027.85N 00°36'35" E ALLEY21BLOCK ONEOUTLOT ABLOCK TWO1137494 S.F.3.16 AC.191086 S.F.4.39 AC.274811 S.F.6.31 AC.N89°18'31"E295.01S0°06'35"E 225.89L=176.80R=851.73Δ=11°53'36"PROPOSEDDRAINAGE ANDUTILITY EASEMENT(25,725 S.F.)PROPOSEDDRAINAGE ANDUTILITY EASEMENT(48,669 S.F.)PROPOSED DRAINAGE & UTILITY EASEMENT OVERALL OF OUTLOT A1ƒ :Parcel 1:That part of the South 1/2 of the Northwest Quarter of Section 7, Township 29, Range 23, beginning at apoint in the South line of said Tract 100 feet East of the Southwest corner thereof; thence North 1079.8 feet;thence East parallel to the South line of said Quarter Section 1041.74 feet; thence South to center of StateHighway No. 63; thence southwesterly along said center line of State Highway No. 63 and St. Anthony andTaylor Falls Road to intersection of center line of said road with the South line of said Quarter Section;thence West along said latter line to the point of beginning, except that part thereof embraced in the South365 feet of the West 395 feet of the Southwest Quarter of the Northwest Quarter of said Section 7 andexcept the easterly 100 feet thereof.Except that part taken for highway purposes by the County of Hennepin as evidenced by Final Certificate,filed May 16, 1985, as Document No. 1652500.Parcel 2:That part of the following described property:The Easterly 100 feet of that part of the South half of the Northwest Quarter, Section 7, Township 29, Range23, beginning at a point in the South line of said Tract 100 feet East of the Southwest corner thereof, thenceNorth 1079.8 feet, thence East parallel to the South line of said quarter section 1041.74 feet; thence Southto center of State Highway No. 63; thence Southwesterly along said center line of State Highway 63 and St.Anthony and Taylor Falls Road to intersection of center line of said road with the South line of said quartersection; thence West along said latter line to the point of beginning,lying Westerly of the following described line and its Southerly extension,Beginning at a point on the North line of the above described Tract, distant 5.50 feet easterly of theNorthwest corner thereof, assumed bearing of said North line is North 89 degrees 24 minutes 53 secondsEast; thence South 01 degree 00 minutes 45 seconds East a distance of 486.65 feet, more or less, to theSouth line of the above described tract and there terminating.Parcel 3:That part of the Northwest Quarter of Section 7, Township 29, Range 23, described as commencing at apoint on the South line of said Northwest Quarter distant 100 feet Easterly from the Southwest corner of saidNorthwest Quarter; thence Northerly parallel with the West line of said Northwest Quarter to the South lineof MURRAY HEIGHTS ADDITION TO MINNEAPOLIS, being the actual point of beginning; thence Southerlyalong said parallel line to a point distant 1079.8 feet Northerly from said South line of the Northwest Quarter;thence on an assumed bearing of North 89 degrees 24 minutes 53 seconds East, parallel with the South lineof said Northwest Quarter a distance of 947.24 feet; thence North 01 degree 00 minutes 45 seconds East tosaid South line of MURRAY HEIGHTS ADDITION TO MINNEAPOLIS; thence Westerly along the lastdescribed line to the point of beginning.All situated in the County of Hennepin and State of Minnesota.Torrens PropertyBeing registered land as evidenced by Certificate of Title No. 10665952501 Lowry Avenue NE,St. Anthony, MN 55418WENCK ASSOCIATES INC.1800 PIONEER CREEK CENTERMAPLE PLAIN MN, 55359SURVEYS BASED ON ALTA/ACSM LAND TITLE SURVEY PREPARED BY PREMIERLAND SURVEYING, LLC, DATED JUNE 6, 2016 AND CERTIFICATE OF SURVEY BYCLARK ENGINEERING DATED MAY 3, 2010.THE VILLAGE LLC1907 WAYZATA BLVD. E. #250WAYZATA, MN 55391DECEMBER 20, 2017727$/$5($72%(3/$77(' 6) $& “2501 LOWRY AVENUE NE, ST. ANTHONY, MN 55418EXSTING IMPROVEMENTS AND UNDERLYING PROPERTY INFORMATION ARESHOWN LIGHTLY IN THE BACKGROUND.DRAINAGE AND UTILITY EASEMENTS SHOWN BEING FIVE FEET IN WIDTH ANDADJOINING SIDE LOT LINES, AND BEING 10 FEET IN WIDTH AND ADJOININGREAR LOT LINES, UNLESS OTHERWISE SHOWN.THE VILLAGE LLCDEVELOPMENTDrawn By:Issue Date:Project #:5005-0003RAGTHE VILLAGE LLC DEVELOPMENT THE VILLAGE, LLC 1907 WAYZATA BLVD, SUITE 250 M:\5005\0003\DESIGN\SURVEY\5005-0003preplat3.dwg Description:Date: WAYZATA, MN 55391Issue #:ST. ANTHONY VILLAGE, MINNESOTA 12/06/20171Issue # Prepared For: XX/XX/XXXX DESCRIPTION ISSUE #Sheet #:Sheet Title:1/25/2018 2:01:51 PM Date:I HEREBY CERTIFY THAT THIS PLAN,SPECIFICATION, OR REPORT WASPREPARED BY ME OR UNDER MYDIRECT SUPERVISION AND THAT I AM ADULY REGISTERED PROFESSIONALENGINEER UNDER THE LAWS OF THESTATE OF MINNESOTA.License #:WARNING:THE CONTRACTOR SHALL BE RESPONSIBLE FOR CALLING FOR LOCATIONS OF ALL EXISTING UTILITIES. THEY SHALLCOOPERATE WITH ALL UTILITY COMPANIES IN MAINTAINING THEIR SERVICE AND/OR RELOCATION OF LINES.THE CONTRACTOR SHALL CONTACT GOPHER STATE ONE CALL AT 651-454-0002 AT LEAST 48 HOURS IN ADVANCE FORTHE LOCATIONS OF ALL UNDERGROUND WIRES, CABLES, CONDUITS, PIPES, MANHOLES, VALVES OR OTHER BURIEDSTRUCTURES BEFORE DIGGING. THE CONTRACTOR SHALL REPAIR OR REPLACE THE ABOVE WHEN DAMAGED DURINGCONSTRUCTION AT NO COST TO THE OWNER.TWIN CITY AREA: 651-454-0002TOLL FREE 1-800-252-1166CALL BEFORE YOU DIGWENCK ASSOCIATES INC.1800 PIONEER CREEK CENTERMAPLE PLAIN MN, 55359C-101PRELIMINARYPLAT94 KEN ZI E T E R R A C E ( C O U N T Y R D 153)STINSON PARKWAYSOUTH LIE OF SW1/4 OF NW1/4 OF SEC. 7, T. 29, R. 23 EXISTING BUILDING (1056 S.F.)EXISTINGBUILDING(2923 S.F.)EAST LINE OF PARCEL 1CHAINLINK FENCE ON PROPERTY LINE EXIST . BLDG . (1663 S . F ) 100 100 SW COR OF SW1/4 OFWEST LINE OF SW1/4 OF NW1/4 OF SEC. 72020100 4 0 20 20 10101010 1010 10 10 20' DRAINAGE & UTILITY EASEMENT PER DOC. NO. 2447499 C LCHAIN LINK FENCE 0.6' WEST OF PROPERTY COR. WEST LINE OF KENZINGTON CONDOMINIUM PLAT AND EAST LINE OF PARCEL 2 BITU MI N O U S 7 STA L L S 3 STALLS4 STALLSBITUMINOUS CON C R E T E C U R B & G U T T E R CONCRETE CURB GUTTERALLEY 920 9 1 5 9 1 3 9 1 5 92092592 5 91 5 91 7 912 916.2916.6928.4930.9916.4918.4921.7926.2EXISTING 12" PLASTIC STORM PIPE EXISTING FLARED END SECTION INV=910.37 EXISTING 8" WATERMAIN EXISTING 8" WATERMAIN EXISTING 8" WATERMAIN APPROXIMATE EDGE OF PAVEMENT (TYP.) APPROXIMATE EDGE OF PAVEMENT (TYP.) APPROXIMATE EDGE OF PAVEMENT (TYP.) APPROXIMATE EDGE OF PAVEMENT (TYP.) C-102 EXISTING CONDITIONS Drawn By: Issue Date: Project #:5005-0003 RAGTHE VILLAGE LLC DEVELOPMENTTHE VILLAGE, LLC1907 WAYZATA BLVD, SUITE 250M:\5005\0003\DESIGN\CAD\PLANSHEETS\C-102 Existing Conditions.dwgDescription:Date:WAYZATA, MN 55391Issue #:ST. ANTHONY VILLAGE, MINNESOTA12/06/2017 1Issue #Prepared For:XX/XX/XXXXDESCRIPTIONISSUE #Sheet #: Sheet Title:1/25/2018 2:02:41 PMDate: I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY REGISTERED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. License #: WARNING: THE CONTRACTOR SHALL BE RESPONSIBLE FOR CALLING FOR LOCATIONS OF ALL EXISTING UTILITIES. THEY SHALL COOPERATE WITH ALL UTILITY COMPANIES IN MAINTAINING THEIR SERVICE AND/OR RELOCATION OF LINES. THE CONTRACTOR SHALL CONTACT GOPHER STATE ONE CALL AT 651-454-0002 AT LEAST 48 HOURS IN ADVANCE FOR THE LOCATIONS OF ALL UNDERGROUND WIRES, CABLES, CONDUITS, PIPES, MANHOLES, VALVES OR OTHER BURIED STRUCTURES BEFORE DIGGING. THE CONTRACTOR SHALL REPAIR OR REPLACE THE ABOVE WHEN DAMAGED DURING CONSTRUCTION AT NO COST TO THE OWNER. TWIN CITY AREA: 651-454-0002 TOLL FREE 1-800-252-1166 CALL BEFORE YOU DIG BENCHMARKS 1. HENNEPIN COUNTY MONUMENT AT STINSON PARKWAY & KENZIE TERRACE INTERSECTION, ELEVATION = 932.75 2. STORM SEWER MANHOLE (SOLID COVER) AT KENZIE TERRACE & ENTRANCE TO THE LEGACY OF ST ANTHONY/AUTUMN WOODS, RIM ELEVATION = 916.16 3. SANITARY SEWER MANHOLE AT WEST END OF ALLEYWAY, ELEVATION = 923.02 95 KEN ZI E T E R R A C E ( C O U N T Y R D 153)STINSON PARKWAYSOUTH LIE OF SW1/4 OF NW1/4 OF SEC. 7, T. 29, R. 23 EXISTING BUILDING (1056 S.F.)EXISTINGBUILDING(2923 S.F.)EAST LINE OF PARCEL 1CHAINLINK FENCE ON PROPERTY LINE EXIST . BLDG. (1663 S . F ) 100 100 SW COR OF SW1/4 OF NW1/4 OF SEC. 7, T. 29, R. 23WEST LINE OF SW1/4 OF NW1/4 OF SEC. 72020100 NW COR. OF SW1/4 OF NW1/4 OF SEC. 7 4 0 20 20 10101010 1010 101020' DRAINAGE & UTILITY EASEMENT PER DOC. NO. 2447499 C LCHAIN LINK FENCE 0.6' WEST OF PROPERTY COR. WEST LINE OF KENZINGTON CONDOMINIUM PLAT AND EAST LINE OF PARCEL 2 BITU MI N O U S 7 STAL L S 3 STALLS4 STALLSBITUMINOUS CON C R E T E C U R B & G U T T E R CONCRETE CURB GUTTERALLEY 920 9 1 5 9 1 3 9 1 5 92092592 5 91 5 91 7 912 NAVD88 VERTICAL DATUM 916.2916.6928.4930.9916.4918.4921.7926.2C-103 EXISTING CONDITIONS Drawn By: Issue Date: Project #:5005-0003 RAGTHE VILLAGE LLC DEVELOPMENTTHE VILLAGE, LLC1907 WAYZATA BLVD, SUITE 250M:\5005\0003\DESIGN\CAD\PLANSHEETS\C-103 Existing Conditions.dwgDescription:Date:WAYZATA, MN 55391Issue #:ST. ANTHONY VILLAGE, MINNESOTA12/06/2017 1Issue #Prepared For:XX/XX/XXXXDESCRIPTIONISSUE #Sheet #: Sheet Title:1/25/2018 2:03:31 PMDate: I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY REGISTERED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. License #: WARNING: THE CONTRACTOR SHALL BE RESPONSIBLE FOR CALLING FOR LOCATIONS OF ALL EXISTING UTILITIES. THEY SHALL COOPERATE WITH ALL UTILITY COMPANIES IN MAINTAINING THEIR SERVICE AND/OR RELOCATION OF LINES. THE CONTRACTOR SHALL CONTACT GOPHER STATE ONE CALL AT 651-454-0002 AT LEAST 48 HOURS IN ADVANCE FOR THE LOCATIONS OF ALL UNDERGROUND WIRES, CABLES, CONDUITS, PIPES, MANHOLES, VALVES OR OTHER BURIED STRUCTURES BEFORE DIGGING. THE CONTRACTOR SHALL REPAIR OR REPLACE THE ABOVE WHEN DAMAGED DURING CONSTRUCTION AT NO COST TO THE OWNER. TWIN CITY AREA: 651-454-0002 TOLL FREE 1-800-252-1166 CALL BEFORE YOU DIG BENCHMARKS 1. HENNEPIN COUNTY MONUMENT AT STINSON PARKWAY & KENZIE TERRACE INTERSECTION, ELEVATION = 932.75 2. STORM SEWER MANHOLE (SOLID COVER) AT KENZIE TERRACE & ENTRANCE TO THE LEGACY OF ST ANTHONY/AUTUMN WOODS, RIM ELEVATION = 916.16 3. SANITARY SEWER MANHOLE AT WEST END OF ALLEYWAY, ELEVATION = 923.02 SITE DATA AREA DEVOTED TO RESIDENTIAL-MANUFACTURED HOMES/RV'S 491,743 SF (11.289 AC) AREA SF (AC) COMMON SPACE N/A PUBLIC OPEN SPACE N/A STREETS 168,364 SF (3.865 AC) OFF-STREET PARKING/LOADING (14 STALLS) 6,751 SF (0.155 AC) PID: 0702923230001 (VILLAGE PROPERTY SITE) AREA AND FLOOR AREA DEVOTED TO COMMERCIAL USES 1,663 SF (0.038 AC) AREA SF (AC) INDUSTRIAL OR OFFICE N/A TOTAL AREA OF PROPERTY 669,885 SF (15.378 AC) 96 MULTI-RESIDENTIAL 1 FFE=923.00 GARAGE=912.00 ASSISTED SENIOR LIVING FFE=923.00 GARAGE=913.00 INDEPENDENT SENIOR LIVING FFE=927.00 GARAGE=917.00 MULTI-RESIDENTIAL 1 FFE=923.00 GARAGE=912.00 LOBBY AND COMMON AREA FFE=923.00 GARAGE=912.00 STORMWATER POND NWL=912.00 HWL=917.35 STORMWATER POND NWL=911.00 HWL=915.92 KEN ZI E T E R R A C E ( C O U N T Y R D 153)STINSON PARKWAY65.2'81.1'78.4'73.1'99' 97.9'22.6'70.7'20'76.7'85'66.9'89.9' 4 2 . 5 ' 9' TYP. 22'23.5'23.5'24'15'23.5'10' 18' 9' TYP.30'10'8.5'8.5'19'TYP.9'TYP. 19' TYP. 10' 23.5' 2 4 '24' PATIO PLAZAPATI O PLAZA PROOF OF PARKING 37 STALLS PATIO 22'22'22'22'22'15'8.5'19'TYP.9' TYP.19'TYP.23.5' 1 2 ' 12' WIDE LEFT TURN LANE 6' WIDE TRAIL 6' WIDE TRAIL 8' WIDE TRAIL EXISTING TREE TO REMAIN (TYP.) 5' WIDE SIDEWALK 5' WIDE SIDEWALK 5' WIDE SIDEWALK 5' WIDE SIDEWALK 5' WIDE SIDEWALK 5' WIDE SIDEWALK 5' WIDE SIDEWALK CONSTRUCTION LIMITS (TYP.) CONSTRUCTION LIMITS (TYP.) 3 0 ' 3 0 ' 20' 20'20'20'20' 20' 12' WIDE RIGHT TURN LANE 6 0 ' 5 ' DOG PARK LIGHT POLE (TYP.) CROSSWALK (TYP.) RETAINING WALL23'C-104 SITE PLAN Drawn By: Issue Date: Project #:5005-0003 RAGTHE VILLAGE LLC DEVELOPMENTTHE VILLAGE, LLC1907 WAYZATA BLVD, SUITE 250M:\5005\0003\DESIGN\CAD\PLANSHEETS\C-104 Site Plan.dwgDescription:Date:WAYZATA, MN 55391Issue #:ST. ANTHONY VILLAGE, MINNESOTA12/06/2017 1Issue #Prepared For:XX/XX/XXXXDESCRIPTIONISSUE #Sheet #: Sheet Title:1/25/2018 2:04:12 PMDate: I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY REGISTERED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. License #: WARNING: THE CONTRACTOR SHALL BE RESPONSIBLE FOR CALLING FOR LOCATIONS OF ALL EXISTING UTILITIES. THEY SHALL COOPERATE WITH ALL UTILITY COMPANIES IN MAINTAINING THEIR SERVICE AND/OR RELOCATION OF LINES. THE CONTRACTOR SHALL CONTACT GOPHER STATE ONE CALL AT 651-454-0002 AT LEAST 48 HOURS IN ADVANCE FOR THE LOCATIONS OF ALL UNDERGROUND WIRES, CABLES, CONDUITS, PIPES, MANHOLES, VALVES OR OTHER BURIED STRUCTURES BEFORE DIGGING. THE CONTRACTOR SHALL REPAIR OR REPLACE THE ABOVE WHEN DAMAGED DURING CONSTRUCTION AT NO COST TO THE OWNER. TWIN CITY AREA: 651-454-0002 TOLL FREE 1-800-252-1166 CALL BEFORE YOU DIG SITE ANALYSIS TABLE EXISTING ZONING R1 SINGLE FAMILY RESIDENTIAL LOT AREA “6) “$& TOTAL BUILDING AREA “6)  GREENSPACE SUMMARY IMPERVIOUS AREA (INCL. BLDG AND POND) PROPOSED PERVIOUS AREA BL. 1 LT. 1 - IND. LIVING PARKING STALLS SUMMARY RAMP PARKWAY BL. 2 LT. 1 - MULTI RES. SETBACK SUMMARY BUILDING EAST 30' WEST NORTH PROPOSED ZONING PUD - PLANNED UNIT DEVELOPMENT 20' 20' 20' SOUTHEAST “6) $& BL. 1 LT. 2 - AST. LIVING SOUTHWEST 20' INTERNAL 0' ADA 30 TOT 4 30 115 61 4 5 0 61 STANDARD SURFACE ADDITIONAL PROOF STALLS 37 37 0 TOTAL PARKING COUNT RAMP SURFACE 0 0 0 0 “6) $& 88 86 231 4 4 7 126 124 358 405 273 15 13 706 PROPERTY LINE SITE LEGEND SETBACK LINE EASEMENT LINE PROPOSED CURB AND GUTTER BITUMINOUS PAVEMENT CONCRETE SIDEWALK PAVEMENT. CONSTRUCTION LIMITS 97 KEN ZI E T E R R A C E ( C O U N T Y R D 153)STINSON PARKWAYMULTI-RESIDENTIAL 1 FFE=923.00 GARAGE=912.00 ASSISTED SENIOR LIVING FFE=923.00 GARAGE=913.00 INDEPENDENT SENIOR LIVING FFE=927.00 GARAGE=917.00 MULTI-RESIDENTIAL 1 FFE=923.00 GARAGE=912.00 LOBBY AND COMMON AREA FFE=923.00 GARAGE=912.00 STORMWATER POND NWL=911.00 HWL=915.92 65.2'81.1'78.4'73.1'99' 70.7'76.7'85'66.9'89.9' 9' TYP. 22'23.5'23.5'24'15'23.5'10' 18' 9' TYP.30'10'8.5'8.5'19'TYP.9'TYP. 19' TYP.30.5' 10' 23.5' 2 4 '24' PROOF OF PARKING 37 STALLS 22'22'22'22'15'8.5'19'TYP.9' TYP.19'TYP.23.5' EXISTING TREE TO REMAIN (TYP.) 5' WIDE SIDEWALK 1 1 1 1 11 1 1 1 1 1 1 1 5 55 5 5 5 5 R15'R15'R5' R3'R3 ' R 1 0 'R2'R3'R5'R 3 ' R3'R1 0 'R10'R10'R10'R10'R3 'R10'R5'R3'R10'R3'R2 ' R 4 0 'R3'R2 0 ' R 1 5 ' R5' R5' R5'R15'R 1 5 'R20'R 3 'R3'R3' R32' R12'R10'R10'R3'R3'R20'R10'R3'35.23' 21.16' R3'R5'R1 5 'R3'R3'R10'R 1 0 'R5' R10'R3'R3' R34' R1 0 'R3'R25'R25'R3'R 3 'R10'R3'R3' R3'R3'R3'R10'R12'R32'R3' R3'R10'R 3 'R3'R15'R 5 'R5'R15'R5'R3' 18'18'25'5 5 2 3 2 2 3 2 2 3 1 9' TYP. 9' TYP.19'TYP.R30'R3'R3'R3'6 6 6 6 6 6 6 6 6 6 6 11 11 11 11 8 8 8 8 26 26 26 26 17 18 18 18 R10' R3' 16 16 16 1616 16 19 19 19 19 19 19 14 14 14 14 14 14 14 14 15 15 15 15 15 15 15 15 15 15 10 10 10 22 22 22 22 22 22 22 22 PAR FITNESS NODE (TYP. OF 8)27 27 27 27 5 ' 27 20' 3 0 '20'20'20' 30 20 3020 20 20 2020 20 20 29 29 29 29 3 28 31 31 31 31 31 31 31 31 31 31 31 31 31 31 31 31 32 3232 32 6 0 '22'23'C-105 SITE PLAN NORTH Drawn By: Issue Date: Project #:5005-0003 RAGTHE VILLAGE LLC DEVELOPMENTTHE VILLAGE, LLC1907 WAYZATA BLVD, SUITE 250M:\5005\0003\DESIGN\CAD\PLANSHEETS\C-105 Site Plan North.dwgDescription:Date:WAYZATA, MN 55391Issue #:ST. ANTHONY VILLAGE, MINNESOTA12/06/2017 1Issue #Prepared For:XX/XX/XXXXDESCRIPTIONISSUE #Sheet #: Sheet Title:1/25/2018 2:04:53 PMDate: I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY REGISTERED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. License #: WARNING: THE CONTRACTOR SHALL BE RESPONSIBLE FOR CALLING FOR LOCATIONS OF ALL EXISTING UTILITIES. THEY SHALL COOPERATE WITH ALL UTILITY COMPANIES IN MAINTAINING THEIR SERVICE AND/OR RELOCATION OF LINES. THE CONTRACTOR SHALL CONTACT GOPHER STATE ONE CALL AT 651-454-0002 AT LEAST 48 HOURS IN ADVANCE FOR THE LOCATIONS OF ALL UNDERGROUND WIRES, CABLES, CONDUITS, PIPES, MANHOLES, VALVES OR OTHER BURIED STRUCTURES BEFORE DIGGING. THE CONTRACTOR SHALL REPAIR OR REPLACE THE ABOVE WHEN DAMAGED DURING CONSTRUCTION AT NO COST TO THE OWNER. TWIN CITY AREA: 651-454-0002 TOLL FREE 1-800-252-1166 CALL BEFORE YOU DIG PROPERTY LINE SITE LEGEND SETBACK LINE EASEMENT LINE PROPOSED CURB AND GUTTER BITUMINOUS PAVEMENT CONCRETE SIDEWALK PAVEMENT. 3 2 1 4 5 6 7 8 9 10 11 12 13 14 15 B612 CURB AND GUTTER B612 TIP-OUT CURB AND GUTTER MOUNTABLE CURB AND GUTTER 2' WIDE CONCRETE VALLEY GUTTER BITUMINOUS PAVEMENT 5' WIDE CONCRETE SIDEWALK 6' WIDE CONCRETE TRAIL 8' WIDE BITUMINOUS TRAIL CONCRETE DRIVEWAY APRON MATCH INTO EXISTING PAVEMENT MATCH INTO EXISTING CURB AND GUTTER MATCH INTO EXISTING SIDEWALK PATCH BITUMINOUS PAVEMENT 16 17 KEYNOTE LEGEND 18 19 20 21 22 23 24 25 26 27PARALLEL PARKING STALLS - 22' X 8.5' TYP. STANDARD PARKING STALL - 9' X 18' TYP. ADA PARKING STALLS WITH ACCESS AISLE & CURB RAMP PLAZA - SEE ARCH. AND LANDSCAPE PLANS PATIO - SEE ARCH. AND LANDSCAPE PLANS PROPERTY LINE RETAINING WALL W/ RAILING. SEE ARCH. FOR RAILING FENCE - SEE LANDSCAPING PLANS 4" STRIPING DOG PARK TOT LOT/COMMUNITY AREA ADA PEDESTRIAN RAMP GARAGE ENTRANCE BUILDING SETBACK LOT LINE DECORATIVE PAVEMENT SEE LANDSCAPE PLANS RAILING - SEE ARCH. PLANS STREET LIGHT CROSSWALK 28 29 30 31 32 98 MULTI-RESIDENTIAL 1 FFE=923.00 GARAGE=912.00 MULTI-RESIDENTIAL 1 FFE=923.00 GARAGE=912.00 LOBBY AND COMMON AREA FFE=923.00 GARAGE=912.00 STORMWATER POND NWL=912.00 HWL=917.35 PROOF OF PARKING 97.88'22.57'20'4 2 . 4 7 '9'TYP. 19' TYP. 30.5' 23.5' 22'3'23.5' 1 2 ' 12' WIDE LEFT TURN LANE 5' WIDE SIDEWALK 1 1 5 R2 0 ' R10'R3'R3' R34' R1 0 'R3'R25'R25'2 6 6 6 7 7 11 11 11 26 26 17 18 16 16 19 19 19 14 14 14 15 15 10 10 2 5 ' 27 3020 20 20 20 2320 20 KENZI E T E R R A C E ( C O U N T Y R D 1 5 3 )STINSON PARKWAYC-106 SITE PLAN SOUTH Drawn By: Issue Date: Project #:5005-0003 RAGTHE VILLAGE LLC DEVELOPMENTTHE VILLAGE, LLC1907 WAYZATA BLVD, SUITE 250M:\5005\0003\DESIGN\CAD\PLANSHEETS\C-106 Site Plan South.dwgDescription:Date:WAYZATA, MN 55391Issue #:ST. ANTHONY VILLAGE, MINNESOTA12/06/2017 1Issue #Prepared For:XX/XX/XXXX DESCRIPTIONISSUE #Sheet #: Sheet Title:1/25/2018 2:33:23 PMDate: I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY REGISTERED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. License #: WARNING: THE CONTRACTOR SHALL BE RESPONSIBLE FOR CALLING FOR LOCATIONS OF ALL EXISTING UTILITIES. THEY SHALL COOPERATE WITH ALL UTILITY COMPANIES IN MAINTAINING THEIR SERVICE AND/OR RELOCATION OF LINES. THE CONTRACTOR SHALL CONTACT GOPHER STATE ONE CALL AT 651-454-0002 AT LEAST 48 HOURS IN ADVANCE FOR THE LOCATIONS OF ALL UNDERGROUND WIRES, CABLES, CONDUITS, PIPES, MANHOLES, VALVES OR OTHER BURIED STRUCTURES BEFORE DIGGING. THE CONTRACTOR SHALL REPAIR OR REPLACE THE ABOVE WHEN DAMAGED DURING CONSTRUCTION AT NO COST TO THE OWNER. TWIN CITY AREA: 651-454-0002 TOLL FREE 1-800-252-1166 CALL BEFORE YOU DIG PROPERTY LINE SITE LEGEND SETBACK LINE EASEMENT LINE PROPOSED CURB AND GUTTER BITUMINOUS PAVEMENT CONCRETE SIDEWALK PAVEMENT. 3 2 1 4 5 6 7 8 9 10 11 12 13 14 15 B612 CURB AND GUTTER B612 TIP-OUT CURB AND GUTTER MOUNTABLE CURB AND GUTTER 2' WIDE CONCRETE VALLEY GUTTER BITUMINOUS PAVEMENT 5' WIDE CONCRETE SIDEWALK 6' WIDE CONCRETE TRAIL 8' WIDE BITUMINOUS TRAIL CONCRETE DRIVEWAY APRON MATCH INTO EXISTING PAVEMENT MATCH INTO EXISTING CURB AND GUTTER MATCH INTO EXISTING SIDEWALK PATCH BITUMINOUS PAVEMENT 16 17 KEYNOTE LEGEND 18 19 20 21 22 23 24 25 26 27 28 29 30 PARALLEL PARKING STALLS - 22' X 8.5' TYP. STANDARD PARKING STALL - 9' X 18' TYP. ADA PARKING STALLS WITH ACCESS AISLE & CURB RAMP PLAZA - SEE ARCH. AND LANDSCAPE PLANS PATIO - SEE ARCH. AND LANDSCAPE PLANS PROPERTY LINE RETAINING WALL W/ RAILING. SEE ARCH. FOR RAILING FENCE - SEE LANDSCAPING PLANS 4" STRIPING DOG PARK TOT LOT/COMMUNITY AREA ADA PEDESTRIAN RAMP GARAGE ENTRANCE BUILDING SETBACK LOT LINE DECORATIVE PAVEMENT SEE LANDSCAPE PLANS RAILING - SEE ARCH. PLANS STREET LIGHT CROSSWALK 31 32 99 KEN ZI E T E R R A C E ( C O U N T Y R D 153)STINSON PARKWAYMULTI-RESIDENTIAL 1 FFE=923.00 GARAGE=912.00 ASSISTED SENIOR LIVING FFE=923.00 GARAGE=913.00 INDEPENDENT SENIOR LIVING FFE=927.00 GARAGE=917.00 MULTI-RESIDENTIAL 1 FFE=923.00 GARAGE=912.00 LOBBY AND COMMON AREA FFE=923.00 GARAGE=912.00 STORMWATER POND NWL=912.00 HWL=917.35 STORMWATER POND NWL=911.00 HWL=915.92 922 924 920 918 924926920 922 920 918 9229249289209109109 1 0 910918920 922 9 2 0 91892 0 910910910 9229249 2 6 920922924926 5 . 0 : 1 4.7 :1 4 . 3 : 13.7:13.8:15.9:1 4.8:1 5.5:1 3:1 3:14.6:14.2%2. 6% 2 . 0%2.5%3:1 3:1 3 : 1 3:13:1 2.6%5.9:17.5:16.6:1 6.4:1 5.2:14.7:16.0:112.9:12.0%1. 3 % 8.9%5.0%1.7 % 2.2% 3. 3%3.6%3.0%3.7%3.0%4.6% 3.5%3.3%6.5 %6.3%11.4%5.5% 2 . 1%3.3%4.1%10.9%13.6%4.8:1918 9 1 6 922 916 914 2 . 1% 914 918 916 916 920 920 916918 922 92091892091892091892292892692 4 9 1 8 9 1 8 EOF=17.58 EOF=17.50 EOF=17.43 EOF=17.50 EOF=17.37 23.5%4.4:1 EOF=18.90 EOF=25.50 EOF=21.909223. 