Loading...
HomeMy WebLinkAboutPK PACKET 04121999CITY OF ST. ANTHONY PARKS COMMISSION MEETING AGENDA April 12, 1999 7:00 PM City Hall/Conference Room I. CALL TO ORDER/PLEDGE OF ALLEGIANCE. II. ROLL CALL. III. APPROVAL OF MARCH 8, 1999 PARKS COMMISSION MINUTES. IV. REVIEW WATER TOWER PARK BIDS. Augie Wong, BRW, Inc. will be present. V. DISCUSS WATER TOWER PARK. VI. SILVER POINT PARK UPDATE. Todd Hubmer, WSB & Associates, Inc. will be present. VII. REPORTS. A. Community Services. B. School Board. C. Sports Boosters. VIII. OTHER BUSINESS. A. Salvation Army. B. Possible Councilmember update. IX. ADJOURNMENT. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 CITY OF ST. ANTHONY PARKS COMMISSION MEETING MINUTES MARCH 8, 1999 I. CALL TO ORDER. The meeting was called to order by Chair Jindra at 7:20P.M. (The meeting was not required due to the weather) II. ROLL CALL. Present: Chair Carol Jindra, Vice Chair Doug Koehntop, Commissioners Paul Louiselle and George Wagner Also Present: Public Works Director Jay Hartman; Representative from Community Services (Diana Roadfeldt); Representative from School Board (Kathie Wolff). Absent: Commissioners Tim Morris, Joanne Kosciolek and Sportsboosters Representative Jan Jensen. III. APPROVAL OF MARCH 8, 1999 PARKS COMMISSION MEETING MINUTES. Motion by Wagner, second by Louiselle to approve the minutes. Motion carried unanimously. IV. DESIGNED KOEHNTOP TO MARCH 16 PLANNING COMMISSION MEETING. JINDRA TO MARCH 23, 1999 COUNCIL MEETING. Members of the Parks Commission are also encouraged to attend the March 23, 1999 Council Meeting. V. SILVER POINT PARK UPDATED. No Report VI. DISCUSS WATER TOWER PARK. Jindra introduced Augie Wong from BRW. Augie presented the proposed playground design. The design of Water Tower Park is currently 75 % completed. See attached diagram: The Commission asked questions about the playground surface, fencing around the park area, drinking fountain and restrooms that serve the tennis courts as well as the park users. Augie pointed out trees that need to be removed as part of the park improvement. 1 2 3 4 Parks Commission Meeting Minutes 5 March 8, 1999 6 Page 2 7 8 9 10 11 The Commission stated that pre -planning is necessary for the installation of trees and shrubs in 12 the play area. Possibly a sub -committee could work on this project. 13 14 The overall square footage of the proposed Water Tower Park is approximately 9000 square 15 feet. 16 17 Jindra stated that Silver Point Park equipment must be included in the bid for the Water Tower 18 Park. 19 20 VII. REPORTS. 21 22 Community Services. No Report 23 School Board. No Report 24 Sports Boosters. No Report 25 26 VIII. OTHER BUSINESS. 27 28 Jindra stated to the Commission that she is meeting with the director of the Salvation Army 29 Camp. 30 31 IX. ADJOURNMENT. 32 Motion by Koehntop, second by Wagner to adjourn the meeting at 9:00 P.M. 33 34 Motion carried unanimously. 35 36 37 38 39 THIS WAS A NON -REQUIRED MEETING DUE TO WEATHER. MEMORANDUM DATE: March 19,1999 TO: Mike Mornson, City Manager FROM: Jay Hartman, Public Works Director RE: Water Tower Park The city of St. Anthony Parks Commission have completed the design and specification requirements for the new Water Tower Park playground area. The engineering estimate for the multi-age playground is approximately $248,000. This estimate does not include engineering costs incurred by BRW. The proposed schedule for the construction of the park is as follows: March 23 City Council authorizes advertisement of bids. March 29 Construction plans available to contractors. April 12 Bid opening 1:00PM. April 13 City Council awards construction contract. April 30 Contractor delivers play equipment designs to City for Parks Commission review and selection. May 7 Public Works Director informs contractor of play equipment design/manufacturer selection. July 19 Park construction is complete. To date, the City Council has authorized BRW to proceed through the bid -opening portion of this project. Bob Kost has submitted a proposal for the construction related services needed to complete this project. The Parks Commission along with Bob Kost from BRW will be presenting the proposed plan to the City Council on March 23, 1999. 