Loading...
HomeMy WebLinkAboutCC WORKSESSION PACKET 01292019If you would like to request special accommodations or alternative formats, please contact the City Clerk at 612-782-3313 or email city@savmn.com. People who are deaf or hard of hearing can contact us by using 711 Relay.   Work Session Agenda  Tuesday, January 29, 2019  7:30 p.m.    1. Missing Link.  Carrie Christensen, Senior Planner, Minneapolis Park & Recreation Board  presenting    2. Adjournment              City of St. Anthony  CITY COUNCIL WORK SESSION  City Council Chambers  Minutes  December 3, 2018  Present:   Mayor & Council. Jerry Faust, Mayor; Hal Gray, Councilmember; Jan Jenson, Councilmember; Randy Stille,  Councilmember, and Thomas Randle, Councilmember.  Absent:   None  Staff:   Mark Casey, City Manager and Shelly Rueckert, Finance Director  Guests:   John M. Baker, Greene Espel and Jay Lindgren, Dorsey  Call to Order:   Meeting called to order by Mayor Faust at 4:30 p.m.  The Village, LLC Litigation:   A motion was made by Faust and seconded by Gray that the meeting be closed pursuant to Minnesota Statutes  Section 13D.05, subdivision 3(b) to discuss attorney‐client privileged matters regarding Bradley A Hoyt and The  Village, LLC, vs. The City of St. Anthony Village, Mark Casey, Jerry Faust, Breanne Rothstein, WSB & Associates, Inc.,  Stacie Kvilvang, Jay R. Lindgren, and Ehlers & Associates, Inc.  A motion was made by Faust and seconded by Stille  to open the meeting.  Planning and Parks Commission Interviews:  Planning:  The following were interviewed by the mayor and council and were given the following cumulative scores.  Dan Payne – 35  Marcey Westrick – 35  Brian Rude – 31  Mark Kalar – 28  Corey Erickson – 17  Garrett Larson – 15  John Hageman – 14  Jedd Larson – 11  By consensus of the mayor and council, staff was directed to draft a resolution appointing Dan Payne, Marcey,  Westrick and Brian Rude to a three year term plus designate Dominic Papatola as Chair and Marcey Westrick as  vice chair.  Parks Commission:   The following were interviewed by the mayor and council and were given the following cumulative scores.  Therese Bellinger ‐ 15  Jessica Rengstorf – 14  Lona Doolan – 11  Scott Daby – 7  By consensus of the mayor and council, staff was directed to draft a resolution appointing Therese Bellinger and  Jessica Rengstorf to a three year term plus designate Erin Jordahl Redlin as Chair and Therese Bellinger as vice  chair.    Both resolutions will be on the December 11, 2018 City Council agenda.  Adjourn:   The meeting adjourned at 8:34 p.m.    Minutes respectfully submitted by Mark Casey, City Manager.      City of St. Anthony  CITY COUNCIL WORK SESSION  Local 49 – 2829 Anthony Lane S, St. Anthony  Minutes  January 10, 2019  Present:   Mayor & Council. Jerry Faust, Mayor; Hal Gray, Councilmember; Randy Stille, Councilmember; Thomas  Randle, Councilmember and Jan Jenson, Councilmember.  Absent:   None  Staff:  Mark Casey, City Manager; Jay Hartman, Public Works Director; Mike Larson, Liquor Operations  Manager; Jon Mangseth, Police Chief; Shelly Rueckert, Finance Director; Mark Sitarz, Fire Chief; Nicole  Miller, City Clerk; Charlie Yunker, Assistant to the City Manager; Jeremy Gumke, Public Works  Superintendent; Kevin Morelli, Assistant L.O.M.; Chris Fuller, Assistant Fire Chief; Jeff Spiess, Police  Captain and Ka Vue, Accountant  Consultants:   Todd Hubmer, WSB & Assoc. (City Engineer); Justin Messner, WSB & Assoc. (A.C. Engineer); Molly Just,  WSB & Assoc. (City Planner); Stacie Kvilvang, Ehlers & Associates (Financial); Jay Lindgren, Dorsey &  Whitney (Legal) and Minette Saulog, GreenCorp Member.  Commission:   Dominic Papatola, Planning Commission Chair and Erin Jordahl Redlin, Parks Commission Chair  Guests:  Liam Biever, LMCIT; Adriana Temali‐Smith; LMC, Kimberly Ciarrocchi;  Metro Cities; John Tingley, City  Administrator, City of Tonka Bay; Bruce Miles, Big River Group; Carolyn Marinan, Hennepin County and  Jamie Zwilling, Hennepin County.  At 9:00 a.m. Miles provided an opening & Introductions.  Faust provided a welcome. Faust, Miles &  Casey provided expectations & guidelines. Miles reviewed the 2018 Strategic Plan.  Faust and Casey  presented the 2018 Goals Accomplishments PowerPoint presentation.   At 11:00 a.m. Miles facilitated the group through an opportunities brainstorming session with a variety  of input provided by the participants.   At Noon we broke for lunch.   At 1:00 p.m. Marinan & Zwilling presented a PowerPoint on communication.    At 2:00 p.m. we took a break   At 2:15 p.m. Miles facilitated the group through St. Anthony’s long term vision/priorities brainstorming  session with a variety of input provided by the participants.   At 4:00 p.m. there were the following staff reports from: Administration, Liquor, Finance/HR, Police, Fire  and Public Works.   At 4:45 p.m. there were the following consultant’s reports from: Engineer, Planning, Financial and Legal.   The session concluded at 5:30 pm and all were invited to meet at the Village Pub for a social gathering.  Respectfully submitted by Mark Casey, City Manager.  City of St. Anthony  CITY COUNCIL WORK SESSION  Local 49 – 2829 Anthony Lane S, St. Anthony  Minutes  January 11, 2019  Present:   Mayor & Council. Jerry Faust, Mayor; Hal Gray, Councilmember; Randy Stille, Councilmember; Thomas  Randle, Councilmember and Jan Jenson, Councilmember.  Absent:   None  Staff:   Mark Casey, City Manager; Jay Hartman, Public Works Director; Mike Larson, Liquor Operations  Manager; Jon Mangseth, Police Chief; Shelly Rueckert, Finance Director; Mark Sitarz, Fire Chief; Charlie  Yunker, Assistant to the City Manager and Nicole Miller, City Clerk  Consultants:   Todd Hubmer, WSB & Assoc. (City Engineer)   Guests:   Bruce Miles, Big River Group  At 9:00 a.m. Miles provided a recap from Thursday’s session.   At 9:15 a.m. Miles facilitated the group through building the 2019 Pyramid by establishing the mission,  vision, strategic initiatives, goals and action steps based on input from Thursday, January 10, 2019  session.  At Noon we broke for lunch.   The session concluded at 1:00 pm  Respectfully submitted by Mark Casey, City Manager.  GRAND ROUNDS MISSING LINKPLANNING PROCESSсϭϬϬƐŽĨǀŽŝĐĞƐĞŶŐĂŐĞĚ Staff from each of these agencies has been onboarded to the process, given input on the draft route, and will be asked to provide comment on the preferred concept. MPRB staff has met with all of these agencies at least once, and in some cases, up to six times over the past year. •Metro Transit Planning•Met Council Parks•UofM Planning•City of Minneapolis Long Range Planning•City of Minneapolis Health Department•City of Minneapolis Public Works Transportation Planning•Hennepin County•City of St. Paul Parks and Bike/Ped staff•MnDOT•City of St Anthony;^ƚĂĨĨŵĞĞƚŝŶŐƐ͕ƉƌĞƐĞŶƚĂƚŝŽŶƚŽWĂƌŬƐŽŵŵŝƐƐŝŽŶ͕ŶĞǁƐĂŶĚǁĞďƐŝƚĞŽƵƚƌĞĂĐŚ͕dĐŽŽƌĚŝŶĂƚŝŽŶͿ•Minneapolis Public Schools•Mississippi Watershed Management Organization•EAST OF THE RIVER REGIONAL TRAIL WORKGROUPENGAGEMENT13City of St Anthony;^ƚĂĨĨŵĞĞƚŝŶŐƐ͕ƉƌĞƐĞŶƚĂƚŝŽŶƚŽWĂƌŬƐŽŵŵŝƐƐŝŽŶ͕ŶĞǁƐĂŶĚǁĞďƐŝƚĞŽƵƚƌĞĂĐŚ͕dĐŽŽƌĚŝŶĂƚŝŽŶͿ•Feasible•A vision founded on interagency coordination•MPRB Parkway typology whenever possible•Increase park space and regional trail access in underserved areas of Minneapolis•Connect the river to St. Anthony Parkway•Consider importance of industry to the city •Mitigate environmental justice challenges in industrial areas and corridors near freeways•Be an asset to the neighborhoods though which it passes•SafetyGRAND ROUNDS MISSING LINK/BRIDAL VEIL REGIONAL TRAIL CONSIDERATIONS •^sŝƚLJŽƵŶĐŝůƌĞǀŝĞǁ•ŶLJĂĚĚŝƚŝŽŶĂůĞŶŐĂŐĞŵĞŶƚǁŝƚŚ^s•ŽŵƉŝůĞĐŽŵŵĞŶƚƐĨƌŽŵƉƵďůŝĐĐŽŵŵĞŶƚƉĞƌŝŽĚ•WƌĞƐĞŶƚƚŽDWZŽĂƌĚŽĨŽŵŵŝƐƐŝŽŶĞƌƐĨŽƌĂƉƉƌŽǀĂů•^ƵďŵŝƚƚŽDĞƚŽƵŶĐŝůĨŽƌĂƉƉƌŽǀĂůƚŽďĞĐŽŵĞĞůŝŐŝďůĞĨŽƌƌĞŐŝŽŶĂůƚƌĂŝůĨƵŶĚŝŶŐ•ZĞƋƵĞƐƚĨŽƌƌĞƐŽůƵƚŝŽŶĨƌŽŵ^sƉƌŝŽƌƚŽŝŵƉůĞŵĞŶƚĂƚŝŽŶEyd^dW^St. Anthony 2040 Comprehensive Plan Chapter 2: Vision & Goals8Key Themes: What we heard from the community The following summarizes some of the common themes heard during the public engagement and visioning phase of comprehensive plan development. What people love xThe schools are great and an attraction to people and thecommunity is great for children.xProximity is to the Twin Cities is one of the city’s biggest assets.xThe city has a reputation for being a sustainability leader.xPeople love St. Anthony in general, and believe it is a greatplace to live.xIt’s peaceful, quiet, and has a small-town feel.Opportunities for change xPeople want more physical connectivity through bicycle andpedestrian infrastructure.xThere should be options for long-time residents to stay, as wellas accommodate new people.xSustainable initiatives are underway yet will continue to beimportant to the community.xHousing affordability is an increasing challenge as rents andproperty values go up.xPeople support new housing options on underutilized property(including some density).xSilver Lake Road is a main thorough-fare and is dangerous tocross.People want more physical connectivity through bicycle andpedestrian infrastructure. St. Anthony 2040 Comprehensive Plan Chapter 6: Transportation ൪ൣ FIGURE 6-12: EXISTING AND PROPOSED LOCAL BICYCLE AND PEDESTRIAN NETWORKSt. Anthony 2040 Comprehensive Plan Chapter 6: Transportation ൪൤ Planned Local Non-Motorized Transportation Network Because the City’s existing non-motorized transportation network is well-established, the planned network focuses on filling gaps that exist and improving safety conditions and the comfort or convenience of non-motorized facilities through intersection design, streetscape improvements, and other design considerations. When the network is complete, it will provide safe, convenient linkages between residential areas and commercial, institutional, and recreational areas within the City. The network will improve options for people to walk and bicycle for transportation within the City, and facilitate regional connections (described in greater detail in the following section). The existing and proposed local bicycle and pedestrian network is shown in FIGURE 6-12. The identified non-motorized gaps in this network include the following locations: x St. Anthony Boulevard between Ridgway Parkway and Stinson Boulevard (bicycle) x New Brighton Boulevard/Old Highway 8 between St. Anthony Boulevard and 33rd Avenue NE (bicycle/pedestrian) x 29th Avenue between Stinson Boulevard and St. Anthony Village-Roseville border (bicycle and pedestrian west of New Brighton Boulevard) x Stinson Boulevard between St. Anthony Boulevard and 37th Avenue (bicycle/pedestrian) x Maplewood Drive/Chelmsford Road between Skycroft Drive and 37th Avenue (pedestrian) x Private road/driveway south of Silver Lane within Silver Lake Village Shopping Center (pedestrian) x Silver Lake Road between Silver Lane and Silverwood Park (bicycle) Planned Regional Non-Motorized Transportation Network The Metropolitan Council 2040 TPP encourages the use of bicycles as a mode of transportation and establishes a Regional Bicycle Transportation Network (RBTN) to establish an integrated network of on-street bikeways and off-road trails that complement each other to improve conditions for bicycle transportation at the regional level. The RBTN identifies Tier 1 and Tier 2 alignments where existing regional or other trails exist or where a specific alignment has been identified. The RBTN also identifies Tier 1 and Tier 2 corridors where specific alignments have not yet been defined. Within St. Anthony Village, the RBTN identifies three Tier 1 RBTN alignments and three Tier 1 RBTN corridors. SEE FIGURE 6-13. The alignments include the existing Northeast Diagonal Trail, Stinson Parkway between Kenzie Terrace and St. Anthony Boulevard, and