7 %922EOF=21.90 EOF=23.50926 920 10:110:13:110:13:110:110:1 10 : 1 10:13:13:13:1 EOF=16.00922PATIO EL=923.00 PATIO EL=927.00 PATIO EL=923.00PATIOEL=927.00EOF=17.30 EOF=17.41 EOF=22.30 EOF=22.54 9 2 0 EOF=20.32 EOF=19.68 EOF=19.75 EOF=22.30 EOF=19.89 EOF=19.91 EOF=19.88 EOF=16.90 EOF=17.79 EOF=16.39 EOF=16.84 EOF=16.31 EOF=16.31 C-301 GRADING PLAN Drawn By: Issue Date: Project #:5005-0003 RAGTHE VILLAGE LLC DEVELOPMENTTHE VILLAGE, LLC1907 WAYZATA BLVD, SUITE 250M:\5005\0003\DESIGN\CAD\PLANSHEETS\C-301 Grading Plan.dwgDescription:Date:WAYZATA, MN 55391Issue #:ST. ANTHONY VILLAGE, MINNESOTA12/06/2017 1Issue #Prepared For:XX/XX/XXXXDESCRIPTIONISSUE #Sheet #: Sheet Title:1/25/2018 2:06:43 PMDate: I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY REGISTERED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. License #: WARNING: THE CONTRACTOR SHALL BE RESPONSIBLE FOR CALLING FOR LOCATIONS OF ALL EXISTING UTILITIES. THEY SHALL COOPERATE WITH ALL UTILITY COMPANIES IN MAINTAINING THEIR SERVICE AND/OR RELOCATION OF LINES. THE CONTRACTOR SHALL CONTACT GOPHER STATE ONE CALL AT 651-454-0002 AT LEAST 48 HOURS IN ADVANCE FOR THE LOCATIONS OF ALL UNDERGROUND WIRES, CABLES, CONDUITS, PIPES, MANHOLES, VALVES OR OTHER BURIED STRUCTURES BEFORE DIGGING. THE CONTRACTOR SHALL REPAIR OR REPLACE THE ABOVE WHEN DAMAGED DURING CONSTRUCTION AT NO COST TO THE OWNER. TWIN CITY AREA: 651-454-0002 TOLL FREE 1-800-252-1166 CALL BEFORE YOU DIG PROPERTY LINE GRADING LEGEND SETBACK LINE EASEMENT LINE PROPOSED STORM SEWER PROPOSED CATCH BASIN PROPOSED MANHOLE 1.00% FL=9XX PROPOSED SPOT ELEVATION (ALL ELEVATIONS ARE TO FLOWLINE UNLESS OTHERWISE NOTED) ME=9XX TC=9XX MATCH EXISTING SPOT ELEVATION TOP OF CURB SPOT ELEVATION EOF=9XX EMERGENCY OVERFLOW SPOT ELEVATION HP=9XX HIGH POINT SPOT ELEVATION PROPOSED RIDGE / VALLEY / BREAKLINE PROPOSED SLOPE ARROW EXISTING STORM STRUCTURE EXISTING STORM SEWER EXISTING CONTOUR PROPOSED CONTOUR9XX NOTE: SEE C-501 STORM SEWER PLAN FOR STORM SEWER DESIGN DETAILS FG=9XX FINISHED GRADE SPOT ELEVATION TW=9XX TOP OF WALL SPOT ELEVATION BW=9XX BOTTOM / TOE OF WALL SPOT ELEVATION CONSTRUCTION LIMITS EOF FLOW ARROW 100 KEN ZI E T E R R A C E ( C O U N T Y R D 153)STINSON PARKWAYMULTI-RESIDENTIAL 1 FFE=923.00 GARAGE=912.00 ASSISTED SENIOR LIVING FFE=923.00 GARAGE=913.00 INDEPENDENT SENIOR LIVING FFE=927.00 GARAGE=917.00 MULTI-RESIDENTIAL 1 FFE=923.00 GARAGE=912.00 LOBBY AND COMMON AREA FFE=923.00 GARAGE=912.00 STORMWATER POND NWL=911.00 HWL=915.92 922 918 920 918 924926920 922 920 918 922924918920 922 920918922 9229209 2 0 910910910 922922924926 3.7:13.8:12 . 0%2.5%3:1 3:1 3 : 1 3:13:1 2.6%9.1:17.5:16.6:1 6.4:1 19.1%21.2%16.8%7.7%2.0%0. 7%5.8%8.5% 1.7 % 2.2% 3. 3%3.6%3.0%3.7%3.0%4.6% 3.5%3.3%6.5 %6.3%11.4%9.5 % 2 . 1%3.3%4.1%12.1%918 9 1 6 922 916 914 2 . 1% 914918916 920 918 922 920918920918920918922926928926 928 9269289 2 4 9 1 8 9 1 8 918EOF=17.58 920924926 EOF=25.80 EOF=25.50 EOF=22.30 EOF=23.50 1.9%2.1%2.0% 2.0% 2.1% 2. 0 % EOF=17.30 EOF=17.50 EOF=17.43 EOF=17.50 EOF=17.37 1.4% 2 . 1%2.4%11.4%7.8:18.4%4.8% 3.5%2.0% 1.9% 2.0% 2.7 % 920 922 4 . 3% FG=17.62 FG=23.47 FG=23.92 FG=21.22 FG=24.99 FG=24.38 CONCRETE STEPS 2.4%1.4%4.5% 2.8% FG=24.87 12.2% 1 0 . 2 % 3.4%18.1%15.3% 8. 9 % FG=23.97 FG=17.51 FG=16.60 FG=17.00 RETAINING WALL TW=23.00 BW=17.00 BW=19.89 BW=20.97BW=21.80 BW=17.00 TW=21.86 TW=21.47 TW=24.00 TW=22.30 RETAINING WALL BW=12.00 BW=16.24 BW=20.00 BW=20.00 BW=16.61 BW=12.00 BW=13.00 BW=13.85 BW=13.42 BW=13.00 BW=15.67 BW=15.54BW=17.05 BW=17.05 TW=20.50 TW=18.39 TW=22.50 TW=22.50 TW=21.62 TW=21.00 TW=18.00 TW=19.17 TW=18.26 TW=17.55 TW=17.55 TW=18.32 TW=19.39 TW=20.00 RETAINING WALL RETAINING WALL RETAINING WALL RETAINING WALL RETAINING WALL RETAINING WALL BW=17.50 BW=15.71 BW=12.00 BW=12.00 BW=13.68 BW=15.45 BW=17.00 TW=19.00 TW=18.30 TW=18.00 TW=17.50 TW=18.54 TW=19.84TW=21.008.1%FG=27.00 FG=26.00 FG=25.00 FG=22.00 FG=22.00 FG=18.00 BW=18.00 BW=18.00 BW=24.00 BW=27.00 TW=27.00 TW=27.00 TW=27.00TW=27.00 FG=27.00 FG=26.00 FG=26.00 FG=24.00 FG=23.00 FG=26.13 FG=27.00 FG=27.00 FG=27.00 FG=27.00 FG=27.00 FG=27.00 FG=27.00 FG=27.00 FG=23.00 FG=23.00 FG=22.50 FG=18.00 FG=18.00 FG=22.00 FG=22.00 FG=20.00 FG=20.00FG=23.00FG=23.00 FG=23.00 FG=23.00 FG=23.00 FG=23.00 FG=20.00 FG=20.00FG=18.00 FG=22.50 FG=23.00 FG=23.00 FG=23.00 FG=23.00 FG=22.50 FG=22.50 FG=23.00 FG=23.00 FG=23.00 FG=21.00 1 0 : 1 3: 110:13:110:13:1EOF=16.00 FG=23.00 FG=23.00 FG=23.00 FG=23.00 BW=20.00 BW=20.00 BW=20.00 BW=20.00 BW=20.00 BW=20.00 BW=20.00 TW=23.00 TW=23.00 TW=23.00 TW=23.00 TW=23.00 TW=23.00 TW=23.00 TW=23.00 BW=20.002.0%4.0%EOF=21.90 EOF=17.70 EOF=20.32 EOF=22.54 EOF=19.68 EOF=19.75 EOF=22.30 EOF=19.89 EOF=16.39 EOF=16.84 EOF=17.79 EOF=19.88 EOF=19.91 EOF=16.90 EOF=16.31 EOF=16.31 C-302 GRADING PLAN NORTH Drawn By: Issue Date: Project #:5005-0003 RAGTHE VILLAGE LLC DEVELOPMENTTHE VILLAGE, LLC1907 WAYZATA BLVD, SUITE 250M:\5005\0003\DESIGN\CAD\PLANSHEETS\C-302 Grading Plan North.dwgDescription:Date:WAYZATA, MN 55391Issue #:ST. ANTHONY VILLAGE, MINNESOTA12/06/2017 1Issue #Prepared For:XX/XX/XXXXDESCRIPTIONISSUE #Sheet #: Sheet Title:1/25/2018 2:07:45 PMDate: I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY REGISTERED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. License #: WARNING: THE CONTRACTOR SHALL BE RESPONSIBLE FOR CALLING FOR LOCATIONS OF ALL EXISTING UTILITIES. THEY SHALL COOPERATE WITH ALL UTILITY COMPANIES IN MAINTAINING THEIR SERVICE AND/OR RELOCATION OF LINES. THE CONTRACTOR SHALL CONTACT GOPHER STATE ONE CALL AT 651-454-0002 AT LEAST 48 HOURS IN ADVANCE FOR THE LOCATIONS OF ALL UNDERGROUND WIRES, CABLES, CONDUITS, PIPES, MANHOLES, VALVES OR OTHER BURIED STRUCTURES BEFORE DIGGING. THE CONTRACTOR SHALL REPAIR OR REPLACE THE ABOVE WHEN DAMAGED DURING CONSTRUCTION AT NO COST TO THE OWNER. TWIN CITY AREA: 651-454-0002 TOLL FREE 1-800-252-1166 CALL BEFORE YOU DIG PROPERTY LINE GRADING LEGEND SETBACK LINE EASEMENT LINE PROPOSED STORM SEWER PROPOSED CATCH BASIN PROPOSED MANHOLE FL=9XX PROPOSED SPOT ELEVATION (ALL ELEVATIONS ARE TO FLOWLINE UNLESS OTHERWISE NOTED) ME=9XX TC=9XX MATCH EXISTING SPOT ELEVATION TOP OF CURB SPOT ELEVATION EOF=9XX EMERGENCY OVERFLOW SPOT ELEVATION HP=9XX HIGH POINT SPOT ELEVATION PROPOSED RIDGE / VALLEY / BREAKLINE EXISTING CONTOUR PROPOSED CONTOUR9XX NOTE: SEE C-501 STORM SEWER PLAN FOR STORM SEWER DESIGN DETAILS FG=9XX FINISHED GRADE SPOT ELEVATION TW=9XX TOP OF WALL SPOT ELEVATION BW=9XX BOTTOM / TOE OF WALL SPOT ELEVATION 1.00%PROPOSED SLOPE ARROW EXISTING STORM STRUCTURE EXISTING STORM SEWER CONSTRUCTION LIMITS EOF FLOW ARROW 101 MULTI-RESIDENTIAL 1 FFE=923.00 GARAGE=912.00 MULTI-RESIDENTIAL 1 FFE=923.00 GARAGE=912.00 LOBBY AND COMMON AREA FFE=923.00 GARAGE=912.00 STORMWATER POND NWL=912.00 HWL=917.35 9269 2 8 9209109 1 0 9 1 0 9109189109229249 2 6 9209104.8:14 . 3 : 1 4. 7 : 13.7:13.8:15.9:1 4.8:1 5.5:1 10:1 3:14.7:13 3 . 3%3:10. 7% 4.0% 8.5%5.0%3.5%3.3%7. 3 % 9.5 %12.1%4.1%4.8:1916 914 FG=22.50 FG=22.50 FG=20.00 FG=22.50 FG=23.00 FG=23.00 FG=23.00 FG=23.00 FG=23.00 FG=21.00FG=23.00FG=23.00FG=23.00 TW=19.00 TW=21.00 TW=23.00 TW=23.00 TW=23.00 TW=23.00 TW=23.00 TW=23.00 TW=23.00 TW=23.00 TW=23.00 BW=20.00 BW=20.00 BW=20.00 BW=20.00 BW=20.00 BW=20.00 BW=20.00 BW=20.00 BW=20.00 BW=12.00 BW=12.00 BW=12.00 BW=12.00 BW=13.68 BW=15.71 BW=17.50 BW=16.64 BW=15.45 BW=16.78 TW=19.84 TW=18.54 TW=17.61TW=18.00 TW=18.15 TW=18.30 FG=20.00 FG=21.00 FG=21.00 EOF=21.90 0.1%2.8% EOF=21.90 2.0%2.0%FG=24.38 FG=26.52 FG=30.93 FG=17.00 FG=16.60 TW=26.03 BW=20.00BW=26.00 BW=19.39 BW=26.73 TW=26.73 TW=25.20TW=27.37 BW=22.50 TW=26.00 FG=20.00 FG=20.00 10:1 10:110:110:110:13:13:13:13:12.6:14.2:14.4:1 2.0% EOF=18.9011.7%TW=19.27 TW=17.00 TW=17.00 TW=19.27 BW=19.27 BW=16.25 BW=15.50 BW=19.27 RETAINING WALL 1.9% 1.9% EOF=16.31 EOF=16.31 EOF=16.90 RETAINING WALL BW=12.50 BW=12.50 TW=16.86 TW=16.87 11.4:1 4.5:1 3.7: 1 KENZI E T E R R A C E ( C O U N T Y R D 1 5 3 )STINSON PARKWAYC-303 GRADING PLAN SOUTH Drawn By: Issue Date: Project #:5005-0003 RAGTHE VILLAGE LLC DEVELOPMENTTHE VILLAGE, LLC1907 WAYZATA BLVD, SUITE 250M:\5005\0003\DESIGN\CAD\PLANSHEETS\C-303 Grading Plan South.dwgDescription:Date:WAYZATA, MN 55391Issue #:ST. ANTHONY VILLAGE, MINNESOTA12/06/2017 1Issue #Prepared For:XX/XX/XXXXDESCRIPTIONISSUE #Sheet #: Sheet Title:1/25/2018 2:08:36 PMDate: I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY REGISTERED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. License #: WARNING: THE CONTRACTOR SHALL BE RESPONSIBLE FOR CALLING FOR LOCATIONS OF ALL EXISTING UTILITIES. THEY SHALL COOPERATE WITH ALL UTILITY COMPANIES IN MAINTAINING THEIR SERVICE AND/OR RELOCATION OF LINES. THE CONTRACTOR SHALL CONTACT GOPHER STATE ONE CALL AT 651-454-0002 AT LEAST 48 HOURS IN ADVANCE FOR THE LOCATIONS OF ALL UNDERGROUND WIRES, CABLES, CONDUITS, PIPES, MANHOLES, VALVES OR OTHER BURIED STRUCTURES BEFORE DIGGING. THE CONTRACTOR SHALL REPAIR OR REPLACE THE ABOVE WHEN DAMAGED DURING CONSTRUCTION AT NO COST TO THE OWNER. TWIN CITY AREA: 651-454-0002 TOLL FREE 1-800-252-1166 CALL BEFORE YOU DIG PROPERTY LINE GRADING LEGEND SETBACK LINE EASEMENT LINE PROPOSED STORM SEWER PROPOSED CATCH BASIN PROPOSED MANHOLE 1.00% FL=9XX PROPOSED SPOT ELEVATION (ALL ELEVATIONS ARE TO FLOWLINE UNLESS OTHERWISE NOTED) ME=9XX TC=9XX MATCH EXISTING SPOT ELEVATION TOP OF CURB SPOT ELEVATION EOF=9XX EMERGENCY OVERFLOW SPOT ELEVATION HP=9XX HIGH POINT SPOT ELEVATION PROPOSED RIDGE / VALLEY / BREAKLINE PROPOSED SLOPE ARROW EXISTING STORM STRUCTURE EXISTING STORM SEWER EXISTING CONTOUR PROPOSED CONTOUR9XX NOTE: SEE C-501 STORM SEWER PLAN FOR STORM SEWER DESIGN DETAILS FG=9XX FINISHED GRADE SPOT ELEVATION TW=9XX TOP OF WALL SPOT ELEVATION BW=9XX BOTTOM / TOE OF WALL SPOT ELEVATION CONSTRUCTION LIMITS EOF FLOW ARROW 102 MULTI-RESIDENTIAL 1 FFE=923.00 GARAGE=912.00 ASSISTED SENIOR LIVING FFE=923.00 GARAGE=913.00 INDEPENDENT SENIOR LIVING FFE=927.00 GARAGE=917.00 MULTI-RESIDENTIAL 1 FFE=923.00 GARAGE=912.00 LOBBY AND COMMON AREA FFE=923.00 GARAGE=912.00 STORMWATER POND NWL=912.00 HWL=917.35 STORMWATER POND NWL=911.00 HWL=915.92 KEN ZI E T E R R A C E ( C O U N T Y R D 153)STINSON PARKWAYFIRE DEPARTMENT CONNECTION FIRE DEPARTMENT CONNECTION HYDRANT HYDRANT HYDRANT HYDRANT HYDRANT HYDRANT HYDRANT HYDRANT HYDRANT CONNECT TO EX. WATERMAIN CONNECT TO EX WATERMAIN MH - 8 MH - 7 MH - 6 MH - 5 MH - 4 MH - 3 MH - 2 MH - 1 STRUCTURE - (16) CONNECT TO EXISTING 24" SANITARY SEWER CORE DRILL AND FILL W/ WATERTIGHT BOOT INV-902.10 REMOVE 266 LF OF 9" VCP SANITARY SEWER AND REPLACE WITH 24" PVC CONNECT TO EXISTING SANITARY SEWER 10" DIP WATERMAIN W/ POLYWRAP 8" DIP WATERMAIN W/ POLYWRAP 6" DIP WATERMAIN W/ POLYWRAP 6" DIP WATERMAIN W/ POLYWRAP WATER SERVICE 10' MIN. SEPARATION 10' MIN. SEPARATION 10' MIN. SEPARATION 10' MIN. SEPARATION 10' MIN. SEPARATION VALVE VALVE VALVE VALVE VALVE VALVE CLEANOUT CLEANOUT CLEANOUT CLEANOUT FIRE DEPARTMENT CONNECTION HYDRANT C-401 UTILITY PLAN Drawn By: Issue Date: Project #:5005-0003 RAGTHE VILLAGE LLC DEVELOPMENTTHE VILLAGE, LLC1907 WAYZATA BLVD, SUITE 250M:\5005\0003\DESIGN\CAD\PLANSHEETS\C-401 Uitlity Plan.dwgDescription:Date:WAYZATA, MN 55391Issue #:ST. ANTHONY VILLAGE, MINNESOTA12/06/2017 1Issue #Prepared For:XX/XX/XXXXDESCRIPTIONISSUE #Sheet #: Sheet Title:1/25/2018 2:09:15 PMDate: I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY REGISTERED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. License #: WARNING: THE CONTRACTOR SHALL BE RESPONSIBLE FOR CALLING FOR LOCATIONS OF ALL EXISTING UTILITIES. THEY SHALL COOPERATE WITH ALL UTILITY COMPANIES IN MAINTAINING THEIR SERVICE AND/OR RELOCATION OF LINES. THE CONTRACTOR SHALL CONTACT GOPHER STATE ONE CALL AT 651-454-0002 AT LEAST 48 HOURS IN ADVANCE FOR THE LOCATIONS OF ALL UNDERGROUND WIRES, CABLES, CONDUITS, PIPES, MANHOLES, VALVES OR OTHER BURIED STRUCTURES BEFORE DIGGING. THE CONTRACTOR SHALL REPAIR OR REPLACE THE ABOVE WHEN DAMAGED DURING CONSTRUCTION AT NO COST TO THE OWNER. TWIN CITY AREA: 651-454-0002 TOLL FREE 1-800-252-1166 CALL BEFORE YOU DIG PROPERTY LINE UTILITY LEGEND SETBACK LINE EASEMENT LINE EXISTING SANITARY SEWER EXISTING / PROPOSED STORM SEWER EXISTING SANITARY STRUCTURE PROPOSED SANITARY SEWER PROPOSED WATERMAIN EXISTING WATERMAIN PROPOSED SANITARY STRUCTURE PROPOSED HYDRANT PROPOSED FIRE DEPARTMENT CONNECTION 103 MULTI-RESIDENTIAL 1 FFE=923.00 GARAGE=912.00 ASSISTED SENIOR LIVING FFE=923.00 GARAGE=913.00 INDEPENDENT SENIOR LIVING FFE=927.00 GARAGE=917.00 MULTI-RESIDENTIAL 1 FFE=923.00 GARAGE=912.00 LOBBY AND COMMON AREA FFE=923.00 GARAGE=912.00 STORMWATER POND NWL=911.00 HWL=915.92 KEN ZI E T E R R A C E ( C O U N T Y R D 153)STINSON PARKWAY926 926 926 928 920 916916 918 9189229229249 2 4 91 8 920 918 918 922 922924926 920920 922 920 918 922924920914 9 1 6 9 1 8 920914914916916918 922918920 922 920918922 9229209 2 0 910910918918918918 914916 9 1 8 918 914 91 6 910 FIRE DEPARTMENT CONNECTION FIRE DEPARTMENT CONNECTION FIRE DEPARTMENT CONNECTION HYDRANT HYDRANT HYDRANT HYDRANT HYDRANT HYDRANT HYDRANT HYDRANT CONNECT TO EX WATERMAIN MH - 8 RIM=921.49 NE INV=911.34 MH - 7 RIM=919.84 SW INV=910.33 E INV=910.23 MH - 6 RIM=918.40 W INV=909.52 SE INV=909.42 MH - 5 RIM=917.15 NW INV=908.79 SE INV=908.69 MH - 4 RIM=916.33 NW INV=907.91 NE INV=907.81 MH - 3 RIM=917.04 SW INV=907.03 N INV=906.93 MH - 2 RIM=917.64 S INV=906.05 N INV=905.95 MH - 1 OUTSIDE DROP RIM=924.95 W INV=907.28 S INV=905.07 E INV=904.97 252 L F O F 1 0" P V C @ 0. 4 0 % 177 LF OF 10" PVC @ 0 . 4 0 % 14 2 L F O F 1 0 " P V C @ 0 . 4 5 % 2 0 8 LF OF 1 0 " PVC @ 0 . 3 8%220 LF OF 10" PVC @ 0.40%266 LF OF 24" PVC @ 1.08%194 LF OF 10" PV C @ 0.40 %220 LF OF 10" PVC @ 0.40%CONNECT TO EXISTING 24" SANITARY SEWER CORE DRILL AND FILL W/ WATERTIGHT BOOT INV=902.10 REMOVE 266 LF OF 9" VCP SANITARY SEWER AND REPLACE WITH 24" PVC CONNECT TO EXISTING SANITARY SEWER GRAVITY CONNECTION FOR MAIN LEVEL AND ABOVE. GARAGE LEVEL TO BE PUMPED SANITARY SERVICE 2% SLOPE WATERMAIN CROSSING MAINTAIN 2' SEPARATION GRAVITY CONNECTION FOR MAIN LEVEL AND ABOVE. GARAGE LEVEL TO BE PUMPED GRAVITY CONNECTION FOR MAIN LEVEL AND ABOVE: GARAGE LEVEL TO BE PUMPED SANITARY SERVICE 2% SLOPE FULL GRAVITY CONNECTION SANITARY SERVICE 2% SLOPE SANITARY SERVICE 2% SLOPE WATERMAIN CROSSING MAINTAIN 2' SEPARATION WATER SERVICE CROSSING MAINTAIN 2' SEPARATION WATERMAIN CROSSING MAINTAIN 2' SEPARATION WATERMAIN CROSSING MAINTAIN 2' SEPARATION 10" DIP WATERMAIN W/ POLYWRAP 10' MIN SEPARATION WATERMAIN CROSSING MAINTAIN 2' SEPARATION 10' MIN SEPARATION 10' MIN SEPARATION 10' MIN SEPARATION 6" DIP WATERMAIN W/ POLYWRAP 10" DIP WATERMAIN W/ POLYWRAP 10" DIP WATERMAIN W/ POLYWRAP 6" DIP WATERMAIN W/ POLYWRAP 6" DIP WATERMAIN W/ POLYWRAP 6" DIP WATERMAIN W/ POLYWRAP 10" DIP WATERMAIN W/ POLYWRAP 8" DIP WATERMAIN W/ POLYWRAP 8" DIP WATERMAIN W/ POLYWRAP VALVE VALVE VALVE VALVE VALVE CLEANOUT CLEANOUT CLEANOUT CLEANOUT VALVE VALVE C-402 UTILITY PLAN NORTH Drawn By: Issue Date: Project #:5005-0003 RAGTHE VILLAGE LLC DEVELOPMENTTHE VILLAGE, LLC1907 WAYZATA BLVD, SUITE 250M:\5005\0003\DESIGN\CAD\PLANSHEETS\C-402 Uitlity Plan North.dwgDescription:Date:WAYZATA, MN 55391Issue #:ST. ANTHONY VILLAGE, MINNESOTA12/06/2017 1Issue #Prepared For:XX/XX/XXXXDESCRIPTIONISSUE #Sheet #: Sheet Title:1/25/2018 2:10:02 PMDate: I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY REGISTERED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. License #: WARNING: THE CONTRACTOR SHALL BE RESPONSIBLE FOR CALLING FOR LOCATIONS OF ALL EXISTING UTILITIES. THEY SHALL COOPERATE WITH ALL UTILITY COMPANIES IN MAINTAINING THEIR SERVICE AND/OR RELOCATION OF LINES. THE CONTRACTOR SHALL CONTACT GOPHER STATE ONE CALL AT 651-454-0002 AT LEAST 48 HOURS IN ADVANCE FOR THE LOCATIONS OF ALL UNDERGROUND WIRES, CABLES, CONDUITS, PIPES, MANHOLES, VALVES OR OTHER BURIED STRUCTURES BEFORE DIGGING. THE CONTRACTOR SHALL REPAIR OR REPLACE THE ABOVE WHEN DAMAGED DURING CONSTRUCTION AT NO COST TO THE OWNER. TWIN CITY AREA: 651-454-0002 TOLL FREE 1-800-252-1166 CALL BEFORE YOU DIG PROPERTY LINE UTILITY LEGEND SETBACK LINE EASEMENT LINE EXISTING SANITARY SEWER EXISTING / PROPOSED STORM SEWER EXISTING SANITARY STRUCTURE PROPOSED SANITARY SEWER PROPOSED WATERMAIN EXISTING WATERMAIN PROPOSED SANITARY STRUCTURE PROPOSED HYDRANT PROPOSED FIRE DEPARTMENT CONNECTION 104 MULTI-RESIDENTIAL 1 FFE=923.00 GARAGE=912.00 MULTI-RESIDENTIAL 1 FFE=923.00 GARAGE=912.00 LOBBY AND COMMON AREA FFE=923.00 GARAGE=912.00 STORMWATER POND NWL=912.00 HWL=917.35 920914914916916918 9229249 2 6 926926 928 920910910 910 920 922 920912914916918 918910HYDRANT HYDRANT CONNECT TO EX. WATERMAIN MH - 4 RIM=916.33 NW INV=907.91 NE INV=907.81 208 LF OF 1 0 " PVC @ 0 . 3 8%194 LF OF 10" PV C @ 0.40 % 10' MIN SEPARATION 10" DIP WATERMAIN W/ POLYWRAP 10" DIP WATERMAIN W/ POLYWRAP VALVE VALVE KENZI E T E R R A C E ( C O U N T Y R D 1 5 3 )STINSON PARKWAYHYDRANT C-403 UTILITY PLAN SOUTH Drawn By: Issue Date: Project #:5005-0003 RAGTHE VILLAGE LLC DEVELOPMENTTHE VILLAGE, LLC1907 WAYZATA BLVD, SUITE 250M:\5005\0003\DESIGN\CAD\PLANSHEETS\C-403 Uitlity Plan South.dwgDescription:Date:WAYZATA, MN 55391Issue #:ST. ANTHONY VILLAGE, MINNESOTA12/06/2017 1Issue #Prepared For:XX/XX/XXXXDESCRIPTIONISSUE #Sheet #: Sheet Title:1/25/2018 2:10:42 PMDate: I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY REGISTERED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. License #: WARNING: THE CONTRACTOR SHALL BE RESPONSIBLE FOR CALLING FOR LOCATIONS OF ALL EXISTING UTILITIES. THEY SHALL COOPERATE WITH ALL UTILITY COMPANIES IN MAINTAINING THEIR SERVICE AND/OR RELOCATION OF LINES. THE CONTRACTOR SHALL CONTACT GOPHER STATE ONE CALL AT 651-454-0002 AT LEAST 48 HOURS IN ADVANCE FOR THE LOCATIONS OF ALL UNDERGROUND WIRES, CABLES, CONDUITS, PIPES, MANHOLES, VALVES OR OTHER BURIED STRUCTURES BEFORE DIGGING. THE CONTRACTOR SHALL REPAIR OR REPLACE THE ABOVE WHEN DAMAGED DURING CONSTRUCTION AT NO COST TO THE OWNER. TWIN CITY AREA: 651-454-0002 TOLL FREE 1-800-252-1166 CALL BEFORE YOU DIG PROPERTY LINE UTILITY LEGEND SETBACK LINE EASEMENT LINE EXISTING SANITARY SEWER EXISTING / PROPOSED STORM SEWER EXISTING SANITARY STRUCTURE PROPOSED SANITARY SEWER PROPOSED WATERMAIN EXISTING WATERMAIN PROPOSED SANITARY STRUCTURE PROPOSED HYDRANT PROPOSED FIRE DEPARTMENT CONNECTION 105 MULTI-RESIDENTIAL 1 FFE=923.00 GARAGE=912.00 ASSISTED SENIOR LIVING FFE=923.00 GARAGE=913.00 INDEPENDENT SENIOR LIVING FFE=927.00 GARAGE=917.00 MULTI-RESIDENTIAL 1 FFE=923.00 GARAGE=912.00 LOBBY AND COMMON AREA FFE=923.00 GARAGE=912.00 STORMWATER POND NWL=912.00 HWL=917.35 STORMWATER POND NWL=911.00 HWL=915.92 KEN ZI E T E R R A C E ( C O U N T Y R D 153)STINSON PARKWAY92492692 6 920 916916 918 9189229229249 2 4 91 8 922924926 920920 922 920 918 922924920914 9 1 6 9 1 8 9 2 2 926926926 928 9209109 1 0 9 1 0 9 1 0 920 920912914916918 918920 922 920918922922920 9 2 0 910910914916 9 1 8 918 914 91 6 910 9 2 4 9 2 6 924924 924910920 924 92 4 920 918 920 920920 922 920 918 918 920922924926 STRUCTURE - (16) STRUCTURE - (14) STRUCTURE - (46) STRUCTURE - (28) STRUCTURE - (30) STRUCTURE - (22) STRUCTURE - (62) STRUCTURE - (47) STRUCTURE - (61) STRUCTURE - (15) STRUCTURE - (59) STRUCTURE - (60) STRUCTURE - (49)STRUCTURE - (50) STRUCTURE - (52) STRUCTURE - (54) STRUCTURE - (32) STRUCTURE - (55) STRUCTURE - (51) STRUCTURE - (19) STRUCTURE - (24)STRUCTURE - (33) STRUCTURE - (37) STRUCTURE - (18) STRUCTURE - (58) STRUCTURE - (25) STRUCTURE - (38) STRUCTURE - (40) STRUCTURE - (57) STRUCTURE - (53) STRUCTURE - (63) STRUCTURE - (65) STRUCTURE - (41) STRUCTURE - (64) STRUCTURE - (39) STRUCTURE - (36) STRUCTURE - (17) STRUCTURE - (21) STRUCTURE - (29) STRUCTURE - (92) STRUCTURE - (72) STRUCTURE - (89) STRUCTURE - (88) STRUCTURE - (90) STRUCTURE - (69) RIPRAP CLASS III (NO LIMESTONE) RIPRAP CLASS III (NO LIMESTONE) CONSTRUCTION LIMITS (TYP.) CONSTRUCTION LIMITS (TYP.) BAY FILTER 15'X25' STRUCTURE - (95) CONNECT TO EXISTING STORM SEWER EOF=17.50 EOF=17.58 EOF=17.41 EOF=17.30EOF=23.50 EOF=17.43 EOF=20.32 EOF=22.54 EOF=25.50 EOF=19.68 EOF=17.50 EOF=17.37 EOF=19.75 EOF=22.85 EOF=19.89 EOF=16.39 EOF=16.00 EOF=16.84 EOF=17.79 EOF=19.88 EOF=19.91EOF=22.30 EOF=16.90 EOF=16.31 EOF=16.31 EOF=21.90 EOF=21.90 EOF=18.90 C-501 STORM SEWER PLAN Drawn By: Issue Date: Project #:5005-0003 RAGTHE VILLAGE LLC DEVELOPMENTTHE VILLAGE, LLC1907 WAYZATA BLVD, SUITE 250M:\5005\0003\DESIGN\CAD\PLANSHEETS\C-501 Storm Sewer Plan.dwgDescription:Date:WAYZATA, MN 55391Issue #:ST. ANTHONY VILLAGE, MINNESOTA12/06/2017 1Issue #Prepared For:XX/XX/XXXXDESCRIPTIONISSUE #Sheet #: Sheet Title:1/25/2018 2:11:38 PMDate: I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY REGISTERED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. License #: WARNING: THE CONTRACTOR SHALL BE RESPONSIBLE FOR CALLING FOR LOCATIONS OF ALL EXISTING