03/19/99 08:47 FAX 6123701378 BRW, INC. WATER TOWER PARK IMPROVEMENT CITY OF ST. ANTHONY VILLAGE, MINNESOTA PRELIMINARY COST ESTIMATE 3/1 R/AA Total $235,500.00 Contingency (5%) Grand Total Prepared by: BRW, Inc, $11,775.00 $247,276.00 2002/002 LIAR -18-1999 17 14 BRW BRW _ A DAMES 6 MOORS GROUP COMPANY March 18, 1999 Jay Hartman Public Works Director City of St. Anthony Village Minnesota Dear Jay: 612 370 1378 PA1i02 Thresher Square 700 Third Sac6i Soush Minncnpnhs, Minnnoca 55415 612 970 11700 Tcl 612 370 1378 Fax Ww ftlrwincxoan This letter follows our phone conversation on March 16, 1999 requesting additional fees for services to complete the construction documents and construction observation for Central Park Water Tower Area PlayGround. The original contract was to prepare a site survey and construction document package for the project based upon a preliminary construction budget of $150,000 (as identified in the Central Park Concept Plan). Additions, changes and refinements to the park design over the past six months have increased the construction budget from $150,000 to about $240,000. This has also resulted in additional work for BRW in the areas of design, drafting and project management totaling $5,500. You have also asked us to propose fees for providing additional services in the area of construction observation this spring /summer. Based upon this we hereby request additional fees in the amount of $ 14, 890. The breakdown of these fees is as follows: • Additional design, drafting and project management fees = $5,500.00 ♦ Construction Observation (4% of construction, $234,750) = $9,390.00 Total Amount Requested $14,890.00 We are excited to see the park's vision turn into reality and will continue to provide the best service possible. Thank you for the opportunity to be of service. If you have questions, please call me at 373-6421. Sincerely, BRW, Inc. AobeTt Kost, ASLA Project Manager Post -if Fax Note 7671 Date 9 , 6p 7 pager► To,aw f} Phon P �3 Fa: N Fax 0 March 8, 1999 St. Anthony Village Parks Commission: The following are concerns that my family has regarding Silver Point Park. I understand that there is some uncertainty as to what responsibility the Parks Commission has and what responsibility the designing engineer has as far as what group makes what recommendations to the City Council. Please consider those for which you are qualified to answer. Thank you. Lighting within the park (in the basin), at the parking lot, and any peripheral lighting on ground that is level with the surrounding housing. How is this being planned so that the lights are not intrusive on the neighbors' properties? Will there be a light with a manual switch for when kids want to play in the evening? In the spring and especially in the fall older kids come to play football in the hockey rink (that's where the light was). They turn the lights on when they come and off when they leave. We enjoy seeing these older kids playing as we know they have so few choices for spontaneous recreation in the community. 2. Landscaping as it relates to noise and light barriers. When the park was leveled, it opened Highway 88 to the surrounding homes. The amount of car and truck lights that are now visible from the highway is considerable, as is the traffic noise. We are concerned that the landscaping be planned to lessen this disturbance from the traffic. Initially a sledding area was talked about for one of the slopes. If this is still an option, are the affected areas being landscaped accordingly? The hockey rink. Are the boards going to be removable to accommodate summer activities? Will it be necessary to encircle the rink above the wooden boards with fencing to act as a barrier to errant hockey pucks? 