Loading...
HomeMy WebLinkAboutCC PACKET 11272018 If you would like to request special accommodations or alternative formats, please contact the City Clerk at 612-782-3313 or email city@savmn.com. People who are deaf or hard of hearing can contact us by using 711 Relay. Our Mission is to be a progressive and welcoming Village that is walkable, sustainable and safe.     Call to Order.  Pledge of Allegiance. Roll Call. Consideration, discussion, and possible action on all of the following items: I. Approval of the November 27, 2018, City Council Meeting Agenda. (action requested.) II. Proclamations and Recognitions. A. Presentation of 2018 Fire Prevention Poster Winners, presented by the St. Anthony Fire Department. (pp.1-3) B. Presentation of 2018 Water Conservation Poster Winners, presented by Erin Jordahl Redlin, Vice Chair of Parks Commission. (pp.5-7) C. Students in Government participants. Gabby Herlofsky, James Wald, Stu Scamehorn and Jacinta Wappes presenting. III. Consent Agenda. These items are considered routine and will be enacted by one motion. There will be no separate discussion of these items unless a Councilmember or citizen so requests, in which the item will be removed from the Consent Agenda and placed elsewhere on the agenda. A. Approval of November 13, 2018, City Council meeting minutes. (pp.9-16) B. Licenses and Permits. (pp.17) C. Claims. (pp.19-21) IV. Public Hearing. V. Reports from Commission and Staff. VI. General Business of Council. A. Resolution 18-077 a resolution Approving Hennepin and Ramsey County Improvements to County Road C. Todd Hubmer, City Engineer presenting. (pp.23-25) B. Resolution 18-073 a resolution Accepting the 27th Avenue/Pahl Avenue Neighborhood Traffic Study and Adopting the Traffic Device Installation Policy. Todd Hubmer, City Engineer presenting. C. Resolution 18-078 a resolution Approving St. Anthony 2040 Comprehensive Plan and Authorizing Submission to Metropolitan Council for Action. Molly Just, City Planner presenting. (pp.27-29) D. Ordinance 2018-02 an ordinance Setting Sewer, Water, Storm Water charges and Establishment of Fee Amounts for 2019. Mark Casey, City Manager presenting. (2nd of 3 readings). (pp.31-51) CITY OF ST. ANTHONY VILLAGE CITY COUNCIL MEETING AGENDA NOVEMBER 27, 2018 7:00 p.m. If you would like to request special accommodations or alternative formats, please contact the City Clerk at 612-782-3313 or email city@savmn.com. People who are deaf or hard of hearing can contact us by using 711 Relay. Our Mission is to be a progressive and welcoming Village that is walkable, sustainable and safe. E. Resolution 18-079 a resolution Designating Polling Places for the 2019 Election Year. Mark Casey, City Manager presenting. (pp.53-55) VII. Reports from City Manager and Council members. VIII. Community Forum Individuals may address the City Council about any item not included on the regular agenda. Speakers are requested to come to the podium, sign their name and address on the form at the podium, state their name and address for the Clerk’s record, and limit their remarks to five minutes. Generally, the City Council will not take official action on items discussed at this time, but may typically refer the matter to staff for a future report or direct the matter to be scheduled on an upcoming agenda. IX. Information and Announcements X. Adjournment 2018 FIRE PREVENTION POSTER WINNERS 4th Place –Maya Telander 5th Grade St. Charles 1 3rd Place –Cece Kram 5th Grade Wilshire Park 2nd Place -?? 2 1st Place –Anna Tsukamoto 5th Grade Wilshire Park 1st Place –Naomi Waldusky 5th Grade Wilshire Park 3 THIS PAGE LEFT INTENTIONALLY BLANK 4 2018 WATER CONSERVATION POSTER WINNERS HONORABLE MENTION- ARYAN S. 5 4TH PLACE- ELLIE M. 3RD PLACE- ELLA B. 6 2ND PLACE- JOSIE T. 1ST PLACE- JUNO F. 7 THIS PAGE LEFT INTENTIONALLY BLANK 8 CITY OF ST. ANTHONY 1 CITY COUNCIL REGULAR MEETING MINUTES 2 NOVEMBER 13, 2018 3 4 CALL TO ORDER. 5 6 Mayor Faust called the meeting to order at 7:00 p.m. 7 8 PLEDGE OF ALLEGIANCE. 9 10 Mayor Faust invited the Council and audience to join him in the Pledge of Allegiance. 11 12 ROLL CALL. 13 14 Present: Mayor Faust, Councilmembers Gray, Jenson, Randle and Stille. 15 Absent: None 16 Also Present: City Manager Mark Casey, Finance Director Shelly Rueckert. Planning 17 Commissioner Bibi Neumann, Liquor Operations Manager Mike Larson. 18 19 CONSIDERATION, DISCUSSION, AND POSSIBLE ACTION ON ALL OF THE FOLLOWING 20 ITEMS. 21 22 I. APPROVAL OF NOVEMBER 13, 2018 CITY COUNCIL MEETING AGENDA. 23 24 Motion by Councilmember Gray, seconded by Councilmember Randle, to approve the City 25 Council Meeting Agenda of November 13, 2018 as presented. 26 27 Motion carried 5-0. 28 29 II. PROCLAMATIONS AND RECOGNITIONS. 30 31 III. CONSENT AGENDA. 32 33 A. Approval of October 9, 2018, City Council Meeting Minutes. 34 B. Licenses and Permits. 35 C. Claims. 36 D. Resolution 18-071; a Resolution Establishing an Investment Account with Multi-Bank 37 Securities, Inc. 38 E. Resolution 18-072; a Resolution approving the 2019 Incentive SCORE Grant application 39 request to Ramsey County. 40 41 Motion by Councilmember Stille, seconded by Councilmember Jenson, to approve the Consent 42 Agenda items. 43 44 Motion carried 5-0. 45 46 9 City Council Regular Meeting Minutes November 13, 2018 Page 2 1 IV. PUBLIC HEARINGS. 2 3 A. Ordinance 2018-02 an Ordinance Setting Sewer, Water, Storm Water charges and 4 Establishment of Fee Amounts for 2019. 5 6 Mayor Faust opened the public hearing at 7:03 p.m. 7 8 Finance Director Shelly Rueckert reviewed the utility rates recommended for 2019 which 9 illustrates the multi-year approach towards rate adjustments that began in 2012. The parameters 10 used for adjusting rates are: Align revenue sources with corresponding costs; Provide 11 transparency as to the basis of rates and rate adjustments; Maintain a structural balanced 12 operation; Ensure that rates appropriately support the ability to provide safe drinking water, 13 properly discharge sanitary sewer flows and appropriately control and treat storm water runoff. 14 15 The Water Fund expenditures are comprised of two primary operating functions Production 16 $666,871 and Distribution $628,128. The current recommendation includes continuing the 17 phase-in of a quarterly fee to support distribution system costs and the quarterly water 18 distribution fee will increase by $3.35. Staff also recommends to continue to manage the growth 19 in usage rates to recognize the revenues provided by the phase in of the water distribution fee 20 and keeping the water usage tier rates the same as 2018. 21 22 The Sewer Fund expenditures are comprised of two primary operating functions Treatment 23 $784,407 and Collection $477,265. The current recommendation includes continuing the phase-24 in of the quarterly fee to support collection system costs and the quarterly sewer collection fee 25 will increase by $3.20. Staff also recommends to continue to manage the growth in usage rates to 26 recognize the revenues provided by the phase in of the Sewer collection fee and the sewer usage 27 rate will remain the same as 2018. 28 29 The multi-year approach to Storm water rates planned for the quarterly single-family residential 30 charge to increase by thirty-five cents ($.35) in 2019 represents a 2.22% increase in rate and the 31 2.22% rate increase will be applied to all levels of storm water charges. 32 33 Councilmember Stille commented the key points in the presentation are transparent and 34 structurally balanced. The money collected for sewer and water need to be used for those 35 purposes. This makes a lot of sense. St. Anthony is in the ballpark for rates compared to other 36 cities. He noted this is a challenging thing to budget for and the City encourages residents to 37 conserve water. 38 39 Councilmember Jenson stated the quarterly flat fee is to spread the cost equally among all users. 40 That also helps reduce the volatility of the water usage from weather changes. 41 42 Mayor Faust stated price per unit is always going to go up as less is used which is a good thing. 43 He hopes in the future people realize that sprinkling their yard isn’t in the best ecological interest 44 of society or sustainable. A lot of water is used to produce electricity. 45 46 10 City Council Regular Meeting Minutes November 13, 2018 Page 3 Mayor Faust closed the public hearing at 7:15 p.m. 1 2 Motion by Councilmember Randle, seconded by Councilmember Jenson, to approve First 3 Reading of Ordinance 2018-02; an Ordinance Setting Sewer, Water, and Storm Water charges 4 and Establishment of Fee Amounts for 2019. 5 6 Motion carried 5-0. 7 8 V. REPORTS FROM COMMISSION AND STAFF. 9 10 A. Ordinance 2018-01; an Ordinance amending the Zoning Code, Sections 152.008 11 Definitions and 152.177 Permitted Encroachments in Yards, related to decks. 12 13 Planning Commissioner Neumann presented that currently there are no provisions for decks in 14 City Code, staff has been applying the principal structure setback to deck, an administrative 15 appeal of staff interpretation went to Planning Commission, the Planning Commission directed 16 staff to prepare provisions for decks and the Planning Commission reviewed the terms and 17 ordinance at the past two meetings. 18 19 The ordinance adds the following language to the City Code. 20 21 A definition of “deck” – DECK – A platform to and projecting from the wall of a building or 22 constructed on top of a building designed to be used by people which is part of the structure. For 23 the purpose of this Zoning Ordinance a deck is considered “attached” if any part of it is within 24 five (5) feet of an adjacent wall or building. An unattached platform or a platform attached to an 25 accessory structure, shall be considered an accessory structure. 26 27 Add language in “permitted encroachments” relating to decks – Decks which are not higher than 28 thirty (30) inches above grade at any given point along the grade are permitted to encroach into 29 the rear yard setback and the side yard setback, as long as a minimum side or rear yard setback of 30 5 feet is maintained. This encroachment does not apply in the R-1A Residential Lakeshore 31 District or to decks higher than thirty (30) inches above grade at any given point along the grade. 32 Such decks must comply with the setbacks for principal structures. 33 34 Planning Commissioner Neumann stated the Planning Commission held a public hearing in 35 October and took public comment from one person (administrative appeal applicant), and 36 recommended approval of the enclosed ordinance. 37 38 Councilmember Stille asked for clarification if a deck is detached from the house can it be 39 anywhere on the lot as long as it has a five-foot setback from the rear and side yard. Ms. 40 Neumann stated if it is not attached to the house, it would not be considered a deck. 41 Councilmember Stille stated the way he understands it, if it isn’t higher than thirty inches above 42 grade, it could be located anywhere on the lot, and be five feet from the property line. This 43 would be considered an accessory structure. 44 45 11 City Council Regular Meeting Minutes November 13, 2018 Page 4 Councilmember Jenson referred to slide four and five. He asked what the difference is and Ms. 1 Neumann stated it depends if it is a deck or accessory structure. 2 3 Mayor Faust stated he is confused as to what a deck is and what an accessory structure is. He 4 stated it seems this Ordinance is being changed for one property and an Ordinance should work 5 for the entire City. He requested a definition of a deck. Mayor Faust stated the wording appears 6 that a 30 inch or lower deck could be put in any size in a yard. He is not sure if that is what the 7 Planning Commission intended. Mayor Faust noted at the last Planning Commission meeting one 8 member needed to leave early and three were absent and it seemed rushed without due diligence 9 being done to affect the entire City. 10 11 Councilmember Stille stated he did not think about the mass that could occur with this 12 Ordinance. He noted one could put a deck up that invades the neighbor’s privacy. He is 13 concerned some residents would come forward asking why this Ordinance was passed. He 14 believes it needs to be looked at from a global approach. 15 16 Mayor Faust stated there is an issue of a neighbor’s enjoyment of their property. He is reluctant 17 to see this Ordinance go forward due to many unanswered questions and unintended 18 consequences that were not considered. 19 20 Ms. Neumann stated this was discussed at two Planning Commission meetings. She noted also 21 discussed was the question if someone were to construct a deck on top of their garage, would that 22 be considered a deck or not. It was difficult to give detail as far as the definition of a deck and 23 what is attached and what is unattached. 24 25 Councilmember Gray asked if the privacy issues were discussed at all and Ms. Neumann stated it 26 was discussed. Ms. Neumann cited her own personal property and there would not be privacy 27 concerns in her area. Councilmember Gray stated it seems like it could be very close to the 28 neighbors. 29 30 Councilmember Randle asked if the Planning Commission heard from the owner or residents and 31 if this is for a specific resident’s property. City Manager Casey stated this was brought forward 32 because a resident asked for a deck variance and the resident submitted an administrative appeal. 33 Mr. Casey noted whatever applies to this property if the Ordinance is passed would apply to all 34 properties within the City’s residential areas. 35 36 Motion by Councilmember Jenson, seconded by Councilmember Gray, to table consideration of 37 First Reading of Ordinance 2018-01; an Ordinance amending the Zoning Code, Sections 152.008 38 Definitions and 152.177 Permitted Encroachments in Yards, related to decks and refer back to 39 the Planning Commission for consideration and further clarification and provide a definition of a 40 deck. 41 42 Motion carried 5-0. 43 44 Mayor Faust requested the size of the deck or accessory structure and privacy to neighbors 45 should be considered. 46 12 City Council Regular Meeting Minutes November 13, 2018 Page 5 1 Councilmember Gray suggested pervious and impervious decks be addressed. 2 3 Councilmember Jenson stated he has a neighbor with a walkout with a deck attached to the house 4 and it is a story off the ground. Mr. Casey stated that would need to meet the principal structure 5 setbacks. 6 7 VI. GENERAL BUSINESS OF COUNCIL. 8 9 A. Resolution 18-073; a Resolution Accepting the 27th Avenue/Pahl Avenue Neighborhood 10 Traffic Study and Adopting the Traffic Decide Installation Policy. 11 12 City Manager Casey recommended tabling this item due to the absence of the City Engineer. 13 14 Motion by Mayor Faust, no second necessary, to table consideration of Resolution 18-073; a 15 Resolution Accepting the 27th Avenue and Pahl Avenue Neighborhood Traffic Study and 16 Adopting the Traffic Device Installation Policy. 17 18 Motion carried 5-0. 19 20 B. Resolution 18-074; a Resolution Approving Ratifying the 2019-2020 Agreement between 21 the Law Enforcement Labor Services, Inc., #186 Local Representing the St. Anthony 22 Police Department Licensed Employees and the City of St. Anthony Village. 23 24 City Manager Casey reviewed before the Council is a request to approve a resolution ratifying 25 the contract agreement with the police union. This is a two-year contract with the St. Anthony 26 Police Department’s licensed employees. There will be a 3.25% increase for both 2019 and 27 2020. Health insurance premium increases will be split equally between City and employees. 28 29 Councilmember Jenson stated the budget has been set for the City and asked what was used for a 30 planning percentage in the budget. City Manager Casey stated the number was greater than the 31 3.25% and is covered by the 2019 budget. 32 33 Motion by Councilmember Jenson, seconded by Councilmember Stille, to approve Resolution 34 18-074; a Resolution Ratifying the 2019-2020 Agreement Between the Law Enforcement Labor 35 Services, Inc. #186 Local Representing the St. Anthony Police Department Licensed Employees 36 and the City of St. Anthony Village. 37 38 Motion carried 5-0. 39 40 C. Resolution 18-075; a Resolution Approving Ratifying the 2019 – 2020 Agreement 41 between the International Association of Fire Fighters, local 3486 Representing the St. 42 Anthony Fire Department Employees and the City of St. Anthony Village. 43 44 City Manager Casey reviewed before the Council is a request to approve a resolution ratifying 45 the contract agreement between the International Association of Fire Fighters, Local 3486 46 13 City Council Regular Meeting Minutes November 13, 2018 Page 6 representing the St. Anthony Fire Department Employees and the City of St. Anthony Village. 1 This is a two-year contract with the St. Anthony Fire Department’s employees. There will be a 2 3.25% increase for both 2019 and 2020. Health insurance premium increases will be split equally 3 between City and employees. 4 5 Motion by Councilmember Gray, seconded by Councilmember Jenson, to approve Resolution 6 18-075; a Resolution Ratifying the 2019 – 2020 Agreement Between the International 7 Association of Fire Fighters, Local 3486 Representing the St. Anthony Fire Department 8 Employees and the City of St. Anthony Village. 9 10 Motion carried 5-0. 11 12 D. Resolution 18-076; a Resolution Approving Ratifying the 2019 – 2020 Agreement 13 between the International Union of Operating Engineers Local No. 49 AFL-CIO 14 Representing the St. Anthony Public Works Department Employees and the City of St. 15 Anthony Village. 16 17 City Manager Casey reviewed before the Council is a request to approve a resolution ratifying 18 the contract agreement with the public works union. This is a two-year contract with the St. 19 Anthony Public Works Department employees. There will be a 3.25% increase for both 2019 and 20 2020. Health insurance premium increases will be split equally between City and employees. 