HomeMy WebLinkAboutPK PACKET 04121999CITY OF ST. ANTHONY
PARKS COMMISSION MEETING AGENDA
April 12, 1999
7:00 PM
City Hall/Conference Room
I. CALL TO ORDER/PLEDGE OF ALLEGIANCE.
II. ROLL CALL.
III. APPROVAL OF MARCH 8, 1999 PARKS COMMISSION MINUTES.
IV. REVIEW WATER TOWER PARK BIDS. Augie Wong, BRW, Inc. will be
present.
V. DISCUSS WATER TOWER PARK.
VI. SILVER POINT PARK UPDATE. Todd Hubmer, WSB & Associates, Inc. will
be present.
VII. REPORTS.
A. Community Services.
B. School Board.
C. Sports Boosters.
VIII. OTHER BUSINESS.
A. Salvation Army.
B. Possible Councilmember update.
IX. ADJOURNMENT.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
CITY OF ST. ANTHONY
PARKS COMMISSION MEETING MINUTES
MARCH 8, 1999
I. CALL TO ORDER.
The meeting was called to order by Chair Jindra at 7:20P.M. (The meeting was not required
due to the weather)
II. ROLL CALL.
Present: Chair Carol Jindra, Vice Chair Doug Koehntop,
Commissioners Paul Louiselle and George Wagner
Also Present: Public Works Director Jay Hartman; Representative from Community
Services (Diana Roadfeldt); Representative from School Board (Kathie
Wolff).
Absent: Commissioners Tim Morris, Joanne Kosciolek and Sportsboosters
Representative Jan Jensen.
III. APPROVAL OF MARCH 8, 1999 PARKS COMMISSION MEETING
MINUTES.
Motion by Wagner, second by Louiselle to approve the minutes.
Motion carried unanimously.
IV. DESIGNED KOEHNTOP TO MARCH 16 PLANNING COMMISSION MEETING.
JINDRA TO MARCH 23, 1999 COUNCIL MEETING.
Members of the Parks Commission are also encouraged to attend the March 23, 1999 Council
Meeting.
V. SILVER POINT PARK UPDATED. No Report
VI. DISCUSS WATER TOWER PARK.
Jindra introduced Augie Wong from BRW. Augie presented the proposed playground design.
The design of Water Tower Park is currently 75 % completed. See attached diagram:
The Commission asked questions about the playground surface, fencing around the park area,
drinking fountain and restrooms that serve the tennis courts as well as the park users.
Augie pointed out trees that need to be removed as part of the park improvement.
1
2
3
4 Parks Commission Meeting Minutes
5 March 8, 1999
6 Page 2
7
8
9
10
11 The Commission stated that pre -planning is necessary for the installation of trees and shrubs in
12 the play area. Possibly a sub -committee could work on this project.
13
14 The overall square footage of the proposed Water Tower Park is approximately 9000 square
15 feet.
16
17 Jindra stated that Silver Point Park equipment must be included in the bid for the Water Tower
18 Park.
19
20 VII. REPORTS.
21
22 Community Services. No Report
23 School Board. No Report
24 Sports Boosters. No Report
25
26 VIII. OTHER BUSINESS.
27
28 Jindra stated to the Commission that she is meeting with the director of the Salvation Army
29 Camp.
30
31 IX. ADJOURNMENT.
32 Motion by Koehntop, second by Wagner to adjourn the meeting at 9:00 P.M.
33
34 Motion carried unanimously.
35
36
37
38
39 THIS WAS A NON -REQUIRED MEETING DUE TO WEATHER.
MEMORANDUM
DATE: March 19,1999
TO: Mike Mornson, City Manager
FROM: Jay Hartman, Public Works Director
RE: Water Tower Park
The city of St. Anthony Parks Commission have completed the design and specification
requirements for the new Water Tower Park playground area. The engineering estimate
for the multi-age playground is approximately $248,000. This estimate does not include
engineering costs incurred by BRW.
The proposed schedule for the construction of the park is as follows:
March 23 City Council authorizes advertisement of bids.
March 29 Construction plans available to contractors.
April 12 Bid opening 1:00PM.
April 13 City Council awards construction contract.
April 30 Contractor delivers play equipment designs to City for
Parks Commission review and selection.
May 7 Public Works Director informs contractor of play
equipment design/manufacturer selection.
July 19 Park construction is complete.
To date, the City Council has authorized BRW to proceed through the bid -opening
portion of this project. Bob Kost has submitted a proposal for the construction related
services needed to complete this project.
The Parks Commission along with Bob Kost from BRW will be presenting the proposed
plan to the City Council on March 23, 1999.
03/19/99 08:47 FAX 6123701378 BRW, INC.
WATER TOWER PARK IMPROVEMENT
CITY OF ST. ANTHONY VILLAGE, MINNESOTA
PRELIMINARY COST ESTIMATE
3/1 R/AA
Total $235,500.00
Contingency (5%)
Grand Total
Prepared by: BRW, Inc,
$11,775.00
$247,276.00
2002/002
LIAR -18-1999 17 14 BRW
BRW _
A DAMES 6 MOORS GROUP COMPANY
March 18, 1999
Jay Hartman
Public Works Director
City of St. Anthony Village
Minnesota
Dear Jay:
612 370 1378 PA1i02
Thresher Square
700 Third Sac6i Soush
Minncnpnhs, Minnnoca 55415
612 970 11700 Tcl
612 370 1378 Fax
Ww ftlrwincxoan
This letter follows our phone conversation on March 16, 1999 requesting additional fees for
services to complete the construction documents and construction observation for Central Park
Water Tower Area PlayGround. The original contract was to prepare a site survey and
construction document package for the project based upon a preliminary construction budget of
$150,000 (as identified in the Central Park Concept Plan).