St. Anthony Boulevard between Stinson Parkway and the Northeast Diagonal Trail. The Northeast Diagonal Trail and Stinson Parkway alignments are also designated as regional trails. The RBTN corridors all extend St. Anthony Boulevard between Ridgway Parkway and Stinson BoulevardParkway a(bicycle) St. Anthony 2040 Comprehensive Plan Chapter 6: Transportation ൪൥ from the southwest corner of the City, and include one corridor running north-south on the western edge of the City (centered on Stinson Boulevard north of St. Anthony Boulevard), and one running in a southwest/northeast direction (centered on Silver Lake Road, 29th Avenue, and Old Highway 8). There is also a corridor running to the east from St. Anthony Village centered on the existing Northeast Diagonal Trail; however, because that trail already exists, an alignment does not need to be identified for the segment within the St. Anthony Village. The RBTN alignment identified along St. Anthony Boulevard, along with the remaining portion of St. Anthony Boulevard south of the Northeast Diagonal Trail, is also identified in the Hennepin County 2040 Bicycle Transportation Plan as part of the planned off-street bikeway system. The Minneapolis Park & Recreation Board has also identified this corridor for a regional trail as part of the Grand Rounds Missing Link project, a project to develop connections to the existing Grand Rounds trail system. The City of St. Anthony Village has passed a resolution opposing an off-street bike facility along St. Anthony Boulevard between Stinson Boulevard and New Brighton Boulevard. The Hennepin County plan also identifies Stinson Boulevard as part of the planned on-street bikeway system. Hennepin County has a planned reconstruction project on 29th Avenue which will add sidewalk to CSAH 94 (29th Avenue) between CSAH 88 and the county line. This project also includes participation from the City and Ramsey County. The Ramsey County-Wide Pedestrian & Bicycle Plan identifies a Connected Ramsey Communities Network, with a series of corridors that represent long-distance bikeways crossing the county. Within St. Anthony Village, there are three of these corridors: County Road D (37th Avenue), Stinson (Stinson Boulevard), and Silver Lake Road. County Road E (45th Avenue) is shown as a planned Local Corridor, while Silver Lane is identified as a Local Corridor with an identified need. The City proposes the following alignments for the RBTN corridors identified within the City: x Along Stinson Boulevard between St. Anthony Boulevard and 37th Avenue (coordination with City of Minneapolis and Hennepin County needed). x Along New Brighton Boulevard (CSAH 88) and Old Highway 8. The existing and proposed regional network is shown in FIGURE 6-13. The Minneapolis Park & Recreation poBoard has also identified this corridor for a regional trail as part of the Grandl trail Rounds Missing Link project, a project to develop connections to the existingop connGrand Rounds trail system. The City of St. Anthony Village has passed a resolutionny Village haopposing an off-street bike facility along St. Anthony Boulevard between StinsonAnthoevardBoulevard and New Brighton Boulevard. The Hennepin County plan also identifiesThe Hety planStinson Boulevard as part of the planned ond on-street bikewbikeay system. em. St. Anthony 2040 Comprehensive Plan Chapter 6: Transportation ൪൦ Intersection Improvements for Bicycling and Walking A number of intersections have been identified for improvements based on safety issues related to skew or operations for motor vehicles; however, improvements at many of these same intersections would also benefit pedestrians and bicyclists by slowing vehicles, shortening crossing distances, providing pedestrian refuges, and/or adding improved pavement markings or signals. Intersections include: x Kenzie Terrace/Silver Lake Road and St. Anthony Boulevard x CSAH 88 and St. Anthony Boulevard x 29th Avenue and CSAH 88 x 33rd Avenue and Highway 8/Highcrest Road x 29th Avenue and Silver Lake Road x 37th Avenue and Silver Lake Road xKenzie Terrace/Silver Lake Road and St. Anthony BoulevardxCSAH 88 and St. Anthony Boulevard ALTERNATIVE ROUTE 1: ELEVATED CROSSINGPREFERRED ROUTE: ELEVATED CROSSINGALTERNATIVE ROUTE 2: ELEVATED CROSSINGEXISTING GREAT NORTHERN GREENWAYOTHER'ƌĂŶĚZŽƵŶĚƐDŝƐƐŝŶŐ>ŝŶŬϮϬϭϴhƉĚĂƚĞʹ^ĞĐƚŝŽŶƐMPRB PROPERTYGREEN LINE LRT & STATIONSON STREET ROUTE SEGMENTGRANARY CORRIDORSECTIONEXISTING EXISTING GRAND ROUNDS ROUTEEXISTING BIKE ROUTE (OTHER)ALTERNATIVE ROUTESZ&dPREFERRED ROUTERAILROAD CROSSINGSUB-OPTIONALTERNATE ROUTE 2:BIKE + PEDESTRIAN + AUTOMOBILE ACCESSBIKE + PEDESTRIAN + AUTOMOBILE ACCESSBIKE + PEDESTRIAN ACCESS ONLYBIKE + PEDESTRIAN + AUTOMOBILE ACCESSBIKE + PEDESTRIAN ACCESS ONLYABEFGHIJKLMNOCDE^d/KE<͗/ŶĚƵƐƚƌŝĂůůǀĚEĂŶĚ^ŽĨƌŽĂĚǁĂLJ^ƚE;ϭϬϬ͛džŝƐƟŶŐZKtͿΎEŽƚĞ͗KƉƟŽŶƌĞƚĂŝŶƐĞdžŝƐƟŶŐŵĞĚŝĂŶǁŝĚƚŚĂŶĚůĂŶĞǁŝĚƚŚ͘>ŽĐĂƟŽŶŵĂLJĐŚĂŶŐĞĂƐZKtŝƐĨƵƌƚŚĞƌĚĞĮŶĞĚ͘ΎEŽƚĞ͗WĂƌŬŝŶŐĐŽƵůĚďĞĂĚĚĞĚďLJŶĂƌƌŽǁŝŶŐŵĞĚŝĂŶ͕ďƵƚĂůƐŽƌƵŶƐƌŝƐŬĨŽƌƐĞŵŝͲƚƌƵĐŬƐƉĂƌŬŝŶŐƚŚĞƌĞĨŽƌůŽŶŐƉĞƌŝŽĚƐĚƵĞƚŽůŽĐĂƟŽŶ͘^>͗ϭͬϴ͟сϭ͛Ϭϴ͛ϲ͛Ϯ͛ ϰ͛ϲ͛ϲ͛ϲ͛ϴ͛ϲ͛ϲ͛ϯϬ͛ϯϬ͛Ϯϲ͛ϰ͛Kh>ͲsZKh>ͲsZKh>ͲsZD/EͬdhZE>ED/EͬdhZE>ED/EͬdhZE>EKh>ͲsZ^/t><^/t><^/t><WZKWK^WZKWK^y/^d/E'ϭϮ͛ϭϰ͛ϭϮ͛ϭϯ͛ ϭϯ͛ϭϯ͛ ϭϯ͛ϭϮ͛ϭϮ͛ϭϰ͛ϭϰ͛ϭϮ͛dZ/>dZ/>>E>E >E>E >E>E>E>E>E>E ^d/KE>͗/ŶĚƵƐƚƌŝĂůůǀĚEĂŶĚEŽĨƌŽĂĚǁĂLJ^ƚE;ϭϬϬ͛ZKtͿ^>͗ϭͬϴ͟сϭ͛Ϭϴ͛ϲ͛Ϯ͛ ϰ͛ϲ͛ϯ͛ϭϮ͛Kh>ͲsZKh>sZ Kh>sZD/E^/t><dZ/>WZKWK^y/^d/E'ϭϮ͛ϭϮ͛ ϭϮ͛ϭϭ͛ϭϮ͛ϭϮ͛ϮϬ͛ϲ͛ϭϰ͛ϭϰ͛ ϭϰ͛>E>E >EdhZE>EdhZE>E>E>E >E^d/KED͗^ƚ͘ŶƚŚŽŶLJWĂƌŬǁĂLJĂƚ'ƌŽƐƐ'ŽůĨŽƵƌƐĞ;tĞƐƚŽĨdƌĂŝůƌŽƐƐŝŶŐͿ;ϭϬϬ͛džŝƐƟŶŐZKtͿ^>͗ϭͬϴ͟сϭ͛Ϭϴ͛ϲ͛Ϯ͛ ϰ͛ϭϬ͛ϭϬ͛ϲ͛ϲ͛Kh>sZKh>sZKh>sZKh>sZ Kh>sZdZ/>Kh>sZKh>sZ^/t><^/t><^/t><^/t><WZKWK^y/^d/E'ϭϮ͛ϭϲ͛ϭϮ͛ϭϲ͛ϭϬ͛ϭϮ͛ϭϴ͛ϭϬ͛ ϭϬ͛ϭϰ͛ϲ͛ϲ͛>E>E>E>E /'ZDE͗/EdZ^d/KEW>E͗^ƚ͘ͲŶƚŚŽŶLJŽƵůĞǀĂƌĚĂŶĚ<ĞŶnjŝĞdĞƌƌĂĐĞ;KīͲ^ƚƌĞĞƚƚŽKŶͲ^ƚƌĞĞƚdƌĂŝůͿ^d/KEK͗^ƚ͘ŶƚŚŽŶLJWĂƌŬǁĂLJďĞƚǁĞĞŶ^ƟŶƐŽŶŽƵůĞǀĂƌĚĂŶĚ^ŝůǀĞƌ>ĂŬĞZŽĂĚ;ϭϬϬ͛džŝƐƟŶŐZKtͿ^>͗ϭͬϴ͟сϭ͛Ϭϴ͛ϲ͛Ϯ͛ ϰ͛ϱ͛ϱ͛ϱ͛ϱ͛ϲ͛ϲ͛Kh>sZKh>sZKh>sZh&&h&&h&&/<dZ/>/<dZ/>WZ<WZ<Kh>sZKh>sZh&&Kh>sZ^/t><^/t><^/t><^/t><^/t><^/t><WZKWK^KEͲ^dZd/<>E^WZ</E'KE^/K&^dZdydE^ϳϮ͛K&ZKtWZKWK^ϭϬ͛dZ/>ͲKWd/KEϭWZ</E'KE^/K&^dZdydE^ϳϮ͛K&ZKtWZKWK^ϭϬ͛dZ/>ͲKWd/KEϮWZ</E'Kd,^/^K&^dZdydE^&h>>ϭϬϬ͛K&ZKtϭϭ͛ϭϭ͛ϰ͛ϭϭ͛ϭϭ͛ϭϭ͛ϴ͛ϴ͛ϭϭ͛ϳ͛ϭϬ͛ϭϰ͛ϰ͛ϰ͛ϰ͛ϲ͛ϭϬ͛ϲ͛ϭϬ͛ϴ͛ϴ͛ϭϬ͛ϴ͛ϯ͛ϭϰ͛>E>Eh&&>E>E>EWZ<WZ<>E ^d/KEK͗^ƚ͘ŶƚŚŽŶLJWĂƌŬǁĂLJďĞƚǁĞĞŶ^ƟŶƐŽŶŽƵůĞǀĂƌĚĂŶĚ^ŝůǀĞƌ>ĂŬĞZŽĂĚ;ϭϬϬ͛džŝƐƟŶŐZKtͿ^>͗ϭͬϴ͟сϭ͛Ϭϴ͛ϲ͛Ϯ͛ ϰ͛y/^d/E'ydE^ϳϮ͛K&ZKtϲ͛ϲ͛Kh>sZKh>sZ^/t><^/t><ϭϮ͛ϭϮ͛ϴ͛ϭϰ͛ϭϰ͛>E>EWZ<QUESTIONS?Carrie ChristensenSenior Planner, MPRBcchristensen@minneapolisparks.orgwww.minneapolisparks.org/eastoftheriver INTRODUCTION SERVICE AREA VISION PARK PLANS IMPLEMENTATIONPLANNING PROCESS EAST OF THE RIVER PARK MASTER PLAN OPERATIONS AND MAINTENANCE PLANNING PROCESS 2 21 INTRODUCTION SERVICE AREA VISION PARK PLANS IMPLEMENTATIONPLANNING PROCESS EAST OF THE RIVER PARK MASTER PLAN OPERATIONS AND MAINTENANCE COMMUNITY ENGAGEMENT The East of the River Park Master Plan is the result of more than 1 ½ years of planning and design by MPRB staff, the community, and hired technical consultants. More than 90 community engagement events were held and several different stages of input garnered thousands of individual comments on park plans, guiding principles, and the planning process itself. The backbone of community engagement was the 19-member Community Advisory Committee (CAC), a group of community members appointed by MPRB Commissioners, City Council Members, and Neighborhood Organizations. The CAC met 12 times as a group. CAC members also created a working group to address the Regional Trail system and Grand Rounds Missing Link. The workgroup delved in more deeply into their topic area and reported back to the full CAC along with a recommendation on the final route for the Grand Rounds Missing Link. Many CAC members also connected directly with their networks and neighbors to bring valuable insight to the planning process. Throughout the process, MPRB staff expended significant efforts to reach out to community members often left out of planning processes, namely people of youth, seniors, and people of color. Staff and design team members attended numerous community events, both in and outside of parks, door knocked, and often simply visited parks on busy days to talk with users. Southeast Minneapolis is home to the University of Minnesota, and reaching out to the student, staff, and faculty population was also a core strategy for outreach which included appointing a student to the CAC, presenting on the plan in courses, and even organizing a walking tour for a student club of neighborhood parks. Four other efforts were specifically envisioned to involve more East of the River in the process and to make the design process itself more transparent: the Youth Design Team, the Data Jam, Design Week, and the Plan Van pop-up park engagement tour. The Youth Design Team (YDT) employed high school students to participate in the planning of neighborhood parks in NE and SE Minneapolis. During the year-long process, these youth worked with MPRB planning staff, design consultants, local artists, and community members to help bring important youth perspectives and creative ideas to the process and park plans. Youth Design Team participants went through a competitive application process, were 15-19 years old, live or attend school in Northeast or Southeast Minneapolis, and are interested in parks, design, and/or policy making. The YDT worked on all stages of the plan including site inventory and analysis, community data collection, data analysis, and park planning and design. The YDT had hands-on experience learning concepts, building skills, and gaining professional experience, all while helping to impact the future of parks in their communities. All the gathered input was incorporated into the Data Jam (see appendix B) and provided to park designers. The Youth Design Team was the first of its kind at MPRB and is unique in the public sector, but did build off the success of other youth job Image 11 | Youth Design Team talks to community members. Source: MPRB 22 INTRODUCTION SERVICE AREA VISION PARK PLANS IMPLEMENTATIONPLANNING PROCESS EAST OF THE RIVER PARK MASTER PLAN OPERATIONS AND MAINTENANCE initiatives at MRPB including the Green Team program. At CAC meeting #5, the CAC and general public participated in MPRB’s first ever Data Jam. In an effort to involve the community in not just the gathering of data, but in the interpretation of that data, meeting participants were asked to sift through collected community engagement and demographic data. They developed major topics for both the service area as a whole, and for each individual park. They worked both individually and collectively, having excellent arguments about what the “public” was actually saying. The results of the Data Jam fed directly into the initial designs of the parks themselves, which were also prepared in a new and different way. In order to diversify the pool of designers involved in the park designs and to open the process to the CAC and public, over twelve designers, planners, and park staff came together for one week and helped generate initial park designs. These multi-disciplinary design teams represented gender and race diversity. They worked during an intense 4 ½ days that involved site visits, a charette-style working environment, and public events. Design week began with CAC #6, at which CAC members presented guidance from the Data Jam and working groups, then sat at tables with the designers and began thinking about park amenities and arrangement. Two days later, MPRB opened the design studio doors for a public walk-through, where community members could see the designers’ early ideas and chat again with them about park designs. Design week resulted in two concepts for each park and triangle in the service area that were a combination of the hopes of the community, innovations in park design, and