Loading...
HomeMy WebLinkAboutRES 19-086 APPROVING THE 2020 FEE SCHEDULECITY OF ST. ANTHONY VILLAGE STATE OF MINNESOTA RESOLUTION 19-086 A RESOLUTION APPROVING THE 2020 FEE SCHEDULE WHEREAS, the City of St. Anthony Village has approved an ordinance allowing fees to be established by resolution; and WHEREAS, staff has established a fee schedule that can be amended annually; and WHEREAS, attached is the 2020 Fee Schedule. Adopted this 26th day of November, 2019. ATTEST: NicoleMiller, City Clerk Reviewed for administration: Jerome O. Faust, Mayor Mark Casey, City Mager City of St. Anthony Village 3301 Silver Lake Road St. Anthony, Minnesota 55418 FEE SCHEDULE 2020 1 Table of Contents General Construction Building ................................................................................................... 1 Electrical .................................................................................................. 2 Mechanical .............................................................................................. 3 Miscellaneous ......................................................................................... 3 Plumbing ............................................................................................... 4 Manufactured Home/Accessory Installation Permit ............................... 4 Land Use Applications ................................................................................... 4 Licenses ............................................................................................................. 5 Miscellaneous Fees.......................................................................................... 6 Park Contributions ................................................................................ 6 Right of Way ........................................................................................... 7 Utilities Fire Control Devices .............................................................................. 7 Irrigation Rates ....................................................................................... 7 Sewer Rates ............................................................................................. 7 Storm water Facilities Rates ................................................................. 7 Water Meters .......................................................................................... 7 Water Rates ............................................................................................. 8 1 GENERAL CONSTRUCTION BUILDING PERMITS FEES: Total Valuation Amount $1 to $500 $29.50 $501 to $2,000 $28 for the first $500 plus $3.70/additional $100 or fraction thereof, to including $2,000 $2,001 to $25,000 $83.50 for the first $2,000 plus $16.55/additional $1,000 or fraction thereof, to including $25,000 $25,001 to $50,000 $464.15 for the first $25,000 plus $12.00/additional $1,000 or fraction thereof, to including $50,000 $50,001 to $100,000 $764.15 for the first $50,000 plus $8.45/additional $1,000 or fraction thereof, to including $100,000 $100,001 to $500,000 $1,186.65 for the first $100,000 plus $6.75/additional $1,000 or fraction thereof, to including $500,000 $500,001 to $1,000,000 $3,886.65 for the first $500,000 plus $5.50/additional $1,000 or fraction thereof, to including $1,000,000 $1,000,001 and up $6,636.65 for the first $1,000,000 plus $4.50/additional $1,000 or fraction thereof Inspections outside of normal business hours (minimum charge, 2 hours) $65.00 per hour (or the total hourly cost to the jurisdiction, which is the greatest. This cost shall include supervision, overhead, equipment, hourly wages, and fringe benefits of the employees involved.) Re-inspection; fees assessed under provisions of §32.08 $65.00 per hour Inspections for which no fee is specifically indicated (minimum charge, 1/2 hour) $65.00 per hour Additional plan review required by changes, additions, or revisions to plans (minimum charge, 1/2 hour) $65.00 per hour For use of outside consultants for plan checking and inspections, or both Actual costs (including administrative and overhead costs) Notes to Table: A plan review fee of 65% of the permit fee will be charged for building permits which requires the submittal of plans. Fees for similar plans will be charged in accordance with provisions of MN Rules, Chapter 1300.0160, subd. 5. 