Additions, changes and refinements to the park design over the past six months have increased
the construction budget from $150,000 to about $240,000. This has also resulted in additional
work for BRW in the areas of design, drafting and project management totaling $5,500. You
have also asked us to propose fees for providing additional services in the area of construction
observation this spring /summer. Based upon this we hereby request additional fees in the
amount of $ 14, 890. The breakdown of these fees is as follows:
• Additional design, drafting and project management fees = $5,500.00
♦ Construction Observation (4% of construction, $234,750) = $9,390.00
Total Amount Requested $14,890.00
We are excited to see the park's vision turn into reality and will continue to provide the best
service possible. Thank you for the opportunity to be of service. If you have questions, please
call me at 373-6421.
Sincerely,
BRW, Inc.
AobeTt Kost, ASLA
Project Manager
Post -if Fax Note
7671 Date 9 , 6p
7
pager►
To,aw
f}
Phon
P �3
Fa: N
Fax 0
March 8, 1999
St. Anthony Village Parks Commission:
The following are concerns that my family has regarding Silver Point Park. I understand that there
is some uncertainty as to what responsibility the Parks Commission has and what responsibility the
designing engineer has as far as what group makes what recommendations to the City Council.
Please consider those for which you are qualified to answer. Thank you.
Lighting within the park (in the basin), at the parking lot, and any peripheral lighting on ground
that is level with the surrounding housing. How is this being planned so that the lights are not
intrusive on the neighbors' properties? Will there be a light with a manual switch for when kids
want to play in the evening? In the spring and especially in the fall older kids come to play
football in the hockey rink (that's where the light was). They turn the lights on when they come
and off when they leave. We enjoy seeing these older kids playing as we know they have so
few choices for spontaneous recreation in the community.
2. Landscaping as it relates to noise and light barriers. When the park was leveled, it opened
Highway 88 to the surrounding homes. The amount of car and truck lights that are now visible
from the highway is considerable, as is the traffic noise. We are concerned that the landscaping
be planned to lessen this disturbance from the traffic. Initially a sledding area was talked about
for one of the slopes. If this is still an option, are the affected areas being landscaped
accordingly?
The hockey rink. Are the boards going to be removable to accommodate summer activities?
Will it be necessary to encircle the rink above the wooden boards with fencing to act as a barrier
to errant hockey pucks?
4. It is our opinion that the city's maintenance of the ice rinks improved every year. Over the
years that we've lived on Silver Lake Road, we saw an increase in the number of children and
young adults using the rinks. We'd like to be assured that the city crew feels that the plans for
the hockey rink and the recreational rink are the most reasonable for accessibility with its water
truck and snow removal equipment.
5. Accessibility issues. Is emergency vehicle access being considered; is it necessary to solicit
the opinions of the police and fire departments? I know of one instance last year when the
police drove vehicles to the shelter. Has NSP been consulted as to the feasibility of access to
poles for maintenance? If NSP has not yet been consulted, will it be contacted?
6. Walking path. Assuming that this will be a soft -ground path instead of a concrete sidewalk, dog
walkers should enjoy it. They are the only ones who, in the past, walked the perimeter of the
park. With the concern of so little green land to absorb water, I do not recommend a paved
path. I need only to point out the tarred walk down Silver Lake Road as an example. If there is
no money or desire to maintain a well-designed sidewalk on the city's main road, I question the
suggestion to install one in a park. However, if a paved walk is being planned, will it also be
available to in-line skaters and runners? Are there cost concerns the city would have if it will
require additional time from the maintenance crew to hand mow the areas affected by the paved
walk? (Most of the mowing is done by a large, riding mower.) There are areas between the
park's fence and the slope that measure 3 to 5 feet in width. This does not seem like a wide
enough area in which to lay a path and still have green space on the sides of the path. There still
is a considerable number of bushes on the south side; these would have to be removed in order
to be able to walk at all through this area.
7. At the October 1998 City Council meeting it was stated that Silver Point Park would service
kids up to 13 years old, except for ice skating and hockey. Is this still the same plan?
8. Personal items that relate to my family. (A) There is a wooden pole just the other side of the
fence from our back yard. In the past it blended in with the hockey fence, but now it does not
blend in with anything. It has not been used for many years. I would like to request that it be
removed. (B) There is a broken limb on the tree in the same area. I talked to the excavation
contact person this fall and requested that it be trimmed when they had the equipment already
available. It was not trimmed, therefore I request again that it be trimmed. (C) Our son is
getting married June 12`h. We will be hosting several events at our house that weekend and
would like to request that (A) and (B) be completed before then and also, in the event crews are
scheduled to work that weekend, they work as far away from our yard as possible or, preferably,
not work at all.
We would like to invite members of the Parks Commission to our house as a starting point for a
walk through the park. Please consider this, especially those who are not extremely familiar with
what remains after the excavation. A drive-by viewing isn't as effective as a perimeter walk-
through. Please come on a walk with us and you'll be able to see close up what you've been
looking at on paper. We know you believe that this is a great area for a park, otherwise you would
not be spending a lot of your time and energy working on this project. We look forward to hearing
from you.
Sincerely,
Don and Diane Skrivseth and family
2815 Silver Lake Road
(612)788-0568
�s
Central Park
SW Area Improvements
for the
CITY OF ST. ANTHONY VILLAGE
City Project No.:
NEIGHBORHOOD
MAP LOCATION
SHEETS:
1. TITLE
2. HARDSCAPE PLAN
3. GRADING PLAN
4. LANDSCAPE PLAN
5. PLAY STRUCTURES PLAN
6. DETAILS
7. DETAILS
8. DETAILS
9. DETAILS
EXISTING
SITE CONDITIONS
iA
5 ,
�iI�
Fr
80�+}WtryV
ego<�kb
�E�33�M
d„add
€ 40
gs O
C
W
5
O
d
W Q
no
:r Hj
1 9
N 3
® CONCRETE RESERVOIR
# STORAGE TANK
i
K
3
'p �u
I STORY MN
♦ � BURDIN6
vt
❑M
r—O
INIMIG BUDDING
gawem xurc mx G/�
Mtl]O GWF410xEV W 0
o /
43
� EKISI7NC DRIVE ,° w
IIUII j V 1m .Exs arta
y—T.V.
y V
XV. F1E 1012
y LV. nr. V
n �f
1 ST(My mm
a NEIAL Ww G
1
E.b$11H �-__ � � 0 R. pID14W. IU✓<
BUILMNG _ �
TENNIS CQlR15
%
I [1
z
W
W
z
Q
AP
ire ut
TOWER LEG
/
(TYPICAL)
O
O
O O
6" ina
O
SAFETY ZONE
sh
l
101
�
e 2" .ape OD-Flecn 111�r.J "�
1+ r•w.
