Loading...
HomeMy WebLinkAboutCC PACKET 12082020 If you would like to request special accommodations or alternative formats, please contact the City Clerk at 612-782-3313 or email city@savmn.com. People who are deaf or hard of hearing can contact us by using 711 Relay. Our Mission is to be a progressive and welcoming Village that is walkable, sustainable and safe. The meeting can be viewed live via cable channel 16 in the North Suburbs or the web broadcast at https://webstreaming.ctv15.org/regionview.php?regionid=64. Due to health concerns and limited seating, we encourage use of virtual option by using this link: https://www.savmn.com/Calendar.aspx?EID=975 There is also a dial-in option available. Members of the public who wish to attend the meeting may do so in person. For those not in attendance, If you wish to submit a comment or question, electronically submit your comments at http://www.savmn.com/FormCenter/Public-Comments-for-City-Meetings-conduc-20/Public-Comments-for- City-Council-Meeting-91 no later than 5:30 pm on the day of the City Council meeting. Following guidance from state health officials, some City Council Members may choose to participate in upcoming meetings electronically pursuant to MN Stat. §13D.021. Call to Order. Pledge of Allegiance. Roll Call. Consideration, discussion, and possible action on all of the following items: I.Approval of the November 24, 2020, City Council Meeting Agenda. (action requested.) II.Proclamations and Recognitions. III.Consent Agenda. These items are considered routine and will be enacted by one motion. There will be no separate discussion of these items unless a Councilmember or citizen so requests, in which the item will be removed from the Consent Agenda and placed elsewhere on the agenda. A.Approval of November 24, 2020, City Council meeting minutes. (pp.1-5) B.Licenses and Permits. (pp.7) C.Claims. (pp.9-11) D.Resolution 20-087 a resolution authorizing transfers and closing of specified funds. (pp.13-15) IV.Public Hearing. A.Resolution 20-088 a resolution setting the final 2021 Tax Levy and General Operating Budget for the City of St. Anthony Village. Shelly Rueckert, Finance Director presenting. (pp.17-55) V.Reports from Commission and Staff A.Resolution 20-089 a resolution approving a request for a final Plan Stage PUD for the Interstate Development Multi-family residential project of 38 dwelling units at 3725 Stinson Boulevard NE. Steve Grittman, City Planner presenting. (pp.57-98) CITY OF ST. ANTHONY VILLAGE CITY COUNCIL MEETING AGENDA DECEMBER 8, 2020 7:00 p.m. HRA meeting immediately after council meeting If you would like to request special accommodations or alternative formats, please contact the City Clerk at 612-782-3313 or email city@savmn.com. People who are deaf or hard of hearing can contact us by using 711 Relay. Our Mission is to be a progressive and welcoming Village that is walkable, sustainable and safe. B. Ordinance 2020-04 an ordinance amending Title XV of the St. Anthony City Code, known as the zoning ordinance, by amending the Silver Lake Village Planned Unit Development District by revising the PUD district development plans to convert the land use on the following parcel to a 38 unit multi-family residential development and appurtenant accessory uses: PID 31-30-23-33-0209. Steve Grittman, City Planner presenting. (pp.99-100) VI. General Business of Council. A. Resolution 20-090 a resolution accepting plans and specifications and ordering advertisement for bids for the 2021 street and utility improvement project. Justin Messner, City Engineer presenting. (pp.101-113) B. Resolution 20-091 a resolution approving the Joint Powers Agreement for the establishment of the North East Metropolitan Area Municipal Internetworking Collaborative to be known as Metro-Inet. Charlie Yunker, Interim City Manager presenting. (pp.115-143) C. Resolution 20-092 a resolution approving the 2021 appointments of the planning commissioners and the Chair and Vice Chair. Charlie Yunker, Interim City Manager presenting. (pp.145-146) D. Resolution 20-093 a resolution approving the 2021 appointments of the Parks and Environmental Commission Chair and Vice Chair. Charlie Yunker, Interim City Manager presenting. (pp.147-148) E. Ordinance 2020-03 an Ordinance amending multiple sections relating to Sewer, Water, and Stormwater Fees and other Fees. (final reading and adoption). Charlie Yunker, Interim City Manager presenting. (pp.149-166) F. Resolution 20-094 a resolution approving the summary publication of Ordinance 2020-03. Charlie Yunker, Interim City Manager presenting. (pp.167) G. Resolution 20-095 a resolution adopting the 2021 Fee Schedule. Charlie Yunker, Interim City Manager presenting. (pp.169-181) VII. Reports from City Manager and Council members. VIII. Community Forum Individuals may address the City Council about any City business item not included on the regular agenda. Speakers are requested to come to the podium, sign their name and address on the form at the podium, state their name and address for the Clerk’s record, and limit their remarks to five minutes. Generally, the City Council will not take official action on items discussed at this time, but may typically refer the matter to staff for a future report or direct the matter to be scheduled on an upcoming agenda. IX. Information and Announcements X. Adjournment CITY OF ST. ANTHONY 1 CITY COUNCIL REGULAR MEETING MINUTES 2 NOVEMBER 24, 2020 3 4 CALL TO ORDER. 5 6 Mayor Stille called the meeting to order at 7:00 p.m. 7 8 PLEDGE OF ALLEGIANCE. 9 10 Mayor Stille invited the Council and audience to join him in the Pledge of Allegiance. 11 12 ROLL CALL. 13 14 Present: Mayor Stille, Councilmembers Randle, Walker and Webster. 15 Absent: Councilmember Jenson 16 Also Present: Interim City Manager Charlie Yunker, Fire Chief Mark Sitarz and Fire Lieutenant 17 Jaros. 18 Guests: Evan Doran 19 20 CONSIDERATION, DISCUSSION, AND POSSIBLE ACTION ON ALL OF THE FOLLOWING 21 ITEMS. 22 23 I.APPROVAL OF NOVEMBER 24, 2020 CITY COUNCIL MEETING AGENDA. 24 25 Motion by Councilmember Webster, seconded by Councilmember Walker, to approve the City 26 Council Meeting Agenda of November 24, 2020. 27 28 Motion carried 4-0. 29 30 II.PROCLAMATIONS AND RECOGNITIONS. 31 32 A.Presentation of 2020 Fire Prevention Poster Winners33 Officer Jaros and members of the St. Anthony Fire Department presented the 2020 Fire34 Prevention Poster winners.35 36 Fire Chief Sitarz thanked all of the youth who entered their posters into the contest and37 indicated this is a way for the Fire Department to get into all of the schools and tie fire38 prevention into a creative way for the kids. He noted this is a wonderful program that39 will continue in the future.40 41 Mayor Stille thanked the Fire Department for all their efforts with the contest and42 congratulated all of the winners.43 44 Councilmember Webster thanked the Fire Department for presenting the winners. She45 indicated she was really proud of all of the winners.46 47 Fire Lieutenant Jaros reminded the residents that Santa on the Fire Truck is December48 13th through December 15th. She reviewed the changes being made this year.49 1 City Council Regular Meeting Minutes November 24, 2020 Page 2 1 III. CONSENT AGENDA. 2 3 A. Approve November 10, 2020, Council meeting minutes. 4 B. Licenses and permits. 5 C. Claims. 6 D. Resolution 20-084; a Resolution Approving Amended and Restated Assignments and 7 Subordinations of Contract for Private Redevelopment Between the City of St. Anthony 8 Village, The Housing and Redevelopment Authority of St. Anthony Village, Minnesota, 9 Doran SLV, LLC, Doran St. Anthony, LLC, Doran SLV II, LLC, Bremer Bank, National 10 Association, and Bridgewater Bank. 11 12 Councilmember Webster requested the removal of Consent Agenda Item A, Approve November 13 10, 2020, Council meeting minutes. Councilmember Webster indicated she had a change to the 14 consent agenda motion. It is stated as Motion carried 5-0. She explained she did not vote for the 15 consent agenda because it did include Care Act dollars that would be benefiting the School 16 District and following the yes votes she did not vote yes and went to abstain, which by her own 17 admission did not abstain before the meeting moved on. The vote should read: Motion carried 4-18 0-1 abstain (Webster). 19 20 Mayor Stille indicated he had a question regarding Consent Agenda Item D, Resolution 20-084. 21 He asked for clarification that this is an amendment to a document that was previously executed 22 but has this been fully vetted by attorney’s and did the attorney’s recommend approval. Interim 23 City Manager Yunker explained City Attorney Ingram is working on this and has been fully 24 reviewed by legal. 25 26 Motion by Councilmember Randle, seconded by Councilmember Walker, to approve the 27 Consent Agenda as amended. 28 29 Motion carried 4-0. 30 31 IV. PUBLIC HEARING – NONE. 32 33 V. REPORTS FROM COMMISSION AND STAFF – NONE. 34 35 VI. GENERAL BUSINESS OF COUNCIL. 36 37 A. Resolution 20-085; a Resolution Approving the Second Amendment to Contract for 38 Private Redevelopment between The Housing and Redevelopment Authority of St. 39 Anthony, the City of St. Anthony Village, Doran SLV, LLC, Doran St. Anthony, LLC, 40 Doran SLV II, LLC. 41 42 Interim City Manager Yunker reviewed the resolution with the Council. 43 44 Mayor Stille indicated he reported at the last meeting that Kelly Doran called him and told him 45 the construction loan had closed and the sequences of events are falling in place to start 46 2 City Council Regular Meeting Minutes November 24, 2020 Page 3 construction but evidently though in order to aleve the winter conditions and the extra costs 1 associated with it this is being pushed back into 2021, which is understandable. He indicated he 2 was surprised how far back it has been pushed, May 31, 2021 and he asked for an explanation as 3 to why this was pushed so far back. Mr. Evan Doran explained they used that date as an outside 4 date to give them some time to make sure that all of the winter conditions would be taken care of 5 such as thawing and frozen ground. He noted it is a matter of getting all of the items into the 6 proper sequence and proper timeframes. He noted their anticipation with the go date is really 7 April 1st. 8 9 Councilmember Webster stated she has been thinking a lot about how the pandemic and 10 economic conditions may have likely impacted this project and she asked if this could be 11 discussed so the community is aware of some of the challenges that came with the financing and 12 how might the pandemic affect even the construction crews and the availability of SAC at that 13 point as well. Mr. Evan Doran indicated they have had nine months already to deal with COVID 14 and have seen what the seasonal adjustments of COVID has impacted the construction industry. 15 He reviewed some of the changes that have been made. 16 17 Mayor Stille explained the surprising and encouraging aspect of that is the general lease up of 18 project seen throughout the community because he thought there would be some further impact 19 on that. 20 21 Motion by Councilmember Webster, seconded by Councilmember Randle, to approve 22 Resolution 20-085; a Resolution Approving the Second Amendment to Contract for Private 23 Redevelopment between The Housing and Redevelopment Authority of St. Anthony, the City of 24 St. Anthony Village, Doran SLV, LLC, Doran St. Anthony, LLC, Doran SLV II, LLC. 25 26 Motion carried 4-0. 27 28 B. Resolution 20-086; a Resolution Approving Minor Subdivision at 2501 Lowry Avenue. 29 30 Interim City Manager Yunker reviewed the resolution with the Council. 31 32 Councilmember Randle indicated he was confused by this proposal and wondered what the 33 purpose of it is. Mr. Yunker explained this is a project in the very preliminary stage with a 34 developer looking to put in some senior and assisted living type units on track B and that is only 35 at the stage where staff has received the preliminary application and is at the staff comment 36 stage. It has yet to go to the Planning Commission or to the City Council. He noted this is done 37 to facilitate the possible future project. 38 39 Motion by Councilmember Walker, seconded by Councilmember Randle, to approve Resolution 40 20-086; a Resolution Approving Minor Subdivision at 2501 Lowry Avenue. 41 42 Motion carried 4-0. 43 44 C. Ordinance 2020-03 an Ordinance Amending Multiple Sections Relating to Sewer, Water, 45 and Stormwater Fees and Other Fees. 46 3 City Council Regular Meeting Minutes November 24, 2020 Page 4 1 Interim City Manager Yunker reviewed the ordinance with the Council. 2 3 Motion by Councilmember Webster, seconded by Councilmember Walker, to approve second 4 reading of Ordinance 2020-03; an Ordinance Amending Multiple Sections Relating to Sewer, 5 Water and Stormwater Fees and Other Fees. 6 7 Motion carried 4-0. 8 9 VII. REPORTS FROM CITY MANAGER AND COUNCIL MEMBERS. 10 11 Councilmember Webster stated she attended the Community Services Advisory Council earlier 12 in the month and had a chance to not only review the programs with the Community Services 13 Department this year but in addition was able to hear updates from other members around the 14 table. She also attended the St. Anthony Family Services Collaborative and it approved to work 15 with Marius Nacie and he has initiated some restorative circles and engagement circles. She 16 noted two have already been held and two more will be held in December. This is an 17 opportunity for community members to come together virtually in a really safe place to get to 18 know each other and in some ways start to rebuild some communication that may have been lost 19 between residents and just a chance to connect. 20 21 Councilmember Randle stated he attended the Sister Cities annual meeting on Saturday, 22 November 21st. He noted some members from Finland were able to join the meeting and three 23 new Board Members were elected. The topic of conversation was about the 75th Anniversary 24 and talk about the relationships between the St. Anthony Sister Cities and Solo Finland Sister 25 Cities. There was also discussion on pen pals. He indicated Solo has a new Mayor as well as St. 26 Anthony and there was discussion about having the two Mayors get together virtually. 27 28 VIII. COMMUNITY FORUM. 29 30 Mayor Stille invited residents to come forward at this time and address the Council on items that 31 are not on the regular agenda. 32 33 Ms. Lona Doolan, 3511 Harding Street, stated she would like to remember Jay Hartman and his 34 commitment to the City of St. Anthony. She explained when she thought of Jay some of the 35 things that come to mind are his devotion to St. Anthony, his willingness to listen, his 36 commitment to doing the right thing, his humble approach to solving problems and his constant 37 support throughout the community. She stated she has worked with Jay so many times over the 38 years and did not remember the first time she met him. She would like to recognize some of 39 Jay’s work with organizations she has been involved with. Citizens for Sustainability, Friends of 40 the Parks, St. Anthony Village Gardeners and Wilshire Park Ecology Club. She noted Jay 41 helped them achieve their vision of a pollinator pathway through St. Anthony and took the idea 42 they proposed with the Parks Commission in 2015 and he focused Green Corp. intern Kristin 43 Seaman on making it a reality. Jay continued to refer interested residents to CFS for assistance 44 in planning pollinator gardens. She reviewed some of the changes he helped make in regard to 45 pollinator gardens. She explained Jay was a strong advocate for parks and helped find more 46 4 City Council Regular Meeting Minutes November 24, 2020 Page 5 places within the parks for natural habitat. She continued listing many of the things Jay Hartman 1 accomplished in the City. 2 3 Mayor Stille thanked Ms. Doolan for taking the time and for the tribute to Jay Hartman and 4 indicated everyone will miss him. 5 6 Hearing from no one else, Mayor Stille moved forward with the agenda. 7 8 IX. INFORMATION AND ANNOUNCEMENTS. 9 10 Mayor Stille noted the School District is working at some of the ballfields and some of the drain 11 tiles going in so the paths will not be flooded and he thinks of Jay Hartman because he had been 12 trying to deal with that for years and finally the money was found and a joint project with the 13 School District was done to fix the paths. Again, his legacy lives on here and Jay left his mark 14 on the community that will go on for a very long time. 15 16 X. ADJOURNMENT. 17 18 Mayor Stille adjourned the meeting at 7:49 p.m. 19 20 21 Respectfully submitted, 22 Sue Osbeck 23 TimeSaver Off Site Secretarial, Inc. 24 25 Mayor 26 ATTEST: 27 City Clerk 28 5 THIS PAGE LEFT INTENTIONALLY BLANK 6 Saint Anthony Village DATE: December 8, 2020 Approved: TO: Mayor and Councilmembers FROM: License Clerk ITEM: License and Permits for Approval: General Contractors License: Empire Solar Group, Salt Lake City, UT Mechanical Licenses: Centraire Heating & Air Conditioning, Edina, MN Glowing Hearth & Home, Jordan, MN 7 THIS PAGE LEFT INTENTIONALLY BLANK 8 City of St Anthony Village CITY OF ST ANTHONY CHECK REGISTER Page: 1 Check Issue Dates: 11/26/2020 - 12/8/2020 Dec 01, 2020 02:24PM Vendor Number Payee Check Number Check Issue Date Amount 10078 AMERICAN WATER WORKS ASSN 42390 11/30/2020 221.00- V 12760 10322006 SSI MN TRANCHE 1 (FD)42656 12/08/2020 636.86 1118 56 BREWING 42657 12/08/2020 948.00 1122 AM CRAFTS SPIRITS 42658 12/08/2020 345.00 1100 ARTISIAN BEER COMPANY 42659 12/08/2020 14,091.25 10115 ASPEN MILLS 42660 12/08/2020 479.25 12993 AURORA ASPHALT & CONCRETE INC 42661 12/08/2020 2,138.52 2030 BALD MAN BREWING 42662 12/08/2020 258.20 1013 BELLBOY CORPORATION 42663 12/08/2020 4,094.12 1014 BELLBOY CORPORATION 42664 12/08/2020 535.62 2009 BLACK STACK BREWING 42665 12/08/2020 702.00 10175 BLAINE LOCK & SAFE INC.42666 12/08/2020 285.95 8544 BOURGET IMPORTS 42667 12/08/2020 121.75 1018 BREAKTHRU BEVERAGE MN BEER 42668 12/08/2020 29,023.96 1011 BREAKTHRU BEVERAGE MN WINE & SPIRITS 42669 12/08/2020 3,482.65 1009 BREAKTHRU BEVERAGE MN WINE & SPIRITS 42670 12/08/2020 2,076.75 1017 CAPITOL BEVERAGE SALES 42671 12/08/2020 14,428.34 12596 CINTAS 42672 12/08/2020 1,406.08 10307 CIVIC SYSTEMS, LLC 42673 12/08/2020 362.00 1010 CLEAR RIVER BEVERAGE COMPANY 42674 12/08/2020 1,918.00 12044 COMPASS MINERALS 42675 12/08/2020 9,367.81 10332 COMPTON'S COMMERCIAL CLNG. INC 42676 12/08/2020 4,228.00 12995 COPELAND, ROGER 42677 12/08/2020 125.00 12561 CORE & MAIN LP 42678 12/08/2020 2,551.10 12924 COREMARK METALS 42679 12/08/2020 46.69 10349 CREATIVE FORMS & CONCEPTS 42680 12/08/2020 713.70 1042 CRYSTAL SPRINGS ICE 42681 12/08/2020 116.64 10375 DALCO 42682 12/08/2020 519.46 10501 FASTENAL COMPANY 42683 12/08/2020 132.03 10508 FERGUSON WATERWORKS 42684 12/08/2020 533.30 1030 FLAHERTY'S HAPPY TYME COMPANY 42685 12/08/2020 342.00 10526 FLEETPRIDE 42686 12/08/2020 59.06 12353 GARY CARLSON EQUIPMENT COMPANY 42687 12/08/2020 78.30 10603 H & L MESABI INC 42688 12/08/2020 1,029.69 10624 HAWKINS, INC 42689 12/08/2020 658.40 10636 HEDBACK & CARLSON PLLC 42690 12/08/2020 3,500.00 10657 HENNEPIN COUNTY TREASURER 42691 12/08/2020 467.50 12711 HENNEPIN HEALTHCARE 42692 12/08/2020 4,500.00 1019 HOHENSTEIN'S, INC 42693 12/08/2020 13,910.37 2013 INBOUND BREWCO 42694 12/08/2020 518.00 1027 INDEED BREWING COMPANY 42695 12/08/2020 1,826.25 12893 INNOVO AUTOMATION 42696 12/08/2020 5,406.46 11754 INTEGRATED LOSS CONTROL, INC.42697 12/08/2020 617.00 1016 JJ TAYLOR DISTRIBUTING 42698 12/08/2020 31,407.26 1004 JOHNSON BROTHERS LIQUOR CO.42699 12/08/2020 1,102.54 1005 JOHNSON BROTHERS LIQUOR COMPANY.42700 12/08/2020 9,610.79 1006 JOHNSON BROTHERS LIQUOR COMPANY.42701 12/08/2020 11,360.68 1044 JOHNSON BROTHERS LIQUOR COMPANY.42702 12/08/2020 5,678.39 10806 L.T.G. POWER EQUIPMENT 42703 12/08/2020 79.90 2028 LADONA CERVECERIA 42704 12/08/2020 148.00 10861 LOFFLER COMPANIES - 131511 42705 12/08/2020 153.09 2010 LUPULIN BREWING 42706 12/08/2020 590.65 12474 MARS SUPPLY 42707 12/08/2020 55.03 9 City of St Anthony Village CITY OF ST ANTHONY CHECK REGISTER Page: 2 Check Issue Dates: 11/26/2020 - 12/8/2020 Dec 01, 2020 02:24PM Vendor Number Payee Check Number Check Issue Date Amount 12940 MINNEHAHA BLDG MAINTENANCE 42708 12/08/2020 67.57 11032 MINNESOTA DEPT OF HEALTH 42709 12/08/2020 5,669.00 11019 MISTER CAR WASH 42710 12/08/2020 33.92 2006 MODIST BREWING COMPANY 42711 12/08/2020 526.25 11061 MORRELL ENTERPRISES LP 42712 12/08/2020 520.00 12989 NAGEL, KENNETH 42713 12/08/2020 12.85 1125 NEGOCE 42714 12/08/2020 252.00 1051 NEW FRANCE WINE COMPANY 42715 12/08/2020 408.00 12088 OFFICE 8 42716 12/08/2020 132.00 11163 OFFICE DEPOT 42717 12/08/2020 20.00 2011 OMNI BREWING 42718 12/08/2020 312.00 12779 OPTION ONE MECHANICAL LLC 42719 12/08/2020 9,419.00 11185 PACE ANALYTICAL SERVICES, INC.42720 12/08/2020 285.00 1012 PAUSTIS & SONS 42721 12/08/2020 2,782.00 2034 PEQUOD DISTRIBUTION 42722 12/08/2020 1,432.08 1001 PHILLIPS WINE & SPIRITS 42723 12/08/2020 7,509.40 1002 PHILLIPS WINE & SPIRITS 42724 12/08/2020 4,265.58 11215 PIONEER RIM AND WHEEL CO.42725 12/08/2020 85.76 11241 POSTMASTER - MPLS BMEU 42726 12/08/2020 240.00 2019 PRYES BREWING COMPANY 42727 12/08/2020 954.00 12311 PUCKETTS RECYCLING 42728 12/08/2020 120.00 1062 RED BULL DISTRIBUTION COMPANY 42729 12/08/2020 349.50 11345 ROSEVILLE CHRYSLER DODGE 42730 12/08/2020 20.10 12990 SANDIN, PAM 42731 12/08/2020 28.01 12346 SHRED IT 42732 12/08/2020 37.77 11408 SIGNATURE CONCEPTS, INC.42733 12/08/2020 845.18 11414 SITARZ/MARK 42734 12/08/2020 70.00 1024 SOUTHERN GLAZER'S OF MN 42735 12/08/2020 2,775.12 1008 SOUTHERN GLAZER'S OF MN 42736 12/08/2020 1,058.08 1026 SOUTHERN GLAZER'S OF MN 42737 12/08/2020 7,497.48 1036 SOUTHERN GLAZER'S OF MN 42738 12/08/2020 113.28 2035 STACKED DECK BREWING CO 42739 12/08/2020 1,130.00 12994 STAPF CONCRETE CONSTRUCTION INC 42740 12/08/2020 1,500.00 2001 STEEL TOE BREWING 42741 12/08/2020 417.00 11502 STREICHER'S 42742 12/08/2020 1,007.59 11513 SULLIVAN, TOM 42743 12/08/2020 125.00 11566 TIMESAVER OFF SITE SECRETARIAL 42744 12/08/2020 402.50 12156 TOR-VER HARDSCAPES 42745 12/08/2020 6,700.00 11585 TRACE ANALYTICS, INC.42746 12/08/2020 372.00 12619 USP TECHNOLOGIES 42747 12/08/2020 13,973.96 12776 USS MINNESOTA ONE MT LLC (CH)42748 12/08/2020 3,639.64 11674 VERIZON WIRELESS 42749 12/08/2020 1,542.07 11682 VIKING INDUSTRIAL CENTER 42750 12/08/2020 25.87 1025 VINOCOPIA 42751 12/08/2020 1,736.50 12759 WESTSIDE WHOLESALE TIRE & SUPPLY 42752 12/08/2020 131.49 12648 WINDSTREAM 42753 12/08/2020 65.42 1034 WINE COMPANY/THE 42754 12/08/2020 1,820.95 1038 WINE MERCHANTS INC 42755 12/08/2020 1,644.57 1032 WINEBOW 42756 12/08/2020 2,795.50 11738 WSB & ASSOCIATES, INC.42757 12/08/2020 44,381.75 11740 XCEL ENERGY 42758 12/08/2020 21,271.72 10 City of St Anthony Village CITY OF ST ANTHONY CHECK REGISTER Page: 3 Check Issue Dates: 11/26/2020 - 12/8/2020 Dec 01, 2020 02:24PM Vendor Number Payee Check Number Check Issue Date Amount Grand Totals: 341,070.85 11 THIS PAGE LEFT INTENTIONALLY BLANK 12 CITY OF ST. ANTHONY VILLAGE STATE OF MINNESOTA RESOLUTION 20-087 A RESOLUTION AUTHORIZING TRANSFERS AND CLOSING OF SPECIFIED FUNDS WHEREAS, each year staff budgets certain operating and debt service transfers between funds; and WHEREAS, each year, staff evaluates existing funds and identifies those funds in which all activity has concluded and obligations have been satisfied; and WHEREAS, Capital Projects should be closed when all activity has concluded; any residual money and all assets should be transferred to the associated debt service fund or a capital project fund reserved for public projects and if a deficit exist, funding must be provided. NOW THEREFORE BE IT RESOLVED, that the City Council of the City of St. Anthony here approves the transfer of any funds noted, but subject to closing adjustments as needed: 13 Adopted this 8th day of December, 2020. ______________________________ Randy Stille, Mayor ATTEST: ______________________________ Nicole Miller, City Clerk Reviewed for Administration: ______________________________ Charlie Yunker, Interim City Manager 14 City of St. Anthony Interfund Transfers 12/31/20 FUNDTRANSFER OUT 101 335 336 225 401 402 450 509 514 530 536 601 901 Total Monthly101 96,588 96,588 96,588 Rent Transfer to Community Center Fund Monthly101 86,300 86,300 86,300 Transfer in accordance with the 2018 General Fund Budget 101 2,500 2,500 2,500 Transfer to supplement Recycling fund 330 5,000 5,000 5,000 Transfer to reimburse administrative costs 326 5,000 5,000 5,000 Transfer to reimburse administrative costs 321 2,500 2,500 2,500 Transfer to reimburse administrative costs Jul/Dec330 327,712 327,712 327,712 Annual Transfer TIF District #3-5 Revenue to Debt Fund #335 Jul/Dec330 282,725 282,725 282,725 Annual Transfer TIF District #3-5 Revenue to Debt Fund #336 Monthly401 21,958 21,958 21,958 Annual Transfer to Debt Fund (Fire Truck DS ) 411 47,142 47,142 47,142 Tranfers to close truck project fund to debt service fund 509 251,610 251610 251,610 Refund 2019 transfer from Public Utilities fund #509 90,000 90,000 90,000 Annual Transfer to Capital Equipment Fund 525 60,000 60,000 60,000 Refund 2019 transfer from revolving fund fund 525 12,670 12,670 12,670 Transfer to close 2016 street improvement fund HSIP 529 108,577 108,577 108,577 Transfer to close 2018 street improvement fund HSIP 705 250,000 250,000 250,000 Liquor transfer to General Fund 1,650,282 262,500 327,712 282,725 2,500 90,000 69,100 251,610 60,000 - 108,577 12,670 96,588 86,300 1,650,282 610,437 TRANSFER IN 15 THIS PAGE LEFT INTENTIONALLY BLANK 16 M E M O R A N D U M DATE: December 8, 2020 TO: Charlie Yunker, Interim City Manager FROM: Shelly Rueckert, Finance Director ITEM: 2021 Preliminary Levy / General Fund Budget At the September 8th City Council meeting, the city staff presented the proposed 2021 general fund operating budget and the 2021 overall levy. Staff’s has affirmed the proposed 2021 overall levy of $7,865,595. The 2021 proposal represents an increase of $256,137 or a 3.37% increase from 2020. The components of the 2021 proposed preliminary levy are as follows: The standard parameters for preparing the General Fund Budget and Levy include: •City revenues budgeted using current run rates for sources that are subject to trends and conservative baseline estimates for re-occurring aids and charges for services. •Expenses budgeted at amounts that will maintain present level of City services. •Liquor transfer to the general Fund are based on operating results. Each year the General Fund revenue and expenditure budget line items are examined for changes in expected collections/charges, labor adjustments, changes in contract rates, insurance rates, utility costs, usage of various materials or needs, etc. The findings of this examination produce the drivers associated with the proposed 3.37% increase in the General Fund Levy The General Fund Budget and Levy cost drivers are as follows: Expenditures: •Personnel costs – 70.6% of expenditures, costs increased by $167,990 or 3.2% (wages representing 2.2% and health insurance 1%). •The Unions wage increases at the 2021 estimated contracts amounts. 