UTILITIES. THEY SHALL COOPERATE WITH ALL UTILITY COMPANIES IN MAINTAINING THEIR SERVICE AND/OR RELOCATION OF LINES. THE CONTRACTOR SHALL CONTACT GOPHER STATE ONE CALL AT 651-454-0002 AT LEAST 48 HOURS IN ADVANCE FOR THE LOCATIONS OF ALL UNDERGROUND WIRES, CABLES, CONDUITS, PIPES, MANHOLES, VALVES OR OTHER BURIED STRUCTURES BEFORE DIGGING. THE CONTRACTOR SHALL REPAIR OR REPLACE THE ABOVE WHEN DAMAGED DURING CONSTRUCTION AT NO COST TO THE OWNER. TWIN CITY AREA: 651-454-0002 TOLL FREE 1-800-252-1166 CALL BEFORE YOU DIG PROPERTY LINE STORM SEWER LEGEND SETBACK LINE EASEMENT LINE PROPOSED STORM SEWER PROPOSED STORM SEWER STRUCTURE EXISTING STORM STRUCTURE EXISTING STORM SEWER EXISTING CONTOUR PROPOSED CONTOUR9XX PROPOSED 6" PVC DRAINTILE 106 MULTI-RESIDENTIAL 1 FFE=923.00 GARAGE=912.00 ASSISTED SENIOR LIVING FFE=923.00 GARAGE=913.00 INDEPENDENT SENIOR LIVING FFE=927.00 GARAGE=917.00 MULTI-RESIDENTIAL 1 FFE=923.00 GARAGE=912.00 LOBBY AND COMMON AREA FFE=923.00 GARAGE=912.00 STORMWATER POND STORMWATER POND NWL=911.00 HWL=915.92 KEN ZI E T E R R A C E ( C O U N T Y R D 153)STINSON PARKWAY92492692 6 920 916916 918 9189229229249 2 4 91 8 922924926 920920 922 920 918 92292492091 4 9 1 6 9 1 8 9 2 2 9 1 0 9 1 0 9 1 0 920 920912914916918 918920 922 920918922 9229209 2 0 910910914916 9 1 8 918 914 91 6 910 9 2 4 910924 92 4 920 918 920 920920 922 920 918 918 920922924926 RIPRAP CLASS III (NO LIMESTONE) RIPRAP CLASS III (NO LIMESTONE) CONSTRUCTION LIMITS (TYP.) CONSTRUCTION LIMITS (TYP.) STRUCTURE - (14) RIM=922.02 N INV=914.05 NE INV=914.05 SE INV=914.05 STRUCTURE - (46) RIM=922.25 N INV=915.37 S INV=915.37 STRUCTURE - (30) RIM=920.03 N INV=915.22 S INV=915.22 STRUCTURE - (22) RIM=919.76 E INV=914.93 N INV=914.93 SW INV=914.93 STRUCTURE - (62) RIM=922.47 NW INV=913.91 SW INV=913.91 STRUCTURE - (47) RIM=919.82 N INV=916.21 W INV=916.21 STRUCTURE - (61) RIM=920.67 N INV=912.68 SE INV=912.68 STRUCTURE - (15) RIM=922.26 NW INV=912.56 E INV=912.56 STRUCTURE - (59) RIM=922.06 E INV=915.61 S INV=915.61 STRUCTURE - (60) RIM=923.62 E INV=913.56 NE INV=913.56 S INV=913.56 STRUCTURE - (49) RIM=919.42 S INV=914.81 W INV=914.81 STRUCTURE - (50) RIM=919.64 NE INV=913.44 STRUCTURE - (52) RIM=918.67 E INV=914.41 NE INV=914.41 SW INV=914.41 STRUCTURE - (54) RIM=915.80 W INV=913.78 E INV=913.78 STRUCTURE - (32) RIM=917.72 SW INV=913.38 STRUCTURE - (55) RIM=916.21 W INV=913.07 S INV=913.07 E INV=913.07 STRUCTURE - (51) RIM=917.49 NE INV=912.41 SE INV=912.31 STRUCTURE - (19) RIM=915.63 W INV=912.44 S INV=912.44 STRUCTURE - (24) RIM=917.72 NE INV=913.10 SW INV=913.10 SE INV=913.00 STRUCTURE - (33) RIM=916.88 SW INV=912.88 STRUCTURE - (37) RIM=916.55 N INV=908.94 SW INV=911.00 STRUCTURE - (18) RIM=916.20 E INV=914.68 STRUCTURE - (58) RIM=916.77 N INV=911.30 W INV=912.00 S INV=911.30 STRUCTURE - (25) RIM=916.72 NW INV=912.60 NE INV=912.60 SW INV=912.50 STRUCTURE - (38) RIM=916.73 SW INV=909.50 NE INV=909.50 STRUCTURE - (40) RIM=916.64 S INV=912.50 STRUCTURE - (57) RIM=916.62 N INV=911.79 S INV=911.79 STRUCTURE - (53) RIM=916.09 NE INV=911.72 STRUCTURE - (63) RIM=916.06 SW INV=911.28 NE INV=911.18 STRUCTURE - (65) RIM=916.06 SW INV=911.66 NW INV=911.66 NE INV=911.56 STRUCTURE - (41) RIM=916.00 NE INV=912.00 STRUCTURE - (64) SW INV=911.00 STRUCTURE - (39) RIM=916.04 NW INV=908.51 N INV=911.91 SW INV=910.88 STRUCTURE - (36) S INV=909.20 STRUCTURE - (21) N INV=911.00 29 LF OF 15" RCP @ 0.50% 180 LF OF 15" HDP E @ 0 . 5 0 % 128 LF OF 21" HDPE @ 0.51% 60 LF OF 24" RCP @ 0.50% 93 LF OF 12" RCP @ 0.42%58 LF OF 21" RCP @ 0.50% 56 LF OF 12" RCP @ 0.50%57 LF OF 12" RCP @ 0.50% 1 2 6 L F O F 1 5 " RCP @ 0 . 5 2% 53 LF OF 12" RCP @ 0.50% 114 LF OF 12" RCP @ 1.75% 37 LF OF 12" RCP @ 1.34% 29 LF OF 12" RCP @ 2.00% 56 LF OF 12" RCP @ 2.00% 22 LF OF 15" RCP @ 0.67% 257 LF O F 1 8 " R C P @ 0 . 5 0 % 133 LF OF 30" RCP @ 0.39% 60 LF OF 12" RCP @ 0.58% 12 LF OF 15" RCP @ 0.76% 61 LF OF 18" RCP @ 0.66% 12 LF OF 12" RCP @ 0.49% 141 LF OF 15" HDPE @ 0 . 5 0 % 120 LF OF 21 " H D P E @ 0 . 5 2 %97 LF OF 21" RCP @ 0.50%172 LF OF 12" HDPE @ 0.50%90 LF OF 36" RCP @ 0.40%69 LF OF 15" RCP @ 0.50% 37 LF OF 18" RCP @ 0.50% 57 LF OF 18" RCP @ 0.50% 85 LF O F 3 0" R C P @ 0. 3 9 % STRUCTURE - (92) N INV=912.00 35 LF OF 15" RCP @ 2.00% STRUCTURE - (72) RIM=921.19 NE INV=914.08 W INV=914.08 STRUCTURE - (89) RIM=924.59 N INV=914.75 S INV=914.75 STRUCTURE - (88) RIM=920.32 S INV=916.64 W INV=916.64 131 LF O F 3 0 " R C P @ 0 . 4 0 % 50 LF OF 12" PVC @ 2.00% 206 LF OF 12" HDPE @ 0.50%88 LF OF 12" PVC @ 2.00%83 LF OF 12" PVC @ 1.99%65 LF OF 12" PVC @ 1.93%130 LF OF 36" RCP @ 0.40%140 LF OF 12" HDPE @ 0.50%EOF=17.50 EOF=17.58 EOF=17.41 EOF=17.30 EOF=23.50 EOF=17.43 EOF=20.32 EOF=22.54 EOF=25.50 EOF=19.68 EOF=17.50 EOF=17.37 EOF=19.75 EOF=22.85 EOF=19.89 EOF=16.00 EOF=16.39 EOF=16.84 EOF=17.79 EOF=19.88 EOF=19.91 EOF=22.30 EOF=16.90 EOF=16.31 EOF=16.31 EOF=21.90 EOF=18.90 TRENCH DRAIN TRENCH DRAIN TRENCH DRAIN TRENCH DRAIN STRUCTURE - (69) RIM=916.80 SW INV=909.00 NE INV=909.00 SE INV=909.00 17 LF OF 12" RCP @ 2.81% C-502 STORM SEWER PLAN NORTH Drawn By: Issue Date: Project #:5005-0003 RAGTHE VILLAGE LLC DEVELOPMENTTHE VILLAGE, LLC1907 WAYZATA BLVD, SUITE 250M:\5005\0003\DESIGN\CAD\PLANSHEETS\C-502 Storm Sewer Plan North.dwgDescription:Date:WAYZATA, MN 55391Issue #:ST. ANTHONY VILLAGE, MINNESOTA12/06/2017 1Issue #Prepared For:XX/XX/XXXXDESCRIPTIONISSUE #Sheet #: Sheet Title:1/25/2018 2:12:38 PMDate: I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY REGISTERED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. License #: WARNING: THE CONTRACTOR SHALL BE RESPONSIBLE FOR CALLING FOR LOCATIONS OF ALL EXISTING UTILITIES. THEY SHALL COOPERATE WITH ALL UTILITY COMPANIES IN MAINTAINING THEIR SERVICE AND/OR RELOCATION OF LINES. THE CONTRACTOR SHALL CONTACT GOPHER STATE ONE CALL AT 651-454-0002 AT LEAST 48 HOURS IN ADVANCE FOR THE LOCATIONS OF ALL UNDERGROUND WIRES, CABLES, CONDUITS, PIPES, MANHOLES, VALVES OR OTHER BURIED STRUCTURES BEFORE DIGGING. THE CONTRACTOR SHALL REPAIR OR REPLACE THE ABOVE WHEN DAMAGED DURING CONSTRUCTION AT NO COST TO THE OWNER. TWIN CITY AREA: 651-454-0002 TOLL FREE 1-800-252-1166 CALL BEFORE YOU DIG PROPERTY LINE STORM SEWER LEGEND SETBACK LINE EASEMENT LINE PROPOSED STORM SEWER PROPOSED STORM SEWER STRUCTURE EXISTING STORM STRUCTURE EXISTING STORM SEWER EXISTING CONTOUR PROPOSED CONTOUR9XX PROPOSED 6" PVC DRAINTILE 107 MULTI-RESIDENTIAL 1 FFE=923.00 GARAGE=912.00 MULTI-RESIDENTIAL 1 FFE=923.00 GARAGE=912.00 LOBBY AND COMMON AREA FFE=923.00 GARAGE=912.00 STORMWATER POND NWL=912.00 HWL=917.35 9 2 2 926926926 928 9209109 1 0 9 1 0 920 918 9189109 2 4 9 2 6 924924 924910920 189 LF OF 36" RCP @ 0.24% 45 LF OF 36" RCP @ 0.28% 67 LF OF 12" RCP @ 1.53% 57 LF OF 12" RCP @ 0.50% 1 2 6 L F O F 1 5 " RCP @ 0 . 5 2% 53 LF OF 12" RCP @ 0.50% 114 LF OF 12" RCP @ 1.75% 37 LF OF 12" RCP @ 1.34% 29 LF OF 12" RCP @ 2.00% 56 LF OF 12" RCP @ 2.00% 12 LF OF 12" RCP @ 0.49%90 LF OF 36" RCP @ 0.40%37 LF OF 36" RCP @ 0.33% 37 LF OF 18" RCP @ 0.50% 57 LF OF 18" RCP @ 0.50% 35 LF OF 15" RCP @ 2.00% RIPRAP CLASS III (NO LIMESTONE)130 LF OF 36" RCP @ 0.40%193 LF OF 12" R CP @ 0.76 % STRUCTURE - (16) RIM=919.54 W INV=912.12 NE INV=912.12 STRUCTURE - (28) RIM=919.64 W INV=909.91 NE INV=912.00 N INV=912.00 STRUCTURE - (61) RIM=920.67 N INV=912.68 SE INV=912.68 STRUCTURE - (15) RIM=922.26 NW INV=912.56 E INV=912.56 STRUCTURE - (60) RIM=923.62 E INV=913.56 NE INV=913.56 S INV=913.56 STRUCTURE - (37) RIM=916.55 N INV=908.94 SW INV=911.00 STRUCTURE - (38) RIM=916.73 SW INV=909.50 NE INV=909.50 STRUCTURE - (40) RIM=916.64 S INV=912.50 STRUCTURE - (53) RIM=916.09 NE INV=911.72 STRUCTURE - (63) RIM=916.06 SW INV=911.28 NE INV=911.18 STRUCTURE - (65) RIM=916.06 SW INV=911.66 NW INV=911.66 NE INV=911.56 STRUCTURE - (41) RIM=916.00 NE INV=912.00 STRUCTURE - (64) SW INV=911.00 STRUCTURE - (39) RIM=916.04 NW INV=908.51 N INV=911.91 SW INV=910.88 S INV=909.20 STRUCTURE - (17) SW INV=912.00 STRUCTURE - (29) E INV=910.20 STRUCTURE - (92) N INV=912.00 STRUCTURE - (69) RIM=916.80 SW INV=909.00 NE INV=909.00 SE INV=909.00 BAY FILTER 15'X25' STRUCTURE - (95) RIM=918.17 SW INV=910.98 W INV=910.98 NE INV=910.98 CONNECT EX. STORM PIPE EOF=16.90 EOF=16.31 EOF=16.31 EOF=21.90 EOF=21.90 EOF=18.90 TRENCH DRAIN TRENCH DRAIN 17 LF OF 12" RCP @ 2.81% KENZI E T E R R A C E ( C O U N T Y R D 1 5 3 )STINSON PARKWAYC-503 STORM SEWER PLAN SOUTH Drawn By: Issue Date: Project #:5005-0003 RAGTHE VILLAGE LLC DEVELOPMENTTHE VILLAGE, LLC1907 WAYZATA BLVD, SUITE 250M:\5005\0003\DESIGN\CAD\PLANSHEETS\C-503 Storm Sewer Plan South.dwgDescription:Date:WAYZATA, MN 55391Issue #:ST. ANTHONY VILLAGE, MINNESOTA12/06/2017 1Issue #Prepared For:XX/XX/XXXXDESCRIPTIONISSUE #Sheet #: Sheet Title:1/25/2018 2:13:37 PMDate: I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY REGISTERED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. License #: WARNING: THE CONTRACTOR SHALL BE RESPONSIBLE FOR CALLING FOR LOCATIONS OF ALL EXISTING UTILITIES. THEY SHALL COOPERATE WITH ALL UTILITY COMPANIES IN MAINTAINING THEIR SERVICE AND/OR RELOCATION OF LINES. THE CONTRACTOR SHALL CONTACT GOPHER STATE ONE CALL AT 651-454-0002 AT LEAST 48 HOURS IN ADVANCE FOR THE LOCATIONS OF ALL UNDERGROUND WIRES, CABLES, CONDUITS, PIPES, MANHOLES, VALVES OR OTHER BURIED STRUCTURES BEFORE DIGGING. THE CONTRACTOR SHALL REPAIR OR REPLACE THE ABOVE WHEN DAMAGED DURING CONSTRUCTION AT NO COST TO THE OWNER. TWIN CITY AREA: 651-454-0002 TOLL FREE 1-800-252-1166 CALL BEFORE YOU DIG PROPERTY LINE STORM SEWER LEGEND SETBACK LINE EASEMENT LINE PROPOSED STORM SEWER PROPOSED STORM SEWER STRUCTURE EXISTING STORM STRUCTURE EXISTING STORM SEWER EXISTING CONTOUR PROPOSED CONTOUR9XX PROPOSED 6" PVC DRAINTILE 108 ℄ 15' THRU LANE 15' THRU LANE 8.5' PARKING LANE8.5' PARKING LANE5' CONC. WALK 5' CONC. WALK 1V:3H S L O P E M A X 1V:3H S L O P E M A X 1V:3H S L O P E M A X 1V:3H S L O P E M A X 23.5'23.5' 1 C-801 TYPICAL PARKWAY SECTION NOT TO SCALE PLAN VIEW 48" SECTION VIEW DETAIL A-A 14" STEEL PLATE PLAN VIEW EL=916.74 8" EL=911.00 48" INLET EL=916.00 EL=916.74 PROFILE VIEW 5" FLOW OUTLET INLET OUTLET PLAN VIEW 48" SECTION VIEW DETAIL A-A 14" STEEL PLATE PLAN VIEW EL=920.19 6" EL=912.00 48" INLET EL=918.00 EL=920.19 PROFILE VIEW 5" FLOW OUTLET INLET OUTLET 2 C-801 OUTLET CONTROL STRUCTURE (OCS) NORTH POND (STRUCTURE 37) NOT TO SCALE 3 C-801 OUTLET CONTROL STRUCTURE (OCS) SOUTH POND (STRUCTURE 28) NOT TO SCALE 1/4"x1" FLAT STEEL SEE DETAIL A-A FOUR (4) 1/2 IN. DIA.-13 UNC HEX HEAD STAINLESS STEEL BOLTS WITH NUTS AND WASHERS #5 SMOOTH BAR @ 4 IN. O.C. EACH WAY INV=911.00INV=908.94 CLASS 5 AGGREGATE BASE WATERTIGHT WEIR GROUT BOTTOM OF STRUCTURE ORIFICE WATERTIGHT WEIR 1/4"x1" FLAT STEEL SEE DETAIL A-A FOUR (4) 1/2 IN. DIA.-13 UNC HEX HEAD STAINLESS STEEL BOLTS WITH NUTS AND WASHERS #5 SMOOTH BAR @ 4 IN. O.C. EACH WAY INV=912.00INV=909.91 CLASS 5 AGGREGATE BASE WATERTIGHT WEIR GROUT BOTTOM OF STRUCTURE ORIFICE WATERTIGHT WEIR ORIFICEORIFICE NWL 3:1 MA X S L O P E 10:1 POND SLOP E 3:1 MA X S L O P E IMPERMEABLE LINER 4 C-801 TYPICAL POND SECTION NOT TO SCALE 1'1'PROPERTYLINEPROPERTYLINE10' F-F 69' OUTLOT A LANDCAPE MEDIAN ℄ LIGHT POLE C-801 DETAILS Drawn By: Issue Date: Project #:5005-0003 RAGTHE VILLAGE LLC DEVELOPMENTTHE VILLAGE, LLC1907 WAYZATA BLVD, SUITE 250M:\5005\0003\DESIGN\CAD\PLANSHEETS\C-801 DETAILS.dwgDescription:Date:WAYZATA, MN 55391Issue #:ST. ANTHONY VILLAGE, MINNESOTA12/06/2017 1Issue #Prepared For:XX/XX/XXXXDESCRIPTIONISSUE #Sheet #: Sheet Title:1/25/2018 2:14:07 PMDate: I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY REGISTERED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. License #: 109 KEN ZI E T E R R A C E ( C O U N T Y R D 153)STINSON PARKWAYMULTI-RESIDENTIAL 1 FFE=923.00 GARAGE=912.00 ASSISTED SENIOR LIVING FFE=923.00 GARAGE=913.00 INDEPENDENT SENIOR LIVING FFE=927.00 GARAGE=917.00 MULTI-RESIDENTIAL 1 FFE=923.00 GARAGE=912.00 LOBBY AND COMMON AREA FFE=923.00 GARAGE=912.00 STORMWATER POND NWL=912.00 HWL=917.35 STORMWATER POND NWL=911.00 HWL=915.92 PATIO EL=923.00 PATIO EL=927.00 PATIO EL=923.00PATIOEL=927.00L-100 PLANTING PLAN - OVERALL CONCEPT Drawn By: Issue Date: Project #:5005-0003 RAGTHE VILLAGE LLC DEVELOPMENTTHE VILLAGE, LLC1907 WAYZATA BLVD, SUITE 250M:\5005\0003\DESIGN\CAD\PLANSHEETS\L-101 Planting Plan.dwgDescription:Date:WAYZATA, MN 55391Issue #:ST. ANTHONY VILLAGE, MINNESOTA12/06/2017 1Issue #Prepared For:XX/XX/XXXX DESCRIPTIONISSUE #Sheet #: Sheet Title:1/26/2018 12:42:30 AMDate: I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY REGISTERED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. License #: WARNING: THE CONTRACTOR SHALL BE RESPONSIBLE FOR CALLING FOR LOCATIONS OF ALL EXISTING UTILITIES. THEY SHALL COOPERATE WITH ALL UTILITY COMPANIES IN MAINTAINING THEIR SERVICE AND/OR RELOCATION OF LINES. THE CONTRACTOR SHALL CONTACT GOPHER STATE ONE CALL AT 651-454-0002 AT LEAST 48 HOURS IN ADVANCE FOR THE LOCATIONS OF ALL UNDERGROUND WIRES, CABLES, CONDUITS, PIPES, MANHOLES, VALVES OR OTHER BURIED STRUCTURES BEFORE DIGGING. THE CONTRACTOR SHALL REPAIR OR REPLACE THE ABOVE WHEN DAMAGED DURING CONSTRUCTION AT NO COST TO THE OWNER. TWIN CITY AREA: 651-454-0002 TOLL FREE 1-800-252-1166 CALL BEFORE YOU DIG PLANTING LEGEND OVERSTORY TREE ORNAMENTAL TREE CONIFEROUS TREE CONIFEROUS SHRUB DECIDUOUS SHRUB L - 101 L - 103 L - 102 EXISTING TREE 110 MULTI-RESIDENTIAL 1 FFE=923.00 GARAGE=912.00 MULTI-RESIDENTIAL 1 FFE=923.00 GARAGE=912.00 LOBBY AND COMMON AREA FFE=923.00 GARAGE=912.00 STORMWATER POND NWL=912.00 HWL=917.35 PATIO EL=923.00 PATIO EL=923.00 Af Af Af Af Co Co Co Qb Qb Qb Af Af Af Co Af Af Af Co Co Qb Qb Qb Qb Af PATIO/PAVILION WATER FOUNTAIN WATER FOUNTAIN DOG RUN PROOF OF PARKING ENTRY PLAZA CONCRETE PATH PAVED PATH CONCRETE PATH CONCRETE RETAINING WALL Af Af EXISTING BREMER BANK SITE DECORATIVE PAVEMENT MEDIAN Af L-101 PLANTING PLAN - CONCEPT SOUTH Drawn By: Issue Date: Project #:5005-0003 RAGTHE VILLAGE LLC DEVELOPMENTTHE VILLAGE, LLC1907 WAYZATA BLVD, SUITE 250M:\5005\0003\DESIGN\CAD\PLANSHEETS\L-101 Planting Plan.dwgDescription:Date:WAYZATA, MN 55391Issue #:ST. ANTHONY VILLAGE, MINNESOTA12/06/2017 1Issue #Prepared For:XX/XX/XXXX DESCRIPTIONISSUE #Sheet #: Sheet Title:1/26/2018 12:44:14 AMDate: I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY REGISTERED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. License #: WARNING: THE CONTRACTOR SHALL BE RESPONSIBLE FOR CALLING FOR LOCATIONS OF ALL EXISTING UTILITIES. THEY SHALL COOPERATE WITH ALL UTILITY COMPANIES IN MAINTAINING THEIR SERVICE AND/OR RELOCATION OF LINES. THE CONTRACTOR SHALL CONTACT GOPHER STATE ONE CALL AT 651-454-0002 AT LEAST 48 HOURS IN ADVANCE FOR THE LOCATIONS OF ALL UNDERGROUND WIRES, CABLES, CONDUITS, PIPES, MANHOLES, VALVES OR OTHER BURIED STRUCTURES BEFORE DIGGING. THE CONTRACTOR SHALL REPAIR OR REPLACE THE ABOVE WHEN DAMAGED DURING CONSTRUCTION AT NO COST TO THE OWNER. TWIN CITY AREA: 651-454-0002 TOLL FREE 1-800-252-1166 CALL BEFORE YOU DIG PLANTING LEGEND OVERSTORY TREE ORNAMENTAL TREE CONIFEROUS TREE CONIFEROUS SHRUB DECIDUOUS SHRUB EXISTING TREE FOUNDATION PLANTING 111 KEN ZI E T E R R A C E ( C O U N T Y R D 153) ASSISTED SENIOR LIVING FFE=923.00 GARAGE=913.00 MULTI-RESIDENTIAL 1 FFE=923.00 GARAGE=912.00 LOBBY AND COMMON AREA FFE=923.00 GARAGE=912.00 STORMWATER POND NWL=911.00 HWL=915.92 PATIO EL=923.00 PATIO EL=927.00 PATIO EL=923.00 Ac Pg PATIO EL=923.00 PATIO EL=927.00 PATIO EL=923.00 Af Af Co Co Af Af Af Co Co Co Co Co Co Co Qb Qb Qb Qb Qb Qb Qb Qb Qb Qb Qb Af Af Qb Af Af Qb ENTRY PLAZA Af Pg Pg Ac Ac Pg Ac Ac Pg Pg AcAcAcAcPgPgPgPg Ac Ac Ac DECORATIVE PAVEMENT MEDIAN ACTIVITY NODE ACTIVITY NODE WATER FOUNTAIN EXISTING TREELINE ACTIVITY NODE Af Af L-102 PLANTING PLAN - CONCEPT EAST Drawn By: Issue Date: Project #:5005-0003 RAGTHE VILLAGE LLC DEVELOPMENTTHE VILLAGE, LLC1907 WAYZATA BLVD, SUITE 250M:\5005\0003\DESIGN\CAD\PLANSHEETS\L-101 Planting Plan.dwgDescription:Date:WAYZATA, MN 55391Issue #:ST. ANTHONY VILLAGE, MINNESOTA12/06/2017 1Issue #Prepared For:XX/XX/XXXX DESCRIPTIONISSUE #Sheet #: Sheet Title:1/26/2018 12:44:52 AMDate: I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY REGISTERED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. License #: WARNING: THE CONTRACTOR SHALL BE RESPONSIBLE FOR CALLING FOR LOCATIONS OF ALL EXISTING UTILITIES. THEY SHALL COOPERATE WITH ALL UTILITY COMPANIES IN MAINTAINING THEIR SERVICE AND/OR RELOCATION OF LINES. THE CONTRACTOR SHALL CONTACT GOPHER STATE ONE CALL AT 651-454-0002 AT LEAST 48 HOURS IN ADVANCE FOR THE LOCATIONS OF ALL UNDERGROUND WIRES, CABLES, CONDUITS, PIPES, MANHOLES, VALVES OR OTHER BURIED STRUCTURES BEFORE DIGGING. THE CONTRACTOR SHALL REPAIR OR REPLACE THE ABOVE WHEN DAMAGED DURING CONSTRUCTION AT NO COST TO THE OWNER. TWIN CITY AREA: 651-454-0002 TOLL FREE 1-800-252-1166 CALL BEFORE YOU DIG PLANTING LEGEND OVERSTORY TREE ORNAMENTAL TREE CONIFEROUS TREE CONIFEROUS SHRUB DECIDUOUS SHRUB EXISTING TREE FOUNDATION PLANTING 112 STINSON PARKWAYMULTI-RESIDENTIAL 1 FFE=923.00 GARAGE=912.00 INDEPENDENT SENIOR LIVING FFE=927.00 GARAGE=917.00 MULTI-RESIDENTIAL 1 FFE=923.00 GARAGE=912.00 LOBBY AND COMMON AREA FFE=923.00 GARAGE=912.00 PATIO EL=927.00 PATIO EL=923.00PATIOEL=927.00PATIO EL=927.00 PATIO EL=923.00PATIOEL=927.00Af Co Co Co Af Af Af Co Co Co Co Co Co Co Co Qb Qb Qb Qb Qb Qb Af Af Qb Qb Qb Qb Qb Qb Af Af PROOF OF PARKING ENTRY PLAZA PAVED PATH Af Pg Ac Ac Ac Ac PgPgPgPg Ac DECORATIVE PAVEMENT MEDIAN ACTIVITY NODE ACTIVITY NODE ACTIVITY NODE PAVED PATH ACTIVITY NODE ACTIVITY NODE Af Af Af Af ENTRY PLAZA L-103 PLANTING PLAN - CONCEPT WEST Drawn By: Issue Date: Project #:5005-0003 RAGTHE VILLAGE LLC DEVELOPMENTTHE VILLAGE, LLC1907 WAYZATA BLVD, SUITE 250M:\5005\0003\DESIGN\CAD\PLANSHEETS\L-101 Planting Plan.dwgDescription:Date:WAYZATA, MN 55391Issue #:ST. ANTHONY VILLAGE, MINNESOTA12/06/2017 1Issue #Prepared For:XX/XX/XXXX DESCRIPTIONISSUE #Sheet #: Sheet Title:1/26/2018 12:45:29 AMDate: I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY REGISTERED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. License #: WARNING: THE CONTRACTOR SHALL BE RESPONSIBLE FOR CALLING FOR LOCATIONS OF ALL EXISTING UTILITIES. THEY SHALL COOPERATE WITH ALL UTILITY COMPANIES IN MAINTAINING THEIR SERVICE AND/OR RELOCATION OF LINES. THE CONTRACTOR SHALL CONTACT GOPHER STATE ONE CALL AT 651-454-0002 AT LEAST 48 HOURS IN ADVANCE FOR THE LOCATIONS OF ALL UNDERGROUND WIRES, CABLES, CONDUITS, PIPES, MANHOLES, VALVES OR OTHER BURIED STRUCTURES BEFORE DIGGING. THE CONTRACTOR SHALL REPAIR OR REPLACE THE ABOVE WHEN DAMAGED DURING CONSTRUCTION AT NO COST TO THE OWNER. TWIN CITY AREA: 651-454-0002 TOLL FREE 1-800-252-1166 CALL BEFORE YOU DIG PLANTING LEGEND OVERSTORY TREE ORNAMENTAL TREE CONIFEROUS TREE CONIFEROUS SHRUB DECIDUOUS SHRUB EXISTING TREE FOUNDATION PLANTING 113 THIS PAGE LEFT INTENTIONALLY BLANK 114 Revised Traffic Study Southern Gateway (The Village LLC) For: City of Saint Anthony Village 3301 Silver Lake Road Saint Anthony, MN 55418 February 19, 2018 Prepared By: WSB & Associates, Inc. 701 Xenia Ave. South, Suite 300 Minneapolis, MN, 55416 (763) 541-4800 (763) 541-1700 (Fax) 115 CERTIFICATION I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly registered professional engineer under the laws of the State of Minnesota. Charles T. Rickart, P.E. Date: February 19, 2018 Reg. No. 26082 116 Table of Contents INTRODUCTION / BACKGROUND ............................................................................ 1 EXISTING CONDITIONS ............................................................................................... 5 TRAFFIC PROJECTIONS ............................................................................................. 10 TRAFFIC IMPACT ANALYSIS .................................................................................... 19 CONCLUSIONS / RECOMMENDATIONS ................................................................ 25 Figures / Tables Figure 1 – Project Location ........................................................................................ 2 Figure 2 – Project Area ................................................................................................ 3 Figure 3 – Development Site ...................................................................................... 4 Figure 4 – Existing AM and PM Peak Hour Traffic (1) ....................................... 8 Figure 5 – Existing AM and PM Peak Hour Traffic (2) ....................................... 9 Figure 6 – No-Build 2030 AM and PM Peak Hour Traffic (1) ....................... 13 Figure 7 - No-Build 2030 AM and PM Peak Hour Traffic (2) ........................ 14 Figure 8 – Build 2018 AM and PM Peak Hour Traffic (1) .............................. 