21 22 Councilmember Stille thanked Mr. Casey for his negotiation of these three contracts. Mr. Casey 23 stated the City has outstanding staff and they feel well supported by the Council and the 24 community. 25 26 Councilmember Gray stated this is the highest increase for all three contracts compared to the 27 past few years. The unemployment rate is very low. There is a lot of competition in finding and 28 retaining good employees. 29 30 Motion by Councilmember Stille, seconded by Councilmember Jenson, to approve Resolution 31 18-076; a Resolution Ratifying the 2019 – 2020 Agreement Between the International Union of 32 Operating Engineers Local No. 49 AFL-CIO Representing the St. Anthony Public Works 33 Department Employees and the City of St. Anthony Village. 34 35 Motion carried 5-0. 36 37 Mayor Faust thanked the employees that serve the City every day. Their dedication is great and 38 the Council appreciates their loyalty. 39 40 E. Liquor Operations Update. 41 42 Liquor Operations Manager Mike Larson presented an Operations Update on St. Anthony 43 Village Liquor Operations. The presentation included Locations, Mission Statement, Vision 44 Statement, Liquor Operations Update, Sales and Profit Update, New Point of Sale System, LED 45 14 City Council Regular Meeting Minutes November 13, 2018 Page 7 Lighting Project, Customer Royalty Program, and Holiday Wine Sampling Events. Mr. Larson 1 summarized what is available on the City website regarding liquor operations. 2 3 Councilmember Stille referred to the sales profit and would like to see the sales comparison for 4 2017 and 2018. 5 6 Mayor Faust stated Mr. Larson and his staff are doing a great job and following the Mission 7 Statement. Putting together the Royalty Program was a large task and he looks forward to 8 becoming a loyal member. 9 10 VII. REPORTS FROM CITY MANAGER AND COUNCIL MEMBERS. 11 12 City Manager Casey announced the City was recognized by the Minnesota Department of Health 13 for outstanding performance in fluoridation management by the public water systems. Saturday, 14 November 17, is the Sustainability Fair from 1:30 – 4:30 p.m. at City Hall. Friday is the deadline 15 to submit an application for the Planning and Parks Commissions. 16 17 Councilmember Gray stated on October 25, he attended the North Suburban Communications 18 and Access Corporation meeting and reviewed the productions and programming highlights for 19 October. The October 2018 Production and Programming Report for October 2018 was provided 20 for Council review. Last week, he attended the National League of Cities in Los Angeles, 21 California. 22 23 Councilmember Randle had no report. 24 25 Councilmember Jenson stated on October 30, he attended the joint meeting with the School 26 Board and Council Work Session. 27 28 Councilmember Stille stated he also attended the School Board Meeting and the Council Work 29 Session. On November 8, he attended the Community Services Board meeting. He noted the 30 book is out from the Historical Society and the Sister City annual meeting is next Sunday. 31 32 Mayor Faust stated on October 27, he came to Tech Dump and Fix-It Clinic. Both were very 33 busy. On October 30, he attended the Council Work Session. On November 2, he met with the 34 County Assessor. On November 9 he attended Chandler’s Salute to Armed Forces Day. On 35 November 12 he attended the Regional Council of Mayors meeting. Earlier today, he attended 36 the Mississippi Water Management Organization where the budget was approved. 37 38 VIII. COMMUNITY FORUM – NONE. 39 40 IX. INFORMATION AND ANNOUNCEMENTS - NONE. 41 42 X. ADJOURNMENT. 43 44 Mayor Faust adjourned the meeting at 8:10 p.m. 45 46 15 City Council Regular Meeting Minutes November 13, 2018 Page 8 Respectfully submitted, 1 Debbie Wolfe 2 TimeSaver off Site Secretarial, Inc. 3 4 Mayor 5 ATTEST: 6 City Clerk 7 8 16 Saint Anthony Village DATE: November 27, 2018 Approved: TO: Mayor and Councilmembers FROM: License Clerk ITEM: License and Permits for Approval: Mechanical Licenses: Anderson’s Residential Heating & AC, Fridley, MN Boys Mechanical, South St Paul, MN Knight Heating & AC, Otsego, MN Super Heating & Cooling, Blaine, MN Walter Mechanical, Burnsville, MN Rental Licenses: Applicant: Yaacoub Hark Location: 3000 36th Ave NE Applicant: Girard Management Location: 3713 – 3800 Foss Rd NE Applicant: Laramar Liberty Location: 2808 Silver Ln NE Applicant: Jean Kenney Location: 3525 Stinson Blvd NE 17 THIS PAGE LEFT INTENTIONALLY BLANK 18 City of St Anthony Village CITY OF ST ANTHONY CHECK REGISTER Page: 1 Check Issue Dates: 11/16/2018 - 11/28/2018 Nov 21, 2018 02:23PM Vendor Number Payee Check Number Check Issue Date Amount 12180 ARVIG CONSTRUCTION 133 11/28/2018 345.25 10252 CENTERPOINT ENERGY 134 11/28/2018 1,805.58 12648 WINDSTREAM 135 11/28/2018 207.94 11740 XCEL ENERGY 136 11/28/2018 28,059.58 10710 ICMA RETIREMENT TRUST 36636 11/16/2018 1,625.00 11813 NCPERS GROUP LIFE INSURANCE 36637 11/16/2018 32.00 12077 SUN LIFE FINANCIAL 36638 11/16/2018 959.60 2021 12 EYES BREWING 36639 11/28/2018 1,368.00 1118 56 BREWING 36640 11/28/2018 192.00 1121 ABLE SEED HOUSE + BREWERY 36641 11/28/2018 12.00 12729 ACCLAIM SERVICES INC 36642 11/28/2018 559.10 12722 ACHKAR, SIMONE 36643 11/28/2018 135.59 10039 AIRGAS USA LLC 36644 11/28/2018 338.38 10098 ARAMARK 36645 11/28/2018 101.17 1100 ARTISIAN BEER COMPANY 36646 11/28/2018 6,830.44 10115 ASPEN MILLS 36647 11/28/2018 122.85 10156 BEARCOM 36648 11/28/2018 280.00 10159 BEISSWENGER'S 36649 11/28/2018 207.96 1013 BELLBOY CORPORATION 36650 11/28/2018 3,373.69 1014 BELLBOY CORPORATION 36651 11/28/2018 73.50 1035 BERNICK'S BEVERAGE & VENDING 36652 11/28/2018 6,475.65 10172 BIFFS, INC.36653 11/28/2018 232.28 2009 BLACK STACK BREWING 36654 11/28/2018 702.00 12730 BLOOM, RODNEY 36655 11/28/2018 73.23 8544 BOURGET IMPORTS 36656 11/28/2018 3,036.25 1018 BREAKTHRU BEVERAGE MN BEER 36657 11/28/2018 19,544.00 1011 BREAKTHRU BEVERAGE MN WINE & SPIRITS 36658 11/28/2018 2,489.07 1009 BREAKTHRU BEVERAGE MN WINE & SPIRITS 36659 11/28/2018 2,927.96 10206 BROCK WHITE COMPANY LLC 36660 11/28/2018 135.17 2014 BROKEN CLOCK BREWING 36661 11/28/2018 426.00 1017 CAPITOL BEVERAGE SALES 36662 11/28/2018 19,070.90 10263 CENTURYLINK 36663 11/28/2018 590.35 12596 CINTAS 36664 11/28/2018 709.23 10293 CITY OF ROSEVILLE 36665 11/28/2018 2,310.00 1010 CLEAR RIVER BEVERAGE COMPANY 36666 11/28/2018 614.20 12723 CROWSON, JON & GINNY 36667 11/28/2018 85.66 1042 CRYSTAL SPRINGS ICE 36668 11/28/2018 133.43 10438 D ROCK CENTER & SMALL ENG 36669 11/28/2018 111.80 10373 DAILEY DATA & ASSOCIATES 36670 11/28/2018 202.50 10432 DORSEY & WHITNEY 36671 11/28/2018 17,129.54 12019 ENFORCEMENT LIGHTING LLC 36672 11/28/2018 2,675.00 11783 FIRE EQUIPMENT SPECIALTIES INC 36673 11/28/2018 4,375.90 10517 FIRE SAFETY USA, INC.36674 11/28/2018 667.50 10526 FLEETPRIDE 36675 11/28/2018 143.65 1097 FORESTEDGE WINERY 36676 11/28/2018 117.00 12724 GOOD, DR GARY 36677 11/28/2018 3.53 10585 GRAINGER 36678 11/28/2018 145.11 1032 GRAPE BEGINNINGS, INC.36679 11/28/2018 451.25 10589 GRAY/HAL 36680 11/28/2018 1,855.19 1021 GREAT LAKES COCA COLA 36681 11/28/2018 918.32 12721 HANCO CORPORATION 36682 11/28/2018 29.66 10642 HENN CNTY INFO TECH DEPT 36683 11/28/2018 4,583.81 1019 HOHENSTEIN'S, INC 36684 11/28/2018 8,704.25 Auto Pay Auto Pay Auto Pay Auto Pay 19 City of St Anthony Village CITY OF ST ANTHONY CHECK REGISTER Page: 2 Check Issue Dates: 11/16/2018 - 11/28/2018 Nov 21, 2018 02:23PM Vendor Number Payee Check Number Check Issue Date Amount 2020 HUNYUCK BREWING 36685 11/28/2018 135.00 1027 INDEED BREWING COMPANY 36686 11/28/2018 4,957.07 10733 INSTRUMENTAL RESEARCH, INC.36687 11/28/2018 90.00 11754 INTEGRATED LOSS CONTROL, INC.36688 11/28/2018 604.00 12105 INTERSTATE ALL BATTERY CENTER 36689 11/28/2018 580.75 12462 JACKSON & ASSOCIATES LLC 36690 11/28/2018 15,697.00 1016 JJ TAYLOR DISTRIBUTING 36691 11/28/2018 15,290.77 1004 JOHNSON BROTHERS LIQUOR CO.36692 11/28/2018 1,014.60 1005 JOHNSON BROTHERS LIQUOR COMPANY.36693 11/28/2018 5,495.30 1006 JOHNSON BROTHERS LIQUOR COMPANY.36694 11/28/2018 3,194.61 1044 JOHNSON BROTHERS LIQUOR COMPANY.36695 11/28/2018 3,045.08 10831 LEAGUE OF MINNESOTA CITIES 36696 11/28/2018 45.00 10851 LILLIE SUBURBAN NEWSPAPER 36697 11/28/2018 40.25 12725 LINDMAN, MARY 36698 11/28/2018 21.28 10857 LMCIT % BERKLEY ADMINISTRATORS 36699 11/28/2018 1,023.03 10833 LMCIT %BERKLY RISK ADMIN CO 36700 11/28/2018 80,628.00 10874 MACQUEEN EQUIPMENT GROUP 36701 11/28/2018 203.37 11817 MINNEAPOLIS FINANCE DEPARTMENT 36702 11/28/2018 850.00 10978 MINNESOTA COUNTY ATTYS ASSN 36703 11/28/2018 22.00 12699 MINNESOTA EQUIPMENT 36704 11/28/2018 181.11 11002 MINNESOTA SHERIFFS ASSOCIATION 36705 11/28/2018 980.00 11019 MISTER CAR WASH 36706 11/28/2018 36.50 12726 MORANO, JOSEPH & ROSALITIA 36707 11/28/2018 227.76 11061 MORRELL ENTERPRISES LP 36708 11/28/2018 266.70 12441 MTI DISTRIBUTING INC 36709 11/28/2018 98.36 1051 NEW FRANCE WINE COMPANY 36710 11/28/2018 2,984.50 11163 OFFICE DEPOT 36711 11/28/2018 185.70 11164 OFFICE OF THE SECRETARY STATE 36712 11/28/2018 120.00 11185 PACE ANALYTICAL SERVICES, INC.36713 11/28/2018 525.00 1012 PAUSTIS & SONS 36714 11/28/2018 1,876.75 11211 PETTY CASH - U.S. BANK 36715 11/28/2018 85.00 1001 PHILLIPS WINE & SPIRITS 36716 11/28/2018 3,822.80 1002 PHILLIPS WINE & SPIRITS 36717 11/28/2018 2,689.75 12447 PMG 56 LLC MN SERIES 36718 11/28/2018 298.50 12727 POLETZ, ALEXANDER 36719 11/28/2018 22.68 2019 PRYES BREWING COMPANY 36720 11/28/2018 970.00 1062 RED BULL DISTRIBUTION COMPANY 36721 11/28/2018 392.50 1020 ROOTSTOCK WINE COMPANY 36722 11/28/2018 154.92 12732 ROSE CITY SIGN INC 36723 11/28/2018 934.00 11366 SAM'S CLUB 36724 11/28/2018 1,350.15 12719 SAULOG, MINETTE 36725 11/28/2018 580.00 11384 SECOND NATURE LAWN AND 36726 11/28/2018 6,170.00 11411 SIMON, SANDY 36727 11/28/2018 39.97 2018 SMALL LOT WINES 36728 11/28/2018 702.31 1024 SOUTHERN GLAZER'S OF MN 36729 11/28/2018 856.48 1008 SOUTHERN GLAZER'S OF MN 36730 11/28/2018 1,042.74 1026 SOUTHERN GLAZER'S OF MN 36731 11/28/2018 15,178.49 1036 SOUTHERN GLAZER'S OF MN 36732 11/28/2018 250.56 11434 SPECIALIZED ENVIRONMENTAL 36733 11/28/2018 1,897.50 12728 STAATS, SHEILA 36734 11/28/2018 45.97 11502 STREICHER'S 36735 11/28/2018 1,044.50 12430 SUNRAM CONSTRUCTION 36736 11/28/2018 42,419.62 11566 TIMESAVER OFF SITE SECRETARIAL 36737 11/28/2018 142.00 20 City of St Anthony Village CITY OF ST ANTHONY CHECK REGISTER Page: 3 Check Issue Dates: 11/16/2018 - 11/28/2018 Nov 21, 2018 02:23PM Vendor Number Payee Check Number Check Issue Date Amount 12493 TIRES PLUS ST ANTHONY 36738 11/28/2018 838.96 1098 TRADITION WINE & SPIRITS 36739 11/28/2018 122.00 11595 TRI STATE BOBCAT, INC.36740 11/28/2018 333.00 11626 U.S. BANK (PURCHASING CARD)36741 11/28/2018 1,809.23 11674 VERIZON WIRELESS 36742 11/28/2018 333.91 11681 VIKING ELECTRIC SUPPLY INC 36743 11/28/2018 158.74 11682 VIKING INDUSTRIAL CENTER 36744 11/28/2018 66.31 1025 VINOCOPIA 36745 11/28/2018 883.46 11933 WIMACTEL INC 36746 11/28/2018 45.00 1034 WINE COMPANY/THE 36747 11/28/2018 6,638.75 1038 WINE MERCHANTS INC 36748 11/28/2018 1,098.10 11735 WORLDPOINT ECC, INC.36749 11/28/2018 517.28 1103 WRS IMPORTS 36750 11/28/2018 570.00 12506 WS & D PERMIT SERVICE INC 36751 11/28/2018 80.04 11750 ZEE MEDICAL SERVICE 36752 11/28/2018 86.35 Grand Totals: 383,390.08 21 THIS PAGE LEFT INTENTIONALLY BLANK 22    701 Xenia Avenue South | Suite 300 | Minneapolis, MN 55416 | (763) 541-4800    Building a legacy – your legacy. Equal Opportunity Employer | wsbeng.com  S:\1Council Meetings\2018\11272018\LTR-hmcc-111618 (003).docx November 16, 2018 Honorable Mayor, City Council and Staff c/o Mark Casey, City Manager City of St. Anthony Village 3301 Silver Lake Road NE St. Anthony, MN 55418 Re: Resolution approving Hennepin and Ramsey County improvements to County Road C St. Anthony Village, MN WSB Project No. R-011648-000 Dear Honorable Mayor, City Council, and Staff: Attached for your consideration is a resolution approving Hennepin and Ramsey County improvements to County Road C in the City of St. Anthony Village. Ramsey County is the lead agency for the design and management of the proposed County Road C project. Representatives from the County will be present at your November 27th, 2018 council meeting to present the project for your review and approval. I will also be present to answer questions at the Council Meeting or you are welcome to call me to discuss at 763-287-7182. Sincerely, WSB & Associates, Inc. Todd E. Hubmer, PE City Engineer 23 THIS PAGE LEFT INTENTIONALLY BLANK 24 S:\1Council Meetings\2018\11272018\Resolution 18-077 County Road C.docx CITY OF ST. ANTHONY VILLAGE STATE OF MINNESOTA RESOLUTION 18-077 A RESOLUTION APPROVING HENNEPIN AND RAMSEY COUNTY IMPROVEMENTS TO COUNTY ROAD C WHEREAS, Ramsey County is the lead agency for the reconstruction of Ramsey County Road C and Hennepin County Road 94. WHEREAS, Ramsey County has presented the proposed alignment, and pedestrian improvements to the City Council, WHEREAS, Ramsey County has accommodated the City watermain and sanitary sewer utility replacement into the project. NOW, THEREFORE, BE IT RESOLVED, by the City Council of the City of St. Anthony Village that: The City Engineer is authorized to approve and sign the plans as presented by Ramsey County. Adopted this 27th day of November, 2018. _____________________________ Jerome O. Faust, Mayor ATTEST:____________________________ Nicole Miller, City Clerk Reviewed for administration: _____________________________ Mark Casey, City Manager 25 11/28/2018 1 County Road C Reconstruction Project Saint Anthony City Council November 27, 2018 Location Along 29th Avenue (CSAH 94)/County Road C (CSAH 23) from Highway 88 to Long Lake Road Joint Effort Ramsey County –Project Lead Hennepin County City of Roseville St. Anthony Village Minnesota Department of Transportation (MnDOT)County Road C Reconstruction Project 11/28/2018 2 Need for Project Replace aging concrete pavement Original construction –1979 Bituminous overlay –2014 Provide Pedestrian and Bike connection Improve traffic operations Long delays and back-ups for traffic turning east from southbound Long Lake Road to County Road C Some delays/turning difficulty at Walnut Street intersection County Road C Reconstruction Project County Road C Reconstruction Project Public Involvement Public meetings Two in December 2017 One in August 2018 Major issues identified by public: Lack of adequate pedestrian facilities along corridor Important truck access route for I-35W and Highway 88 Need wide lanes for trucks 11/28/2018 3 Need for Project County Road C Reconstruction Project County Road C Reconstruction Project Work Includes Pavement reconstruction Construction of paved trail on south side of County Road C Signal/ADA upgrades at Highway 88 Signal reconstruction at Walnut Street Railroad crossing upgrades Signal reconstruction and addition of turn lanes at Long Lake Road Storm sewer system replacement Watermain and sanitary sewer repairs 11/28/2018 4 County Road C Reconstruction Project New paved trail 8-foot wide paved trail with minimum 2-foot wide safety shoulders Extends from Highway 88 to Long Lake Road Typically has 5-foot wide grass boulevard between trail and CRC curb line Eliminated truck stopping lanes allow trail to pass along north side of transmission tower County Road C Reconstruction Project Walnut Street Intersection Traffic analysis showed capacity issues for turning movement from NB Walnut Street to WB CRC Southbound through lane will be converted to second left turn lane Traffic signal will be reconstructed with ADA upgrades 11/28/2018 5 County Road C Reconstruction Project Long Lake Road Intersection Currently drivers experience long queues waiting to turn on to EB County Road C from SB Long Lake Road (no dedicated left turn lane). Revised design has dual left turn lanes from southbound Long Lake Road to eastbound County Road C. Improved intersection and signal design will allow flashing yellow arrow for left turns during off-peak hours. Project Costs / Funding •$8,380,000 Estimated Construction Costs •$10,975,000 Total Estimated Project Costs •Funded through a combination of: •County State Aid funds –gas tax •Special assessments to benefitting properties •City funds for requested improvements (watermain and sanitary sewer replacements, etc.) County Road C Reconstruction Project 11/28/2018 6 Construction Schedule •Construction expected to begin May/June 2019. •Any required utility relocations will occur first. •Intent is to complete the project in one construction season (dependent on weather). County Road C Reconstruction Project Construction Staging •County Road C will remain open during construction •Expect to build road half at a time •Access to driveways will be maintained to the greatest extent possible •Construction staging and schedule will be coordinated with upcoming MnPASS project on I-35W (expected to begin spring 2019) County Road C Reconstruction Project THIS PAGE LEFT INTENTIONALLY BLANK 26 REQUEST FOR COUNCIL CONSIDERATION      Meeting Date: November 27, 2018 Resolution- a resolution accepting the 27th Avenue/Pahl Avenue Neighborhood Traffic Study and Adopting the Traffic Device Installation Policy. OVERVIEW: In front of you this evening is a resolution accepting the 27th Avenue/Pahl Avenue Neighborhood Traffic Study and Adopting the Traffic Device Installation Policy. At the April 24, 2018 City Council meeting, Council authorized WSB to conduct a traffic study on 27th Avenue and Pahl Avenue. On July 16, 2018 a public information meeting was held at City Hall. At the public information meeting, it was requested to extend the study to include the alley during school hours. At the October 1, 2018 City Council Work Session, a draft of the study was presented to the City Council, and subsequently the Council directed staff to bring forward the study to a future City Council meeting, along with a policy for driver feedback signs installation. Within the Traffic Device Installation Policy, is our Intersection Control Policy that was previously approved by the City Council. New items added to the Traffic Device Installation Policy include: Driver Feedback Sign Installation Policy, and Speed Limit Determination, which provides information taken from the Minnesota Manual on Uniform Traffic Control Devices (MnMUTCD) guidelines. Attached is the 27th Avenue/Pahl Avenue Traffic Study and Traffic Device Installation Policy. S:\1Council Meetings\2018\11272018\Resolution 18-073- Neighborhood Traffic.docx CITY OF ST. ANTHONY VILLAGE STATE OF MINNESOTA RESOLUTION 18-073 A RESOLUTION ACCEPTING THE 27TH AVENUE AND PAHL AVENUE NEIGHBORHOOD TRAFFIC STUDY AND ADOPTING THE TRAFFIC DEVICE INSTALLATION POLICY WHEREAS, the City of St. Anthony residents have requested the study of traffic in the 27th Avenue and Pahl Avenue Neighborhood; WHEREAS, the City of St. Anthony has completed the requested neighborhood traffic study. NOW, THEREFORE, BE IT RESOLVED, that the City Council of the City of St. Anthony Village accepts the 27th Avenue and Pahl Avenue Neighborhood Traffic Study and; BE IT FURTHER RESOLVED that the City adopts the Traffic Device Installation Policy; and NOW BE IT FURTHER RESOLVED that City Manager, is hereby authorized to work collaboratively with the Counties of Ramsey and Hennepin, and the Minneapolis Park Board to develop and install school zone speed limits where permitted. Adopted this 27th day of November, 2018. _____________________________ Jerome O. Faust, Mayor ATTEST:____________________________ Nicole Miller, City Clerk Reviewed for administration: ______________________________ Mark Casey, City Manager TRAFFIC STUDY 27th Avenue NE / Pahl Avenue NE Area October 1, 2018 City of St Anthony Village 3301 Silver Lake Road NE St Anthony Village, MN 55418 WSB PROJECT NO. 12064-000 27th Avenue NE / Pahl Avenue NE Area Traffic Study For: City of St Anthony Village 3301 Silver Lake Road NE St Anthony Village, MN 55418 October 1, 2018 Prepared By: WSB & Associates, Inc. 701 Xenia Ave. South, Suite 300 Minneapolis, MN, 55416 (763) 541-4800 (763) 541-1700 (Fax) 27th AVE NE / Pahl AVE NE AREA TRAFFIC STUDY CITY OF ST ANTHONY VILLAGE WSB PROJECT NO. 12064-000 PAGE i Table of Contents Certification ................................................................................................................... 