4. It is our opinion that the city's maintenance of the ice rinks improved every year. Over the years that we've lived on Silver Lake Road, we saw an increase in the number of children and young adults using the rinks. We'd like to be assured that the city crew feels that the plans for the hockey rink and the recreational rink are the most reasonable for accessibility with its water truck and snow removal equipment. 5. Accessibility issues. Is emergency vehicle access being considered; is it necessary to solicit the opinions of the police and fire departments? I know of one instance last year when the police drove vehicles to the shelter. Has NSP been consulted as to the feasibility of access to poles for maintenance? If NSP has not yet been consulted, will it be contacted? 6. Walking path. Assuming that this will be a soft -ground path instead of a concrete sidewalk, dog walkers should enjoy it. They are the only ones who, in the past, walked the perimeter of the park. With the concern of so little green land to absorb water, I do not recommend a paved path. I need only to point out the tarred walk down Silver Lake Road as an example. If there is no money or desire to maintain a well-designed sidewalk on the city's main road, I question the suggestion to install one in a park. However, if a paved walk is being planned, will it also be available to in-line skaters and runners? Are there cost concerns the city would have if it will require additional time from the maintenance crew to hand mow the areas affected by the paved walk? (Most of the mowing is done by a large, riding mower.) There are areas between the park's fence and the slope that measure 3 to 5 feet in width. This does not seem like a wide enough area in which to lay a path and still have green space on the sides of the path. There still is a considerable number of bushes on the south side; these would have to be removed in order to be able to walk at all through this area. 7. At the October 1998 City Council meeting it was stated that Silver Point Park would service kids up to 13 years old, except for ice skating and hockey. Is this still the same plan? 8. Personal items that relate to my family. (A) There is a wooden pole just the other side of the fence from our back yard. In the past it blended in with the hockey fence, but now it does not blend in with anything. It has not been used for many years. I would like to request that it be removed. (B) There is a broken limb on the tree in the same area. I talked to the excavation contact person this fall and requested that it be trimmed when they had the equipment already available. It was not trimmed, therefore I request again that it be trimmed. (C) Our son is getting married June 12`h. We will be hosting several events at our house that weekend and would like to request that (A) and (B) be completed before then and also, in the event crews are scheduled to work that weekend, they work as far away from our yard as possible or, preferably, not work at all. We would like to invite members of the Parks Commission to our house as a starting point for a walk through the park. Please consider this, especially those who are not extremely familiar with what remains after the excavation. A drive-by viewing isn't as effective as a perimeter walk- through. Please come on a walk with us and you'll be able to see close up what you've been looking at on paper. We know you believe that this is a great area for a park, otherwise you would not be spending a lot of your time and energy working on this project. We look forward to hearing from you. Sincerely, Don and Diane Skrivseth and family 2815 Silver Lake Road (612)788-0568 �s Central Park SW Area Improvements for the CITY OF ST. ANTHONY VILLAGE City Project No.: NEIGHBORHOOD MAP LOCATION SHEETS: 1. TITLE 2. HARDSCAPE PLAN 3. GRADING PLAN 4. LANDSCAPE PLAN 5. PLAY STRUCTURES PLAN 6. DETAILS 7. DETAILS 8. DETAILS 9. DETAILS EXISTING SITE CONDITIONS iA 5 , �iI� Fr 80�+}WtryV ego<�kb �E�33�M d„add € 40 gs O C W 5 O d W Q no :r Hj 1 9 N 3 ® CONCRETE RESERVOIR # STORAGE TANK i K 3 'p �u I STORY MN ♦ � BURDIN6 vt ❑M r—O INIMIG BUDDING gawem xurc mx G/� Mtl]O GWF410xEV W 0 o / 43 � EKISI7NC DRIVE ,° w IIUII j V 1m .Exs arta y—T.V. y V XV. F1E 1012 y LV. nr. V n �f 1 ST(My mm a NEIAL Ww G 1 E.b$11H �-__ � � 0 R. pID14W. IU✓< BUILMNG _ � TENNIS CQlR15 % I [1 z W W z Q AP ire ut TOWER LEG / (TYPICAL) O O O O 6" ina O SAFETY ZONE sh l 101 � e 2" .ape OD-Flecn 111�r.J "� 1+ r•w. 3 Lay c p lo�� Jss ole O to _ 0 O s Me L- g 2" in •� so LOW RETAINING W Y sy �c "pine • ®12" . c ESIUENT SURFACE 6" a E \� r ' x s=: - y ,_ Y00 sPruca Eel - 6" 6" maple 6" s nice ZIL- 6" /\ spruce 6" spruce pin G •� _ T __F SY G G G G G EF 1 aple / O v e i S®.w" WOOD FIBE (TYP.) W 12" o pine �12" vino z O VE PIPE 106 W / VAULT _ 12" maple z SAFETY Z S 0/>, 2" na w 2" maple 12" pine 12" pine as 7 O 004 � �{n sHc¢r nj 5 9 0 D PLANTING HOLE DIMENSIONS MINIMUM WIDTH DOES NOT APPLY IN MASS PLANTING BEDS) I MINI" .VPACXDA1E PLANT TYPE PLANT SIZE MOLE WIDTH UNCHCD Mci WTH C4 CUP to AHD A B INnwING 2. AUGER B" DIAMETER HOLES ENTIRELY THROUGH EVERGREEN TREES 3' B.B. 42 11 4' B.H. 51 13 5' B.B. 60 13 6' B.B. 66 15 7' B,H. 72 16 B' B.B. 81 18 9' H.B. 90 20 10' B.H. 102 21 SHADE 6 FLOWERING 1" B.R. 54 14 TREES60 1 1/ " R.R. 14 1 1/22 BR. 66 15 1 3/4 " &P 72 16 2" HR. B4 19 2" B.B. 72 16 2 1/2 " H.B. 84 19 3" B.B. 96 20 3 1/2 " B.B. 114 23 4" B.B. 126 25 EVERGREEN SHRUBS 2' B.B. 36 9 (UPRIGHT) 3' H.B. 48 12 4' H.B. 63 14 EVERGREEN 18" spread B.H. 30 8 S14RUBS 2' spread B.B. 36 9 (SPREADING) 2 1/2 ' spread B.B. 42 11 3' spread B.B. 48 12 DECIDUOUS IB" B.R. 30 8 SHRUBS 2' B.R. 33 9 3' H.R. 42 11 4' B.R. 48 12 5' B.R. 54 14 6' HR. ` 60 14 IB" B.H. 27 7 2' B.B. 30 8 3' B.B. 36 9 4' B,B. 42 11 S. B.B. 48 12 6' B.B. 54 14 CONTAINER GROWN Cellpacks 6 2.5 PLANTS 225" cont. 7 3 3.5" cont. 10 3 4,0" cont. 11 4 4S' coni. 13 4 I QVart cant. IS 5.5 HI cont. 18 6 D2 cont. 23 7.5 03 cont. 29 8.5 M5 cont. 30 11 07 cone. 37 tl #10 cont 44 14 B15 coni. 45 15 B20 cont. 60 17 R25 cont. 72 16 ILL m�°�aam ha°s \' "m'2Siay Fy<a°m` o. '-trm �H�l aym�ry a 3 P FN4 Hy(ym\�\�'� �mH A� iQr!\Y a14 GENERAL NOTES - SEE SPECIAL PROVISICNS FOR SPECIFIC PROJECT REQUIREMENTS PLANTING HOLEALL ISOLATED TREE PLANTING LOCATIONS AND PLANTING AND BED BEDS SHALL BE CULTIVATED BY TILLING TO A MINIMUM CULTIVATION DEPTH OF 10". SOIL AMENDMENTS SHALL BE APPLIED BALLED & BURLAPPED CONTAINER BARE ROOT MACHINE -TRANSPLANT DURING CULTIVATION. STOCK STOCK STOCK STOCK (TREE SPADE) BACKFILL SOIL:USE CULTIVATED AND AMENDED SCI_ EXCAVATED FRGM PLANTING HOLES. REMOVE ALL DEBRIS INCLUDING 1. SCARIFY SIDES AND BOTTOM OF HOLE. 1. SCARIFY SIDES AND BOTTOM OF HOLE. I. SOAK ROUTS IN WATER FOR AT LEAST I. SCARIFY SIDES AND BOTTOM OF HOLE. ROCKS LARGER THAN 3" DIA 2. PROCEED WITH CORRECTIVE PRUNING AS 2. PROCEED WITH CORRECTIVE PRUNING ONE HOUR PRIOR TO PLANTING. 2. SET PLANT ON UNDISTURBED NATIVE DIRECTED BY ENGINEER. AS DIRECTED BY ENGINEER. 2. SCARIFY SIDES AND BOTTOM OF HOLE. SOIL AT SAME DEPTH AS IT WAS FERTILIZER, 3. SET PLANT ON UNDISTURBED NATIVE SOIL, 3. REMOVE CONTAINER AND SCORE OR PRUNE 3. PROCEED WITH CORRECTIVE PRUNING PREVIOUSLY GROWN. OR THOROUGHLY COMPACTED 0 ACTED BACKFILLT I F OU S ➢E D SOIL MASS TO REDIRECT AS DIRECTED BY ENGINEER. 3 PLUMB AND BACXFILL WITH THE HALKFIL L SOIL AT THE SAME DEPTH PROPER) CIRCLING FIBROUS ROOTS ANECESSARY. 4. TRANSFER PLANT DIRECTLY FROM WATER SOIL SPECIFIED, FILLING ALL VOIDS AND COMPOSE NU AS IT WAS GROWN IN THE NURSERY. 