policy direction. Each park concept balanced being data driven and a creative vision for the community. Following design week, two concepts of each park were shared out with the general public for feedback. The planning team hosted four events during this period in addition to the online survey that was open for almost two months, to facilitate robust community dialogue about the concepts for each park. The events included a BBQ with a DJ at a park, a happy hour at a local brewery, a bus tour of all the parks, and a pop-up engagement series in the parks across the service area, called the Plan Van. The Plan Van, hosted by the Youth Design Team and MPRB staff, included a mobile display of all the park concepts, free popsicles, and many opportunities for users of parks to spontaneously provide feedback on the park designs. The Plan Van took the planning process directly into the parks and made it possible for people with a deep understanding of the parks, the users, to weigh in on the designs without having to go online or attend a meeting. Image 12 | Community designed service area map. Source: MPRB 23 INTRODUCTION SERVICE AREA VISION PARK PLANS IMPLEMENTATIONPLANNING PROCESS EAST OF THE RIVER PARK MASTER PLAN OPERATIONS AND MAINTENANCE The high amount of community engagement events, the Youth Design Team, the Data Jam, Design Week, and the Plan Van were all done in an effort to ensure that the planning process was open and equitable, and to perform work in the spirit of a racial equity lens. Community engagement unfolded in three main phases, in concert with the gradual evolution of park plans over 19 months (for a detailed list of engagement events, see Appendix A). While there is always room for improvement, and we always learn how to improve our work with every planning process, we can confidently say that the extensive engagement associated with the East of the River Park Master Plan garnered input and dialog from a broad cross-section of the community. The planning team worked hard to reach the broader community in the effort and was supported by local media in getting the word out through evening news coverage and almost monthly articles in local and neighborhood papers. The ERPMP is the result of input that spans ranges of age, gender, economic status, race and ethnicity, and historic involvement with park planning. Most important, the planning process and park designs changed over the course of the project in response to the community’s voice. The ERPMP process unfolded slowly and deliberately over more than a year and a half, repeatedly asking the community to weigh in at each stage: at the initial visioning, on the community engagement data themselves, on early hand-sketched designs, at the stage of design refinement, and even on this very document, which will doubtlessly change between this draft and the final adopted version. Though a park planning process cannot solve the deeply entrenched institutional bias that exists throughout government systems, it can recognize that such bias does exist. It can do its part to make decisions that set the stage for eliminating that bias in areas where MPRB has jurisdiction. MPRB recognizes the importance of the commitment to the ERPMP process many community members have made— especially at a time of heightened tension and dialog around race—and the agency is indebted for that service. The ERPMP is a significant step forward in ensuring that racial and other bias is eliminated. It envisions a neighborhood park system that meets the needs of the changing community. It aligns park plans with community needs and invests in areas where those needs are greatest. It does not assume the parks will be remade just as they are now. It remakes the parks in the image of the new present and future Minneapolis. Image 13 | Toole Design Group presents at Community Advisory Committee meeting on design for accessibility. Source: MPRB 24 INTRODUCTION SERVICE AREA VISION PARK PLANS IMPLEMENTATIONPLANNING PROCESS EAST OF THE RIVER PARK MASTER PLAN OPERATIONS AND MAINTENANCE PROJECT TIME LINE The ERPMP process unfolded in six distinct stages. The following is a brief stage-by-stage overview of the project. 1: EARLY CONNECTIONS AND THE CAC At the inception of the project, MPRB staff met with multiple community organizations and neighborhood organizations in the Northeast and Southeast Service Area. The purpose of these meetings was to build awareness of the planning process and to also ask for help in broadening the applicant pool for the CAC. In addition, MPRB staff attended park events during this start-up phase, to gather input and encourage CAC applications. MPRB staff worked closely with appointments on the CAC composition, to ensure broad representation. It must be noted here that, as with any CAC, attendance was never perfect. MPRB recognizes that the multiple evening meetings demanded by the current CAC process can disproportionately affect members of color and those with lower incomes. MPRB will continue to work on improving access to CAC meetings, including continued consideration of altered meeting, always providing food during dinner-time meetings, providing children’s activities, and bringing individual CAC members up to speed after the fact when they cannot attend meetings. 2: INVENTORY, ANALYSIS, AND DATA Somewhat outside the CAC and community engagement process, MPRB and its consultant team prepared an inventory and analysis of park assets, with descriptions of condition and quality, and also a demographic analysis of the service area. These documents were presented during CAC #4 and were included in the Data Jam. FIGURE 3 | PROJECT TIMELINE VISION AN D D I S C O V E R Y PARK PL A N N I N G MASTER P L A N A P P R O V A L OPPORTUNITIES AND CONSTRAINTS CONCEPT ALTERNATIVES PREFERRED CONCEPT WIDE RANGE OF DESIRES AND NEEDS FINAL PLAN 1 2 3 4EQUITY PUBLIC PROCESS CULTURAL DIVERSITY ADOPTION REVIEW + APPROVAL 25 INTRODUCTION SERVICE AREA VISION PARK PLANS IMPLEMENTATIONPLANNING PROCESS EAST OF THE RIVER PARK MASTER PLAN OPERATIONS AND MAINTENANCE 3: PHASE 1 COMMUNITY ENGAGEMENT MPRB staff, consultants, community connectors, and CAC members attended nearly 90 events that summer, both in the parks and elsewhere. There were also maps of each park and a description of the plan on display in each rec center for several months where park users could make notes. No park designs were presented. Rather, the engagement activities were designed to get people thinking generally about what the park system as a whole should be and what they would like to change or preserve in their local park. And finally, since much of this stage of engagement fell during winter months, when there are fewer community events to attend to get input, the design team developed a series of Park Design Sessions. The Park Design Sessions were hosted in almost every neighborhood in NE and SE Minneapolis and were open to the public. They were designed as hour long creative sessions focused on the parks and triangles in each of the neighborhoods. An average of 20 people attended each of the 80 of design sessions. As a result of these engagements, the design team produced summaries of responses associated with each park and parks in general in the service area. This information was included in the Data Jam and provided critical insight as the design team began drawing the first initial park plans. Also during this phase, MPRB planning staff and consultants met with each recreation center leader as well as with an MPRB team from across the organization. The general input and summaries of the data from this phase are in Appendix B (DATA JAM PACKETS). Image 14 | TOP : Community member participating in early park visioning. Source: MPRB Image 15 | BOTTOM LEFT : Perkins + Will staff talks to young park users on early park design concepts. Source: MPRB Image 16 | BOTTOM RIGHT : Park user reviews concept plans. Source: MPRB 26 INTRODUCTION SERVICE AREA VISION PARK PLANS IMPLEMENTATIONPLANNING PROCESS EAST OF THE RIVER PARK MASTER PLAN OPERATIONS AND MAINTENANCE FIGURE 4 | PHASE 1 COMMUNITY ENGAGEMENT SUMMARY DATA SUMMARY : COMMUNITY ENGAGEMENT METHOD 1: ACTIVITY SELECTION ATTENDED : 50 + COMMUNITY EVENTS SINCE AUGUST 2017 1200 + ENGAGEMENT MATERIALS METHOD 2: DREAM PARK CARDS METHOD 3: DESIGN SESSIONS METHOD 4: SURVEY METHOD 5: CANVASSING COUNT : TBDIN PROCESSCOUNT : 260COUNT : 289 COUNT : 582 COUNT : 80+ ++++ 27 INTRODUCTION SERVICE AREA VISION PARK PLANS IMPLEMENTATIONPLANNING PROCESS EAST OF THE RIVER PARK MASTER PLAN OPERATIONS AND MAINTENANCE FIGURE 5 | SUMMARY OF COMMUNITY ENGAGEMENT FROM INITIAL CONCEPT REVIEW DURING SUMMER 2018. 28 INTRODUCTION SERVICE AREA VISION PARK PLANS IMPLEMENTATIONPLANNING PROCESS EAST OF THE RIVER PARK MASTER PLAN OPERATIONS AND MAINTENANCE 4: INITIAL PARK CONCEPTS AND PHASE 2 COMMUNITY ENGAGEMENT Based on the extensive phase 1 input and the Data Jam in CAC #5, the expanded design team prepared the initial park concepts. During Design Week, the design team reviewed all the community engagement to date and hand-sketched one or two different concept ideas for each park. The team refined these sketches over the course of several weeks and then brought them back out to the community. The designs were intended to spur community discussion, test different ideas, and then be significantly revised in a later stage. The initial concepts were brought out to the community in several open houses scattered throughout the service area. The open house set-up was such that community members could gather around the different designs and discuss them with neighbors, at times even drawing new solutions right on the initial sketches. MPRB also met with some stakeholder groups during this process and initial concepts were available online with an accompanying survey. MPRB staff were also asked to weigh in on the concepts through two “in-houses” where the draft concepts were displayed for staff feedback from across the agency. Over forty staff attended each open house to provide comments and insights on the plans from a variety of perspectives including maintenance, aquatics, events, ecological management, and recreation. Technical advisors from other agencies were also invited to the open houses and for one-on- one conversations about the process as needed. The technical advisors included: • Metro Transit Planning • Met Council Parks • UofM Planning • City of Minneapolis Long Range Planning • City of Minneapolis Health Department • City of Minneapolis Public Works Transportation Planning • Hennepin County • City of St. Paul Parks and Bike/Ped staff • MnDOT • City of St Anthony • Minneapolis Public Schools • Mississippi Watershed Management Organization All input—on-line, open house, stakeholder, MPRB staff, technical advisor etc.—was entered into MPRB’s on-line survey system to generate detailed summaries for each park and ideas for the service area as a whole. The general input themes are included in the park packet for each park, in Chapter 4. 