3 Lay c p lo��
Jss ole
O
to _ 0 O s
Me
L- g
2" in •� so
LOW RETAINING W
Y sy
�c "pine •
®12"
. c ESIUENT SURFACE
6" a E \� r ' x s=: - y ,_ Y00
sPruca
Eel -
6"
6" maple 6" s nice
ZIL-
6"
/\ spruce
6" spruce pin G •� _
T __F
SY G G
G
G G
EF
1
aple /
O
v
e i
S®.w" WOOD FIBE (TYP.)
W
12"
o
pine
�12" vino
z
O VE PIPE 106
W
/
VAULT _ 12" maple
z
SAFETY Z S 0/>,
2" na
w
2" maple
12" pine 12" pine
as
7
O 004 �
�{n
sHc¢r nj
5 9
0
D
PLANTING HOLE DIMENSIONS
MINIMUM WIDTH DOES NOT APPLY
IN MASS PLANTING BEDS)
I
MINI"
.VPACXDA1E
PLANT TYPE PLANT SIZE
MOLE WIDTH
UNCHCD
Mci WTH
C4
CUP to AHD
A
B
INnwING
2.
AUGER B" DIAMETER HOLES ENTIRELY THROUGH
EVERGREEN TREES 3' B.B.
42
11
4' B.H.
51
13
5' B.B.
60
13
6' B.B.
66
15
7' B,H.
72
16
B' B.B.
81
18
9' H.B.
90
20
10' B.H.
102
21
SHADE 6 FLOWERING 1" B.R.
54
14
TREES60
1 1/ "
R.R.
14
1 1/22
BR. 66
15
1 3/4 "
&P 72
16
2" HR.
B4
19
2" B.B.
72
16
2 1/2 " H.B. 84
19
3" B.B.
96
20
3 1/2 " B.B. 114
23
4" B.B.
126
25
EVERGREEN SHRUBS 2' B.B.
36
9
(UPRIGHT) 3' H.B.
48
12
4' H.B.
63
14
EVERGREEN 18" spread B.H.
30
8
S14RUBS 2' spread B.B.
36
9
(SPREADING) 2 1/2 ' spread B.B.
42
11
3' spread B.B.
48
12
DECIDUOUS IB" B.R.
30
8
SHRUBS 2' B.R.
33
9
3' H.R.
42
11
4' B.R.
48
12
5' B.R.
54
14
6' HR.
` 60
14
IB" B.H.
27
7
2' B.B.
30
8
3' B.B.
36
9
4' B,B.
42
11
S. B.B.
48
12
6' B.B.
54
14
CONTAINER GROWN Cellpacks
6
2.5
PLANTS 225" cont.
7
3
3.5" cont.
10
3
4,0" cont.
11
4
4S' coni.
13
4
I QVart cant.
IS
5.5
HI cont.
18
6
D2 cont.
23
7.5
03 cont.
29
8.5
M5 cont.
30
11
07 cone.
37
tl
#10 cont
44
14
B15 coni.
45
15
B20 cont.
60
17
R25 cont.
72
16
ILL
m�°�aam ha°s \' "m'2Siay Fy<a°m` o. '-trm �H�l aym�ry a
3 P FN4 Hy(ym\�\�'� �mH A� iQr!\Y a14
GENERAL NOTES - SEE SPECIAL PROVISICNS FOR SPECIFIC
PROJECT REQUIREMENTS
PLANTING HOLEALL ISOLATED TREE PLANTING LOCATIONS AND PLANTING
AND BED BEDS SHALL BE CULTIVATED BY TILLING TO A MINIMUM
CULTIVATION DEPTH OF 10". SOIL AMENDMENTS SHALL BE APPLIED
BALLED & BURLAPPED CONTAINER BARE ROOT MACHINE -TRANSPLANT DURING CULTIVATION.
STOCK STOCK STOCK STOCK (TREE SPADE) BACKFILL SOIL:USE CULTIVATED AND AMENDED SCI_ EXCAVATED
FRGM PLANTING HOLES. REMOVE ALL DEBRIS INCLUDING
1. SCARIFY SIDES AND BOTTOM OF HOLE. 1. SCARIFY SIDES AND BOTTOM OF HOLE. I. SOAK ROUTS IN WATER FOR AT LEAST I. SCARIFY SIDES AND BOTTOM OF HOLE. ROCKS LARGER THAN 3" DIA
2. PROCEED WITH CORRECTIVE PRUNING AS 2. PROCEED WITH CORRECTIVE PRUNING ONE HOUR PRIOR TO PLANTING. 2. SET PLANT ON UNDISTURBED NATIVE
DIRECTED BY ENGINEER. AS DIRECTED BY ENGINEER. 2. SCARIFY SIDES AND BOTTOM OF HOLE. SOIL AT SAME DEPTH AS IT WAS FERTILIZER,
3. SET PLANT ON UNDISTURBED NATIVE SOIL, 3. REMOVE CONTAINER AND SCORE OR PRUNE 3. PROCEED WITH CORRECTIVE PRUNING PREVIOUSLY GROWN.