1 Introduction / Background ....................................................................................... 2 Public Input .................................................................................................................... 4 Existing Traffic Characteristics ............................................................................... 5 Identified Issues ......................................................................................................... 17 Improvement Opportunities .................................................................................. 19 Issue Analysis/Conclusions .................................................................................... 22 Recommendations ..................................................................................................... 24 Figures / Tables Figure 1 - Location / Study Area ............................................................................... 3 Figure 2 – Daily Traffic Volumes .............................................................................. 6 Figure 3 – Hourly Traffic Volumes (Weekday) .................................................... 7 Figure 4 – Hourly Traffic Volumes (Weekend) ................................................... 8 Figure 5 – Heavy Vehicle Volumes ........................................................................... 9 Figure 6 – Hourly Pedestrian Volumes (Weekday) ........................................ 12 Figure 7 – Hourly Pedestrian Volumes (Weekend) ........................................ 13 Figure 8 – 85th Percentile Vehicle Speeds .......................................................... 14 Figure 9 – Crash History Location ......................................................................... 15 Figure 10 – Existing Traffic Control ..................................................................... 16 Figure 11 – Recommended Improvements ....................................................... 25 Table 1 – Crash Summary by Year ........................................................................ 11 Table 2 – Crash Summary by Type ....................................................................... 11 Appendix • Public Information Meeting Material • ADT and Speed Data Summary by Day • FHWA Vehicle Classifications 27th AVE NE / Pahl AVE NE AREA TRAFFIC STUDY CITY OF ST ANTHONY VILLAGE WSB PROJECT NO. 12064-000 PAGE 1 Certification I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly registered professional engineer under the laws of the State of Minnesota. Charles T. Rickart, P.E. Date: October 1, 2018 Reg. No. 26082 27th AVE NE / Pahl AVE NE AREA TRAFFIC STUDY CITY OF ST ANTHONY VILLAGE WSB PROJECT NO. 12064-000 PAGE 2 Introduction / Background St. Anthony Village residents within the neighborhood located immediately east of St. Charles Borromeo Church along 27th Avenue NE, Pahl Avenue NE, Roosevelt Street NE, Wilson Street NE and Coolidge Street NE have raised concerns with the speed and volume traffic on these roadways. As a result, the St Anthony Village City Council requested a Traffic Study be prepared to evaluate the existing traffic conditions and recommend possible improvements for the 27th Avenue NE / Pahl Avenue NE area. To address the residents’ concerns WSB collected necessary traffic volume, pedestrian and speed data, and; identify and evaluate traffic improvements/measures to improve the safety and operation on the area streets. In addition, data from the recently completed Lowery Grove EAW Traffic Study was used to document the traffic conditions on Stinson Boulevard and St. Antony Boulevard. The evaluation process focused on determining if and where traffic issues exist and if they could be improved or eliminated by the application of alternative traffic improvements. The Minnesota Manual on Uniform Traffic Control Devices (MnMUTCD); Minnesota Department of Transportation (MnDOT) Design and Traffic Engineering Manuals; and traffic engineering standard practices and principal were used as the basis for the evaluation process. The steps in the process included: 1. Documenting that a problem exists such as excessive traffic volumes and/or speeds or vehicle crashes 2. Determine the frequency or recurring nature of the problem and that it is not a random or isolated event. 3. Identifying potential measures that would improve or eliminate the problem. This includes intersection controls and/or addressing other conditions at the problem locations. Any recommendations for changes in the 27th Avenue NE / Pahl Avenue NE area have been developed keeping the following goals in mind: • Improvement to vehicle and pedestrian safety. • Application of least restrictive control type possible. • Traffic control consistency within the area. • Would not promote cut-through or diversion of traffic to other streets in the area. • Would not promote speeding on streets within the area. The 27th Avenue NE / Pahl Avenue NE area for the purposes of this study is bounded by St Anthony Boulevard on the north, 27th Avenue on the south, Stinson Parkway on the west and Kenzie Terrace on the east. The Project Location is shown in Figure 1. The following sections of this report document the existing traffic data collected, analysis of the data, improvement alternatives and recommended improvements. 27th AVE NE / Pahl AVE NE AREA TRAFFIC STUDY CITY OF ST ANTHONY VILLAGE WSB PROJECT NO. 12064-000 PAGE 3 27th AVE NE / Pahl AVE NE AREA TRAFFIC STUDY CITY OF ST ANTHONY VILLAGE WSB PROJECT NO. 12064-000 PAGE 4 Public Input Public input is a critical element in the identification of issues and concerns in the area. For the 27th Avenue NE / Pahl Avenue NE Traffic Study a public information meeting was held on July 16, 2018 at the St Anthony Village City Hall. There were 17 residents that signed in at the meeting. The primary purpose of the open house was to update the residents on the data collection, discuss the identified issues and concerns, outline the potential opportunities and, to receive input on the issues and concerns. The primary comments received include: • Need for pedestrian / school zone improvements • Need for blinker signs in the corridor • Need for additional traffic counts on Roosevelt Street • Concern with the posted speed limit • Concern with traffic rolling through stop signs Copies of the meeting notice, sign-in sheets and presentation materials is included in the Appendix. Also included are all comment cards received at the Open House meet, comment cards mailed to the City and phone/email comments received. 27th AVE NE / Pahl AVE NE AREA TRAFFIC STUDY CITY OF ST ANTHONY VILLAGE WSB PROJECT NO. 12064-000 PAGE 5 Existing Traffic Characteristics In order to evaluate the current safety and operational conditions in the 27th Avenue NE / Pahl Avenue NE area, the existing traffic characteristics were collected. This included: • Traffic volumes (hourly and daily) • Heavy vehicle volumes • Pedestrian volumes • Crash history • Vehicle speeds • Current traffic control (signing, pavement markings, sidewalks, etc.). Traffic Volumes Hourly turning movement and daily traffic volumes were collected over a two-week period from May 18, 2018 to May 31, 2018 for most of the area roadway system. Based on comments at the public information meeting additional traffic counts were collected over a one-week period from September 5, 2018 to September 11th, 2018. In both cases the counts were conducted when school was in session to assure a worst-case condition. In general, the counts show that the volumes in the area are at those of typical residential neighborhood streets. Typical residential streets will have traffic volumes between 500 and 1000 vehicles per day(vpd). The ADT volumes on the streets in the 27th Avenue NE / Pahl Avenue NE area range from less than 100 to 750vpd Figure 2 shows the Average Daily Traffic (ADT) volumes for an average weekday, average Saturday and average Sunday in area. Included in the Appendix is a table showing a summary of the ADT traffic volumes per day. Figure 3 shows the hourly traffic volumes on an average weekday for the AM peak hour (7:15am-8:15am), PM peak hour (4:30pm-5:30pm) and school peak hour (3:15pm – 4:15pm). Figure 4 the hourly traffic volumes on an average Saturday peak hour and average Sunday peak hour. Heavy Vehicle Volumes Heavy vehicle traffic volumes were collected in conjunction with the average daily traffic counts. The vehicle classification was based on the Federal Highway Administration (FHWA) standard vehicle splits. The standard FHWA Vehicle Classification table is included in the Appendix. Figure 5 shows the percent vehicles, percent single unit trucks / buses and percent of heavy trucks. Typical residential streets will have heavy vehicle traffic ranging from 2% to 5%. The percent heavy vehicles in the 27th Avenue NE / Pahl Avenue NE area range from 0 to 4.7%. 27th AVE NE / Pahl AVE NE AREA TRAFFIC STUDY CITY OF ST ANTHONY VILLAGE WSB PROJECT NO. 12064-000 PAGE 6 27th AVE NE / Pahl AVE NE AREA TRAFFIC STUDY CITY OF ST ANTHONY VILLAGE WSB PROJECT NO. 12064-000 PAGE 7 27th AVE NE / Pahl AVE NE AREA TRAFFIC STUDY CITY OF ST ANTHONY VILLAGE WSB PROJECT NO. 12064-000 PAGE 8 27th AVE NE / Pahl AVE NE AREA TRAFFIC STUDY CITY OF ST ANTHONY VILLAGE WSB PROJECT NO. 12064-000 PAGE 9 27th AVE NE / Pahl AVE NE AREA TRAFFIC STUDY CITY OF ST ANTHONY VILLAGE WSB PROJECT NO. 12064-000 PAGE 10 Pedestrian Volumes Pedestrian volumes were collected with the hourly turning movement counts conducted at the intersections in the study area. The data indicates that the pedestrian volumes are slightly higher during the afternoon school peak hour time. The heaviest volumes were recorded: along Roosevelt Street adjacent to the school; at the Stinson Parkway crossing at 27th Avenue NE, and; at the Roosevelt Street crossing at St Anthony Boulevard. Figure 6 shows the hourly pedestrian volumes on an average weekday for the AM peak hour (7:15am-8:15am), PM peak hour (4:30pm-5:30pm) and school peak hour (3:15pm – 4:15pm). Figure 7 shows the hourly traffic volumes on an average Saturday peak hour and average Sunday peak hour. Vehicle Speeds In conjunction with the daily traffic counts, vehicle speeds were also collected. Vehicle speed data is typically given as the 85% speed. The 85% speed represents the speed at which 85% percent of the counted vehicles are traveling at or below. Research indicates that this value is where most drivers will operate their vehicle in a reasonable manor. The posted speed limit on the area roadways is 30 mph which is the typical speed limit on most residential streets. The data indicates that most streets in the study area have vehicles that are traveling at or below the posted speed. The 85% speed ranges from 25.0mph to 32.4mph. Figure 8 shows the average 85% vehicle speed for the average weekday and weekend on the streets within the 27th Avenue NE / Pahl Avenue NE area. Included in the Appendix is a table showing a summary of the vehicle speeds per day. Crash History Using the State of Minnesota Crash Mapping Analysis Tool (CMAT), crash data from the past 5 years (2011-2015) was documented. The data shows that over the past five years five locations have had at least one crash. The locations that have had more than one crash are at the intersections outside the study area including: Stinson Parkway at 27th Avenue NE; St Anthony Boulevard at Wilson Street, and; Kenzie Terrace at 27th Avenue NE. NE. Of the crashes reported the majority have been either rear-end or sideswipe type crashes. Figure 9 shows the location of the crashes from 2011-2015 in the 27th Avenue NE / Pahl Avenue NE area. Table 1 show the crash data by year for each location. Table 2 shows the type of crash by location. 27th AVE NE / Pahl AVE NE AREA TRAFFIC STUDY CITY OF ST ANTHONY VILLAGE WSB PROJECT NO. 12064-000 PAGE 11 Table 1: Crash Summary by Year Location Crashes 2011 2012 2013 2014 2015 Total Crashes PD PI PD PI PD PI PD PI PD PI Stinson Parkway at 27th Ave NE 0 0 0 0 1 0 0 0 1 1 3 27th Ave NE at Roosevelt St 0 0 0 0 0 0 0 0 1 0 1 Wilson St at Pahl Ave NE 0 0 0 0 1 0 0 0 0 0 1 St Anthony Blvd at Wilson St 1 0 1 0 0 0 0 0 0 0 2 Kenzie Terrace at 27th Ave NE 1 0 1 0 2 1 2 0 0 0 7 PD = Property Damage PI = Personal Injury Table 2: Crash Summary by Type Location Type Total Crashes Sideswipe Right Turn Rear End Right Angle Unknown Stinson Parkway at 27th Ave NE 0 1 2 0 0 3 27th Ave NE at Roosevelt St 1 0 0 0 0 1 Wilson St at Pahl Ave NE 1 0 0 0 0 1 St Anthony Blvd at Wilson St 1 0 0 0 1 2 Kenzie Terrace at 27th Ave NE 1 0 3 2 1 7 Existing Conditions/Traffic Control Devices The existing traffic control was documented within the study area. This included location of; warning signs, stop signs, speed limit signs, no-parking signs and pedestrian crosswalks. Figure 10 shows the existing conditions in the 27th Avenue NE / Pahl Avenue NE study area. 27th AVE NE / Pahl AVE NE AREA TRAFFIC STUDY CITY OF ST ANTHONY VILLAGE WSB PROJECT NO. 12064-000 PAGE 12 27th AVE NE / Pahl AVE NE AREA TRAFFIC STUDY CITY OF ST ANTHONY VILLAGE WSB PROJECT NO. 12064-000 PAGE 13 27th AVE NE / Pahl AVE NE AREA TRAFFIC STUDY CITY OF ST ANTHONY VILLAGE WSB PROJECT NO. 12064-000 PAGE 14 27th AVE NE / Pahl AVE NE AREA TRAFFIC STUDY CITY OF ST ANTHONY VILLAGE WSB PROJECT NO. 12064-000 PAGE 15 27th AVE NE / Pahl AVE NE AREA TRAFFIC STUDY CITY OF ST ANTHONY VILLAGE WSB PROJECT NO. 12064-000 PAGE 16 27th AVE NE / Pahl AVE NE AREA TRAFFIC STUDY CITY OF ST ANTHONY VILLAGE WSB PROJECT NO. 12064-000 PAGE 17 Identified Issues Issues were identified based on two primary sources including neighborhood input and the data collected. The issues and concerns identified include: 1. Vehicle traffic volumes 2. Speeding 3. Cut-through traffic 4. Pedestrian and bicycle traffic / circulation 5. School traffic 6. Adjacent development Based on the data collected three primary issues were reviewed including, safety, speed and cut-through traffic. In order to determine the magnitude of the issues and the level of improvements needed, screening criteria was developed and discussed below. Safety The safety of an intersection or roadway segment is defined by the number, frequency and type of crashes at a location. An intersection or roadway segment is not considered to have a safety issue if there have only been one or two crashes during any multiyear analysis period. However, if there have been more than three crashes the following criteria should be used to trigger further study of an intersection or roadway segment. • One (1) crash per year for three or more years, or • More than three (3) crashes in one year. Based on these criteria the only location in the study area that was identified for additional study is the intersection of Kenzie Terrace at 27th Avenue NE with 7 reported crashes. All other intersections or roadway segments had three crashes or less in the 5-year period. Speed The 85% speed is used as the primary measure of the speed on a segment of street. If the 85% speed is greater than the posted (30mph) speed limit, then the street segment should be further studied. Based on this criterion the only roadway segment that had a 85% speed over 30mph was 27th Avenue NE between Roosevelt Street and Wilson Street at 32.4mph. Cut-Through Traffic The potential for cut-through traffic was evaluated for the 27th Avenue NE / Pahl Avenue NE area. The study area is fairly captive with a limited number of street accesses in and out. Based on a review of the area there are approximately 92 homes in the study area that could use the area streets to St Anthony Boulevard, Stinson Parkway or Kenzie Terrace. 