4. SET PLANT ON UNDISTURBED NATIVE SOIL, TO HALE. SET PLANT AT SAME DEPTH IIF ACCOMPLISHING SETTLEMENT BY WATERING. I. PLANT SHALL BE PLACED IN PLANTING HD, OR THOROUGHLY COMPACTED BACKFILL PROPER) AS IT WAS GROWN IN THE 4. AFTER PLANTING, THE SOIL IMMEDIATELY MULCH IN NU WITH BURLAP AWIRE BASKET, IF USED, SOIL AT THE SAME DEPTH PROPER) NURSERY, PLUMB AND IMMEDIATELY BACKFILL ADJACENT TO THE SPADE MOVED SOIL, MATERIAL: INTACT. ONCE IN PLACE, THE PLANT SHALL AS IT WAS GROWN IN THE NURSERY. WITH THE BACKFILL SOIL SPECIFIED. FOR p MINIMUM DISTANCE OF IB" SHALL BE BACKFILLED WITHIN THE TOP 5. APPLY WATER TO SETTLE PLANTS AND 5. APPLY WATER TO SETTLE PLANTS AND BE TURNED OVER AND/OR ROTOTILLED OF THE FOOTBALLL AND WATERED. LL BE FAL VOIDS THEN CONSTRUCT 3" DEPTH FILL VOIDS THEN CONSTRUCT 3' DEPTH TO A CONSTRUCT 3 DEPTH OF TER TREE LOGOS D THE VIRE BASKETS SHALL BE WATERING BASIN. WATERING BASIN. 5. CONSTRUCT 3" DEPTH WATERING BASIN. STAKING REMOVED AND THE BURLAP SHALL BE FOLDED OR CUT BACK. 6. WATER THOROUGHLY WITHIN 2 HOURS, 6. WATER THOROUGHLY WITHIN 2 HOURS. 6. WATER THOROUGHLY WITHIN 2 HOURS. S. PLUMB AND BACKFILL WITH THE BACKFILL 7. PLACE MULCH WITHIN 48 HOURS OF THE ]. PLACE MULCH WITHIN 49 HOURS ]. PLACE MULCH WITHIN HOURS OF THE SOIL SPECIFIED. SECOND WATERING UNLESS SOIL MOISTURE THE SECOND WATERING UNLESS SOIL SECOND WATERING. UNLESS SOIL MOISTURE 6. APPLY WATER TO SETTLE PLANTS AND IS EXCESSIVE. MOISTURE IS EXCESSIVE. IS EXCESSIVE. TREE FILL VOIDS THEN CONSTRUCT 3" DEPTH PAINTING- WATERING AINTING WATERING BASIN. NOTES: 7. WATER THOROUGHLY WITHIN 2 HOURS. 1, THE PLANTING DETAILS REPRESENT ADEQUATELY DRAINED SOIL CONDITIONS, THE CONTRACTOR MINIMUM TREE SPADE SIZE REQUIREMENTS RODENT B. PLACE MULCH WITHIN 48 HGURS OF THE SHOULD EXERCISE DISCRETION IN SETTING PLANTS 1"-3" HIGHER IN POORLY DRAINED SOILS. SPADE SIZE OAK DECIDUOUS EVERGREEN PROTECTION SECOND WATERING UNLESS SOIL MOISTURE 2. ON 28 SLOPES OR GREATER, DO NOT CONSTRUCT THE UPHILL HALF OF THE WATERING BASIN. (DIAMETER) TREES TREES TREES IS EXCESSIVE. 3. ON VET, POORLY DRAINED SOILS. DO NOT CONSTRUCT WATERING BASIN. D' (CALIPER) (CALIPER) (HEIGHT) MASS 9. BIODEGRADABLE TWINE MAY BE LEFT ON AS 4. THE CONTRACTOR IS RESPONSIBLE FOR PROVIDING ADEQUATE DRAINAGE IN HEAVY POORLY 42" 1.0" to I.5" 2" to 3" 5' to 7' PLANTINGS. SUPPORT BETWEEN THE ROOT BALL AND DRAINED OR IMPERVIOUS SOILS. 60" I.5" to 2.5"3" to 4" 7' to 9' ROOT COLLAR UNTIL THE ENDOF THE PLANT 5. PLANTS SHOULD BE SET AT THE PROPER DEPTH WHEREBY THE BEGINNING TAPER OF THE ESTABLISHMENT PERIOD AT WHICH TIME IT ROOT FLARE IS AT THE SAME ELEVATION AS THE FINISHED SOIL GRADE. THIS SHOULD BE 78" 2.5" to 3.5" 4" to 6" 9' to 14' MUST BE CUT AND TOTALLY REMOVED FROM THE SAME DEPTH AS THE PLANTS WERE GROWN AT IN THE NURSERY. NOTE THAT THE 85" 3.5" to 5.0" 6" to B" 14' to IB' 9 THE ROOT COLLAR, THE TWINE MUST BE TIED ROOTS OF BALLED AND BURLAPPED PLANTS ARE UNACCEPTABLE WHEN THEY ARE OR RETIED TO MID-LEVEL LOOPS OR POINTS COVERED BY MORE THAN 4" OF SOIL IN THE TOP OF THE BALL. ON THE BASKET. USE OF NONSIODEGRADABLE 6. DELAY MULCH PLACEMENT IF NECESSARY TO ALLOW MORE TIME FOR EXCESS SOIL MOISTURE TWINE SHALL HOT BE PERMITTED. TO EVAPORATE FROM PLANTING AREAS BEFORE PLACING MULCH. PLANTING DETAILS FOR ISOLATED PLANTING LOCATIONS I . EXCAVATE MOLE OR BED 1/4 I . EXCAVATE HOLE OR BED TO ALLOW PLACING TOP I . EXCAVATE HOLE OR BED TO ALLOW PLACMENT OF THE TOP THE DEPTH OF THE ROOT MASS. AVERAGE OF ROOT MASS 1"-3" HIGHER THAN FINISHED GRADE. GUIDELINES, OF THE ROOT MASS 1"-3" HIGHER THAN FINISHED GRADE, 2. SET ROOT MASS IN HOLE. 2. AUGER B" DIAMETER HOLES ENTIRELY THROUGH 2. INSTALL 4" MINIMUM DIAMETER BRAIN TILE 3. CONSTRUCT BERM WITH SANDY LOAM 20t IMPERVIOUS OR POORLY DRAINED HARD PAN SOIL BARE ROOT TREES DAYLIGHTING AT A LOVER GRADE AS APPROVED TOPSOIL EXTENDING THE BERM BASE TO A BALLED 6 BURLAPPED SHRUBS LAYER TO ADEQUATELY DRAINED SUBSOIL. BY THE ENGINEER. 