OR THOROUGHLY COMPACTED 0 ACTED BACKFILLT I F
OU S ➢E D SOIL MASS TO REDIRECT AS DIRECTED BY ENGINEER. 3 PLUMB AND BACXFILL WITH THE HALKFIL
L
SOIL AT THE SAME DEPTH PROPER) CIRCLING FIBROUS ROOTS ANECESSARY. 4. TRANSFER PLANT DIRECTLY FROM WATER SOIL SPECIFIED, FILLING ALL VOIDS AND COMPOSE
NU
AS IT WAS GROWN IN THE NURSERY. 4. SET PLANT ON UNDISTURBED
NATIVE SOIL, TO HALE. SET PLANT AT SAME DEPTH IIF ACCOMPLISHING SETTLEMENT BY WATERING.
I. PLANT SHALL BE PLACED IN PLANTING HD, OR THOROUGHLY COMPACTED BACKFILL PROPER) AS IT WAS GROWN IN THE 4. AFTER PLANTING, THE SOIL IMMEDIATELY MULCH
IN NU
WITH BURLAP AWIRE BASKET, IF USED, SOIL AT THE SAME DEPTH PROPER) NURSERY, PLUMB AND IMMEDIATELY BACKFILL ADJACENT TO THE SPADE MOVED SOIL, MATERIAL:
INTACT. ONCE IN PLACE, THE PLANT SHALL AS IT WAS GROWN IN THE NURSERY. WITH THE BACKFILL SOIL SPECIFIED. FOR p MINIMUM DISTANCE OF IB" SHALL
BE BACKFILLED WITHIN THE TOP 5. APPLY WATER TO SETTLE PLANTS AND 5. APPLY WATER TO SETTLE PLANTS AND BE TURNED OVER AND/OR ROTOTILLED
OF THE FOOTBALLL AND WATERED.
LL BE FAL VOIDS THEN CONSTRUCT 3" DEPTH FILL VOIDS THEN CONSTRUCT 3' DEPTH TO A CONSTRUCT
3 DEPTH OF TER TREE
LOGOS D THE VIRE BASKETS SHALL BE WATERING BASIN. WATERING BASIN. 5. CONSTRUCT 3" DEPTH WATERING BASIN. STAKING
REMOVED AND THE BURLAP SHALL BE
FOLDED OR CUT BACK. 6. WATER THOROUGHLY WITHIN 2 HOURS, 6. WATER THOROUGHLY WITHIN 2 HOURS. 6. WATER THOROUGHLY WITHIN 2 HOURS.
S. PLUMB AND BACKFILL WITH THE BACKFILL 7. PLACE MULCH WITHIN 48 HOURS OF THE ]. PLACE MULCH WITHIN 49 HOURS ]. PLACE MULCH WITHIN HOURS OF THE
SOIL SPECIFIED. SECOND WATERING UNLESS SOIL MOISTURE THE SECOND WATERING UNLESS SOIL SECOND WATERING. UNLESS SOIL MOISTURE
6. APPLY WATER TO SETTLE PLANTS AND IS EXCESSIVE. MOISTURE IS EXCESSIVE. IS EXCESSIVE. TREE
FILL VOIDS THEN CONSTRUCT 3" DEPTH PAINTING-
WATERING
AINTING
WATERING BASIN. NOTES:
7. WATER THOROUGHLY WITHIN 2 HOURS. 1, THE PLANTING DETAILS REPRESENT ADEQUATELY DRAINED SOIL CONDITIONS, THE CONTRACTOR MINIMUM TREE SPADE SIZE REQUIREMENTS RODENT
B. PLACE MULCH WITHIN 48 HGURS OF THE SHOULD EXERCISE DISCRETION IN SETTING PLANTS 1"-3" HIGHER IN POORLY DRAINED SOILS. SPADE SIZE OAK DECIDUOUS EVERGREEN PROTECTION
SECOND WATERING UNLESS SOIL MOISTURE 2. ON 28 SLOPES OR GREATER, DO NOT CONSTRUCT THE UPHILL HALF OF THE WATERING BASIN. (DIAMETER) TREES TREES TREES
IS EXCESSIVE. 3. ON VET, POORLY DRAINED SOILS. DO NOT CONSTRUCT WATERING BASIN. D' (CALIPER) (CALIPER) (HEIGHT) MASS
9. BIODEGRADABLE TWINE MAY BE LEFT ON AS 4. THE CONTRACTOR IS RESPONSIBLE FOR PROVIDING ADEQUATE DRAINAGE IN HEAVY POORLY 42" 1.0" to I.5" 2" to 3" 5' to 7' PLANTINGS.
SUPPORT BETWEEN THE ROOT BALL AND DRAINED OR IMPERVIOUS SOILS. 60" I.5" to 2.5"3" to 4" 7' to 9'
ROOT COLLAR UNTIL THE ENDOF THE PLANT 5. PLANTS SHOULD BE SET AT THE PROPER DEPTH WHEREBY THE BEGINNING TAPER OF THE
ESTABLISHMENT PERIOD AT WHICH TIME IT ROOT FLARE IS AT THE SAME ELEVATION AS THE FINISHED SOIL GRADE. THIS SHOULD BE 78" 2.5" to 3.5" 4" to 6" 9' to 14'
MUST BE CUT AND TOTALLY REMOVED FROM THE SAME DEPTH AS THE PLANTS WERE GROWN AT IN THE NURSERY. NOTE THAT THE 85" 3.5" to 5.0" 6" to B" 14' to IB'
9 THE ROOT COLLAR, THE TWINE MUST BE TIED ROOTS OF BALLED AND BURLAPPED PLANTS ARE UNACCEPTABLE WHEN THEY ARE
OR RETIED TO MID-LEVEL LOOPS OR POINTS COVERED BY MORE THAN 4" OF SOIL IN THE TOP OF THE BALL.