27th AVE NE / Pahl AVE NE AREA TRAFFIC STUDY CITY OF ST ANTHONY VILLAGE WSB PROJECT NO. 12064-000 PAGE 18 By using standard Institute of Transportation (ITE) trip generation factors for residential homes the number of estimated daily trips that could use the area roadway was determined to be approximately 920 vehicles per day (vpd). Comparing this the existing traffic count on the adjacent streets in and out of the area, it can be concluded that the level of traffic entering or exiting the area does not indicate a cut-through issue. However, reviewing the hourly peak hour turning movement counts there appears to be two routes that may be experiencing some cut-through traffic. The first route is between St Anthony Boulevard and Kenzie Terrace using Coolidge Street to 27th Avenue NE. The second is between St Anthony Boulevard and Stinson Parkway using Wilson Street to 27th Avenue. 27th AVE NE / Pahl AVE NE AREA TRAFFIC STUDY CITY OF ST ANTHONY VILLAGE WSB PROJECT NO. 12064-000 PAGE 19 Improvement Opportunities For each of the identified issues there are several low cost, low impact improvement opportunities that could be implemented depending on further analysis of the conditions and data. Discussed below are some of the possible improvement opportunities and the criteria for implementations. Vehicle Safety Improvements Safety improvements include items that could provide potential benefits by reducing the number of crashes. These improvements would include: 1. Removing obstructions – When the analysis indicates that a sight line issue is present at an intersection; where possible the sight line triangle should be cleared of obstructions. Based on a typical 25mph/30 mph city street the sight triangle is a distance between 30’ and 50’ (depending on right of way width) measured along the right of way line at the intersection. This distance should be based on calculations from the AASHTO “A Policy on Geometric Design of Highways and Streets” Green Book. If clearing the obstruction is not possible, further consideration to other intersection control should be explored. 2. Advance warning signs – Advance warning signs could include “Stop Ahead”, “Intersection Ahead”, etc. These signs would be installed where intersection control is typically in place and/or crashes indicate that sight lines to the intersection may be an issue. 3. “Blinker” signs – Blinker signs are typically used where vehicles need additional warning or in extreme cases with limited sight distance and higher traffic volumes. They can be used on either warning signs (advanced signs) or regulatory signs (stop or yield signs). 4. Pavement markings – This could include either center line or edge line markings. They would typically be used where crashes indicate issues with vehicles staying in their own lane. 5. Lighting – Intersection lighting could be used to clearly locate an intersection at night. Typically, lighting could be installed where there are a significant number of crashes occurring at night. 27th AVE NE / Pahl AVE NE AREA TRAFFIC STUDY CITY OF ST ANTHONY VILLAGE WSB PROJECT NO. 12064-000 PAGE 20 6. Yield signs – Yield signs are typically used in locations where there is confusion on which vehicle approaching the intersection has the right of way. These signs can be used to help clearly assign the right-of-way at an intersection with a balanced traffic flow on all approaches. 7. Stop signs – The Minnesota Manual on Uniform Traffic Control Devices outlines warrants for the installation of stop signs. These warrants include criteria for installation of both all-way or 2-way stops. In addition, stop signs could be considered where sight distance cannot be improved. 8. Turn Lanes/By-Pass Lanes – The Minnesota Department of Transportation (MnDOT) Road Design Manual and Local Road Research Board have established criteria for the addition of turn lanes or by-pass lanes based on traffic volumes and crash data. Specifically, the number of turning vehicles vs opposing vehicles and/or rear-end type crashes. Speed Reduction Improvements Speed improvements include items that would provide potential benefits by reducing speeding in the neighborhood. These improvements could include: 1. Speed limit signs – In locations where the ADT volume is over 750 vehicles per day and there is currently not a posted speed limit sign and the 85% speed is over the posted speed limit, consideration should be given to installing speed limit signs. 2. Driver feed-back (dynamic) speed signs – Driver feed-back signs are signs that display the actual speed of a vehicle as it drives by the location. On neighborhood streets where the 85% speed is determined to be greater than 3mph above the posted speed limit, a driver feed-back sign could be used to warn the driver that they are speeding. 3. Additional enforcement – Based on the traffic speed data collected if the 85% speed is up to 3mph over the posted speed limit, consideration should be given to requesting additional police enforcement. Pedestrian Safety Improvements Pedestrian safety improvements include items that would provide potential benefits by reducing conflicts between vehicles and pedestrians or increasing awareness of pedestrians in the neighborhood. These improvements could include: 27th AVE NE / Pahl AVE NE AREA TRAFFIC STUDY CITY OF ST ANTHONY VILLAGE WSB PROJECT NO. 12064-000 PAGE 21 1. School Speed Zone Signing – The City may establish school speed limits within a school zone of public or non-public school on a basis of engineering and traffic investigations based on the following parameters: The school speed zone shall only be in effect when children are present going to or leaving the school; school speed zones cannot lower the posted speed zone more than 30 mph and shall not be established below 15 mph; school zones are defined as a segment of street or highway that abuts school grounds where children have access to the roadway or where a school crossing is in place; school speed zone signing and stripping must be in accordance with the Minnesota Manual on Uniform Traffic Control Devices (MMUTCD), and; any traffic violations of a school speed limit are subject to a double fine. 2. Pedestrian-activated Flashing LEDs in the Border of a Warning Sign - Section 2A.07 in the MnMUTCD describes the use of flashing white or yellow LEDs in the border of a pedestrian crossing warning sign. The flashing LEDs may be pedestrian activated to increase their effectiveness in making the crossing sign more conspicuous when pedestrians desire to cross the roadway. 3. Signed and Marked Crosswalks – Signed and marked pedestrian crosswalks may be used to delineate preferred pedestrian paths across roadways under the following conditions: at locations with stop signs or traffic signals to direct pedestrians to those crossing locations and to prevent vehicular traffic from blocking the pedestrian path when stopping for a stop sign or red light; at non-signalized street crossing locations in designated school zones, or; at non-signalized locations where engineering judgment dictates that the number of motor vehicle lanes, pedestrian exposure, average daily traffic (ADT), posted speed limit, and geometry of the location would make the use of specially designated crosswalks desirable for traffic/pedestrian safety and mobility. 4. Sidewalk / Path Construction – In areas where pedestrian volumes and vehicle volumes are at a level where safety of the pedestrian is jeopardized, construction of a separated sidewalk or path can be considered. Sidewalks or paths provide many benefits including safety, mobility, and healthier communities. In addition to reducing walking along roadway crashes, sidewalks reduce other pedestrian crashes. Providing walkways for pedestrians dramatically increases how well pedestrians perceive their needs are being met along roadways. 27th AVE NE / Pahl AVE NE AREA TRAFFIC STUDY CITY OF ST ANTHONY VILLAGE WSB PROJECT NO. 12064-000 PAGE 22 Issue Analysis/Conclusions Based on the identified issues and the criteria discussed above for each improvement opportunity, the following analysis conclusions were made: • Safety Issues: As indicated, the only location that was identified with safety (crash) issues is the intersection of Kenzie Terrace at 27th Avenue NE. The majority of the crashes are northbound or southbound on Kenzie Terrace. There are no other trends with the crashes such as time of day or day or week or time of year. Based on the number of vehicles on Kenzie Terrace and with the type and number of crashes a request should be made to Hennepin County to consider a safety improvements at the intersection. • Speeding Issues: As indicated by the neighborhood concerns and verified with the collected data, the speed of traffic on 27th Avenue between Roosevelt Street and Wilson Street has an 85% speed over the posted 30mph limit. Based on the traffic volume review it was documented that most of the traffic on these streets is local to the neighborhood. These should be people that know the area and what the speed limit and road conditions are. Based on the review of the alternatives available there are two improvements that could be considered. 1. Additional Enforcement – With the majority of the streets in the 27th Avenue NE / Pahl Avenue NE area having an 85% speed below the posted 30mph speed limit, and; with the majority of the traffic being local to the area, and; with the recommended installation of the School Speed Zone (see below); additional enforcement should be implemented. The streets should continue to be monitored and evaluated to determine if the speed limit is reduced. 2. Driver Feed-Back (DFB) Signs – Should the 85% speed not be reduced with the additional enforcement. DFB signs could be considered. Research has shown that installation of DFB signs can reduce the 85th speed by up to 3mph. This would reduce the 85% speed on 27th Avenue NE to below the posted speed limit. If this alternative is implemented, a temporary DFB should be installed as a test to determine if the installation provides the benefit anticipated. • Pedestrian Safety: Based on the pedestrian and vehicle data collected consideration should be given to providing accommodation and/or awareness of pedestrians, especially adjacent to the St. Charles Borromeo Church and School. There are two primary options for improving the safety for pedestrian traffic in the area. 27th AVE NE / Pahl AVE NE AREA TRAFFIC STUDY CITY OF ST ANTHONY VILLAGE WSB PROJECT NO. 12064-000 PAGE 23 1. School Speed Zone Establishment – Based on the State requirements and the MnMUTCD the City can establish a school speed zone adjacent to the St. Charles Borromeo School on 27th Avenue NE between Stinson Parkway and Roosevelt Street. Based on the traffic volumes and speeds a 20mph school speed zone is recommended as a solution to improve safety of the students and pedestrians adjacent to 27th Avenue NE. 2. Construction of a Sidewalk Connection – Currently there is sidewalk connections in the 27th Avenue NE / Pahl Avenue NE area located: on the north side of 27th Avenue NE between Stinson Parkway and Roosevelt Street adjacent to the St Charles Borromeo Church and School; on both sides of Stinson Parkway between 27th Avenue NE and St Anthony Boulevard adjacent to St Charles Borromeo Church and School; on both sides of St Anthony Boulevard between Stinson Parkway and Kenzie Terrace. Based on pedestrian data collected and standard practices construction of sidewalk connections could be considered in the area. This would need to be requested by the adjacent land owners. • Cut-Through Traffic: As discussed in the issues identification section most of the traffic in the 27th Avenue NE / Pahl Avenue NE area is local from the neighborhood. However, based on a review of the traffic volume data there appears to be to two possible cut-through routes. 1. Between St Anthony Boulevard and Kenzie Terrace using Coolidge Street to 27th Avenue NE. – The traffic using this cut-through route appears to be trying to avoid the traffic signal at St Anthony Boulevard and Kenzie Terrace. In order to discourage this cut-through route it will require making it less desirable. An option to address this issue would be to install “Stop” signs on Coolidge Street at the Pahl Avenue NE intersection making it an all-way stop consistent with the adjacent intersection. 2. Between St Anthony Boulevard and Stinson Parkway using Wilson Street to 27th Avenue – The traffic using this route appears to be avoiding the intersection of St. Anthony Boulevard and Stinson Parkway. It is unclear if this traffic is actually cutting through or destined for St Charles Borromeo Church and School. One of the concerns is with this traffic using the alleys between Wilson Street and Roosevelt Street. An option to address this issue would be to install “No Thru Traffic” signs on both ends of the two alleys between Wilson Street and Roosevelt Street. Concern has also been raised that as the adjacent area continues to develop, traffic will used 27th Avenue NE as a cut-through. Based on the Traffic Study completed for the Lowry Grove project the majority of the traffic (approximately 85%) is entering and exiting the area from the south and west. The remining traffic will access the Lowry Grove site from Stinson Parkway or Kenzie Terrace. There is no advantage for traffic to cut-through on 27th Avenue to access the Lowry Grove site. 27th AVE NE / Pahl AVE NE AREA TRAFFIC STUDY CITY OF ST ANTHONY VILLAGE WSB PROJECT NO. 12064-000 PAGE 24 Recommendations Based on the issues analysis and the analysis conclusions, the following low impact, low cost improvements are recommended for the 27th Avenue NE / Pahl Avenue NE area. Figure 11 shows the location for the proposed improvements. Safety Improvements • Continue working with Hennepin County on the future improvements at Kenzie Terrace and 27th Avenue NE. Speed Improvements • Provide additional speed enforcement in the area. • Develop a policy for the use of and possible installation of driver feed-back signs in the City. Pedestrian Improvements • Develop City policy for the location of a School Speed Zone (20mph). This may be applied to 27th Avenue NE and Stinson Boulevard. • Changes to Stinson Boulevard will require approval from the Minneapolis Park Board. Cut-Through Traffic • Review additional signage on northbound and southbound Coolidge Street at Pahl Avenue NE. • Consider “No Thru Traffic” signs on both ends of the alleys between Wilson Street and Roosevelt Street. • Continue to monitor the traffic in the 27th Avenue NE / Pahl Avenue NE area as the adjacent development continues. 27th AVE NE / Pahl AVE NE AREA TRAFFIC STUDY CITY OF ST ANTHONY VILLAGE WSB PROJECT NO. 12064-000 PAGE 25 27th AVE NE / Pahl AVE NE AREA TRAFFIC STUDY CITY OF ST ANTHONY VILLAGE WSB PROJECT NO. 12064-000 PAGE 26 APPENDIX 27th Avenue NE / Pahl Avenue NE Area Traffic Study Public Information Meeting July 16th, 2018 6:00 PM to 7:00 PM The City of St Anthony Village has initiated a Traffic Study for the neighborhood located immediately east of St. Charles Borromeo Church along 27th Avenue NE, Pahl Avenue NE, Roosevelt Street NE, Wilson Street NE and Coolidge Street NE. The map below shows the project study area. The study is being prepared to address residents’ concerns with traffic and pedestrian safety related to the speed and volume of traffic on these roadways. The traffic data has now been collected and tabulated and the initial review has been completed. In order to prepare the draft study, the City wishes to get public input. A Public Information Meeting is scheduled for July 16th, 2018. The meeting will be held at the St. Anthony Village Hall beginning at 6:00 pm with a short presentation beginning at 6:15 pm. The purpose of the meeting will be to review the traffic data collected, discuss the traffic calming and safety improvement options and to receive input from adjacent property owners on their issues and concerns. Following the meeting a final report will be prepared with final conclusions and recommendations. If you are unable to attend the Public Information meeting and are in interested in providing input please contact the City’s consultant engineer Chuck Rickart at (612) 360-1283 or crickart@wsbeng.com. 9/19/2018 1 Public Information Meeting July 16, 2018 6:00 PM 27th Avenue NE/Pahl Avenue Area NE Traffic Study Study Location Map 9/19/2018 2 •Review Study Purpose, Objectives and Process •Discus data collection •Discuss identified neighborhood traffic issues and concerns •Discuss alternative solutions •Receive public input on issues and solutions Purpose of the Meeting •Improve vehicle and pedestrian safety •Apply least restrictive control type possible •Traffic control consistency •Not to promote cut-through traffic or diversion of traffic •Not to promote speeding Study Objectives 9/19/2018 3 •Identify neighborhood issues: 1.Traffic operations (signing, pavement markings, pedestrians, sight distance, etc.) 2.Speeding 3.Cut-through traffic •Determine potential low impact, low cost improvements Study Purpose •Collect existing data –Completed •Gather neighborhood input –Tonight •Collect additional data if needed •Conduct preliminary analysis •Present findings to City Council •Prepare final report and recommendations •Present findings to neighborhood for additional input Study Process 9/19/2018 4 •Existing Traffic Control / Signing •Traffic Volumes 1.Weekday hourly peak hours (AM, PM, School) 2.Weekend hourly peak hours (Saturday, Sunday) 3.Daily •Pedestrian Volumes •Speed •Vehicle Classification (Heavy Vehicles) Data Collection Traffic Control / Signing 9/19/2018 5 Hourly Traffic Volumes –Weekday Hourly Traffic Volume -Weekend 9/19/2018 6 Daily Traffic Volumes Hourly Pedestrian Volumes -Weekday 9/19/2018 7 Hourly Pedestrian Volumes -Weekend 85% Speed 9/19/2018 8 Vehicle Classification •Vehicle traffic volumes •Speeding •Cut-through traffic •Pedestrian and bicycle traffic / Circulation •School traffic •Adjacent development Identified Issues 9/19/2018 9 •Traffic is Local to the Neighborhood –Typical residential street 500 –1000vpd –Volumes range from 110 to 750vpd •Heavy vehicles –Typical residential street 2%-5% trucks –% trucks range from 0% to 4.7% Issues Review –Traffic Volumes •Guideline -85% Speed •Typical speed limit on neighborhood streets is 30mph •Existing 85% speed ranges from 25.0 to 32.4 Issues Review –Speed 9/19/2018 10 •Study Area captive with limited number of streets •Standard ITE Traffic Generation rate of approximately 10 trips/day •Approximately 92 homes in area or 920 trips from the residential area •Travel time with stop signs •Traffic volumes show possible cut through –Wilson St/27th St –Coolidge St/Pahl Ave Issues Review –Cut Through Traffic •Traffic control changes •Revised / additional signing •Revised pavement markings •Technology (driver feedback signs, blinker signs, etc.) Possible Low Cost/Low Impact Examples 9/19/2018 11 •Collect additional data, conduct analysis, prepare preliminary findings •Final report •City Council meeting •Neighborhood meeting #2 •Implement approved recommendation (based on funding availability) Next Steps Jay Hartman –City of St Anthony 612-782-3314 jhartman@savmn.com Charles Rickart –WSB & Associates 612-360-1283 crickart@wsbeng.com Contacts/Additional Information 9/19/2018 12 Questions / Comments ALL CARS CARS CARS W/ 1-AXLE TRAILER CARS W/ 2-AXLE TRAILER 2 3 4 2 MOTORCYCLES 21 NO. OF AXLESDESCRIPTION Figure 1 CLASS GROUP FHWA VEHICLE CLASSIFICATION PICK-UPS & VANS 1 & 2 AXLE TRAILERS 2, 3, & 43 BUSES 2&34 2-AXLE, SINGLE UNIT 25 3-AXLE, SINGLE UNIT 36 4-AXLE, SINGLE UNIT 47 2-AXLE, TRACTOR, 1-AXLE TRAILER (2&1) 3 8 2-AXLE, TRACTOR, 2-AXLE TRAILER (2&2) 4 3-AXLE, TRACTOR, 2-AXLE TRAILER (3&2) 5 9 3-AXLE, TRACTOR, 1-AXLE TRAILER (3&1) 4 TRACTOR W/ SINGLE TRAILER 6&710 5-AXLE MULTI-TRAILER 511 6-AXLE MULTI-TRAILER 612 13 14 15 7 or moreANY 7 OR MORE AXLE NOT USED UNKNOWN VEHICLE TYPE 3-AXLE, TRUCK W/ 2-AXLE TRAILER 5 HEAVY TRUCKS     3301 Silver Lake Road, St. Anthony, Minnesota 55418‐1699   www.savmn.com (612) 782‐3301 Fax (612) 782‐3302   Our mission is to be a progressive and welcoming Village that is walkable, sustainable, safe.    