7t MOTH 3 TIMES THE EIGHT OF THE BERM. 3. BACKFILL AUGER HOLES WITH A THOROUGHLY 3. COMPLETE PLANTING ACCORDING TO PLANTING 4. COMPLETE PLANTING ACCORDING TO HERBACEOUS GROUNDCOVERS INCORPORATED MIXTURE OF 5OX SAND AND 50% DETAILS ABOVE AS APPLICABLE. PLANTING DETAILS ABOVE AS APPLICABLE. INPLACE SOIL. RESTS SNUGLY ON VALU 4. COMPLETE PLANTING ACCORDING TO PLANTING MULCH 3" DEPTH WATERING HASH 9 DETAILS ABOVE AS APPLICABLE. FINISHED GRAD y7 x' _ NONE JL MN/DOT 3BB1 % NONE _ Mn/DOT 3890 Mn/DOT 3882 TYPE 6. UNLESS OT-ERVISE SPECIFIED. TREE STAKING (ALL SIZES) VILL HCT BE REQUIRED UNLESS SPECIFIED OR NECESSARY vO MAINTAIN TREES IN A PLUMB CONDITION VHERE VANDALISM, SOIL. OR WIND CONDITIONS ARE A PROBLEM OR AS REQUESTED BY THE ENGINEER. PAINT OAKS, LINDENS, LOCUSTS. MAPLES, CRABAPPLES, AND MOUNTAIN ASHES. ONLY UNDILUTED EXTERIOR WHITE LATEX BASE PAINT IS ACCEPTABLE. PROVIDE ON ALL DECIDUOUS TREES AND PINE TEES UNLESS OTHERWISE SPECIFIED. PLANT SPACING GFS' OR LESS SMALL BE MASS TREE. THIS SHALL BE OF THE T PLANTING RESPECT STATED DIMENSIONS BEFORE SCALING PLAN, FROM PLAN. WATERING AVERAGE AMOUNT OF WATER GUIDELINES, PLANT TYPE PER APPLICATION (GALLOND MACHINE TRANSPLANTED 50-100 TREES 0" CALIPER-) BALLED 6 BURLAPPED TREES 20t FENCE WITH BIODEGRADABLE BARE ROOT TREES l3 WIDTH OF MOLE EXCAVATION SMALL BALLED 6 BURLAPPED SHRUBS IOc BARE ROOT OR CONTAINER 7t SHRUBS BEYOND THE PLANTS ROOT SYSTEM. 1"X 36" WOOD LATH WOODY SEEDLINGS 4i PREPARED PLANTING HED AND BACKFILL HERBACEOUS GROUNDCOVERS 3t AND VINES AN ANGLE SO THAT TOP VINE PLANTING DETAIL PLANTING DETAIL FOR STEEP SLOPES 1) THE WATERING GUIDELINES ASSUME A SOIL CONDITION WITH ADEQUATE BUT NOT EXCESSIVE OR POOR DRAINAGE. WATERING INTERVALS AND AMOUNT OF APPLICATION MUST BE VARIED CONSIDERING PREVAILING SOIL MOISTURE AND WEATHER CONDITIONS THROUGHOUT. THE GROWING SEASON. ADEQUATE BUT NOT EXCESSIVE SOIL MOISTURE IN THE ROOT ZONE OF NEW PLANTINGS MUST BE MAIN- TAINED AT ALL TIMES THROUGHOUT THE GROWING SEASON FOR THE FIRST TWO YEARS FOLLOWING PLANTING. WATERING MAY BE REQUIRED WEEKLY OR INFREQUENTLY. THIS DETERMINATION SHALL BE MADE BY THE CONTRACTOR. 2) THE CONTRACTDR IS ADVISED THAT THE WATERING GUIDELINES ARE NOT REQUIREMENTS OF THE CONTRACT ALTHOUGH FAILURE TO CORRECT WATER DEFICITS BY SUPPLEMENTAL WATERING OR FAILURE TO COMPENSATE FOR EXCESSIVE SO(L MOISTURE AND DRAINAGE PROBLEMS MAY RESULT IN UNACCEPTABLE PLANTS LEADING TO REDUCED OR NO PAYMENT. I� I� 8 a L' 3 G 0W 0y S? ALTERNATIVE PLANTING DETAILS IN POORLY DRAINED SOIL (NEED AND ALTERNATIVE SELECTION SHALL BE DETERMINED BY CONTRACTOR SUBJECT TO APPROVAL BY THE ENGINEER.) INPLACE WALL CHAIN-LINK FEN ClE AS STATED DN PLAN FENCE WITH BIODEGRADABLE WIDTH OF MOLE EXCAVATION SMALL STRING CUT AREA EXTEND A MINIMUM OF 6 INCHES BEYOND THE PLANTS ROOT SYSTEM. 1"X 36" WOOD LATH PLANT ACCORDING TO PREPARED PLANTING HED AND BACKFILL (DRIVE 12" INTO SOIL AT PLANTING DETAILS ABOVE SOIL (THOROUGHLY TILLED AND LOOSEN[ AN ANGLE SO THAT TOP AS APPLICABLE 3" DEPTH WATERING BASIN RESTS SNUGLY ON VALU MULCH BACKFILL AREA MULCH 3" DEPTH WATERING HASH 9 FINISHED GRADE FINISHED GRAD y7 x' PLANT ACCORDING TO s', -.�' PLANTING DETAILS FOR ISOLATED NOTES NOTES PLANTING LOCATIONS WITH THE 1. PLANT ACCORDING TO PLANTING 1. EXTENDED EXCAVATION AND BACKFILL SOIL TO A EXCEPTION OF REDUCED HOLE WIDTH DETAILS ABOVE AS APPLICABLE J�- POINT DOWNSLOPE EQUAL TO OR LOVER IN ELEVATION THAN EOF THE PLANT B LE CR BENEATH E TOINSU E�ADEQUA EU DRAINAGE INH HEAVY SOILSY GRANULAR SOIL MUST BE ADDED AS BACKFILL IN AREAS OF POOR DRAINAGE. PLANTING DETAIL FOR MASS PLANTING BEDS VINE PLANTING DETAIL PLANTING DETAIL FOR STEEP SLOPES 1) THE WATERING GUIDELINES ASSUME A SOIL CONDITION WITH ADEQUATE BUT NOT EXCESSIVE OR POOR DRAINAGE. WATERING INTERVALS AND AMOUNT OF APPLICATION MUST BE VARIED CONSIDERING PREVAILING SOIL MOISTURE AND WEATHER CONDITIONS THROUGHOUT. THE GROWING SEASON. ADEQUATE BUT NOT EXCESSIVE SOIL MOISTURE IN THE ROOT ZONE OF NEW PLANTINGS MUST BE MAIN- TAINED AT ALL TIMES THROUGHOUT THE GROWING SEASON FOR THE FIRST TWO YEARS FOLLOWING PLANTING. WATERING MAY BE REQUIRED WEEKLY OR INFREQUENTLY. THIS DETERMINATION SHALL BE MADE BY THE CONTRACTOR. 