15 Figure 9 - Build 2018 AM and PM Peak Hour Traffic (2) .............................. 16 Figure 10 - Build 2030 AM and PM Peak Hour Traffic (1) ............................ 17 Figure 11 - Build 2030 AM and PM Peak Hour Traffic (2) ............................ 18 Figure 12 – Level of Service Ranges ..................................................................... 20 Table 1 – Crash Summary ........................................................................................... 7 Table 2 – Site Development Traffic Generation ............................................... 10 Table 3 – Trip Generation Comparison .............................................................. 11 Table 4 – Traffic Volume Summary ...................................................................... 12 Table 5 – Existing Level of Service Summary .................................................... 21 Table 6 – 2030 No Build Level of Service Summary ....................................... 22 Table 7 – Build Level of Service Summary ......................................................... 23 117 INTRODUCTION / BACKGROUND A Traffic Impact Study, dated November 11, 2016, was completed for The Village LLC development as part of the Environmental Assessment Worksheet (EAW) process. The purpose of the study was to determine the potential transportation impacts for the redevelopment of the existing 15-acre, 200 unit manufactured home/RV park community, located in the northeast quadrant of the intersection of Kenzie Terrace (CR 153) and NE Stinson Parkway in the City of St Anthony. Figure 1 and Figure 2 show the project location and project area. The development was originally proposed to include five, 3 to 5 story multi-unit buildings with a mix of apartments, senior living, and continuing care uses consisting of approximately 800 units and; 37, 2- to 3-story townhome units. After input from the public and elected officials, the development team is now proposing a revised, less intense, development plan. The new plan now includes 225 market rate apartments; 61 senior living units; and, 128 assisted living units. The proposed site plan is shown on Figure 3. Based on the revised plan the transportation impacts of the existing and proposed traffic conditions were evaluated for the NE Stinson Parkway and Kenzie Terrace (CR 153)/Lowry Avenue corridors including the following intersections: • St Anthony Blvd at NE Stinson Pkwy • St Anthony Blvd at Silver Lake Blvd (CR 136) / Kenzie Terrace (CR 153) • St Anthony Blvd at New Brighton Blvd (CR 88) • NE Stinson Pkwy at 27th Avenue • NE Stinson Pkwy at 26th Avenue • NE Stinson Pkwy at Lowry Ave / Kenzie Terrace (CR 153) • Kenzie Terrace (CR 153) at Lowry Grove Entrance • Kenzie Terrace (CR 153) at Wilson Street • Kenzie Terrace (CR 153) at Autumn Woods/Kenzington Apartments The Traffic Engineering Review and Analysis in this Study was conducted to determine the impacts the site would have on the area traffic operations, lane geometry/traffic control and access. The following sections of this report outline the findings of this study including: • Documentation of existing traffic conditions in the area, and; • Projecting future traffic for the proposed development, and; • Determining lane configuration needs at the primary driveways and intersections in the area, and; • Developing conclusions and recommendations with respect to the existing and future roadway needs and configurations at area intersections and/or roadways. 118 119 120 121 EXISTING CONDITIONS A. Land Use The existing land use in the study area consists primarily of single family and multi-family residential, office commercial and retail uses. B. Roadway Characteristics Stinson Parkway is a north/south “A” Minor Arterial extending from 40th Avenue on the north, in Columbia Heights to E Hennepin Avenue in the City of Minneapolis. Stinson Parkway south of St Anthony Blvd, adjacent to the proposed site is a Minneapolis Park Board street and has a typical 95 foot urban cross section with one lane in each direction, a parking bay and a raised grass median. Traffic signal control is provided at the Lowry Ave/Kenzie Terrace (CR 153) intersection. All other intersections are Stop Sign controlled. A 25mph speed limit is posted on Stinson Parkway south of St Anthony Blvd. Kenzie Terrace (CR 153) is a east/west “B” Minor Arterial extending from where it changes to Lowry Avenue at Stinson Parkway to where it changes to Silver Lake Road at St Anthony Parkway. Kenzie Terrace (CR 153) has a primary 64 foot two-lane urban cross section with a center left turn lane and a raised concrete median. It provides access to the multi-family apartments and businesses adjacent to the roadway with median breaks at several driveways. Traffic signal control is provided at the Stinson Parkway, Autumn Woods/Kenzington Apartments and St Anthony Blvd intersections. All other intersections are Stop Sign controlled. Signed and marked pedestrian crossings are provided at Stenson Parkway, at the Lowry Grove entrance, at Autumn Woods/Kenzington Apartments entrance, at 27th Avenue and at St Anthony Blvd. A 30mph speed limit is posted on Kenzie Terrace (CR 153). The lane configurations at each of the study area intersections are as follows: St Anthony Blvd at NE Stinson Pkwy – All Way Stop Control NB Stinson Pkwy – one left/through/right, one parking lane SB Stinson Pkwy – one left/through/right, one parking lane WB St Anthony Blvd – one left/through/right EB St Anthony Blvd – one left/through/right St Anthony Blvd at Silver Lake Rd (CR 136) / Kenzie Terrace (CR 153) – Traffic Signal Control: NW St Anthony Blvd – one left, one through, one free right turn lane SE St Anthony Blvd – one left, one through/free right lane SW Silver Lake Rd – one left, one through, one through/free right turn lane NE Kenzie Terrace – one left, two through, one right 122 St Anthony Blvd at New Brighton Blvd (CR 88) – Traffic Signal Control: NW St Anthony Blvd – one left, one through, one right SE St Anthony Blvd – one left, one through, one free right SW New Brighton Blvd – one left, two through, one right NE New Brighton Blvd – one left, two through, one free right NE Stinson Pkwy at 27th Avenue – All Way Stop Control: NB Stinson Pkwy – one left/through/right SB Stinson Pkwy – one left/through/right WB 27th Avenue – one left/through/right EB 27th Avenue – one left/through/right NE Stinson Pkwy at 26th Avenue – Side Street Stop Control: NB Stinson Pkwy – one left/through/right SB Stinson Pkwy – one left/through/right WB 26th Avenue – one left/through/right EB 26th Avenue – one left/through/right NE Stinson Pkwy at Lowry Ave / Kenzie Terrace (CR 153) – Traffic Signal Control: NB Stinson Pkwy – one left, one through/right SB Stinson Pkwy – one left, one through/right WB Kenzie Terrace – one left, one through, one right EB Lowry Ave – one left/through, one right Kenzie Terrace (CR 153) at Lowry Grove Entrance – Side Street Stop Control: SB Lowry Grove Entrance – one left/through/right WB Kenzie Terrace – one left/through, one through/right EB Kenzie Terrace – one left, one through/right Kenzie Terrace (CR 153) at Wilson Street – Side Street Stop Control: NB Wilson Street – one left/through/right WB Kenzie Terrace – one left, one through, one through/right EB Kenzie Terrace – one left/through, one through/right Kenzie Terrace (CR 153) at Autumn Woods/Kenzington Apartments – Traffic Signal Control: NB Autumn Woods – one left/through/right SB Kenzington Apts – one left/through/right WB Kenzie Terrace – one left, one through, one through/right EB Kenzie Terrace – one left, one through, one through/right The existing roadway geometrics including the intersection traffic control, is shown on Figure 4 and Figure 5. 123 C. Traffic Volumes AM and PM peak hour turning movements and daily counts were conducted during the week of October 10th, 2016. These counts were used as the existing baseline conditions for the area. Figure 4 and Figure 5 shows the existing intersections that were analyzed as part of this, with the existing 2016 AM and PM peak hour and traffic volumes. D. Crash Data The crash data included with this study was obtained using the Minnesota Crash Mapping Analysis Tool (MnCMAT) developed by MnDOT. The database includes crashes reported to MnDOT by local law enforcement agencies. The crash data presented are for the years of 2013-2015. The MnCMAT database does not provide access to the original handwritten crash reports which contain some details that are not represented in the MnCMAT database. Crashes that resulted in damages under $1000 may not be included in the database results as well. The results indicate that the intersections of St Anthony Blvd at New Brighton Blvd, Stinson Blvd at 27th Street and Stinson Blvd at 26th Street have calculated accident and/or severity rates above the MnDOT Metro and Statewide averages. A summary of the existing crash data is shown in Table 1. Table 1 – Crash Summary Intersection 2013 2014 2015 Total Crashes PD PI PD PI PD PI St Anthony Blvd at Stinson Pkwy 1 0 0 0 0 0 1 St Anthony Blvd at Kenzie Terrace 2 0 2 0 2 0 6 St Anthony Blvd at New Brighton Blvd 4 2 4 1 3 2 16 Stinson Blvd at 27th Street 1 0 0 0 1 1 3 Stinson Blvd at 26th Street 0 1 0 0 0 0 1 Stinson Blvd at Lowry Ave/Kenzie Terrace 0 0 3 2 1 2 8 Kenzie Terrace at Lowry Grove Entrance 0 0 0 0 0 0 0 Kenzie Terrace at Wilson Street 0 0 0 0 0 0 0 Kenzie Terrace at Autumn Wood/Apartments 0 1 0 0 0 0 1 124 125 126 TRAFFIC PROJECTIONS In order to analyze the lane configuration and traffic control needs, projected traffic volumes were determined for the area. Projected 2019 and 2030 traffic volumes were determined based on proposed anticipated future development land use in the area and the City’s current Transportation Plan. The following sections outline the traffic generation from the study area, as well as the traffic distribution and projected traffic volumes. A. Traffic Generation Traffic growth in the vicinity of a proposed site will occur between existing conditions and any given future year due to other development within the region. This background growth must be accounted for and included in future year traffic forecasts. Reviewing the historical traffic counts in the area, traffic has stayed somewhat constant or dropped in the past few years. However, in order to account for some background growth in traffic the Metropolitan Travel Demand model projection factor of 0.15% per year was used to project traffic from the 2016 counts to the 2019 and 2030 analysis years. The estimated trip generation from the Southern Gateway (revised Village LLC) development project is shown in Table 2. The trip generation used to estimate the proposed site traffic is also based on rates for other similar land uses as documented in the Institute of Transportation Engineers Trip Generation Manual, 10th Edition. The table shows the weekday AM and PM peak hour trip generation for the proposed development. Table 2 - Estimated Southern Gateway Development Site Trip Generation Planned Use Dwelling Units ADT AM Peak PM Peak Total In Out Total In Out Total In Out Apartments 225 1487 743 744 114 30 84 141 86 55 Senior Living 61 203 102 101 12 4 8 16 9 7 Townhomes 128 473 236 237 38 24 14 76 29 47 Total 414 2163 1081 1082 164 58 106 233 124 109 Source: Institute of Transportation Engineers Trip Generation Manual, 10th Edition As discussed previously the proposed Southern Gateway Development is less intense than the original The Village LLC Development. Table 3 below shows a comparison of the traffic generation that would be anticipated from the existing Mobile Home Park, assuming it fully developed; the original The Village LLC Development, and; the revised Southern Gateway Development. 127 Table 3 - Site Trip Generation Comparison Option Use Size (Units) ADT AM Peak Hour PM Peak Hour Existing Mobile Home Park 200 1298 82 118 The Village LLC Development Apartments 500 3154 249 293 Senior Living 100 319 20 26 Continuing Care Retirement Community 200 640 47 85 Townhomes 37 271 23 27 Total 837 4384 339 431 Southern Gateway Development Apartments 225 1487 114 141 Senior Living 61 203 12 16 Assisted Living 128 473 38 76 Total 414 2163 164 233 B. Traffic Distribution Area generated trips were distributed to the adjacent roadway system based on several factors including: • Previous traffic and transportation studies in the area. • Anticipated origins and destinations for specific land use (i.e. location of commercial uses in relationship to residential). • Existing travel patterns and future roadway connections. Based on these parameters the following general traffic distribution was used to distribute the projected traffic volumes in the study area: • 5% to/from the north on Stinson Blvd (CR 27) • 4% to/from north on Silver Lake Rd (CR 136) • 5% to/from northeast on New Brighton Blvd (CR 88) • 5% to/from southeast on St Anthony Blvd • 20% to/from southwest on New Brighton Blvd (CR 88) • 50% to/from south on Stinson Blvd • 6% to/from west on Lowry Ave • 1% to/from west on 26th Ave • 1% to/from west on 27th Ave • 3% to/from west on St Anthony Blvd 128 C. Projected Traffic Volumes Traffic forecasts were prepared for the year 2019 which is the year after the initial phase the proposed development is anticipated to be completed and for the 2030 conditions the Comprehensive Plan year which represents the full development of the area. The traffic forecasts were prepared by adding the projected annual background traffic growth and the projected non-development traffic growth to the existing 2016 traffic counts to determine the “No-Build” traffic conditions. It was determined that with the minimal increase in background traffic the 2019 no- build condition would be similar to the existing 2016 conditions, therefore it was not included in the analysis. The proposed development traffic was then added to the no-build traffic conditions to determine the 2019 and 2030 Build traffic conditions. As a worst case condition it was assumed that the entire site would be developed for the 2019 build condition. Figures 6 - 11 show the projected 2030 no-build, 2019 build and 2030 Build AM and PM peak hour traffic volumes. During the preparation of the previous Traffic Study concerns were raised with the amount of traffic on adjacent roadways, specifically; Stinson Parkway north and south of Kenzie Terrace (CR 153) and Lowry Avenue west of Stinson Parkway. Table 4 below shows the summary of the existing and projected traffic volumes. Table 4 – Traffic Volume Summary Location Existing 2016 2030 No-Build 2030 Build 2040 ADT ADT AM Peak PM Peak ADT AM Peak PM Peak ADT AM Peak PM Peak Stinson Pkwy - South of Kenzie Tr 8,000 698 1,053 8,200 716 1,078 9,500 806 1,203 11,500 Stinson Pkwy - North of Kenzie Tr 6,000 463 697 6,150 476 734 6,350 534 797 7,250 Lowry Ave - West of Stinson Pkwy 7,000 793 1,117 7,150 812 1,142 7,300 820 1,153 8,100 129 130 131 132 133 134 135 TRAFFIC IMPACT ANALYSIS Existing and/or forecasted traffic operations were evaluated for the intersections and driveway in the study area. The analysis was conducted for the following scenarios: 1. Existing 2016 2. Projected 2019 Build 3. Projected 2030 No-Build 4. Projected 2030 Build This section describes the methodology used to assess the operations and provides a summary of traffic operations for each scenario. A. Methodology The intersections in the corridor were evaluated during the AM and PM peak hours using Synchro/SimTraffic micro simulation software. The results are derived from established methodologies documented in the Highway Capacity Manual (HCM) 2010. The software was used to evaluate the characteristics of the roadway network including lane geometrics, turning movement volumes, traffic control and signal timing. In addition, the signal timing parameters for future year conditions were optimized using Synchro. This information was then transferred to SimTraffic (the traffic simulation model) to estimate average peak hour vehicle delays and queues. One of the primary measures of effectiveness used to evaluate intersection traffic operations, as defined in the HCM, is Level of Service (LOS) – a qualitative letter grade, A – F, based on seconds of vehicle delay due to a traffic control device at an intersection. By definition, LOS A conditions represent high quality operations (i.e., motorists experience very little delay or interference) and LOS F conditions represent very poor operations (i.e., extreme delay or severe congestion). Figure 12 depicts a graphical interpretation of delay times that define level of service. The delay thresholds are lower for un-signalized intersections than signalized intersections due to the public’s perception of acceptable delays for different traffic controls as indicated in the HCM. In accordance with the Minnesota Department of Transportation (MnDOT) guidelines, this analysis used the LOS D/E boundary as an indicator of acceptable traffic operations. 136 Figure 12: Level of Service Ranges for Signalized and Un-signalized Intersections Existing Level of Service Summary Table 5 - 2016 Existing Conditions shown below, summarizes the existing LOS at the primary intersections and driveways in the study area assuming the current lane geometry, traffic control and 2016 traffic volumes. The analysis results show that all intersection and driveways are operating at an overall LOS C or better during both the weekday AM and PM peak hours except the intersection of St Anthony Blvd at New Brighton Blvd which is operating at a LOS D during the PM Peak Hour. All movements are also operating at LOS C or better, except the following which are at LOS D or worse: • AM Peak Hour o NW left turn from St Anthony Blvd to New Brighton Blvd – LOS D o NW thru on St Anthony Blvd at New Brighton Blvd – LOS D • PM Peak Hour o NB left from New Brighton Blvd to St Anthony Blvd – LOS D o NB thru on New Brighton Blvd at St Anthony Blvd – LOS D o SB left from New Brighton Blvd to St Anthony Blvd – LOS D o SB thru on New Brighton Blvd to St Anthony Blvd – LOS D o SE left from St Anthony Blvd to New Brighton Blvd – LOS D o NW left turn from St Anthony Blvd to New Brighton Blvd – LOS E o NW thru on St Anthony Blvd at New Brighton Blvd – LOS D 80 55 35 20 10 LOS A LOS B LOS C LOS D LOS E LOS F Not CongestedCongested50 35 25 10 LOS A LOS B LOS C LOS D LOS E LOS F Not CongestedCongested15 Signalized Intersection Unsignalized IntersectionControl Delay per Vehicle (sec.)Control Delay per Vehicle (sec.)SOURCE: Level of Service thresholds from the Highway Capacity Manual, 2000. 