TRAFFIC DEVICE INSTALLATION POLICY    INTERSECTION CONTROL POLICY    PURPOSE  This document outlines policies for determining the location and type of intersection control signage on  roadways owned and maintained by the City of St. Anthony Village.  The City of St. Anthony Village is  implementing this policy for several reasons:   Effective traffic control is achieved by exercising the least intrusive control to achieve safe traffic  flow. When excessive control or unnecessary control is used, motorists feel imposed upon and  frequently will ignore the traffic control device. This can lead to severe consequences involving  collisions and possibly personal injury.   Consistent application of intersection control devices increases safety to both motorists and  pedestrians within the community.   Research conducted by the Federal Highway Administration shows that adding stop signs are not  effective in addressing the issue of speed. The purpose of stop signs is to assign right‐of‐way at an  intersection, not to control speeding.   The Federal Highway Administration also concluded that adding stop signs do not necessarily  improve safety at an intersection.   A common misconception is that stop signs at an intersection are needed because an accident has  occurred there recently. It is important to keep in mind that accidents are random events. Many  collisions are the result of driver error and are not the fault of poor design or insufficient traffic  control.   Public understanding of the function of stop signs is one of the most critical elements in reducing  speeding and traffic accidents.    A consistent application of the policy serves both the motorist and resident within the City. Stop signs  can be an effective safety measure if properly warranted. However, they should not be installed  inappropriately where they may be ignored by drivers, needlessly interrupt traffic flow, and negatively  affect fuel consumption, the environment, or cause needless noise.     The traffic control at an intersection is critical to the operation of both intersecting roadways. If  incorrect traffic control is installed for the existing traffic conditions and topographic characteristics of  the intersection, undue delays and even unnecessary accidents could occur. The traveling public,  especially persons not familiar with the area, typically drive based on instinct. Drivers subconsciously  evaluate their surroundings to determine if a stop sign should or should not be located on an  intersection approach.                3301 Silver Lake Road, St. Anthony, Minnesota 55418‐1699   www.savmn.com (612) 782‐3301 Fax (612) 782‐3302   Our mission is to be a progressive and welcoming Village that is walkable, sustainable, safe.    PROCESS  City staff will formalize the traffic safety concern or request. City staff will assist concerned residents to  complete a “Traffic Study Request Form” (appendix A) and gather the pertinent facts to help clearly  define the problem and seek a possible solution. Traffic Study Request forms will be reviewed by the  City Manager (or designee), Public Works Director, Police Chief and City Engineer. City staff will  complete an “Intersection Control Justification Worksheet” (Appendix C) and share the results with all  interested parties. If a disagreement with the decision or additional information and/or facts that are  persuasive as related to the City warrants/policies for the requested sign, interested parties may appear  at a City Council meeting and present viewpoint. Any subsequent review of the same or similar request  is at the discretion of the City Council.    The City Council is the final authority on traffic safety matters, in all cases of traffic control changes to  intersections under City of St. Anthony Village jurisdiction, approval by resolution by Council shall be  required. Requests for removal of a sign will follow the same process.    POLICY  The following information explains St. Anthony Village’s policies on intersection traffic control and the  correct use of stop signs.    LOCAL STREET “RESIDENTIAL” STOP SIGNS  The purpose of the local street stop sign policy is to provide fair and uniform treatment of all  requests for stop signs in residential areas.  1. The provisions of the Minnesota Manual on Uniform Traffic Control Devices (MUTCD) shall be  followed. Relevant speed, volumes, accident records and sight obstructions shall be reviewed  when considering the installation of a stop sign. The following MUTCD standards will be applied:  a. If an intersection experiences five (5) or more right angle accidents in a three (3) year  period, stop signs should be considered.   b. If the presence of a sight obstruction is contributing to accidents at an intersection, removal  of the sight obstruction should be sought before considering a stop sign.   c. If the 85th percentile speed on any leg of an intersection is more than five (5) MPH over the  posted speed limit, a stop sign should be considered for the intersecting street.   d. If traffic volumes exceed 500 vehicles per day on each of the intersecting streets, stop signs  should be considered.  2. Absent traffic data which clearly indicates the need for a stop sign, a residential intersection  should be left uncontrolled.  3. Residential stop signs shall not be installed in an attempt to control speed.  4. Residential stop signs shall not be installed in an attempt to control volume.  5. Residential stop sign appropriateness will be reviewed as part of any street reconstruction.                3301 Silver Lake Road, St. Anthony, Minnesota 55418‐1699   www.savmn.com (612) 782‐3301 Fax (612) 782‐3302   Our mission is to be a progressive and welcoming Village that is walkable, sustainable, safe.      COLLECTOR STREET STOP SIGNS  The purpose of the collector street stop sign policy is to provide fair and uniform treatment of all  requests for multiway, all way, and 4‐way stop signs.  1. The provisions of the Minnesota Manual on Uniform Traffic Control Devices (MUTCD) shall be  followed. Relevant speed, volumes, accident records and sight obstructions shall be reviewed by  City Staff when considering the installation of a stop sign.  2. Any of the following conditions may warrant a multiway stop sign installation:   a. An accident problem, as indicated by five or more reported accidents in a 12‐month period  of a type susceptible to correction by a multiway stop installation. Such accidents include  right‐ and left‐turn collisions as well as right angle collisions.   b. Minimum traffic volumes:   1) The total vehicular volume entering the intersection from all approaches must average  at least 500 vehicles per hour for any 8 hours of an average day, and  2) The combined vehicular and pedestrian volume from the minor street or highway must  average at least 200 units per hour for the same 8 hours, with an average delay to minor  street vehicular traffic of at least 30 seconds per vehicle during the maximum hours, but  3) When the 85‐percentile approach speed of the major street traffic exceeds 40 miles per  hour, the minimum vehicular volume warrant is 70 percent of the above requirements.  3. Multiway stop signs shall not be installed in an attempt to control speed.  4. Multiway stop signs shall not be installed in an attempt to control volume.  5. Absent traffic data, which clearly indicates the need for a multiway stop sign, control devices at  an intersection will remain unchanged.  6. Multiway stop sign appropriateness will be reviewed as part of any street reconstruction.                                        3301 Silver Lake Road, St. Anthony, Minnesota 55418‐1699   www.savmn.com (612) 782‐3301 Fax (612) 782‐3302   Our mission is to be a progressive and welcoming Village that is walkable, sustainable, safe.    DRIVER FEEDBACK SIGN INSTALLATION POLICY    PURPOSE  The purpose of this policy is to outline the processes and procedures for installing Driver Feedback (DFB)  signs as a traffic calming device.  The City of St. Anthony Village is implementing this policy for several  reasons:     Currently local City streets in the City of St. Anthony Village have a speed limit of 30 mph. On some  of these streets the speed of traffic is a concern that maybe actual or perceived.    Driver feedback signs are traffic calming devices designed to slow speeders down by alerting them  of their speed. They are designed to increase driver speed awareness and roadway safety in  residential communities, schools, hospital zones, business parks, highway and road construction  sites, police enforcement zones or just about anywhere speeding is a problem.   Vehicle speeds on local City streets are determined based upon guidelines from Minnesota Statutes,  Minnesota Department of Transportation (MnDOT) policies and Minnesota Manual on Uniform  Traffic Control Devices (MnMUTCD) (see Appendix B).    DFB signs display the speed of approaching vehicles, making speeding drivers aware that they are  exceeding the speed limit.    DFB signs may be used to address excessive mean speed and 85th percentile speed issues. Studies  have shown that: speeders will slow down up to 80% of the time when alerted by a radar sign;  typical speed reductions are from 10‐20%, and; overall compliance with the posted speed limit will  go up by 30‐60%.    PROCESS  City staff will have primary responsibility for determining the need for installation of DFB’s on St  Anthony Village city streets. City staff will assist concerned residents to complete a “Traffic Study  Request Form” (Appendix A) and gather the pertinent facts to help clearly define the problem and seek  a possible solution. Traffic Study Request forms will be reviewed by the City Manager (or designee),  Public Works Director, Police Chief and City Engineer.     It is the policy of the City of St Anthony Village to follow the guidelines and recommendations contained  in the most current approved Minnesota Manual on Uniform Traffic Control Devices (MnMUTCD) to  make decisions on design, locations, installation and maintenance of signs, pavement markings and  traffic calming devices.  Minnesota State Statute 169.06, Sub. 3 states, "All traffic control devices  erected shall conform to the state manual and specifications." (Appendix B)    Following a determination that the street segment meets the eligibility guidelines; City staff will  complete a Driver Feedback sign justification and share the results with all interested parties. If a  disagreement with the decision or additional information and/or facts that are persuasive as related to  the City warrants/policies for the requested installation, interested parties may appear at a City Council  meeting and present viewpoint. Any subsequent review of the same or similar request is at the  discretion of the City Council.            3301 Silver Lake Road, St. Anthony, Minnesota 55418‐1699   www.savmn.com (612) 782‐3301 Fax (612) 782‐3302   Our mission is to be a progressive and welcoming Village that is walkable, sustainable, safe.    The City Engineer or designee is responsible for coordinating with other agencies (park board, state and  county) when a traffic evaluation request is received regarding a park board, state or county roadway  within the city limits.      The City Council is the final authority on traffic safety matters, in all cases of traffic changes to streets  under City of St. Anthony Village jurisdiction, approval by resolution by Council shall be required.  Requests for removal of a sign will follow the same process.    EVALUATION  If a speed concern is identified where a Driver Feedback (DFB) sign is an appropriate solution, the  following guidelines should be followed:    Step 1 ‐ Eligibility:    In order for a roadway to be eligible for consideration of a DFB, it needs to meet the following minimum  criteria.     Classified as a local or collector street    Length greater than 1,000 feet   Traffic volumes greater than 1,000 vehicles per day   Posted speed of 30 mph   Cannot be a cul‐de‐sac    Step 2 ‐ Data Collection:    For eligible roadway segments, available data should be collected including:     Average Daily Traffic Volume    Crash History   Pedestrian Traffic Volumes (if applicable)   Vehicle Speeds    Site Topography    Step 3 ‐ Evaluation Process:    If the roadway is eligible for consideration for a DFB sign, a study will be conducted using the collected  data. In analyzing the speed data, the 85th percentile speed and Pace of the traffic of the collected data  will be calculated. Pace and 85th Percentile speed are defined as follows:       Pace – The 10 MPH range of speeds containing the largest number of observations   85th Percentile Speed – The speed at or below which 85 percent of the traffic is moving.    Typically, the 85th Percentile Speed is within two miles per hour of the upper limit of the Pace.  A normal  speed distribution will contain approximately 70% of the sample within the Pace with 15% above and  15% below.       3301 Silver Lake Road, St. Anthony, Minnesota 55418‐1699   www.savmn.com (612) 782‐3301 Fax (612) 782‐3302   Our mission is to be a progressive and welcoming Village that is walkable, sustainable, safe.    Based on the data collected for streets with a posted speed limit of 30 mph the following criteria will be  used to determine if a DFB sign or other mitigations should be considered:    1. 85% Speed less than 30 mph with less than 15% over the Pace:   No further action required    2. 85% Speed between 30 mph and 33 mph with less than 15% over the Pace:   Continue to monitor location   Additional enforcement    3. 85% Speed between 33 mph and 35 mph with more than 15% over the Pace:   Installation of Driver Feedback Signs    4. 85% Speed is greater than 35 mph with more than 15% over the Pace:   Installation of Driver Feedback Signs   Consider evaluation for potential engineering solutions.     Step 4 – Implementation/Funding:    Upon the recommendation of City staff and approval by the City Council, the appropriate measures will  be implemented by the City once funding is secured.  Possible funding sources include:     Inclusion in the City’s Capital Improvement Plan (CIP)   Special request from the City Council    Assessment process    Figure 1 represents the decision diagram used in the speed concern evaluation process.                                          3301 Silver Lake Road, St. Anthony, Minnesota 55418‐1699   www.savmn.com (612) 782‐3301 Fax (612) 782‐3302   Our mission is to be a progressive and welcoming Village that is walkable, sustainable, safe.    Figure 1 – Driver Feedback Sign Evaluation Process                                                              Request Received  Staff Evaluation  (Data collection and evaluation)  85th  Percentile  Speed > 33  mph  Council to consider   Driver Feedback Signs   Council to consider  potential engineering  solutions  Additional Speed Enforcement  if perceived speed concern   is still present  (No further action by City Council)  NO  Roadway  Eligible   NO  YES  No further action  YES  Feasibility, Funding, and Installation  85th  Percentile  Speed > 35  mph  NO YES        3301 Silver Lake Road, St. Anthony, Minnesota 55418‐1699   www.savmn.com (612) 782‐3301 Fax (612) 782‐3302   Our mission is to be a progressive and welcoming Village that is walkable, sustainable, safe.                    Appendix A         3301 Silver Lake Road, St. Anthony, Minnesota 55418‐1699   www.savmn.com (612) 782‐3301 Fax (612) 782‐3302   Our mission is to be a progressive and welcoming Village that is walkable, sustainable, safe.    