5: PREFERRED CONCEPTS AND PHASE 3 COMMUNITY ENGAGEMENT Based on input about the initial concepts, the design team met again in a workshop to discuss revision of the designs. Each park was considered individually and in the context of the service area as a whole, with the draft guiding principles (see Chapter 3) also driving decision-making. The team produced a single “preferred concept” for each park. The service area- wide maps and charts were updated to reflect the preferred concepts. In CAC #7, members heard from MPRB staff about Operations and Maintenance at MPRB. This session was designed to provide the CAC with more detailed understanding of the maintenance needs and possibilities for the proposed park improvements. LOGAN PARK Concept A 7-1-2018 East of the River Park Master PlanNORTHBROADWAY STREETPLAYGROUND WADING POOL DIAMOND NEW NATURAL AREA UPDATED MULTIUSE FIELD NEW PICNIC AREA RECREATION CENTER NEW TERRACE SEATING AND EVENT SPACE TENNIS/PICKLE BALL STRIPING UPDATED BASKETBALL NEW PLAZA AND PERFORMANCE SPACE FRUIT TREES WALKING TRAILS IMPROVED SEATING BOULDER SEATING AREA JEFFERSON STREET MONROE STREET 29 INTRODUCTION SERVICE AREA VISION PARK PLANS IMPLEMENTATIONPLANNING PROCESS EAST OF THE RIVER PARK MASTER PLAN OPERATIONS AND MAINTENANCE After a year of extensive community engagement with a wide range of people and groups that know and love their parks, community engagement around the preferred concepts centered on the CAC. The preferred concepts were discussed in meetings 10, 11, 12—meetings that regularly attracted between 20 and 30 members of the general public in addition to the CAC members. CAC meeting #10 featured a process of sorting the parks into those that the CAC felt were in the realm of consensus toward recommendation and those that required further discussion. The general public had an opportunity to speak about each park in turn as it was raised to the floor (see Appendix 3 for CAC meeting notes showing the details of the discussion). CAC #11 began the discussion of the “non- consensus” parks. CAC #12 was the final meeting, with the CAC recommending the overall guiding principles, guiding principles for the Grand Rounds Missing Link, and the designs of all parks to the MPRB Commissioners. The CAC did request further exploration of the Caleb Dorr triangle concept with the technical advisory committee and the neighborhood during the public comment period. 6: PUBLIC COMMENT ON THE ERPMP DOCUMENT AND FINAL APPROVAL At the conclusion of the CAC process, MPRB staff and consultants prepared the draft ERPMP document and provided it to the community for formal public comment. The document was made available on line and in print at all service area recreation centers. Surveys were made available online or printed in all recreation centers. As the conclusion of the 45-day comment period, MPRB staff will tabulate the comments, make necessary changes to the document to reflect that input, and bring the Final ERPMP before the Board of Commissioners for approval with a public hearing. 30 THIS PAGE WAS INTENTIONALLY LEFT BLANK PLANNING PROCESSINTRODUCTION SERVICE AREA VISION PARK PLANS IMPLEMENTATION EAST OF THE RIVER PARK MASTER PLAN OPERATIONS AND MAINTENANCE One regional trail system was included in the ERPMP planning process. The Grand Rounds Missing Link (GRML) Master Plan from 2009 needs an update and to be approved by the Metropolitan Council. The Metropolitan Council has identified the Grand Rounds Missing Link as a Regional Trail Search Corridor in the 2040 Regional Parks Policy Plan. The GRML is inextricably intertwined with the neighborhood facilities in the ERPMP project area as well as other current and planned regional trail connections. The other regional parks in the area (Ridgway Parkway, Saint Anthony Parkway, Central Riverfront, and Above the Falls/Riverfirst) already have adopted master plans. The Metropolitan Council requires a specific format for regional park and trail master plans, including information on operations, public safety, environment, and other factors. The Metropolitan Council submission may include a preferred and alternate route options. Not all of these sections are included in this draft document. However, a detailed description of the development proposal for the GRML is included, and roughly parallels what is included for neighborhood parks. This should provide adequate information for the public to comment on the intent of the park designs and to offer suggestions or corrections. The additional sections will be completed prior to final approval by the MPRB commissioners, and the public will have an opportunity to review them and provide comments at a public hearing prior to adoption. After adoption of the ERPMP document, MPRB staff will compile information on the regional trail section, separate it from this overall document, and submit it to the Metropolitan Council for approval. Council approval is necessary prior to any expenditure of state or regional funds on the regional trails. REGIONAL TRAIL: THE GRAND ROUNDS MISSING LINK REGIONAL TRAIL CONNECTIONSFIGURE 18 | REGIONAL TRAIL CONNECTIONS 254 PLANNING PROCESSINTRODUCTION SERVICE AREA VISION PARK PLANS IMPLEMENTATION EAST OF THE RIVER PARK MASTER PLAN OPERATIONS AND MAINTENANCE TRAIL PLANNING PROCESS In addition to being integrated into the park planning processes for ERPMP, the Grand Rounds Missing Link has received additional input through a Regional Trails Workgroup as well as the Technical Advisory Committee. Building off the 2009 plan, MPRB has focused on strong interagency coordination and community engagement as part of this process. The Regional Trail Work Group formed out of the East of the River Park Master Plan Community Advisory Committee. They met four times since March 2018, and all meetings were open to the public. The workgroup was largely composed of residents from neighborhoods along the Grand Rounds Missing Link potential route. The workgroup has offered ongoing insight and received staff updates on the process of the Grand Rounds Missing Link interagency coordination. The workgroup focused discussions around GRML route options and a set of trail planning considerations were developed out of the meetings that were approved by the East of the River Community Advisory Committee in October, 2018. The trail planning considerations will guide the route and design of the Grand Rounds Missing Link. The GRML Route Considerations are: The workgroup and CAC also recommend that as it is completed, the regional trail should be called Bridal Veil Regional Trail as it will no longer be a missing link of the Grand Rounds. • Feasible • A vision founded on interagency coordination • MPRB Parkway typology whenever possible • Increase park space and regional trail access in underserved areas of Minneapolis • Connect the river to St. Anthony Parkway • Consider importance of industry to the city STINSON PARKWAY Although outside of the scope of the neighborhood parks and the Grand Rounds Missing Link, Stinson Parkway is a key connection between Ridgway and St. Anthony Parkway. It has several garden areas maintained by the Stinson Parkway Conservancy which offer visual interest and small opportunities for gathering along the route. There is interest by the community in pursuing improved bike facilities along the parkway. On-street bike lanes are one option that the community has expressed some interest in but also with the acknowledgement that increasing development and density in St. Anthony may bring higher traffic volumes to the parkway. A bike trail was considered in the median, but the initial potential for bike/auto conflict is high. • Mitigate environmental justice challenges in industrial areas and corridors near freeways • Be an asset to the neighborhoods though which it passes • Be a safe route for all users* *This consideration was a staff addition to the route considerations after the final CAC approval. MAP LEGEND Alternative Route 1: Elevated Crossing Preferred Route: Elevated Crossing Alternative Route 2: Elevated Crossing ALTERNATIVE ROUTESPREFERRED ROUTE Railroad Crossing Sub-Option ALTERNATE ROUTE 2: Bike + Pedestrian + Automobile Access Bike + Pedestrian + Automobile Access Bike + Pedestrian Access Only Bike + Pedestrian + Automobile Access Bike + Pedestrian Access Only Hennepin Uni v e r s i t y 35-W Como IndustrialS t . An th on y P a r kw a y Parkway to the River At Grade Crossing Raised Crossing Trail Crosses River Downtown Minneapolis Gross GolfCourse FIGURE 19 | PREFERRED AND ALTERNATIVE GRML ROUTES 255 PLANNING PROCESSINTRODUCTION SERVICE AREA VISION PARK PLANS IMPLEMENTATION EAST OF THE RIVER PARK MASTER PLAN OPERATIONS AND MAINTENANCE PICNIC AREAS TRAIL SPECIFIC WAYFINDING ART ART AS INFRASTRUCTURE SYSTEM WIDE WAYFINDING STORMWATER GARDENS POCKET PARKS TRAILSIDE AMENITY EXAMPLES 256 PLANNING PROCESSINTRODUCTION SERVICE AREA VISION PARK PLANS IMPLEMENTATION EAST OF THE RIVER PARK MASTER PLAN OPERATIONS AND MAINTENANCE The Grand Rounds is the nation’s largest urban scenic byway stretching 50 miles and circling three fourths of Minneapolis. The Grand Rounds contains a park-like road, biking and walking trails, and green open spaces. The Missing Link is between St. Anthony Parkway in Northeast Minneapolis and East River Parkway along the Mississippi River in Southeast Minneapolis. In 1883, H. W. S. Cleveland went before the newly formed Minneapolis Board of Park Commissioners to propose a series of parks and connecting parkways that would surround downtown Minneapolis. William Watts Folwell, the head of a special committee formed in 1891 to study park expansion to the north and east, first dubbed the parkway system the “Grand Rounds.” As Minneapolis Superintendent of Parks, Theodore Wirth took the components of Cleveland’s plan, the suggestions of the special committee, and the work of his predecessor William M. Berry, to further the creation of the Grand Rounds. Wirth envisioned a parkway system encircling Minneapolis that would connect parks, lakes, rivers, creeks, and neighborhoods. Through the vision and hard work of Cleveland, Wirth, and countless others, the Grand Rounds now includes East River Parkway, West River Parkway, Minnehaha Parkway, the Chain of Lakes, Wirth Parkway, Victory Memorial Parkway, and St. Anthony Parkway. The Missing Link is the one uncompleted section of the Grand Rounds Parkway System. Plans for completing the Missing Link were prepared in 1910, 1918, 1930, 1939, and 2009. Early construction of the Grand Rounds followed the key scenic areas of the Mississippi River, Minnehaha Creek, and LOCATION AND HISTORY the Chain of Lakes. The presence of wetlands in the Missing Link area deterred construction. A large and profitable gravel mine located south of what is now Gross Golf Course was also an obstacle to parkway development during the 1930s and 1940s. When gravel mining ceased in the 1950s, the area was developed with industrial uses. Active railroad lines and a major rail yard north of the University of Minnesota were also impediments. In the MPRB 2007 Comprehensive Plan, a major initiative is to complete the Missing Link. Completion of the parkway will fulfill the vision of having a “grand parkway” and green “necklace” encircling the city and will provide Minneapolis and adjoining communities access to parks, trails, paths, and green space. The GRML route planning process has been working in parallel with a City street improvement and protected bikeway improvement initiative along Industrial Boulevard, and as a result of this project, part of the future Grand Rounds Missing Link has been implemented during the planning process. This brings an exciting momentum to the master plan vision, and sets a precedent for how the regional trail will integrate into the existing street network, including operations and maintenance. The Industrial Boulevard trail is a result of the City of Minneapolis and Minnesota Department of Transportation (MnDOT) entering into an agreement in 2018 to construct a shared-use trail segment on MnDOT right of way along Industrial Boulevard in the City of Minneapolis, and MPRB was invited to participate in the trail improvement project. The Park Board agrees to maintain the trail segment as part of the Park Board’s Grand Rounds. The Park Board maintenance will include routine and seasonal maintenance including plowing, mowing and sweeping as needed to maintain the daily operation of the trail. As owner of the infrastructure, the City, will be responsible for maintaining the asset condition of the Trail Segment at its own discretion, including crack sealing, patching, resurfacing, and reconstruction. The Park Board will not be responsible for maintenance or operations of the pedestrian sidewalks on Industrial Blvd. Maintenance of the sidewalks on Industrial Boulevard will be performed in accordance with Minneapolis City Ordinances. There are plans to continue the trail to Broadway Street on Industrial Boulevard in 2019, contingent upon GRML master plan approval. On the southern segment of the route, in the Towerside District, MPRB has developed two Memorandums of Understanding with developers working on realizing the vision of the mixed use district. With significant park dedication fees in place and ample community support for new parkland in the emerging district, there are also immediate opportunities for implementation of the regional trail, contingent on master plan approval by MPRB and the Metropolitan Council. 