137 Table 5: 2016 Existing Conditions Level of Service Summary Intersection AM Peak Hour PM Peak Hour LOS Overall Delay (sec/veh) LOS Overall Delay (sec/veh) St Anthony Blvd at Stinson Pkwy A (B) 8.9 C (C) 15.7 St Anthony Blvd at Kenzie Ter B (C) 16.2 B (C) 14.6 St Anthony Blvd at New Brighton Blvd B (D) 16.1 D (E) 39.9 Stinson Blvd at 27th Street A (A) 6.5 A (B) 8.9 Stinson Blvd at 26th Street A (A) 1.8 A (B) 2.4 Stinson Blvd at Lowry Ave/Kenzie Ter B (C) 14.4 C (C) 21.3 Kenzie Ter at Lowry Grove Entrance A (A) 0.4 A (B) 0.7 Kenzie Ter at Wilson Street A (A) 1.1 A (A) 1.5 Kenzie Ter at Autumn Wood/Apt B (C) 13.7 B (B) 13.9 A (A) – Overall LOS (Worst Movement LOS) Forecasted Traffic Operations A capacity and LOS analysis was completed for the study area intersections and driveways for 2019 which is the year after the proposed initial development would be completed and for the 2030 condition which represents the 20-year design timeframe assumed to be full development of the area. It was determined that with the minimal increase in background traffic the 2019 no-build condition would be similar to the existing 2016 conditions, therefore it was not included in the analysis. The results of the analysis are discussed below. Table 6 – 2030 No Build Level of Service Summary, shows that all intersection and driveways are operating at an overall LOS C or better in 2030 during both the weekday AM and PM peak hours with the existing intersection geometrics and traffic control, except the intersection of St Anthony Blvd at New Brighton Blvd which is operating at a LOS D during the PM Peak Hour. All movements are also operating at LOS C or better, however, with the increase in traffic, some movements will be operating at LOS D or worse including the following: • AM Peak Hour o NW left from St Anthony Blvd to New Brighton Blvd – LOS D o NW thru on St Anthony Blvd at New Brighton Blvd – LOS D 138 • PM Peak Hour o NB left from New Brighton Blvd to St Anthony Blvd – LOS E o NB thru on New Brighton Blvd at St Anthony Blvd – LOS D o SB left from New Brighton Blvd to St Anthony Blvd – LOS E o SB thru on New Brighton Blvd at St Anthony Blvd – LOS D o SE left from St Anthony Blvd to New Brighton Blvd – LOS D o NW left from St Anthony Blvd to New Brighton Blvd – LOS F o NW thru on St Anthony Blvd at New Brighton Blvd – LOS F o NW right from St Anthony Blvd to New Brighton Blvd – LOS E Table 6: 2030 No Build Condition Level of Service Summary Intersection AM Peak Hour PM Peak Hour LOS Overall Delay (sec/veh) LOS Overall Delay (sec/veh) St Anthony Blvd at Stinson Pkwy A (B) 9.5 C (C) 15.9 St Anthony Blvd at Kenzie Ter B (C) 18.4 B (D) 15.0 St Anthony Blvd at New Brighton Blvd B (D) 17.7 D (F) 45.7 Stinson Blvd at 27th Street A (A) 6.7 A (B) 9.0 Stinson Blvd at 26th Street A (B) 2.9 A (C) 4.7 Stinson Blvd at Lowry Ave/Kenzie Ter B (C) 18.2 D (E) 36.5 Kenzie Ter at Lowry Grove Entrance A (A) 0.6 A (B) 0.8 Kenzie Ter at Wilson Street A (B) 2.7 A (B) 3.0 Kenzie Ter at Autumn Wood/Apt B (C) 13.8 B (C) 14.3 A (A) – Overall LOS (Worst Movement LOS) Table 7 – Projected Build Level of Service Summary, shows that, similar to the no-build conditions, all intersection and driveways will be operating at an overall LOS C or better in 2019 and 2030 during both the weekday AM and PM peak hours with the existing intersection geometrics and traffic control, except the intersection of St Anthony Blvd at New Brighton Blvd which is operating at a LOS D during the PM Peak Hour. All movements are also operating at LOS C or better, however, with the increase in traffic, some movements will be operating at LOS D or worse including the following: • 2019 o NB left from New Brighton Blvd to St Anthony Blvd, PM – LOS D o NB thru on New Brighton Blvd at St Anthony Blvd, PM – LOS D o SB left from New Brighton Blvd to St Anthony Blvd, PM – LOS E o SB thru on New Brighton Blvd at St Anthony Blvd, PM – LOS D o SE left from St Anthony Blvd to New Brighton Blvd, PM – LOS D o NW left from St Anthony Blvd to New Brighton Blvd, AM - LOS D, PM – LOS E o NW thru on St Anthony Blvd at New Brighton Blvd, PM – LOS E o NW right from St Anthony Blvd to New Brighton Blvd, PM – LOS D 139 • 2030 o NB left from New Brighton Blvd to St Anthony Blvd, PM – LOS E o NB thru on New Brighton Blvd at St Anthony Blvd, PM – LOS D o SB left from New Brighton Blvd to St Anthony Blvd, PM – LOS E o SB thru on New Brighton Blvd at St Anthony Blvd, PM – LOS D o SE left from St Anthony Blvd to New Brighton Blvd, PM – LOS D o NW left from St Anthony Blvd to New Brighton Blvd, AM - LOS D, PM – LOS F o NW thru on St Anthony Blvd at New Brighton Blvd, AM – LOS D, PM – LOS F o NW right from St Anthony Blvd to NE Brighton Blvd, PM – LOS E Table 7: Build Condition Level of Service Summary Intersection 2019 2030 AM Peak Hour PM Peak Hour AM Peak Hour PM Peak Hour LOS Delay (sec/veh) LOS Delay (sec/veh) LOS Delay (sec/veh) LOS Delay (sec/veh) St Anthony Blvd at Stinson Pkwy A (B) 9.5 C (C) 15.7 A (B) 9.6 C (C) 16.0 St Anthony Blvd at Kenzie Ter B (C) 17.3 B (C) 14.7 B (C) 18.5 B (D) 15.1 St Anthony Blvd at New Brighton Blvd B (D) 16.1 D (E) 40.0 B (D) 18.1 D (F) 46.0 Stinson Blvd at 27th Street A (A) 6.6 A (B) 8.9 A (A) 6.8 A (B) 9.1 Stinson Blvd at 26th Street A (A) 2.3 A (C) 3.7 A (B) 2.9 A (C) 4.8 Stinson Blvd at Lowry Ave/Kenzie B (C) 16.3 D (E) 32.8 B (C) 18.4 D (E) 36.9 Kenzie Ter at Lowry Grove Entrance A (A) 0.4 A (B) 0.7 A (A) 0.6 A (B) 0.8 Kenzie Ter at Wilson Street A (B) 1.9 A (B) 2.1 A (B) 2.8 A (B) 3.2 Kenzie Ter at Autumn Wood/Apt B (C) 13.5 B (B) 14.0 B (C) 13.9 B (C) 14.4 A (A) – Overall LOS (Worst Movement LOS) 140 Vehicle Queuing Analysis A queuing analysis for the existing and future 2019 and 2030 conditions was conducted, evaluating the anticipated vehicle queues with the build traffic conditions. The analysis was conducted using the SimTraffic simulation software. The results found that during both the weekday AM and PM peak hours in 2019 and 2030 several movements were identified that would exceed turn lane storage. These include the following movements: • Southwest bound Silver Lake Road left turn to St Anthony Blvd will back up past existing turn storage length. • Northeast bound Kenzie Terrace right turn to St Anthony Blvd will back up past the existing right storage length. • Northwest bound St Anthony Blvd right turn and left turn to New Brighton Blvd will back up past the existing turn lane storage length. • North bound Stinson Parkway left turn to Lowry Ave will back up past the existing turn lane storage length. • West bound Lowry Avenue left turn to Stinson Parkway will back up past the existing turn lane storage length. • East bound Kenzie Terrace right turn to Stinson Parkway will back up past the existing turn lane storage length. 141 CONCLUSIONS / RECOMMENDATIONS Based on the analysis documented in this Study, WSB has concluded the following: • The proposed Southern Gateway (revised The Village LLC) development is anticipated to consist of 414 total units (200 multi-family apartment residential units, 61 senior living units and 128 assisted living units). Access from the site will be through driveway connections to Stinson Blvd at 26th Street and to Kenzie Terrace at the existing Lowry Grove entrance. • The proposed Southern Gateway (revised The Village LLC) development is anticipated to generate an additional 2,163 daily trips, 164 AM peak trips and 233 PM peak trips. The new Southern Gateway development generates less than half of what the previous development (The Village LLC) development was anticipated to generate. • Existing traffic operations analysis shows that all intersection and driveways are operating at an overall LOS C or better during both the weekday AM and PM peak hours except the intersection of St Anthony Blvd at New Brighton Blvd which is operating at a LOS D during the PM Peak Hour. There will be some movements that will be operating at LOS D or LOS E. • Intersection traffic operations for the future 2030 no-build condition show that all intersection and driveways will operate at an overall LOS C or better during both the weekday AM and PM with the existing intersection geometrics and traffic control, except the intersection of St Anthony Blvd at New Brighton Blvd which is operating at a LOS D during the PM Peak Hour. With the increase in traffic, some movements will be operating at LOS D or LOS E. • Intersection traffic operations for the future build condition show that, assuming the addition of Southern Gateway development traffic, all intersection and driveways will be operating at an overall LOS C or better in 2019 and 2030 during both the weekday AM and PM peak hours with the existing intersection geometrics and traffic control, except the intersection of St Anthony Blvd at New Brighton Blvd which is operating at a LOS D during the PM Peak Hour. With the increase in traffic, some movements will be operating at LOS D, LOS E or LOS F. • Based on the vehicle queuing analysis for the existing and future traffic conditions for weekday AM and PM peak hours several locations were identified that would exceed existing turn lane storage lengths. 142 • The Traffic Study evaluated condition for the years 2016 (existing), 2019 and 2030. Based on the analysis four intersections were identified with capacity or vehicle queueing impacts associated with the development of the proposed site. These intersections include: 1. St Anthony Blvd at Kenzie Terrace/New Brighton Blvd (CR 88) 2. St Anthony Blvd at Silver Lake Rd(CR 136)/Kenzie Terrace (CR 153) 3. Kenzie Terrace (CR 153)/NE Lowry Ave at NE Stinson Parkway 4. Kenzie Terrace (CR 153) at Proposed Site Access/Wilson Street Based on the analysis mitigation improvements are recommended for 2019 with the proposed development and by 2030 as the area continues to develop. These recommendations include: 2019 with Southern Gateway Development: 1. Request Hennepin County to optimize the signal time and coordination between the St Anthony Blvd intersections at New Brighton Blvd (CR 88) and Silver Lake Rd (CR 136)/Kenzie Terrance (CR 153). 2. Lengthen the northwest bound left turn lane from St Anthony Blvd to southbound New Brighton Blvd (CR 88) from 125 feet to 225 feet. 3. Lengthen the southwest bound left turn from Silver Lake Rd (CR 136) to southeast St Anthony Blvd from 100 feet to 175 feet. 4. Lengthen the westbound left turn from Kenzie Terrace (CR 153) to southbound NE Stinson Parkway when the Bremer Bank Building site is redeveloped. 5. Lengthen the northbound left turn from NE Stinson Parkway to westbound NE Lowry Ave from 150 feet to 250 feet. 6. At the proposed site driveway at Wilson St on Kenzie Terrace (CR 153) provide: a. Two lanes exiting the site (one left turn and one through/right lane) b. Left turn lane from Kenzie Terrace (CR 153) into the site c. Right turn lane from Kenzie Terrace (CR 153) into the site 2030 with Future Area Development: 1. Consider a dual lane roundabout or other traffic control improvements for the St Anthony Blvd intersections at New Brighton Blvd (CR 88) and Silver Lake Rd (CR 136)/Kenzie Terrance (CR 153). 2. Consider a roundabout or other traffic control improvements at the intersection of Kenzie Terrace (CR 153)/NE Lowry Ave at NE Stinson Parkway. 143 The Village LLC Development - Parking Analysis1.25.20181/31/31/31/31/31/3AL/MC ratios111123IL/MK/AF ratiosTotal Unit CountStalls Required/UnitTotal Parking DemandCommentStudioAlcove1 BR1+Den2BR3BRIndependent (IL) Senior612122IL0016142454108Assisted (AL/MC) Senior1281/363includes 20 staffAL/MC9018125063Market Rate (MR)2252450MR0799807236285635456Surface ParkingGarage ParkingTotal ParkingAvail.-Code DemandIndependent (IL) Senior34921264Assisted (AL/MC) Senior347711148Market Rate (MR)2182384566693PARKING DEMAND PER CITY ORDINANCEPARKING AVAILABILITYIncludes proof of parking on west sideCommentPARKING DEMAND ANALYSIS BY BEDROOM QUANTITY144 kaas wilson architectsUnit DataThe Village, LLCResidential Unit MixNameCount Gross Area17059-Continental-St.Anthony-Market RateUnit 0-18 639 ft²Unit 0-28 619 ft²Unit 0-361 616 ft²Unit 1-160 740 ft²Unit 1-240 824 ft²Unit 2-112 1,113 ft²Unit 2-38 1,369 ft²Unit 2-54 1,357 ft²Unit 2-64 1,085 ft²Unit 2-78 1,206 ft²Unit 3-18 1,382 ft²Unit 3-24 1,282 ft²17059-Continental-St.Anthony-Market Rate: 225225Grand total: 414414Residential Unit MixNameCount Gross Area17059-Continental-St.Anthony-Independent SeniorUnit 1-0 25.59 704 ft²Unit 1-1 25.57 795 ft²Unit 1.5-03 1,128 ft²Unit 1.5-11 1,134 ft²Unit 1.5-22 1,048 ft²Unit 1.5-36 1,071 ft²Unit 1.5-43 1,179 ft²Unit 2-03 1,406 ft²Unit 2-16 1,259 ft²Unit 2-23 1,364 ft²Unit 2.5-012 1,606 ft²Unit 2.5-16 1,432 ft²17059-Continental-St.Anthony-Independent Senior: 61 61Residential Unit MixName Count Gross Area17059-Continental-St.Anthony-Assisted SeniorUnit 0-1 1611 434 ft²Unit 1-0 2434 711 ft²Unit 1-1 2413 651 ft²Unit 1-2 242 650 ft²Unit 1-3 242 762 ft²Unit 1.5-0 3229 928 ft²Unit 1.5-1 End3 937 ft²Unit 1.5-1 End-22 886 ft²Unit 1.5-2 321 868 ft²Unit 2-1 E34.6+10 1,139 ft²Unit 2-2 35.55 1,105 ft²Unit MC 0-0 161 612 ft²Unit MC 0-1 161 533 ft²Unit MC 0-2 161 471 ft²Unit MC 0-3 165 434 ft²Unit MC 0-4 164 494 ft²Unit MC 0-5 161 509 ft²Unit MC 1-0 27.51 755 ft²Unit MC 1-1 Corner2 776 ft²17059-Continental-St.Anthony-Assisted Senior: 128128145 46,191 ft²Area777623456789757473727170696766636261605958575611121314151755545352515049483837363534333231302928272625242322212019101816474645444342414039SD_1261SD_1273SD_12831SD_1272ELEVELEV LOBBYTRASHELEVELEV LOBBYTRASHGARAGE DRSTAIRSTAIRSD_1281SD_1274UNEXCAVATED646568kaas wilson architectsThe Village, LLCAssisted Senior Garage Level Plan1/16" = 1'-0"1Level -1146 776 ft²Unit MC 1-1 Corner755 ft²Unit MC 1-0 27.5776 ft²Unit MC 1-1 Corner2,195 ft²MC Restaurant/Activity1,249 ft²Kitchen2,498 ft²Restaurant877 ft²Club Room981 ft²Lobby746 ft²Elev/Util/Stor1,139 ft²Unit 2-1 E34.6+711 ft²Unit 1-0 24711 ft²Unit 1-0 24434 ft²Unit 0-1 161,850 ft²Office1,139 ft²Unit 2-1 E34.6+434 ft²Unit 0-1 16928 ft²Unit 1.5-0 32SD_1261SD_1263SD_1273SD_1271SD_12832454434 ft²Unit MC 0-3 16494 ft²Unit MC 0-4 16494 ft²Unit MC 0-4 16471 ft²Unit MC 0-2 16509 ft²Unit MC 0-5 16711 ft²Unit 1-0 24928 ft²Unit 1.5-0 32928 ft²Unit 1.5-0 32711 ft²Unit 1-0 24711 ft²Unit 1-0 24711 ft²Unit 1-0 24928 ft²Unit 1.5-0 32711 ft²Unit 1-0 24711 ft²Unit 1-0 24937 ft²Unit 1.5-1 End1,105 ft²Unit 2-2 35.5928 ft²Unit 1.5-0 32928 ft²Unit 1.5-0 32711 ft²Unit 1-0 24928 ft²Unit 1.5-0 32651 ft²Unit 1-1 24711 ft²Unit 1-0 24651 ft²Unit 1-1 24651 ft²Unit 1-1 24434 ft²Unit MC 0-3 16494 ft²Unit MC 0-4 164,792 ft²Corridor271 ft²Stair271 ft²Stair271 ft²Stair434 ft²Unit MC 0-3 16434 ft²Unit MC 0-3 16434 ft²Unit MC 0-3 16494 ft²Unit MC 0-4 16533 ft²Unit MC 0-1 16612 ft²Unit MC 0-0 16271 ft²StairSD_1272865 ft²SupportColor Legend1BR1BR+D2BRStudioMC 1BRMC StudioCirculationCommonsMC CommonsCalculating...SD_1281SD_1274SD_1262kaas wilson architectsThe Village, LLCAssisted Senior First Floor Plan147 434 ft²Unit 0-1 16711 ft²Unit 1-0 24711 ft²Unit 1-0 241,139 ft²Unit 2-1 E34.6+928 ft²Unit 1.5-0 321,139 ft²Unit 2-1 E34.6+1,139 ft²Unit 2-1 E34.6+868 ft²2-Story Lobby434 ft²Library434 ft²Visiting Physician816 ft²Wellness1,353 ft²Community Room542 ft²Small Activity1,105 ft²Unit 2-2 35.5SD_1261SD_1263SD_1273SD_1271SD_128324Color Legend1BR1BR+D2BRStudioCirculationCommonsCalculating...54949 ft²Area732 ft²Area937 ft²Unit 1.5-1 End711 ft²Unit 1-0 241,105 ft²Unit 2-2 35.5928 ft²Unit 1.5-0 32928 ft²Unit 1.5-0 32711 ft²Unit 1-0 24928 ft²Unit 1.5-0 32651 ft²Unit 1-1 24928 ft²Unit 1.5-0 32650 ft²Unit 1-2 24711 ft²Unit 1-0 24928 ft²Unit 1.5-0 32651 ft²Unit 1-1 24711 ft²Unit 1-0 24928 ft²Unit 1.5-0 32711 ft²Unit 1-0 24928 ft²Unit 1.5-0 32711 ft²Unit 1-0 24928 ft²Unit 1.5-0 32711 ft²Unit 1-0 24434 ft²Unit 0-1 16434 ft²Unit 0-1 16651 ft²Unit 1-1 24928 ft²Unit 1.5-0 32711 ft²Unit 1-0 241,139 ft²Unit 2-1 E34.6+4'-8"16'-4"17'-8"434 ft²Unit 0-1 16651 ft²Unit 1-1 24711 ft²Unit 1-0 24711 ft²Unit 1-0 24762 ft²Unit 1-3 24886 ft²Unit 1.5-1 End-2SD_1272657 ft²Support271 ft²Stair271 ft²Stair271 ft²Stair271 ft²Stair767 ft²Area4,724 ft²CorridorSD_1281SD_1274SD_1262kaas wilson architectsThe Village, LLCAssisted Senior Second Floor Plan148 1,139 ft²Unit 2-1 E34.6+1,139 ft²Unit 2-1 E34.6+928 ft²Unit 1.5-0 32711 ft²Unit 1-0 241,105 ft²Unit 2-2 35.51,139 ft²Unit 2-1 E34.6+1,139 ft²Unit 2-1 E34.6+711 ft²Unit 1-0 24711 ft²Unit 1-0 24434 ft²Unit 0-1 16434 ft²Unit 0-1 16SD_1261SD_1263SD_1273SD_1271SD_12832454937 ft²Unit 1.5-1 End1,105 ft²Unit 2-2 35.5928 ft²Unit 1.5-0 32928 ft²Unit 1.5-0 32711 ft²Unit 1-0 24928 ft²Unit 1.5-0 32651 ft²Unit 1-1 24928 ft²Unit 1.5-0 32650 ft²Unit 1-2 24711 ft²Unit 1-0 24711 ft²Unit 1-0 24928 ft²Unit 1.5-0 32651 ft²Unit 1-1 24711 ft²Unit 1-0 24928 ft²Unit 1.5-0 32711 ft²Unit 1-0 24928 ft²Unit 1.5-0 32711 ft²Unit 1-0 24928 ft²Unit 1.5-0 32711 ft²Unit 1-0 24434 ft²Unit 0-1 16434 ft²Unit 0-1 16651 ft²Unit 1-1 24868 ft²Unit 1.5-2 32651 ft²Unit 1-1 24651 ft²Unit 1-1 24928 ft²Unit 1.5-0 32711 ft²Unit 1-0 24711 ft²Unit 1-0 24658 ft²Support651 ft²Unit 1-1 24434 ft²Unit 0-1 16886 ft²Unit 1.5-1 End-2762 ft²Unit 1-3 24928 ft²Unit 1.5-0 32928 ft²Unit 1.5-0 32SD_1272271 ft²Stair271 ft²Stair270 ft²Stair271 ft²Stair766 ft²Support4,716 ft²CorridorColor Legend1BR1BR+D2BRStudioCirculationCommonsCalculating...SD_1281SD_1274SD_1262kaas wilson architectsThe Village, LLCAssisted Senior Third Floor Plan149 4.1CMU4.2Brick4.3Brick Soldier Course4.4Stone Sill5.1Aluminum Deck Rail7.1CFB Lap Siding, Color 17.2CFB Shake Siding, Color 28.1Prefinished PTAC Grille, Color TBD8.2Prefinished Metal Magic Pak Grille, Color TBDEXTERIOR MATERIALS KEY7.3CFB Panel, Color 37.4CFB Trim, Color 3Level 1100'-0"Level 2111'-1 7/8"Level -189'-4"Level 3122'-3 3/4"Truss Brg.131'-4 7/8"Site Plan932'-0"31'-4 7/8"7.27.37.17.27.34.47.34.34.34.17.47.48.2Level 1100'-0"Level 2111'-1 7/8"Level 3122'-3 3/4"Truss Brg.131'-4 7/8"7.27.14.24.37.47.3Level 1100'-0"Level 2111'-1 7/8"Level 3122'-3 3/4"Truss Brg.131'-4 7/8"Site Plan932'-0"7.37.47.17.24.24.34.48.27.3Level 1100'-0"Level 2111'-1 7/8"Level 3122'-3 3/4"Truss Brg.131'-4 7/8"?7.17.27.2??4.47.37.4Level 1100'-0"Level 2111'-1 7/8"Level 3122'-3 3/4"Truss Brg.131'-4 7/8"7.27.37.47.14.24.34.47.37.4kaas wilson architectsThe Village, LLCAssisted Senior Exterior Elevations1/8" = 1'-0"1South Elevation1/8" = 1'-0"2Southwest End Bay Elevation1/8" = 1'-0"3Southwest Elevation1/8" = 1'-0"4Main Entry West Elevation1/8" = 1'-0"5NorthwestElevation150 4.1CMU4.2Brick4.3Brick Soldier Course4.4Stone Sill5.1Aluminum Deck Rail7.1CFB Lap Siding, Color 17.2CFB Shake Siding, Color 28.1Prefinished PTAC Grille, Color TBD8.2Prefinished Metal Magic Pak Grille, Color TBDEXTERIOR MATERIALS KEY7.3CFB Panel, Color 37.4CFB Trim, Color 3Level 1100'-0"Level 2111'-1 7/8"Level 3122'-3 3/4"Truss Brg.131'-4 7/8"7.17.47.27.37.34.24.34.47.4Level 1100'-0"Level 2111'-1 7/8"Level 3122'-3 3/4"Truss Brg.131'-4 7/8"Site Plan932'-0"31'-4 7/8"7.27.37.14.24.34.37.44.47.48.2Level 1100'-0"Level 2111'-1 7/8"Level 3122'-3 3/4"Truss Brg.131'-4 7/8"Site Plan932'-0"31'-4 7/8"7.17.37.37.37.44.24.34.37.27.28.2Level 1100'-0"Level 2111'-1 7/8"Level 3122'-3 3/4"Truss Brg.131'-4 7/8"Site Plan932'-0"7.17.27.47.37.34.24.34.4kaas wilson architectsThe Village, LLCAssisted Senior Exterior Elevations1/8" = 1'-0"1Northwest End Bay Elevation1/8" = 1'-0"2North Elevation - 11/8" = 1'-0"3North Elevation - 21/8" = 1'-0"4Northeast End Bay Elevation151 Level 1100'-0"Level 2111'-1 7/8"Level 3122'-3 3/4"Truss Brg.131'-4 7/8"Site Plan932'-0"7.27.37.47.17.34.24.34.47.4Level 1100'-0"Level 2111'-1 7/8"Level 3122'-3 3/4"Truss Brg.131'-4 7/8"Site Plan932'-0"7.37.47.27.27.37.47.14.24.34.47.4Level 1100'-0"Level 2111'-1 7/8"Level 3122'-3 3/4"Truss Brg.131'-4 7/8"Site Plan932'-0"7.27.27.37.37.37.14.24.34.47.4Level 1100'-0"Level 2111'-1 7/8"Level 3122'-3 3/4"Truss Brg.131'-4 7/8"Site Plan932'-0"7.17.27.38.27.47.44.34.24.1CMU4.2Brick4.3Brick Soldier Course4.4Stone Sill5.1Aluminum Deck Rail7.1CFB Lap Siding, Color 17.2CFB Shake Siding, Color 28.1Prefinished PTAC Grille, Color TBD8.2Prefinished Metal Magic Pak Grille, Color TBDEXTERIOR MATERIALS KEY7.3CFB Panel, Color 37.4CFB Trim, Color 3kaas wilson architectsThe Village, LLCAssisted Senior Exterior Elevations1/8" = 1'-0"1Southeast End Bay Elevation1/8" = 1'-0"2Southeast Elevation1/8" = 1'-0"3Northeast Elevation1/8" = 1'-0"4East Elevation152 32,746 ft²Garage31'-0"SD_5001SD_5011SD_5002SD_50036'-8"32,746 ft²GarageSD_5004SD_50142468135710111214131517192116182022232527242628293031323334363839353740414243444645474951485052545658606264666869707274767880828486889092918987858381797775737153555759616365679SD_0051200 ft²Stair210 ft²StairGarage Dr.BIKESBIKESTRASHkaas wilson architectsThe Village, LLCIndependent Senior Garage Plan1/16" = 1'-0"1Level -1153 patio2,683 ft²Commons1,606 ft²Unit 2.5-01,606 ft²Unit 2.5-01,617 ft²CommonsSD_5001SD_5011SD_5013SD_5012SD_5002SD_50031,128 ft²Unit 1.5-01,406 ft²Unit 2-01,259 ft²Unit 2-11,259 ft²Unit 2-11,364 ft²Unit 2-2704 ft²Unit 1-0 25.5704 ft²Unit 1-0 25.51,071 ft²Unit 1.5-31,071 ft²Unit 1.5-31,606 ft²Unit 2.5-01,606 ft²Unit 2.5-01,179 ft²Unit 1.5-4704 ft²Unit 1-0 25.51,432 ft²Unit 2.5-11,432 ft²Unit 2.5-1795 ft²Unit 1-1 25.5SD_5004SD_5014SD_005123'-7"276 ft²Stair276 ft²Stair2,355 ft²CorridorGARDENPLAZAColor Legend1 BR + DEN1BR2BR2BR+DCirculationCommonskaas wilson architectsThe Village, LLCIndependent Senior First Floor Plan1/16" = 1'-0"1Level 11,069 ft1,069 ft154 2,356 ft²Corridor1,048 ft²Unit 1.5-21,432 ft²Unit 2.5-1SD_5001SD_5011SD_5013SD_5012SD_5002SD_50031,259 ft²Unit 2-11,259 ft²Unit 2-11,606 ft²Unit 2.5-01,606 ft²Unit 2.5-01,128 ft²Unit 1.5-01,364 ft²Unit 2-2704 ft²Unit 1-0 25.5704 ft²Unit 1-0 25.51,071 ft²Unit 1.5-31,071 ft²Unit 1.5-31,179 ft²Unit 1.5-4704 ft²Unit 1-0 25.51,432 ft²Unit 2.5-11,406 ft²Unit 2-01,606 ft²Unit 2.5-01,606 ft²Unit 2.5-0795 ft²Unit 1-1 25.5795 ft²Unit 1-1 25.5795 ft²Unit 1-1 25.51,634 ft²CommonsSD_5004SD_5014SD_0051276 ft²Stair276 ft²StairColor Legend1 BR + DEN1BR2BR2BR+DCirculationCommonskaas wilson architectsThe Village, LLCIndependent Senior Second Floor Plan1/16" = 1'-0"1Level 2155 2,359 ft²Corridor1,179 ft²Unit 1.5-41,432 ft²Unit 2.5-1SD_5001SD_5011SD_5013SD_5012SD_5002SD_5003107'-8"704 ft²Unit 1-0 25.51,364 ft²Unit 2-21,259 ft²Unit 2-11,259 ft²Unit 2-11,406 ft²Unit 2-01,071 ft²Unit 1.5-31,071 ft²Unit 1.5-31,606 ft²Unit 2.5-01,606 ft²Unit 2.5-0704 ft²Unit 1-0 25.5795 ft²Unit 1-1 25.5704 ft²Unit 1-0 25.5795 ft²Unit 1-1 25.51,128 ft²Unit 1.5-01,606 ft²Unit 2.5-01,606 ft²Unit 2.5-01,432 ft²Unit 2.5-1SD_5004SD_50141,048 ft²Unit 1.5-21,134 ft²Unit 1.5-1795 ft²Unit 1-1 25.5SD_0051276 ft²Stair276 ft²Stair496 ft²CommonsColor Legend1 BR + DEN1BR2BR2BR+DCirculationCommonskaas wilson architectsThe Village, LLCIndependent Senior Third Floor Plan1/16" = 1'-0"1Level 3156 Level 1100'-0"Level 