2020 $ Change 2021 % Change General Fund 4,571,013$ 183,637 4,754,650$ 4.02% HRA Fund 185,064 12,500 197,564 6.75% CIP Fund 283,200 - 283,200 0.00% Debt Service Funds 2,487,181 - 2,487,181 0.00% Infrastructure Fund - 60,000 60,000 na Building Improvement Fund 83,000 - 83,000 0.00% Total 7,609,458$ 256,137$ 7,865,595$ 3.37% 17 • Health Insurance premium increase of 9.32% is shared 50/50 by City and the Union and Non-union employees Consistent with the Union contracts. • Union Longevity and Step increases. • Contracted services – 11% of expenditures, overall increase of $47,794. • Construction permits inspections at baseline activity and increased construction costs results in slight expense increase of $1,772. • Assessor, Attorney, Auditor, Engineer and Planner services reflect rate and activity increases. In 2021 engineering for small scale improvement projects will supported by the Infrastructure levy. The net result of these factors is cost impact of $2,450. • Contracted Information Technology costs up $21,030. • Contracted Elections services estimated to increase by $11,800 • Miscellaneous service contracts are estimated to increase by $9,596. • Other Insurance costs – 4.5% of expenditures, overall costs up by $56,318. • Property, casualty and liability costs increased by $20,941 or 14.86%. • Worker’s compensation costs increased $35,377 or 23.72%. • Both Worker’s Compensation and Property and Liability coverages have experienced rate increases in the prior and current renewal periods beyond budget estimates. • Pass through costs – 2.3% of expenditures, costs down $138,032. • The Saint Anthony Fire Relief Association elected to transition the management of its pension fund to the state plan managed by PERA. Therefore the State Aid for the Fire Relief Association will not be a budgeted pass through cost in 2021, reduced costs by $52,083. • The City of New Brighton has expanded their Public works facility to accommodate refueling City vehicles on-site. January 2021 will be the last month gas purchases will include New Brighton’s use. Therefore 2021 gasoline purchases are expected to decline by $79,813 (net impact on budget is approximately $3,000). • Remaining budget line items – 11.6% of overall expenditures or $883,454, costs down $88,259 or 9.1%. Costs include repairs and maintenance, utilities, fuels, training, supplies, communications, etc. • This decrease is due to the $35,000 in annual street sealcoating expense will be an expenditure of the Infrastructure Fund beginning in 2021 • Additionally, lower fuel costs, less grant related expenditures and miscellaneous reductions in activities make up the balance of the decrease Revenues: • Liquor transfer to the General Fund remains at $250,000 for 2021. • 2021 State funded Local Government Aid has increased by $30,833. • Police contracted services has increased by $26,147. • Excess Tax Increment collections are projected to decrease by $63,886 in 2021. • General Fund investment earnings are expected to decline by $10,500 in 2021. 18 The 2021 HRA Budget and Levy cost driver is substantially personnel and professional costs. Therefore the proposed Levy increase for the HRA is 6.75% or $12,500. The 2021 Debt Related Levies are proposed to increase by $0 over the 2020 combined levies. A debt levy reduction program (Peak to Plateau) began in 2014 to stabilize the annual increase in levies created by the annual street reconstruction plan. Without the use of resources committed to this program the impact of 2020 street bonds issued along with existing debt service requirements would have required a 10.42 % increase in the overall Levy. The 2021 Capital Improvement Program (CIP) and the 2021 Building Improvement Levies annually proposed increases of $25,000 and $5,000 respectively are being deferred for 2021. Adjustments have been made to CIP and Building Improvement replacement schedules to make the zero levy increase in these capital improvement funds possible. For 2021 a levy to support Infrastructure improvements is proposed at $60,000. As discussed earlier specific costs supported by the general Fund levy in 2020 will now be supported by the Infrastructure levy in 2021. Therefore there is no overall levy increase due to establishing an additional capital fund levy. For 2021, the median taxable valuation for a single-family home in Saint Anthony is $338,000, an increase of 4.97% over 2020. Based on the median valuation of $338,000, the “City Portion” of 2021 property taxes is $2,118.59. A breakdown of the taxes is as follows: General Fund Budget $1,313.66 Road Improvements 528.73 Public Facilities 95.29 Capital Improvements 117.75 Tax Abatement 63.16 Total $2,118.59 In 2020 the median taxable valuation for a single-family home in Saint Anthony was $322,000 with City taxes of $2,064.30. Therefore, the increase in “City taxes” for a median value home will be $54.29 in 2021 (2.63%). The overall taxes on a median value single-family home will be $5,556.59 in 2021 compared to $5,534.48 in 2020. The 2021 overall increase of $22.11 reflects slight decreases in County and School taxes. Lastly, the estimated 2020 General Fund surplus is $405,908. This surplus is primarily due to the receipt of CARES funding. The current expectation is that COVID-19 expenditures will be continued in 2021. The level of that spending and the pandemics impact on revenues is unknown, and was not included in the 2021 budget. Therefore, the surplus is the resource for the 2021 unbudgeted COVID-19 financial impacts versus levy. At tonight’s Council meeting a resolution needs to be passed adopting the 2021 budgets and certifying the final tax levy to Hennepin and Ramsey Counties. Recommendation Staff recommends that Council approves resolution 20-088; Adopting the 2021 General Fund operating budget of $7,651,785 (based on 2021 General Fund expenditures) and certifying the final Property Tax Levy of $7,865,595 to Hennepin and Ramsey Counties 19 Path to the 2021 Tax Levy Cost of City Services: $7,816,147 Police, Fire, Public Works, Parks, Emergency Mgmt, Finance, Administration, HRA City Revenues Generated: $2,863,933 Licenses and Permits Intergovernmental Aids Charges for Services, Fines, Reimbursements and Transfers Gap: $4,952,214 Levy Amount $4,952,214 Buildings Maintenance & Equipment Replacement: $200,000 - $850,000* City Buildings, Fleet, Snow Plows, Fire Engines, Equipment, Technology, Park Shelters City Revenues Generated: $220,500 Transfers, Equipment Sales, Park Dedication Fees, Grants, Fees Gap: $426,200* Levy Amount $426,200 2021 Debt Service Obligations: $3,023,856 Street and Utility Reconstruction, Flood Mitigation, Parks and City Facilities R i Debt Levy Reduction Program Resources: $536,675 Municipal State Aid, Excess Bond Funds, Project Savings, Stormwater Fees Gap: $2,487,181 Levy Amount $2,487,181 Total Levy Amount $7,865,595 Cost of Services Less Operational Revenues Leaves a Funding Gap, Which Equals Levy Replacement Costs Less Generated Revenues Leaves a Funding Gap, Which Equals Levy Debt Payments Less Debt Reduction Resources Leaves a Funding Gap, Which Equals Levy Nd Operating Funds Capital Improvement Debt Levy * Annual needs range from $200,000 - $850,000 based on timing of replacement. * Gap determined by monitoring fund balance annually to maintain 15- year replacement plan. 20 Fiscal Year 2021        ACTUAL ACTUAL ACTUAL ACTUAL BUDGET EST. ACTUAL BUDGET2016 2017 2018 2019 2020 2020 2021Taxes 3,536,079$     3,786,628$     4,236,798$     4,548,038$     4,766,279$     4,501,913$     4,882,357$     2.4%Licenses81,552             77,105             65,220             65,679             72,175             62,910             60,280              ‐19.7%Permits222,527           281,125           230,732           202,884           183,521           234,282           200,321           8.4%Intergovernmental Revenue941,005           978,532           992,347           993,689           1,044,723       1,680,175       1,020,711       ‐2.4%Charges for Services1,513,189       1,567,978       937,105           961,246           1,013,604       984,902           963,922           ‐5.2%Fines84,934             74,762             74,611             87,187             73,900             73,000             69,625             ‐6.1%Reimbursement Revenues472,109             323,461             242,554             238,518             200,137             214,742             199,876              ‐0.1%Transfers In433,606           619,060           357,870           258,200           262,500           262,500           265,000           0.9%TOTAL GENERAL FUND REVENUES 7,285,001$     7,708,650$     7,137,235$     7,355,442$     7,616,839$     8,014,424$     7,662,092$     0.7%% CHANGEGENERAL FUND REVENUES SUMMARY21 Fiscal Year 2021ACTUAL ACTUAL ACTUAL ACTUAL BUDGET EST. ACTUAL BUDGET2016 2017 2018 2019 202020202021TAXES   101‐3101‐0‐0‐01 TAX ‐ CURRENT HENNEPIN/RAMSEY 3,342,377$     3,546,540$     3,948,658$     4,275,305$     4,479,593$      4,255,613$       4,659,557$         Deferred tax collections of 5% estimated for 2020 101‐3102‐0‐0‐01 TAX ‐ DELINQUENT(7,486)              (5,053)              24,954             (18,387)            2,250                2,250                  2,250                   Based on current run rate101‐3103‐0‐0‐02 TAX ‐ MOBILE HOME/NON‐LEVY11,797             ‐                        5,414                5,033                4,050                4,050                  4,050                   Based on current run rate101‐3105‐0‐0‐01 TAX ‐ TIF189,391           245,142           257,772           286,087           280,386            240,000             216,500               Based on 2021 estimated actual  per discussion with county TOTAL 3,536,079$     3,786,628$     4,236,798$     4,548,038$     4,766,279$      4,501,913$       4,882,357$         LICENSES 101‐3210‐1‐1‐01 LICENSE ON SALE INTOXICATING 32,800$           24,600$           16,400$           16,719$           24,600$            16,400$             16,400$               Based on current License count101‐3210‐1‐1‐02 LIQUOR INVST /COMPLIANCE 500                    ‐                        500                   1,000                500                    1,000                  500                       Based on current License count101‐3210‐1‐1‐03 LICENSE WINE & BEER 4,313                6,500                6,375                5,125                5,125                3,000                  3,000                   Based on current License count101‐3210‐1‐1‐04 LICENSE BEER 3.2%550                   550                   550                   300                   550                    200                     200                       Based on current License count101‐3211‐1‐1‐01 LICENSE RENTAL SF15,950             14,350             14,450             14,450             14,150              15,700               14,150                 Based on Est. current License count trend101‐3211‐1‐1‐02 LICENSE RENTAL MULTI FAMILY16,990             19,870             16,990             16,990             16,990              17,190               16,990                 Based on current License count101‐3212‐1‐1‐00 LICENSE CIGARETTE SALES2,100                2,100                2,100                2,400                2,400                2,100                  2,100                   Based on current License count101‐3213‐1‐2‐00 LICENSE DOG404                   20                     ‐                        ‐                        ‐                         ‐                          ‐                            Dog License requirement retired in 2017101‐3214‐1‐1‐00 LICENSE SERVICE STATION1,560                1,560                1,560                2,100                1,560                1,590                  1,560                   Based on current License count for active stations101‐3215‐1‐1‐00 LICENSE OTHER560                   1,250                460                   430                   600                    430                     430                       Based on current License count101‐3216‐1‐2‐00 LICENSE FIREWORKS 100                   100                   100                   100                   100                    100                     100                       Based on current License count101‐3218‐1‐1‐00LICENSE GENERAL CONTRACTOR 4,375                4,855                4,385                4,715                4,250                3,850                  3,500                   License count varies based on construction activity101‐3219‐1‐1‐00 LICENSE HAULERS1,350                1,350                1,350                1,350                1,350                1,350                  1,350                   3 Commercial / 4 Residential Haulers  TOTAL 81,552$           77,105$           65,220$           65,679$           72,175$            62,910$             60,280$               PERMITS101‐3220‐1‐1‐00 PERMITS LAND USE 1,000$             6,300$             7,000$             5,650$             3,000$              8,960$               3,000$                 Conservative Est of run rate101‐3221‐1‐1‐00 PERMITS BUILDING 119,942           123,570           104,862           92,355             86,675              122,017             99,175                 Conservative Est of run rate 2020 actual includes $36,353 in Doran permits101‐3221‐1‐1‐01 PERMITS PLAN CHECK45,895             61,278             50,422             33,048             37,919              48,380               42,919                 Conservative Est of run rate 2020 actual includes $23,629 in Doran permits101‐3222‐1‐1‐00 PERMITS GAS, HVAC12,646             36,501             20,376             15,012             16,805              9,427                  16,805                 Conservative Est of run rate101‐3223‐1‐1‐00 PERMITS PLUMBING10,831             12,724             11,143             9,305                9,240                8,853                  9,240                   Conservative Est of run rate101‐3224‐1‐1‐00 PERMITS ELECTRICAL 15,078             16,947             18,797             21,315             14,214              18,414               14,214                 Conservative Est of run rate101‐3225‐1‐1‐00 PERMITS ADMIN FEES 9,130                11,245             9,968                11,295             8,169                11,201               8,169                   Conservative Est of run rate101‐3228‐1‐1‐00 PERMITS ALARM 5,300                5,700                3,454                2,760                3,250                2,995                  2,800                   Conservative Est of run rate101‐3229‐1‐1‐00 PERMITS MISCELLANEOUS 2,705                6,860                4,710                12,145             4,250                4,035                  4,000                   Sign permits ROW permitsTOTAL 222,527$         281,125$         230,732$         202,884$         183,521$         234,282$           200,321$            INTERGOVERNMENTAL 101‐3310‐2‐3‐00 FEDERAL GRANTS 4,841                6,092 471 2,036 3,500 689,176             3,500 Includes State vest reimbursement as well101‐3320‐2‐2‐01 ISD 282‐ DARE PROGRAM 15,462             14,500             14,500             14,500             14,500              14,500               14,500                 Fixed School reimbursement 101‐3330‐0‐0‐00 MVHC/LGA 523,010           528,225           552,240           553,865           609,553            609,553             640,386               Based on 2021 LGA ‐ additional funding101‐3340‐0‐0‐00 STATE AID‐ PERA INCREASE 7,197                7,197                7,197                7,197                7,197                7,197                  7,197                   Fixed amount of aid101‐3342‐2‐2‐00 STATE AID‐ FIRE RELIEF50,174             53,206             53,083             53,716             53,715              ‐                          ‐                            FIRE RELEF PART OF STATE PLAN NO PASS THOUGH OF AID 101‐3346‐2‐2‐00 STATE AID‐ POLICE197,374           207,448           206,192           197,500           194,192            205,476             198,076               2021 based on 2020 budget plus 2%101‐3348‐3‐2‐00 STATE AID‐ MSA MAINTENANCE 89,905             88,708             97,275             96,265             96,265              103,441             99,302                 2021 Based on 96% 2020 State Aid 101‐3350‐2‐2‐00 LOCAL GRANTS‐ FIRE (DISABILITY & ED) 13,024             37,419             19,696             11,552             12,500              10,500               10,500                 2021 Based on actual 2020 Grants 101‐3360‐2‐2‐00LOCAL GRANTS‐ POLICE33,575             35,658             41,623             52,625             38,426              39,332               42,000                 Safe and sober program101‐3365‐1‐1‐00 LOCAL GRANTS‐ MISCELLANEOUS(97)                    78                     ‐                        ‐                        250                    1,000                  250                       2020 Census grant101‐3370‐2‐2‐00 LOCAL GRANTS‐ PW6,540                ‐                        68                     4,432                14,625              ‐                      5,000                   Opportunity operating grants TOTAL 941,005$         978,532$         992,347$         993,689$         1,044,723$      1,680,175$       1,020,711$         101‐3380‐1‐1‐03 CS MWMO94,881$           94,851$           102,148$         109,612$         112,247$          114,000$           116,204$             2021 based on est increase in 2020 billing rate101‐3380‐1‐1‐04 CS BIRCHWOOD7,531                7,894                7,789                11,492             8,399                8,142                  8,567                   Based on current level of contract services and rate increase101‐3380‐1‐2‐07CS ISD 2825,741                10,366             11,965             13,981             14,126              7,800                  12,854                 Based on current level of contract services101‐3380‐2‐1‐08 CS PD OTHER REIMB OT‐                        ‐                        ‐                        ‐                        10,000              ‐                          10,000                 Other reimbursed OT101‐3380‐3‐1‐05 CS HENNEPIN 28,493             31,312             31,756             33,464             33,966              39,532               35,579                 Estimated @90% 2020 Actual101‐3380‐3‐1‐06 CS NEW BRIGHTON FUEL70,491             78,374             90,678             79,493             87,795              68,357               7,500                   NEW BRIGHTON PW EXPANSION INCLUDED FUELING STATION FEB 2021101‐3380‐5‐1‐01 CS LAUDERDALE 653,026           672,590           692,768           713,204           747,071            747,071             773,218               Based on 2021 Police contract draft proposal CHARGES FOR SERVICESGENERAL FUND REVENUES DETAIL22 Fiscal Year 2021ACTUAL ACTUAL ACTUAL ACTUAL BUDGET EST. ACTUAL BUDGET2016 2017 2018 2019 202020202021GENERAL FUND REVENUES DETAIL101‐3380‐5‐1‐02 CS FALCON HGTS 653,026           672,590            ‐                         ‐                         ‐                          ‐                           ‐                            TOTAL 1,513,189$     1,567,978$     937,105$         961,246$         1,013,604$      984,902$           963,922$            FINES101‐3510‐1‐1‐00 COURT FINES 80,119$           68,532$           65,661$           78,797$           68,400$            67,500$             64,125$               95% of 2020 est actual 101‐3510‐1‐1‐01 FALSE ALARMS 3,600 3,125 6,913 6,290 3,5003,500                  3,500 Est of run rate101‐3885‐2‐1‐00 POLICE IMPOUND FEES 1,215 3,105 2,037 2,100 2,0002,000                  2,000 Est of run rateTOTAL 84,934$           74,762$           74,611$           87,187$           73,900$            73,000$             69,625$               REIMBURSEMENTS AND OTHER REVENUES101‐3622‐1‐1‐00 WT LEASE RENTALS 82,245$           59,408$           56,256$           58,232$           60,267$            60,267$             62,376$               2021 SCHEDULED RENTS. 101‐3800‐1‐1‐00 DONATIONS GENERAL 500                   600                   500                    ‐                        500                    500                     500                       101‐3800‐2‐1‐01 DONATIONS PD ‐                        100,500            ‐                        500                   500                    500                     500                       101‐3800‐2‐1‐02 DONATIONS PD CRIME PREVENTION 720                   400                   3,373                ‐                        ‐                         ‐                          ‐                            101‐3800‐4‐1‐00 DONATIONS PARKS400                   ‐                        ‐                        ‐                        ‐                         ‐                          ‐                            101‐3804‐1‐1‐00 RR‐ MISCELLANEOUS150,977           5,623                19,596             9,752                12,000              3,500                  12,000                 Army reimbursement in 2016 actual101‐3805‐4‐1‐00 CABLE FRANCHISE FEES113,672           115,079           101,612           97,200             86,370              94,500               94,500                 Comcast cable fees at 2020 actual101‐3809‐0‐0‐00LMC DIVIDENDS 65,930             11,394             8,358                6,954                7,500                7,900                  7,500                   P&C dividend not received until fall, no WC dividend budgeted101‐3810‐0‐0‐00 INVESTMENT INCOME 26,856             17,994             23,866             58,472             31,500              42,000               21,000                 Reflects falling interest rates since early 2020101‐3810‐1‐1‐00 MISCELLANEOUS(5,370)              6,557                5,199                7,258                1,500                5,575                  1,500                   place holder 101‐3890‐0‐0‐00INSURANCE PROCEEDS36,179             5,906                23,793             150                   ‐                         ‐                          ‐                            TOTAL 472,109$         323,461$         242,554$         238,518$         200,137$         214,742$           199,876$            TRANSFERS IN101‐3920‐0‐0‐00 LIQUOR FUND 156,396$         249,060$         250,000$         250,000$         250,000$          250,000$           250,000$             No change to Liquor transfer101‐3920‐0‐0‐00 TIF ADMINISTRATION FEES                   ‐                    ‐7,870                8,200                12,500              12,500               15,000                 Additional staff time with TIF redevelopment activites 101‐3920‐0‐0‐00 WATER FILTRATION INT EARNINGS 200,000            ‐                         ‐                         ‐                         ‐                          ‐                           ‐                            101‐3920‐0‐0‐00CAPITAL RESERVE TRANSFER ‐                        370,000           100,000           ‐                        ‐                         ‐                          ‐                            101‐3920‐0‐0‐00 CONDUIT FEE REASSIGNED 77,210             ‐                        ‐                        ‐                        ‐                         ‐                          ‐                            TOTAL 433,606$         619,060$         357,870$         258,200$         262,500$         262,500$           265,000$            TOTAL FUND REVENUE 7,285,001$     7,708,650$     7,137,235$     7,355,442$     7,616,839$      8,014,424$       7,662,092$         23 Fiscal Year 2021ACTUAL ACTUAL ACTUAL ACTUAL BUDGET EST. ACTUAL BUDGET% CHANGE 2016 2017 2018 2019 2020 2020 2021Administration  Mayor/City Council80,340$             82,693$             93,537$             86,066$             88,793$             85,971$             105,968$          16.2%  General Management115,771             120,873             127,942             130,883             231,175             199,928             205,274             ‐12.6%  Planning121,952             109,805             73,544               95,596               80,258               75,889               92,706               13.4%  Elections / Administrative Services22,114               23,740               20,893               34,113               123,402             108,991             130,313             5.3%  Financial Services341,367             347,391             