257 PLANNING PROCESSINTRODUCTION SERVICE AREA VISION PARK PLANS IMPLEMENTATION EAST OF THE RIVER PARK MASTER PLAN OPERATIONS AND MAINTENANCE Minneapolis barely extended beyond St. Anthony Falls when Cleveland proposed the first park system. The Minneapolis area has greatly changed and grown. Today the study area is developed with a mix of residential, commercial, industrial, public, and institutional uses. Industrial uses are located south of I- 35W and along railroad lines. Commercial and high density residential buildings are near the river and along major roadways, and the University of Minnesota is located in the southern portion of the study area. The terrain varies from flat urban streetscapes to the scenic Mississippi River gorge. Much of the housing was built from 1900 to the 1940’s. Industrial development occurred later in the 1950-1970’s. Gross Golf Course, the Mississippi River, Ridgeway Park, Deming Park, Columbia Golf Course and Hillside Cemetery are the primary green spaces within the study area. Bridal Veil Creek used to be a prominent feature with the creek moving through many wetlands, ponds and finally over the Bridal Veil Falls into the Mississippi River. Today the creek is almost completely underground in pipes and has pollution and water quality issues. There is a shortage of trails and parks east of the river in Minneapolis and the adjoining communities in the search corridor for the Grand Rounds Missing Link. Due to the close proximity to the University of Minnesota, this area has a high volume of bike commuters. Truck access and movement are important elements of industrial areas, including Mid City Industrial. Most parkways restrict truck access. Unlike the early Grand Rounds development that occurred in a relatively undeveloped EXISTING CONDITIONS Minneapolis, there is a well established City and County road network in the area provide a framework east of the river along much of the preferred parkway route. The Burlington Northern Santa Fe (BNSF) railroad line and the BNSF railroad yard run through the east central part of the study area. An inventory and analysis of existing land cover for the Missing Link alignment was done using the Minnesota Land Cover Classification system developed by the Minnesota Department of Natural Resources and the Metro Geographic Information System. The result of the inventory shows, for the most part, that the area is highly developed with industry, commercial and residential uses. Open or ‘green’ space along the route can be considered at Gross Golf Course and Sunset/ Hillside Cemetery. While these areas are open and provide for a high percentage of pervious surfaces, they are not natural or native landscapes; rather they are highly manicured and maintained, constructed landscape systems. Along the route, there are no known or identified natural, unique or sensitive land cover types. 258 PLANNING PROCESSINTRODUCTION SERVICE AREA VISION PARK PLANS IMPLEMENTATION EAST OF THE RIVER PARK MASTER PLAN OPERATIONS AND MAINTENANCE The construction of the Missing Link will fulfill a 120-year civic vision of creating a grand loop of green space and parkway through Minneapolis and the adjoining communities. The Missing Link will connect the east side of Minneapolis to the Mississippi River, Wirth Park, the Chain of Lakes, Minnehaha Park, and other amenities. It will bring needed connections and parkland east of the river, and the adjoining communities. Portions of southeast Minneapolis lack access to parks, and the regional trail is a great opportunity to bring more parklike spaces to the service area. MPRB’s goal is to provide parks within a 6-10 block distance from residents, and according to the Trust for Public Land Park Score, 97% of Minneapolis residents benefit from parks near their homes. Southeast Como and Mid City Industrial are two neighborhoods that are underserved. The addition of the final parkway would add parks, in the form of a regional trail and trailside amenities along the route, to those areas which have been underserved. In essence, much of the Missing Link work will involve “greening” existing roads and right-of-way. In some cases, the Missing Link may only include a regional trail system if the final route passes through areas that do not have an existing street grid, like along 33rd Avenue and through the Towerside District. Although trucks and freight are not allowed on most parkways, since the Missing Link route will go through an existing industrial area the truck access policy will need to be examined on a site specific basis to decide if and where truck use of the parkway is appropriate or necessary. DEVELOPMENT CONCEPT (AND COSTS) FIGURE 20 |LOCATION OF GRAND ROUNDS MISSING LINK MAP LEGEND Existing Grand Rounds Minneapolis City Boundary Northeast Minneapolis Study Area Location of Grand Rounds Missing Link I-35WMississippi RiverMississippi RiverI-94 I-94 I-35W Hi aw a th a A v e I-394 Downtown Minneapolis Northeast Minneapolis 259 PLANNING PROCESSINTRODUCTION SERVICE AREA VISION PARK PLANS IMPLEMENTATION EAST OF THE RIVER PARK MASTER PLAN OPERATIONS AND MAINTENANCE FIGURE 21 |PREFERRED GRML ROUTE FIGURE 22 |ALTERNATIVE GRML ROUTES MAP LEGEND Alternative Route 1: Elevated Crossing Preferred Route: Elevated Crossing Alternative Route 2: Elevated Crossing ALTERNATIVE ROUTESPREFERRED ROUTE EXISTING OTHER Railroad Crossing Sub-Option ALTERNATE ROUTE 2: Bike + Pedestrian + Automobile Access Bike + Pedestrian + Automobile Access Bike + Pedestrian Access Only Bike + Pedestrian + Automobile Access Existing Grand Rounds Route Existing Bike Route (Other) MPRB Property Green Line LRT and Stations Bike + Pedestrian Access Only On Street Route Segment Granary Corridor Hennepin Uni v e r s i t y 35-W Como IndustrialS t . An tho n y P a r kw a y Hennepin Uni v e r s i t y 35-W 35-W Como IndustrialS t . An tho n y P a r kw a y At Grade Crossing At Grade Crossing Raised Crossing Raised Crossing Trail Crosses River Trail Crosses River Downtown Minneapolis Downtown Minneapolis Gross GolfCourse Gross GolfCourse Parkway to the RiverParkway to the River 260 PLANNING PROCESSINTRODUCTION SERVICE AREA VISION PARK PLANS IMPLEMENTATION EAST OF THE RIVER PARK MASTER PLAN OPERATIONS AND MAINTENANCE MAP LEGEND Alternative Route 1: Elevated Crossing Preferred Route: Elevated Crossing Alternative Route 2: Elevated Crossing ALTERNATIVE ROUTESPREFERRED ROUTE Railroad Crossing Sub-Option ALTERNATE ROUTE 2: Bike + Pedestrian + Automobile Access Bike + Pedestrian + Automobile Access Bike + Pedestrian Access Only Bike + Pedestrian + Automobile Access Bike + Pedestrian Access Only There is a preferred route and alternate routes for the GRML. These were both supported by the ERPMP CAC to open for public comment. The Preferred Route was the recommended route of the Regional Trail Workgroup who worked closely with staff over the course of several months on the route possibilities. The CAC made a recommendation of the route and considerations to provide a framework for MPRB in the development of the GRML with the understanding that MPRB cannot go at this alone, and that ongoing coordination with the local neighborhoods, business owners, the City of Minneapolis, the City of Saint Anthony, Hennepin County, the UofM and other stakeholders is the only way forward to realize the Grand Rounds vision. BOUNDARY AND ACQUISITION Each route concept passes through a wide variety of landuse types and through and along other public agency right of way and numerous privately owned properties. The City of Minneapolis, the County and BNSF Railroad own almost all the right of way. The University of Minnesota is a major land holder along the route as well as the owner and operator of the University of MN Transitway. FIGURE 23 |ZONING ALONG PROPOSED GRML ROUTES FIGURE 24 |OWNERSHIP ALONG GRML ROUTES ZONING OWNERSHIP Railroad PropertiesB4-B4S City of MinneapolisC1-C2 University of MinnesotaC3A-C3S Minneapolis Park BoardC4 Commercial / ResidentialI1-I3 OR1-OR3 R1-R2B R3-R6 Hennepin Uni v e r s i t y 35-W 35-W Como IndustrialS t . An tho n y P a r kw a y Hennepin Uni v e r s i t y 35-W 35-W Como IndustrialS t . An tho n y P a r kw a y At Grade Crossing At Grade Crossing Raised Crossing Raised Crossing Trail Crosses River Trail Crosses River Downtown Minneapolis Downtown Minneapolis Gross GolfCourse Gross GolfCourse Parkway to the RiverParkway to the River 261 PLANNING PROCESSINTRODUCTION SERVICE AREA VISION PARK PLANS IMPLEMENTATION EAST OF THE RIVER PARK MASTER PLAN OPERATIONS AND MAINTENANCE Easement Acquistion MAP LEGEND Alternative Route 1: Elevated Crossing Preferred Route: Elevated Crossing Alternative Route 2: Elevated Crossing ALTERNATIVE ROUTESPREFERRED ROUTE EXISTING OTHER Railroad Crossing Sub-Option ALTERNATE ROUTE 2: Bike + Pedestrian + Automobile Access Bike + Pedestrian + Automobile Access Bike + Pedestrian Access Only Bike + Pedestrian + Automobile Access Existing Grand Rounds Route Existing Bike Route (Other) MPRB Property Green Line LRT and Stations Bike + Pedestrian Access Only On Street Route Segment Granary Corridor FIGURE 25 |PREFERRED GRML ROUTE: EASEMENTS & ACQUISITIONS FIGURE 26 |ALTERNATIVE GRML ROUTES: EASEMENTS & ACQUISITIONS Hennepin Uni v e r s i t y 35-W Como IndustrialS t . An th on y P a r kw a y Hennepin Uni v e r s i t y 35-W Como IndustrialS t . An th on y P a r kw a y At Grade Crossing At Grade Crossing Raised Crossing Raised Crossing Trail Crosses River Trail Crosses River Downtown Minneapolis Downtown Minneapolis Gross GolfCourse Gross GolfCourse Parkway to the RiverParkway to the River 262 PLANNING PROCESSINTRODUCTION SERVICE AREA VISION PARK PLANS IMPLEMENTATION EAST OF THE RIVER PARK MASTER PLAN OPERATIONS AND MAINTENANCE MAP LEGEND Alternative Route 1: Elevated Crossing Preferred Route: Elevated Crossing Alternative Route 2: Elevated Crossing ALTERNATIVE ROUTESPREFERRED ROUTE EXISTING OTHER Railroad Crossing Sub-Option ALTERNATE ROUTE 2: Bike + Pedestrian + Automobile Access Bike + Pedestrian + Automobile Access Bike + Pedestrian Access Only Bike + Pedestrian + Automobile Access Existing Grand Rounds Route Existing Bike Route (Other) MPRB Property Green Line LRT and Stations Bike + Pedestrian Access Only On Street Route Segment Granary Corridor Section Guide A A B B E F G H I JJ K K L MM L C C D D E FIGURE 27 |PREFERRED GRML ROUTE - SECTION GUIDE FIGURE 28 |ALTERNATIVE GRML ROUTES - SECTION GUIDE Hennepin Uni v e r s i t y 35-W Como IndustrialS t . A n thon y P a r kw a y Hennepin Uni v e r s i t y 35-W Como IndustrialS t . A n thon y P a r kw a y At Grade Crossing At Grade Crossing Raised Crossing Raised Crossing