2111'-1 7/8"Level 3122'-3 3/4"Truss Brg.131'-4 7/8"Site Plan932'-0"7.17.24.27.38.27.37.47.48.24.34.3Level 1100'-0"Level 2111'-1 7/8"Level 3122'-3 3/4"Truss Brg.131'-4 7/8"Site Plan932'-0"7.47.18.27.27.27.37.44.34.38.24.3Level 1100'-0"Level 2111'-1 7/8"Level 3122'-3 3/4"Truss Brg.131'-4 7/8"Site Plan932'-0"7.37.27.28.24.2Level 1100'-0"Level 2111'-1 7/8"Level 3122'-3 3/4"Truss Brg.131'-4 7/8"Site Plan932'-0"7.37.27.18.27.34.24.34.34.17.44.1CMU4.2Brick4.3Brick Soldier Course4.4Stone Sill5.1Aluminum Deck Rail7.1CFB Lap Siding, Color 17.2CFB Shake, Color 28.2Prefinished Metal Magic Pak Grille, Color TBDEXTERIOR MATERIALS KEY7.3CFB Panel, Color 37.4CFB Trim, Color 3kaas wilson architectsThe Village, LLCIndependent Senior Exterior Elevations1/8" = 1'-0"1Elevation 31/8" = 1'-0"2Elevation 11/8" = 1'-0"3Elevation 21/8" = 1'-0"4Elevation 4157 Site Plan932'-0"7.27.47.37.28.24.27.2Level 1100'-0"Level 2111'-1 7/8"Level 3122'-3 3/4"Truss Brg.131'-4 7/8"Site Plan932'-0"7.47.17.27.47.44.3Level 1100'-0"Level 2111'-1 7/8"Level 3122'-3 3/4"Truss Brg.131'-4 7/8"Site Plan932'-0"7.27.38.27.47.14.2Level 1100'-0"Level 2111'-1 7/8"Level -189'-4"Level 3122'-3 3/4"Truss Brg.131'-4 7/8"7.47.27.17.34.28.24.14.34.3kaas wilson architectsThe Village, LLCIndependent Senior Exterior Elevations1/8" = 1'-0"1Elevation 51/8" = 1'-0"2Elevation 61/8" = 1'-0"3Elevation 71/8" = 1'-0"4Elevation 8158 79,415 ft²Garage572 ft²Trash360 ft²Trash360 ft²Trash180 ft²Elevator220 ft²Elevator180 ft²Elevator190 ft²Stair A194 ft²Stair B194 ft²Stair CC C CCCCSD_5001CCCCCCCSD_5002BIKEHVACHVACSchema 1 LegendCirculationCommonkaas wilson architectThe Village, LLCMarket Rate Building Garage Floor Plan1/16" = 1'-0"1Level -1159 140 ft²Stair D280 ft²Stair B740 ft²Unit 1-1740 ft²Unit 1-12,125 ft²Common2,265 ft²Common261 ft²Stair A616 ft²Unit 0-3616 ft²Unit 0-3619 ft²Unit 0-21,382 ft²Unit 3-1824 ft²Unit 1-2824 ft²Unit 1-2616 ft²Unit 0-3639 ft²Unit 0-15,330 ft²Corridor1,369 ft²Unit 2-3740 ft²Unit 1-11,369 ft²Unit 2-3740 ft²Unit 1-1740 ft²Unit 1-1740 ft²Unit 1-1740 ft²Unit 1-1198 ft²Trash220 ft²Elevator117 ft²Trash1,085 ft²Unit 2-6824 ft²Unit 1-21,357 ft²Unit 2-5740 ft²Unit 1-1616 ft²Unit 0-3616 ft²Unit 0-3824 ft²Unit 1-2639 ft²Unit 0-1117 ft²Trash619 ft²Unit 0-21,382 ft²Unit 3-1261 ft²Stair C824 ft²Unit 1-21,282 ft²Unit 3-2190 ft²Elevator190 ft²Elevator616 ft²Unit 0-3616 ft²Unit 0-3616 ft²Unit 0-3616 ft²Unit 0-3616 ft²Unit 0-3740 ft²Unit 1-1616 ft²Unit 0-3SD_5001616 ft²Common824 ft²Unit 1-2824 ft²Unit 1-21,113 ft²Unit 2-11,113 ft²Unit 2-11,206 ft²Unit 2-7740 ft²Unit 1-1740 ft²Unit 1-1740 ft²Unit 1-1740 ft²Unit 1-11,206 ft²Unit 2-7740 ft²Unit 1-1824 ft²Unit 1-2740 ft²Unit 1-11,113 ft²Unit 2-1SD_5002SD_50110SD_5019SD_5018SD_5017SD_5016SD_5015SD_5014SD_5013SD_5012SD_5011SD_5005SD_5004PLAZAPOOLLANSCAPEPUTTING616 ft²Unit 0-3616 ft²Unit 0-3Schema 1 Legend1 BR2 BR3BRCirculationCommonSTUDIOkaas wilson architectThe Village, LLCMarket Rate Building First Floor Plan1/16" = 1'-0"1Level 1160 190 ft²Elevator117 ft²Trash619 ft²Unit 0-21,382 ft²Unit 3-1261 ft²Stair A616 ft²Unit 0-3616 ft²Unit 0-3824 ft²Unit 1-2824 ft²Unit 1-2639 ft²Unit 0-1616 ft²Unit 0-31,369 ft²Unit 2-3740 ft²Unit 1-11,369 ft²Unit 2-3740 ft²Unit 1-1740 ft²Unit 1-1740 ft²Unit 1-1740 ft²Unit 1-1280 ft²Stair B616 ft²Unit 0-33,150 ft²Corridor220 ft²Elevator198 ft²Trash740 ft²Unit 1-1740 ft²Unit 1-1616 ft²Unit 0-3140 ft²Stair D824 ft²Unit 1-21,085 ft²Unit 2-61,357 ft²Unit 2-5740 ft²Unit 1-1616 ft²Unit 0-3616 ft²Unit 0-3639 ft²Unit 0-1824 ft²Unit 1-2117 ft²Trash619 ft²Unit 0-21,382 ft²Unit 3-1261 ft²Stair C824 ft²Unit 1-21,282 ft²Unit 3-2190 ft²Elevator616 ft²Unit 0-3616 ft²Unit 0-3616 ft²Unit 0-3616 ft²Unit 0-3616 ft²Unit 0-3616 ft²Unit 0-3740 ft²Unit 1-1SD_5001824 ft²Unit 1-2824 ft²Unit 1-2740 ft²Unit 1-1740 ft²Unit 1-1740 ft²Unit 1-1740 ft²Unit 1-1740 ft²Unit 1-1740 ft²Unit 1-1824 ft²Unit 1-21,206 ft²Unit 2-71,206 ft²Unit 2-71,113 ft²Unit 2-11,113 ft²Unit 2-11,113 ft²Unit 2-1SD_5002SD_50110SD_5019SD_5018SD_5017SD_5016SD_5015SD_5014SD_5013SD_5012SD_5011SD_5005SD_50041,885 ft²Corridor121'-7 7/16"TWO STORY SPACE616 ft²Unit 0-3616 ft²Unit 0-3616 ft²Unit 0-3Schema 1 Legend1 BR2 BR3BRCirculationCommonSTUDIO9'-4"14'-8"kaas wilson architectThe Village, LLCMarket Rate Second Floor Plan1/16" = 1'-0"1Level 2161 261 ft²Stair A616 ft²Unit 0-3616 ft²Unit 0-3117 ft²Trash619 ft²Unit 0-21,382 ft²Unit 3-1190 ft²Elevator824 ft²Unit 1-2639 ft²Unit 0-1824 ft²Unit 1-2616 ft²Unit 0-31,369 ft²Unit 2-31,369 ft²Unit 2-3740 ft²Unit 1-1740 ft²Unit 1-1740 ft²Unit 1-1740 ft²Unit 1-1740 ft²Unit 1-1740 ft²Unit 1-1280 ft²Stair B616 ft²Unit 0-35,330 ft²Corridor198 ft²Trash616 ft²Unit 0-3824 ft²Unit 1-2824 ft²Unit 1-21,357 ft²Unit 2-51,085 ft²Unit 2-6616 ft²Unit 0-3616 ft²Unit 0-3639 ft²Unit 0-1117 ft²Trash619 ft²Unit 0-21,382 ft²Unit 3-1261 ft²Stair C824 ft²Unit 1-21,282 ft²Unit 3-2824 ft²Unit 1-2740 ft²Unit 1-1190 ft²Elevator824 ft²Unit 1-2616 ft²Unit 0-3616 ft²Unit 0-3616 ft²Unit 0-3616 ft²Unit 0-3616 ft²Unit 0-3220 ft²Elevator824 ft²Unit 1-2824 ft²Unit 1-2824 ft²Unit 1-2740 ft²Unit 1-1740 ft²Unit 1-1616 ft²Unit 0-3SD_5001824 ft²Unit 1-21,113 ft²Unit 2-11,113 ft²Unit 2-11,206 ft²Unit 2-7740 ft²Unit 1-1740 ft²Unit 1-1740 ft²Unit 1-1740 ft²Unit 1-11,206 ft²Unit 2-7740 ft²Unit 1-1824 ft²Unit 1-2740 ft²Unit 1-11,113 ft²Unit 2-1SD_5002SD_50110SD_5019SD_5018SD_5017SD_5016SD_5015SD_5014SD_5013SD_5012SD_5011SD_5005SD_5004616 ft²Unit 0-3616 ft²Unit 0-3616 ft²Unit 0-3Schema 1 Legend1 BR2 BR3BRCirculationCommonSTUDIOkaas wilson architectThe Village, LLCMarket Rate Third Floor Plan1/16" = 1'-0"1Level 3162 198 ft²Trash616 ft²Unit 0-3616 ft²Unit 0-3616 ft²Unit 0-3616 ft²Unit 0-3616 ft²Unit 0-3616 ft²Unit 0-3740 ft²Unit 1-1740 ft²Unit 1-1220 ft²Elevator5,330 ft²Corridor616 ft²Unit 0-3280 ft²Stair B740 ft²Unit 1-1740 ft²Unit 1-1740 ft²Unit 1-1740 ft²Unit 1-11,369 ft²Unit 2-3740 ft²Unit 1-11,369 ft²Unit 2-3616 ft²Unit 0-3639 ft²Unit 0-1117 ft²Trash619 ft²Unit 0-21,382 ft²Unit 3-1261 ft²Stair A616 ft²Unit 0-3616 ft²Unit 0-3824 ft²Unit 1-2824 ft²Unit 1-2190 ft²Elevator824 ft²Unit 1-2616 ft²Unit 0-3824 ft²Unit 1-2824 ft²Unit 1-21,357 ft²Unit 2-51,085 ft²Unit 2-6740 ft²Unit 1-1824 ft²Unit 1-21,282 ft²Unit 3-2117 ft²Trash616 ft²Unit 0-3616 ft²Unit 0-3639 ft²Unit 0-1619 ft²Unit 0-21,382 ft²Unit 3-1261 ft²Stair C824 ft²Unit 1-2190 ft²Elevator824 ft²Unit 1-2824 ft²Unit 1-2824 ft²Unit 1-2740 ft²Unit 1-1SD_5001824 ft²Unit 1-21,113 ft²Unit 2-11,113 ft²Unit 2-11,206 ft²Unit 2-7740 ft²Unit 1-1740 ft²Unit 1-1740 ft²Unit 1-1740 ft²Unit 1-11,206 ft²Unit 2-7740 ft²Unit 1-1824 ft²Unit 1-2740 ft²Unit 1-11,113 ft²Unit 2-1SD_5002SD_50110SD_5019SD_5018SD_5017SD_5016SD_5015SD_5014SD_5013SD_5012SD_5011SD_5005SD_5004616 ft²Unit 0-3616 ft²Unit 0-3616 ft²Unit 0-3Schema 1 Legend1 BR2 BR3BRCirculationCommonSTUDIOkaas wilson architectThe Village, LLCMarket Rate Fourth Floor Plan1/16" = 1'-0"1Level 4163 Level 1100'-0"Level 2111'-1 7/8"Level -189'-4"Level 3122'-3 3/4"Level 4133'-5 5/8"Truss Brg.142'-6 3/4"Site Plan932'-0"7.17.24.35.15.27.27.28.24.24.4Site Plan932'-0"4.27.17.28.27.25.25.17.24.34.44.1Level 1100'-0"Level 2111'-1 7/8"Level 3122'-3 3/4"Level 4133'-5 5/8"Truss Brg.142'-6 3/4"Site Plan932'-0"7.17.25.14.37.24.35.24.4Site Plan932'-0"7.17.25.17.25.24.34.24.44.1Architectural Rockface CMU - Color TBD4.2Brick Masonry - Color TBD4.3Brick Soldier Course - Color TBD4.4Stone Still - Color TBD5.1Aluminum Deck Rail - Color TBD7.1Cement Fiber Lap Siding - Color TBD7.2Cement Fiber Panel Siding - Color TBD8.2Prefinished Metal Magic Pak Grille, Color TBDEXTERIOR MATERIALS KEY5.2Metal Panel Cladding - Color TBDkaas wilson architectThe Village, LLCMarket Rate Building Exterior Elevations3/32" = 1'-0"1Elevation - North 13/32" = 1'-0"2Elevation - Northeast3/32" = 1'-0"4Elevation - Northwest - Stinson3/32" = 1'-0"5Elevation - West - Stinson164 Site Plan932'-0"7.15.18.24.44.34.27.25.27.27.24.14.4Site Plan932'-0"7.25.15.27.24.44.34.24.14.4Site Plan932'-0"5.27.27.27.24.44.34.27.18.25.1Site Plan932'-0"7.18.27.25.14.24.34.4Level 1100'-0"Level 2111'-1 7/8"Level 3122'-3 3/4"Level 4133'-5 5/8"Truss Brg.142'-6 3/4"Site Plan932'-0"7.27.27.24.44.34.27.15.27.27.25.1Site Plan932'-0"5.27.28.27.15.17.24.44.34.27.2Site Plan932'-0"7.27.15.14.44.34.28.2Site Plan932'-0"5.27.27.27.18.24.14.44.34.25.1Site Plan932'-0"7.25.14.44.34.25.27.2Site Plan932'-0"5.27.24.44.37.27.14.27.25.25.14.1Architectural Rockface CMU - Color TBD4.2Brick Masonry - Color TBD4.3Brick Soldier Course - Color TBD4.4Stone Still - Color TBD5.1Aluminum Deck Rail - Color TBD7.1Cement Fiber Lap Siding - Color TBD7.2Cement Fiber Panel Siding - Color TBD8.2Prefinished Metal Magic Pak Grille, Color TBDEXTERIOR MATERIALS KEY5.2Metal Panel Cladding - Color TBDkaas wilson architectThe Village, LLCMarket Rate Building Exterior Elevations3/32" = 1'-0"1Elevation - West End - South3/32" = 1'-0"2Elevation - West End- East3/32" = 1'-0"3Elevation - West End - North3/32" = 1'-0"4Elevation - Interior Courtyard - East 13/32" = 1'-0"5Elevation - Interior Courtyard - East 23/32" = 1'-0"6Elevation - Interior Courtyard - South3/32" = 1'-0"7Elevation - Interior Courtyard - West 23/32" = 1'-0"8Elevation - East End - North3/32" = 1'-0"9Elevation - East End - West3/32" = 1'-0"10Elevation - East End - South165 THIS PAGE LEFT INTENTIONALLY BLANK 166                                                                                            178 East 9th Street, Suite 200 | St. Paul, MN 55101 | (651) 286-8450     Building a legacy – your legacy. Equal Opportunity Employer | wsbeng.com  S:\1Planning Commission\2018\02262018\Village Development - Plan Review - 021318-engineer.docx February 13, 2018 Ms. Traci Tomas Continental Property Group Re: The Village LLC Development St. Anthony Village, MN Preliminary PUD Plan Review WSB Project No. 02170-300 Dear Ms. Tomas: We have reviewed the development plan submittal received on January 29, 2018, for the above referenced project. Plans have been prepared by Wenck Associates, dated January 26, 2017 and include the storm water management plan, preliminary plat, site plan, grading plan, sanitary sewer, water, and storm utility plans. We have the following comments and recommendations for this preliminary PUD Plan review. General 1. Prior to the start of any construction, permits will need to be obtained and submitted to the city from the following agencies: a. MPCA Construction General Permit b. MPCA Sanitary Sewer Extension Permit c. MnDOH Watermain Extension Permit 2. Prior to the start of any construction, project approval will need to be obtained and submitted to the city from the following agencies: a. Hennepin County (access and traffic control associated with Kenzie Terrace/ CR 153) b. Minneapolis Park Board (access and traffic control associated with Stinson Parkway) 3. An operations and maintenance component will be required to ensure that the stormwater treatment facilities will be maintained long term. The declarations must at a minimum include the following: a. Annual inspection and reporting to the city b. Maintenance of all erosion control measures including, but not limited to: rip rap, storm sewer outlets, catch basin inlets, etc. (annual documentation required) c. Verification of system drawdowns with 48 hours (annual documentation required) d. Removal of sediment, trash and debris (annual documentation required) Cover Sheet and Project Notes 1. Reference the most recent edition (2018) of the City of St. Anthony’s General Specifications and Standard Detail Plates for Street and Utility Construction as a governing specification. Preliminary Plat 1. Remove the erroneous line within the 15’ drainage and utility easement along Kenzie Terrace. 167 Mr. Ward  January 15, 2018  Page 2   S:\1Planning Commission\2018\02262018\Village Development - Plan Review - 021318-engineer.docx 2. Simplify the drainage and utility easements around the ponds and along the west side of the development by squaring them off and combining them with nearby and adjacent drainage and utility easements. 3. Provide an easement for the shared hydrant service lead crossing over between both lots 1 and 2 of block 1. Existing Conditions, Erosion, and Sediment Control 1. Submit erosion control plans with final plat/construction plan submittal. Site Plan 1. Provide 6’ wide concrete walks per City standards where 5’ concrete walks are currently shown. 2. Show necessary removals for the installation of the proposed utilities along Kenzie Terrace/ CR 153. Grading Plan 1. Structural calculations for the proposed retaining walls greater than 4.0’ in height need to be submitted for review prior to construction of the walls. The submittal will need to include: a. Certification of a qualified MN licensed professional b. Soil boring logs and geotechnical recommendation for support c. Identify the type of material for the wall and design details d. Provide details of the wall construction e. Provide a safety railing or fence above the wall 2. Driveway ramps into the buildings should not exceed 10%. 3. The outdoor patios and plazas with the buildings do not appear to have any slope. How will surface drainage be accomplished? 4. The NWL of the southwestern stormwater pond is the same elevation as the Multi-residential 1 garage floor (912.0). 5. The HWL of both ponds exceed the garage levels of the connected buildings. 6. Demonstrate how the proposed improvements accommodate for the current ground water elevations. 7. There are areas where the slopes shown do not meet the minimum required 2% or exceed the maximum allowed 3:1. 8. The driveway elevations at the top of the ramps need to be raised to achieve a minimum 1’ freeboard above the adjacent road’s EOF. Sanitary Sewer and Watermain 1. There appears to be a conflict between the storm sewer and sanitary sewer service to the assisted senior living facility. 168 Mr. Ward  January 15, 2018  Page 3   S:\1Planning Commission\2018\02262018\Village Development - Plan Review - 021318-engineer.docx 2. Provide 4” thickness of insulation at watermain and storm sewer crossings where storm sewer and drainage structures provide less than 3.5 feet of cover (not 2.0’) over the watermain. 3. Verify an 8” watermain as proposed will provide adequate fire flow and pressure to serve the number of units and building elevations being proposed. 4. Water and sanitary sewer connections to buildings must conform to the plumbing code as interpreted by the local building officials. 5. The applicant shall include a drain tile system behind the curbs to convey sump pump discharge from the units as detailed in the City Standard Specifications. 6. The proposed 24” pipe between Ex. Structure 16 and MH 1 appears to be oversized assuming it is proposed to take the existing 9” line from the west and the proposed 10” line from the development. 7. Due to the depth, this pipe should be shown as SDR 26 with the construction plans and the adjacent storm sewer should be shown as being impacted with construction. 8. Provide for granular bedding for installed utility pipe in unsuitable materials per the applicable City standard detail plate. 9. Show and call out the size and material of the existing waterlines where the development is connecting on the west and south. 10. The Independent Senior Living facility is shown with an 8” DIP service while the other facilities were shown with 6” DIP services. Was this done by design? 11. Provide 45-degree bends in lieu of 90-degree bends near the western connection with the existing watermain. 12. Place a hydrant at the original proposed location along Kenzie Terrace near the connection to the existing watermain on the south side of the development. The main can be capped/plugged at that point. Detail Sheet 1. Include all applicable standard detail plates from the most recent edition (2018) of the City of St. Anthony’s General Specifications and Standard Detail Plates for Street and Utility Construction for project construction. Thank you for the opportunity to provide comments on this project. If you have any questions, please do not hesitate to contact me at 763-287-7182. Sincerely, WSB & Associates, Inc. Todd Hubmer, PE City Engineer 169 THIS PAGE LEFT INTENTIONALLY BLANK 170 701 Xenia Avenue South | Suite 300 | Minneapolis, MN 55416 | (763) 541-4800 Building a legacy – your legacy. Equal Opportunity Employer | wsbeng.com C:\Users\jabramson\FROM KP\Joey's Projects Transfer\St Anthony Village\SAV - The Village LLC Stormwater Management Review Memo - 02-16-2018.docx Memorandum To: Breanne Rothstein From: Joey Abramson Cc: Todd Hubmer Date: February 16, 2018 Re: The Village LLC Development Stormwater Management Review WSB has reviewed the stormwater management memorandum produced by Wenck for the above project dated January 26, 2018. The review has found that the project complies with applicable freeboard and rate control stormwater management regulations. The applicant needs to provide updated information related to water quality treatment. See comments below. Comments on the stormwater management plan include the following: - Ponds should be labeled on the plans to correspond to the IDs in the report and models: North Pond should include “1P” and South Pond should include “2P” - The EOF for Pond 2P (south) is noted to be “18.90” on the plans, but is noted as 919.0 in the stormwater management report. - The report notes that the proposed development will achieve 65% TP loading reduction (page 1) but the table indicates that 72% removals will be achieved. Revise for consistency. - It should be considered that unless the BayFilter is capable of removing dissolved phosphorus from stormwater, its efficacy will likely be reduced from 50% removal if it is downstream of the sedimentation ponds. This is because those ponds already remove a large portion of the particulate phosphorus. Applicant must provide clarification on the BayFilter removal abilities or provide updated calculations for removals. 