ON THE BASKET. USE OF NONSIODEGRADABLE 6. DELAY MULCH PLACEMENT IF NECESSARY TO ALLOW MORE TIME FOR EXCESS SOIL MOISTURE
TWINE SHALL HOT BE PERMITTED. TO EVAPORATE FROM PLANTING AREAS BEFORE PLACING MULCH.
PLANTING DETAILS FOR ISOLATED PLANTING LOCATIONS
I . EXCAVATE MOLE OR BED 1/4
I
. EXCAVATE HOLE OR BED TO ALLOW PLACING TOP
I
. EXCAVATE HOLE OR
BED TO ALLOW PLACMENT OF THE TOP
THE DEPTH OF THE ROOT MASS.
AVERAGE
OF ROOT MASS 1"-3" HIGHER THAN FINISHED GRADE.
GUIDELINES,
OF THE ROOT MASS
1"-3" HIGHER THAN FINISHED GRADE,
2. SET ROOT MASS IN HOLE.
2.
AUGER B" DIAMETER HOLES ENTIRELY THROUGH
2.
INSTALL 4" MINIMUM
DIAMETER BRAIN TILE
3. CONSTRUCT BERM WITH SANDY LOAM
20t
IMPERVIOUS OR POORLY DRAINED HARD PAN SOIL
BARE ROOT TREES
DAYLIGHTING AT A LOVER GRADE AS APPROVED
TOPSOIL EXTENDING THE BERM BASE TO A
BALLED 6 BURLAPPED SHRUBS
LAYER TO ADEQUATELY DRAINED SUBSOIL.
BY THE ENGINEER.
7t
MOTH 3 TIMES THE EIGHT OF THE BERM.
3.
BACKFILL AUGER HOLES WITH A THOROUGHLY
3.
COMPLETE PLANTING
ACCORDING TO PLANTING
4. COMPLETE PLANTING ACCORDING TO
HERBACEOUS GROUNDCOVERS
INCORPORATED MIXTURE OF 5OX SAND AND 50%
DETAILS ABOVE AS
APPLICABLE.
PLANTING DETAILS ABOVE AS APPLICABLE.
INPLACE SOIL.
RESTS SNUGLY ON VALU
4.
COMPLETE PLANTING ACCORDING TO PLANTING
MULCH
3" DEPTH WATERING HASH 9
DETAILS ABOVE AS APPLICABLE.
FINISHED GRAD y7
x'
_ NONE
JL MN/DOT 3BB1
% NONE
_ Mn/DOT 3890
Mn/DOT 3882 TYPE 6. UNLESS OT-ERVISE SPECIFIED.
TREE STAKING (ALL SIZES) VILL HCT BE REQUIRED
UNLESS SPECIFIED OR NECESSARY vO MAINTAIN
TREES IN A PLUMB CONDITION VHERE VANDALISM, SOIL.
OR WIND CONDITIONS ARE A PROBLEM OR AS
REQUESTED BY THE ENGINEER.
PAINT OAKS, LINDENS, LOCUSTS. MAPLES, CRABAPPLES,
AND MOUNTAIN ASHES. ONLY UNDILUTED EXTERIOR
WHITE LATEX BASE PAINT IS ACCEPTABLE.
PROVIDE ON ALL DECIDUOUS TREES AND PINE TEES
UNLESS OTHERWISE SPECIFIED.
PLANT SPACING GFS' OR LESS SMALL BE MASS
TREE. THIS
SHALL BE
OF THE T
PLANTING
RESPECT STATED DIMENSIONS
BEFORE SCALING
PLAN,
FROM PLAN.
WATERING
AVERAGE
AMOUNT OF WATER
GUIDELINES,
PLANT TYPE PER APPLICATION (GALLOND
MACHINE TRANSPLANTED
50-100
TREES 0" CALIPER-)
BALLED 6 BURLAPPED TREES
20t
FENCE WITH BIODEGRADABLE
BARE ROOT TREES
l3
WIDTH OF MOLE EXCAVATION SMALL
BALLED 6 BURLAPPED SHRUBS
IOc
BARE ROOT OR CONTAINER
7t
SHRUBS
BEYOND THE PLANTS ROOT SYSTEM.
1"X 36" WOOD LATH
WOODY SEEDLINGS
4i
PREPARED PLANTING HED AND BACKFILL
HERBACEOUS GROUNDCOVERS
3t
AND VINES
AN ANGLE SO THAT TOP
VINE PLANTING DETAIL PLANTING DETAIL FOR STEEP SLOPES
1) THE WATERING GUIDELINES ASSUME A SOIL
CONDITION WITH ADEQUATE BUT NOT EXCESSIVE OR
POOR DRAINAGE. WATERING INTERVALS AND
AMOUNT OF APPLICATION MUST BE VARIED CONSIDERING
PREVAILING SOIL MOISTURE AND WEATHER
CONDITIONS THROUGHOUT. THE GROWING SEASON.
ADEQUATE BUT NOT EXCESSIVE SOIL MOISTURE IN
THE ROOT ZONE OF NEW PLANTINGS MUST BE MAIN-
TAINED AT ALL TIMES THROUGHOUT THE GROWING
SEASON FOR THE FIRST TWO YEARS FOLLOWING
PLANTING. WATERING MAY BE REQUIRED WEEKLY OR
INFREQUENTLY. THIS DETERMINATION SHALL BE
MADE BY THE CONTRACTOR.
2) THE CONTRACTDR IS ADVISED THAT THE
WATERING GUIDELINES ARE NOT REQUIREMENTS OF
THE CONTRACT ALTHOUGH FAILURE TO CORRECT WATER
DEFICITS BY SUPPLEMENTAL WATERING OR FAILURE
TO COMPENSATE FOR EXCESSIVE SO(L MOISTURE AND
DRAINAGE PROBLEMS MAY RESULT IN UNACCEPTABLE
PLANTS LEADING TO REDUCED OR NO PAYMENT.
I�
I�
8
a
L' 3
G 0W 0y
S?
