HomeMy WebLinkAboutRES 19-072 AUTHORIZING MAYOR AND CITY MANAGER TO APPROVE AGREEMENT WITH RAMSEY COUNTY FOR THE SILVER LAKE ROAD FLOODING PROJECTCITY OF SAINT ANTHONY VILLAGE
STATE OF MINNESOTA
RESOLUTION 19-072
A RESOLUTION AUTHORIZING MAYOR AND CITY MANAGER TO APPROVE
AGREEMENT WITH RAMSEY COUNTY FOR THE SILVER LAKE ROAD
FLOODING PROJECT
WHEREAS, the City of Saint Anthony Village along with Ramsey County, Rice Creek
Watershed District and the Minnesota Department of Natural Resources have
partnered together to alleviate flooding on Silver Lake Road and reduce flooding
downstream.; and
WHEREAS, the City of Saint Anthony authorizes the Mayor and City Manager to approve the
agreement with Ramsey County for the reconstruction of storm sewer on Silver
Lake Road.
NOW THEREFORE BE IT RESOLVED, by the City Council of the City of Saint Anthony
Village hereby authorizes the Mayor and City Manager to approve the agreement with Ramsey
County for the reconstruction of storm sewer on Silver Lake Road.
Adopted this 8t" day of October 2019.
1
ATTEST:
1/
Nicole iller, City Clerk
Review for Administration:
rome O. Faust, Mayor
Casey, City Ma6inV-
Mark
Agreement PW2018-23
RAMSEY COUNTY
COOPERATIVE AND MAINTENANCE AGREEMENT
WITH THE CITY OF SAINT ANTHONY FOR
Storm Sewer on Silver Lake Road (County State Aid Highway 44)
between 280' south of Silver Lane and 635' north of Silver Lane
Total Project Cost: $665,583.27 Attachments:
City of Saint Anthony Cost: $425,028.29 A — Cost Summary and
Ramsey County Cost: $240,554.98 Engineer's Estimate
B — Project Location Map
C — Storm Sewer Ownership
This Agreement is between the City of Saint Anthony, a municipal corporation ("City") and
Ramsey County, a political subdivision of the State of Minnesota, ("County") for the
reconstruction of storm sewer on Silver Lake Road between 280 feet south of Silver Lane
and 635 feet north of Silver Lane ("Project").
RECITALS
The Project is identified in Ramsey County's 2018 — 2022 Transportation Improvement
Program.
2. Silver Lake Road, in the area affected by reconstruction, is designated County State
Aid Highway (CSAH) 44.
3. The Project has been designated by the Minnesota Department of Transportation
(Mn/DOT) as eligible for County State Aid Highway funds.
4. The Project has been designated as State Aid Project (S.A.P.) 062-644-037.
5. The subject road segment is located within the City.
AGREEMENTS
1. Responsibility for Design Engineering
1.1. Plans, specifications, and proposals will be prepared in accordance with
Mn/DOT State Aid requirements.
1.2. The City will prepare plans, specifications, and proposals for the Project, which
will include, among other things, the proposed reconstruction, alignment,
PW 2018-23 Page 1 of 7
profiles, grades, cross sections, paving, concrete curb and gutter, medians,
storm sewer, pedestrian curb ramps, turf establishment, street lighting, and utility
replacement and adjustments.
1.3. Plans for the Project showing proposed construction will be presented to the
County.
1.4. Any costs associated with Project revisions after the completion of plans and
specifications will be paid for by the party requesting the revisions. Revisions are
subject to approval by the County.
2. Procurement and Award of Contract
2.1. The City will take bids in accordance with state law and City procedures.
2.2. The City will prepare an abstract of bids and a cost participation summary based
on the lowest responsible bidder's proposal, and will provide the same to the
County.
2.3. The City will request the County's concurrence to award a contract to the lowest
responsible bidder, which shall not be unreasonably withheld.
2.4. The City will award a contract, and pay the contractor from the Federal Aid,
County State Aid Highway, Municipal State Aid Highway, and local funds
identified for the Project.
Responsibility for Construction Engineering
3.1. The City shall perform or contract the performance of the construction
engineering for all elements of the Project.