171 THIS PAGE LEFT INTENTIONALLY BLANK 172 BREMER BANK PARCEL 716.23 432.18S 01° 07' 07" E 3.02S 39°13'04" E1041.74ALLEY232.76100.00S 50°46'56" WN 89°07'06" E947.20564.06S 50°33'24" WPARCEL 1PARCEL 2PARCEL 3KENZIE TERRACE(CO. RD. NO. 153)STINSON PARKWAY1027.85N 00°36'35" EALLEY21BLOCK ONEOUTLOT ABLOCK TWO1137494 S.F.3.16 AC.191086 S.F.4.39 AC.274811 S.F.6.31 AC.N89°18'31"E295.01S0°06'35"E 225.89L=176.80R=851.73Δ=11°53'36"PROPOSEDDRAINAGE ANDUTILITY EASEMENT(48,669 S.F.)PROPOSED DRAINAGE & UTILITY EASEMENT OVERALL OF OUTLOT AN0°06'31"W 311.67Parcel 1:That part of the South 1/2 of the Northwest Quarter of Section 7, Township 29, Range 23, beginning at apoint in the South line of said Tract 100 feet East of the Southwest corner thereof; thence North 1079.8 feet;thence East parallel to the South line of said Quarter Section 1041.74 feet; thence South to center of StateHighway No. 63; thence southwesterly along said center line of State Highway No. 63 and St. Anthony andTaylor Falls Road to intersection of center line of said road with the South line of said Quarter Section;thence West along said latter line to the point of beginning, except that part thereof embraced in the South365 feet of the West 395 feet of the Southwest Quarter of the Northwest Quarter of said Section 7 andexcept the easterly 100 feet thereof.Except that part taken for highway purposes by the County of Hennepin as evidenced by Final Certificate,filed May 16, 1985, as Document No. 1652500.Parcel 2:That part of the following described property:The Easterly 100 feet of that part of the South half of the Northwest Quarter, Section 7, Township 29, Range23, beginning at a point in the South line of said Tract 100 feet East of the Southwest corner thereof, thenceNorth 1079.8 feet, thence East parallel to the South line of said quarter section 1041.74 feet; thence Southto center of State Highway No. 63; thence Southwesterly along said center line of State Highway 63 and St.Anthony and Taylor Falls Road to intersection of center line of said road with the South line of said quartersection; thence West along said latter line to the point of beginning,lying Westerly of the following described line and its Southerly extension,Beginning at a point on the North line of the above described Tract, distant 5.50 feet easterly of theNorthwest corner thereof, assumed bearing of said North line is North 89 degrees 24 minutes 53 secondsEast; thence South 01 degree 00 minutes 45 seconds East a distance of 486.65 feet, more or less, to theSouth line of the above described tract and there terminating.Parcel 3:That part of the Northwest Quarter of Section 7, Township 29, Range 23, described as commencing at apoint on the South line of said Northwest Quarter distant 100 feet Easterly from the Southwest corner of saidNorthwest Quarter; thence Northerly parallel with the West line of said Northwest Quarter to the South lineof MURRAY HEIGHTS ADDITION TO MINNEAPOLIS, being the actual point of beginning; thence Southerlyalong said parallel line to a point distant 1079.8 feet Northerly from said South line of the Northwest Quarter;thence on an assumed bearing of North 89 degrees 24 minutes 53 seconds East, parallel with the South lineof said Northwest Quarter a distance of 947.24 feet; thence North 01 degree 00 minutes 45 seconds East tosaid South line of MURRAY HEIGHTS ADDITION TO MINNEAPOLIS; thence Westerly along the lastdescribed line to the point of beginning.All situated in the County of Hennepin and State of Minnesota.Torrens PropertyBeing registered land as evidenced by Certificate of Title No. 10665952501 Lowry Avenue NE,St. Anthony, MN 55418WENCK ASSOCIATES INC.1800 PIONEER CREEK CENTERMAPLE PLAIN MN, 55359SURVEYS BASED ON ALTA/ACSM LAND TITLE SURVEY PREPARED BY PREMIERLAND SURVEYING, LLC, DATED JUNE 6, 2016 AND CERTIFICATE OF SURVEY BYCLARK ENGINEERING DATED MAY 3, 2010.THE VILLAGE LLC1907 WAYZATA BLVD. E. #250WAYZATA, MN 55391DECEMBER 20, 2017TOTAL AREA TO BE PLATTED = 669,816 S.F. (15.38 AC.) ±2501 LOWRY AVENUE NE, ST. ANTHONY, MN 55418EXSTING IMPROVEMENTS AND UNDERLYING PROPERTY INFORMATION ARESHOWN LIGHTLY IN THE BACKGROUND.DRAINAGE AND UTILITY EASEMENTS SHOWN BEING FIVE FEET IN WIDTH ANDADJOINING SIDE LOT LINES, AND BEING 10 FEET IN WIDTH AND ADJOININGREAR LOT LINES, UNLESS OTHERWISE SHOWN.THE VILLAGE LLCDEVELOPMENTDrawn By:Issue Date:Project #:5005-0003RAGTHE VILLAGE LLC DEVELOPMENTTHE VILLAGE, LLC1907 WAYZATA BLVD, SUITE 250M:\5005\0003\DESIGN\SURVEY\5005-0003preplat3.dwgDescription:Date:WAYZATA, MN 55391Issue #:ST. ANTHONY VILLAGE, MINNESOTA12/06/20171Issue #Prepared For:XX/XX/XXXX DESCRIPTION ISSUE #Sheet #:Sheet Title:1/25/2018 2:01:51 PMDate:I HEREBY CERTIFY THAT THIS PLAN,SPECIFICATION, OR REPORT WASPREPARED BY ME OR UNDER MYDIRECT SUPERVISION AND THAT I AM ADULY REGISTERED PROFESSIONALENGINEER UNDER THE LAWS OF THESTATE OF MINNESOTA.License #:WARNING:THE CONTRACTOR SHALL BE RESPONSIBLE FOR CALLING FOR LOCATIONS OF ALL EXISTING UTILITIES. THEY SHALLCOOPERATE WITH ALL UTILITY COMPANIES IN MAINTAINING THEIR SERVICE AND/OR RELOCATION OF LINES.THE CONTRACTOR SHALL CONTACT GOPHER STATE ONE CALL AT 651-454-0002 AT LEAST 48 HOURS IN ADVANCE FORTHE LOCATIONS OF ALL UNDERGROUND WIRES, CABLES, CONDUITS, PIPES, MANHOLES, VALVES OR OTHER BURIEDSTRUCTURES BEFORE DIGGING. THE CONTRACTOR SHALL REPAIR OR REPLACE THE ABOVE WHEN DAMAGED DURINGCONSTRUCTION AT NO COST TO THE OWNER.TWIN CITY AREA: 651-454-0002TOLL FREE 1-800-252-1166CALL BEFORE YOU DIGWENCK ASSOCIATES INC.1800 PIONEER CREEK CENTERMAPLE PLAIN MN, 55359C-101PRELIMINARYPLATAccess Easement for futuresite access when BremerBank Site RedevelopsAccess Easement for futuresite access when BremerBank Site RedevelopsNeed to dedicateadditional right ofway fully coversidewalk andboulevard in right ofwayNeed to dedicateadditional right ofway fully cover rightturn lane, sidewalkand boulevard inright of wayNeed corner cutsto accommodateradii, signage, etcwithin theintersectionNeed sighteasement (Note thespelling is sight, notsite) to cover sightdistance forvehicles comingaround the curve173 C-104SITE PLANDrawn By:Issue Date:Project #:5005-0003RAGTHE VILLAGE LLC DEVELOPMENTTHE VILLAGE, LLC1907 WAYZATA BLVD, SUITE 250M:\5005\0003\DESIGN\CAD\PLANSHEETS\C-104 Site Plan.dwgDescription:Date:WAYZATA, MN 55391Issue #:ST. ANTHONY VILLAGE, MINNESOTA12/06/20171Issue #Prepared For:XX/XX/XXXXDESCRIPTIONISSUE #Sheet #:Sheet Title:1/25/2018 2:04:12 PMDate:I HEREBY CERTIFY THAT THIS PLAN,SPECIFICATION, OR REPORT WASPREPARED BY ME OR UNDER MYDIRECT SUPERVISION AND THAT I AM ADULY REGISTERED PROFESSIONALENGINEER UNDER THE LAWS OF THESTATE OF MINNESOTA.License #:WARNING:THE CONTRACTOR SHALL BE RESPONSIBLE FOR CALLING FOR LOCATIONS OF ALL EXISTING UTILITIES. THEY SHALLCOOPERATE WITH ALL UTILITY COMPANIES IN MAINTAINING THEIR SERVICE AND/OR RELOCATION OF LINES.THE CONTRACTOR SHALL CONTACT GOPHER STATE ONE CALL AT 651-454-0002 AT LEAST 48 HOURS IN ADVANCE FORTHE LOCATIONS OF ALL UNDERGROUND WIRES, CABLES, CONDUITS, PIPES, MANHOLES, VALVES OR OTHER BURIEDSTRUCTURES BEFORE DIGGING. THE CONTRACTOR SHALL REPAIR OR REPLACE THE ABOVE WHEN DAMAGED DURINGCONSTRUCTION AT NO COST TO THE OWNER.TWIN CITY AREA: 651-454-0002TOLL FREE 1-800-252-1166CALL BEFORE YOU DIGSITE ANALYSIS TABLEEXISTING ZONING R1 SINGLE FAMILY RESIDENTIALLOT AREA±669,585 SF (±15.4 AC)TOTAL BUILDING AREA±134,593 SF (20.1%)GREENSPACE SUMMARYIMPERVIOUS AREA (INCL. BLDG AND POND)PROPOSEDPERVIOUS AREABL. 1 LT. 1 - IND. LIVINGPARKING STALLS SUMMARY RAMPPARKWAYBL. 2 LT. 1 - MULTI RES.SETBACK SUMMARYBUILDINGEAST30'WESTNORTHPROPOSED ZONING PUD - PLANNED UNIT DEVELOPMENT20'20'20'SOUTHEAST±378,084 SF (8.68 AC)BL. 1 LT. 2 - AST. LIVINGSOUTHWEST20'INTERNAL0'ADA30TOT4301156145061STANDARDSURFACEADDITIONAL PROOF STALLS37 370TOTAL PARKING COUNTRAMP SURFACE0000±291,501 SF (6.69 AC)8886231447126124358405 273 15 13 706PROPERTY LINESITE LEGENDSETBACK LINEEASEMENT LINEPROPOSED CURB AND GUTTERBITUMINOUS PAVEMENTCONCRETE SIDEWALK PAVEMENT.CONSTRUCTION LIMITSNeed to removeexisting drivewayapron and placefull height curb andgutterNeed to close offmedianLength of Left TurnLane appears tooshort, need toextendWe stronglyencourage parking beremoved within thefunctional area of theintersectionHas autoturn beenrun to determinevehicle movements& radii work?(besides fire trucks)Need to submit turnlane design details(Examples includecross slopes,pavement Designmatching theexisting, striping,signing, storm, etc)174 C-105SITE PLANNORTHDrawn By:Issue Date:Project #:5005-0003RAGTHE VILLAGE LLC DEVELOPMENTTHE VILLAGE, LLC1907 WAYZATA BLVD, SUITE 250M:\5005\0003\DESIGN\CAD\PLANSHEETS\C-105 Site Plan North.dwgDescription:Date:WAYZATA, MN 55391Issue #:ST. ANTHONY VILLAGE, MINNESOTA12/06/20171Issue #Prepared For:XX/XX/XXXXDESCRIPTIONISSUE #Sheet #:Sheet Title:1/25/2018 2:04:53 PMDate:I HEREBY CERTIFY THAT THIS PLAN,SPECIFICATION, OR REPORT WASPREPARED BY ME OR UNDER MYDIRECT SUPERVISION AND THAT I AM ADULY REGISTERED PROFESSIONALENGINEER UNDER THE LAWS OF THESTATE OF MINNESOTA.License #:WARNING:THE CONTRACTOR SHALL BE RESPONSIBLE FOR CALLING FOR LOCATIONS OF ALL EXISTING UTILITIES. THEY SHALLCOOPERATE WITH ALL UTILITY COMPANIES IN MAINTAINING THEIR SERVICE AND/OR RELOCATION OF LINES.THE CONTRACTOR SHALL CONTACT GOPHER STATE ONE CALL AT 651-454-0002 AT LEAST 48 HOURS IN ADVANCE FORTHE LOCATIONS OF ALL UNDERGROUND WIRES, CABLES, CONDUITS, PIPES, MANHOLES, VALVES OR OTHER BURIEDSTRUCTURES BEFORE DIGGING. THE CONTRACTOR SHALL REPAIR OR REPLACE THE ABOVE WHEN DAMAGED DURINGCONSTRUCTION AT NO COST TO THE OWNER.TWIN CITY AREA: 651-454-0002TOLL FREE 1-800-252-1166CALL BEFORE YOU DIGPROPERTY LINESITE LEGENDSETBACK LINEEASEMENT LINEPROPOSED CURB AND GUTTERBITUMINOUS PAVEMENTCONCRETE SIDEWALK PAVEMENT.321456789101112131415B612 CURB AND GUTTERB612 TIP-OUT CURB AND GUTTERMOUNTABLE CURB AND GUTTER2' WIDE CONCRETE VALLEY GUTTERBITUMINOUS PAVEMENT5' WIDE CONCRETE SIDEWALK6' WIDE CONCRETE TRAIL8' WIDE BITUMINOUS TRAILCONCRETE DRIVEWAY APRONMATCH INTO EXISTING PAVEMENTMATCH INTO EXISTING CURB AND GUTTERMATCH INTO EXISTING SIDEWALKPATCH BITUMINOUS PAVEMENT1617KEYNOTE LEGEND18192021222324252627PARALLEL PARKING STALLS - 22' X 8.5' TYP.STANDARD PARKING STALL - 9' X 18' TYP.ADA PARKING STALLS WITH ACCESS AISLE & CURB RAMPPLAZA - SEE ARCH. AND LANDSCAPE PLANSPATIO - SEE ARCH. AND LANDSCAPE PLANSPROPERTY LINERETAINING WALL W/ RAILING. SEE ARCH. FOR RAILINGFENCE - SEE LANDSCAPING PLANS4" STRIPINGDOG PARKTOT LOT/COMMUNITY AREAADA PEDESTRIAN RAMPGARAGE ENTRANCEBUILDING SETBACKLOT LINEDECORATIVE PAVEMENT SEE LANDSCAPE PLANSRAILING - SEE ARCH. PLANSSTREET LIGHTCROSSWALK2829303132With existing curbbeing integral totravel lanepavement, fullconcrete panelmust be replacedwhen CB is moved.With existing curbbeing integral totravel lanepavement, fullconcrete panelmust be replacedwhen CB is moved.Right of way shouldcover to 1' behindback of sidewalk6' boulevard175 C-106SITE PLANSOUTHDrawn By:Issue Date:Project #:5005-0003RAGTHE VILLAGE LLC DEVELOPMENTTHE VILLAGE, LLC1907 WAYZATA BLVD, SUITE 250M:\5005\0003\DESIGN\CAD\PLANSHEETS\C-106 Site Plan South.dwgDescription:Date:WAYZATA, MN 55391Issue #:ST. ANTHONY VILLAGE, MINNESOTA12/06/20171Issue #Prepared For:XX/XX/XXXX DESCRIPTION ISSUE #Sheet #:Sheet Title:1/25/2018 2:33:23 PMDate:I HEREBY CERTIFY THAT THIS PLAN,SPECIFICATION, OR REPORT WASPREPARED BY ME OR UNDER MYDIRECT SUPERVISION AND THAT I AM ADULY REGISTERED PROFESSIONALENGINEER UNDER THE LAWS OF THESTATE OF MINNESOTA.License #:WARNING:THE CONTRACTOR SHALL BE RESPONSIBLE FOR CALLING FOR LOCATIONS OF ALL EXISTING UTILITIES. THEY SHALLCOOPERATE WITH ALL UTILITY COMPANIES IN MAINTAINING THEIR SERVICE AND/OR RELOCATION OF LINES.THE CONTRACTOR SHALL CONTACT GOPHER STATE ONE CALL AT 651-454-0002 AT LEAST 48 HOURS IN ADVANCE FORTHE LOCATIONS OF ALL UNDERGROUND WIRES, CABLES, CONDUITS, PIPES, MANHOLES, VALVES OR OTHER BURIEDSTRUCTURES BEFORE DIGGING. THE CONTRACTOR SHALL REPAIR OR REPLACE THE ABOVE WHEN DAMAGED DURINGCONSTRUCTION AT NO COST TO THE OWNER.TWIN CITY AREA: 651-454-0002TOLL FREE 1-800-252-1166CALL BEFORE YOU DIGPROPERTY LINESITE LEGENDSETBACK LINEEASEMENT LINEPROPOSED CURB AND GUTTERBITUMINOUS PAVEMENTCONCRETE SIDEWALK PAVEMENT.321456789101112131415B612 CURB AND GUTTERB612 TIP-OUT CURB AND GUTTERMOUNTABLE CURB AND GUTTER2' WIDE CONCRETE VALLEY GUTTERBITUMINOUS PAVEMENT5' WIDE CONCRETE SIDEWALK6' WIDE CONCRETE TRAIL8' WIDE BITUMINOUS TRAILCONCRETE DRIVEWAY APRONMATCH INTO EXISTING PAVEMENTMATCH INTO EXISTING CURB AND GUTTERMATCH INTO EXISTING SIDEWALKPATCH BITUMINOUS PAVEMENT1617KEYNOTE LEGEND18192021222324252627282930PARALLEL PARKING STALLS - 22' X 8.5' TYP.STANDARD PARKING STALL - 9' X 18' TYP.ADA PARKING STALLS WITH ACCESS AISLE & CURB RAMPPLAZA - SEE ARCH. AND LANDSCAPE PLANSPATIO - SEE ARCH. AND LANDSCAPE PLANSPROPERTY LINERETAINING WALL W/ RAILING. SEE ARCH. FOR RAILINGFENCE - SEE LANDSCAPING PLANS4" STRIPINGDOG PARKTOT LOT/COMMUNITY AREAADA PEDESTRIAN RAMPGARAGE ENTRANCEBUILDING SETBACKLOT LINEDECORATIVE PAVEMENT SEE LANDSCAPE PLANSRAILING - SEE ARCH. PLANSSTREET LIGHTCROSSWALK3132Right of way shouldcover to 1' behindback of sidewalkwith 6' boulevardRemove curb cutand replace withfull height curb andgutterRemove curb cutand replace withfull height curb andgutterRemove existingmarked crosswalk,without ADA rampsit is out ofcompliance. If acrossing is desired,discuss more withHennepin CountyDiscuss withHennepin Countymaximum widthallowable forprivate entrance.New entranceneeds to meetsight distance(horizontal andvertical)176 C-301GRADINGPLANDrawn By:Issue Date:Project #:5005-0003RAGTHE VILLAGE LLC DEVELOPMENTTHE VILLAGE, LLC1907 WAYZATA BLVD, SUITE 250M:\5005\0003\DESIGN\CAD\PLANSHEETS\C-301 Grading Plan.dwgDescription:Date:WAYZATA, MN 55391Issue #:ST. ANTHONY VILLAGE, MINNESOTA12/06/20171Issue #Prepared For:XX/XX/XXXXDESCRIPTIONISSUE #Sheet #:Sheet Title:1/25/2018 2:06:43 PMDate:I HEREBY CERTIFY THAT THIS PLAN,SPECIFICATION, OR REPORT WASPREPARED BY ME OR UNDER MYDIRECT SUPERVISION AND THAT I AM ADULY REGISTERED PROFESSIONALENGINEER UNDER THE LAWS OF THESTATE OF MINNESOTA.License #:WARNING:THE CONTRACTOR SHALL BE RESPONSIBLE FOR CALLING FOR LOCATIONS OF ALL EXISTING UTILITIES. THEY SHALLCOOPERATE WITH ALL UTILITY COMPANIES IN MAINTAINING THEIR SERVICE AND/OR RELOCATION OF LINES.THE CONTRACTOR SHALL CONTACT GOPHER STATE ONE CALL AT 651-454-0002 AT LEAST 48 HOURS IN ADVANCE FORTHE LOCATIONS OF ALL UNDERGROUND WIRES, CABLES, CONDUITS, PIPES, MANHOLES, VALVES OR OTHER BURIEDSTRUCTURES BEFORE DIGGING. THE CONTRACTOR SHALL REPAIR OR REPLACE THE ABOVE WHEN DAMAGED DURINGCONSTRUCTION AT NO COST TO THE OWNER.TWIN CITY AREA: 651-454-0002TOLL FREE 1-800-252-1166CALL BEFORE YOU DIGPROPERTY LINEGRADING LEGENDSETBACK LINEEASEMENT LINEPROPOSED STORM SEWERPROPOSED CATCH BASINPROPOSED MANHOLE1.00%FL=9XXPROPOSED SPOT ELEVATION(ALL ELEVATIONS ARE TO FLOWLINE UNLESSOTHERWISE NOTED)ME=9XXTC=9XXMATCH EXISTING SPOT ELEVATIONTOP OF CURB SPOT ELEVATIONEOF=9XXEMERGENCY OVERFLOW SPOT ELEVATIONHP=9XXHIGH POINT SPOT ELEVATIONPROPOSED RIDGE / VALLEY / BREAKLINEPROPOSED SLOPE ARROWEXISTING STORM STRUCTUREEXISTING STORM SEWEREXISTING CONTOURPROPOSED CONTOUR9XXNOTE: SEE C-501 STORM SEWER PLAN FOR STORM SEWERDESIGN DETAILSFG=9XXFINISHED GRADE SPOT ELEVATIONTW=9XXTOP OF WALL SPOT ELEVATIONBW=9XXBOTTOM / TOE OF WALL SPOT ELEVATIONCONSTRUCTION LIMITSEOF FLOW ARROWRemove existingstructure, extendthe pipe, and placenew structureoutside of curb linewithin entrance.Storm sewerconnection ratesmust not exceedexisting flows.County permitrequired for stormconnection.Need to move CBto new curb lineand remove oldMove pipe runoutside of proposedright of wayMove outside ofproposed right ofwayMove outside ofproposed right ofwayMove outside ofproposed right ofway177 L-100PLANTING PLAN -OVERALL CONCEPTDrawn By:Issue Date:Project #:5005-0003RAGTHE VILLAGE LLC DEVELOPMENTTHE VILLAGE, LLC1907 WAYZATA BLVD, SUITE 250M:\5005\0003\DESIGN\CAD\PLANSHEETS\L-101 Planting Plan.dwgDescription:Date:WAYZATA, MN 55391Issue #:ST. ANTHONY VILLAGE, MINNESOTA12/06/20171Issue #Prepared For:XX/XX/XXXX DESCRIPTION ISSUE #Sheet #:Sheet Title:1/26/2018 12:42:30 AMDate:I HEREBY CERTIFY THAT THIS PLAN,SPECIFICATION, OR REPORT WASPREPARED BY ME OR UNDER MYDIRECT SUPERVISION AND THAT I AM ADULY REGISTERED PROFESSIONALENGINEER UNDER THE LAWS OF THESTATE OF MINNESOTA.License #:WARNING:THE CONTRACTOR SHALL BE RESPONSIBLE FOR CALLING FOR LOCATIONS OF ALL EXISTING UTILITIES. THEY SHALLCOOPERATE WITH ALL UTILITY COMPANIES IN MAINTAINING THEIR SERVICE AND/OR RELOCATION OF LINES.THE CONTRACTOR SHALL CONTACT GOPHER STATE ONE CALL AT 651-454-0002 AT LEAST 48 HOURS IN ADVANCE FORTHE LOCATIONS OF ALL UNDERGROUND WIRES, CABLES, CONDUITS, PIPES, MANHOLES, VALVES OR OTHER BURIEDSTRUCTURES BEFORE DIGGING. THE CONTRACTOR SHALL REPAIR OR REPLACE THE ABOVE WHEN DAMAGED DURINGCONSTRUCTION AT NO COST TO THE OWNER.TWIN CITY AREA: 651-454-0002TOLL FREE 1-800-252-1166CALL BEFORE YOU DIGPLANTING LEGENDOVERSTORY TREEORNAMENTAL TREECONIFEROUS TREECONIFEROUS SHRUBDECIDUOUS SHRUBL - 101L - 103L - 102EXISTING TREEVerify intersectionsight distance toensure sightdistance is notobstructed bylandscapingVerify intersectionsight distance toensure sightdistance is notobstructed bylandscapingVerify horizontalcurve sightdistance to ensuresight distance isnot obstructed bylandscaping178 MULTI-RESIDENTIAL 1 FFE=923.00 GARAGE=912.00 ASSISTED SENIOR LIVING FFE=923.00 GARAGE=913.00 INDEPENDENT SENIOR LIVING FFE=927.00 GARAGE=917.00 MULTI-RESIDENTIAL 1 FFE=923.00 GARAGE=912.00 LOBBY AND COMMON AREA FFE=923.00 GARAGE=912.00 STORMWATER POND NWL=912.00 HWL=917.35 STORMWATER POND NWL=911.00 HWL=915.92 KEN ZI E T E R R A C E ( C O U N T Y R D 153)STINSON PARKWAY83.4'80.3'78.4'73.1'91' 97.9'22.6'73.9'20'76.3'84.5'66.9'81.9' 4 2 . 5 ' 9' TYP. 22'23.5'23.5'24'15'23.5'10' 18' 9' TYP.30'10'8.5'8.5'19'TYP.9'TYP. 19' TYP. 10' 23.5' 2 4 '24' PATIO PLAZAPATI O PLAZA PROOF OF PARKING 37 STALLS PATIO 22'22'22'22'22'15'8.5'19'TYP.9' TYP.19'TYP.23.5' 1 2 ' 12' WIDE LEFT TURN LANE 6' WIDE TRAIL 6' WIDE TRAIL 8' WIDE TRAIL EXISTING TREE TO REMAIN (TYP.) 5' WIDE SIDEWALK 5' WIDE SIDEWALK 5' WIDE SIDEWALK 5' WIDE SIDEWALK 5' WIDE SIDEWALK 5' WIDE SIDEWALK 5' WIDE SIDEWALK CONSTRUCTION LIMITS (TYP.) CONSTRUCTION LIMITS (TYP.) 3 0 ' 3 0 ' 20' 20'20'20'20' 20' 12' WIDE RIGHT TURN LANE 6 0 ' 5 ' DOG PARK LIGHT POLE (TYP.) CROSSWALK (TYP.) RETAINING WALL23'C-104 SITE PLAN Drawn By: Issue Date: Project #:5005-0003 RAGTHE VILLAGE LLC DEVELOPMENTTHE VILLAGE, LLC1907 WAYZATA BLVD, SUITE 250M:\5005\0003\DESIGN\CAD\PLANSHEETS\c-104 Site Plan.dwgDescription:Date:WAYZATA, MN 55391Issue #:ST. ANTHONY VILLAGE, MINNESOTA12/06/2017 1Issue #Prepared For:XX/XX/XXXX DESCRIPTIONISSUE #Sheet #: Sheet Title:3/15/2018 9:58:22 AMDate: I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY REGISTERED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. License #: WARNING: THE CONTRACTOR SHALL BE RESPONSIBLE FOR CALLING FOR LOCATIONS OF ALL EXISTING UTILITIES. THEY SHALL COOPERATE WITH ALL UTILITY COMPANIES IN MAINTAINING THEIR SERVICE AND/OR RELOCATION OF LINES. THE CONTRACTOR SHALL CONTACT GOPHER STATE ONE CALL AT 651-454-0002 AT LEAST 48 HOURS IN ADVANCE FOR THE LOCATIONS OF ALL UNDERGROUND WIRES, CABLES, CONDUITS, PIPES, MANHOLES, VALVES OR OTHER BURIED STRUCTURES BEFORE DIGGING. THE CONTRACTOR SHALL REPAIR OR REPLACE THE ABOVE WHEN DAMAGED DURING CONSTRUCTION AT NO COST TO THE OWNER. TWIN CITY AREA: 651-454-0002 TOLL FREE 1-800-252-1166 CALL BEFORE YOU DIG SITE ANALYSIS TABLE EXISTING ZONING R1 SINGLE FAMILY RESIDENTIAL LOT AREA ±669,585 SF (±15.4 AC) TOTAL BUILDING AREA ±134,593 SF (20.1%) GREENSPACE SUMMARY IMPERVIOUS AREA (INCL. BLDG AND POND) PROPOSED PERVIOUS AREA BL. 1 LT. 1 - IND. LIVING PARKING STALLS SUMMARY RAMP PARKWAY BL. 2 LT. 1 - MULTI RES. SETBACK SUMMARY BUILDING EAST 30' WEST NORTH PROPOSED ZONING PUD - PLANNED UNIT DEVELOPMENT 20' 20' 20' SOUTHEAST ±378,084 SF (8.68 AC) BL. 1 LT. 2 - AST. LIVING SOUTHWEST 20' INTERNAL 0' ADA 30 TOT 4 30 115 61 4 5 0 61 STANDARD SURFACE ADDITIONAL PROOF STALLS 37 37 0 TOTAL PARKING COUNT RAMP SURFACE 0 0 0 0 ±291,501 SF (6.69 AC) 88 86 231 4 4 7 126 124 358 405 273 15 13 706 PROPERTY LINE SITE LEGEND SETBACK LINE EASEMENT LINE PROPOSED CURB AND GUTTER BITUMINOUS PAVEMENT CONCRETE SIDEWALK PAVEMENT. CONSTRUCTION LIMITS 179 THIS PAGE LEFT INTENTIONALLY BLANK 180 701 Xenia Avenue South | Suite 300 | Minneapolis, MN 55416 | (763) 541-4800 Building a legacy – your legacy. Equal Opportunity Employer | wsbeng.com Memorandum To: Honorable Mayor and City Council Mark Casey, City Manager City of Saint Anthony Village From: Charles Rickart, PE, PTOE, Traffic Engineer WSB & Associates Inc Copy To: Breanne Rothstein, Planner & Todd Hubmer, City Engineer WSB & Associates, Inc. Date: March 13, 2018 Re: Southern Gateway (The Village LLC) Revised Traffic Study Supplemental Traffic Information WSB Project No. 2170-300 A Revised Traffic Study, dated February 19, 2018, was prepared for redevelopment of the existing 15-acre, 200 unit manufactured home/RV park community located in the northeast quadrant of the intersection of Kenzie Terrace (CR 153) and Stinson Parkway in the City of St Anthony. The purpose of the study was to determine the potential transportation impacts from the redevelopment of the site. The development was originally proposed to include five, 3 to 5 story multi-unit buildings with a mix of apartments, senior living, and continuing care uses consisting of approximately 800 units and; 37, 2- to 3-story townhome units. After input from the public and elected officials, the development team is now proposing a revised, less intense, development plan. The new plan now includes 225 market rate apartments; 61 senior living units; and, 128 assisted living units. The plan including the Traffic Study was presented to the St Anthony Planning Commission on February 26, 2018. One of the comments received from the public at the meeting was concerning the possible traffic impacts specifically on NE 27th Avenue north of the site adjacent to St. Charles Borromeo School. The propose of this memo is to provide additional information on the expected traffic conditions and impacts on NE 27th Avenue. The existing AM and PM peak hour turning movement and daily counts were conducted during the week of October 10th, 2016 for the intersections and roadways surrounding the site including the intersection of Stinson Parkway at NE 27th Avenue. The existing traffic volumes were shown on Figure 4 and Figure 5 from the study. 