371,306             387,492             297,217             308,611             323,902             8.2%  Legal104,693             86,739               75,369               92,198               142,250             85,000               142,250             0.0%  Assessing59,338               61,917               65,285               68,483               72,921               73,147               76,316               4.4%  City Buildings156,991             200,412             201,625             220,831             219,257             218,320             227,160             3.5%  Cable Franchise42,703               45,391               47,572               44,237               48,361               48,362               49,551               2.4%Public Safety  Police Protection3,400,353         3,160,996         3,170,332         3,276,319         3,463,212         3,239,694         3,621,976         4.4%  Fire Protection1,029,340         1,091,110         1,105,292         1,090,527         1,167,607         917,477             1,148,881         ‐1.6%  Protective Services118,685             144,407             123,208             106,668             103,695             123,005             105,721             1.9%  Emergency Management67,806               71,895               76,393               79,515               83,937               82,671               89,106               5.8%Public Works  Public Works795,817             775,842             879,273             942,872             999,168             758,802             855,121             ‐16.8%  Parks293,059             300,536             305,892             316,846             326,523             307,102             328,740             0.7%Other Expenditures and Transfers  Non‐Departmental 661,628             1,003,845         292,128             299,764             158,200             975,545             148,800             ‐6.3%TOTAL FUND EXPENDITURES 7,411,957$       7,627,593$       7,029,590$       7,272,412$       7,605,976$       7,608,516$       7,651,785$       0.6%GENERAL FUND TOTAL REVENUES 7,285,001$       7,708,650$       7,137,235$       7,355,442$       7,616,839$       8,014,424$       7,662,092$       0.6%Surplus (Deficit) (126,956)$         81,058$             107,646$          83,030$             10,863$             405,908$          10,307$              ‐5.4%GENERAL FUND EXPENDITURES SUMMARY24 Fiscal Year 2021ACTUAL 2016ACTUAL 2017ACTUAL2018ACTUAL2019BUDGET2020EST. ACTUAL2020BUDGET2021MAYOR / CITY COUNCIL101‐4110‐11‐0000 CN REGULAR EMPLOYEE38,256$             36,692$             38,256$             38,256$             38,256$             38,256$               38,256$             0.00% NO CHANGE IN 2021 COUNCIL COMPENSATION101‐4121‐11‐0000 CN PERA1,913                 1,826                 1,913                 1,913                 1,913                 1,913                   1,913                 0.00% 5%  contribution rate101‐4122‐11‐0000 CN FICA/MEDICARE555                     567                     552                     555                     555                     555                       566                     2.00% 1.45%  contribution rate ‐ Medicare only101‐4300‐11‐0000CN PROFESSIONAL SERVICES920                     3,710                 6,508                 6,088                 6,500                 5,571                   6,630                 2.00% 2021 PROJECTED RUN RATE101‐4309‐11‐0000 CN MISC CONTRACTED SERVICES887                     926                     907                     905                     1,150                 921                       1,200                 4.35% ADJUSTED TO ESTIMATED RUN RATE101‐4315‐11‐0000 CN RECORDING SERVICE4,679                 6,439                 6,441                 5,749                 6,733                 6,480                   6,868                 2.00% 2021 PROJECTED RUN RATE101‐4341‐11‐0000CN TRAINING, CONF., AND MTG. 12,877               12,659               14,698               10,612               9,068                 7,609                   9,249                 2.00% LOCAL GOAL SETTING101‐4342‐11‐0000 CN MEMBERSHIPS & DUES12,797               12,797               13,121               13,250               14,290               14,290                 20,900               46.26% ADJUSTED TO ESTIMATED RUN RATE‐ added support for NYFS101‐4345‐11‐0000 CN INTERGOVERMENTAL ACTIVITIES‐                          447                     3,678                 ‐                          ‐                          ‐                            ‐                          0.00% SALO COSTS101‐4352‐11‐0000 CN CITY NEWSLETTER6,502                 5,374                 6,624                 7,558                 9,579                 9,626                   19,637               105.00% 2021 FULL COST OF NEWSLETTER VS SPLIT WITH RECYCLING FUND 101‐4499‐10‐0000 CN MISCELLANEOUS954                     1,256                 839                     1,181                 750                     750                       750                     0.00% 4499‐10 and 4499‐11TOTAL 80,340$             82,693$             93,537$             86,066$             88,793$             85,971$               105,968$          19.34%GENERAL MANAGEMENT101‐4110‐12‐0000 GM REGULAR EMPLOYEE68,479$             70,406$             76,046$             80,586$             162,307$           148,451$             149,276$           ‐8.03% INCLUDES ESTIMATED 2021 WAGE ADJUSTMENTS‐ NEW CM 4/1/21101‐4121‐12‐0000 GM PERA4,993                 5,274                 5,665                 5,999                 12,173               11,134                 11,196               ‐8.03% BASED ON CURRENT PERA FUNDING RATE 101‐4122‐12‐0000 GM FICA/MEDICARE3,544                 3,787                 3,929                 4,016                 12,416               11,357                 11,420               ‐8.03% BASED ON ER 7.65% OF GROSS101‐4131‐12‐0000 GM INSURANCE HEALTH11,652               11,330               11,849               12,328            10,806               8,100                   10,379                ‐3.95% SPLIT 9.4% PREMUIM  INCREASE IN 2021101‐4135‐12‐0000 GM INSURANCE WC 522                     1,079                 1,054 1,142 1,862 1,527 2,073                 11.33% 2020/2021 RENEWAL101‐4211‐12‐0000 GM OFFICE SUPPLIES 64                        ‐                          117                     862                     250                     250                       255                     2.00% 2021 PROJECTED RUN RATE101‐4300‐12‐0000 GM PROFESSIONAL SERVICES‐                           ‐                           ‐                           ‐                          275                     275                       275                     0.00% 2021 PLACEHOLDER101‐4309‐12‐0000 GM MISC CONTRACTED SERVICES355                     371                     800                     362                     460                     426                       480                     4.35% BASED ON MISC CONTRACTED SERVICES SPREADSHEET101‐4341‐12‐0000 GM TRAINING, CONF., AND MTG.12,310               14,705               14,387               11,498               16,000               5,541                   6,500                 ‐59.38% 2021 PROJECTED RUN RATE101‐4342‐12‐0000 GM MEMBERSHIPS & DUES6,553                 6,878                 6,664                 6,841                 6,900                 5,464                   5,758                 ‐16.55% 2021 PROJECTED RUN RATE101‐4343‐12‐0000 GM HEALTH & SAFETY PROGRAMS7,086                 6,958                 7,430                 7,248                 7,725                 7,404                   7,663                 ‐0.80% INTEGRATED LOSS CONTROL SERVICES101‐4499‐12‐0000 GM MISCELLANEOUS213                     87                       ‐                          ‐                          ‐                          ‐                            ‐                          0.00%TOTAL 115,771$          120,873$          127,942$          130,883$          231,175$          199,928$            205,274$          ‐11.20%PLANNING101‐4110‐13‐0100 PL REGULAR EMPLOYEE6,143$               6,330$               7,259$               7,996$               8,319$               8,319$                 8,515$               2.36% PORTION OF ADMIN SRVCS COORD TIME101‐4110‐13‐0000 PL COMMISSION2,155                 2,095                 2,295                 1,855                 2,500                 2,500                   2,500                 0.00% BASED ON MEETINGS ATTENDED BY COMMISSIONERS101‐4111‐13‐0000 PL OVERTIME‐                          ‐                          ‐                          3                         250                     250                       253                     1.00% ADJUSTED TO ESTIMATED RUN RATE101‐4121‐13‐0000PL PERA461                     475                     544                     600                     643                     643                       658                     2.32% ADJUSTED TO ESTIMATED RUN RATE101‐4122‐13‐0000 PL FICA/MEDICARE635                     645                     731                     754                     847                     847                       862                     1.79% ADJUSTED TO ESTIMATED RUN RATE101‐4131‐13‐0000 PL INSURANCE HEALTH1,690                 1,652                 1,723                 1,793                 1,869                 ‐                            1,972                 5.51% 2020 WC INCLUDED IN FINANCE101‐4226‐13‐0000PL GENERAL SUPPLIES132                     83                       121                     133                     135                     135                       138                     2.00% ADJUSTED TO ESTIMATED RUN RATE101‐4302‐13‐0000 PL CONTRACTED PLANNER49,690               56,252               57,805               78,061               60,000               57,500                 72,000               20.00% ASSUMES HIGH ACTIVITY LEVEL CONTINUES 101‐4302‐13‐0100 PL COMP PLAN ‐ PLANNER56,483               37,592               ‐                          ‐                          ‐                          ‐                            ‐                          0.00% COMPREHENSIVE PLAN COMPLETE101‐4305‐13‐0000 PL GIS CONTRACTED SERVICES4,563                 4,682                 2,887                 4,039                 5,050                 5,050                   5,151                 2.00% DATA LINK MAINT. AND MAPPING REQUESTS, ADJ TO EST RUN RATE 101‐4341‐13‐0000 PL TRAINING, CONF. & MTG.‐                          ‐                          ‐                          362                     485                     485                       494                     2.00% PLACEHOLDER FOR PLANNING COMMISSION TRAINING/GOAL SETTING101‐4351‐13‐0000 PL NOTICES & PUBLICATIONS‐                          ‐                          178                     ‐                          160                     160                       163                     2.00%TOTAL 121,952$          109,805$          73,544$             95,596$             80,258$             75,889$               92,706$             15.51%ADMINISTRATIVE SERVICES101‐4110‐14‐0000 AD REGULAR EMPLOYEE‐$                        ‐$                        ‐$                        ‐$                        33,276$             33,787$               34,059$             2.35% INCLUDES ESTIMATED 2021 WAGE ADJUSTMENTS 101‐4111‐14‐0000 AD OVERTIME‐                          ‐                          ‐                          ‐                          750                     750                       758                     1.00% INCL ADMIN SRVCS COORD 2020, CLERK 40%101‐4112‐14‐0000 AD PART‐TIME EMPLOYEE‐                          ‐                          ‐                          ‐                          3,000                 3,000                   1,500                 ‐50.00% Added pt help for early voting coverage101‐4121‐14‐0000 AD PERA‐                           ‐                           ‐                           ‐                          2,721                 2,759                   2,667                  ‐1.98% BASED ON CURRENT PERA FUNDING RATE 101‐4122‐14‐0000 AD FICA/MEDICARE‐                           ‐                           ‐                           ‐                          2,775                 2,814                   2,720                  ‐1.98% BASED ON ER 7.65% OF GROSS101‐4131‐14‐0000 AD INSURANCE HEALTH‐                           ‐                           ‐                           ‐                          7,477                 7,477                   7,889                 5.51% SPLIT 9.4% PREMUIM  INCREASE IN 2021101‐4211‐14‐0000AD OFFICE SUPPLIES934                     352                     365                     428                     525                     525                       536                     2.00% COSTS INCLUDED IN RAMSEY COUNTY CONTRACT101‐4221‐14‐0000 AD SUPPLIES‐ EQUIPMENT‐                          ‐                          ‐                          899                     ‐                          ‐                            ‐                          0.00% COSTS INCLUDED IN RAMSEY COUNTY CONTRACT101‐4226‐14‐0000 AD POSTAGE ABSENTEE‐                          ‐                          ‐                          137                     ‐                          ‐                            ‐                          0.00% COSTS INCLUDED IN RAMSEY COUNTY CONTRACT101‐4309‐14‐0000AD CONTRACTED SERVICES19,713               19,712               19,713               20,700               20,700               20,700                 32,500               57.00% RAMSEY COUNTY CONTRACT  2019‐2020, 2021 RENEWAL INCREASE101‐4315‐14‐0000 AD MISC CONTRACTED SERVICES‐                          ‐                          ‐                          10,282               50,000               35,000                 45,000               ‐10.00% SHARED COMMUNICATIONS POSITION ESTIMATED RUN RATEGENERAL FUND EXPENDITURES DETAIL25 Fiscal Year 2021ACTUAL 2016ACTUAL 2017ACTUAL2018ACTUAL2019BUDGET2020EST. ACTUAL2020BUDGET2021GENERAL FUND EXPENDITURES DETAIL101‐4339‐14‐0000 AD REPAIR & MAINTENANCE 1,267                 3,397                  ‐                          1,248                 1,300                 1,300                   1,326                 2.00% RAMSEY COUNTY CONTRACT  2019‐2020, 2021 RENEWAL NOT YET AVAILABLE101‐4341‐14‐0000 AD TRAINING, CONF. & MTG. 200                     279                     816                     174                     428                     428                       900                     110.08% ELECTION/CLERK/ COMMUNICATIONS TRAINING101‐4342‐14‐0000 AD MEMBERSHIPS & DUES‐                           ‐                           ‐                          85                       150                     150                       153                     2.00% CLERKS ASSOCIATION101‐4351‐14‐0000 AD NOTICES & PUBLICATIONS‐                          ‐                          ‐                          160                     150                     150                       153                     2.00% COMMUNICATIONS SUBSCRIPTIONS101‐4499‐14‐0000 AD MISCELLANEOUS‐                          ‐                          ‐                          ‐                          150                     150                       153                     2.00% PLACEHOLDER TOTAL 22,114$             23,740$             20,893$             34,113$             123,402$          108,991$            130,313$          5.60%FINANCIAL SERVICES101‐4110‐15‐0000 FS REGULAR EMPLOYEE166,690$           174,095$           190,903$           194,309$           114,857$           118,806$             123,648$           7.65% INCLUDES ESTIMATED 2021 WAGE ADJUSTMENTS / STAFF TURNOVER FROM 2020101‐4111‐15‐0000 FS OVERTIME1,563                 2,193                 8,131                 8,912                 4,646                 4,646                   4,739                 2.00% 2021 PROJECTED RUN RATE101‐4121‐15‐0000 FS PERA12,864               13,580               14,775               15,409               8,963                 9,259                   9,629                 7.43% BASED ON CURRENT PERA FUNDING RATE 101‐4122‐15‐0000 FS FICA/MEDICARE10,625               11,530               14,440               13,473               9,142                 9,444                   9,822                 7.43% BASED ON ER 7.65% OF GROSS101‐4131‐15‐0000 FS INSURANCE HEALTH21,562               20,969               21,133               22,174               20,456               23,810                 22,565               10.31% SPLIT 9.4% PREMUIM  INCREASE IN 2021 PLUS EAP FEES@100/mo101‐4135‐15‐0000 FS INSURANCE WC836                     1,773                 1,290                 1,947                 1,185                 1,739                   1,967                 65.99% 2020/2021 RENEWAL101‐4133‐15‐0000 FS LIFE INSURANCE905                     863                     787                     951                     942                     850                       867                      ‐7.93% 2021 PROJECTED RUN RATE101‐4211‐15‐0000 FS OFFICE SUPPLIES5,662                 5,161                 5,163                 5,500                 6,120                 6,120                   6,242                 2.00% 2021 PROJECTED RUN RATE101‐4221‐15‐0000 FS  SUPPLIES ‐ EQUIP853                     679                     ‐                          219                     1,000                 600                       1,000                 0.00% MINOR EQUIPMENT NEW & REPLACEMENT 101‐4226‐15‐0000 FS GENERAL SUPPLIES 2,176                 1,876                 2,686                 3,077                 2,500                 2,500                   2,900                 16.00% ADJUST TO RUN RATE / ALLOCATION TO OTHER DEPTS ELIMINATED101‐4300‐15‐0000 FS PROFESSIONAL SERVICES 17,220               19,142               16,655               18,080               18,250               18,250                 17,150                ‐6.03% AUDIT AND FD ACTUARY REPORT UPDATE IN 2019101‐4309‐15‐0000 FS CONTRACTED IT & SW SUPPORT3,088                 3,962                 3,850                 3,902                 6,200                 4,800                   5,810                 ‐6.29% BASED ON CONTRACTED IT /SW SPREADSHEET CIVIC UPGRADE 2020/2021101‐4310‐15‐0000 FS MISC CONTRACTED SERVICES4,230                 4,916                 6,510                 5,434                 4,490                 5,890                   6,030                 34.30% BASED ON MISC CONTRACTED SERVICES SPREADSHEET 101‐4315‐15‐0000 FS HC ASSESSOR SERVICES460                     446                     ‐                          ‐                          500                     500                       510                     2.00% HC TNT MAILING101‐4325‐15‐0000FS COMMUNICATIONS1,159                 638                     962                     1,379                 775                     775                       800                     3.23% ADJ TO ESTIMATED RUN RATE‐COMMUNICATIONS SPREADSHEET101‐4339‐15‐0000 FS REPAIR & MAINTENANCE328                     205                     ‐                          ‐                          173                     173                       177                     2.00% CURRENT RUN RATE101‐4341‐15‐0000 FS TRAINING, CONF. & MTG.3,307                 5,991                 1,669                 1,004                 2,750                 500                       1,250                 ‐54.55% INCLUDES LESS IN TUTION REIMBURSEMENT EXPECTED FOR 2021101‐4342‐15‐0000 FS MEMBERSHIPS & DUES 515                     486                     95                       105                     115                     145                       150                     30.43% 2021 PROJECTED RUN RATE101‐4350‐15‐0000 FS PRINTED FORMS & ENVELOPES 1,381                 1,172                 1,077                 1,879                 1,500                 2,004                   1,750                 16.67% 2021 PROJECTED RUN RATE101‐4351‐15‐0000 FS NOTICES & PUBLICATIONS 1,115                 1,701                 781                     1,776                 1,500                 2,100                   2,150                 43.33% 2021 PROJECTED RUN RATE101‐4365‐15‐0000 FS INSURANCE PROPERTY / LIABILITY 78,867               68,962               74,109               81,212               84,295               88,842                 97,586               15.77% BASED ON 2020/2021 RENEWAL 101‐4498‐15‐0000 FS REIMBURSED COSTS ADVANCED 5,886                 6,594                 6,280                 6,144                 6,725                 6,725                   6,860                 2.00% MWMO ADP COST101‐4499‐15‐0000 FS MISCELLANEOUS 75                       459                     8                         608                     133                     133                       300                     126.16% ADJUSTED TO ESTIMATED RUN RATETOTAL 341,367$          347,391$          371,306$          387,492$          297,217$          308,611$            323,902$          8.98%LEGAL101‐4312‐16‐0000 AT GENERAL LEGAL 30,000$             39,272               16,786               15,812               35,000               28,000                 35,000               0.00% 2021 PROJECTED RUN RATE101‐4313‐16‐0000 AT CIVIL LITIGATION 32,693               5,467                 16,583               34,386               65,250               15,000                 65,250               0.00% 2021 BUDGET INCLUDES POTENTIAL REDACTION COSTS 101‐4314‐16‐0000 AT PROSECUTION RETAINER42,000               42,000               42,000               42,000               42,000               42,000                 42,000               0.00% 2021 PROJECTED RUN RATETOTAL 104,693$          86,739$             75,369$             92,198$             142,250$          85,000$               142,250$          0.00%ASSESSING101‐4110‐17‐0000 ASR REGULAR EMPLOYEE2,718$               2,789$               2,890$               3,013$               3,082$               3,308$                 3,387$               9.90% INCLUDES ESTIMATED 2021 WAGE ADJUSTMENTS / STAFF TURNOVER101‐4111‐17‐0000 ASR OVERTIME EMPLOYEE47                       87                       295                     277                     415                     415                       416                     0.24% 2021 PROJECTED RUN RATE101‐4121‐17‐0000 ASR PERA206                     215                     237                     246                     262                     262                       285                     8.75% BASED ON CURRENT PERA FUNDING RATE 101‐4122‐17‐0000 ASR FICA/MEDICARE 212                     220                     244                     252                     268                     268                       291                     8.75% BASED ON ER 7.65% OF GROSS101‐4131‐17‐0000 ASR INSURANCE HEALTH 486                     471                     503                     531                     564                     564                       604                     7.09% SPLIT 9.4% PREMUIM  INCREASE IN 2021101‐4226‐17‐0000 ASR GENERAL SUPPLIES 138                     135                     116                     166                     170                     170                       173                     2.00% 2021 PROJECTED RUN RATE101‐4311‐17‐0000 ASR HC ASSESSOR SERVICES 55,531               58,000               61,000               64,000               68,000               68,000                 71,000               4.41% BASED ON ASSESSOR CORESPONDENCE DATED 7/1/20101‐4350‐17‐0000 ASR PRINTED FORMS & ENVELOPES‐                          ‐                          ‐                          ‐                          160                     160                       160                     0.00% PLACEHOLDERTOTAL 59,338$             61,917$             65,285$             68,483$             72,921$             73,147$               76,316$             4.66%CITY BUILDINGS101‐4310‐18‐0000 CB MISC CONTRACTED SERVICES 10,718$             55,817               54,760               56,825               56,985               56,985                 59,100               3.71% City contracted cleaning services / refuse / rugs 101‐4325‐18‐0000 CB COMMUNICATIONS 6,532                 5,833                 5,762                 5,624                 6,270                 6,270                   6,700                 6.86% BASED ON COMMUNICATION SPREADSHEET101‐4340‐18‐0000 CB REPAIRS AND MAINTENANCE 25,345               19,121               17,414               23,118               22,950               22,950                 23,409               2.00% 2021 PROJECTED RUN RATE101‐4381‐18‐0000CB ELECTRIC AND GAS UTILITIES32,596               33,751               33,505               40,571               36,465               35,528                 37,500               2.84% 2021 budget based on usage run rates and Estimated rate increases101‐4920‐18‐0000 CB TRANSFER CH RENT 81,800               85,890               90,185               94,694               96,588               96,588                 100,451             4.00% 4.0 % increase in rent transfer ‐ funds CC / CH Facility expensesTOTAL 156,991$          200,412$          201,625$          220,831$          219,257$          218,320$            227,160$          3.60%26 Fiscal Year 2021ACTUAL 2016ACTUAL 2017ACTUAL2018ACTUAL2019BUDGET2020EST. ACTUAL2020BUDGET2021GENERAL FUND EXPENDITURES DETAILCABLE FRANCHISE101‐4110‐19‐0000 CF REGULAR EMPLOYEE6,143$               6,330$               7,259$               7,999$               8,319$               8,320$                 8,515$               2.36% INCLUDES ESTIMATED 2021 WAGE ADJUSTMENTS 101‐4121‐19‐0000 CF PERA461                     475                     544                     600                     624                     