4. Project Costs
4.1. A list of the construction pay items and percentages of City funding responsibility
as well as the total estimated City Project cost is attached as Exhibit A. (Cost
Participation Based on Engineer's Estimate). Quantities and unit prices in Exhibit
A are estimates. Actual costs shall be based on the contract unit prices and the
quantities constructed.
4.2. Mobilization, Field Office, Erosion Control Supervisor, and Traffic Control are
defined collectively as the "Prorated Items". The City percentage of the Prorated
Items is calculated as follows:
City % Prorated Items =
(City Cost excluding the Prorated Items Cost)
(Total Project Cost excluding the Prorated Items Cost)
PW 2018-23 Page 2 of 7
The costs in the Prorated Items calculation will be based on contract unit prices
and quantities at the time of contract award. No adjustments in the percentages
will be made if unit prices or quantities vary during construction.
4.3. Design Engineering Costs
4.3.1. The County shall pay the City a design engineering fee equal to 10% of
County's share of the project costs.
4.3.2. Design engineering fees shall be calculated based on the quantities and
unit prices at the time of contract award and prior to the application of
federal funds.
4.4. Construction Engineering Costs
4.4.1. The County shall pay the City a construction engineering fee equal to
10% of County's share of the project costs.
4.4.2. Design engineering fees shall be calculated based on the final quantities
and unit prices and prior to the application of federal funds.
5. Payment Schedule
5.1. Design engineering will be invoiced at the time of contract award.
5.2. The City will invoice the County for construction costs incurred on a monthly
basis or as determined by the payment schedule for the contractor.
5.3. Construction engineering will be invoiced at the time of substantial project
completion.
5.4. Payment will be made within 30 days of receipt of an invoice.
6. Ownership and Maintenance Responsibility for Project Elements
6.1. Ownership and Maintenance Responsibility of the Roadway
6.1.1. The County will own and maintain the roadway and associated roadway
elements location within the County Right of Way, except as detailed
below.
6.2. Ownership and Maintenance Responsibility of the Storm Sewer (catch basins
and leads, main, outfalls) shall be as shown on Attachment B and described
below:
6.2.1. The City shall own the following components of the storm sewer system:
PW 2018-23 Page 3 of 7
i. Trunk line
ii. Trunk line manholes
iii. Surface drains located outside of the County road right-of-way and
associated leads
iv. Trunk line outfalls
6.2.2. The County shall own the following components of the storm sewer
system:
v. Catch basins
vi. Catch basin leads
vii. Surface drains located within the County road right-of-way
6.2.3. The City and County shall each maintain the components of the storm
sewer system under their respective ownership.
6.2.4. The cost for maintenance of trunk line outfalls and BMPs shall be
distributed between the City and County by relative contributing area and
runoff coefficient based on its adopted land -use classification. The cost
distribution for trunk line outfalls and BMPs within this agreement are
specified below:
List all trunk line outfall(s):
1698hh (County Identification Number of BMP), City 64%, County
36%.
Structure ID 5000, City 64%, County 36%
List all BMP(s): None
7. The County grants the City temporary construction permits over all County owned
rights -of -way and property within the limits of the Project for use during construction at
no cost to the City.
8. The City and County shall indemnify, defend, and hold each other harmless against
any and all liability, losses, costs, damages, expenses, claims, or actions, including
attorney's fees, which the indemnified party, its officials, agents, or employees may
hereafter sustain, incur, or be required to pay, arising out of or by reason of any act or
omission of the indemnifying party, its officials, agents, or employees, in the
execution, performance, or failure to adequately perform the indemnifying party's
obligation pursuant to this Agreement. Nothing in this Agreement shall constitute a
waiver by the County or the City of any statutory or common law immunities, limits, or
exceptions on liability.
9. This Agreement shall remain in full force and effect until terminated by mutual
agreement of the parties.
THE REMAINDER OF THIS PAGE IN INTENTIONALLY BLANK.
PW 2018-23 Page 4 of 7
PW 2018-23
Page 5 of 7
CITY O%S1AINT AIjITHONY, MINNESOTA
By:
By:
Mayor
City Manager
Date: As? / ?
Date: 10 -"cc
— /
PW 2018-23
Page 6 of 7
RAMSEY COUNTY, MINNESOTA
Date:
Ryan O'Connor, County Manager
Approval recommended:
Ted Schoenecker, Director
Public Works Department
Approved as to form:
Assistant County Attorney
PW 2018-23 Page 7 of 7