2 ELECTRICAL PERMITS FEES: Purpose of Fee: Description Amount Residential or Commercial Building or Garage Electrical panel change out, repair or service upgrade, new panel replacement is $100.00 Up to 300 amps $55.00 400 amps $71.00 For each additional 100 amps add $16.00 Residential or Commercial Building or Garage New circuits or reconnected circuits spliced outside of electric panel are at full fee Charge for each up to 100 amps $9.00 Charge for each 101-200 amps $15.00 For each additional 100 amps add $6.00 All Remodel Projects Single Family Residence or Building Remodel $190 not over 200ampcircuits and 2 inspections. Apartment Buildings Fee per unit of an apartment or condominium complex. This does not cover service, unit feeders or house panels. $80.00 Additional inspection trip $45.00 House Wiring and service is separate. Above fees apply. Transformers 0 -10 kilovolt-amperes $5.00 11 - 75 kilovolt-amperes $40.00 75 - 299 kilovolt -amperes $60.00 Over 299 kilovolt-amperes $165.00 Retro fit lighting (ballast & lamps only; new fixture is per circuit fee) Each fixture $.85 cents Sign Transformer $9.00 Solar PV Systems-The inspection fee for the installation is as follows (plan review fee is $100.00 per hour) 0 watts to and including 5,000 watts $90.00 5,001 watts to and including 10,000 watts $150.00 10,001 watts to and including 20,000 watts $225.00 20,001 watts to and including 30,000 watts $300.00 30,001 watts to and including 40,000 watts $375.00 3 40,001 watts and larger $375.00 & $25 for each additional 10,000 watts over 40,000 watts Swimming Pools Includes 2 inspections plus circuit fees $90.00 Street Lights and lot lights per pole $5.00 Traffic Signals per standard $8.00 Remote Control, Signal, fire alarm & energy management Each device $.85 cents MECHANICAL PERMIT: Purpose of Fee Amount Residential (R-1, R-1A, and R-2) Each dwelling unit (new construction) $150 Other (furnace, gas range, gas dryer, hot water heater, air conditioner, gas piping, duct work, and the like) $30 Commercial, light industrial, and multi-family (C, LI, R-3,and R-4) All 3% of contract price Add $20 Administrative fee and $1.00 surcharge to all permits NOTES TO TABLE: The minimum permit fee for commercial, industrial, institutional, or business occupancies is $20 plus state permit fee surcharge. MISCELLANEOUS PERMIT: Permit Amount Antennas, disk antennas and towers Per Building Permit Fee Schedule Demolition Permit $50 Residential $75 Commercial Driveway/Sidewalk $75 Fence $75 Public Safety $20 Solar $50 plus 1.25% of total valuation Zoning Permit $75 Storage Tank Removal $95 4 PLUMBING PERMIT: Residential (R-1, R-1A, and R-2) First bath $100 Each additional bath $35 3/4 bath $35 1/2 bath $20 Laundry $20 Water softener $20 Other $30 Commercial, Light Industrial, and Multi-Family (C, LI, R-3, and R-4) All 3% of contract price Lawn sprinklers, residential $20 Lawn sprinklers, commercial $30 Add $20 Administrative fee and $1.00 surcharge to all permits MANUFACTURED HOME/ACCESSORY INSTALLATION PERMIT: Permit Amount Single Wide $79 Double Wide $95 Each Additional 1’ Width $16 Add $20 Administrative fee and $1.00 surcharge to all permits LAND USE APPLICATION: Purpose of Fee (Code #) Amount Appeal $500.00 and an Escrow deposit of $500 Comprehensive Plan $750 and an Escrow deposit of $1,500 for Residential and $3,500 for Commercial Conditional Use Permit (§152.243) $ 1,000 and an Escrow deposit of $450 for Residential and $850 for Commercial Easement Vacation (§151.11) $200 Final Plat (§151.04) $500 with an Escrow deposit of $500 Garage Setback permit (§152.176) $60 Planned Unit Development (§152.176) $ 1,500 with a $2,500 Escrow deposit 5 Preliminary Plat (§151.03) $500 with a $500 Escrow deposit Rezoning (§152.242) $ 750 with a $750 Escrow deposit Sign Permit (§155) $75 for cost of $1 to $500, plus $5 each $100 over $500 Sign Plan review (§155) $75 Site Plan (§152.241) $250 with an Escrow deposit of $450 Subdivision/Lot Split $250 with a $1,250 Escrow deposit Variance (§152.245) $ 750 and an Escrow deposit of $450 for Residential and $850 Commercial LICENSES: License (Ord. #) Amount Alarm Permits: (§111.152) Commercial $25 Residential $10 Christmas Tree Lots: Non-Profit No fee Other Applicants $50 Contractors (§111.231) $35 or $5 if licensed by state Courtesy Ad Bench $30 per bench New $10 per bench renewal Fireworks: (§111.371) $100 Existing $350 Stand Alone Gasoline service stations (stations with multiple products dispensed through 1 hose) $75 for station and 1 production line, plus $15 for each product line dispensed. Haulers of