Trail Crosses River Trail Crosses River Downtown Minneapolis Downtown Minneapolis Gross GolfCourse Gross GolfCourse Parkway to the RiverParkway to the River 263 PLANNING PROCESSINTRODUCTION SERVICE AREA VISION PARK PLANS IMPLEMENTATION EAST OF THE RIVER PARK MASTER PLAN OPERATIONS AND MAINTENANCE RIVER TO GREEN 4TH: In both the preferred and the alternate concepts, the regional trail crosses from East River Road and takes 27th Ave SE up toward University Avenue. This route passes by the proposed Luxton Park addition which would be an important connection to the neighborhood park network along the new route (Section A.) The route crosses University Avenue and proceeds to Green 4th, a newly improved street that includes ecological and traffic calming features (Section B.) PROPOSED EXISTING SECTION A: 27th Ave SE and Luxton Park (60’ Existing ROW) 6’ 5’5’5’5’ 8’ 8’12’12’ 10’10’5’10’4’6’ BOULE- VARD BOULE- VARDSIDEWALK SIDEWALKLANE LANE LANE PARKING LANE TRAIL BIKE BIKE CL CL SIDEWALK SIDEWALKPARKINGPARKING SCALE: 1/8”=1’ 0 8’6’2’4’ SECTION A: 27TH AVE SE AND LUXTON PARK (60’ EXISTING ROW) PROPOSED EXISTING SECTION KEY A 27TH AVE SEUNI V E R S I T Y A V E S E 264 PLANNING PROCESSINTRODUCTION SERVICE AREA VISION PARK PLANS IMPLEMENTATION EAST OF THE RIVER PARK MASTER PLAN OPERATIONS AND MAINTENANCE INTERSECTION CONSIDERATIONS ALONG THE ROUTE SEGMENT: 27th Avenue Southeast and East River Parkway: MPRB, along with agency partners, considers the intersection at 27th Avenue SE, East River Parkway, and Franklin Avenue a crucial confluence of the parkway and regional trail system. While Franklin Ave is owned by the City of Minneapolis east of the Franklin Bridge, 27th Avenue Southeast is a Hennepin County road (CSAH 5), and East River Road and Caleb Dorr Triangle by MPRB, the intersection is a complex web of property ownership and multimodal movement. The County completed a study in 2010 that highlighted several opportunities for improvements to the intersection that MPRB is in support of exploring in collaboration with the County and City. MPRB is open to a wide variety of intersection improvements, that balance all modes of transportation, including but not limited to: • A one-lane round about that prioritizes bike and pedestrian safety • Raised crossings for bikes and pedestrians • Realignment of streets at the intersection to create a four way intersection to replace the five way intersection that may include the integration of MPRB owned land or ROW into the solution • Solutions yet to be determined PROPOSED EXISTING SECTION B: 27th Ave SE, South of SE 4th St, North of University (80’ Existing ROW) SCALE: 1/8”=1’ 0 8’6’2’4’ 8’6’ 6’6’6’6’ 8’ 8’8’ 8’10’ 12’12’ 10’14’6’6’4’ BOULE- VARD BOULE- VARD BOULE- VARD BOULE- VARD BOULE- VARDSIDEWALK SIDEWALK SIDEWALK SIDEWALKLANE LANE LANE PARKING PARKING PARKING PARKINGLANE TRAIL CL CL PROPOSED EXISTING SECTION B: 27th Ave SE, South of SE 4th St, North of University (80’ Existing ROW) SCALE: 1/8”=1’ 0 8’6’2’4’ 8’6’ 6’6’6’6’ 8’ 8’8’ 8’10’ 12’12’ 10’14’6’6’4’ BOULE- VARD BOULE- VARD BOULE- VARD BOULE- VARD BOULE- VARDSIDEWALK SIDEWALK SIDEWALK SIDEWALKLANE LANE LANE PARKING PARKING PARKING PARKINGLANE TRAIL CL CL SECTION B: 27TH AVE SE, SOUTH OF SE 4TH ST, NORTH OF UNIVERSITY (80’ EXISTING ROW) PROPOSED EXISTING SECTION KEY B SE 4 T H S T UNI V E R S I T Y A V E S E 265 PLANNING PROCESSINTRODUCTION SERVICE AREA VISION PARK PLANS IMPLEMENTATION EAST OF THE RIVER PARK MASTER PLAN OPERATIONS AND MAINTENANCE TOWERSIDE DISTRICT In the preferred concept, trail users can remain on 4th over to Malcolm (Section C and Section D) where they will head north to a bridge over the railyard. All modes can use this route, including bikes, pedestrians, and automobiles. A secondary route for the regional trail facility is to move it through the Towerside District. Additional coordination is needed with MetroTransit and the UofM to determine the preferred crossing for the LRT tracks and the UofM Transitway. In order to maximize the trail presence in the emerging Towerside District north of the Transitway, MPRB is committed to a study of crossing the transitway at 27th Avenue SE and 29th Avenue SE that would include potential traffic control devices to regulate trail user access across the transitway and to prioritize UofM Transitway buses. MPRB supports the relocation of the Transitway as long term solution for improved trail and parkway connections across the district, and would be interested in exploring a repurposing of the transitway as a parkway and regional trail if the opportunity arises. Finding a way to move the regional trail through the heart of the district will provide a backbone of parkland that will be a foundation for innovation in line with the Towerside vision. The UofM has expressed support for crossing the Transitway at 27th Avenue SE, but this would require a crossing of the LRT tracks, which the 29th Avenue SE crossing would not entail. SECTION C: SE 4th St and Malcolm Ave SE (Use New Construction; On-Street Bike Lanes) SCALE: 1/8”=1’ 0 8’6’2’4’ PROPOSED EXISTING 6’ 6’ 6’ 6’ 6’ 6’ 5’ 5’ 8’ 8’ 8’ 8’ 8’ 8’ 7’ 7’ 10’ 10’ 10’ 10’ BOULE- VARD BOULE- VARD BOULE- VARD BOULE- VARD SIDEWALK SIDEWALK SIDEWALK SIDEWALK LANE LANE BIKE BIKE BIKE BIKE PARKING PARKING PARKING PARKING LANE LANE CL CL SECTION C: SE 4TH ST AND MALCOLM AVE SE (USE NEW CONSTRUCTION; ON-STREET BIKE LANES) PROPOSED EXISTING SECTION KEY C SE 4 T H S T UNI V E R S I T Y A V E S E 266 PLANNING PROCESSINTRODUCTION SERVICE AREA VISION PARK PLANS IMPLEMENTATION EAST OF THE RIVER PARK MASTER PLAN OPERATIONS AND MAINTENANCE SECTION C: SE 4th St and Malcolm Ave SE (Use New Construction; On-Street Bike Lanes) SCALE: 1/8”=1’ 0 8’6’2’4’ PROPOSED EXISTING 6’ 6’ 6’ 6’ 6’ 6’ 5’ 5’ 8’ 8’ 8’ 8’ 8’ 8’ 7’ 7’ 10’ 10’ 10’ 10’ BOULE- VARD BOULE- VARD BOULE- VARD BOULE- VARD SIDEWALK SIDEWALK SIDEWALK SIDEWALK LANE LANE BIKE BIKE BIKE BIKE PARKING PARKING PARKING PARKING LANE LANE CL CL SECTION D: Malcolm Ave SE, South of Railroad Crossing (60’ Existing ROW) SCALE: 1/8”=1’ 0 8’6’2’4’ PROPOSED EXISTING 6’ 4’ 6’4’ 5’6’5’ 5’8’ 8’8’ 10’11’ 12’12’ 10’ BOULE- VARD BOULE- VARD BOULE- VARD BOULE- VARDSIDEWALK SIDE- WALK SIDE- WALK SIDEWALKTRAILPARKING PARKING PARKING LANE LANE LANE LANE CL CL SECTION D: Malcolm Ave SE, South of Railroad Crossing (60’ Existing ROW) SCALE: 1/8”=1’ 0 8’6’2’4’ PROPOSED EXISTING 6’ 4’ 6’4’ 5’6’5’ 5’8’ 8’8’ 10’11’ 12’12’ 10’ BOULE- VARD BOULE- VARD BOULE- VARD BOULE- VARDSIDEWALK SIDE- WALK SIDE- WALK SIDEWALKTRAILPARKING PARKING PARKING LANE LANE LANE LANE CL CL SECTION D: MALCOLM AVE SE, SOUTH OF RAILROAD CROSSING (60’ EXISTING ROW) PROPOSED EXISTING SECTION KEY D Image 17 | Green on 4th, an apartment complex along Green Fourth Street developed by Minneapolis-based Prospect Park Properties & Bloomington-based Timberland Partners (Renderings by Tushie Montgomery Architects, January 2018, Source: https://finance-commerce.com/2018/01/just-sold-work- starts-on-green-on-4th-rentals-in-prospect-park/) Image 18 | Green on 4th Apartment Complex Development (Renderings by Tushie Montgomery Architects, January 2018, Source: greenonfourth.com) SE 4 T H S T MALCOLM AVE SE267 PLANNING PROCESSINTRODUCTION SERVICE AREA VISION PARK PLANS IMPLEMENTATION EAST OF THE RIVER PARK MASTER PLAN OPERATIONS AND MAINTENANCE RAILYARD: There are two proposed railyard crossings in the plan. Both would include multi-modal bridges, with the preferred crossing happening from Malcolm or the Towerside District to Kasota on the northside of the railyard (Section E.) Extensive coordination with other public agencies and the railroad are needed to assess the best route forward for moving pedestrians, cyclists, cars, freight across the rails. This railyard crossing is the most complex infrastructural component of the GRML, and will require multi-agency consensus, fundraising, and effort to accomplish. Trailside amenities such as benches, lighting and wayfinding would be included to instill a sense of parkway character on the bridge. 25TH AVE SE A crossing of the railyard at 25th Avenue SE is an alternative route that MPRB will continue to explore. This option bypasses the Towerside District, but it does offer an existing, signalized, on-street crossing of the Transitway and LRT tracks, which are both barriers to the Towerside District Route. The UofM has expressed support for this alternative. SECTION E: Typical Bridge Crossing (52’ Wide) SCALE: 1/8”=1’ 0 8’6’2’4’ PROPOSED EXISTING N/A 10’14’14’14’ SIDEWALKTRAILLANELANE CL SECTION E: TYPICAL BRIDGE CROSSING (52’ WIDE) PROPOSED SECTION KEY E E K A SO T A A V E S E24TH AVE SE268 PLANNING PROCESSINTRODUCTION SERVICE AREA VISION PARK PLANS IMPLEMENTATION EAST OF THE RIVER PARK MASTER PLAN OPERATIONS AND MAINTENANCE 33RD AVE SE This route will provide access to Bridal Veil Wetland, Bridal Veil Creek, and enhance access to the Mississippi River. The proposed regional trail would restore historic natural features such as wetlands and ponds in parks and green spaces to this area that requires additional environmental analysis to assess a necessary mitigation efforts. This route would involve several acquisitions or easements along the 33rd Ave SE corridor south of Como Ave. SE [See GRML Easements & Acquistions, Figures 25 and 26]. The segment south of Como Avenue could be regional trail only, rather than a route for all modes. Cars and freight could take alternate routes including Kasota and reconnect to the GRML at Como Avenue and 33rd Ave SE. SECTION F: 33rd Ave SE (between Como Ave SE and Weeks Ave SE) (60’ Existing ROW) SCALE: 1/8”=1’ 0 8’6’2’4’ 6’6’4’5’8’10’11’10’ BOULE- VARD BOULE- VARDSIDEWALK SIDEWALKTRAILPARKINGLANELANEPROPOSED EXISTING 8’8’11’11’11’11’ SIDEWALK SIDEWALKLANELANELANELANE CL CL SECTION F: 33rd Ave SE (between Como Ave SE and Weeks Ave SE) (60’ Existing ROW) SCALE: 1/8”=1’ 0 8’6’2’4’ 6’6’4’5’8’10’11’10’ BOULE- VARD BOULE- VARDSIDEWALK SIDEWALKTRAILPARKINGLANELANEPROPOSED EXISTING 8’8’11’11’11’11’ SIDEWALK SIDEWALKLANELANELANELANE CL CL SECTION F: 33RD AVE SE (BETWEEN COMO AVE SE AND WEEKS AVE SE) (60’ EXISTING ROW) PROPOSED EXISTING SECTION KEY F F K A SO T A A V E S E 33RD AVE SE269 PLANNING PROCESSINTRODUCTION SERVICE AREA VISION PARK PLANS IMPLEMENTATION EAST OF THE RIVER PARK MASTER PLAN OPERATIONS AND MAINTENANCE 29TH AVE SE One alternate route takes trail users up Kasota from the railyard to cross over another set of tracks, then jobs down to 29th Ave SE (Section I.) On 29th Ave SE, the trail would include a simple shared use facility on the east side of the road. This concept does not remove parking from the street. SECTION I: 29th Ave SE, South of E Hennepin Ave SCALE: 1/8”=1’ 0 8’6’2’4’ 6’ 6’6’ 4’ 8’6’ 6’34’ 34’ 10’ BOULE- VARD BOULE- VARD BOULE- VARD BOULE- VARDSIDEWALK SIDEWALK SIDEWALK LANES + PARKING LANES + PARKING TRAILPROPOSED EXISTING SECTION I: 29th Ave SE, South of E Hennepin Ave SCALE: 1/8”=1’ 0 8’6’2’4’ 6’ 6’6’ 4’ 8’6’ 6’34’ 34’ 10’ BOULE- VARD BOULE- VARD BOULE- VARD BOULE- VARDSIDEWALK SIDEWALK SIDEWALK LANES + PARKING LANES + PARKING TRAILPROPOSED EXISTING SECTION I: 29TH AVE SE, SOUTH OF EAST HENNEPIN AVE PROPOSED EXISTING SECTION KEY I 33RD AVE SESE HENNEPIN AVE 27TH AVE SE270 PLANNING PROCESSINTRODUCTION SERVICE AREA VISION PARK PLANS IMPLEMENTATION EAST OF THE RIVER PARK MASTER PLAN OPERATIONS AND MAINTENANCE SECTION G: 27th Ave SE, South of Como Ave SE (115’ Existing ROW) SCALE: 1/8”=1’ 0 8’6’2’4’ 6’ 6’ 6’ 6’ 6’4’6’5’ 4’5’25’ 8’ 8’8’8’8’ 8’8’8’10’ 10’ 10’ 10’ 11’ 13’ 11’ 13’ BOULE- VARD BOULE- VARD BOULE- VARD BOULE- VARD BOULE- VARDBOULEVARD SIDEWALK SIDEWALK SIDEWALK SIDEWALK SIDEWALKPARKING PARKING PARKING PARKING PARKING PARKING PARKING PARKINGLANE LANE LANE LANE LANE LANE LANE