2) THE CONTRACTDR IS ADVISED THAT THE WATERING GUIDELINES ARE NOT REQUIREMENTS OF THE CONTRACT ALTHOUGH FAILURE TO CORRECT WATER DEFICITS BY SUPPLEMENTAL WATERING OR FAILURE TO COMPENSATE FOR EXCESSIVE SO(L MOISTURE AND DRAINAGE PROBLEMS MAY RESULT IN UNACCEPTABLE PLANTS LEADING TO REDUCED OR NO PAYMENT. I� I� 8 a L' 3 G 0W 0y S? I � 7 3 ZONE 1 Q BELOW -50 F ZONE 2 Q -50 to -40 ZONE 3 Q -40 to -30 ZONE 4 Q -30 to -20 STATE INSPECTED PLANTS GROWN WITHIN ZONES 1-4 AND THE ACCEPTABLE GROWING RANGE FOR A MINIMUM OF 2 YEARS MAY BE USED ON ALL PROJECTS UNLESS OTHERWISE SPECIFIED, ZONE 5 Q -20 to -10 STATE INSPECTED PLANTS GROWN WITHIN ZONE 5 AND THE ACCEPTABLE GROWING RANGE FOR A MINIMUM OF 2 YEARS ARE ALLOWED ONLY aN PROJECTS WITHIN ZONE 4 IN MINNESOTA. UNLESS CERTIFIED AS MINNESOTA ZONE HARDY IN ZONES 3 AND 2. PLANT STOCK NOT GROWN WITHIN THE THE ACCEPETABLE ZONES AND GROWING RANGE FOR A MINIMUM OF 2 YEARS MAY BE ACCEPTED IF THE SEED SOURCE OR ROOT AND GRAFT STOCK IS CERTIFIED AND DOCUMENTED AS MIDWEST AND NORTHERN GROWN AND MINNESOTA ZONE HARDY. ACCEPTABLE GROWING RANGE FOR MIDWEST AND NORTHERN GROWN PLANT STOCK SOURCE- U.S.D.A. PLANT HARDINESS ZONE MAP NOTES, I. SEEDLING INCLUDES DECIDUOUS AND EVERGREEN STOCK. 2. ACTUAL DATES MAY CHANGE DEPENDING UPON SEASONAL CONDITIONS AS DETERMINED BY THE ENGINEER 3. FALL PLANTING MAY NOT BE RECOMMENDED OR ALLOWED. O - INDICATES PROJECT LOCATION SEE SPECIAL PROVISIONS FOR SPECIFIC PROJECT REQUIREMENTS. THE FOLLOWING PLANTS ARE NOT RECOMMENDED FOR FALL INSTALLATION HAWTHORNE. RUSSIAN OLIVE. DOGWOOD, POPLAR. HACKBERRY, LINDEN, IRONWOOD. MONEYLOCUST, BIRCH, MOUNTAIN ASH, MAPLE, WILLOW, CRABAPPLE, PLUM/CHERRY, OAKS,SUMAC. OPTIMUM PLANTING DATE ZONES IN MINNESOTA STANDARD TREE STAKING / GUYING AND PAINTING DETAIL 7' ROLLED STEEL 10' 2.2 LB. FLANGED - POST UM/DOT 3403) CHANNEL STEEL SIGF OR APPROVED EQUAL POST (Mn/DOT 3401) OR APPROVED EQUAL 16" LONG POLYPROPYLENE OR POLYETHYLENE (40 MIL) 1 1/2 " VIDE STRAPS. 10 GA. VIRE 12 GA. VIRE PAINT TREE FULL CIRCUMFERENCE FROM BUTTONTO FIRST MAJOR BRANCH WITH APPROVED TREE PAINT MULCH FINISHED GRADE NOTES, 1. STEEL POSTS TO BE NOTCHED OR DRILLED TO RETAIN GUY VIRES PLACE OUTSIDE OF ROOT BALL. DRIVE PLUMB REGARDLESS OF GROUND SLOPE. 2. REQUESTS TO SUBSTITUTE RUBBER HOSE AND VIRE GUYING SYSTEMS WILL NOT BE APPROVED. APPLICABLE TO DECIDUOUS TREES OVER 4" CALIPER AND EVERGREEN TREES OVER 10' IN HEIGHT ONLY WHEN NECESSARY OR SPECIFIED. LARGE MACHINE - TRANSPLANT TREE STAKING / GUYING AND PAINTING DETAIL X Y Z SUBSIDENCE OR DETERIORATION OF MULCH THROUGHOUT THE CONTRACT IS ACCEPTABLE TO THE EXTENT THAT THE MULCH DEPTH IS MAINTAINED AT A X, MINIMUM DEPTH OF 3 INCHES AT ALL TIMES AND UPON FINAL ACCEPTANCE. REPLACEMENT MULCH SHALL BE REQUIRED TO PROVIDE THE MINIMUM MULCH DEPTH SPECIFIED WHEN SUBSIDENCE OR LOSS IS EXCESSIVE OR WHEN THE CONTRACTOR'S OPERATIONS HAVE CONTAMINATED THE MULCH WITH SOIL. TYPE OF PLANT SPRING XI EDGE OF BRANCHING TO MRM LME Y DEPTH OF WLLM M. MAz FALL EVERGREEN TREES VARIES SEEDLING DECIDUOUS EVERGREEN DECIDUOUS EVERGREV APRIL 15 APRIL 21 APRIL 21 OCT. 1 AUG. 25 TO TO TO TO 4" TO 6" MAY 15 JUNE 1 JUNE I NOV. 1 SEPT. 15 7 APRIL 14 APRIL 14 OCT. 1 AUG. 25 TORIL TO TO TO 4" TO 4" MAY 15 JUNE I MAY 24 NOV. 6 SEPT. 15 APRIL 1 APRIL 7 APRIL 7 OCT, 10 AUG. 25 TO TO TO TO TO MAY 15 JUNE I MAY 17 NOV. 15 SEPT. 15 APRIL 1 APRIL I APRIL 1 OCT, 15 SEPT. 5 TO TO TO TO TO MAY 15 MpY 25 MAT IS NOV. 20 OCT. I NOTES, I. SEEDLING INCLUDES DECIDUOUS AND EVERGREEN STOCK. 