Garbage or Recyclables (§111.216) $150 Kennel (§91.20) $50 Laundromats (coin-operated not in multiple family building) $10 per machine, up to a maximum of $190 per location Liquor: (March 15th renewal date; annually) (§112.03) Beer: off-sale; 3.2% malt liquor license $100 Beer: on-sale; 3.2% malt liquor license $350 Beer: Temporary on-sale 3.2% malt liquor license None Liquor: on-sale intoxicating liquor $8,000 6 Liquor: Sunday on-sale Wine: only Wine: with strong beer endorsement Wine: temporary $200 $400 license fee & $100 processing fee $1,500 license fee & a 100 processing fee None Multiple Dwellings (§111.188) $150 base fee plus $10 per unit for 3 or more (penalty after July 1st base fee increase to $250) Pawnbroker (§111.287) $8,000 license fee; $750 investigation fee Peddler (§113.01) $50 Physical culture and health service or club, reducing club or salon, sauna parlor, therapeutic massage studio (§111.341) $500 investigation $250 Therapist Secondhand good dealer (§111.252) $5,000 license fee; $750 investigation fee Tobacco or tobacco related products (§111.047) $300 Towing/Motor Vehicle Starting (§111.111) $30 for first vehicle and $20 for each additional vehicle Transient Merchant (§113.01) $50 MISCELLANEOUS FEES: Type Amount Security False Alarm (§111.155 D) First 2 are free, 3rd is $75 and each additional is an additional $25 Vehicle Impounding Fee (§72.33) $85 for tow: $25 per day storage (applied the first day) $25 Tow Company Administration $15 SAPD Administration Delinquent Utility Assessment Notification $25 PARK CONTRIBUTION: (§151.12) Type Amount Single Family lot $1,500/unit Duplex lot $1,800/unit Townhouse development $2,000/unit Mobile Home $1,000/unit Multi-family, apartment or condominium $1,500/unit Commercial/Industrial $4,000 per acre 7 RIGHT OF WAY: Permit Amount Registration Fee $60 Excavation Permit Fee: Hole $150 Trench $70/100 lineal foot (plus hole fee) Obstruction permit base fee $50 plus $.05/lineal foot Permit Extension fee $55 Street Excavation (§150.031) $50 Small Cell Wireless ROW Rent $150 per year (plus $25 per site) Small Cell Wireless Monthly Electrical Fee Actual Cost or $73 per radio node less than or equal to 100 maximum watts; $182 per radio node over 100 maximum watts (whichever is greater) UTILITIES: FIRE CONTROL DEVICES: (billed quarterly) Size Amount 2" $7.88 3" $10.50 4" $15.75 6" $21.00 8" $26.25 10" $42.00 IRRIGATION RATES: $4.08 per 1,000 gallons 8 SEWER CONNECTION PERMIT: $850.00-per Metropolitan Council Environmental Services (MCES) units initial or re-determination. SEWER RATES: $4.64 per 1,000 gallons, quarterly Collection system charge $12.80 per residential equivalency unit. STORM WATER FACILITIES: (billed quarterly) WATER CONNECTION PERMIT: $850.00-per Metropolitan Council Environmental Services (MCES) units initial or re-determination. RESIDENTIAL WATER METERS: SIZE METER PRICE RADIO TOTAL COST ¾” $160.00 $140.00 $300.00 1” $220.00 $140.00 $360.00 n COMMERCIAL WATER METERS: Cost of meter dependent upon size and type required. Cost will be included in plumbing permit Classification Charge (per acre) 1 $66.94 2 $64.60 3 $64.60 4 $154.14 5 $196.60 6 $245.60 9 WATER RATES: (billed quarterly) Water Usage billing will be computed quarterly based on metered water used according to the tiered rates system below, quarterly Distribution system charge $13.40 per residential equivalency unit. RESIDENTIAL Consumption (gallons) Rate/per 1,000 gallons TIER 1 0-7,500 $3.07 TIER II 7,500-15,000 $3.24 TIER III 15,000-22,500 $3.55 TIER IV 22,500-30,000 $4.08 TIER V Over 30,000 $5.12 COMMERCIAL Consumption (gallons) Rate/per 1,000 gallons TIER 1 0-7,500 $3.07 TIER II 7,500-53,500 $3.24 TIER III 53,500-175,000 $3.55 TIER IV 175,000-300,000 $4.08 TIER V Over 300,000 $5.12 WILSHIRE Consumption( gallons) Rate/per 1,000 gallons TIER 1 0-7,500 $3.07 TIER II 7,500-510,000 $3.24 TIER III 510,000-610,000 $3.55 TIER IV 610,000-710,000 $4.08 TIER V Over 710,000 $5.12 SAVHS Consumption (gallons) Rate/per 1,000 gallons TIER 1 0-7,500 $3.07 TIER II 7,500-850,000 $3.24 TIER III 850,000-1,150,000 $3.55 TIER IV 1,150,000-1,450,000 $4.08 TIER V Over 1,450,000 $5.12 HAPPY’S Consumption (gallons) Rate/per 1,000 gallons TIER 1 0-7,500 $3.07 TIER II 7,500-3,650,000 $3.24 TIER III 3,650,000-4,650,000 $3.55 TIER IV 4,650,000-5,650,000 $4.08 TIER V Over 5,650,000 $5.12 Late payment penalty for quarterly utility bills is equal to 5% of the account balance at the date the account becomes past due.