Traffic Study Request Form  Date:__________________    Requested by (Name, Address, & Phone Number):  _____________________________________________________________________________________ _____________________________________________________________________________________ _____________________________________________________________________________________    Description of the Problem:  _____________________________________________________________________________________ _____________________________________________________________________________________ _____________________________________________________________________________________ _____________________________________________________________________________________ _____________________________________________________________________________________ _____________________________________________________________________________________    Time of Day Problem Occurs:  _____________________________________________________________________________________ _____________________________________________________________________________________ _____________________________________________________________________________________    Requested Action of the City:  _____________________________________________________________________________________ _____________________________________________________________________________________ _____________________________________________________________________________________    Sketch intersection of roadway segment showing where the problem occurs:                                      Return form to City Hall            3301 Silver Lake Rd NE            St. Anthony, MN 55418      3301 Silver Lake Road, St. Anthony, Minnesota 55418‐1699   www.savmn.com (612) 782‐3301 Fax (612) 782‐3302   Our mission is to be a progressive and welcoming Village that is walkable, sustainable, safe.                                      Appendix B                                                                                3301 Silver Lake Road, St. Anthony, Minnesota 55418‐1699   www.savmn.com (612) 782‐3301 Fax (612) 782‐3302   Our mission is to be a progressive and welcoming Village that is walkable, sustainable, safe.    SPEED LIMIT DETERMINATION  The City of St Anthony Village will address speed limit related concerns based upon guidelines  from Minnesota Statutes, Minnesota Department of Transportation (MnDOT) policies,  Minnesota Manual on Uniform Traffic Control Devices (MnMUTCD), and engineering  judgement.     The basis for setting a speed limit follows the Minnesota State Statutes and the MnMUTCD. The  following segments of information were taken from the Minnesota Statutes and MnMUTCD,  those of which apply to the City of St Anthony Village. A exert from the FHWA discussing best  practices is also included showing how engineering studies are used to set new speed limits or  change existing ones.    Minnesota Statues:    169.011 DEFINITIONS  Subdivision 64. Residential Roadway  A “residential roadway” is a city street or town road whose length is up to a half‐mile.    169.14 SPEED LIMITS, ZONES; RADAR.  Subdivision 1. Duty to drive with due care.  No person shall drive a vehicle on a highway at a speed greater than is reasonable and prudent  under the conditions. Every driver is responsible for becoming and remaining aware of the  actual and potential hazards then existing on the highway and must use due care in operating a  vehicle.    In every event speed shall be so restricted as may be necessary to avoid colliding with any  person, vehicle or other conveyance on or entering the highway in compliance with legal  requirements and the duty of all persons to use due care.    Subdivision 2. Speed limits.  (a) Where no special hazard exists the following speeds shall be lawful, but any speeds in excess  of such limits shall be prima facie evidence that the speed is not reasonable or prudent and that  it is unlawful; except that the speed limit within any municipality shall be a maximum limit and  any speed in excess thereof shall be unlawful:  (1) 30 miles per hour in an urban district;  (Subdivisions 2.2‐2.7 do not apply here, therefore were excluded)  (8) 35 miles per hour in a rural residential district if adopted by the road authority  having jurisdiction over the rural residential district.  (c) A speed limit adopted under paragraph (a), clause (8), is not effective unless the road  authority has erected signs designating the speed limit and indicating the beginning and end of  the rural residential district for the roadway on which the speed limit applies.        3301 Silver Lake Road, St. Anthony, Minnesota 55418‐1699   www.savmn.com (612) 782‐3301 Fax (612) 782‐3302   Our mission is to be a progressive and welcoming Village that is walkable, sustainable, safe.  MnMUTCD:  2B.13 Speed Limit Sign  A Standard: Speed zones (other than statutory speed limits) shall only be established on the  basis of an engineering study that has been performed in accordance with traffic engineering  practices.    The engineering study shall include an analysis of the current speed distribution of free‐flowing  vehicles.    The speed limit (R2‐1) sign shall display the limit established by law, ordinance, regulation, or as  adopted by the authorized agency based on the engineering study. The speed limits displayed  shall be in multiples of 5 mph. Speed Limit signs, indicating speed limits for which posting is  required by law, shall be located at the points of change from one speed limit to another.    An Option: Other factors that may be considered when establishing speed limits are the  following:   Road characteristics, shoulder condition, grade, alignment, and sight distance   The pace speed   Roadside development (nearby school) and environment   Parking practices and pedestrian activity (mainly children)   Reported crash experience for at least a 12‐month period    Methods and Practices for Setting Speed Limits: An Informational Report by the FHWA Safety  Program:  Most engineering approaches to speed limit setting are based on the 85th percentile speed— the speed at which 85 percent of free‐flowing traffic is traveling at or below. The typical  procedure is to set the speed limit at or near the 85th percentile speed of free‐flow traffic.  Adjustments to either increase or decrease the speed limits may be made depending on  infrastructure and traffic conditions.    The 85th percentile speed method is also attractive because it reflects the collective judgment  of the vast majority of drivers as to a reasonable speed for given traffic and roadway conditions.    This is aligned with the general policy sentiment that laws (i.e., speed limits) should not make  people acting reasonably into law‐breakers. Setting a speed limit even 5 mph below the 85th  percentile speed can make almost half the drivers illegal; setting a speed limit 5 mph above the  85th percentile speed will likely make few additional drivers legal.     Under the operating speed method of setting speed limits, the first approximation of the speed  limit is to set the speed limit at the 85th percentile speed. The MnMUTCD recommends that the  speed limit be within 5 mph of the 85th percentile speed of free‐flowing traffic. The posted  speed limit shall be in multiples of 5 mph.      3301 Silver Lake Road, St. Anthony, Minnesota 55418‐1699   www.savmn.com (612) 782‐3301 Fax (612) 782‐3302   Our mission is to be a progressive and welcoming Village that is walkable, sustainable, safe.      While the MnMUTCD recommends setting the posted speed limits near the 85th percentile  speed, and traffic engineers say that agencies are using the 85th percentile speed to set speed  limits, the speed limit is often set much lower. At these locations, the 85th percentile operating  speeds exceed the posted speed limits; and, in many cases, the 50th percentile operating speed  is either near or exceeds that posted speed limit as well. Many agencies deviate from their  agency's written guidelines and instead post lower speed limits. According to an ITE Engineering  Council Technical Committee survey, these reduced speed limits are often the result of political  pressures.    NOTE: Federal and State speed limit guidelines define the 85th percentile speed as a  “reasonable speed” or the speed in which 85% of motorists travel at or below.  Experience has  shown that the 85th Percentile Speed most closely provides for a safe and reasonable speed  limit.  Therefore, it can be expected that on a typical roadway, approximately 15 percent of the  vehicles may be traveling at speeds greater than the posted speed limit.      It is important to note that setting speed limits lower than 85th percentile speed does not  encourage compliance with the posted speed limit.                                                                    3301 Silver Lake Road, St. Anthony, Minnesota 55418‐1699   www.savmn.com (612) 782‐3301 Fax (612) 782‐3302   Our mission is to be a progressive and welcoming Village that is walkable, sustainable, safe.                                          Appendix C        3301 Silver Lake Road, St. Anthony, Minnesota 55418‐1699   www.savmn.com (612) 782‐3301 Fax (612) 782‐3302   Our mission is to be a progressive and welcoming Village that is walkable, sustainable, safe.    INTERSECTION LOCATION: ____________________________________________________________________ EXISTING TRAFFIC CONTROL: _______________________________________ DATE: ____________________ This Residential Street Stop Control Justification Worksheet is applicable only to intersections of residential streets with speed limits of 30 miles Per hour. This procedure is “not” to be applied to the intersection of a local residential street with a major collector or arterial street as identified in the City’s Transportation Plan. APPROACH SPEEDS 1 2 Uncontrolled approach speed. Check two boxes, one for the 30 miles per hour or less 0 points 85th percentile approach speed group and one for the highest recorded speed group with two or more observations. 31 to 35 miles per hour 10 points = 85th percentile approach speed (highest approach) 36 to 38 miles per hour 20 points = highest recorded speed group with two or more 39 to 42 miles per hour 30 points observations. 43 to 45 miles per hour 40 points 46 miles per hour or more 50 points TRAFFIC VOLUMES 1 2 Intersection approach daily traffic volume. Check one box Less than 250 vehicles per day 0 points for the total major street approach volume and one box for the highest minor street leg. 250 to 450 vehicles per day 10 points = total daily traffic volume for both major street 450 to 700 vehicles per day 20 points approaches = highest minor street approach daily traffic 700 to 1000 vehicles per day 30 points volume (times two). More than 1000 vehicles per day 40 points The safe stopping sight distance on any uncontrolled approach is restricted to less than 300 feet by horizontal and/or vertical roadway alignment, or by other “permanent” obstructions to sight distance. (See Figure 1) The safe stopping sight distance on any uncontrolled approach is greater than 300 feet but less than 450 feet due to horizontal and/or vertical roadway alignment, or other “permanent” obstructions to sight distance. (See Figure 1) 50 points 10 points The number of reported traffic accidents at the subject intersection within the past 12 months _= ________x 10 points = __________ School, park, bus stop or other major pedestrian generator causing many pedestrians to cross the 20 points subject intersection. PREPARED BY: _________________________________________________________ Total Points *If the worksheet point total is greater than or equal to 100 points, all-way stop control may be “justified” at the subject intersection. RESIDENTIAL STREET ALL-WAY STOP CONTROL JUSTIFICATION WORKSHEET SIGHT DISTANCE RESTRICTION OTHER CONDITIONS 1 2 1 2 11/7/2018 1 City Council Meeting November 13, 2018 7:00 PM 27th Avenue NE/Pahl Avenue Area NE Traffic Study Study Location Map 11/7/2018 2 •Review Study Purpose, Objectives and Process •Discuss data collection •Discuss identified neighborhood traffic issues and concerns •Discuss alternative solutions and recommendations •Receive input on issues and solutions Purpose of the Meeting •Improve vehicle and pedestrian safety •Apply least restrictive control type possible •Traffic control consistency •Not to promote cut-through traffic or diversion of traffic •Not to promote speeding Study Objectives 11/7/2018 3 •Identify neighborhood issues: 1.Traffic operations (signing, pavement markings, pedestrians, sight distance, etc.) 2.Speeding 3.Cut-through traffic •Determine potential low impact, low cost improvements Study Purpose •Collect existing data –Completed •Gather neighborhood input –Completed •Collect additional data if needed -Completed •Conduct preliminary analysis -Completed •Present findings to City Council -Tonight •Prepare final report and recommendations Study Process 11/7/2018 4 •Existing Traffic Control / Signing •Traffic Volumes 1.Weekday hourly peak hours (AM, PM, School) 2.Weekend hourly peak hours (Saturday, Sunday) 3.Daily •Pedestrian Volumes •Speed •Vehicle Classification (Heavy Vehicles) •Alley Counts Data Collection Traffic Control / Signing 11/7/2018 5 Hourly Traffic Volumes –Weekday Hourly Traffic Volume -Weekend 11/7/2018 6 Daily Traffic Volumes Hourly Pedestrian Volumes -Weekday 11/7/2018 7 Hourly Pedestrian Volumes -Weekend 85% Speed 11/7/2018 8 Vehicle Classification •Vehicle traffic volumes •Speeding •Cut-through traffic •Pedestrian and bicycle traffic / Circulation •School traffic •Adjacent development Identified Issues 11/7/2018 9 •Traffic is Local to the Neighborhood –Typical residential street 500 –1000vpd –Volumes range from 110 to 750vpd •Heavy vehicles –Typical residential street 2%-5% trucks –% trucks range from 0% to 4.7% Issues Review –Traffic Volumes •Guideline -85% Speed •Typical speed limit on neighborhood streets is 30mph •Existing 85% speed ranges from 25.0 to 32.4 Issues Review –Speed 11/7/2018 10 •Study Area captive with limited number of streets •Standard ITE Traffic Generation rate of approximately 10 trips/day •Approximately 92 homes in area or 920 trips from the residential area •Travel time with stop signs •Traffic volumes show possible cut through –Wilson St/27th St –Coolidge St/Pahl Ave Issues Review –Cut Through Traffic •Traffic control changes •Revised / additional signing •Revised pavement markings •Technology (driver feedback signs, blinker signs, etc.) Possible Traffic Improvements 11/7/2018 11 •Safety: –Continue working with Hennepin County on future improvements at Kenzie Terrace and 27th Avenue NE •Speed: –Provide additional speed enforcement –Develop a policy for the use and possible installation of a driver feed- back signs in the city. Recommendations •Pedestrian: –Develop City policy for location of a School Speed Zone (20mph). This may be applied to 27th Avenue NE and Stinson Boulevard. –Changes to Stinson Boulevard will required approval from the MPRB •Cut-Through: –Review additional signage on northbound and southbound Coolidge St at Pahl Avenue NE –Consider “No Thru Traffic” signs on both ends of the alleys between Wilson Street and Roosevelt Street –Continue to monitor traffic as adjacent development continues Recommendations 11/7/2018 12 Questions / Comments MEMORANDUM To: St. Anthony Village City Council From: Molly Just, AICP, City Planner Date: November 18, 2018 City Council Regular Meeting for November 27, 2018 WSB Project No. 002170-230: Comprehensive Plan Update Recommendation: Approve the St. Anthony 2040 Comprehensive Plan and Authorize Submission to Metropolitan Council for Formal Action Background. A comprehensive plan is the city’s guiding policy document related to the built environment. State law requires preparation of a comprehensive plan every ten years. This is an update of the comprehensive plan adopted by the City of St. Anthony Village in 2008. The current comprehensive plan was preceded by a plan adopted in 1998, and prior to that a plan in 1979. St. Anthony is a desirable place to live, work and play in part because of a strong history of planning. Long- range planning has provided certainty and direction to homeowners and investors and helped the City make cost-effective investments in streets, parks and utilities. The purpose of a comprehensive plan is to cast a vision and to establish policy direction for those elements over which the City has jurisdiction. These primarily include the pattern of land development and public facilities such as streets, utilities and parks. Land development is regulated through the City’s zoning ordinance and map, which is prepared or amended with guidance from the comprehensive land use plan map and policies. Recent development interest in St. Anthony, particularly the re-development of the Lowry Grove, and development trends toward re-development, has sparked interest in the importance and value of the Comprehensive Plan as a guiding vision document for growth and development in the city. This interest has generated a high level of community engagement and input into the plan. Given this, the city undertook a major update and overhaul of the comprehensive plan. Process. A comprehensive planning process is strengthened by input from residents, business owners, interest groups and advisory committees. This nearly three year process began with a presentation at the City’s strategic planning session by the Planner on January 14, 2016. A steering committee was formed which included the Planning Commission and two members of the City Council. The steering committee provided feedback and direction to staff during the creation of the plan. The Comp Plan Steering Committee, had their first meeting on February 22, 2016. The Comp Plan Steering Committee’s twelfth (12) and final meeting was held on November 14, 2018. In that time period, Input was collected throughout the process from over 15 engagement sessions, including: a visioning meeting, a sustainability focus group, around the community, at the high school, 27 the rental complexes, Village Fest, and the community education classrooms, and social media, engaging over 250 residents and community members. Highlights of Outreach Efforts: Community Visioning Day - Wine Tasting at St. Anthony Wine & Spirits - ECFE Class Chats and Community Ed Parent Council - Key Club - Engage Seniors Where They Live - Sustainability Planning with US Green Building Council - Citizens for Sustainability - Park Board - Online Engagement Forum Key Themes: What we heard from the community. What people love •The schools are great and an attraction to people and the community is great for children. •Proximity is to the Twin Cities is one of the city’s biggest assets. •The city has a reputation for being a sustainability leader. •People love St. Anthony in general, and believe it is a great place to live. •It’s peaceful, quiet, and has a small town feel. Opportunities for change •People want more physical connectivity through bicycle and pedestrian infrastructure. •There should be options for long-time residents to stay, as well as accommodate new people. •Sustainable initiatives are underway yet will continue to be important to the community. •Housing affordability is an increasing challenge as rents and property values go up. •People support new housing options on underutilized property (including some density). •Silver Lake Road is a main thorough-fare and is dangerous to cross. On May 22, 2018 a Public Hearing was conducted and council authorized submittal to the Metropolitan Council and adjacent communities for review. The adjacent community review process is a mandatory 6 months, per state statute (unless all comments are received prior to that). Adjacent community review includes all adjacent communities, Hennepin and Ramsey Counties, Three Rivers Park District, Minneapolis Park and Recreation Board, MnDOT, and the DNR. For More Information. See the plan’s web page for a list of public comments with responses, a summary of key strategies from the public engagement process, and to see packets from Comprehensive Plan Steering Committee meetings. You can also view the Draft Comprehensive Plan. Recommendation. This robust planning process has been designed to meet the deadline for submission of an approved plan to the Metropolitan Council by December 31, 2018. Staff recommends that the City Council approve the St. Anthony 2040 Comprehensive Plan and authorize submission to the Metropolitan Council for formal action. Once formal action has been taken by the Met Council, the plan will return to the City Council for adoption and implementation. 