ALTERNATIVE PLANTING DETAILS IN POORLY DRAINED SOIL
(NEED AND ALTERNATIVE
SELECTION SHALL BE DETERMINED BY
CONTRACTOR SUBJECT TO
APPROVAL BY THE ENGINEER.)
INPLACE WALL
CHAIN-LINK FEN ClE
AS STATED DN PLAN
FENCE WITH BIODEGRADABLE
WIDTH OF MOLE EXCAVATION SMALL
STRING
CUT AREA
EXTEND A MINIMUM OF 6 INCHES
BEYOND THE PLANTS ROOT SYSTEM.
1"X 36" WOOD LATH
PLANT ACCORDING TO
PREPARED PLANTING HED AND BACKFILL
(DRIVE 12" INTO SOIL AT
PLANTING DETAILS ABOVE
SOIL (THOROUGHLY TILLED AND LOOSEN[
AN ANGLE SO THAT TOP
AS APPLICABLE
3" DEPTH WATERING BASIN
RESTS SNUGLY ON VALU
MULCH
BACKFILL AREA
MULCH
3" DEPTH WATERING HASH 9
FINISHED GRADE
FINISHED GRAD y7
x'
PLANT ACCORDING TO
s', -.�'
PLANTING DETAILS FOR ISOLATED
NOTES
NOTES
PLANTING LOCATIONS WITH THE
1. PLANT ACCORDING TO PLANTING
1. EXTENDED EXCAVATION AND BACKFILL SOIL TO A
EXCEPTION OF REDUCED HOLE WIDTH
DETAILS ABOVE AS APPLICABLE
J�-
POINT DOWNSLOPE EQUAL TO OR LOVER IN ELEVATION THAN
EOF THE PLANT
B LE CR BENEATH E
TOINSU E�ADEQUA EU
DRAINAGE INH HEAVY SOILSY GRANULAR
SOIL MUST BE ADDED AS BACKFILL IN AREAS OF POOR DRAINAGE.
PLANTING DETAIL FOR MASS
PLANTING BEDS
VINE PLANTING DETAIL PLANTING DETAIL FOR STEEP SLOPES
1) THE WATERING GUIDELINES ASSUME A SOIL
CONDITION WITH ADEQUATE BUT NOT EXCESSIVE OR
POOR DRAINAGE. WATERING INTERVALS AND
AMOUNT OF APPLICATION MUST BE VARIED CONSIDERING
PREVAILING SOIL MOISTURE AND WEATHER
CONDITIONS THROUGHOUT. THE GROWING SEASON.
ADEQUATE BUT NOT EXCESSIVE SOIL MOISTURE IN
THE ROOT ZONE OF NEW PLANTINGS MUST BE MAIN-
TAINED AT ALL TIMES THROUGHOUT THE GROWING
SEASON FOR THE FIRST TWO YEARS FOLLOWING
PLANTING. WATERING MAY BE REQUIRED WEEKLY OR
INFREQUENTLY. THIS DETERMINATION SHALL BE
MADE BY THE CONTRACTOR.
2) THE CONTRACTDR IS ADVISED THAT THE
WATERING GUIDELINES ARE NOT REQUIREMENTS OF
THE CONTRACT ALTHOUGH FAILURE TO CORRECT WATER
DEFICITS BY SUPPLEMENTAL WATERING OR FAILURE
TO COMPENSATE FOR EXCESSIVE SO(L MOISTURE AND
DRAINAGE PROBLEMS MAY RESULT IN UNACCEPTABLE
PLANTS LEADING TO REDUCED OR NO PAYMENT.
I�
I�
8
a
L' 3
G 0W 0y
S?
I � 7
3
ZONE 1 Q BELOW -50 F
ZONE 2 Q -50 to -40
ZONE 3 Q -40 to -30
ZONE 4 Q -30 to -20
STATE INSPECTED PLANTS GROWN WITHIN
ZONES 1-4 AND THE ACCEPTABLE
GROWING RANGE FOR A MINIMUM OF 2
YEARS MAY BE USED ON ALL PROJECTS
UNLESS OTHERWISE SPECIFIED,
ZONE 5 Q -20 to -10
STATE INSPECTED PLANTS GROWN WITHIN
ZONE 5 AND THE ACCEPTABLE
GROWING RANGE FOR A MINIMUM OF
2 YEARS ARE ALLOWED ONLY aN
PROJECTS WITHIN ZONE 4 IN MINNESOTA.
UNLESS CERTIFIED AS MINNESOTA
ZONE HARDY IN ZONES 3 AND 2.
PLANT STOCK NOT GROWN WITHIN THE
THE ACCEPETABLE ZONES AND GROWING
RANGE FOR A MINIMUM OF 2 YEARS MAY
BE ACCEPTED IF THE SEED SOURCE OR
ROOT AND GRAFT STOCK IS CERTIFIED AND
DOCUMENTED AS MIDWEST AND NORTHERN
GROWN AND MINNESOTA ZONE HARDY.
ACCEPTABLE GROWING RANGE FOR MIDWEST AND NORTHERN GROWN PLANT STOCK
SOURCE- U.S.D.A. PLANT HARDINESS ZONE MAP
NOTES,
I. SEEDLING INCLUDES DECIDUOUS AND EVERGREEN STOCK.
2. ACTUAL DATES MAY CHANGE DEPENDING UPON SEASONAL CONDITIONS
AS DETERMINED BY THE ENGINEER
3. FALL PLANTING MAY NOT BE RECOMMENDED OR ALLOWED.
O - INDICATES PROJECT LOCATION SEE SPECIAL PROVISIONS FOR SPECIFIC PROJECT REQUIREMENTS. THE
FOLLOWING PLANTS ARE NOT RECOMMENDED FOR FALL INSTALLATION
HAWTHORNE. RUSSIAN OLIVE. DOGWOOD, POPLAR. HACKBERRY, LINDEN,
IRONWOOD. MONEYLOCUST, BIRCH, MOUNTAIN ASH, MAPLE, WILLOW, CRABAPPLE,
PLUM/CHERRY, OAKS,SUMAC.