LANE PROPOSED 27th Ave SE 27th Ave SE 28th Ave SE 28th Ave SE EXISTING CL CL CL CL 14’ TRAIL SECTION G: 27th Ave SE, South of Como Ave SE (115’ Existing ROW) SCALE: 1/8”=1’ 0 8’6’2’4’ 6’ 6’ 6’ 6’ 6’4’6’5’ 4’5’25’ 8’ 8’8’8’8’ 8’8’8’10’ 10’ 10’ 10’ 11’ 13’ 11’ 13’ BOULE- VARD BOULE- VARD BOULE- VARD BOULE- VARD BOULE- VARDBOULEVARD SIDEWALK SIDEWALK SIDEWALK SIDEWALK SIDEWALKPARKING PARKING PARKING PARKING PARKING PARKING PARKING PARKINGLANE LANE LANE LANE LANE LANE LANE LANE PROPOSED 27th Ave SE 27th Ave SE 28th Ave SE 28th Ave SE EXISTING CL CL CL CL 14’ TRAIL SECTION G: 27TH AVE SE, SOUTH OF COMO AVE SE (115’ EXISTING ROW) EXISTING PROPOSED SECTION KEY G 33RD AVE SESE HENNEPIN AVE 27TH AVE SE29TH AVE SE271 PLANNING PROCESSINTRODUCTION SERVICE AREA VISION PARK PLANS IMPLEMENTATION EAST OF THE RIVER PARK MASTER PLAN OPERATIONS AND MAINTENANCE SECTION H: 27th Ave SE, North of Como Ave SE (60’ Existing ROW) SCALE: 1/8”=1’ 0 8’6’2’4’ 6’ 6’6’ 4’ 6’6’ 4’5’5’ 8’8’ 8’8’10’10’ BOULE- VARD BOULE- VARD BOULE- VARD PEDBIKE TRAIL: SEPARATE USE PATH BIKESIDEWALK SIDEWALK SIDEWALKPARKINGPARKING PARKING PARKINGLANELANEPROPOSED EXISTING 12’12’ LANE LANE CL CL SECTION H: 27th Ave SE, North of Como Ave SE (60’ Existing ROW) SCALE: 1/8”=1’ 0 8’6’2’4’ 6’ 6’6’ 4’ 6’6’ 4’5’5’ 8’8’ 8’8’10’10’ BOULE- VARD BOULE- VARD BOULE- VARD PEDBIKE TRAIL: SEPARATE USE PATH BIKESIDEWALK SIDEWALK SIDEWALKPARKINGPARKING PARKING PARKINGLANELANEPROPOSED EXISTING 12’12’ LANE LANE CL CL SECTION H: 27TH AVE SE, NORTH OF COMO AVE SE (60’ EXISTING ROW) PROPOSED EXISTING 27TH AVE SE Another alternate route takes trail users from the railyard crossing at 25th Avenue SE up to 24th Avenue SE north of the tracks and then over to 27th Avenue SE. This route takes trail users up the median of 27th/28th Avenue SE south of Como Avenue, and then stays on the west side of the street on a shared use trail (Section G and Section H.) This concept does not remove parking from the street. Crossing of the tracks for both alternate route concepts would require additional study to ensure the safety of all modes. If an at grade crossing is pursued, the most direct crossing is at Paul Place which maximizes keeping the trail on the existing street grid, but require an easement or acquisition of a parcel [See GRML Easements & Acquistions, Figure 26 and 27]. SECTION KEY H 33RD AVE SESE HENNEPIN AVE 27TH AVE SE29TH AVE SE272 PLANNING PROCESSINTRODUCTION SERVICE AREA VISION PARK PLANS IMPLEMENTATION EAST OF THE RIVER PARK MASTER PLAN OPERATIONS AND MAINTENANCE FIGURE 29 |PREFERRED AND ALTERNATIVE GRML ROUTES A B E E G H I J K L C D Hennepin Uni v e r s i t y 35-W Como IndustrialS t . An th on y P a r kw a y F INTERSECTION CONSIDERATIONS ALONG THE ROUTE SEGMENT: The proposed routes continue along East Hennepin Ave to the intersection of Industrial Boulevard NE and East Hennepin Avenue. MPRB would like to explore alternatives for a shared use trail along the southern edge of East Hennepin Avenue for this segment coming from the east or the west, depending on the southern route. Trail users will move along Hennepin to Industrial Boulevard for a safe, signalized crossing. This option would not entail adding a signal on Hennepin, and could therefore maintain its level of service. A potential for rail spur connection from 33rd Avenue will be explored that would allow the trail to bypass busy Hennepin, but still make use of the signalized crossing at Industrial Boulevard and Hennepin Avenue. SAINT ANTHONY PARKWAY: In the preferred and alternate route concepts, the GRML moves from Industrial Boulevard across 35W to Saint Anthony Parkway. In 2018, a shared use trail was installed on the west side of Industrial Boulevard connecting across 35W to Ridgway Parkway. The GRML proposed routes call for the shared use path to continue up the west side of the parkway north of 35W until the driveway to Gross Golf Course where trail users will cross over the parkway to the east side of the street to continue on a regional trail that will take them north (Section L). The intersection at Saint Anthony Parkway and New Brighton should be improved to accommodate for safer bike and pedestrian crossings. Diagram M shows the crossing suggestions. North of Saint Anthony’s Trillium Park, the trail will move to an on-street bike lane configuration with the potential for an off street facility in the future. MAP LEGEND Alternative Route 1: Elevated Crossing Preferred Route: Elevated Crossing Alternative Route 2: Elevated Crossing ALTERNATIVE ROUTESPREFERRED ROUTE EXISTING OTHER Railroad Crossing Sub-Option ALTERNATE ROUTE 2: Bike + Pedestrian + Automobile Access Bike + Pedestrian + Automobile Access Bike + Pedestrian Access Only Bike + Pedestrian + Automobile Access Existing Grand Rounds Route Existing Bike Route (Other) MPRB Property Green Line LRT and Stations Bike + Pedestrian Access Only On Street Route Segment Granary Corridor Section Guide INTERSECTION CONSIDERATIONS ALONG THE ROUTE SEGMENT: The trail will continue on the north side of St. Anthony Boulevard and New Brighton Boulevard and switch from off-street to on-street at the intersection of St. Anthony Boulevard and Kenzie Terrace with the addition of a 2-Stage Bike Box, and continue on-street. If needed, there is the opportunity to reduce lane widths to accomodate a trail, especially if needed east of New Brighton. Also recommended is the removal of free right turns and tighten radii, although there could exist right turn lanes that T into the intersection if traffic volumes warrent them. INDUSTRIAL BOULEVARD: In both the preferred concept and the alternate route concepts, the GRML is proposed along Industrial Boulevard starting at Hennepin Avenue (Section J and Section K.) In this concept, a shared use trail would connect users from Como Avenue across I-35W on the west side of the street. To maximize the parkway character and safety on the corridor, boulevard trees, parkway lighting, sidewalks, and, in some cases, reduced traffic lanes are all included in the plan. Gross GolfCourse Parkway to the River M 273 PLANNING PROCESSINTRODUCTION SERVICE AREA VISION PARK PLANS IMPLEMENTATION EAST OF THE RIVER PARK MASTER PLAN OPERATIONS AND MAINTENANCE SECTION K: Industrial Blvd NE and S of Broadway St NE (100’ Existing ROW) *Note: Option retains existing median width and lane width. Location may change as ROW is further defined. *Note: Parking could be added by narrowing median, but also runs risk for semi-trucks parking there for long periods due to location. SCALE: 1/8”=1’ 0 8’6’2’4’ 6’ 6’6’8’6’6’ 30’ 30’ 26’ 4’ BOULE- VARD BOULE- VARD BOULE- VARD MEDIAN / TURN LANE MEDIAN / TURN LANE MEDIAN / TURN LANE BOULE- VARD SIDEWALK SIDEWALK SIDEWALKPROPOSED PROPOSED EXISTING 12’ 14’ 12’ 13’13’13’13’ 12’12’ 14’14’ 12’ TRAIL TRAIL LANE LANE LANE LANE LANE LANE LANE LANELANE LANE SECTION K: Industrial Blvd NE and S of Broadway St NE (100’ Existing ROW) *Note: Option retains existing median width and lane width. Location may change as ROW is further defined. *Note: Parking could be added by narrowing median, but also runs risk for semi-trucks parking there for long periods due to location. SCALE: 1/8”=1’ 0 8’6’2’4’ 6’ 6’6’8’6’6’ 30’ 30’ 26’ 4’ BOULE- VARD BOULE- VARD BOULE- VARD MEDIAN / TURN LANE MEDIAN / TURN LANE MEDIAN / TURN LANE BOULE- VARD SIDEWALK SIDEWALK SIDEWALKPROPOSED PROPOSED EXISTING 12’ 14’ 12’ 13’13’13’13’ 12’12’ 14’14’ 12’ TRAIL TRAIL LANE LANE LANE LANE LANE LANE LANE LANELANE LANE SECTION K: Industrial Blvd NE and S of Broadway St NE (100’ Existing ROW) *Note: Option retains existing median width and lane width. Location may change as ROW is further defined. *Note: Parking could be added by narrowing median, but also runs risk for semi-trucks parking there for long periods due to location. SCALE: 1/8”=1’ 0 8’6’2’4’ 6’ 6’6’8’6’6’ 30’ 30’ 26’ 4’ BOULE- VARD BOULE- VARD BOULE- VARD MEDIAN / TURN LANE MEDIAN / TURN LANE MEDIAN / TURN LANE BOULE- VARD SIDEWALK SIDEWALK SIDEWALKPROPOSED PROPOSED EXISTING 12’ 14’ 12’ 13’13’13’13’ 12’12’ 14’14’ 12’ TRAIL TRAIL LANE LANE LANE LANE LANE LANE LANE LANELANE LANE SECTION J: INDUSTRIAL BLVD NE AND S OF BROADWAY ST NE (100’ EXISTING ROW) EXISTING PROPOSED PROPOSED SECTION KEY J INDUSTRIAL BLVD NEBROADWAY ST NE 274 PLANNING PROCESSINTRODUCTION SERVICE AREA VISION PARK PLANS IMPLEMENTATION EAST OF THE RIVER PARK MASTER PLAN OPERATIONS AND MAINTENANCE SECTION L: Industrial Blvd NE and N of Broadway St NE (100’ ROW) SCALE: 1/8”=1’ 0 8’6’2’4’ 6’3’12’ BOULE- VARDBOULEVARDBOULEVARD MEDIAN SIDEWALKTRAILPROPOSED EXISTING 12’ 12’12’ 11’ 12’ 12’20’ 6’ 14’ 14’14’ LANE LANE LANE TURN LANE TURN LANE LANE LANE LANE SECTION L: Industrial Blvd NE and N of Broadway St NE (100’ ROW) SCALE: 1/8”=1’ 0 8’6’2’4’ 6’3’12’ BOULE- VARDBOULEVARDBOULEVARD MEDIAN SIDEWALKTRAILPROPOSED EXISTING 12’ 12’12’ 11’ 12’ 12’20’ 6’ 14’ 14’14’ LANE LANE LANE TURN LANE TURN LANE LANE LANE LANE SECTION K: INDUSTRIAL BLVD NE AND N OF BROADWAY ST NE (100’ ROW) PROPOSED EXISTING SECTION KEY K INDUSTRIAL BLVD NEBROADWAY ST NE 275 PLANNING PROCESSINTRODUCTION SERVICE AREA VISION PARK PLANS IMPLEMENTATION EAST OF THE RIVER PARK MASTER PLAN OPERATIONS AND MAINTENANCE SECTION M: St. Anthony Boulevard at Gross Golf Course (West of Trail Crossing) (100’ Existing ROW) SCALE: 1/8”=1’ 0 8’6’2’4’ 10’10’ 6’6’ BOULEVARD BOULEVARD BOULEVARD BOULEVARD BOULEVARDTRAILBOULEVARD BOULEVARDSIDEWALKSIDEWALK SIDEWALK SIDEWALK PROPOSED EXISTING 12’ 16’ 12’ 16’ 10’ 12’18’ 10’10’14’6’6’ LANE LANE LANE LANE SECTION M: St. Anthony Boulevard at Gross Golf Course (West of Trail Crossing) (100’ Existing ROW) SCALE: 1/8”=1’ 0 8’6’2’4’ 10’10’ 6’6’ BOULEVARD BOULEVARD BOULEVARD BOULEVARD BOULEVARDTRAILBOULEVARD BOULEVARDSIDEWALKSIDEWALK SIDEWALK SIDEWALK PROPOSED EXISTING 12’ 16’ 12’ 16’ 10’ 12’18’ 10’10’14’6’6’ LANE LANE LANE LANE SECTION L: ST. ANTHONY BOULEVARD AT GROSS GOLF COURSE (WEST OF TRAIL CROSSING) (100’ EXISTING ROW) PROPOSED EXISTING SECTION KEY L Gross GolfCourseST ANTHONY BLVD I-35W 276 PLANNING PROCESSINTRODUCTION SERVICE AREA VISION PARK PLANS IMPLEMENTATION EAST OF THE RIVER PARK MASTER PLAN OPERATIONS AND MAINTENANCE SECTION L: ST. ANTHONY BOULEVARD AT GROSS GOLF COURSE (WEST OF TRAIL CROSSING) (100’ EXISTING ROW) INTERSECTION PLAN: St. Anthony Boulevard and Kenzie Terrace (Off-Street to On-Street Trail) DIAGRAM M: INTERSECTION PLAN OF ST. ANTHONY BOULEVARD AND KENZIE TERRACE (OFF-STREET TO ON-STREET TRAIL)BOULEVARD DIAGRAM KEY M Gross GolfCourseST ANTHONY BLVD NEW BRIGHTON BLVDKENZIE TERRACE277 PLANNING PROCESSINTRODUCTION SERVICE AREA VISION PARK PLANS IMPLEMENTATION EAST OF THE RIVER PARK MASTER PLAN OPERATIONS AND MAINTENANCE TRAILSIDE AMENITIES: Along the route map, there are potential greenspace identified that are considered part of the regional trail. They offer spots along the route for rest, stormwater capture, gathering, and wayfinding. In some cases, they may be restored and remediate wetlands, or pocket-park nodes of greenspace, and in some cases, simply a sign or bench along the route. The added open space will provide a much needed element to an area of the city that is highly developed and without any significant adjacent or nearby natural resources. FIGURE 30 |PREFERRED ROUTE: TRAILSIDE AMENITIES FIGURE 31 |ALTERNATIVE ROUTES: TRAILSIDE AMENITIES MAP LEGEND Alternative Route 1: Elevated Crossing Preferred Route: Elevated Crossing Alternative Route 2: Elevated Crossing ALTERNATIVE ROUTESPREFERRED ROUTE EXISTING OTHER Railroad Crossing Sub-Option ALTERNATE ROUTE 2: Bike + Pedestrian + Automobile Access Bike + Pedestrian + Automobile Access Bike + Pedestrian Access Only Bike + Pedestrian + Automobile Access Existing Grand Rounds Route Existing Bike Route (Other) MPRB Property Green Line