28 CITY OF ST. ANTHONY VILLAGE STATE OF MINNESOTA RESOLUTION 18-078 RESOLUTION TO APPROVE ST. ANTHONY 2040 COMPREHENSIVE PLAN AND AUTHORIZE SUBMISSION TO METROPOLITAN COUNCIL FOR ACTION WHEREAS under state law, the City of St. Anthony Village is required to prepare a comprehensive plan every ten years and the Metropolitan Council is enabled to act as the reviewing authority for the City’s comprehensive plan; WHEREAS the City’s comprehensive plan guides land use which is the basis for regulating zoning in the City; WHEREAS the last update to the comprehensive plan was in 2008; WHEREAS in the creation of the St. Anthony 2040 Comprehensive Plan a steering committee made up of Planning Commission and City Council members met twelve times and conducted an extensive and broad public engagement process; WHEREAS the public engagement process reflected the topics to be covered in the plan and comments were solicited and formal responses given on the topics of of land use, housing, transportation, sanitary sewer, water supply, sustainability, and plan implementation; WHEREAS at their final meeting on November 14, 2018, the Comprehensive Plan Steering Committee by consensus directed staff to submit the St. Anthony 2040 Comprehensive Plan to the City Council for approval and submission to the Metropolitan Council for formal action; WHEREAS state statute establishes that approval of the City of St. Anthony comprehensive plan is within the jurisdiction and authority of the City Council; and NOW THEREFORE BE IT RESOLVED that the City Council of the City of St. Anthony Village approves the St. Anthony 2040 Comprehensive Plan and authorizes submission of the plan to the Metropolitan Council for action with City Council final adoption to follow. APPROVED in the regular session of the City Council on November 27, 2018 ___________________________________ Jerome O. Faust, Mayor Attested: ___________________________________ Nicole Miller, City Clerk Reviewed for administration: ______________________________ Mark Casey, City Manager 29 THIS PAGE LEFT INTENTIONALLY BLANK 30 REQUEST FOR COUNCIL CONSIDERATION      Meeting Date: November 27, 2018 Ordinance 2018-02 – Setting Sewer, Water, Storm Water charges, and establishment of certain fee amounts for 2019 OVERVIEW: In front of you this evening is the second of three readings of an ordinance to set sewer, water, storm water charges, and establishment of certain fee amounts for 2019. Enclosed is the 2019 Utility Rates staff memo, and PowerPoint that was presented at the November 13, 2018 City Council meeting. Staff has not received any letters or calls. Following the adoption of the ordinance, the ordinance will be published in the December 19, 2018 edition of the St. Anthony Bulletin, which is the official newspaper for the City of St. Anthony. 31 THIS PAGE LEFT INTENTIONALLY BLANK 32 CITY OF SAINT ANTHONY VILLAGE STATE OF MINNESOTA ORDINANCE NO. 2018-02 AN ORDINANCE AMENDING SECTIONS §33.018 SEWER CHARGES TO OWNERS; 33.036 WATER CHARGES TO OWNERS, §33.090 CHARGES FOR STORM WATER FACILITIES AND SECTION §33.061 ESTABLISHMENT OF FEE AMOUNTS The City Council of the City of Saint Anthony Village ordains as follows: Section One. Amendment to the City of Saint Anthony Village City Code Sections §33.018, 33.036 and §33.090 of the City Code of the City of Saint Anthony Village is hereby amended as follows. The deleted language is represented by strikethrough text. The additional language is represented by underlined text. 33.018 SEWER RATES: Usage rate $4.69 per 1,000 gallons, quarterly Collection system charge $9.646.40 per residential equivalency unit. 33.036 WATER RATES. Water Usage billing will be computed quarterly based on metered water used according to the tiered rates system below, quarterly Distribution system charge $10.056.70 per residential equivalency unit. 33.090 STORM WATER FACILITIES: (billed quarterly) 33.061 ESTABLISHMENT OF FEE AMOUNTS. These fees are set by Resolution as stated in §33.062. The dollar amounts of feess required by this code as stated in the following table. In addition to the application fee, applicants are responsible for the City’s out-of-pocket costs for the planner, engineer, attorney and/or other consultants to review the application. To provide for payment of such costs, the applicant will make a deposit (escrow) with the city at the end of the tie of application submittal, in an amount determined by the City Manager. If costs are less than the deposit (escrow), the difference will be billed to the applicant. Classification Charge (per acre) 1 $65.5164.10 2 $63.2061.80 3 $63.2061.80 4 $150.87147.62 5 $192.42188.28 6 $240.38235.21 33 BUILDING PERMIT Total Valuation $1 to $500 $29.50 $501 to $2,000 $28 for the first $500 plus $3.70/additional $100 or fraction thereof, to including $2,000 $2,001 to $25,000 $83.50 for the first $2,000 plus $16.55/additional $1,000 or fraction thereof, to including $25,000 $25,001 to $50,000 $464.15 for the first $25,000 plus $12.00/additional $1,000 or fraction thereof, to including $50,000 $50,001 to $100,000 $764.15 for the first $50,000 plus $8.45/additional $1,000 or fraction thereof, to including $100,000 $100,001 to $500,000 $1,186.65 for the first $100,000 plus $6.75/additional $1,000 or fraction thereof, to including $500,000 $500,001 to $1,000,000 $3,886.65 for the first $500,000 plus $5.50/additional $1,000 or fraction thereof, to including $1,000,000 $1,000,001 and up $6,636.65 for the first $1,000,000 plus $4.50/additional $1,000 or fraction thereof Inspections outside of normal business hours (minimum charge, 2 hours) $65.0063.25 per hour Reinspection; fees assessed under provisions of §32.08 $65.0063.25 per hour Inspections for which no fee is specifically indicated (minimum charge, 1/2 hour) $65.0063.25 per hour Additional plan review required by changes, additions, or revisions to plans (minimum charge, 1/2 hour) $65.0063.25 per hour For use of outside consultants for plan checking and inspections, or both Actual costs** NOTES TO TABLE: * Or the total hourly cost to the jurisdiction, whichever is the greatest. This cost shall include supervision, overhead, equipment, hourly wages, and fringe benefits of the employees involved. ** Actual costs include administrative and overhead costs. A plan review fee of 65% of the permit fee will be charged for building permits which require the submittal of plans. Fees for similar plans will be charged in accordance with provisions of Minn. Rules, Chapter 1300.0160, subd. 5. ELECTRICAL PERMITS Purpose of Fee: Residential or Commercial Building or Garage Electrical panel change out, repair or service upgrade, new panel replacement is $100.00 Up to 300 amps $50.00 400 amps $58.00 For each additional 100 amps add $14.00 Reconnected circuits Charge for each $3.00 Residential or Commercial Building or Garage New circuits or reconnected circuits spliced outside of electric panel are at full fee Charge for each up to 30 amps $8.00 Charge for each up to 100 amps $10.00 For each additional 100 amps add $5.00 New Home New Single Family Residence or Building Remodel up to 200 amps and 30 circuits used or less - includes a maximum of 3 inspection trips (There is no maximum fee if the service is larger than 200 amps) $150.00 34 All Remodel Projects Single Family Residence or Building Remodel Total costs equals required number of inspections trips multiplied by $35 each or the total cost of the circuits being used whichever is greater, but not both. Multi-Family Dwelling with 3 or more Units Each housing unit - up to 200 amps with a meter bank application and 20 circuits or less $70.00 Additional inspection trip $40.0035.00 House Wiring and service is separate. Above fees apply Transformers 0 -10 kilovolt-amperes $10.00 11 - 756 kilovolt-amperes $40.00 over 76-299 kilovolt -– amperes Over 299 kilovolt amperes $60.0080.00 $150.00 Retro fit lighting (ballast & lamps only; new fixture is per circuit fee) Each fixturefor the first 10 fixtures $.75 cents10.00 each additional fixture $0.65 Sign Transformer $8.00 Solar PV Systems-The inspection fee for the installation is as follows (plan review fee is $100.00 per hour) 0 watts to and including 5,000 watts $90.00 5,001 watts to and including 10,000 watts $150.00 10,001 watts to and including 20,000 watts $225.00 20,001 watts to and including 30,000 watts $300.00 30,001 watts to and including 40,000 watts $375.00 40,001 watts and largerto and including 1,000,000 watts $250.00375.00 & $2540 for each additional 10,000 watts over 40,000 watts 1,000,000 watts to 5,000,000 watts $3975 & $25 for each additional 10,000 watts over 1,000,000 watts 5,000,000 watts and larger $12,975 & $15 for each additional 10,000 watts over 5,000,000 watts 35 Effective Date: This ordinance shall become effective as of its publication. First Reading: November 13, 2018 Second Reading: November 27, 2018 Adopted: December 11, 2018 CITY OF SAINT ANTHONY VILLAGE By:_________________________________ Jerome O. Faust, Mayor ATTEST: By:_________________________________ Nicole Miller, City Clerk Publish: St. Anthony Bulletin Publication Date: December 19, 2018 36 TO: MARK CASEY, CITY MANAGER FROM: SHELLY RUECKERT, FINANCE DIRECTOR SUBJECT: 2019 UTILITY RATES DATE: OCTOBER 30, 2018 The utility rates recommended herein for 2019 builds on the multi-year approach towards rate adjustments that began in 2012. The parameters used for adjusting rates are as follows:  Align revenue sources with corresponding costs  Provide transparency as to the basis of rates and rate adjustments  Maintain a structural balanced operation  Ensure that rates appropriately support the ability to: o Provide safe drinking water o Properly discharge sanitary sewer flows o Appropriately control and treat stormwater runoff Water Rates: As part of the annual rate adjustment process the water production and distribution costs are categorized as fixed in nature or usage driven. The 2019 budgeted water costs are comprised of $628,128 in fixed costs and $666,817 in usage driven costs, see table below:  OPERATING  DEPRECIATION OVERALL  FIXED 452,243  45%  175,885  63%  628,128  49%  USAGE  563,520  55%  103,297  37%  666,817  51%   1,015,763  100%  279,182  100%  1,294,945  100%          37   The Multiyear approach to water rates includes the phase in of the flat fee which began in 2016. The transition process expected the usage rate growth to decelerate as flat fee was phased-in. Based on estimated actual results for 2018 and updated 2019 budgeted costs that expectation is reflected in the proposed rates for 2019. Proposed 2019 water rates:   2018  2019    Per 1000 gallons  Rates  Rates   $ Increase  Water Tier I 3.07  3.07  ‐  Water Tier II 3.24  3.24  ‐  Water Tier III 3.55  3.55  ‐  Water Tier IV 4.08  4.08  ‐  Water Tier V 5.12  5.12  ‐  Irrigation  4.08  4.08  ‐  Quarterly flat fee  6.70    10.05  3.35  The above rates are projected to produce $1,058,928 in revenues assuming water consumption similar to 2018. At this level of revenues the operating income before depreciation is budgeted to be $43,165. The recommendation’s impact on 2019 Water bills are reflected below: 2019 Tier Rates 3.07             3.07             3.24             3.55             4.08             5.12             2019 Usage levels 4,600           7,500           15,000         22,500         30,000         37,500         Fixed Fee 10.05           10.05           10.05           10.05           10.05          10.05 Usage 14.12           23.02           47.30           73.95          104.54         142.93         2019 Billing 24.17 33.07 57.35 84.00 114.59 152.98 2018 Billing 20.82 29.72 54.00 80.65 111.24 149.63 DIFFERENCE 3.35 3.35 3.35 3.35 3.35 3.35 38 Sewer Rates: As part of the annual rate adjustment process the sewer treatment and collection system costs are categorized as fixed in nature or flow volume driven. The 2019 budgeted sewer costs are comprised of $477,265 in fixed costs and $784,407 in flow volume driven costs (usage), see table below:    OPERATING  DEPRECIATION OVERALL  FIXED        406,312   35%       70,953   70%        477,265   38%  USAGE        753,998   65%       30,409   30%        784,407   62%      1,160,310   100%     101,362   100%     1,261,672   100%  The Multiyear approach to sewer rates also includes the phase in of the flat fee. As part of the transition process the usage rate growth was expected to decelerate as flat fee was phased-in. Based on estimated actual results for 2018 and updated 2019 budgeted costs that expectation is reflected in the proposed rates for 2019. Proposed 2019 Sewer rates are below:   2018 2019 Per 1000 gallons Rates Rates $ Increase Sewer Usage rate 4.69 4.69 - Qtr. Collection system charge 6.40 9.60 3.20 The above rates are projected to produce $1,213,153 in revenues in 2018. At this level of revenues the operating income before depreciation is budgeted to be $52,843. The recommendation’s impact on 2018 billings is reflected below: 2019 Tier Rates 4.69             4.69             4.69             4.69             4.69             4.69             2019 Usage levels 4,600           7,500           15,000         22,500         30,000         37,500         Fixed Fee 9.60             9.60             9.60             9.60             9.60            9.60 Usage 21.57           35.18           70.35          105.53         140.70         175.88         2019 Billing 31.17 44.78 79.95 115.13 150.30 185.48 2018 Billing 27.97 41.58 76.75 111.92 147.10 182.28 DIFFERENCE 3.20 3.20 3.20 3.20 3.20 3.20 39 Stormwater rates: The multi-year approach to Stormwater rates in place since 2012 called for an annual increase for single family residential (classifications 2 & 3) of thirty-five cent ($.35) increase. This represents a 2.22% increase in rate and should generate $4,440 in additional revenues (assuming no new construction). The 2.22% rate increase will be applied to all levels of stormwater charges. The historical impact on a residential single family user is as follows: The rate increase for other land use categories is consistent with the increase in single family residential (classifications 2 & 3) as see below: Quarterly Bill Usage Rate % Change 2011 $13.00 - - 2012 $13.35 $0.35 2.69 2013 $13.70 $0.35 2.62 2014 $14.05 $0.35 2.55 2015 $14.40 $0.35 2.49 2016 $14.75 $0.35 2.43 2017 $15.10 $0.35 2.32 2018 $15.45 $0.35 2.27 2019 $15.80 $0.35 2.22 Classification-Land Use Proposed 2019 Charge 2018 Charge % Change 1-Cemeteries, parks, golf courses, railroads, vacant land $65.51 per acre $64.10 per acre 2.22% 2- R-1, R-1a, and R-2 residential $63.20 per unit $61.80 per unit 2.22% 3- R-3 residential $63.20 per unit $61.80 per unit 2.22% 4- Schools and institutional uses $150.87 per acre $147.62 per acre 2.22% 5- R-4 Residential , churches and manufactured home parks $192.42 per acre $188.28 per acre 2.22% 6- Commercial and industrial $240.38 per acre $235.21 per acre 2.22% 40 The overall annual impact of the recommended rates for a residential customer at each of the five tier level is a flat increase per tier, see below: The Water/Sewer Utility fund summary budget is attached as Exhibit A. Lastly a long range Utility revenues plan is attached as Exhibit B. The plan addressed a 2017 strategic plan goal to develop long term revenue planning. The rates are being managed to begin supporting capital needs of the water and sewer operations. The current plan projects that support to begin in 2022 with a transfer to Utilities Infrastructure fund. The plan includes assumptions regarding future City costs and MCES treatment costs. It also factors in the retirement of water /sewer bonds occurring in 2024. A minimum cash balance was established to recognize that the quarterly billing and collection process is recovering 90-120 days of prior cash outlays. No growth in accounts or usage was factored in the projection. Real growth will be noted annually through the process of updating the base year results. With these factors in place the phase-in of the flat fee and usage rate adjustments were determined. Staff believes the model will help guide year to year rate increases while being flexible enough to keep the annual increases reasonable for utility customers. As always your comments and suggestions are welcomed. Tier Level 1st -7,500 2nd -15,000 3rd -22,000 4th -30,000 5th- 37,500 Distribution (1st Qrt. 