624                       639                     2.36% BASED ON CURRENT PERA FUNDING RATE 101‐4122‐19‐0000 CF FICA/MEDICARE470                     484                     555                     612                     636                     636                       651                     2.36% BASED ON ER 7.65% OF GROSS101‐4131‐19‐0000 CF INSURANCE HEALTH 1,690                 1,652                 1,723                 1,793                 1,869                 1,869                   1,972                 5.51% SPLIT 9.4% PREMUIM  INCREASE IN 2021101‐4211‐19‐0000 CF OPERATING SUPPLIES‐                          86                        ‐                          20                       400                     400                       408                     2.00% 2021 PROJECTED RUN RATE101‐4221‐19‐0000 CF SUPPLIES‐ EQUIPMENT‐                           ‐                           ‐                          32                       1,025                 1,025                   1,046                 2.00% 2021 PROJECTED RUN RATE101‐4307‐19‐0000CF NSCC OPERATING SUPPORT28,736               29,402               30,529               29,777               31,716               31,716                 32,350               2.00% 2021 PROJECTED RUN RATE101‐4310‐19‐0000 CF MISC CONTRACTED SERVICES5,203                 6,961                 6,961                 3,403                 3,772                 3,772                   3,970                 5.26% 2021 Annual website support ‐SEE MISC CONTRACTED SPREADSHEET101‐4341‐19‐0000 CF TRAINING, CONF & MTG‐                          ‐                          ‐                          ‐                          ‐                          ‐                            ‐                          0.00%TOTAL 42,703$             45,391$             47,572$             44,237$             48,361$             48,362$               49,551$             2.46%POLICE PROTECTION101‐4110‐21‐0000 PD REGULAR EMPLOYEE2,170,749$        $       2,014,439  $       1,934,184 1,976,883$       2,074,359$       1,878,448$         2,157,963$       4.03%2021 INCLUDES ESTIMATED 2021 WAGE ADJUSTMENTS AND UNIFORM                      2020 EXCLUDES PR COSTS FOR COVID ‐19 ACTIVITY / CARES101‐4110‐21‐0100 PD MECHANIC ALLOC‐WAGES 16,097               17,242               17,894               18,476               19,212               19,212                 19,854               3.34% INCLUDES ESTIMATED 2021 WAGE ADJUSTMENTS 101‐4110‐21‐0200 PD DARE ALLOC‐WAGES 8,257                 7,726                 7,947                 8,215                 10,749               8,612                   8,913                  ‐17.08% INCLUDES ESTIMATED 2021 WAGE ADJUSTMENTS 101‐4111‐21‐0000 PD OVERTIME EMPLOYEE 68,103               64,615               105,139             98,673               98,120               115,000               108,034             10.10% INCLUDES ESTIMATED 2021 WAGE ADJUSTMENTS 101‐4111‐21‐0100 PD MECHANIC OVERTIME EMPLOYEE 164                     150                     71                       159                     162                     162                       165                     2.00% INCLUDES ESTIMATED 2021 WAGE ADJUSTMENTS 101‐4111‐21‐0200 PD DARE ALLOC ‐ OT118                     228                     371                     538                     765                     765                       891                     16.47% INCLUDES ESTIMATED 2021 WAGE ADJUSTMENTS 101‐4111‐21‐0300 PD SAFE & SOBER ‐ OT26,843               28,732               31,805               37,916               32,250               32,370                 34,566               7.18% PASS THROUGH COSTS NO NET LEVY IMPACT101‐4111‐21‐0400 PD COURT OVERTIME10,274               5,721                 3,927                 4,316                 4,500                 3,000                   4,700                 4.44% Based on estimated run rate101‐4111‐21‐0500 PD OTHER REIMB OT‐                          ‐                          15,379               ‐                          10,000               ‐                            ‐                           ‐100.00%101‐4121‐21‐0000 PD PERA359,051             332,437             322,711             340,375             376,846             381,245               391,636             3.92% BASED ON CURRENT PERA FUNDING RATE 101‐4121‐21‐0100 PD MECHANIC ALLOC‐ PERA1,297                 1,371                 1,423                 1,474                 1,453                 1,453                   1,501                 3.33% BASED ON CURRENT PERA FUNDING RATE 101‐4121‐21‐0200 PD DARE ALLOC‐ PERA1,537                 1,442                 1,487                 1,621                 2,050                 2,050                   2,142                 4.49% BASED ON CURRENT PERA FUNDING RATE 101‐4122‐21‐0000 PD FICA/MEDICARE37,946               38,792               37,432               38,224               41,903               41,903                 43,313               3.36% DEPT SUMMARIES FICA101‐4122‐21‐0100 PD MECHANIC ALLOC‐SS/MEDICARE1,251                 1,342                 1,383                 1,430                 1,470                 1,470                   1,519                 3.34% BASED ON ER 7.65% OF GROSS101‐4122‐21‐0200 PD DARE ALLOC‐SS/MEDICARE127                     119                     123                     128                     167                     167                       173                     3.62% BASED ON 1.45% ER MEDICARE RATE101‐4131‐21‐0000 PD INSURANCE HEALTH337,706             304,352             308,057             318,684             326,054             331,949               354,123             8.61% SPLIT 9.4% PREMUIM  INCREASE IN 2021 & TURNOVER PLAN CHANGES 101‐4131‐21‐0100PD MECHANIC ALLOC‐HLTH INS445                     655                     840                     958                     1,008                 564                       1,058                 4.96% SPLIT 9.4% PREMUIM  INCREASE IN 2021101‐4131‐21‐0200 PD HEALTH ‐ DARE1,629                 1,394                 1,450                 1,506                 1,907                 1,560                   2,012                 5.51% SPLIT 9.4% PREMUIM  INCREASE IN 2021101‐4135‐21‐0000 PD WORKER'S COMP INS68,584               60,750               71,027               83,558               87,105               91,376                 106,025             21.72% BASED ON 2020/2021 RENEWAL 101‐4212‐21‐0100 PD MOTOR FUELS45,023               47,085               47,154               36,821               56,882               38,882                 44,526               ‐21.72% 2020 contracted cost per gal $2.13 / 2021 projection $2.28 / 3yr avg usage101‐4220‐21‐0000 PD SQUADS CLEANING1,165                 1,232                 1,399                 1,336                 1,900                 1,900                   1,938                 2.00% 2021 PROJECTED RUN RATE101‐4221‐21‐0000 PD SUPPLIES‐ EQUIPMENT113                     138                     537                     3,959                 2,000                 725                       2,040                 2.00% 2021 PROJECTED RUN RATE101‐4221‐21‐0100 PD VEHICLE REPAIRS/PARTS12,955               30,315               11,045               16,144               16,000               14,145                 16,000               0.00% 2021 PROJECTED RUN RATE101‐4226‐21‐0000 PD GENERAL SUPPLIES22,455               12,593               19,439               17,894               21,500               16,508                 21,500               0.00% 2021 PROJECTED RUN RATE101‐4226‐21‐0100 PD SHOP SUPPLIES‐                          ‐                          100                     536                     500                     500                       510                     2.00% 2021 PROJECTED RUN RATE101‐4226‐21‐0200 PD DARE SUPPLIES2,718                 2,719                 1,981                 2,595                 2,000                 125                       2,040                 2.00% 2021 PROJECTED RUN RATE101‐4226‐21‐0500 PD VEST GRANT SUPPLIES9,313                 1,303                 2,212                 4,073                 3,500                 1,500                   3,570                 2.00% Supported by grant revenues101‐4309‐21‐0000 PD CONTRACTED IT & SFTW SUPPORT56,748               62,306               69,210               87,643               91,780               96,780                 108,860             18.61% BASED ON CONTRACTED IT SPREADSHEET,  ADDED LEXIPOL IN 2019101‐4310‐21‐0000 PD MISC CONTRACTED SERVICES8,074                 4,512                 5,008                 10,814               8,420                 15,025                 16,250               92.99% BASED ON MISC. CONTRACTED SERVICES SPREADSHEET101‐4325‐21‐0000 PD COMMUNICATIONS44,478               44,672               55,454               61,645               63,220               58,420                 62,500               ‐1.14% BASED ON COMMUNICATION SPREADSHEET101‐4333‐21‐0000 PD HC PRISONER SERVICES5,692                 3,913                 5,766                 7,233                 6,885                 8,400                   8,500                 23.46% 2021 PROJECTED RUN RATE101‐4341‐21‐0000 PD TRAINING, CONF. & MTG.21,876               16,658               27,738               22,353               33,611               8,500                   24,000               ‐28.59% 2021 PROJECTED RUN RATE101‐4342‐21‐0000 PD MEMBERSHIPS & DUES2,085                 2,580                 1,954                 5,606                 5,600                 5,100                   5,150                 ‐8.04% 2021 PROJECTED RUN RATE101‐4350‐21‐0000 PD PRINTED FORMS & ENVELOPES902                     602                     769                     1,442                 969                     969                       988                     2.00% 2021 PROJECTED RUN RATE101‐4365‐21‐0000 PD INSURANCE PC / LIABILITY51,476               47,941               51,065               54,753               56,615               60,359                 64,265               13.51% BASED ON 2020/2021 RENEWAL 101‐4345‐21‐0000 PD MISC GRANTS / REIMB EXPENDITURES1,293                 848                     1,756                 ‐                          1,500                 500                       500                      ‐66.67% 2021 PROJECTED RUN RATE101‐4499‐21‐0000 PD MISCELLANEOUS3,809                 75                       49                       ‐                          250                     50                         250                     0.00% PLACEHOLDER TOTAL 3,400,353$       3,160,996$       3,170,332$       3,276,319$       3,463,212$       3,239,694$         3,621,976$       4.58%FIRE PROTECTION27 Fiscal Year 2021ACTUAL 2016ACTUAL 2017ACTUAL2018ACTUAL2019BUDGET2020EST. ACTUAL2020BUDGET2021GENERAL FUND EXPENDITURES DETAIL101‐4110‐22‐0000 FD REGULAR EMPLOYEE485,961$           512,052$           519,281$           521,497$           540,307$           353,980$             550,330$           1.86%2021 INCLUDES ESTIMATED 2021 WAGE ADJUSTMENTS AND UNIFORM                      2020 EXCLUDES PR COSTS FOR COVID ‐19 ACTIVITY / CARES101‐4110‐22‐0100 FD MECHANIC ALLOC‐ WAGES9,198                 9,852                 10,225               10,558               11,070               10,176                 11,345               2.48% 16% of mechanic wages/uniform101‐4111‐22‐0000FD OVERTIME EMPLOYEE36,622               39,228               43,950               35,486               41,500               33,500                 41,500               0.00% FROM DEPT SUMMARIES OT101‐4111‐22‐0100 FD OT ‐ UNION CONTRACT33,950               35,301               35,918               36,303               37,570               37,570                 38,321               2.00% FROM DEPT SUMMARIES OT101‐4112‐22‐0000 FD PART‐TIME EMPLOYEE70,763               77,231               83,155               82,977               78,066               77,675                 79,627               2.00% 2021 Moved Housing Inspector to code enforcement101‐4112‐22‐0100 FD CODE ENFORCEMENT8,513                 9,992                 4,883                 5,509                 18,200               13,300                 18,564               2.00% 2021 see above 101‐4121‐22‐0000 FD PERA91,759               94,880               97,699               100,475             109,630             107,980               111,537             1.74% BASED ON CURRENT PERA FUNDING RATE 101‐4121‐22‐0100 FD MECHANIC ALLOC‐ PERA741                     783                     813                     842                     830                     830                       851                     2.48% BASED ON ER 7.65% OF GROSS101‐4122‐22‐0000 FD FICA/MEDICARE 11,674               13,065               15,585               14,325               17,185               14,770                 17,333               0.86% See dept. summary‐PR, Medicare on FD OT union plus fica for VT off101‐4122‐22‐0100 FD MECHANIC FICA/MEDICARE 715                     767                     791                     817                     847                     847                       868                     2.48% BASED ON ER 7.65% OF GROSS101‐4123‐22‐0000 FD CITY CONTR‐ FIRE RELIEF6,000                 6,000                 6,000                 6,000                 6,000                 6,000                   6,000                 0.00% Kept same101‐4124‐22‐0000 FD  CONTR. STATE AID FIRE RELIEF50,174               52,546               52,743               54,716               52,083               ‐                            ‐                           ‐100.00% FIRE RELIEF WENT TO STATE PLAN IN 2020101‐4131‐22‐0000 FD INSURANCE HEALTH84,639               94,378               92,441               87,755               99,097               92,786                 104,989             5.95% SPLIT 9.4% PREMUIM  INCREASE IN 2021101‐4131‐22‐0100 FD MECHANIC ALLOC‐ HLTH INS254                     374                     480                     547                     576                     576                       605                     5.03% SPLIT 9.4% PREMUIM  INCREASE IN 2021101‐4135‐22‐0000 FD INSURANCE WC27,580               26,783               33,916               36,035               34,219               36,687                 41,065               20.01% BASED ON 2020/2021 RENEWAL 101‐4140‐22‐0000 FD UNIFORM EXPENSES7,461                 5,974                 8,155                 8,445                 8,700                 7,800                   8,874                 2.00% ADJUSTED TO ESTIMATED RUN RATE101‐4212‐22‐0100FD MOTOR FUELS5,064                 6,010                 6,214                 5,240                 7,529                 5,282                   5,890                 ‐21.77% 2020 contracted cost per gal $2.13 / 2021 projection $2.28 / 3yr avg usage101‐4221‐22‐0000 FD SUPPLIES‐ EQUIPMENT2,277                 1,114                 3,484                 1,411                 2,805                 2,805                   2,861                 2.00% ADJUSTMENT TO USAGE / PRICE101‐4221‐22‐0100 FD VEHICLE REPAIRS/PARTS16,984               10,688               13,486               4,746                 10,000               21,500                 10,200               2.00% 2021 PROJECTED RUN RATE101‐4225‐22‐0000 FD FIRE PREVENTION SUPPLIES1,346                 1,811                 1,373                 1,530                 2,000                 950                       2,000                 0.00% 2021 PROJECTED RUN RATE101‐4226‐22‐0000 FD GENERAL SUPPLIES4,379                 4,970                 4,670                 3,558                 5,142                 3,500                   5,244                 2.00% 2021 PROJECTED RUN RATE101‐4226‐22‐0100 FD SHOP SUPPLIES1,146                 1,016                 349                     1,803                 1,408                 650                       1,436                 2.00% 2021 PROJECTED RUN RATE101‐4227‐22‐0000FD MEDICAL SUPPLIES3,810                 2,792                 5,184                 4,958                 5,814                 4,600                   5,930                 2.00% 2021 PROJECTED RUN RATE101‐4309‐22‐0000 FD CONTRACTED IT & SFTW SUPPORT22,511               25,760               27,163               31,789               32,630               36,938                 37,730               15.63% BASED ON CONTRACTED IT /SW SPREADSHEET101‐4310‐22‐0000 FD MISC CONTRACTED SERVICES3,552                 3,016                 3,063                 2,221                 3,180                 3,180                   3,290                 3.46% BASED ON MISC CONTRACTED SERVICES SPREADSHEET101‐4325‐22‐0000 FD COMMUNICATIONS15,512               17,020               15,686               17,213               21,800               18,750                 22,930               5.18% BASED ON COMM SPREADSHEET/RADIO BUDGET INC TO RUN RATE101‐4339‐22‐0000 FD EQUIP REPAIRS & MAINTENANCE2,345                 84                       196                     685                     3,450                 3,750                   3,600                 4.35% 2021 PROJECTED RUN RATE101‐4340‐22‐0000 FD BLDG REPAIRS & MAINTENANCE698                     ‐                          936                     617                     510                     ‐                            ‐                           ‐100.00% 2021 PROJECTED RUN RATE101‐4341‐22‐0000 FD TRAINING, CONF. & MTG.12,050               17,415               13,753               10,942               13,260               19,000                 14,000               5.58% 2021 PROJECTED RUN RATE101‐4342‐22‐0000 FD MEMBERSHIPS & DUES966                     1,601                 917                     1,125                 1,700                 1,595                   1,450                 ‐14.71% ADJUSTED TO ESTIMATED RUN RATE101‐4345‐22‐0000 FD GRANT REIMB/EXPENDITURES10,696               18,607               2,780                 403                     500                     500                       510                     2.00% estimated net match expense  TOTAL 1,029,340$       1,091,110$       1,105,292$       1,090,527$       1,167,607$       917,477$            1,148,881$       ‐1.60%PROTECTIVE INSPECTIONS101‐4110‐24‐0000 PI REGULAR EMPLOYEE9,964$               10,447$             10,943$             11,761$             11,872$             10,182$               11,945$             0.61% INCLUDES ESTIMATED 2021 WAGE ADJUSTMENTS 101‐4121‐24‐0000 PI PERA755                     786                     817                     850                     890                     781                       896                     0.61% BASED ON CURRENT PERA FUNDING RATE 101‐4122‐24‐0000 PI FICA/MEDICARE763                     799                     837                     900                     908                     796                       914                     0.61% BASED ON ER .0765 OF GROSS101‐4131‐24‐0000 PI INSURANCE HEALTH 947                     1,055                 1,150                 1,234                 1,336                 1,114                   1,460                 9.28% SPLIT 9.4% PREMUIM  INCREASE IN 2021101‐4226‐24‐0000 PI GENERAL SUPPLIES‐                           ‐                           ‐                           ‐                           ‐                           ‐                             ‐                          0.00%101‐4320‐24‐0000 PI BUILDING OFFICAL CONTRACT 95,392               118,761             91,209               74,789               77,923               96,167                 79,482               2.00% EXPENSE BASED ON SHARE OF REVENUES101‐4321‐24‐0000PI ELECTRICAL INSPECTOR10,772               12,468               17,819               17,134               10,661               13,811                 10,874               2.00% EXPENSE BASED ON SHARE OF REVENUES101‐4350‐24‐0000 PI PRINTED FORMS & ENVELOPES92                       92                       433                     ‐                          104                     154                       150                     44.18%TOTAL 118,685$          144,407$          123,208$          106,668$          103,695$          123,005$            105,721$          1.95%EMERGENCY MANAGEMENT101‐4110‐25‐0000 EMS REGULAR EMPLOYEE47,613$             51,197$             53,409$             55,548$             57,945$             58,213$               61,444$             6.04% INCLUDES ESTIMATED 2021 WAGE ADJUSTMENTS 101‐4121‐25‐0000 EMS PERA7,678                 8,281                 8,613                 9,371                 10,256               10,305                 10,876               6.04% BASED ON CURRENT PERA FUNDING RATE 101‐4122‐25‐0000 EMS FICA/MEDICARE690                     742                     774                     806                     840                     840                       891                     6.04% 1.45% FICA rate101‐4131‐25‐0000EMS INSURANCE HEALTH7,116                 6,963                 7,248                 7,533                 7,841                 7,841                   8,255                 5.28% SPLIT 9.4% PREMUIM  INCREASE IN 2021101‐4135‐25‐0000 EMS INSURANCE WC2,894                 2,948                 3,741                 4,123                 3,770                 4,042                   4,521                 19.92% BASED ON 2020/2021 RENEWAL 101‐4221‐25‐0000 EMS SUPPLIES‐ EQUIPMENT‐                          239                     301                     ‐                          510                     ‐                            520                     2.00%101‐4227‐25‐0000 EMS MEDICAL SUPPLIES150                     ‐                          48                       ‐                          49                       ‐                            50                       2.00% Haz Mat medical supplies 101‐4323‐25‐0000 EMS PAGERS, SIREN1,251                 1,237                 1,289                 1,233                 1,500                 1,255                   1,300                 ‐13.33% 2021 PROJECTED RUN RATE101‐4339‐25‐0000 EMS REPAIRS AND MAINTENANCE221                     ‐                          ‐                          287                     100                     100                       102                     2.00% 2021 PROJECTED RUN RATE28 Fiscal Year 2021ACTUAL 2016ACTUAL 2017ACTUAL2018ACTUAL2019BUDGET2020EST. ACTUAL2020BUDGET2021GENERAL FUND EXPENDITURES DETAIL101‐4341‐25‐0000 EMS TRAINING, CONF. & MTG. 193                     288                     970                     615                     975                      ‐                            995                     2.00% 2021 PROJECTED RUN RATE101‐4350‐25‐0000 EMS PRINTED FORMS & ENVELOPES‐                           ‐                           ‐                           ‐                          150                     75                         153                     2.00% 2021 PROJECTED RUN RATETOTAL 67,806$             71,895$             76,393$             79,515$             83,937$             82,671$               89,106$             6.16%PUBLIC WORKS101‐4110‐31‐0000 PW REGULAR EMPLOYEE273,345$           269,329$           278,917$           286,839$           299,039$           213,436$             292,796$           ‐2.09%2021 INCLUDES ESTIMATED 2021 WAGE ADJUSTMENTS AND UNIFORM                      2020 EXCLUDES PR COSTS FOR COVID ‐19 ACTIVITY / CARES101‐4110‐31‐0100 PW MECHANIC 33,149               35,525               36,837               37,966               39,423               39,423                 40,042               1.57% See dept summaries‐PR excludes other pay codes101‐4111‐31‐0000 PW OVERTIME EMPLOYEE 6,005                 2,897                 13,518               12,285               17,690               9,500                   17,900               1.19% See dept summaries‐PR OT mapping to dept 31101‐4111‐31‐0100 PW OVERTIME MECHANIC 327                     300                     141                     318                     471                     471                       350                      ‐25.69% Based on last three years 101‐4112‐31‐0000 PW PART‐TIME EMPLOYEE 27,407               26,592               30,018               30,300               35,812               29,292                 36,886               3.00% Inflate 3% / assume extended winter conditions 101‐4121‐31‐0000 PW PERA21,168               20,741               21,775               22,611               23,755               16,720                 23,302               ‐1.90% BASED ON CURRENT PERA FUNDING RATE 101‐4121‐31‐0100 PW MECHANIC ALLOC‐ PERA2,594                 2,742                 2,845                 2,948                 2,992                 2,992                   3,029                 1.25% BASED ON CURRENT PERA FUNDING RATE 101‐4122‐31‐0000 PW FICA21,821               21,531               22,682               23,654               26,969               19,295                 26,590               ‐1.41% BASED ON ER .0765 OF GROSS101‐4122‐31‐0100 PW MECHANIC ALLOC‐ FICA2,778                 2,899                 3,028                 3,157                 3,052                 3,052                   3,090                 1.25% BASED ON ER .0765 OF GROSS101‐4131‐31‐0000 PW INSURANCE HEALTH59,897               57,127               60,325               60,641               63,874               65,650                 72,179               13.00% SPLIT 9.4% PREMUIM  INCREASE IN 2021101‐4131‐31‐0100 PW MECHANIC ALLOC‐ HI2,480                 1,310                 1,680                 1,915                 2,016                 2,016                   2,117                 5.01% 56% Tucker101‐4135‐31‐0000 PW INSURANCE WC13,525               14,096               13,436               13,198               13,412               13,412                 19,852               