LRT and Stations Bike + Pedestrian Access Only On Street Route Segment Granary Corridor Hennepin Uni v e r s i t y 35-W Como IndustrialS t . A n thon y P a r kw a y Hennepin Uni v e r s i t y 35-W Como IndustrialS t . A n thon y P a r kw a y At Grade Crossing At Grade Crossing Raised Crossing Raised Crossing Trail Crosses River Trail Crosses River Downtown Minneapolis Downtown Minneapolis Potential Location of Trailside Amenities Gross GolfCourse Gross GolfCourse Parkway to the RiverParkway to the River 278 PLANNING PROCESSINTRODUCTION SERVICE AREA VISION PARK PLANS IMPLEMENTATION EAST OF THE RIVER PARK MASTER PLAN OPERATIONS AND MAINTENANCE Criteria How it's Evaluated Malcolm/33rd 25th/24th/27th Malcolm/Kasota/25th/27th or 29th Feasible Ease of implementation in terms of cost and property ownership constraints Poor Fair Good Interagency Coordination Encourages interagency coordination with property and right of way owners along the route Good Good Good MPRB Parkway Typology Adheres to ideal Grand Rounds typology whenever possible Good Fair Poor Increase Park Space and Regional Trail Access in Underserved Areas Improves access to park facilities in underserved areas Fair Fair Fair Connect River to St. Anthony Parkway Creates a connection between the river and St. Anthony Parkway Good Good Good Industry Importance to City Minimizes impacts to existing industry including property impacts, movement of freight, and jobs creation Fair Good Good Mitigate Environmental Justice Challenges in Industrial Areas and Corridors Near Freeways Mitigates air, soil and water pollution in the area Good Poor Poor Asset to Neighborhoods it Passes Through Benefits the quality of life of residents along the route Good Good Good Safety* Safe and comfortable for users of all ages and abilities. Reduces conflicts with motor vehicles, freight, and other uses at driveway crossings, with adjacent truck traffic, length of bridge crossings, and intersection crossings Good Fair Poor *Criteria added by MPRB staff Route FIGURE 32 |GRAND ROUNDS EVALUATION MATRIX 279 PLANNING PROCESSINTRODUCTION SERVICE AREA VISION PARK PLANS IMPLEMENTATION EAST OF THE RIVER PARK MASTER PLAN OPERATIONS AND MAINTENANCE Cost Share - Draft for Discussion Purposes Description Unit Unit Price Est Quantity Est Expenditure MPRB City of Mpls Parkway/Pedestrian Scale Lighting 285,000.00$ 285,000.00$ 0 Sawing Pavement Lin Ft 7.80$ 11,850 92,500.00$ 92,500.00$ Remove Curb and Gutter Lin Ft 3.90$ 12,950 50,600.00$ 50,600.00$ Remove Pavement (13')Sq Yd 13.50$ 4,916 66,400.00$ 33,200.00$ 33,200.00$ Remove Driveway Pavement Sq Yd 13.50$ 1,300 17,600.00$ 17,600.00$ 0 Remove Catchbasins Each 390.00$ 7 2,800.00$ 2,800.00$ Concrete Base Repair (1' Wide)Sq Yd 55.10$ 112 6,200.00$ 6,200.00$ 4" Asphalt Patch Tons 130.00$ 29 3,800.00$ 3,800.00$ Granular Borrow Cu Yd 20.70$ 7,863 162,800.00$ 162,800.00$ Common Excavation Cu Yd 29.50$ 8,006 236,200.00$ 236,200.00$ Asphalt Paving SF 8.50$ 214,500 1,823,300.00$ 1,823,300.00$ Aggregate Base Cu Yd 45.05$ 3,967 178,800.00$ 178,800.00$ Move Hydrant Each 16,500.00$ 3 49,500.00$ 24,750.00$ 24,750.00$ 6" Concrete Walk Sq Ft 6.20$ 137,100 850,100.00$ 850,100.00$ Drainage Structure Each 2,175.00$ 0 -$ -$ 12" RC Pipe Sewer Lin Ft 110.00$ 0 -$ -$ 8" Driveway Pavement Sq Yd 82.80$ 2,070 171,400.00$ 171,400.00$ Concrete C & G B624 Lin Ft 20.75$ 15,750 326,900.00$ 326,900.00$ Signal Modifications Each 25,000.00$ 1 25,000.00$ 25,000.00$ 4" Painted Stripe Lin Ft 0.75$ 2,600 2,000.00$ 2,000.00$ Sodding Type Lawn Sq Yd 23.30$ 3,090 72,000.00$ 72,000.00$ Easement Each 311,336.00$ 1 311,400.00$ Bridge Each 14,025,000.00$ 1 14,025,000.00$ 14,025,000.00$ RR Crossing Each 250,000.00$ 1 250,000.00$ Construction Subtotal 19,010,000.00$ 17,708,750.00$ 739,150.00$ Traffic Control (10%)`1,901,000.00$ 1,901,000.00$ Subtotal 20,911,000.00$ 17,708,750.00$ 2,640,150.00$ Contigency (25%)5,228,000.00$ 2,614,000.00$ 2,614,000.00$ Subtotal 26,139,000.00$ 20,322,750.00$ 5,254,150.00$ Inflation (5%)1,307,000.00$ 653,500.00$ 653,500.00$ Subtotal 22,218,000.00$ 20,976,250.00$ 5,907,650.00$ Engineering (15%)3,333,000.00$ 1,666,500.00$ 1,666,500.00$ Subtotal 25,551,000.00$ 22,642,750.00$ 7,574,150.00$ General Fund Overhead (5%)1,278,000.00$ 0 1,278,000.00$ Project Total 26,829,000.00$ 22,642,750.00$ 8,852,150.00$ COST ESTIMATE OF PREFERRED ROUTE (RED): DRAFT 0% DESIGN / Broadway To Nb 35W Ramp *Expenditures would be met through cost share with other public agencies. 280 PLANNING PROCESSINTRODUCTION SERVICE AREA VISION PARK PLANS IMPLEMENTATION EAST OF THE RIVER PARK MASTER PLAN OPERATIONS AND MAINTENANCE Cost Share - Draft for Discussion Purposes Description Unit Unit Price Est Quantity Est Expenditure MPRB City of Mpls Parkway/Pedestrian Scale Lighting 245,000.00$ 245,000.00$ 0 Sawing Pavement Lin Ft 7.80$ 11,600 90,500.00$ 90,500.00$ Remove Curb and Gutter Lin Ft 3.90$ 11,640 45,400.00$ 45,400.00$ Remove Pavement (13')Sq Yd 13.50$ 4,698 63,500.00$ 31,750.00$ 31,750.00$ Remove Driveway Pavement Sq Yd 13.50$ 1,360 18,400.00$ 18,400.00$ 0 Remove Catchbasins Each 390.00$ 5 2,000.00$ 2,000.00$ Concrete Base Repair (1' Wide)Sq Yd 55.10$ 98 5,400.00$ 5,400.00$ 4" Asphalt Patch Tons 130.00$ 21 2,800.00$ 2,800.00$ Granular Borrow Cu Yd 20.70$ 7,350 152,200.00$ 152,200.00$ Common Excavation Cu Yd 29.50$ 7,515 221,700.00$ 221,700.00$ Asphalt Paving SF 8.50$ 212,000 1,802,000.00$ 1,802,000.00$ Aggregate Base Cu Yd 45.05$ 3,925 176,900.00$ 176,900.00$ Move Hydrant Each 16,500.00$ 3 49,500.00$ 24,750.00$ 24,750.00$ 6" Concrete Walk Sq Ft 6.20$ 160,100 992,700.00$ 992,700.00$ Drainage Structure Each 2,175.00$ 0 -$ -$ 12" RC Pipe Sewer Lin Ft 110.00$ 0 -$ -$ 8" Driveway Pavement Sq Yd 82.80$ 1,475 122,200.00$ 122,200.00$ Concrete C & G B624 Lin Ft 20.75$ 14,800 307,100.00$ 307,100.00$ Signal Modifications Each 25,000.00$ 1 25,000.00$ 25,000.00$ 4" Painted Stripe Lin Ft 0.75$ 2,180 1,700.00$ 1,700.00$ Sodding Type Lawn Sq Yd 23.30$ 3,140 73,200.00$ 73,200.00$ Easement Each 56,402.00$ 1 56,500.00$ Bridge Each 14,025,000.00$ 1 14,025,000.00$ 14,025,000.00$ RR Crossing Each 250,000.00$ 1 250,000.00$ Construction Subtotal 18,729,000.00$ 17,763,600.00$ 658,600.00$ Traffic Control (10%)`1,873,000.00$ 1,873,000.00$ Subtotal 20,602,000.00$ 17,763,600.00$ 2,531,600.00$ Contigency (25%)5,151,000.00$ 2,575,500.00$ 2,575,500.00$ Subtotal 25,753,000.00$ 20,339,100.00$ 5,107,100.00$ Inflation (5%)1,288,000.00$ 644,000.00$ 644,000.00$ Subtotal 21,890,000.00$ 20,983,100.00$ 5,751,100.00$ Engineering (15%)3,284,000.00$ 1,642,000.00$ 1,642,000.00$ Subtotal 25,174,000.00$ 22,625,100.00$ 7,393,100.00$ General Fund Overhead (5%)1,259,000.00$ 0 1,259,000.00$ Project Total 26,433,000.00$ 22,625,100.00$ 8,652,100.00$ COST ESTIMATE OF ALTERNATIVE ROUTE (YELLOW): DRAFT 0% DESIGN / Broadway To Nb 35W Ramp *Expenditures would be met through cost share with other public agencies. 281 PLANNING PROCESSINTRODUCTION SERVICE AREA VISION PARK PLANS IMPLEMENTATION EAST OF THE RIVER PARK MASTER PLAN OPERATIONS AND MAINTENANCE COST ESTIMATE OF ALTERNATIVE ROUTE (PURPLE): DRAFT 0% DESIGN / Broadway To Nb 35W Ramp Description Unit Unit Price Est Quantity Est Expenditure MPRB City of Mpls Parkway/Pedestrian Scale Lighting 230,000.00$ 230,000.00$ 0 Sawing Pavement Lin Ft 7.80$ 12,200 95,200.00$ 95,200.00$ Remove Curb and Gutter Lin Ft 3.90$ 13,840 54,000.00$ 54,000.00$ Remove Pavement (13')Sq Yd 13.50$ 5,956 80,500.00$ 40,250.00$ 40,250.00$ Remove Driveway Pavement Sq Yd 13.50$ 3,900 52,700.00$ 52,700.00$ 0 Remove Catchbasins Each 390.00$ 7 2,800.00$ 2,800.00$ Concrete Base Repair (1' Wide)Sq Yd 55.10$ 124 6,900.00$ 6,900.00$ 4" Asphalt Patch Tons 130.00$ 25 3,200.00$ 3,200.00$ Granular Borrow Cu Yd 20.70$ 7,950 164,600.00$ 164,600.00$ Common Excavation Cu Yd 29.50$ 8,270 244,000.00$ 244,000.00$ Asphalt Paving SF 8.50$ 242,400 2,060,400.00$ 2,060,400.00$ Aggregate Base Cu Yd 45.05$ 4,490 202,300.00$ 202,300.00$ Move Hydrant Each 16,500.00$ 3 49,500.00$ 24,750.00$ 24,750.00$ 6" Concrete Walk Sq Ft 6.20$ 119,900 743,400.00$ 743,400.00$ Drainage Structure Each 2,175.00$ 0 -$ -$ 12" RC Pipe Sewer Lin Ft 110.00$ 0 -$ -$ 8" Driveway Pavement Sq Yd 82.80$ 1,590 131,700.00$ 131,700.00$ Concrete C & G B624 Lin Ft 20.75$ 11,800 244,900.00$ 244,900.00$ Signal Modifications Each 25,000.00$ 1 25,000.00$ 25,000.00$ 4" Painted Stripe Lin Ft 0.75$ 2,750 2,100.00$ 2,100.00$ Sodding Type Lawn Sq Yd 23.30$ 2,950 68,800.00$ 68,800.00$ Easement Each 45,839.00$ 1 45,900.00$ Bridge Each 14,025,000.00$ 1 14,025,000.00$ 14,025,000.00$ RR Crossing Each 250,000.00$ 1 250,000.00$ Construction Subtotal 18,783,000.00$ 17,856,200.00$ 630,800.00$ Traffic Control (10%)`1,879,000.00$ 1,879,000.00$ Subtotal 20,662,000.00$ 17,856,200.00$ 2,509,800.00$ Contigency (25%)5,166,000.00$ 2,583,000.00$ 2,583,000.00$ Subtotal 25,828,000.00$ 20,439,200.00$ 5,092,800.00$ Inflation (5%)1,292,000.00$ 646,000.00$ 646,000.00$ Subtotal 21,954,000.00$ 21,085,200.00$ 5,738,800.00$ Engineering (15%)3,294,000.00$ 1,647,000.00$ 1,647,000.00$ Subtotal 25,248,000.00$ 22,732,200.00$ 7,385,800.00$ General Fund Overhead (5%)1,263,000.00$ 0 1,263,000.00$ Project Total 26,511,000.00$ 22,732,200.00$ 8,648,800.00$ Project Total 27,774,000.00$ 22,732,200.00$ 9,911,800.00$ *Expenditures would be met through cost share with other public agencies. 282 THIS PAGE WAS INTENTIONALLY LEFT BLANK ALTERNATIVE ROUTE 1: ELEVATED CROSSINGPREFERRED ROUTE: ELEVATED CROSSINGALTERNATIVE ROUTE 2: ELEVATED CROSSINGEXISTING GREAT NORTHERN GREENWAYOTHER'ƌĂŶĚZŽƵŶĚƐDŝƐƐŝŶŐ>ŝŶŬϮϬϭϴhƉĚĂƚĞʹ^ĞĐƚŝŽŶƐMPRB PROPERTYGREEN LINE LRT & STATIONSON STREET ROUTE SEGMENTGRANARY CORRIDORSECTIONEXISTING EXISTING GRAND ROUNDS ROUTEEXISTING BIKE ROUTE (OTHER)ALTERNATIVE ROUTESZ&dPREFERRED ROUTERAILROAD CROSSINGSUB-OPTIONALTERNATE ROUTE 2:BIKE + PEDESTRIAN + AUTOMOBILE ACCESSBIKE + PEDESTRIAN + AUTOMOBILE ACCESSBIKE + PEDESTRIAN ACCESS ONLYBIKE + PEDESTRIAN + AUTOMOBILE ACCESSBIKE + PEDESTRIAN ACCESS ONLYABEFGHIJKLMNOCDE ^d/KE<͗/ŶĚƵƐƚƌŝĂůůǀĚEĂŶĚ^ŽĨƌŽĂĚǁĂLJ^ƚE;ϭϬϬ͛džŝƐƟŶŐZKtͿΎEŽƚĞ͗KƉƟŽŶƌĞƚĂŝŶƐĞdžŝƐƟŶŐmedian width and ůĂŶĞǁŝĚƚŚ͘>ŽĐĂƟŽŶŵĂLJĐŚĂŶŐĞĂƐZKtŝƐĨƵƌƚŚĞƌĚĞĮŶĞĚ͘ΎEŽƚĞ͗WĂƌŬŝŶŐcould be added by ŶĂƌƌŽǁŝŶŐŵĞĚŝĂŶ͕but also runs risk for semi-trucks ƉĂƌŬŝŶŐƚŚĞƌĞĨŽƌůŽŶŐƉĞƌŝŽĚƐĚƵĞƚŽůŽĐĂƟŽŶ͘SCALE: 1/8”=1’08’6’2’ 4’6’6’6’8’6’6’30’30’26’4’BOULE-VARDBOULE-VARDBOULE-VARDMEDIAN / TURN LANEMEDIAN / TURN LANEMEDIAN / TURN LANEBOULE-VARD^/t><^/t><^/t><PROPOSEDPROPOSEDEXISTING12’14’12’13’ 13’13’ 13’12’12’14’14’12’TRAILTRAILLANELANE LANELANE LANELANELANELANELANELANE ^d/KE>͗/ŶĚƵƐƚƌŝĂůůǀĚEĂŶĚEŽĨƌŽĂĚǁĂLJ^ƚE;ϭϬϬ͛ZKtͿSCALE: 1/8”=1’08’6’2’ 4’6’3’12’BOULE-VARDBOULEVARD BOULEVARDMEDIAN^/t><TRAILPROPOSEDEXISTING12’12’ 12’11’12’12’20’6’14’14’ 14’LANELANE LANETURN LANETURN LANELANELANE LANE ^d/KED͗^ƚ͘ŶƚŚŽŶLJWĂƌŬǁĂLJĂƚ'ƌŽƐƐ'ŽůĨŽƵƌƐĞ;tĞƐƚŽĨdƌĂŝůƌŽƐƐŝŶŐͿ;ϭϬϬ͛džŝƐƟŶŐZKtͿSCALE: 1/8”=1’08’6’2’ 4’10’10’6’6’BOULEVARDBOULEVARDBOULEVARDBOULEVARD BOULEVARDTRAILBOULEVARDBOULEVARD^/t><^/t><^/t><^/t><PROPOSEDEXISTING12’16’12’16’10’12’18’10’ 10’14’6’6’LANELANELANELANE /'ZDE͗/EdZ^d/KEW>E͗^ƚ͘ͲŶƚŚŽŶLJŽƵůĞǀĂƌĚĂŶĚ<ĞŶnjŝĞdĞƌƌĂĐĞ;KīͲ^ƚƌĞĞƚƚŽKŶͲ^ƚƌĞĞƚdƌĂŝůͿ ^d/KEK͗^ƚ͘ŶƚŚŽŶLJWĂƌŬǁĂLJďĞƚǁĞĞŶ^ƟŶƐŽŶŽƵůĞǀĂƌĚĂŶĚ^ŝůǀĞƌ>ĂŬĞZŽĂĚ;ϭϬϬ͛džŝƐƟŶŐZKtͿSCALE: 1/8”=1’08’6’2’ 4’5’5’5’5’6’6’BOULEVARDBOULEVARDBOULEVARDBUFFBUFFBUFF/<TRAIL/<TRAILWZ<WZ<BOULEVARDBOULEVARDBUFFBOULEVARD^/t><^/t><^/t><^/t><^/t><^/t><PROPOSEDKEͲ^dZd/<>E^WZ</E'KE^/K&^dZdydE^ϳϮ͛K&ZKtPROPOSED10’ TRAIL - OPTION 1 WZ</E'KE^/K&^dZdydE^ϳϮ͛K&ZKtPROPOSED10’ TRAIL - OPTION 2 WZ</E'Kd,^/^K&^dZdydE^&h>>ϭϬϬ͛K&ZKt11’11’4’11’11’11’8’8’11’7’10’14’4’4’4’6’10’6’10’8’8’10’8’3’14’LANELANEBUFFLANELANELANEWZ<WZ<LANE ^d/KEK͗^ƚ͘ŶƚŚŽŶLJWĂƌŬǁĂLJďĞƚǁĞĞŶ^ƟŶƐŽŶŽƵůĞǀĂƌĚĂŶĚ^ŝůǀĞƌ>ĂŬĞZŽĂĚ;ϭϬϬ͛džŝƐƟŶŐZKtͿSCALE: 1/8”=1’08’6’2’ 4’EXISTINGydE^ϳϮ͛K&ZKt6’6’BOULEVARDBOULEVARD^/t><^/t><12’12’8’14’14’LANELANEWZ<