2018)32% 46% 17% 3% 2% 2019 Proposed 93.64 153.10 214.93 280.69 354.26 2018 Actual 86.74 146.20 208.03 273.79 347.36 Quarterly Increase 6.90 6.90 6.90 6.90 6.90 Annual Increase 27.60 27.60 27.60 27.60 27.60 41 42 Fiscal Year 2019 ACTUAL ACTUAL ACTUAL ACTUAL ACTUAL BUDGET EST. ACTUAL BUDGET REVENUES 2013 2014 2015 2016 2017 2018 2018 2019 Water Operations 880,851$ 875,407$ 897,232$ 917,927$ 945,788$ 1,044,818$ 985,721$ 1,058,928$ Sewer Operations 849,032 914,442 947,618 1,005,329 1,098,938 1,174,957 1,131,590 1,213,153 Total Operating Revenues 1,729,883$ 1,789,849$ 1,844,850$ 1,923,256$ 2,044,726$ 2,219,775$ 2,117,311$ 2,272,081$ EXPENDITURES Water Operations 619,477$ 601,617$ 618,069$ 787,497$ 841,508$ 940,252$ 974,111$ 1,015,763$ Sewer Operations 937,717 982,557 963,621 930,659 1,029,372 1,118,985 1,115,154 1,160,310 Total Operating Expenditures 1,557,194$ 1,584,174$ 1,581,690$ 1,718,156$ 1,870,880$ 2,059,237$ 2,089,265$ 2,176,073$ Combined Operating Income 172,689$ 205,675$ 263,160$ 205,100$ 173,846$ 160,537$ 28,045$ 96,008$ Other (Income)/Expense Water (41,064)$ (4,214)$ (1,938)$ (11,143)$ (40,051)$ 10,100$ (18,500)$ (26,795)$ Sewer (99,138)(5,828)(21,139)(14,045)(36,189)(550)(22,650)(34,550) Interest Income - - (499) (23,907) (11,500) (13,605) (13,605) (13,605) Depreciation Expense 268,981 288,955 308,955 332,399 352,399 371,766 371,766 391,766 Total Other (Income)/Expense 128,779 278,913 285,380 283,304 264,659 367,711 317,011 316,816 Net Income/(Loss) 43,911$ (73,238)$ (22,220)$ (78,204)$ (90,813)$ (207,174)$ (288,965)$ (220,808)$ Other Sources and Uses: Transfers Out -$ -$ (15,000)$ (225,000)$ -$ -$ -$ -$ Transfers In - - - 1,632,862 - - - - Debt Service Payments (153,458) (137,700) (140,450) (138,150) (145,750) (148,200) (148,200) (145,600) Net Change in Assets / Liabilities 11,622 (39,142) (46,105) 49,451 - - - - Proceeds Bonding/Army 13,524 - - 130,932 - - - - Add back Depreciation Expense 268,981 288,955 308,955 332,399 352,399 371,766 371,766 391,766 Total Other Sources and Uses 140,669 112,113 107,400 1,782,494 206,649 223,566 223,566 246,166 Net increase (decrease) in cash 184,580$ 38,875$ 85,180$ 1,704,290$ 115,836$ 16,393$ (65,399)$ 25,358$ BEGINNING CASH BALANCE (182,618) 1,962 40,837 126,017 1,830,307 1,946,143 1,946,143 1,880,745 ENDING CASH BALANCE 1,962$ 40,837$ 126,017$ 1,830,307$ 1,946,143$ 1,962,537$ 1,880,745$ 1,906,104$ EXHIBIT A UTILITY FUND SUMMARY 43 Fiscal Year 2018 Assumptions 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Water Rates Flat Fee N/A N/A 3.35$ 6.70$ 10.05$ 13.40$ 16.75$ 20.10$ 23.45$ 24.39$ 25.36$ 26.38$ 27.43$ 28.53$ 29.67$ 30.86$ 32.09$ Usage (Tier one)3.10$ 3.10$ 3.07$ 3.07$ 3.04$ 3.01$ 2.98$ 2.95$ 3.07 3.19 3.32 3.45 3.59 3.73 3.88 4.04 Sewer Rates Flat Fee N/A 3.20$ 6.40$ 9.60$ 12.80$ 16.00$ 19.20$ 22.40$ 25.60$ 26.50 27.42 28.38 29.38 30.40 31.47 32.57 Usage 4.62$ 4.69$ 4.69$ 4.64$ 4.60$ 4.60$ 4.60$ 4.60$ 4.85 5.12 5.40 5.69 6.01 6.34 6.69 Expenses Met Council - $ Actual 593,381 576,237 643,390 708,567 5.50%5.50%5.50%5.50%5.50%5.50%5.50%5.50%5.50%5.50%5.50%5.50%5.50% Met Council - % Increase -4.57%-2.89%11.65%10.13%NA NA NA NA NA NA NA NA NA NA NA NA NA City Water Expenses - % Increase 4.00%4.00%4.00%4.00%4.00%4.00%4.00%4.00%4.00%4.00%4.00%4.00%4.00% City Sewer Expenses - % Increase 3.50%3.50%3.50%3.50%3.50%3.50%3.50%3.50%3.50%3.50%3.50%3.50%3.50% Actual Actual Actual Est. Actual Budget Projected Projected Projected Projected Projected Projected Projected Projected Projected Projected Projected Projected REVENUES 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Water Operations 897,232$ 917,927 945,788 985,721 1,058,928 1,157,839 1,214,736 1,271,707 1,328,814 1,381,967 1,437,246 1,494,735 1,554,525 1,616,706 1,681,374 1,748,629 1,818,574 Sewer Operations 947,618 1,005,329 1,098,938 1,131,590 1,213,153 1,276,503 1,327,371 1,388,557 1,449,742 1,526,225 1,600,071 1,677,491 1,758,657 1,843,750 1,932,960 2,026,487 2,124,539 Total Operating Revenues 1,844,850$ 1,923,256$ 2,044,726$ 2,117,311$ 2,272,081$ 2,434,342$ 2,542,107$ 2,660,264$ 2,778,557$ 2,908,191$ 3,037,317$ 3,172,226$ 3,313,182$ 3,460,456$ 3,614,334$ 3,775,116$ 3,943,113$ EXPENDITURES Water Operations 618,069$ 787,497 841,508 974,111 1,015,763 1,056,394 1,098,649 1,142,595 1,188,299 1,235,831 1,285,264 1,336,675 1,390,142 1,445,747 1,503,577 1,563,720 1,626,269 Sewer Operations 963,621 930,659 1,029,372 1,115,154 1,160,310 1,228,162 1,286,921 1,348,604 1,413,361 1,481,350 1,552,737 1,627,698 1,706,416 1,789,085 1,875,910 1,967,105 2,062,896 Total Operating Expenditures 1,581,690 1,718,156 1,870,880 2,089,265 2,176,073 2,284,556 2,385,570 2,491,199 2,601,660 2,717,181 2,838,002 2,964,373 3,096,558 3,234,833 3,379,487 3,530,825 3,689,165 Combined Operating Income 263,160$ 205,100$ 173,846$ 28,046$ 96,008$ 149,786$ 156,537$ 169,065$ 176,897$ 191,010$ 199,315$ 207,854$ 216,624$ 225,623$ 234,847$ 244,291$ 253,948$ Other (Income)/Expense Water (1,938)(11,143)(40,051)(18,500)(26,795)(26,745)(26,695)(26,645)(26,595)(26,545)(26,495)(26,445)(26,395)(26,345)(26,295)(26,245)(26,195) Sewer (21,139) (14,045) (36,189) (22,650) (34,550) (34,500) (34,450) (34,400) (34,350) (34,300) (34,250) (34,200) (34,150) (34,100) (34,050) (34,000) (33,950) Interest income (499) (23,907) (11,500) (13,605) (13,605) (28,170) (33,041) (37,055) (40,344) (44,777) (46,505) (48,497) (50,762) (53,306) (56,139) (59,267) (59,564) Depreciation Expense 308,955 332,399 352,399 371,766 391,766 426,766 461,766 496,766 531,766 566,766 601,766 636,766 671,766 706,766 741,766 776,766 811,766 Total Other (Income)/Expense 285,380 283,304 264,659 317,011 316,816 337,351 367,580 398,666 430,477 461,144 494,516 527,624 560,459 593,015 625,282 657,254 692,057 Net Income/(Loss) (22,220)$ (78,204)$ (90,813)$ (288,965)$ (220,808)$ (187,565)$ (211,043)$ (229,601)$ (253,581)$ (270,133)$ (295,201)$ (319,770)$ (343,835)$ (367,392)$ (390,435)$ (412,963)$ (438,110)$ Other Sources and Uses: Transfers- in - 1,632,862 - - - - - - - - - - - - - - - Transfers Out CIP (15,000) (225,000) - - - - - - - - - - - - - - - Transfers Out - W/S Infrastructure - - - - - - - (75,000) (115,000) (140,000) (175,000) (175,000) (175,000) (175,000) (175,000) (175,000) (175,000) Army Reimbursements - 130,932 - - - - - - - - - - - - - - - Debt Service Payments (140,450) (138,150) (145,750) (148,200) (145,600) (147,950) (150,200) (147,400) (149,550) (156,550) - - - - - - - Net Change in Assets / Liabilities (46,105) 49,451 - - - - - - - - - - - - - - - Add back Depreciation Expense 308,955 332,399 352,399 371,766 391,766 426,766 461,766 496,766 531,766 566,766 601,766 636,766 671,766 706,766 741,766 776,766 811,766 Total Other Sources and Uses 107,400 1,782,494 206,649 223,566 246,166 278,816 311,566 274,366 267,216 270,216 426,766 461,766 496,766 531,766 566,766 601,766 636,766 Net increase (decrease) in cash 85,180$ 1,704,290$ 115,836$ (65,398)$ 25,358$ 91,251$ 100,523$ 44,765$ 13,635$ 83$ 131,565$ 141,996$ 152,931$ 164,374$ 176,331$ 188,803$ 198,656$ BEGINNING CASH BALANCE 40,837 126,017 1,830,307 1,946,143 1,880,745 1,906,103 1,997,355 2,097,878 2,142,643 2,156,278 2,156,361 2,287,926 2,429,922 2,582,853 2,747,227 2,923,558 3,112,361 ENDING CASH BALANCE 126,017$ 1,830,307$ 1,946,143$ 1,880,745$ 1,906,103$ 1,997,355$ 2,097,878$ 2,142,643$ 2,156,278$ 2,156,361$ 2,287,926$ 2,429,922$ 2,582,853$ 2,747,227$ 2,923,558$ 3,112,361$ 3,311,018$ MINIMUM CASH BALANCE 755,400 779,235 827,325 853,970 902,960 959,397 997,569 1,034,155 1,075,736 1,125,947 1,012,439 1,057,409 1,104,394 1,153,485 1,204,778 1,176,942 1,229,722 EXHIBIT B 44  2019 Align revenue sources with corresponding costs Provide transparency as to the basis of rates and rate adjustments Maintain a structural balanced operation Ensure that rates appropriately support the ability to: o Provide safe drinking water o Properly discharge of sanitary sewer flows o Appropriately control and treatment of stormwater runoff 2019 45 2019 Water Fund expenditures are comprised of two primary operating functions: Production $666,871 Distribution $628,128 The current recommendation includes: Continuing the phase-in of the a quarterly fee to support distribution system costs Quarterly Water Distribution fee will increase by $3.35 2019 46 The current recommendation includes: Continue to manage the growth in usage rates to recognize the revenues provided by the phase in of the Water distribution fee The Water usage tier rates will remain the same as 2018 2019 2019 Per 1000 Gallons 2018 Rates 2019 Rates $ Change Water Tier I 3.07 3.07 - Water Tier II 3.24 3.24 - Water Tier III 3.55 3.55 - Water Tier IV 4.08 4.08 - Water Tier V 5.12 5.12 - Irrigation 4.08 4.08 - Quarterly flat fee 6.70 10.05 3.35 47 2019 Sewer Fund expenditures are comprised of two primary operating functions: Treatment $784,407 Collection $477,265 The current recommendation includes: Continuing the phase-in of the quarterly fee to support collection system costs Quarterly Sewer Collection fee will increase by $3.20 2019 48 The current recommendation includes: Continue to manage the growth in usage rates to recognize the revenues provided by the phase in of the Sewer collection fee The Sewer usage rate will remain the same as 2018 2019 2019 Recommended 2019 Sewer Rates: Per 1000 gallons Rates Rates $ Increase Sewer Treatment rate 4.62 4.62 0.00 Quarterly flat fee 6.40 9.60 3.20 49 The multi-year approach to Stormwater rates planned for the quarterly single family residential charge to increase by thirty-five cents ($.35). In 2019 represents a 2.22% increase in rate The 2.22% rate increase will be applied to all levels of stormwater charges 2019 The impact of the recommended rates on a residential customer at each tier level would be as follows: 2019 Tier Level 1st -7,500 2nd -15,000 3rd -22,000 4th -30,000 5th- 37,500 Distribution (1st Qrt. 2018)32%46%17%3%2% 2019 Proposed 93.64 153.10 214.93 280.69 354.26 2018 Actual 86.74 146.20 208.03 273.79 347.36 Quarterly Increase 6.90 6.90 6.90 6.90 6.90 Annual Increase 27.60 27.60 27.60 27.60 27.60 50  2019 51 THIS PAGE LEFT INTENTIONALLY BLANK 52 REQUEST FOR COUNCIL CONSIDERATION      Meeting Date: November 27, 2018 Resolution- a resolution Designating Polling Places for the 2019 Election Year. OVERVIEW: In from of you this evening is a resolution to designate our polling places for 2019 election year. The council previously adopted this resolution in October, however our long standing Ramsey County precinct, Chandler Place has decided they no longer wish to be a polling location. We are fortunate that the management of The Legends in Silver Lake Village, located in Ramsey County, had previously contacted us expressing their interest in becoming a polling location. Ramsey County Elections and our City Clerk have toured The Legends and have determined it meets all the requirements to be designated a polling place. Once this resolution is approved staff will work with Ramsey County Elections to notify the affected voters of the polling location change. We will also communicate this change via the website, newsletter, social media, etc. 53 THIS PAGE LEFT INTENTIONALLY BLANK 54 CITY OF ST. ANTHONY VILLAGE STATE OF MINNESOTA RESOLUTION 18-079 A RESOLUTION DESIGNATING POLLING PLACES FOR THE 2019 ELECTION YEAR WHEREAS, Minnesota Statutes 204B.16, subd 1 requires the City Council, by ordinance or resolution, to designate polling places for the upcoming year; and WHEREAS, changes to the polling places locations may be made at least 90 days before the next election if one or more of the authorized polling places becomes unavailable for use; and WHEREAS, changes to the polling place locations may be made in the case of an emergency when it is necessary to ensure a safe and secure location for voting; and NOW, THEREFORE, BE IT RESOLVED, that the St. Anthony Village City Council hereby designates the following polling places for elections conducted in the city in 2019: Hennepin Precinct 1 Autumn Woods 2600 Kenzie Terrace Hennepin Precinct 2 St. Anthony Community Center 3301 Silver Lake Road Ramsey Precinct 1 Legends at Silver Lake Village 2500 38th Avenue NE AND BE IT FURTHER RESOLVED, that the city clerk is hereby authorized to designate a replacement meeting the requirements of the Minnesota Election Law for any polling place designated in this Resolution that becomes unavailable for use by the City; AND BE IT FURTHER RESOLVED, that the city clerk is hereby authorized to designate an emergency replacement polling place meeting the requirements of the Minnesota Election Law for any polling place designated in this Resolution when necessary to ensure a safe and secure location for voting; AND BE IT FURTHER RESOLVED, that the city clerk is directed to send a copy of this resolution and any subsequent polling place designations to the Ramsey County Elections Office. Adopted this 27th day of November, 2018. _________________________________________ Jerome O. Faust, Mayor ATTEST:___________________________ Nicole Miller, City Clerk Review for Administration: _______________________________________ Mark Casey, City Manager 55 THIS PAGE LEFT INTENTIONALLY BLANK 56 Date Type Staff Present December 3 Special 5:30 pm Work Session City Council City Manager December 11 Regular Planning Commission items from November Appoint Parks and Planning Commissioners and Chair/Vice Chairs Setting Salary of City Manager Authorizing Transfers & Closing of Specified Funds Setting the 2019 City & HRA Budgets and Final Property Tax Levy -Public Hearing Final Reading Water, Sewer, & Stormwater 2019 Fee Schedule 2019 Street Project Approve Plans & Specifications, Authorize Advertisement for Bids Cheers Pablo LQ license City Council City Manager Finance Director City Engineer December 26 Regular City Council City Manager January 8 Regular Planning Commission items from December Housekeeping Resolutions Resolution for the Street Improvement Bond Reimbursement Quarterly Donations & Grants City Council City Manager January 10 Special 9:00 a.m.Goal Setting City Council City Manager Dept Heads January 11 Special 9:00 a.m.Goal Setting City Council City Manager Dept Heads January 22 Regular 2019 Parks Commission Work Plan- (motion only) Park Commission Recommendations 2019 Planning Commission Work Plan-(motion only) Solsmart Designation City Council Outside Organization assignments City Council City Manager January 29 Special 5:30 p.m.Joint Meeting with School Board City Council City Manager February 12 Regular Planning Commission items from January 2019 Street Project Call for Hearing on Improvements, Call for Hearing on Assessments, Order Preparation of Assessments Snow Plowing presentation City Council City Manager City Engineer Public Works Director February 26 Regular Administration Annual Report Adoption of Strategic Plan City Council City Manager FUTURE COUNCIL AGENDA ITEMS 2018 2019 57 Date Type Staff Present FUTURE COUNCIL AGENDA ITEMS March 12 Regular Planning Commission Items from February Presentation from Ramsey County Sheriff Bob Fletcher Liquor Annual Report Fire Annual Report Liquor License Renewals GreenCorp Member application-resolution City Council City Manager Fire Dept Liquor Op Manager March 26 Regular 2019 Street Project Public Hearing, Order Improvements, Adopt & Confirm Assessments, Award Contract for Construction, Call for Sale of GO Bonds Police Annual Report City Council City Manager Police Dept City Engineer April 9 Regular Planning Commission Items from March Quarterly Donations & Grants Public Works Annual Report Spirit of St. Anthony Award City Council City Manager Public Works Director April 23 Regular Arbor Day Proclamation 1st Quarter Goals Update 2019 Street Project Approve Sale of Bonds Students in Governement Presentation City Council City Manager City Planner May 14 Regular Planning Commission items from April Chamber of the Year and Business of the Year Finance Annual Report Public Hearing-Budget Calendar City Council City Manager Finance Director May 28 Regular Salo Park Concert Series Insurance Renewal Tort Limits - Consent Order 2021 Street & Utility Recon Feasibility Study City Council City Manager City Engineer May_Special 4:30 p.m.Tour of the City City Council City Manager June 11 Regular Planning Commission Items from May City Council City Manager June 25 Regular Audit Presentation City Council City Manager Finance Director July 9 Regular Planning Commission items from June Quarterly Donations & Grants Quarterly Goals Update City Council City Manager 58 Date Type Staff Present FUTURE COUNCIL AGENDA ITEMS July 23 Regular Night to Unite Presentation Night to Unite Proclamation Liquor Operations Mid Year Report VillageFest Presentation City Council City Manager Police Chief Liquor Op Mgr August 13 Regular Planning Commission items from July SANB #282 Presentation City Council City Manager August 27 Regular Budget Presentation Sheriff Stanek presentation City Council City Manager Finance Director September 10 Regular Planning Commission items from August 2020 Preliminary Operating Budget and Levy-Public Hearing Kiwanis Peanut Day Approve 2020 Street & Utility Recon Feasibility Study & order 2020 Plans and Specs City Council City Manager Finance Director City Engineer September 24 Regular Fire Prevention Presentation Commissioner Mary Jo McGuire City Council City Manager Fire Dept October 8 Regular Planning Commission items from September Quarterly Donations & Grants Certification of Delinquent Waste Hauler Accounts-Consent Agenda Certification of Delinquent Utility Accounts-Consent Agenda Quarterly Goals Update City Council City Manager October 22 Regular Approval of CIP City Council City Manager Finance Director November 12 Regular Planning Commission items from October 1st Reading Water, Sewer, & Stormwater-Public Hearing Union Contracts City Council City Manager November 26 Regular Fire Prevention Poster Winners Municipal Consent for Co. Rd. C project Water Conservation Poster Winners 2nd Reading Water, Sewer, & Stormwater Authorizing polling places for 2020 City Council City Manager Fire Dept Public Works Director December 10 Regular City Council City Manager December 23 Regular City Council City Manager 59