OPTIMUM PLANTING DATE ZONES IN MINNESOTA
STANDARD TREE STAKING / GUYING
AND PAINTING DETAIL
7' ROLLED STEEL 10' 2.2 LB. FLANGED -
POST UM/DOT 3403) CHANNEL STEEL SIGF
OR APPROVED EQUAL POST (Mn/DOT 3401)
OR APPROVED EQUAL
16" LONG POLYPROPYLENE OR POLYETHYLENE
(40 MIL) 1 1/2 " VIDE STRAPS.
10 GA. VIRE
12 GA. VIRE
PAINT TREE FULL CIRCUMFERENCE FROM
BUTTONTO FIRST MAJOR BRANCH WITH
APPROVED TREE PAINT
MULCH
FINISHED GRADE
NOTES,
1. STEEL POSTS TO BE NOTCHED OR DRILLED
TO RETAIN GUY VIRES PLACE OUTSIDE OF
ROOT BALL. DRIVE PLUMB REGARDLESS OF
GROUND SLOPE.
2. REQUESTS TO SUBSTITUTE RUBBER HOSE
AND VIRE GUYING SYSTEMS WILL NOT
BE APPROVED.
APPLICABLE TO DECIDUOUS TREES
OVER 4" CALIPER AND EVERGREEN
TREES OVER 10' IN HEIGHT ONLY
WHEN NECESSARY OR SPECIFIED.
LARGE MACHINE - TRANSPLANT TREE
STAKING / GUYING AND PAINTING DETAIL
X Y Z SUBSIDENCE OR DETERIORATION OF MULCH THROUGHOUT
THE CONTRACT IS ACCEPTABLE TO THE EXTENT
THAT THE MULCH DEPTH IS MAINTAINED AT A
X, MINIMUM DEPTH OF 3 INCHES AT ALL TIMES AND UPON
FINAL ACCEPTANCE. REPLACEMENT MULCH SHALL
BE REQUIRED TO PROVIDE THE MINIMUM MULCH
DEPTH SPECIFIED WHEN SUBSIDENCE OR LOSS IS
EXCESSIVE OR WHEN THE CONTRACTOR'S OPERATIONS
HAVE CONTAMINATED THE MULCH WITH SOIL.
TYPE OF PLANT
SPRING
XI
EDGE OF
BRANCHING TO
MRM LME
Y
DEPTH OF
WLLM
M. MAz
FALL
EVERGREEN TREES
VARIES
SEEDLING
DECIDUOUS
EVERGREEN
DECIDUOUS
EVERGREV
APRIL 15
APRIL 21
APRIL 21
OCT.
1
AUG.
25
TO
TO
TO
TO
4"
TO
6"
MAY 15
JUNE 1
JUNE I
NOV.
1
SEPT.
15
7
APRIL 14
APRIL 14
OCT.
1
AUG.
25
TORIL
TO
TO
TO
4"
TO
4"
MAY 15
JUNE I
MAY 24
NOV.
6
SEPT.
15
APRIL 1
APRIL 7
APRIL 7
OCT,
10
AUG.
25
TO
TO
TO
TO
TO
MAY 15
JUNE I
MAY 17
NOV.
15
SEPT.
15
APRIL 1
APRIL I
APRIL 1
OCT,
15
SEPT.
5
TO
TO
TO
TO
TO
MAY 15
MpY 25
MAT IS
NOV.
20
OCT.
I
NOTES,
I. SEEDLING INCLUDES DECIDUOUS AND EVERGREEN STOCK.
2. ACTUAL DATES MAY CHANGE DEPENDING UPON SEASONAL CONDITIONS
AS DETERMINED BY THE ENGINEER
3. FALL PLANTING MAY NOT BE RECOMMENDED OR ALLOWED.
O - INDICATES PROJECT LOCATION SEE SPECIAL PROVISIONS FOR SPECIFIC PROJECT REQUIREMENTS. THE
FOLLOWING PLANTS ARE NOT RECOMMENDED FOR FALL INSTALLATION
HAWTHORNE. RUSSIAN OLIVE. DOGWOOD, POPLAR. HACKBERRY, LINDEN,
IRONWOOD. MONEYLOCUST, BIRCH, MOUNTAIN ASH, MAPLE, WILLOW, CRABAPPLE,
PLUM/CHERRY, OAKS,SUMAC.
OPTIMUM PLANTING DATE ZONES IN MINNESOTA
STANDARD TREE STAKING / GUYING
AND PAINTING DETAIL
7' ROLLED STEEL 10' 2.2 LB. FLANGED -
POST UM/DOT 3403) CHANNEL STEEL SIGF
OR APPROVED EQUAL POST (Mn/DOT 3401)
OR APPROVED EQUAL
16" LONG POLYPROPYLENE OR POLYETHYLENE
(40 MIL) 1 1/2 " VIDE STRAPS.
10 GA. VIRE
12 GA. VIRE
PAINT TREE FULL CIRCUMFERENCE FROM
BUTTONTO FIRST MAJOR BRANCH WITH
APPROVED TREE PAINT
MULCH
FINISHED GRADE
NOTES,
1. STEEL POSTS TO BE NOTCHED OR DRILLED
TO RETAIN GUY VIRES PLACE OUTSIDE OF
ROOT BALL. DRIVE PLUMB REGARDLESS OF
GROUND SLOPE.
2. REQUESTS TO SUBSTITUTE RUBBER HOSE
AND VIRE GUYING SYSTEMS WILL NOT
BE APPROVED.
APPLICABLE TO DECIDUOUS TREES
OVER 4" CALIPER AND EVERGREEN
TREES OVER 10' IN HEIGHT ONLY
WHEN NECESSARY OR SPECIFIED.