2. ACTUAL DATES MAY CHANGE DEPENDING UPON SEASONAL CONDITIONS AS DETERMINED BY THE ENGINEER 3. FALL PLANTING MAY NOT BE RECOMMENDED OR ALLOWED. O - INDICATES PROJECT LOCATION SEE SPECIAL PROVISIONS FOR SPECIFIC PROJECT REQUIREMENTS. THE FOLLOWING PLANTS ARE NOT RECOMMENDED FOR FALL INSTALLATION HAWTHORNE. RUSSIAN OLIVE. DOGWOOD, POPLAR. HACKBERRY, LINDEN, IRONWOOD. MONEYLOCUST, BIRCH, MOUNTAIN ASH, MAPLE, WILLOW, CRABAPPLE, PLUM/CHERRY, OAKS,SUMAC. OPTIMUM PLANTING DATE ZONES IN MINNESOTA STANDARD TREE STAKING / GUYING AND PAINTING DETAIL 7' ROLLED STEEL 10' 2.2 LB. FLANGED - POST UM/DOT 3403) CHANNEL STEEL SIGF OR APPROVED EQUAL POST (Mn/DOT 3401) OR APPROVED EQUAL 16" LONG POLYPROPYLENE OR POLYETHYLENE (40 MIL) 1 1/2 " VIDE STRAPS. 10 GA. VIRE 12 GA. VIRE PAINT TREE FULL CIRCUMFERENCE FROM BUTTONTO FIRST MAJOR BRANCH WITH APPROVED TREE PAINT MULCH FINISHED GRADE NOTES, 1. STEEL POSTS TO BE NOTCHED OR DRILLED TO RETAIN GUY VIRES PLACE OUTSIDE OF ROOT BALL. DRIVE PLUMB REGARDLESS OF GROUND SLOPE. 2. REQUESTS TO SUBSTITUTE RUBBER HOSE AND VIRE GUYING SYSTEMS WILL NOT BE APPROVED. APPLICABLE TO DECIDUOUS TREES OVER 4" CALIPER AND EVERGREEN TREES OVER 10' IN HEIGHT ONLY WHEN NECESSARY OR SPECIFIED. LARGE MACHINE - TRANSPLANT TREE STAKING / GUYING AND PAINTING DETAIL X Y Z SUBSIDENCE OR DETERIORATION OF MULCH THROUGHOUT THE CONTRACT IS ACCEPTABLE TO THE EXTENT THAT THE MULCH DEPTH IS MAINTAINED AT A X, MINIMUM DEPTH OF 3 INCHES AT ALL TIMES AND UPON FINAL ACCEPTANCE. REPLACEMENT MULCH SHALL BE REQUIRED TO PROVIDE THE MINIMUM MULCH DEPTH SPECIFIED WHEN SUBSIDENCE OR LOSS IS EXCESSIVE OR WHEN THE CONTRACTOR'S OPERATIONS HAVE CONTAMINATED THE MULCH WITH SOIL. TYPE OF PLANT X CENTER OF PLANT TO WILCH LINE XI EDGE OF BRANCHING TO MRM LME Y DEPTH OF WLLM M. MAz Z DEPTH OF HAM NIH ... EVERGREEN TREES VARIES 3' MIN. 4" 6" 4" 6" DECIDUOUS TREES 3' MIN. N/A 4" 6" 4" 6" EVERGREEN SHRUBS VARIES 3' MIN. 3" 4" 4" 6" DECIDUOUS SHRUBS 3' MIN. N/A 4" 6" 4" 6" VINES 2' MIN. N/A 4" 6" 4" 6" GROUNDCOVERS VARIES 2' MIN. 3" 4" 3" 4" MACHINE -TRANSPLANTED TREES 12" BEYOND EDGE OF HOLE 4" 6" 1 4" 6" NOTE, REMOVE MULCH PLACED TO A DEPTH GREATER THAN THAT SPECIFIED WHEN DIRECTED BY THE ENGINEER. MULCH PLACEMENT DETAIL le I SHEET Nj 7 9 Is CRR5 5L 3Z 1H4K (5CE CtAONG RA10 't 2MOOT PE1 4 WEARING COARSE v°o v1 6' CL 3 AGGREGATE u BASE 000K CRUSHED LIMESTONE) COMPACTED SUBGRADE BITUMINOUS WALK SECTION rar m aExE EXPANSION OROR P.N. tA.RUNT ATT 1 12'-0' AS BENCH SUPPORT SHOVN ON PLAN U A" CONCRETE SIDEWALK ,• (TYPO " COMPACTED GRANIAAR GILL COMPACTED SUHGRADE CONCtt.RETE SIDEWALK SECTION J wr m �E C�KTE SIDEWALK 1/2' R. CENTIEFiS r1 :Svn Yy\`SGyQ k"3�,'liinSj yk \s mrm k}k ) to 4 Lk11y� tP k'{k vkeT i WDIST�SED EARTHCOHF`A�TED VBCRADE WE POST __._.SECTON PLAYGROUND EDGE ;,,76-- m ,L A �EroTI40N BELELEVATION Ntp� C) C DEORATIVE METAL FENCE a mw DCHAIN LINK FENCE SECTION m msvE SIO. PIPE T POSTS RAIL C SHALL m /9 CA i m RAR - MODULAR BLOCK RETAINING WALL )or m SCW.E ES OR SOD SCAPE PLAN) IDTH CRUSHED RUCK TONE OR SOD ;CAPE PLAN) IASE SUBGRADE JIMMY SPEC 2310 11 VEARINfi COURSE MIT SPEC. 2310 31 BASE CORSE SUBGRADE G BASKETBALL COURT PAVING rar m srxc BENCH SUPPORT Y (LBS OD U OR LI TIRI' L E FOt� 3/1' z 1' BAR (TYPO 3/z' z 1' W (� sMY DYIXTINGDETAIfr Eat" f J+IILJIII. A �EroTI40N BELELEVATION Ntp� C) C DEORATIVE METAL FENCE a mw DCHAIN LINK FENCE SECTION m msvE SIO. PIPE T POSTS RAIL C SHALL m /9 CA i m RAR - MODULAR BLOCK RETAINING WALL )or m SCW.E ES OR SOD SCAPE PLAN) IDTH CRUSHED RUCK TONE OR SOD ;CAPE PLAN) IASE SUBGRADE JIMMY SPEC 2310 11 VEARINfi COURSE MIT SPEC. 2310 31 BASE CORSE SUBGRADE G BASKETBALL COURT PAVING rar m srxc j'W-O BENCH SUPPOtT EPDXY ADHESIVE MAS T ASTT LESS/SBOLT. e a. NUT i WASHERXI CmC. BASE COMPACTED GRAMILM FILL V/ COMPACTED SUBCRADE KIIINTI+^. DETAT eBENCH_INSTALLATION Nm To swAs eHAIN LINK FENCE AT HARDCOURT Inr m sutE :D RUCK 5 9 E M 8 9 BENCH SUPPORT U OR LI TIRI' L E FOt� (TYPO (� sMY DYIXTINGDETAIfr Eat" COIL BASE J+IILJIII. j'W-O BENCH SUPPOtT EPDXY ADHESIVE MAS T ASTT LESS/SBOLT. e a. NUT i WASHERXI CmC. BASE COMPACTED GRAMILM FILL V/ COMPACTED SUBCRADE KIIINTI+^. DETAT eBENCH_INSTALLATION Nm To swAs eHAIN LINK FENCE AT HARDCOURT Inr m sutE :D RUCK 5 9 E M 8 9 j