48.02% BASED ON 2020/2021 RENEWAL 101‐4140‐31‐0000 PW UNIFORM EXPENSES8,567                 9,650                 9,137                 12,504               9,547                 9,547                   9,738                 2.00% 2021 PROJECTED RUN RATE101‐4140‐31‐0100 PW UNIFORM EXPENSES ‐ MECH704                     1,103                 727                     1,172                 817                     817                       833                     2.00% 2021 PROJECTED RUN RATE101‐4212‐31‐0100 PW MOTOR FUELS MISC1,304                 976                     1,080                 3,460                 1,406                 1,406                   1,434                 2.00% Other non‐contracted fuel / oil101‐4212‐31‐0200 PW MOTOR FUELS NB 70,612               75,716               88,671               77,009               84,537               65,657                 7,059                 ‐91.65% NEW BRIGHTON PW ADDED ON SITE RE‐FUELING FEB 2021101‐4212‐31‐0300PW FUEL ‐ MWMO1,124                 1,462                 1,488                 1,164                 1,775                 1,227                   1,410                 ‐20.56% 2020 cost per gal $2.13 / 2021 projection $2.28 / 3yr avg usage/ Deisel 2.45/2.57101‐4212‐31‐0400 PW FUEL ‐ SANB #2823,495                 3,209                 8,710                 10,480               11,936               7,474                   9,966                 ‐16.50% 2020 cost per gal $2.13 / 2021 projection $2.28 / 3yr avg usage/ Deisel 2.45/2.57101‐4212‐31‐0600 PW FUEL ‐ STREET/PARKS10,356               11,362               14,846               14,229               22,203               13,265                 16,332               ‐26.44% 2020 cost per gal $2.13 / 2021 projection $2.28 / 3yr avg usage/ Deisel 2.45/2.57101‐4221‐31‐0100 PW VEHICLE REPAIRS/PARTS6,618                 8,816                 16,540               13,556               14,280               11,515                 14,566               2.00% 2021 PROJECTED RUN RATE101‐4223‐31‐0000 PW SMALL TOOLS MECHANIC 22                       1,720                 750                     70                       584                     584                       595                     2.00% 2021 PROJECTED RUN RATE101‐4223‐31‐0100 PW SMALL TOOLS 1,314                 473                     583                     447                     1,020                 597                       1,040                 2.00% 2021 PROJECTED RUN RATE101‐4224‐31‐0000 PW STREET SIGNS1,522                 563                     464                     2,763                 2,388                 2,278                   2,435                 2.00% 2021 PROJECTED RUN RATE101‐4226‐31‐0000 PW GENERAL SUPPLIES6,417                 7,485                 10,838               6,879                 11,674               10,075                 8,500                 ‐27.19% 2021 PROJECTED RUN RATE101‐4226‐31‐0100 PW SHOP SUPPLIES1,678                 1,958                 1,499                 562                     2,208                 2,208                   3,500                 58.50% 2021 PROJECTED RUN RATE More general supplies being recognized as shop supplies101‐4228‐31‐0000 PW STREET REPAIR & MAINTENANCE61,727               15,571               16,621               91,192               73,950               23,500                 40,429               ‐45.33% MOVED SEALCOATING COST TO INFRASTRUCTURE FUND101‐4229‐31‐0000 PW STREET CHEMICALS & SAND7,275                 23,655               31,281               32,630               32,742               32,742                 28,100               ‐14.18% 2021 ‐ 400  tons of salt, price per ton 13.1% less than 2020 101‐4230‐31‐0000 PW STORMWATER MAINTENANCE1,897                 4,101                 5,817                 7,247                 ‐                          ‐                            ‐                          0.00% Moved to Stormwater utility fund101‐4303‐31‐0000 PW CONTRACTED ENGINEER34,172               27,572               33,093               45,932               32,760               31,850                 18,415               ‐43.79% SUBSTANTIAL PORTION MOVED TO INFRASTRUCTURE FUND101‐4309‐31‐0000 PW CONTRACTED IT & SFTW SUPPORT6,557                 7,423                 13,155               13,566               10,360               12,860                 13,000               25.48% BASED ON CONTRACTED IT /SW SPREADSHEET101‐4310‐31‐0000 PW MISC. CONTRACTED SERVICES2,153                 24,941               43,978               24,399               37,425               37,425                 38,174               2.00% SALO PARK CAM AND VARIOUS ‐2021 RATES NOT CURRENTLY AVAILABLE 101‐4325‐31‐0000 PW COMMUNICATIONS 3,526                 3,246                 2,918                 3,425                 3,210                 710                       3,490                 8.72% BASED ON COMMUNICATION SPREADSHEET101‐4339‐31‐0000 PW EQUIP REPAIRS & MAINTENANCE 12,639               14,786               6,452                 8,701                 14,500               10,750                 14,790               2.00% 2021 PROJECTED RUN RATE101‐4340‐31‐0000 PW BLDG REPAIRS & MAINTENANCE‐                          348                     380                     2,882                 3,000                  ‐                            2,000                  ‐33.33% 2021 PROJECTED RUN RATE101‐4341‐31‐0000PW TRAINING, CONF. & MTG.3,756                 5,475                 3,499                 6,835                 6,500                 750                       6,630                 2.00% 2021 PROJECTED RUN RATE101‐4342‐31‐0000 PW MEMBERSHIPS & DUES689                     1,197                 1,143                 1,428                 1,248                 1,248                   1,273                 2.00% 2021 PROJECTED RUN RATE101‐4344‐31‐0000 PW TRAINING CERT PROGRAMS300                     935                     46                       123                     950                     950                       969                     2.00% 2021 PROJECTED RUN RATE101‐4345‐31‐0000PW GRANT REIMB EXPENDITURES12,023               540                     14,338               2,832                 21,938               ‐                            5,000                 ‐77.21% grant exps for opportunity grants projected in revenue section  101‐4381‐31‐0000 PW STREETLIGHTS & SIGNALS70,049               65,478               65,516               61,512               67,548               63,950                 67,148               ‐0.59% 2021 based on usage run rates and XCEL and Centerpoint rate increases101‐4435‐31‐0000 PW CLEAN‐UP DAY COSTS775                     ‐                          500                     ‐                          ‐                          ‐                            ‐                          0.00%101‐4499‐31‐0000 PW MISCELLANEOUS50                       990                     ‐                          44                       157                     157                       160                     2.00%TOTAL 795,817$          775,842$          879,273$          942,872$          999,168$          758,802$            855,121$          ‐14.42%PARKS101‐4110‐51‐0000 PR REGULAR EMPLOYEE100,528$           101,717$           109,030$           112,855$           114,965$           111,695$             113,176$           ‐1.56% INCLUDES ESTIMATED 2020 WAGE ADJUSTMENTS 101‐4110‐51‐0100 TW REGULAR EMPLOYEE27,130               28,145               29,007               29,970               31,158               28,875                 31,621               1.49% INCLUDES ESTIMATED 2020 WAGE ADJUSTMENTS 101‐4110‐51‐0200 PR COMMITTEE180                     300                     180                     200                     359                     465                       474                     32.14% Parks commission est 3 opt‐in pay‐assume no change for 2020101‐4111‐51‐0000 PR OVERTIME EMPLOYEE2,229                 1,944                 1,827                 2,216                 3,307                 1,590                   2,500                 ‐24.40% BASED ON EE MAPPING101‐4111‐51‐0100 TW OVERTIME EMPLOYEE369                     305                     1,048                 1,176                 867                     600                       1,000                 15.34% BASED ON EE MAPPING29 Fiscal Year 2021ACTUAL 2016ACTUAL 2017ACTUAL2018ACTUAL2019BUDGET2020EST. ACTUAL2020BUDGET2021GENERAL FUND EXPENDITURES DETAIL101‐4121‐51‐0000 PR PERA 7,921                 7,994                 8,606                 8,807                 8,870                 8,496                   8,676                  ‐2.19% BASED ON CURRENT PERA FUNDING RATE 101‐4121‐51‐0100 TW PERA 2,132                 2,189                 2,343                 2,424                 2,402                 2,211                   2,447                 1.86% BASED ON CURRENT PERA FUNDING RATE 101‐4122‐51‐0000 PR FICA/MEDICARE 7,791                 8,115                 8,767                 9,003                 9,075                 8,702                   8,885                  ‐2.09% BASED ON ER 7.65% OF GROSS101‐4122‐51‐0100TW FICA/MEDICARE2,186                 2,258                 2,357                 2,459                 2,450                 2,255                   2,496                 1.86% BASED ON ER 7.65% OF GROSS101‐4131‐51‐0000 PR INSURANCE HEALTH24,223               20,085               21,306               22,380               23,223               23,674                 26,870               15.70% SPLIT 9.4% PREMUIM  INCREASE IN 2021101‐4131‐51‐0100 TW INSURANCE HEALTH4,767                 5,169                 5,004                 5,277                 5,614                 5,615                   6,011                 7.07% SPLIT 9.4% PREMUIM  INCREASE IN 2021101‐4135‐51‐0000PR INSURANCE WC3,258                 3,520                 3,286                 3,641                 3,976                 4,255                   4,877                 22.66% SPLIT 9.4% PREMUIM  INCREASE IN 2021101‐4135‐51‐0100 TW INSURANCE WC2,116                 2,339                 2,191                 2,455                 2,651                 2,836                   3,252                 22.67% BASED ON 2019/2020 RENEWAL 101‐4212‐51‐0000 PW FUEL ‐ STREET/PARKS‐                          ‐                          ‐                          633                     ‐                          ‐                            ‐                          0.00% PW FUELS USE CONSOLIDATED UNDER STREETS DEPT101‐4226‐51‐0000PR GENERAL SUPPLIES11,193               19,832               14,357               15,538               15,810               15,785                 16,126               2.00% 2021 PROJECTED RUN RATE101‐4310‐51‐0100 TW MISC. CONTRACTED SERVICES1,060                 ‐                          ‐                          190                     ‐                          ‐                            ‐                          0.00% coded to 4338101‐4325‐51‐0000 PR COMMUNICATIONS1,285                 1,370                 1,622                 1,522                 1,760                 1,760                   1,810                 2.84% BASED ON COMMUNICATION SPREADSHEET101‐4325‐51‐0100 TW COMMUNICATIONS155                     171                     197                     147                     220                     220                       230                     4.55% BASED ON COMMUNICATION SPREADSHEET101‐4337‐51‐0000 PR STRUCTURES REPAIRS & MAINT.6,687                 8,108                 12,365               6,682                 10,500               2,750                   8,750                 ‐16.67% 2021 PROJECTED RUN RATE101‐4338‐51‐0100 TW TREE REPLACEMENT4,561                 3,542                 583                     3,796                 3,825                 2,500                   3,902                 2.00% 2021 PROJECTED RUN RATE101‐4339‐51‐0000 PR EQUIP REPAIRS & MAINTENANCE8,554                 8,327                 7,857                 11,090               10,250               9,500                   10,455               2.00% 2021 PROJECTED RUN RATE101‐4339‐51‐0100 TW EQUIP REPAIRS & MAINTENANCE‐                          52                       ‐                          ‐                          276                     276                       282                     2.00% 2021 PROJECTED RUN RATE101‐4381‐51‐0000 PR ELECTRIC AND GAS UTILITIES20,135               19,838               19,316               19,389               19,793               18,950                 20,604               4.10% 2021 based on usage run rates and XCEL and Centerpoint rate increases101‐4415‐51‐0000PR SS RENTALS2,423                 2,614                 1,821                 2,820                 2,780                 1,700                   1,900                 ‐31.64% 2021 PROJECTED RUN RATE101‐4499‐51‐0000 PR MISCELLANEOUS‐                          427                     ‐                          ‐                          108                     108                       110                     2.00% 2021 PROJECTED RUN RATE101‐4499‐51‐0100 TW MISCELLANEOUS‐                          ‐                          646                     ‐                          108                     108                       110                     2.00% 2021 PROJECTED RUN RATE101‐4671‐61‐0000 CS ISD 282 REC PROGRAMS 52,176               52,176               52,176               52,176               52,176               52,176                 52,176               0.00% Annual Fixed amount TOTAL 293,059$          300,536$          305,892$          316,846$          326,523$          307,102$            328,740$          0.68%OTHER EXPENDITURES AND TRANSFERS101‐4335‐70‐0000 INSURANCE CLAIMS 21,989$             26,984               14,384               8,710                 15,000               15,000                 15,000               0.00%101‐4343‐70‐0000 EQUITY INTITIATIVE‐                          9,800                 5,119                 9,008                 10,200               1,500                   10,000                ‐1.96% Established funding and specific tracking of initiative costs 101‐4346‐70‐0000 COLLABORATIVE INTITIATIVE‐                          ‐                          1,055                 11,573               11,500               2,500                   10,000               ‐13.04% Additional support for NYFS Community advocate program101‐4347‐70‐0000PROPERTY RESOURCE INTITIATIVE‐                          ‐                          ‐                          593                     10,200               6,000                   10,000               ‐1.96% Established funding and specific tracking of initiative costs 101‐4348‐70‐0000 SUSTAINABILITY INTITIATIVE‐                          ‐                          2,601                 22,400               25,000               4,250                   17,500               ‐30.00% Established funding and specific tracking of initiative costs 101‐4499‐70‐0000 NB MISCELLANEOUS‐                          ‐                          6,298                 25,947               ‐                          22,195                 ‐                          0.00% 2020 Contracted labor and City Manager search101‐4499‐23‐0000 INCIDENT/DATA PROD/COVID‐19 553,339             880,761 176,371             135,233              ‐                          837,800                ‐                          0.00%2020 EST. COVID 19 RELATED EXPENDTURES INCLUDES PUBLIC SAFTEY COSTS, QUARANTINE COSTS, PPE, HVAC VIRUS COMPONENTS, SOCIAL DISTANCING MEASURES, TECHNOLOGY, ECONOMIC SUPPORT GRANTS‐ NYFS ISD 282, DISTANCED LEARNING AND OTHER EXPENDITURES101‐4920‐70‐0000 TRANSFER ‐ SEVERENCE FUND86,300               86,300               86,300               86,300               86,300               86,300                 86,300               0.00% AMOUNT TO MAINTAIN SEVERENCE FUND BALANCETOTAL 661,628$          1,003,845$       292,128$          299,764$          158,200$          975,545$            148,800$          ‐5.94%TOTAL FUND EXPENDITURES 7,411,957$       7,627,593$       7,029,590$       7,272,412$       7,605,976$       7,608,516$         7,651,785$       0.60%TOTAL FUND REVENUE 7,285,001$       7,708,650$       7,137,235$       7,355,442$       7,616,839$       8,014,424$         7,662,092$       0.59%0.00%with 20k hi coverageCHANGE IN FUND BALANCE (126,956)$         * 81,058$             107,646$          83,030$             10,863$             405,908$            10,307$             ‐5.11%BEGINNING FUND BALANCE 2,446,012         2,319,056         2,400,114         2,507,759         2,590,790         2,601,652           3,007,561         16.09%0.00%ENDING FUND BALANCE 2,319,056$       2,400,114$       2,507,759$       2,590,790$       2,601,652$       3,007,561$         3,017,868$       16.00%2,017$               6,835,139$       *SCHEDULED USE OF FUND BALANCE30 Fiscal Year 2020ACTUAL ACTUAL ACTUAL ACTUAL BUDGET EST. ACTUAL BUDGET2016 2017 2018 2019 2020 2020 2021REVENUES301‐3101‐0‐0‐00 PROPERTY TAX LEVY/MVHC138,346$        156,028$        162,542$        167,478$        185,065$        183,214$        197,564$        Actual levy proposed301‐3804‐0‐0‐00 REFUNDS AND REIMBURSEMENTS‐                        31,678             1,131               857                  500                  750                  500                  Reimb of economic dev expense301‐3810‐0‐0‐00 INVESTMENT INCOME‐                        ‐                        ‐                        121                  150                  100                  75                    Adjusted to true run rate301‐3920‐0‐0‐00 TRANSFER ‐ GENERAL FUND‐                        ‐                        ‐                        ‐                        ‐                        ‐                        301‐3920‐0‐0‐00 TRANSFER ‐ HRA PROJECTS FUND‐                        ‐                        ‐                        ‐                        ‐                        ‐                        TOTAL 138,346$        187,706$        163,673$        168,456$        185,715$        184,064$        198,139$        EXPENDITURES301‐4110‐00‐0000 REGULAR EMPLOYEE 81,391$          85,562$          90,719$          95,314$          99,278$          89,918$          86,045$          INCLUDES ESTIMATED 2021 WAGE ADJUSTMENTS 301‐4121‐00‐0000 PERA 6,078               6,411               6,775               7,114               7,446               6,744               6,453               BASED ON CURRENT PERA FUNDING RATE 301‐4122‐00‐0000 FICA/MEDICARE 6,126               6,439               6,718               7,180               7,595               6,879               6,582               BASED ON ER 7.65% OF GROSS301‐4131‐00‐0000INSURANCE HEALTH12,497             12,156             12,179             12,508             13,063             11,757             9,206               SPLIT 9.4% PREMUIM  INCREASE IN 2021301‐4135‐00‐0000 INSURANCE WC326                  895                  878                  1,034               964                  1,130               1,220               BASED ON 2020/2021 RENEWAL 301‐4300‐00‐0000 PROFESSIONAL SERVICES5,452               6,113               4,389               3,987               6,250               5,076               6,805               Auditor / Ehlers 301‐4302‐00‐0100 COMP PLAN/REDEVELOPMENT ‐  PLANNER‐                         ‐                        21,985             20,706             20,000             20,000             20,000             WSB REDEVELOPMENT PLANNING301‐4321‐00‐0000 GMHC ‐ PROGRAM FEE40,676             10,417             985                  755                  720                  535                  550                  Mortgage processing fees301‐4322‐00‐0000 SALO PARK MAINT. CONTRACT320                  ‐                        ‐                        ‐                        ‐                        ‐                        ‐                        Costs moved to Revolving Projects Fund until absorbed by general fund301‐4324‐00‐0000 ECONOMIC DEVELOPMENT 2,250               2,588               3,090               2,250               2,250               ‐                        ‐                        301‐4343‐00‐0000 RE‐DEVELOPMENT / HOUSING PLANNER‐                        ‐                        1,248               10,165             27,500             8,500               27,500             301‐4499‐00‐0000 MISCELLANEOUS EXPENSE.680                  ‐                        ‐                        ‐                        ‐                        ‐                        301‐4920‐00‐0000 TRANSFERS‐OUT‐                        ‐                        ‐                        ‐                        ‐                        ‐                        ‐                        TOTAL 155,116$        131,259$        148,966$        161,013$        185,066$        150,538$        164,362$        NET CHANGE (16,770)$         56,447$          14,707$          7,443$            649$                33,526$          33,777$          BEGINNING FUND BALANCE9,188$            (7,582)$           48,865$          63,572$          71,015$          71,664$          105,190$        ENDING FUND BALANCE(7,582)$           48,865$          63,572$          71,015$          71,664$          105,190$        138,967$        HOUSING & REDEVELOPMENT AUTHORITY31 Fiscal Year 2020ACTUAL ACTUAL ACTUAL ACTUAL BUDGET EST. ACTUAL BUDGET2016 2017 2018 2019 2020 2020 2021REVENUES225‐3362‐0‐0‐01 SCORE INCENTIVE  GRANTS RC‐$                     ‐$                     ‐$                     1,693$             1,694$             ‐$                     ‐$                     225‐3362‐0‐0‐02 RECYCLING GRANT HC20,768             18,989             16,150             15,238             14,538             13,067             13,067             HC IS ALLOCATING  % OF  FUNDS TO ORGANICS 225‐3410‐0‐1‐00 CLEAN‐UP DAY FEES2,636               3,598               4,282               4,017               4,025               3,158               4,500               225‐3810‐0‐0‐00INVESTMENT INCOME182                  141                  244                  571                  50                    50                    50                    225‐3891‐0‐0‐00 MISCELLANEOUS REVENUE‐                        ‐                        ‐                        ‐                        ‐                        ‐                        ‐                        225‐3920‐0‐0‐00 TRANSFERS‐IN GENERAL FUND‐                        ‐                        ‐                        ‐                        ‐                        2,500               ‐                        TOTAL 23,586$          22,728$          20,676$          21,519$          20,307$          18,775$          17,617$          EXPENDITURES225‐4110‐00‐0000 REGULAR EMPLOYEE 6,143$             6,330$             7,259$             7,996$             8,319$             8,320$             8,319$             City Clerk ‐Counties reporting 225‐4111‐00‐0000 OVERTIME EMPLOYEE‐                        ‐                        ‐                        3                       ‐                        ‐                        225‐4121‐00‐0000 PERA461                  475                  544                  600                  624                  624                  624                  225‐4122‐00‐0000 FICA/MEDICARE470                  484                  555                  612                  637                  636                  636                  225‐4131‐00‐0000 INSURANCE HEALTH1,690               1,652               1,723               1,793               1,869               1,876               1,972               225‐4345‐00‐0001 RC ORGANICS PUBLIC EDUCATION‐                        ‐                        ‐                        ‐                        ‐                        ‐                        ‐                        225‐4345‐00‐0002 RC BULKY WASTE PUBLIC EDUCATION‐                        ‐                        ‐                        ‐                        ‐                        ‐                        ‐                        225‐4350‐00‐0000 NEWSLETTER COSTS4,557               5,756               6,243               7,558               7,711               10,034             ‐                        newsletter cost fully  paid by general fund in 2021225‐4435‐00‐0000CLEAN‐UP DAY COSTS 3,731               6,033               5,549               6,823               6,959               7,744               8,025               225‐4499‐00‐0000 MISCELLANEOUS EXPENSE‐                         ‐                         ‐                         ‐                         ‐                         ‐                        225‐4920‐00‐0000 TRANSFERS‐OUT‐                         ‐                         ‐                         ‐                         ‐                         ‐                        TOTAL 17,052$          20,729$          21,874$          25,384$          26,119$          29,234$          19,576$          NET CHANGE 6,534$            1,999$            (1,197)$           (3,865)$           (5,812)$           (10,459)$         (1,959)$           BEGINNING FUND BALANCE 11,792            18,326            20,325            19,128            15,262            15,262            4,803               ENDING FUND BALANCE 18,326$          20,325$          19,128$          15,262$          9,450$            4,803$            2,844$            RECYCLING FUND 32 Fiscal Year 2020ACTUAL ACTUAL ACTUAL ACTUAL BUDGET EST. ACTUAL BUDGET2016 2017 2018 2019 2020 2020 2021REVENUES230‐3360‐0‐0‐00 GRANT REVENUE‐$                      ‐$                      ‐$                      ‐$                      ‐$                      ‐$                     230‐3520‐0‐0‐00 FORFEITURES 9,810               4,400               12,964             