181 Projected traffic volumes were prepared by adding the projected annual background traffic growth (non-site related traffic) of 0.15% per year to the existing 2016 traffic counts to determine the 2030 No-Build traffic conditions. The proposed development traffic was then added to the no-build traffic conditions based on the anticipated area traffic distribution to determine the 2030 Build traffic conditions. Table 2 and Figures 6 – 11 in the study shows the Site Traffic Generation and the projected 2030 no-build and 2030 build traffic volumes. Table 1 below shows a summary of the existing and projected traffic volumes on Stinson Parkway and NE 27th Avenue. Table 1 – Traffic Volume Summary Location Existing 2016 2030 No-Build 2030 Build 2040 ADT ADT AM Peak PM Peak ADT AM Peak PM Peak ADT AM Peak PM Peak Stinson Pkwy – North of NE 27th Ave 6,000 469 600 6,150 481 617 6,350 495 633 7,250 NE 27th Ave – West of Stinson Pkwy 1,200 127 95 1,230 134 101 1,260 138 106 1,300 NE 27th Ave - East of Stinson Pkwy 1,000 126 81 1,025 132 87 1,025 132 87 1,100 Assuming the existing and projected traffic conditions an operations analysis was completed to determine the anticipated impacts both the no-build and build conditions would have on the roadway system. Based on the analysis it was determined that no changes to the existing roadway or traffic control would be required to accommodate the existing or projected traffic volumes. It was also suggested, by the public, that a one-way system be considered for NE 27th Avenue. This was reviewed and the following conclusions were made: • The traffic volumes in the area would not change by converting the roadway to a one- way. The volumes would just be re-distributed to other roadways, increasing volumes on some of them. • There is no good alternative route for eastbound (or westbound) traffic west of Stinson Parkway. • Enforcement of ‘wrong-way” vehicles becomes an issue with low volumes and several access’s. Based on these conclusions and the fact that the traffic volumes and operations analysis does not support any improvements, no changes to the recommendations in the Traffic Study should be considered. If you have any further questions need any additional information, please contact me at (612) 360-1283 or crickart@wsbeng.com. 182 CITY OF ST. ANTHONY VILLAGE STATE OF MINNESOTA RESOLUTION 18-031 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF ST. ANTHONY, STATE OF MINNESOTA, IN SUPPORT OF THE "MAYOR'S CHALLENGE FOR WATER CONSERVATION" WHEREAS, the City of St. Anthony, and the state of Minnesota continue to explore ways to manage residential consumption of water and power, and to inspire its residents to care for our natural resources; and WHEREAS, cities can engage in efforts to inspire their own communities, as well as their neighboring cities, to become better environmental stewards; and WHEREAS the seventh annual National Mayor’s Challenge for Water Conservation presented by the Wyland Foundation and Toyota, with support from the U.S EPA WaterSense, The Toro Company, National League of Cities, Conserva Irrigation, and Earth Friendly Products (makers of ECOS), is a healthy, non- profit competition for cleaner communities and a water use and pollution reduction competition between our cities; and WHEREAS, with the encouragement of their Mayors, residents may register their participation in their city's Challenge, online, by making simple pledges to decrease their water use and to reduce pollution for the period of one year, thereby assisting their cities to apply State and Federal water conservation strategies and to target mandated reductions; and WHEREAS, from April 1- 30, 2018, the City of St. Anthony wishes to inspire its residents and its neighboring communities to take the "Wyland Mayor's Challenge for Water Conservation" by making a series of online pledges at mywaterpledge.com to reduce their impact on the environment and to see immediate savings in their water, trash, and electricity bills; NOW, THEREFORE, THE MAYOR AND CITY COUNCIL MEMBERS OF THE CITY OF ST. ANTHONY, MINNESOTA, DO HEREBY RESOLVE, DECLARE AND DETERMINE AS FOLLOWS: SECTION 1. That the city of St. Anthony agrees and supports the "Wyland Mayor's Challenge for Water Conservation" emphasis. SECTION 2. That the program is to be implemented from April 1- 30, 2018, through a series of communication and outreach strategies, whether new or existing, to encourage St. Anthony residents to take the cnservation "Challenge." 183 SECTION 3. That this resolution shall be effective immediately. BE IT FURTHER RESOLVED THAT that the City Clerk shall certify to the passage and adoption of this resolution; shall cause the same to be entered among the original resolutions of the City; and shall make a minute of the passage and adoption thereof on the records of the proceedings of the City Council for the meeting at which the same is passed and adopted. Adopted this 27th day March, 2018. _____________________________ Jerome O. Faust, Mayor ATTEST:____________________________ Nicole Miller, City Clerk Reviewed for administration: ______________________________ Mark Casey, City Manager 184 2017 St. Anthony Police Department Annual Report Jon Mangseth Police Chief Department Summary Department Strength •23 -Full Time Police Officers (8 contract) •14 -Volunteer Reserve Officers •1 -Full Time Community Service Officer •2 -Full Time Civilian Support Staff •1 -Part Time Civilian Support Staff Department Fleet •7 -Marked Squads •1 -Marked Reserve Unit •1 -Marked CSO Unit •5 -Unmarked Units 185 St. Anthony Part I Crimes St. Anthony Part II Crimes 186 Calls for Service Patrol Review •846 citations issued for moving violations 177 Speed 40 Stop Sign 77 Semaphore •597 Verbal Warnings •65 citations issued for non-moving violations •371 arrests •1 retirement Recognized with the State Commissioners Award for “Towards Zero Death” safety initiative 187 Investigation Review •Total Criminal Cases 435 •Total Cases Cleared 185 •Total Cases Cleared by Arrest 133 •Total Cases Cleared by Other 52 •CLEARANCE RATE 43% Education Summary •The Police Department completed 2043 hours of training (excluding SWAT); Training included: –Promoting Fair & Impartial Public Safety –Procedural Justice Training –Crisis Intervention Training –Emergency Vehicle Operation –Body Worn Camera Implementation –Legal Updates & Case Law –TEMPO/EMR Medical Training –Leadership Development 188 Police Reserves •Events: 59 Hours •Training: 128 Hours •Patrol: 1486 Hours •Adm/Training: 425 hours •Total –2098 Hours •Eagle Award –Panning Social Media In September, we launched 3 police department social media sites: •Facebook •Twitter •Instagram 189 Community Engagement •MN Night to Unite –44 block parties •Cops versus Kids Basketball •7th Summer Survival School •Started Coffee with a Cop Community Engagement •Walk/Bike to School Day •Community Services Halloween Party •Special Olympics •Attended many school & community events 190 Progress Report –All Personnel attended Implicit Bias Training –September 2016 –Department actively involved in the Government Alliance on Race and Equity (GARE) -Current –All personnel attended Fair and Impartial Policing Training – September 2017 –Two officers trained as Fair and Impartial Policing instructors – September 2017 –All personnel attended Procedural Justice Training –November 2017 –Command Staff attended Police Executive Research Forum (PERF) Integrated Communication Assessment and Tactics Training and Implementation (ICAT) seminar –November 2017 Progress Report –Department personnel have attended and actively engaged in numerous community conversation events surrounding topics such as race, equity, and inclusion. –Shift in culture to more accurately reflect our focus on traffic safety. –Complaint and Commendation forms made more accessible via our website. –Strategic Planning process initiated with DOJ personnel on site – January 2018 –Began work with a Senior Research Scientist to create programming to allow for police department personnel to access data in real -time – January 2018. –All personnel attended Crisis Intervention Training –February 2018 –Two police officers recently certified as Procedural Justice instructors – March 2018. 191 What’s On Deck –Two peer-to-peer site visits planned of other police agencies and communities who have been identified as having innovative and successful COP programs –Early 2018. –Seven additional in-person technical assistance, training and professional development sessions with DOJ personnel – through August 2018. –Develop our strategic plan with input from police department personnel and the community –2018. –Body Worn Camera Program fully implemented –mid 2018. –Upgrade of squad car cameras to a high definition system that will work in concert and continuity with the Body Worn Cameras - mid 2018. –Engaging the community in assisting us as we work together to improve the department and improve public safety –continuous. Stay Connected –Updates provided via the St. Anthony Village website. Sign up to be “Notified.” –Email us at police@savmn.com –Attend future Open Houses and other community meetings –Call us at 612-782-3350 to arrange for a meeting via phone or in person 192 This report can be viewed online at: www.savmn.com 193 THIS PAGE LEFT INTENTIONALLY BLANK 194 Date Type Staff Present April 10 Regular Planning Commission Items from March Quarterly Donations & Grants Public Works Annual Report 2018 Planning Commission Work Plan-(motion only) Spirit of St. Anthony Award City Council City Manager Public Works Director April 24 Regular Arbor Day Proclamation 1st Quarter Goals Update 2018 Street Project Approve Sale of Bonds Finance Annual Report Public Hearing-Budget Calendar Students in Governement Presentation City Council City Manager City Planner Finance Director May 8 Regular Planning Commission items from April Chamber of the Year and Business of the Year Public Hearing & Res-Approving Draft Comp Plan, submit to Met Council & Authorizing Adjacent Community Review City Council City Manager May __Special 5:00 p.m.Tour of the City City Council City Manager May 22 Regular Salo Park Concert Series Insurance Renewal Tort Limits - Consent Approval of 2019 Street & Utility Recon Feasibility Study & Order Final Plans and Specs City Council City Manager City Engineer May 29 Special 5:30 p.m.Joint Meeting with School Board City Council City Manager June 11 Special 5:30 p.m.Joint Meeting with Park Commission City Council City Manager June 12 Regular Planning Commission Items from May City Council City Manager June 26 Regular Audit Presentation City Council City Manager Finance Director FUTURE COUNCIL AGENDA ITEMS 2018 195 Date Type Staff Present FUTURE COUNCIL AGENDA ITEMS July 10 Regular Planning Commission items from June Quarterly Donations & Grants Quarterly Goals Update City Council City Manager July 24 Regular Night to Unite Presentation Night to Unite Proclamation Liquor Operations Mid Year Report VillageFest Presentation City Council City Manager Police Chief Liquor Op Mgr July 31 Special 5:30 p.m.Joint Meeting with School Board City Council City Manager August 14 Regular 8:00 p.m. Planning Commission items from July SANB #282 Presentation City Council City Manager August 28 Regular Budget Presentation City Council City Manager Finance Director September 11 Regular Planning Commission items from August Commissioner Mary Jo McGuire 2019 Preliminary Operating Budget and Levy-Public Hearing Kiwanis Peanut Day City Council City Manager Finance Director September 25 Regular Fire Prevention Presentation City Council City Manager Fire Dept October 9 Regular Planning Commission items from September Quarterly Donations & Grants Certification of Delinquent Utility Accounts-Consent Agenda Certification of Delinquent Waste Hauler Accounts-Consent Agenda City Council City Manager October 23 Regular City Council City Manager October 30 Special 5:30 p.m.Joint Meeting with School Board City Council City Manager November 13 Regular Planning Commission items from October 1st Reading Water, Sewer, & Stormwater City Council City Manager 196 Date Type Staff Present FUTURE COUNCIL AGENDA ITEMS November 27 Regular Fire Prevention Poster Winners Water Conservation Poster Winners 2nd Reading Water, Sewer, & Stormwater City Council City Manager Fire Dept Public Works Director December 11 Regular Planning Commission items from November Appoint Parks and Planning Commissioners and Chair/Vice Chairs Setting Salary of City Manager Authorizing Transfers & Closing of Specified Funds Setting the 2019 City & HRA Budgets and Final Property Tax Levy -Public Hearing Final Reading Water, Sewer, & Stormwater 2019 Fee Schedule 2019 Street Project Approve Plans & Specifications, Authorize Advertisement for Bids City Council City Manager Finance Director City Engineer December 26 Regular City Council City Manager January 8 Regular Planning Commission items from December Housekeeping Resolutions Resolution for the Street Improvement Bond Reimbursement Quarterly Donations & Grants City Council City Manager January__Special 9:00 a.m.Goal Setting City Council City Manager Dept Heads January__Special 8:30 a.m.Goal Setting City Council City Manager Dept Heads January 22 Regular 2019 Parks Commission Work Plan- (motion only) City Council City Manager February 12 Regular Planning Commission items from January 2019 Street Project Call for Hearing on Improvements, Call for Hearing on Assessments, Order Preparation of Assessments Snow Plowing presentation City Council City Manager City Engineer Public Works Director February 26 Regular Administration Annual Report Adoption of Strategic Plan City Council City Manager March 12 Regular Planning Commission Items from February Presentation from Ramsey County Sheriff Jack Serier Liquor Annual Report Fire Annual Report Liquor License Renewals GreenCorp Member application-resolution City Council City Manager Fire Dept Liquor Op Manager 2019 197 Date Type Staff Present FUTURE COUNCIL AGENDA ITEMS March 26 Regular 2019 Street Project Public Hearing, Order Improvements, Adopt & Confirm Assessments, Award Contract for Construction, Call for Sale of GO Bonds Police Annual Report Senator Laine Legislative Update Resolution in support of Mayor's Challenge for Water Conservation City Council City Manager Police Dept City Engineer 198 Statement by Perry Thorvig, 3112 Townview Ave. St. Anthony, MN 55418 Lowry Grove Development, March 27, 2018 Mayor and Council Members, Last fall I appeared before you and addressed a number of issues. Most of those have been resolved. Tonight, I want to address three issues. First, I concur with the recommendations of our planning commission except for the additional setback along the east property line. I disagree with my friends from the Kenzington who requested and received an additional setback recommendation from the planning commission. The Kenzington folks have a taller building and are only about 20 feet off the property line. It is unreasonable for them to ask for a setback up to four times what they have in their building. The staff support of their request was arbitrary and is not backed up by any, I repeat ANY, logical or practical explanation. Fortunately, the revised site plan (3/19/2018) setback does not fully comply with the planning commission recommendations. The architects have been able to increase one setback from 65' to 83' on the north wing of the east building. The south wing is only set back three more feet from 70 to 73 feet. I agree with this solution. If both wings had been pushed to the west by a full 20', the road would have had to be shifted to the west resulting in a loss of about 30 parking spaces in the general rental building south of the road. You need to change the wording in your resolution to state that the setbacks be as shown in the revised site plan dated 3/19/2018. Second, the St. Anthony code requires new developments to dedicate open space to the city for additional park space or to pay a fee in lieu of dedication. Dedication of land means that the land is given to the city at no cost so that park facilities can be developed to satisfy the need generated by the new development. The city's subdivision regulations suggest a 10% of lot area dedication. That means that the lot gets smaller and the density increases because part of the original parcel is no longer in control of the developer. In this case, the developer doesn't propose any dedication or conveyance of land. They want to make a payment instead of dedication. BUT, they want the city to give them a monetary credit for development costs of the path around their buildings against the park dedication fee that they would normally have to pay. This is what I would call creative financing. I checked with a former colleague of mine in a large suburban community who said that they do not allow this kind of circumvention of the payment in lieu requirements. I haven't checked the new comprehensive plan draft to see if there is a suggested city trail through this project. (Wouldn't that be a coincidence?) But, I think it is a real stretch to think that this path around the buildings is going to be perceived by the public as "public" open space. Why would anybody walk around the buildings when they can walk down a much more inviting Stinson Parkway? Don't allow the developer to get away this proposal to avoid paying park dedication fees. You need to add an additional resolved statement that reads as follows: Notwithstanding the recommendation of the parks commission, the expenses incurred in the construction of the 8' walkway will not be credited against normal park dedication fees for this project. Finally, there is the issue of affordable housing. It is clear that the city has a policy to provide affordable housing, but does not have an ordinance requiring affordable units to be included in developments. That might be on purpose or an oversight. I also note that staff has not provided any information of record on how you might assure the development of affordable housing in this project. Why haven't they? You have had workshops and presentations, but no ordinance or implementation. Why not? In any case, I support the position of Mr. Jack Cann. It's time for the city to quit stalling and require affordable housing. You need another resolved statement requiring affordable housing units in this subdivision. PUBLIC INPUT SHEET In order to address the City Council and to be heard on an Agenda item, please complete the following and pass this completed sheet to the City Manager. Speakers are requested to come to the podium, clearly state their name and address for the City Clerk's record. Date: Name: Address: 17— Agenda Item Addressing: PUBLIC INPUT SHEET In order to address the City Council and to be heard on an Agenda item, please complete the following and pass this completed sheet to the City Manager. Speakers are requested to come to the podium, clearly state their name and address for the City Clerk's record. Date: nn V �Z 144 Name: `ylnn Address: .� (dU �J .� �V e AG - Address: Mfv SS�Llzl Agenda Item Addressing: i1e c lzce�� PUBLIC INPUT SHEET In order to address the City Council and to be heard on an agenda item, please complete the following and pass this completed sheet to the City Manager. Speakers are requested to come to the podium, clearly state their name and address for the City Clerk's record. Date: 'JL,;, Name:/�� / �Q� U< —1 Address: y 2 %( 7c'J/V (l14't,) Agenda item Addressing;` is PUBLIC INPUT SHEET In order to address the City Council and to be heard on an agenda item, please complete the following and pass this completed sheet to the City Manager. Speakers are requested to come to the podium, clearly state their name and address for the City Clerk's record. Date: --?/ -� 7A? Name: Address: Ll'aL4,s�-- F��s Ky 4-- fl Agenda item Addressing )11:t�� J "� o �3J PUBLIC INPUT SHEET In order to address the City Council and to be heard on an Agenda item, please complete the following and pass this completed sheet to the City Manager. Speakers are requested to come to the podium, clearly state their name and address for the City Clerk's record. Date:,? `,� —;w- , D Nante. Agenda Item Addressing: E�V PUBLIC INPUT SHEET In order to address the City Council and to be heard on an Agenda item, please complete the following and pass this completed sheet to the City Manager. Speakers are requested to come to the podium, clearly state their name and address for the City Clerk's record. Date: 3 (26 I l $ Name: Fx3�I�le�� Address: ('I Agenda Item Addressing: 18 ` O 3 PUBLIC INPUT SHEET In order to address the City Council and to be heard on an Agenda item, please complete the following and pass this completed sheet to the City Manager. Speakers are requested to come to the podium, clearly state their name and address for the City Clerk's record. Date: IINii[a Addre Agenda Item Addressing: JW��/ PUBLIC INPUT SHEET In order to address the City Council and to be heard on an Agenda item, please complete the following and pass this completed sheet to the City Manager. Speakers are requested to come to the podium, clearly state their name and address for the City Clerk's record. Date: Name: , �� y - l Address: -2 3 :30 , Al ✓�- Agenda Item Addressing: PUBLIC INPUT SHEET In order to address the City Council and to be heard on an Agenda item, please complete the following and pass this completed sheet to the City Manager. Speakers are requested to come to the podium, clearly state their name and address for the City Clerk's record. Date: O l --,1 Ale- r Name:f/r�� Address: %( 7 ` ' "Z`r Agenda Item Addressing:'