LARGE MACHINE - TRANSPLANT TREE
STAKING / GUYING AND PAINTING DETAIL
X Y Z SUBSIDENCE OR DETERIORATION OF MULCH THROUGHOUT
THE CONTRACT IS ACCEPTABLE TO THE EXTENT
THAT THE MULCH DEPTH IS MAINTAINED AT A
X, MINIMUM DEPTH OF 3 INCHES AT ALL TIMES AND UPON
FINAL ACCEPTANCE. REPLACEMENT MULCH SHALL
BE REQUIRED TO PROVIDE THE MINIMUM MULCH
DEPTH SPECIFIED WHEN SUBSIDENCE OR LOSS IS
EXCESSIVE OR WHEN THE CONTRACTOR'S OPERATIONS
HAVE CONTAMINATED THE MULCH WITH SOIL.
TYPE OF PLANT
X
CENTER OF
PLANT TO
WILCH LINE
XI
EDGE OF
BRANCHING TO
MRM LME
Y
DEPTH OF
WLLM
M. MAz
Z
DEPTH OF
HAM
NIH ...
EVERGREEN TREES
VARIES
3' MIN.
4"
6"
4"
6"
DECIDUOUS TREES
3' MIN.
N/A
4"
6"
4"
6"
EVERGREEN SHRUBS
VARIES
3' MIN.
3"
4"
4"
6"
DECIDUOUS SHRUBS
3' MIN.
N/A
4"
6"
4"
6"
VINES
2' MIN.
N/A
4"
6"
4"
6"
GROUNDCOVERS
VARIES
2' MIN.
3"
4"
3"
4"
MACHINE -TRANSPLANTED TREES 12" BEYOND EDGE OF HOLE
4"
6" 1
4"
6"
NOTE,
REMOVE MULCH PLACED TO A DEPTH GREATER THAN THAT SPECIFIED
WHEN DIRECTED BY THE ENGINEER.
MULCH PLACEMENT DETAIL
le I
SHEET Nj
7 9
Is
CRR5 5L 3Z 1H4K
(5CE CtAONG RA10
't
2MOOT
PE1
4
WEARING COARSE
v°o v1 6' CL 3 AGGREGATE u
BASE 000K CRUSHED
LIMESTONE)
COMPACTED SUBGRADE
BITUMINOUS WALK SECTION
rar m aExE
EXPANSION OROR P.N. tA.RUNT
ATT 1 12'-0' AS
BENCH SUPPORT
SHOVN ON PLAN
U
A" CONCRETE SIDEWALK
,•
(TYPO
" COMPACTED GRANIAAR GILL
COMPACTED SUHGRADE
CONCtt.RETE SIDEWALK SECTION
J wr m �E
C�KTE SIDEWALK
1/2' R. CENTIEFiS
r1
:Svn Yy\`SGyQ k"3�,'liinSj
yk \s mrm
k}k ) to
4 Lk11y� tP k'{k vkeT i
WDIST�SED EARTHCOHF`A�TED VBCRADE WE POST
__._.SECTON
PLAYGROUND EDGE
;,,76-- m ,L
A �EroTI40N
BELELEVATION
Ntp�
C) C
DEORATIVE METAL FENCE
a mw
DCHAIN LINK FENCE SECTION
m msvE
SIO. PIPE
T POSTS
RAIL
C SHALL m /9 CA i m
RAR -
MODULAR BLOCK RETAINING WALL
)or m SCW.E
ES OR SOD
SCAPE PLAN)
IDTH CRUSHED RUCK
TONE
OR SOD
;CAPE PLAN)
IASE
SUBGRADE
JIMMY SPEC 2310
11 VEARINfi COURSE
MIT SPEC. 2310
31 BASE CORSE
SUBGRADE
G BASKETBALL COURT PAVING
rar m srxc
BENCH SUPPORT
Y (LBS OD
U
OR LI TIRI' L E FOt�
3/1' z 1' BAR
(TYPO
3/z' z 1' W
(�
sMY
DYIXTINGDETAIfr
Eat"
f
J+IILJIII.
A �EroTI40N
BELELEVATION
Ntp�
C) C
DEORATIVE METAL FENCE
a mw
DCHAIN LINK FENCE SECTION
m msvE
SIO. PIPE
T POSTS
RAIL
C SHALL m /9 CA i m
RAR -
MODULAR BLOCK RETAINING WALL
)or m SCW.E
ES OR SOD
SCAPE PLAN)
IDTH CRUSHED RUCK
TONE
OR SOD
;CAPE PLAN)
IASE
SUBGRADE
JIMMY SPEC 2310
11 VEARINfi COURSE
MIT SPEC. 2310
31 BASE CORSE
SUBGRADE
G BASKETBALL COURT PAVING
rar m srxc
j'W-O
BENCH SUPPOtT
EPDXY ADHESIVE MAS T
ASTT
LESS/SBOLT.
e a. NUT i WASHERXI
CmC. BASE
COMPACTED GRAMILM FILL
V/ COMPACTED SUBCRADE
KIIINTI+^. DETAT
eBENCH_INSTALLATION
Nm To swAs
eHAIN LINK FENCE AT HARDCOURT
Inr m sutE
:D RUCK
5
9 E M
8 9
BENCH SUPPORT
U
OR LI TIRI' L E FOt�
(TYPO
(�
sMY
DYIXTINGDETAIfr
Eat"
COIL BASE
J+IILJIII.
j'W-O
BENCH SUPPOtT
EPDXY ADHESIVE MAS T
ASTT
LESS/SBOLT.
e a. NUT i WASHERXI
CmC. BASE
COMPACTED GRAMILM FILL
V/ COMPACTED SUBCRADE
KIIINTI+^. DETAT
eBENCH_INSTALLATION
Nm To swAs
eHAIN LINK FENCE AT HARDCOURT
Inr m sutE
:D RUCK
5
9 E M
8 9
j