11,205             2,750               1,500               2,750               230‐3810‐0‐0‐00 INVESTMENT INCOME 418                  302                  491                  1,435               425                  800                  425                  230‐3891‐0‐0‐00 MISCELLANEOUS INCOME‐                         ‐                         ‐                         ‐                         ‐                         ‐                        230‐3910‐0‐0‐00 SALE OF ASSETS‐                        ‐                        ‐                        230‐3920‐0‐0‐00 TRANSFER‐IN‐                        ‐                        ‐                        TOTAL 10,228$          4,702$            13,455$          12,640$          3,175$            2,300$            3,175$            EXPENDITURES230‐4221‐00‐0000 SUPPLIES‐ EQUIPMENT‐$                      ‐$                      ‐$                      ‐$                     15,000$           ‐$                     15,000$          230‐4226‐00‐0000 GENERAL SUPPLIES‐                         ‐                         ‐                         ‐                        552                   ‐                         ‐                        230‐4310‐00‐0000 EAST METRO SWAT MEMBERSHIP 2,903               3,253                ‐                         ‐                        4,000               4,000               4,000               230‐4341‐00‐0000 TRAINING‐                         ‐                         ‐                         ‐                         ‐                         ‐                         ‐                        230‐4499‐00‐0000 MISCELLANEOUS EXPENSE 857                  708                  1,454               3,170               1,000               1,000               1,000               230‐4530‐00‐0000 POLICE EQUIPMENT  PURCHASED‐                        2,817               5,715               ‐                        ‐                        ‐                        TOTAL 3,760$            6,778$            7,169$            3,170$            20,552$          5,000$            20,000$          NET CHANGE 6,468$            (2,076)$           6,286$            9,470$            (17,377)$         (2,700)$           (16,825)$         BEGINNING FUND BALANCE26,147            32,615            30,539            36,825            46,295            46,295            43,595            ENDING FUND BALANCE32,615$          30,539$          36,825$          46,295$          28,918$          43,595$          26,770$          FORFEITURE FUND33 Fiscal Year 2020ACTUAL ACTUAL ACTUAL ACTUAL BUDGET EST. ACTUAL BUDGET2016 2017 2018 2019 2020 2020 2021REVENUES240‐3440‐0‐0‐00 INSTRUCTOR FEES3,623$             1,934$             2,717$             490$                2,500$             645$                850$                240‐3891‐0‐0‐00 MISCELLANEOUS INCOME61                    ‐                        92                    250                  25                    75                    25                    TOTAL 3,684$            1,934$            2,809$            740$                2,525$            720$                875$                EXPENDITURES240‐4110‐00‐0000 REGULAR EMPLOYEE 1,260$             300$                600$                160$                1,000$             590$                750$                240‐4121‐00‐0000 PERA/FICA‐                         ‐                         ‐                         ‐                         ‐                         ‐                        240‐4225‐00‐0000 TRAINING SUPPLIES 2,062               1,026               635                   ‐                        750                  575                  600                  240‐4426‐00‐0000 GENERAL SUPPLIES‐                         ‐                         ‐                         ‐                        100                  100                  50                    240‐4499‐00‐0000 MISCELLANEOUS EXPENSE‐                         ‐                        TOTAL 3,322$            1,326$            1,235$            160$                1,850$            1,265$            1,400$            NET CHANGE362$                608$                1,574$            580$                675$                (545)$              (525)$              BEGINNING FUND BALANCE4,152               4,514               5,122               6,696               7,276               7,276               6,731               ENDING FUND BALANCE4,514$            5,122$            6,696$            7,276$            7,951$            6,731$            6,206$            FIRE EDUCATOR/TRAINING34 Fiscal Year 2020ACTUAL ACTUAL ACTUAL ACTUAL BUDGET EST. ACTUAL BUDGET2016 2017 2018 2019 2020 2020 2021REVENUES601‐3410‐0‐0‐00 RENTAL RECEIPTS (SCHOOL DISTRICT) 125,000$        127,500$        127,300$        127,300$        127,300$        127,300$        127,300$        127300 to 2021 then 157930 2022‐2026601‐3810‐0‐0‐00 INTEREST EARNINGS 859                  643                  787                  432                  425                  425                  425                  601‐3891‐0‐0‐00 MISC INCOME‐INSURANCE‐                         ‐                         ‐                         ‐                         ‐                         ‐                        601‐3920‐0‐0‐00 RENT TRANSFER 81,800             85,890             90,185             94,694             96,588             96,588             100,451          2022 budget to increase by 34,650TOTAL 207,659$        214,033$        218,272$        222,426$        224,313$        224,313$        228,176$        EXPENDITURES601‐4110‐00‐0000 CC REGULAR EMPLOYEE10,883$          30,234$          31,199$          32,291$          33,889$          32,701$          30,772$          INCLUDES ESTIMATED 2021 WAGE ADJUSTMENTS 601‐4111‐00‐0000 CC OVERTIME EMPLOYEE55                    167                  199                  588                  200                  200                  200                  INCLUDES ESTIMATED 2021 WAGE ADJUSTMENTS 601‐4121‐00‐0000 CC PERA882                  2,375               2,505               2,557               2,692               2,468               2,323               BASED ON CURRENT PERA FUNDING RATE 601‐4122‐00‐0000 CC FICA/MEDICARE897                  2,415               2,545               2,604               2,727               2,517               2,369               BASED ON ER 7.65% OF GROSS601‐4131‐00‐0000 CC INSURANCE HEALTH1,946               5,555               5,858               6,137               6,461               6,461               7,611               SPLIT 9.4% PREMUIM  INCREASE IN 2021601‐4135‐00‐0000 CC INSURANCE WC339                  1,347               700                  1,233               1,396               1,494               1,860               BASED ON 2020/2021 RENEWAL 601‐4226‐00‐0000CC GENERAL SUPPLIES2,579               2,403               1,732               6,027               1,802               5,700               6,150               2021 PROJECTED RUN RATE601‐4309‐00‐0000 CC CONTRACTED SECURITY MONITORING 42,976             ‐                        812                  60                    260                  541                  568                  2021 PROJECTED RUN RATE601‐4310‐00‐0000 CC RUGS AND REFUSE SERVICES3,816               3,764               3,468               4,514               3,716               3,690               3,846               2021 PROJECTED RUN RATE601‐4325‐00‐0000 CC COMMUNICATIONS 1,851               3,396               1,097               861                  910                  900                  950                  See communication spreadsheet601‐4340‐00‐0000 CC REPAIRS & MAINTENANCE 15,465             23,779             21,846             50,726             26,000             31,200             29,500             2021 PROJECTED RUN RATE601‐4381‐00‐0000 CC ELECTRIC & GAS UTILITIES 63,390             55,643             63,954             68,783             63,780             72,000             74,160             2021 PROJECTED RUN RATE601‐4365‐00‐0000CC INSURANCE PROPERTY / LIABILITY 3,686               3,545               4,369               4,778               4,752               4,752               4,752               BASED ON  RENEWAL INFORMATIONTOTAL 148,765$        134,623$        140,284$        181,159$        148,585$        164,624$        165,061$        NET INCOME 58,894            79,410            77,987            41,267            75,728            59,689            63,115            NET CHANGE IN ASSETS / LIABILITIES‐                       ‐                       ‐                       ‐                       ‐                       ‐                       TRANSFER TO BUILDING IMP FUND (25,000)           (85,890)           (90,185)           (94,694)           (96,588)            ‐                       (60,000)           BEGINNING FUND BALANCE 25,761            59,655            53,175            40,977            (12,450)           (33,310)           26,380            ENDING FUND BALANCE 59,655$          53,175$          40,977$          (12,450)$         (33,310)$         26,380$          29,494$          COMMUNITY SERVICE CENTER 35 Fiscal Year 2020 ‐ Estimated Actual1998‐2007 DS Funds2008 DS Fund2009 DS Fund2010 DS Fund2011 DS Fund 2012 DS Fund 2013 DS Fund 2014 DS Fund 2015 DS Fund 2016 DS Fund 2017 DS Fund 2018 DS Fund 2019 DS Fund 2019 DS Fund Combined Est.  Budget503/345 365 512 514 516 518 520 522 524 526 528 530 532 532 2020REVENUESSTREET IMPROVEMENT LEVY, LESS DLR420,310$       163,762$    180,611$     40,944$       71,800$       100,121$     117,984$     123,663$     166,454$     83,349$       173,296$   180,959$   103,950$   ‐$           1,927,203$          SPECIAL ASSESSMENTS32,900            ‐              17,490         4,458           11,435         19,091         15,469         19,438         26,608         19,681         32,709       41,657        ‐              ‐              240,936                INVESTMENT INCOME16,200            2,500          2,125           450              450              5,300           3,500           2,600           5,300           2,900           7,600         6,000          950             400             55,875                  OTHER‐                  ‐              ‐               ‐               ‐               ‐               ‐               ‐               ‐               ‐               ‐              ‐              ‐              ‐              ‐                           TOTAL REVENUES469,410          166,262      200,226       45,852         83,685         124,512       136,953       145,701       198,362       105,930       213,605     228,616     104,900     400             2,224,014             EXPENDITURESDEBT SERVICE:   PRINCIPAL635,000          145,000      160,000       ‐               ‐               145,000       115,000       130,000       160,000       90,000         150,000     145,000     ‐              ‐              1,875,000                INTEREST28,322            17,175        28,950         23,416         31,912         31,663         24,020         42,630         48,513         26,838         71,400       88,375        20,908       ‐              484,121                PAYING AGENT FEES2,500              450             250              400              250              150              550              450              450              450              ‐              ‐              450             ‐              6,350                    PROFESSIONAL SERVICE3,000              250             3,250           150              125              150              150              150              150              150              150             150             150              ‐              7,975                         TOTAL EXPENDITURES668,822          162,875      192,450       23,966         32,287         176,963       139,720       173,230       209,113       117,438       221,550     233,525     21,508       ‐              2,373,446             REVENUES OVER (UNDER) EXPENDITURES(199,412)$      3,387$        7,776$         21,886$       51,398$       (52,451)$     (2,767)$        (27,529)$     (10,751)$     (11,508)$     (7,945)$      (4,909)$      83,392$     400$           (149,432)$            (1)OTHER FINANCING SOURCES (USES)     CAPITALIZED INTEREST‐                  ‐              ‐               ‐               ‐               ‐               ‐               ‐               ‐               ‐               ‐              ‐              ‐              52,220       52,220                     PROJECT SAVINGS TRANSFERED IN‐                  ‐              ‐               ‐               ‐               ‐               ‐               ‐               ‐               ‐               ‐              ‐              ‐              ‐              ‐                           DLR TRANSFERS IN‐                  ‐              ‐               ‐               ‐               ‐               ‐               ‐               ‐               ‐               ‐              ‐              ‐              ‐              ‐                        TOTAL OTHER FINANCING SOURCES‐                  ‐              ‐               ‐               ‐               ‐               ‐               ‐               ‐               ‐               ‐              ‐              ‐              52,220       52,220                  NET CHANGE IN FUND BALANCE(199,412)$      3,387$        7,776$         21,886$       51,398$       (52,451)$     (2,767)$        (27,529)$     (10,751)$     (11,508)$     (7,945)$      (4,909)$      83,392$     52,620$     (97,212)$               FUND BALANCE ‐ JANUARY 1 20201,295,067      169,576      141,733       53,514         61,188         382,907       276,355       216,882       366,108       286,614       441,835     460,318     21,092       ‐              4,173,189             EST. FUND BALANCE ‐ DECEMBER 31 20201,095,655$    172,963$    149,509$     75,400$       112,586$     330,457$     273,588$     189,353$     355,358$     275,107$     433,890$   455,409$   104,484$   52,620$     4,075,977$          1) Deby Levy Reduction plan called for use of Fund BalanceSTREET IMPROVEMENT DEBT SERVICE FUNDS36 Fiscal Year 2021 ‐ Budget1998‐2007 DS Funds2008 DS Fund2009 DS Fund2010 DS Fund2011 DS Fund 2012 DS Fund 2013 DS Fund 2014 DS Fund 2015 DS Fund 2016 DS Fund 2017 DS Fund 2018 DS Fund 2019 DS Fund 2020 DS Fund Combined Est.  Budget503/345 365 512 514 516 518 520 522 524 526 528 530 532 534 2020REVENUESSTREET IMPROVEMENT LEVY, LESS DLR296,171$       150,966$    181,518$     68,859$       121,883$     142,802$     84,582$       122,028$     144,016$     76,956$       84,591$       102,067$   101,430$   235,830$    1,913,699$          SPECIAL ASSESSMENTS20,251            ‐              16,764         4,321           11,015         25,582         15,023         18,722         25,599         9,712           31,824         33,700        ‐              ‐               212,513                INVESTMENT INCOME14,250            2,000          1,975           725              925              4,775           3,100           2,425           4,175           3,275           5,325           4,975          775             1,729          50,429                  OTHER‐                  ‐              ‐               ‐               ‐               ‐               ‐               ‐               ‐               ‐               ‐               ‐              ‐               ‐                           TOTAL REVENUES330,672          152,966      200,257       73,905         133,823       173,159       102,705       143,175       173,790       89,943         121,740       140,742     102,205     237,559      2,176,641             EXPENDITURESDEBT SERVICE:   PRINCIPAL520,000          145,000      165,000       80,000         100,000       145,000       115,000       130,000       165,000       90,000         155,000       150,000     60,000       ‐               2,020,000                INTEREST17,037            14,275        24,075         21,000         28,800         28,762         22,583         40,030         45,263         25,037         66,825         82,475        37,800       52,220        506,182                PAYING AGENT FEES2,500              450             250              400              250              150              550              450              450              450              ‐               ‐              450             450              6,800                    PROFESSIONAL SERVICE3,000              250             250              150              125              150              150              150              150              150              150               150             150             150              5,125                         TOTAL EXPENDITURES542,537          159,975      189,575       101,550       129,175       174,062       138,283       170,630       210,863       115,637       221,975       232,625     98,400       52,820        2,538,107             REVENUES OVER (UNDER) EXPENDITURES(211,865)$      (7,009)$       10,682$       (27,645)$     4,648$         (903)$           (35,578)$     (27,455)$     (37,073)$     (25,694)$     (100,235)$   (91,883)$    3,805$       184,739$    (361,466)$            (1)OTHER FINANCING SOURCES (USES)   CAPITALIZED INTEREST‐                  ‐              ‐               ‐               ‐               ‐               ‐               ‐               ‐               ‐               ‐               ‐              ‐              ‐                           BOND FUND CLOSED AND TRANSFERED IN‐                  ‐              ‐               ‐               ‐               ‐               ‐               ‐               ‐               ‐               ‐               ‐              ‐                           PROJECT SAVINGS TRANSFERED IN‐                  ‐              ‐               ‐               ‐               ‐               ‐               ‐               ‐               ‐               ‐               ‐              ‐              ‐                           DLR TRANSFERS IN50,000            ‐              35,000         41,728         30,000         ‐               ‐               ‐               ‐               ‐               ‐               ‐              ‐              156,728                TOTAL OTHER FINANCING SOURCES50,000            ‐              35,000         41,728         30,000         ‐               ‐               ‐               ‐               ‐               ‐               ‐              ‐              ‐               156,728                NET CHANGE IN FUND BALANCE(161,865)$      (7,009)$       45,682$       14,083$       34,648$       (903)$           (35,578)$     (27,455)$     (37,073)$     (25,694)$     (100,235)$   (91,883)$    3,805$       184,739$    (204,738)$            FUND BALANCE ‐ JANUARY 1 20211,295,067      169,576      141,733       53,514         61,188         382,907       276,355       216,882       366,108       286,614       441,835       460,318     21,092       52,620        4,225,809             EST. FUND BALANCE ‐ DECEMBER 31 2021 1,133,202$    162,567$    187,415$     67,597$       95,836$       382,004$     240,777$     189,427$     329,035$     260,920$     341,600$     368,435$   24,897$     237,359$    4,021,071$          1) Deby Levy Reduction plan called for use of Fund BalanceSTREET IMPROVEMENT DEBT SERVICE FUNDS37 Fiscal Year 2020 ‐ Est. ActualEMERALD PARK HISP / MIRROR LAKE502536502/536311REVENUESTAX ABATEMENT/ LEASE REVENUE LEVY112,325$                (1)106,050$                   218,375$             341,602$             (1)ISD DEBT CONTRIBUTION‐                           ‐                               ‐                              ‐                        INVESTMENT INCOME2,500                       850                             3,350                    6,000                    OTHER‐ HISP GRANT‐                           ‐                              ‐                             ‐                           TOTAL REVENUES114,825$                106,900$                   221,725$             347,602$             EXPENDITURESDEBT SERVICE:   PRINCIPAL95,000                     85,000                        180,000                345,000                  INTEREST17,925                     11,850                        29,775                  35,690                  PAYING AGENT FEES115                          450                             565                        200                       PROFESSIONAL SERVICE250                          250                             500                        500                            TOTAL EXPENDITURES113,290                  97,550                        210,840                381,390               REVENUES OVER (UNDER) EXPENDITURES1,535$                     9,350$                        10,885$                (33,788)$              OTHER FINANCING SOURCES (USES)   CAPITALIZED INTEREST‐                                ‐                                   ‐                             ‐                                TRANSFERS IN‐                                ‐                                   ‐                             ‐                             TOTAL OTHER FINANCING SOURCES‐                                ‐                                   ‐                             ‐                             NET CHANGE IN FUND BALANCE1,535$                     9,350$                        10,885$                (33,788)$              EST. FUND BALANCE ‐ JANUARY 1 2020404,663$             599,328$             EST. FUND BALANCE ‐ DECEMBER 31 2020415,548$             565,540$             1) Deby Levy Reduction plan calles for reduced levyTAX ABATEMENT and LEASE REVENUE DEBT SERVICE FUNDSCOMBINED TAX ABATEMENTPUBLIC FACILITIES LEASE REVENUE 38 Fiscal Year 2021 ‐ BudgetEMERALD PARK HISP / MIRROR LAKE502536502/536311REVENUESTAX ABATEMENT/ LEASE REVENUE LEVY124,425$                104,160$                   228,585$             344,897$             (1)ISD DEBT CONTRIBUTION‐                           ‐                              ‐                             ‐                        INVESTMENT INCOME1,500                       850                             2,350                    4,500                    OTHER‐ HISP GRANT‐                           ‐                              ‐                             ‐                           TOTAL REVENUES125,925$                105,010$                   230,935$             349,397$             EXPENDITURESDEBT SERVICE:   PRINCIPAL100,000                  90,000                        190,000                355,000                  INTEREST15,000                     10,100                        25,100                  28,690                  PAYING AGENT FEES115                          450                             565                        200                       PROFESSIONAL SERVICE250                          250                             500                        500                            TOTAL EXPENDITURES115,365                  100,800                      216,165                384,390               REVENUES OVER (UNDER) EXPENDITURES10,560$                  4,210$                        14,770$                (34,993)$              OTHER FINANCING SOURCES (USES)   CAPITALIZED INTEREST‐                                ‐                                   ‐                             ‐                                TRANSFERS IN‐                                ‐                                   ‐                             ‐                             TOTAL OTHER FINANCING SOURCES‐                                ‐                                   ‐                             ‐                             NET CHANGE IN FUND BALANCE10,560$                  4,210$                        14,770$                (34,993)$              EST. FUND BALANCE ‐ JANUARY 1 2020415,548$             565,540$             EST. FUND BALANCE ‐ DECEMBER 31 2020430,318$             530,547$             1) Deby Levy Reduction plan calles for reduced levyTAX ABATEMENT and LEASE REVENUE DEBT SERVICE FUNDSCOMBINED TAX ABATEMENTPUBLIC FACILITIES LEASE REVENUE 39 THIS PAGE LEFT INTENTIONALLY BLANK 40 2021 PROPOSED BUDGET December 8, 2020 2021 BUDGET CALENDAR •January 16 & 17, 2020: Goal Setting, Financial Management and Planning •February 26, 2020: Adopted Strategic Plan including financial management and planning •March 31, 2020: Council work session to review proposed infrastructure improvement schedule and resulting 2021 Debt levy requirements •May -July:Staff Meetings with Department Heads –Discussion on 2021 Operating Budget and Capital Budgets 41 2021 BUDGET CALENDAR July 7, 2020:Council work session to review initial overall Property Tax Levy estimates and General Fund Budget August 25, 2020: Presentation of Proposed 2021 Budget & Property Tax Levy to the City Council September 8, 2020: Public Hearing to pass resolution setting the Preliminary 2021 Budget and Property Tax Levy December 8, 2020: Public Hearing for Presentation of 2021 Operating Budget and Levy with Public Input. Adoption of the 2021 Operating Budget and Property Tax 2021 BUDGET PARAMETERS •Budgeted City revenues are determined by: •Using current run rates for revenue sources subjected to trends •Conservative baseline estimates are used for re-occurring aids and charges for services •Expenses budgeted at amounts that will maintain present level of City services •Liquor transfers are based on current operating results 42 PATH TO THE 2021 TAX LEVY Cost of Services Less Operational Revenues Leaves a Funding Gap, Which Equals Levy Need Cost of City Services: $7,816,147 Police, Fire, Public Works, Parks, Emergency Management, Finance Administration and HRAOperating FundsCity Revenues Generated: $2,863,933 Licenses and Permits Intergovernmental Aids, Charges for Services, Fines, Reimbursements and Transfers Gap: $4,952,214 Levy Amount $4,952,214 PATH TO THE 2021 TAX LEVY Replacement Costs Less Generated Revenues Leaves a Funding Gap, Which Equals Levy Need Capital Improvement* Annual needs range from $200,000 -$850,000 based on timing of replacement. Buildings Maintenance & Equipment Replacement: $200,000 - $850,000* City Buildings, Fleet, Snow Plows, Fire Engines, Equipment, Technology, Park Shelters and City Infrastructure City Revenues Generated: $220,500 Transfers, Equipment Sales, Park Dedication Fees, Grants, Fees Gap: $426,200* Levy Amount $426,200 * Gap determined by monitoring fund balance annually to maintain a 15 year replacement plan. 43 PATH TO THE 2021 TAX LEVY Debt Payments Less Debt Reduction Resources Leaves a Funding Gap, Which Equals Levy Need Debt LevyLevy Amount $2,487,181 Gap: $2,487,181 2020 Debt Service Obligations: $3,023,856 Street and Utility Reconstruction, Flood Mitigation, Parks and City Facilities Debt Levy Reduction Program Resources: $536,675 Municipal State Aid, Excess Bond Funds, Project Savings, Stormwater Fees Total Levy Amount $7,865,595 GENERAL FUND AND LEVY 2020 2021 Increase General/HRA $4,756,077 $4,952,214 $196,137 Debt Service $2,487,181 $2,487,181 $0 Capital/Building/Infrastructure Improvements $366,200 $426,200 $60,000 Overall Levy $7,609,458 $7,865,595 $256,137 Total Percent Change 3.37% 44 OVERALL LEVY BY FUND TYPE General & HRA Operating, 63% Debt Service, 32% Capital & Building Improvements, 5% 2021 GENERAL FUND REVENUES Tax Levy 63% Licenses, Permits, & Fines 5% Intergov't Revenue 13% Contracts 13% Miscellaneous 3% Transfers 3% 45 2021 GENERAL FUND EXPENDITURES Administration 11% Finance 4% Police 48% Fire 16% Public Works 11% Parks 4% All Other 6% 2021 BUDGET -COST DRIVERS •Personnel costs: 70.6% of expenditures, overall costs up $167,990 or 3.2% ( wages representing 2.2% and health insurance 1%) Union wage increases at 2021 estimated settlement amounts. 9.32% Health Insurance premium increase shared 50% Employee/Employer Union’s scale steps and longevity costs 46 2021 BUDGET -COST DRIVERS •Contracted services: 11% of expenditures, overall costs up $47,794 Contracted Information Technology costs up $21,030 Ramsey County Elections Contract up $11,800 Assessor, Attorney, Auditor, Engineer, Inspector and Planner services up $4,222. Engineering costs for small scale improvement will be an Infrastructure Fund expense in 2021 Miscellaneous service contracts are estimated to increase by $9,596 •Insurance costs: 4.5% of expenditures, overall higher by $56,316 Worker’s Compensation and Property and Liability coverages have experienced rating increases in the prior and current renewal periods beyond budget estimates 2021 BUDGET -COST DRIVERS •Pass through costs: 2.3% of expenditures, costs down $138,032, decrease primarily due to: State Aid for the Fire Relief Association will go directly from the State to PERA in 2021, budgeted at $52,083 in 2020 City of New Brighton gasoline sales end in January 2021, along with lower purchase by the ISD 282 and MWMO sales decrease of $79,813 •Remaining budget line items combined total $883,454 or 11.5% of expenditures, net costs down $88,259 or 9.1% This decrease is due to the $35,000 in annual street sealcoating expense will be an expenditure of the Infrastructure Fund beginning in 2021 Additionally, lower fuel costs, less grant related expenditures and miscellaneous reductions in activities make up the balance of the decrease 47 2021 BUDGET -OTHER FACTORS •Liquor transfer to the General Fund remains at $250,000 for 2021 •2021 State funded Local Government Aid has increased by $30,833 •Police contracted services has increased by $26,147 •Excess Tax Increment collections are projected to decrease by $63,886 in 2021 •General Fund investment earnings are expected to decline by $10,500 in 2021 PROPERTY TAXES 2021 Category Amount County $1,261.18 City $2,118.59 School $1,802.09 Other Districts 374.73 Total $5,556.59 •Median Single Family Home Value of $338,000 48 2021 PROPERTY TAX DISTRIBUTION 7%Parks HRA Rail Museum 38% 32% 23% DISTRIBUTION OF CITY TAXES Category Amount General Fund Levy $1,313.66 Roads $528.73 Public Facilities $95.29 Capital Improvements $117.75 Tax Abatement $63.16 Total $2,118.59 •Median Single Family Home Value of $338,000 49 GENERAL FUND SUPPORTS CITY SERVICES $553 $127 $166 $240 $64 $60 $103 $1,313 -Annually $109 -Monthly ISSUANCE OF 2020A G.O. BONDS •2020A General Obligation Bonds -$3,000,000 Street Reconstruction and Utilities replacement 32nd Avenue -from Rankin Road to Croft Drive Croft Drive –from 32nd Avenue to 31st Avenue Silver Lake Terrace Mill and Overlay Silver Lane –from Stinson Boulevard to Silver Lake Road •In 2021 the median value home’s property taxes will be $57.26 monthly for road, utility, parks and facility improvements 50 IMPACT OF DEBT LEVY RELIEF •Overall levy increase without DLR: 10.42% •With debt levy relief: 3.37% increase 1,000,000 1,500,000 2,000,000 2,500,000 3,000,000 3,500,000 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 SUMMARY OF 2021 BUDGET •General Fund operating budget totals $7,651,785, supported by a property tax levy of 4,754,650 •Personnel costs represent 70.6% of General Fund expenditures: •Costs up $167,990 or 3.2% •Insurance expenditures up $56,318 •Contracted services up $47,794 •Increase in Local Government Aid $30,833 •Capital Funds levies increased by $60,000 •Increase in all levies totals $256,137 or 3.37% 51 QUESTIONS?Call Finance Director: Shelly Rueckert 612-782-3316 52 CITY OF ST. ANTHONY VILLAGE STATE OF MINNESOTA RESOLUTION 20-088 A RESOLUTION SETTING THE FINAL 2021 TAX LEVY AND ADOPTING THE 2021 BUDGET DOCUMENT FOR THE CITY OF ST. ANTHONY VILLAGE WHEREAS, Minnesota State Law requires that the City of St. Anthony Village provide Hennepin and Ramsey Counties with a final 2021 certified property tax levy and WHEREAS, the City Council discussed key financial issues and budgeting goals at the January 2020, goal setting session; and March 31st work session reviewing existing infrastructure improvement schedule and 2021 Debt Levy; and a July 7th work session to the initial 2021 Budget and Property Tax Levy estimates, public meetings were held August 25th and September 8th for public input on the 2021 budget and property tax levy, the 2021-2037 Capital Improvement Budgets were reviewed at the October 26th work session and approved at the November 10th Council meeting, WHEREAS, the allowed Debt Levies will be reduced by $614,910 based on sufficient funds; and WHEREAS, the City Council held the required Truth in Taxation meeting on Tuesday, December 8, 2020, 7:00 P.M. in its Council Chambers, to discuss the 2021 budget and property tax levy with the residents of St. Anthony Village; and WHEREAS, the information required for the City Council to determine a Final 2021 property tax levy has been collected NOW, THEREFORE, BE IT RESOLVED that: 1) The Final 2021 Property Tax Levy is: General Operating Levy $4,754,650 Capital Improvement Project Levy $ 283,200 Road Improvement Levy $1,913,699 Lease Revenue Bonds $ 344,897 Housing and Redevelopment Authority Levy $ 197,564 Tax Abatement Levy $ 228.585 Building Improvement Levy $ 83,000 Infrastructure Levy $ 60,000 Total $7,865,595 2) The 2021 General Fund operating budget of $7,651,785 (based on 2021 General Fund expenditures) will be adopted as the final operating budget. 53 Adopted this 8th day of December, 2020. _________________________________ Randy Stille, Mayor ATTEST: _________________________ Nicole Miller, City Clerk Reviewed for administration: _________________________________ Charlie Yunker, Interim City Manager 54 3301 Silver Lake Road, St. Anthony, Minnesota 55418-1699 Office: (612) 782-3301 • Fax: (612) 782-3302 • www.savmn.com Our Mission is to be a progressive and welcoming Village that is walkable, sustainable and safe. NOTICE OF A PUBLIC HEARING Notice is hereby given that on December 8, 2020 at 7:00 p.m. at City Hall, 3301 Silver Lake Road the Saint Anthony Village City Council will hold a public hearing regarding the 2021 City & HRA Budgets and Final Levy Certification. Oral testimony will be accepted on the above subject at this meeting. Written comments may be taken at the St. Anthony Village City Hall, 3301 Silver Lake Road, St. Anthony Village, Minnesota 55418 until the date of the hearing. If you have any questions, please contact the Finance Director at 612-782-3316. Shelly Rueckert Finance Director Published: November 16, 2020 55 THIS PAGE LEFT INTENTIONALLY BLANK 56 MEMORANDUM To: Mayor Stille and St. Anthony Village City Council Charlie Yunker, Acting City Manager From: Stephen Grittman, City Planner Date: City Council Meeting – December 8, 2020 NAC Project No. 323.01 - 20.14 Request: Request for a Final Plan Planned Unit Development – Stinson Apartments Property Address: 3725 Stinson Boulevard Property PID: 313023330209 STAFF RECOMMENDATION Staff reviewed the Preliminary Plan project for land use compliance with the intent and policies of the City’s Comprehensive Plan, and for zoning consistency with the R-4, Multiple Family Residential District as a baseline. The Comprehensive Plan promotes high density multiple family residential uses of up to 40 units per acre upon the subject site. In this report, staff reviews the submitted materials for Final Plan PUD against the comments and conditions made of the Preliminary Plan PUD approval granted by the City Council this fall. The Final Plan PUD proceeds directly to the City Council for consideration, and does not require a separate Planning Commission review or public hearing. As noted in the Preliminary PUD, the project meets the requirements of the Zoning Ordinance for the majority of the baseline standards. The principal areas of flexibility which have been requested under the PUD include the following: 1) Residential Density. The allowance of a residential density greater than 40 units per acre upon the subject site. Specifically, a density of 44.7 units per acre is proposed (38 units on 0.85 acres of land). For comparison purposes, the baseline R-4 zoning district allows up to 25 units per acre without PUD flexibility. 57 December 8, 2020 Page 2 2) Side Yard Setback. A side yard setback less than 30 feet. The City’s R-4 District imposes a 30-foot building setback requirement along side yards, which are adjacent to public rights-of-way. A 20-foot setback is proposed on the north side of the apartment building (along 38th Avenue NE). 3) Parking Supply. A parking supply of less than 2 spaces per unit as imposed in the R-4 zoning district. A total of 46 parking spaces are proposed which results in a ratio of 1.2 spaces per unit. This number is equal to the total number of bedrooms proposed in the project. 4) Covered (Enclosed) Parking. The allowance of no covered (enclosed) parking stalls. The City’s R-4 District standard requires at least half of all parking stalls to be covered/enclosed. 5) Impervious Surface Coverage. The allowance of impervious surface coverage, which exceeds 50 percent of the area of the site (as imposed in the R-4 zoning district). The proposed site plan calls for 76.7 percent of the site to be devoted to impervious surface. Preliminary Plan Action. The Council will recall that the Planning Commission considered this item at its August 16th meeting as a part of a public hearing on the request. A motion to approve the item was seconded, but failed to prevail, with the vote split at 2 in favor, 2 opposed, and 3 members abstaining. The Planning Commission declined to take up a second motion, and forwarded the application to the City Council without a final recommendation. The City Council voted to approve the Preliminary PUD, with the original staff recommended conditions. Consideration of adding regulatory controls for affordability was discussed, but not included in the Council’s final action. Staff Recommendation. Since the City Council’s Preliminary Plan approval, the applicant has submitted updated exterior plans, reflecting consistency with the requirements of the Preliminary PUD approval. The standard of review for Final Plan consideration is whether the proposed Final Plan submittals comply with the terms of the Preliminary Plan approval. Staff believes that those conditions have been met, pending final plan checks prior to permitting. As such, staff recommends approval of the Final Plan PUD with the noted conditions. 58 December 8, 2020 Page 3 GENERAL INFORMATION Applicant: Interstate Development Owner: Apache Redevelopment, LLC Location: 3725 Stinson Boulevard Existing Land Use Vacant Zoning: PUD, Silver Lake Village PUD Surrounding Land North: Multi-family housing, zoned PUD Use / Zoning: South: Restaurant, zoned PUD East: Multi-family housing, zoned PUD West: Multi-family housing (City of Columbia Heights) Deadline for Agency Application Complete Date: November 17, 2020 Action: 60 Days: January 16, 2021 Letter Sent: NA 120 Days: March 17, 2021 ANALYSIS Background. The applicant is proposing to construct a three-story, 38-unit apartment building upon a vacant, 0.85-acre site located south of 38th Avenue Northeast and east of Stinson Boulevard. Of the 38 proposed units, 30 are to be one-bedroom and 8 are to be two-bedroom. According to the applicant, the apartment units are intended to target renters who wish to live in “new construction” but cannot afford rents associated with typical luxury apartments. In this regard, the target resident profile for the proposed apartment building project is an annual household income starting in the low to mid $40,000 range. The applicant has indicated that the apartment building will incorporate several features, which are common in luxury apartment developments. These features include the following: • Quality exterior finishes (cement board and brick veneer siding) • Quality interior fixtures, flooring, cabinetry and countertops (solid surface) • Ceilings which measure 9 feet in height • In-unit washers and dryers 59 December 8, 2020 Page 4 The subject site is zoned PUD, Planned Unit Development. Within PUD zoning districts, uses and development parameters/requirements are specified in a PUD development agreement. Planned Unit Development Purpose. In consideration of PUD applications, it is important that the purpose of planned unit development be considered and that a determination be made that such purpose will be fulfilled. Generally speaking, planned unit development is intended to allow a mixture of uses and/or flexibility from the strict terms of the Zoning Ordinance in return for higher site and building design standards than what would otherwise be allowed. A PUD should be found to do a better job of meeting the City’s land use goals than what could otherwise be accomplished with a straight zoning-compliant project. The Preliminary Plan approval provided that finding. The Final Plan submission is required to demonstrate compliance with the terms of the Preliminary Plan conditions. 60 December 8, 2020 Page 5 Existing PUD. While the subject site lies within the boundaries of the Silver Lake PUD (approved in 2004), the PUD does not include an approved conceptual development plan for the subject site. In this regard, no modifications to the original terms of the PUD approval or the processing of a PUD amendment are necessary. Comprehensive Plan Land Use Plan. The Land Use Plan included in the 2040 Comprehensive Plan directs high-density residential use of the subject site. The Plan also establishes a desired density range of 20 to 40 units per acre for high-density residential development. Proposed Residential Density. The applicant has proposed a residential density of 44.7 units per acre (38 dwelling units/0.85 acres) which exceeds the density range directed by the City’s draft 2040 Plan. As previously indicated, the applicant has requested flexibility from this density directive via the PUD. The City Council and Planning Commission were supportive of the idea of allowing the proposed development to utilize dwelling unit / development density rights, which were afforded other sites in the Silver Lake PUD but were not used. Densities in the Silver Lake PUD vary widely, and there is little remaining land to develop. Capping the project at 40 units per acre would result in a unit count of 34 units. As such, the increase proposed by the applicants is a total of 4 units over the cap. Averaging this unit count over the larger district would result in an insignificant impact to the PUD density. Affordable Housing. The housing aspect of the project potentially raises the issue of affordability. The City’s Comprehensive Plan identifies several aspects of affordability and density. The Plan notes that for existing housing stock, St. Anthony Village provides a greater ratio of affordable housing, a greater ratio of rental housing, and a greater ratio of multiple family housing that the metropolitan area in general. This is also true for most aspects of affordability when compared to nearby suburban communities. With regard to planned housing and affordability, the Metropolitan Council assigned (as a part of the 2040 Plan Update process) an allocation for 152 additional “affordable” units to St. Anthony for the 2021-2030 decade. The Plan accommodates this allocation with land designated for affordable residential development of more than 460 units. The proposed apartment project serves to implement the City’s Land Use Plan, which directs high-density residential uses upon the subject site. In this regard, the project provides a potential “opportunity” for additional affordable housing units in the City. Moreover, it is worthwhile noting that this supply of affordable units would be provided without need for public subsidy. Preliminary Plan PUD – conditions of approval. The following conditions were attached to the City Council’s Preliminary Plan approval: 61 December 8, 2020 Page 6 1. Access-related issues shall be subject to comment and recommendation by the City Engineer. The Engineer has approved the access design, subject to final review. 2. In recognition of other development sites within the Silver Lake PUD which were developed at densities less than 40 units per acre, the City finds the proposed residential density (44.7 units per acre) to be acceptable. The Preliminary Plan approval included this finding. 3. The City finds that the proposed 20-foot building setback along 38th Avenue NE will not negatively impact adjacent properties and is therefore considered acceptable (within the context of the PUD). The Preliminary Plan approval included this finding. 4. The City finds that the proposed parking supply (and the deficit based on Ordinance requirements) is adequate to serve the parking demand generated by the proposed apartment building. The Preliminary Plan approval included this finding. 5. The City finds that the limited size of the subject and target tenant base justify an off- street parking supply, which does not include covered spaces (within the context of the PUD). The Preliminary Plan approval included this finding. 6. In consideration if the limited site size and previous site development conditions, the City finds the proposed impervious surface coverage of 76.7 to be acceptable. The Preliminary Plan approval included this finding. It is further noted that the City Engineer and the Watershed District will continue to monitor construction permitting to manage this aspect of the project. 7. Impacts associated with the proposed impervious surface coverage shall be subject to comment and recommendation by the City Engineer. See comment for Item 6. 8. As part of the Final PUD Plan submission, a lighting plan be submitted for review, which demonstrates compliance with City requirements. A lighting plan has been submitted that meets this condition. The City’s nuisance code specifies a maximum of 1.0 footcandles of light at the property line – the proposed plans show less than this (and mostly 0 footcandles) around the property. 9. As part of the Final PUD Plan submission, a signage plan be submitted for review, which demonstrates compliance with City requirements. The applicant has submitted a signage plan consisting of a single “Blade Sign” along the west (Stinson) frontage – a total of approximately 28 square feet. This sign is within the allowances for wall signage in the R-4 District. 10. As part of the Final PUD Plan submission, details shall be provided related to the proposed trash enclosure design. The updated plans show a trash enclosure to be 62 December 8, 2020 Page 7 constructed of concrete block, covered with fiber cement siding and aluminum doors. This should be specified to match the colors of the fiber cement and trim on the principal building. 11. Issues related to grading, drainage, stormwater management and utilities shall be subject to comment and recommendation by the City Engineer. Those reviews will continue through final permitting. 12. The applicant enter into a PUD agreement with the City and post all the necessary securities required by it. Staff will work with the City Attorney’s office on the any agreements necessary to document the terms of the PUD in addition to the Council’s resolution and PUD District Amendment Ordinance, attached. The Ordinance amends the Silver Lake PUD District by referring to this Final Plan approval, and defaults to the R-4 District for other related baseline standards if applicable. 13. Consideration of comments of other City Staff. At this point, additional staff comment would apply to construction and permitting documents. SUMMARY AND STAFF RECOMMENDATION • Final Plan PUD, including: o Amendment to Silver Lake Village (Stinson Apartments) PUD Zoning Ordinance Amendment o PUD Development Agreement Staff recommends approval with the following conditions: 1. The applicant enters into the PUD Development Agreement and provides the securities required by it as directed by the City Attorney. 2. The Conditions noted as a part of the Preliminary Plan PUD approval (cited herein) are verified as having been met, including the submission of revised plans necessary to demonstrate compliance prior to construction permitting. 3. All documents are recorded as may be required. 4. Any substantive changes to the plans or relevant documents, as determined by the City Manager, may require resubmission and revised City Council action. This recommendation is based on a finding that the proposal, with the conditions cited, is consistent with the requirements for PUD consideration, with the long-term objectives of the Silver Lake Village PUD, and with the recommendations and policies of the St. Anthony Comprehensive Plan. ATTACHMENTS Exhibit A: Location map Exhibit B: Application and Supporting Material 63 THIS PAGE LEFT INTENTIONALLY BLANK 64 65 66 July 23, 2020 67 6390 Carlson Drive | Eden Prairie, MN 55346 | 651.406.8050 | www.interstatedevelopment.com July 22, 2020 RE: PUD Amendment Application Project Narrative – Stinson Apartments, St. Anthony, MN Interstate Development, an Eden Prairie based development company, in partnership with Belden River Properties, a St. Anthony based real estate company, are under contract to purchase a 0.85 acre site at 3725 Stinson Blvd, St. Anthony, MN. The partnership intends to develop an exciting new 38-unit multi- family project on this last vacant parcel of Silver Lake Village (the “Project”). The lot has sat vacant since 2006 after the demolition of the former use as a gas station/car wash. As the Project is within the Silver Lake Village PUD, we are anticipating going through a Preliminary and Final PUD Amendment process. The Project site is located at the southwest intersection of Stinson Blvd and 38th Ave NE. It is bordered by 1960’s vintage 3-story apartments to the west (in Columbia Heights), a car wash to the north, the Silver Lake Village apartment community to the east, and the Unofficial restaurant/bar to the south. The same development partnership that is planning to build this Project is also the owner of the Unofficial parcel (land and improvements). The business owner of the Unofficial restaurant is fully supportive of this Project as he recognizes the additional residents will expand his customer base as well as that of the other retail in Silver Lake Village. The Development team at Interstate and Belden River are excited about this Project as we both see the need for not just more housing but for housing that most residents in St. Anthony can afford. The price of new construction has skyrocketed the past five years which has led to most new construction having to target the higher-end demographic or the low-income demographic using tax credit financing. Our Project is targeting the renter that wants to live in new construction but can’t quite afford the typical luxury new development rents but also do not qualify for affordable housing. Our targeted resident profile will have household income starting in the low to mid-$40K range. The Project will have the same first-class finishes found in the new luxury developments with quality fixtures, flooring, cabinetry, solid surface countertops, 9-foot ceilings, and in-unit washer/dryers. The exterior design will also be of quality materials including large windows, cement board and brick veneer siding, and is comparable to the other multi-family projects in Silver Lake Village. The way that our Project can still deliver quality design and finishes yet target rents $200 to $300 below other new luxury developments are the intentional small and efficient floor plan layouts and the use of modular construction. Modular construction uses the same wood-frame construction techniques used by traditional builders, however, 90% of the construction is built offsite in a controlled factory. This leads to better quality control, reduced waste, and a shorter construction window, which all contribute to an overall lower development cost. The Project will consist of 38 units, 79% one bedrooms and 21% two bedrooms. The Project will be three stories over a concrete foundation. The site will have 46 parking spaces, one per bedroom, all of which will be surface parking. The project will have controlled access with a package room for deliveries and a lobby and outdoor patio for resident’s communal use. 68 6390 Carlson Drive | Eden Prairie, MN 55346 | 651.406.8050 | www.interstatedevelopment.com Some of the project elements we have incorporated in our Project are a slight departure from current city zoning guidelines. Although the site is guided as high-density residential, the small in-fill location of the Project requires these variances to make the development economically viable. As the project is already located within a PUD, we are seeking the city’s approval of these elements within the flexibility of the PUD. The main project elements needing PUD flexibility are as follows: 1) Density - The 2040 Comprehensive Plan for St. Anthony has designated the Project site as high- density residential at up to 40/units an acre. At 0.85 acres, the guidelines would limit the Project density to 34 units. Under our Project application, we are requesting a density transfer within the PUD that would allow us to build 38 units which is equivalent to 44.7 units per acre. The higher density is necessary to reduce the per unit project development and operating costs. 2) Parking – Current R-4 parking code requires two parking spaces per multi-family unit. Under our Project application, we are showing a total of 1.2 spaces per unit for a total of 46 spaces, all of which will be uncovered. Based on research from the Institute of Transportation Engineers (ITE) in the 5th edition of their Parking Generation Manual, the average demand generated for a suburban 3-story apartment project would have average peak parking demand of 1.31 spaces per unit. ITE also publishes average peak demand per bedroom as they do recognize that a project of one bedroom units (the Project is 79% one bedrooms) will have a lower parking demand than a project of two or more bedroom units. ITE projects the parking demand for a suburban apartment project with 95% confidence to be 0.80 spaces per bedroom, which would generate a demand much lower than the 1 space per bedroom supplied within the Project. When looking at both ITE calculations together, we feel comfortable the Project has a sufficient number of parking spaces to meet demand. If we are short of parking, as owners of the retail parcel to the south with an abundance of parking available, we will ensure the parking demand could be satisfied without the need for on-street parking. The other departure from parking code we are seeking flexibility on is the removal of the requirement of half of the parking to be covered. Due to this small in-fill location and our mission to create housing the majority of residents could afford, building a parking deck is not financially feasible. In addition, due to the modular construction design, we could only get a max of 18 parking spaces within the deck which falls well short of the parking code of 38 covered spaces. With covered parking spaces renting for $75/month at other communities, our total rents at our project will be that much further lower than our competition. Yes, we will lose some potential renters that want covered parking, but there are plenty of options for those residents to choose from in the neighboring apartment communities. However, we are confident that the first-class finishes we are offering and at a reasonable rent will be attractive enough for residents to be comfortable with the slight inconvenience of uncovered parking through the winter months. 3) Impervious Surface – The current R-4 standard for impervious surface area is 50%. Under our project application, our impervious surface area is projected to be 76.7% (0.65 acres of impervious surface area of the 0.85-acre site). Although this site had a similar impervious 69 6390 Carlson Drive | Eden Prairie, MN 55346 | 651.406.8050 | www.interstatedevelopment.com surface percentage under its former use as a gas station/car wash, since that use was demolished in 2006, the current impervious area is now 0.34 acres (40%). The Project will be an increase of these current levels of 0.31 acres of impervious surface area. Our civil engineer has been working on a storm water management plan and has begun conversations with the Rice Creek Watershed agency. Based on initial design work, we are confident our Project’s storm water management plan will satisfy both the watershed agency and the city of St. Anthony. Although we are asking for some PUD flexibility around these key project elements, we feel the Project fits perfectly within the PUD and is consistent with the themes residents of St. Anthony shared during the development of the 2040 Comprehensive Plan as outlined in the Housing section and are noted in bold italics below: • Overwhelming positivity for the “small town feel” of St. Anthony. These small in-fill apartment projects are a nice alternative to the self-contained, massive apartment developments that are increasingly becoming the norm. • Balance the need for housing redevelopment and property improvements with the need to maintain an affordable housing stock. The targeted rental rate is comparable to rent charged at older projects that have been renovated. The Project will add new multi-housing stock at these attractive rents without diminishing the supply of the naturally occurring affordable housing that occurs when these older projects are redeveloped. • There is an interest in increasing housing density in strategic locations (along transit routes or in underutilized areas). The Project is delivering high-density residential housing along a major transit route on Stinson Blvd. • Being inviting to new residents will keep the community vibrant. We believe the Project’s low price point for new construction and its attractive finishes and design will attract new residents to St. Anthony. • The City has housing for all types of families, households and residents at all stages of their lives. We believe the Project is offering a product type not being served by the other communities in the PUD, which are larger and heavily amenitized including covered parking. We are trying to create a modern, boutique living environment at a low price point that we feel will be attractive to a younger demographic early in their careers. • Prioritize mixed uses and allowing housing to co-occur within proximity to services, businesses, and critical infrastructure. The Project completes the Silver Lake Village PUD as it is the last remaining vacant parcel and will help bring additional customers to the struggling retail that has been hit hard by the pandemic. We look forward to working with the city of St. Anthony to further this Development Plan submittal. Sincerely, Michael Holst Interstate Development 70 STINSON APARTMENTS ST. ANTHONY, MINNESOTA PROJECT TEAM OWNER LAND USE APPLICATION OWNER CONTRACTOR Currently Un-named ARCHITECT DJR Architecture, Inc. 333 Washington Avenue N Union Plaza, Suite 210 Minneapolis, MN 55401 Contact: SCOTT ENGLAND 612.676.2720 612.676.2727 (fax) SENGLAND@djr-inc.com STRUCTURAL MECHANICAL & ELECTRICAL CIVIL INTERSTATE DEVELOPMENT 6390 Carlson Drive Eden Prairie, MN 55346 Contact: MICHAEL HOLST 952.658.6443 MHOLST@interstatedevelopment.com DESIGN TREE ENGINEERING + LAND SURVEYING 3339 W. Germain St. Suite 250 St. Cloud MN 56301 Contact: DAN FOLSOM, PE 320.227.0202 DJF@dte-ls.com Currently Un-named Currently Un-named LANDSCAPE ARCHITECT RINGDAHL ARCHITECTS, INC. 510 22nd Avenue East Suite 102 Alexandria, MN 56308 Contact: DUSTIN TOMOSON 320.763.9368 DUSTIN@ringdahlarchitects.com STANDARD PARKING 44 STALLS ACCESSIBLE PARKING 2 STALLS TOTAL 46 STALLS SURFACE PARKING Copyright 2020 DJR Architecture, Inc. G001 COVER SHEET ST. ANTHONY, MN 3725 STINSON BLVD 20-034 10/19/2020 LAND USE APPLICATION SHEET INDEX Sheet Number Sheet Name GENERAL G001 COVER SHEET ARCHITECTURE A110 FLOOR PLAN - LEVEL 1 A120 FLOOR PLAN - LEVEL 2 & 3 A150 ROOF PLAN A200 EXTERIOR ELEVATIONS Area Schedule Name Level Count Area CIRCULATION LEVEL 1 1 623 SF LOBBY LEVEL 1 1 604 SF MECH/ELECT LEVEL 1 1 360 SF STAIR LEVEL 1 2 334 SF UNIT 1A LEVEL 1 1 517 SF UNIT 1B LEVEL 1 9 4,665 SF UNIT 2A LEVEL 1 1 1,045 SF UNIT 2B LEVEL 1 1 868 SF LEVEL 1 9,017 SF CIRCULATION LEVEL 2 1 711 SF STAIR LEVEL 2 2 335 SF UNIT 1B LEVEL 2 10 5,194 SF UNIT 2A LEVEL 2 1 1,045 SF UNIT 2B LEVEL 2 2 1,744 SF LEVEL 2 9,030 SF CIRCULATION LEVEL 3 1 711 SF STAIR LEVEL 3 2 335 SF UNIT 1B LEVEL 3 10 5,194 SF UNIT 2A LEVEL 3 1 1,045 SF UNIT 2B LEVEL 3 2 1,744 SF LEVEL 3 9,030 SF Grand total 27,077 SF UNIT SCHEDULE Name Count Area UNIT 1A 1 517 SF UNIT 1B 29 15,053 SF UNIT 2A 3 3,136 SF UNIT 2B 5 4,357 SF Grand total 38 23,063 SF 71 UP UP STINSON BLVD33'-4"5'-0"33'-4"SPRINKLER ROOM MAIL 126'-10" 5"16'-0"15'-8"15'-8"15'-8"15'-8"15'-8"15'-8"16'-0"5" A200B3 A200 D2 A200 D1 A200 F3 1 2 3 4 5 6 8 9 A B C D E F5"22'-5"10'-6 1/2"5'-9"10'-6 1/2"22'-5"5"UNIT 2A 101 UNIT 1A 103 UNIT 1B 105 UNIT 1B 107 UNIT 1B 109 UNIT 1B 111 MECHANICAL / ELECTRICAL 125 UNIT 1B 112 UNIT 1B 110 UNIT 1B 108 UNIT 1B 106 UNIT 1B 104 UNIT 2B 102 LOBBY/AMENITY 120 STAIR A 121 CORRIDOR 123 STAIR B 124 SETBACK BOUNDARY PROPERTY LINE TRASH ENCLOSURE 18'-8"12'-0" 38TH AVE. NE 40'-0"30'-0"20'-0"30'-0"72'-6"PACKAGE ROOM 517 SF 517 SF 517 SF 517 SF 517 SF 517 SF 528 SF517 SF517 SF517 SF868 SF528 SF 1,045 SF 360 SF Copyright 2020 DJR Architecture, Inc. A110 FLOOR PLAN -LEVEL 1 ST. ANTHONY, MN 3725 STINSON BLVD 20-034 10/19/2020 LAND USE APPLICATION 1/8" = 1'-0"A1 FLOOR PLAN -LEVEL 1 N 72 UP UP DN DN A200B3 A200 D2 A200 D1 A200 F3 1 2 3 4 5 6 8 9 A B C D E F UNIT 2A 201 UNIT 1B 203 UNIT 1B 205 UNIT 1B 207 UNIT 1B 209 UNIT 2B 211 UNIT 1B 212 UNIT 1B 210 UNIT 1B 208 UNIT 1B 206 UNIT 1B 204 UNIT 2B 202 UNIT 1B 200 STAIR A 222 STAIR B 224 CORRIDOR 223 33'-4"5'-0"33'-4"3 3/8"16'-0"15'-8"15'-8"15'-8"15'-8"15'-8"15'-8"16'-0"3 3/8"3 3/8"22'-5"10'-6 1/2"5'-9"10'-6 1/2"22'-5"3 3/8"72'-2 3/4"517 SF 517 SF 517 SF 517 SF 517 SF 528 SF517 SF517 SF517 SF868 SF528 SF 1,045 SF 876 SF 126'-6 3/4" A200B3 A200 D2 A200 D1 A200 F3 1 2 3 4 5 6 8 9 A B C D E F UNIT 2A 301 UNIT 1B 303 UNIT 1B 305 UNIT 1B 307 UNIT 1B 309 UNIT 2B 311 UNIT 1B 312 UNIT 1B 310 UNIT 1B 308 UNIT 1B 306 UNIT 1B 304 UNIT 2B 302 UNIT 1B 300 STAIR A 56 STAIR B 57 CORRIDOR 58 33'-4"5'-0"33'-4"16'-0"15'-8"15'-8"15'-8"15'-8"15'-8"15'-8"16'-0"3 3/8"3 3/8"22'-5"10'-6 1/2"5'-9"10'-6 1/2"22'-5"3 3/8"72'-2 3/4"517 SF 517 SF 517 SF 517 SF 517 SF 528 SF517 SF517 SF517 SF868 SF528 SF 1,045 SF 876 SF 126'-6 3/4" Copyright 2020 DJR Architecture, Inc. A120 FLOOR PLAN -LEVEL 2 & 3 ST. ANTHONY, MN 3725 STINSON BLVD 20-034 10/19/2020 LAND USE APPLICATION 1/8" = 1'-0"A1 FLOOR PLAN -LEVEL 2 1/8" = 1'-0"A3 FLOOR PLAN -LEVEL 3 N N 73 A200B3 A200 D2 A200 D1 A200 F3 SLOPE 1/4" / FT RD 1 2 3 4 5 6 8 9 A B C D E F OF RD RD OF RD SLOPE 1/4" / FT SLOPE 1/4" / FT SLOPE 1/4" / FT SLOPE 1/4" / FTSLOPE 1/4" / FTSLOPE 1/4" / FTSLOPE 1/4" / FT PREFIN. ALUM CAP FLASHING, TYP. ROOF HATCH PARAPET WALL BRACE LOCATIONS PARAPET WALL BRACE LOCATIONS Copyright 2020 DJR Architecture, Inc. A150 ROOF PLAN ST. ANTHONY, MN 3725 STINSON BLVD 20-034 10/19/2020 LAND USE APPLICATION 1/8" = 1'-0"D1 ROOF PLAN 74 LEVEL 1 100' -0" LEVEL 2 110' -10 13/16" LEVEL 3 121' -9 5/8" ROOF TRUSS BEARING 130' -11 1/8" 4 5 3 3 6 7 810'-10 13/16"10'-10 13/16"9'-1 1/2"3'-4"ABCDEF 10 88 5'-0"8'-9"4'-0"2'-0"3'-0"5'-0"7'-0"6 LEVEL 1 100' -0" LEVEL 2 110' -10 13/16" LEVEL 3 121' -9 5/8" ROOF TRUSS BEARING 130' -11 1/8" 1 2 3 88 9'-1 1/2"10'-10 13/16"10'-10 13/16"35'-0"1 2 3 4 5 6 8 9 7 396 5 10 5'-0"3'-0"7'-0"10 1 7 96 6 12'-8"15'-6"2'-2" LEVEL 1 100' -0" LEVEL 2 110' -10 13/16" LEVEL 3 121' -9 5/8" ROOF TRUSS BEARING 130' -11 1/8" 758 8 128 6 35'-0"10'-10 13/16"10'-10 13/16"9'-1 1/2"3'-4"12345689 3 9 10 10 7 5 5'-0"3'-0"7'-0"9'-0"7'-0"66 15'-6"12'-8"2'-2" LEVEL 1 100' -0" LEVEL 2 110' -10 13/16" LEVEL 3 121' -9 5/8" ROOF TRUSS BEARING 130' -11 1/8" 4 21 53 8385 10'-10 13/16"10'-10 13/16"9'-1 1/2"3'-4"A B C D E F 6'-0"3'-0"3'-6"4'-6"7'-0"7'-0"7'-0"2'-0"4'-0"5'-0"5'-0"2'-0"679 Copyright 2020 DJR Architecture, Inc. A200 EXTERIOR ELEVATIONS ST. ANTHONY, MN 3725 STINSON BLVD 20-034 11/16/2020 LAND USE APPLICATION F1 3D BUILDING VIEW AT CORNER 1/8" = 1'-0"B3 EAST EXTERIOR ELEVATION 1/8" = 1'-0"D2 SOUTH EXTERIOR ELEVATION 1/8" = 1'-0"D1 NORTH EXTERIOR ELEVATION 1/8" = 1'-0"F3 WEST EXTERIOR ELEVATION KEYNOTE - EXTERIOR ELEVATIONS Note #Note 1 PREFINISHED METAL CANOPY AT ENTRANCE 2 EXTERIOR LIGHT FIXTURE 3 PREFINISHED METAL PARAPET CAP 4 ALUMINUM STOREFRONT DOOR & WINDOW SYSTEM 5 FIBERGLASS WINDOWS 6 NICHIHA FIBER CEMENT PANEL SIDING, VINTAGEWOOD 7 NICHIHA FIBER CEMENT PANEL SIDING, CREAM 8 PREFINISHED METAL EYE BROW 9 NICHIHA FIBER CEMENT PANEL SIDING, TUFFBLOCK - STEEL 10 CAST STONE BASE 75 2'-0" M.O. 3'-0"7'-0" 12'-0"18'-6"6' HIGH x 4' WIDE GATE, ALUMINUM SQUARE FRAME w/ TREX SLATS, HINGED ON BOLLARD 6" CONCRETE SLAB WITH #5 BARS AT 16" O.C. EACH WAY 6" DIAMETER CONCRETE FILLED STEEL BOLLARD, PAINTED YELLOW (TYP) SEAL EXPOSED CMU W/ WATER REPELLING PAINT FIBER CEMENT LAP SIDING ON REINFORCED 8" X 8" X 16" CMU SET HINGES ON POST FACE NOT SIDE PROVIDE STAINLESS STEEL SLEEVE IN CONCRETE TO ACCEPT CANE BOLTS WHEN DOOR IS OPEN 95 DEGREES & CLOSED 5'-6"4'-0"5'-6"SLOPE TO GRADE 8" CMU, PAINTED LINE OF CMU A0115A0114 6'-0"8"3'-0"3'-0" 3'-0"3'-0"8"A011 2 A011 3 8" 8"5'-3"8'-0"5'-3"TOP OF PAVING CONCRETE FOOTING AT BOLLARD PER STRUCTURAL DRAWINGS CONCRETE FOOTING FOR CMU WALLS5'-0" MIN.T. O. SLAB PREFINISHED METAL COPING FIBER CEMENT LAP SIDING 6" CONCRETE SLAB CONCRETE FOOTING AT BOLLARD PER STRUCTURAL DRAWINGS TOP OF PAVING T. O. SLAB 5'-0" MIN.4'-0"1"4'-0" FIBER CEMENT LAP SIDING ON 8" CMU PREFINISHED METAL COPING 6' HIGH x 4' WIDE GATE, ALUMINUM SQUARE FRAME w/ TREX SLATS, HINGED ON BOLLARD PROVIDE STAINLESS STEEL SLEEVE IN CONCRETE TO ACCEPT CANE BOLTS WHEN DOOR IS OPEN 95 DEGREES & CLOSED2"6'-0"6" CONCRETE SLAB 8'-0" T. O. SLAB TOP OF PAVING CONCRETE FOOTING AT BOLLARD PER STRUCTURAL DRAWINGS CONCRETE FOOTING FOR CMU WALLS PREFINISHED METAL COPING FIBER CEMENT LAP SIDING ON 8" CMU WALL M.O. 3'-0" 6' HIGH x 4' WIDE GATE, ALUMINUM SQUARE FRAME w/ TREX SLATS, HINGED ON BOLLARD 5'-0" MINIMUM2"6'-0"6" CONCRETE SLAB T. O. SLAB TOP OF PAVING CONCRETE FOOTING AT BOLLARD PER STRUCTURAL DRAWINGS CONCRETE FOOTING FOR CMU WALLS PREFINISHED METAL COPING FIBER CEMENT LAP SIDING ON 8" CMU WALL 6' HIGH x 4' WIDE GATE, ALUMINUM SQUARE FRAME w/ TREX SLATS, HINGED ON BOLLARD 5'-0" MINIMUM6" CONCRETE SLAB Copyright 2020 DJR Architecture, Inc. A011 WASTE MANAGEMENT ENCLOSURE ST. ANTHONY, MN 3725 STINSON BLVD 20-034 11/02/20 3/8" = 1'-0"1 PLAN -WASTE MANAGEMENT ENCLOSURE 3/8" = 1'-0"5 ELEVATION -WASTE MANAGEMENT ENCLOSURE -EAST SIDE (REAR) 3/8" = 1'-0"4 ELEVATION -WASTE MANAGEMENT ENCLOSURE -WEST SIDE (FRONT) 3/8" = 1'-0"2 ELEVATION -WASTE MANAGEMENT ENCLOSURE -NORTH SIDE ACCESS 3/8" = 1'-0"3 ELEVATION -WASTE ENCLOSURE -SOUTH SIDE 76 1E1000 10' 20' 40'NAAAAAA1BBBBBBBBHANDHOLE6' - 0"BASE COVER SHALL COVERS POLEDOWN TO TOP OF PLINTH.LEVELING NUTSPROVIDE GROUT CLEANED RUBBED FINISH ON ALLEXPOSED CONCRETETOOL AND CHAMFER EDGECONDUITANCHOR BOLTSGROUND RODGRADE LEVEL4-#4 HORIZONTAL REINFORCINGBARS SPACED 18" APART4-#6 REINFORCING BARS FULL DEPTHREADY MIXED MIN. 3000 PSI AIR ENTRAINEDCONCRETEBOLT DIAMETER & PROJECTION AS RECOMMENDEDBY POLE MANUFACTURERBASE SECTIONDIAMETER DIMENSIONS:2' FOR LOT LIGHT POLEABOVE GRADE DIMENSION:2" ABOVE GRADE LEVEL2E100AA1THIS DRAWING AND THE INFORMATION THEREIN ISTHE PROPERTY OF DESIGN TREE ENGINEERING INC.USE BY THE HOLDER OR DISCLOSURE TO OTHERSWITHOUT THE PERMISSION OF DESIGN TREEENGINEERING INC. IS PROHIBITED. IT CONTAINSPROPRIETARY AND CONFIDENTIAL INFORMATION OFDESIGN TREE ENGINEERING INC. REPRODUCTION OFTHE MATERIAL HEREIN WITHOUT WRITTENERMISSION OF DESIGN TREE ENGINEERING INC.VIOLATES THE COPYRIGHT LAWS OF THE UNITEDSTATES AND WILL SUBJECT THE VIOLATORS TOLEGAL PROSECUTION.COPYRIGHT @ 2020 BY DESIGN TREE ENGINEERINGI HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION,OR REPORT WAS PREPARED BY ME OR UNDER MYDIRECT SUPERVISION AND THAT I AM A DULYLICENSED PROFESSIONAL ENGINEER UNDER THELAWS OF THE STATE OF MINNESOTA.DRAWING NO.DRAWN BY:CHECKED BY:PROJECT NO.:NO.DATE DESCRIPTION PR E L IM IN AR Y :NOT FORCONSTRUCTION DATE:LICENSE #:PRINTED NAME:F:\DESIGN TREE ENGINEERING\PROJECTS\000 - MISC 20\00020057 - 3725 STINSON BLVD APARTMENTS\CONSTRUCTS\ELECTRICAL\00020057-C-BASE PROPOSED-ELECTICAL.DWG #### 11/16/2020 000200573725 STINSONBLVDAPARTMENTSST. ANTHONY, MN07/22/20RSBARMAARON R. MUELLER46184SITE LIGHTINGE10077 StatisticsDescriptionSymbol Avg Max Min Max/Min Avg/MinEast Commercial property line lightspillEast Entry/WalkParking lotSouth commercial property line lightspillStreets light spillWest Patio/Walk0.2 fc 0.6 fc 0.0 fc N/A N/A2.1 fc 15.6 fc 0.1 fc 156.0:1 21.0:11.4 fc 5.7 fc 0.2 fc 28.5:1 7.0:10.2 fc 0.7 fc 0.0 fc N/A N/A0.0 fc 0.3 fc 0.0 fc N/A N/A7.2 fc 16.0 fc 2.5 fc 6.4:1 2.9:10.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00.1 0.1 0.1 0.1 0.1 0.1 0.1 0.10.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00.1 0.1 0.2 0.20.3 0.3 0.30.20.00.0 0.0 0.0 0.0 0.00.00.0 0.0 0.0 0.00.10.10.10.0 0.0 0.00.10.0 0.0 0.00.12.50.0 0.0 0.00.10.0 0.0 0.00.12.93.33.63.73.53.13.84.65.25.55.24.53.50.0 0.00.1 0.10.0 0.00.1 0.17.77.46.45.24.13.73.94.86.07.17.77.26.04.50.0 0.00.1 0.10.0 0.00.1 0.20.0 0.00.1 0.26.58.49.69.48.06.34.94.34.55.67.28.99.89.37.86.04.74.24.55.67.28.99.79.17.35.30.0 0.00.1 0.12.43.60.0 0.00.1 0.12.74.20.0 0.0 0.00.10.0 0.0 0.00.10.0 0.0 0.00.10.30.30.30.30.40.0 0.0 0.0 0.00.40.40.40.40.50.60.60.60.60.60.80.80.70.70.70.70.70.81.2BB8.110.612.111.39.014.911.513.415.514.411.016.0BB13.92.13.45.48.512.315.215.011.88.05.03.01.81.10.70.50.30.30.20.20.20.215.412.28.45.33.22.01.20.80.50.40.30.30.20.20.20.20.20.2BB 15.62.33.65.89.012.83.34.97.29.911.811.69.46.74.52.91.91.20.80.60.40.40.30.30.20.20.20.20.2BB2.94.50.0 0.0 0.0 0.00.50.80.90.90.90.90.90.80.70.70.81.30.0 0.0 0.0 0.00.0 0.00.1 0.2 0.2 0.2 0.4 0.6 0.5 0.3 0.2 0.2 0.2 0.2 0.2 0.2 0.4 0.50.70.6 0.4 0.4 0.30.10.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0.00.1 0.2 0.2 0.2 0.1 0.10.0 0.00.1 0.1 0.1 0.2 0.3 0.3 0.2 0.2 0.1 0.10.03.35.33.35.40.60.91.11.11.11.01.00.90.70.60.81.31.52.00.71.10.71.11.31.31.21.21.10.90.70.50.50.70.50.70.91.31.51.51.41.31.10.90.70.50.40.40.40.50.30.31.11.61.71.71.61.41.21.00.70.50.30.30.30.30.20.21.31.81.81.81.91.61.31.00.70.50.30.30.20.20.20.20.20.20.20.20.20.20.20.20.20.20.20.20.20.20.20.20.20.20.2 0.2 0.2 0.2 0.2 0.2 0.21.62.22.12.02.01.81.41.10.80.50.32.02.62.42.22.11.91.51.20.80.50.32.22.82.52.32.21.91.51.20.80.50.3AA2.22.72.52.22.21.91.51.20.80.50.31.82.42.32.12.01.81.51.10.80.50.31.52.01.91.92.01.71.41.10.80.50.31.21.71.81.81.81.61.31.00.70.50.30.20.20.20.21.01.51.61.61.61.41.21.00.70.50.30.30.20.20.20.20.81.31.41.51.41.31.21.00.70.50.40.30.30.20.71.11.31.31.31.31.21.00.80.60.40.30.30.30.30.71.01.21.21.21.21.21.10.90.70.50.40.30.30.30.30.30.61.01.11.21.21.21.11.10.90.80.60.40.30.30.30.40.30.60.91.11.11.21.11.11.00.90.80.70.50.40.40.30.60.91.11.11.21.11.11.00.90.80.70.50.40.40.30.40.30.61.01.11.21.21.21.11.11.00.80.60.50.40.30.30.30.30.61.01.21.31.31.21.21.10.90.70.50.40.40.30.30.71.11.31.41.31.31.21.10.90.60.50.40.30.30.30.30.30.81.31.51.51.41.41.31.10.80.60.50.40.30.30.30.30.30.91.51.71.71.61.51.31.10.80.60.40.40.30.30.31.11.71.81.81.91.71.41.20.80.60.50.40.30.30.30.40.31.42.02.02.02.01.91.51.20.90.60.50.40.40.40.40.40.41.72.42.42.22.22.01.61.31.00.70.50.40.40.40.42.02.92.72.42.42.11.71.41.00.70.50.50.40.50.50.50.50.50.50.60.60.70.80.91.01.21.62.23.24.66.58.49.79.58.16.14.22.81.81.20.90.60.50.40.40.30.30.30.30.30.32.13.12.92.52.52.21.81.51.10.80.70.60.50.60.60.60.60.70.70.80.91.01.11.31.62.12.94.15.56.97.77.66.75.23.82.61.81.30.90.70.60.50.40.40.40.40.30.40.44.52.91.71.10.80.60.50.50.40.50.45.7AA2.13.02.92.62.52.32.01.71.31.00.80.80.70.70.70.80.91.11.41.82.74.25.61.82.72.72.62.62.52.21.91.61.31.11.11.01.01.01.01.21.31.51.82.22.83.33.42.92.21.61.31.00.80.70.70.70.60.51.62.42.62.62.72.62.32.11.91.61.51.41.31.21.21.31.41.51.61.71.92.12.22.32.21.91.71.51.31.11.00.90.80.70.61.42.12.42.62.72.62.42.32.11.91.81.71.61.51.41.41.41.51.51.61.71.81.92.02.01.91.81.71.51.31.21.00.90.80.61.21.92.32.42.52.62.62.52.42.22.11.91.81.71.61.51.51.51.51.51.61.71.82.02.02.02.01.81.71.51.31.11.00.80.70.00.00.02.42.52.62.52.42.32.22.01.81.71.61.51.51.51.51.51.61.61.71.81.92.02.01.91.71.51.41.22.32.52.52.62.52.42.11.81.71.61.51.41.41.41.41.51.61.61.71.92.12.12.01.71.51.41.22.12.22.52.62.82.72.31.91.61.41.31.21.21.21.21.21.41.51.72.02.32.42.11.71.51.21.01.41.61.81.92.12.01.61.31.10.90.80.80.80.80.70.70.80.91.11.31.61.61.41.20.90.70.60.00.1 0.10.2 0.10.3AA10.3 0.10.10.2 0.10.1 0.10.1 0.10.1 0.10.2 0.10.4 0.20.6AA10.60.30.30.60.30.5 0.30.5 0.20.3 0.10.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0.0 0.00.1 0.1 0.1 0.10.0 0.0 0.0 0.00.1 0.1 0.1 0.1 0.1 0.1 0.1 0.10.0THIS DRAWING AND THE INFORMATION THEREIN ISTHE PROPERTY OF DESIGN TREE ENGINEERING INC.USE BY THE HOLDER OR DISCLOSURE TO OTHERSWITHOUT THE PERMISSION OF DESIGN TREEENGINEERING INC. IS PROHIBITED. IT CONTAINSPROPRIETARY AND CONFIDENTIAL INFORMATION OFDESIGN TREE ENGINEERING INC. REPRODUCTION OFTHE MATERIAL HEREIN WITHOUT WRITTENERMISSION OF DESIGN TREE ENGINEERING INC.VIOLATES THE COPYRIGHT LAWS OF THE UNITEDSTATES AND WILL SUBJECT THE VIOLATORS TOLEGAL PROSECUTION.COPYRIGHT @ 2020 BY DESIGN TREE ENGINEERINGI HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION,OR REPORT WAS PREPARED BY ME OR UNDER MYDIRECT SUPERVISION AND THAT I AM A DULYLICENSED PROFESSIONAL ENGINEER UNDER THELAWS OF THE STATE OF MINNESOTA.DRAWING NO.DRAWN BY:CHECKED BY:PROJECT NO.:NO.DATE DESCRIPTIONPRELIMINARY:NOT FOR CON S TRU C T ION DATE:LICENSE #:PRINTED NAME:F:\DESIGN TREE ENGINEERING\PROJECTS\000 - MISC 20\00020057 - 3725 STINSON BLVD APARTMENTS\CONSTRUCTS\ELECTRICAL\00020057- SITE LIGHTING CALCS.DWG #### 11/16/2020 000200573725 STINSONBLVDAPARTMENTSST. ANTHONY, MN07/22/20RSBARMAARON R. MUELLER46184SITE LIGHTINGCALC'SE10178 FOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFO FO FO FO FO FO FO FO FO FO FO FO FOlllllllllllllllllllFOFOFOFOFOFO lOHE OHE OHE OHE OHE OHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEUGE UGE UGE UGE UGE UGEUGEUGEFOFOFOFOFOFOFOGASGASGASGASlllllllllllllllllllllllllllOHE OHE OHE OHE OHE OHE OHE OHE OHE THIS DRAWING AND THE INFORMATION THEREIN IS THE PROPERTY OF DESIGN TREE ENGINEERING INC. USE BY THE HOLDER OR DISCLOSURE TO OTHERS WITHOUT THE PERMISSION OF DESIGN TREE ENGINEERING INC. IS PROHIBITED. IT CONTAINS PROPRIETARY AND CONFIDENTIAL INFORMATION OF DESIGN TREE ENGINEERING INC. REPRODUCTION OF THE MATERIAL HEREIN WITHOUT WRITTEN ERMISSION OF DESIGN TREE ENGINEERING INC. VIOLATES THE COPYRIGHT LAWS OF THE UNITED STATES AND WILL SUBJECT THE VIOLATORS TO LEGAL PROSECUTION. COPYRIGHT @ 2020 BY DESIGN TREE ENGINEERING I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. DRAWING NO. DRAWN BY: CHECKED BY: PROJECT NO.: NO.DATE DESCRIPTIONPRELIMINARY:NOT F O R CONSTRUCTIONDATE:LICENSE #: PRINTED NAME:F:\DESIGN TREE ENGINEERING\PROJECTS\000 - MISC 20\00020057 - 3725 STINSON BLVD APARTMENTS\CONSTRUCTS\CIVIL\00020057-C-BASE PROPOSED.DWG #### 11/17/2020JEREMY E. ANDERSON 44223 00020057 3725 STINSON BLVD APARTMENTS ST. ANTHONY, MN 11/17/20 RJK JEA 0 20'40' OHE LEGEND HYDRANT SANITARY MANHOLE GATE VALVE POWER POLE LIGHT POLE CATCH BASIN SIGN DECIDUOUS TREE CONIFEROUS TREE SHRUB PEDESTAL GUY WIRE BOLLARD POWER BOX ELECTRIC METER MONITORING WELL SANITARY SEWER CLEANOUT WOOD FENCE CHAINLINK FENCE WIRE FENCE STORM SEWER LINE SANITARY SEWER LINE WATERMAIN OVERHEAD ELECTRIC UNDERGROUND TELEPHONE UNDERGROUND FIBER UNDERGROUND ELECTRIC UNDERGROUND GAS LINE CONCRETE PAVEMENT BITUMINOUS PAVEMENT AGGREGATE SURFACING LANDSCAPING BUILDING UGT FO UGE GAS l W CO NOTES: 1. CONTRACTOR SHALL FIELD VERIFY ALL BUILDING DIMENSIONS AND REMOVAL LIMITS PRIOR TO ANY CONSTRUCTION. 2. SAWCUT CURB AND GUTTER AND SIDEWALK, OR REMOVE AT NEAREST EXPANSION JOINTS. 3. SAWCUT BITUMINOUS PAVEMENT FULL DEPTH AT ALL TIE-IN LOCATIONS. 4. THE LOCATIONS AND ELEVATIONS OF THE EXISTING UTILITIES SHOWN HEREIN ARE APPROXIMATE. THEY HAVE BEEN PLOTTED FROM AVAILABLE SURVEYS AND/ OR RECORDS. THE CONTRACTOR IS RESPONSIBLE FOR FIELD VERIFYING LOCATION AND ELEVATION TO ENSURE THAT ANY EXISTING UTILITIES (SHOWN OR NOT SHOWN) ARE NOT DAMAGED DURING CONSTRUCTION. 5. ALL UTILITIES AND SERVICES SHOWN OR NOT SHOWN SHALL BE REMOVED OR ABANDONED WITHIN THE PROPERTY LINES. COORDINATE WITH LOCAL GAS COMPANY, UTILITY COMPANY, OR PROPER AUTHORITIES PRIOR TO REMOVAL OR ABANDONING, UNLESS OTHERWISE NOTED. 6. GOPHER STATE ONE CALL DAMAGE PREVENTION SYSTEM FOR BURIED UTILITIES. 1-800-252-1166. X 38TH AVENUE NE STINSON BLVDREMOVALS PLAN C101 REMOVE CURB AND GUTTER SAWCUT CURB AND GUTTER OR REMOVE AT NEAREST EXPANSION JOINT SAWCUT CURB AND GUTTER OR REMOVE AT NEAREST EXPANSION JOINT REMOVE CURB AND GUTTER SAWCUT CURB AND GUTTER OR REMOVE AT NEAREST EXPANSION JOINT SAWCUT CURB AND GUTTER OR REMOVE AT NEAREST EXPANSION JOINT SAWCUT EXISTING BITUMINOUS PAVEMENT AT PROPERTY LINE REMOVE BITUMINOUS PAVEMENT REMOVE AND REINSTALL LIGHT POLE AS REQUIRED FOR UTILITY INSTALLATION REMOVE TREES HANDHOLE TO REMAIN (ADJUST CASTING AS NECESSARY TO ACCOMMODATE PROPOSED GRADES) REMOVE EXISTING TRUNCATED DOMES REMOVE AND RELOCATE EXISTING UTILITY PEDESTAL (COORDINATE WITH LOCAL UTILITY COMPANY) SAWCUT EXISTING CONCRETE SIDEWALK OR REMOVE AT NEAREST EXPANSION JOINT SAWCUT EXISTING CONCRETE SIDEWALK OR REMOVE AT NEAREST EXPANSION JOINT REMOVE PEDESTRIAN RAMP SAWCUT EXISTING CONCRETE SIDEWALK OR REMOVE AT NEAREST EXPANSION JOINT REMOVE SIDEWALK REMOVE POWER POLE AND OVERHEAD LINE AND PROVIDE UNDERGROUND BACK TO POLE IN SOUTHEAST CORNER OF STINSON BLVD/38TH AVE NE INTERSECTION (COORDINATE WITH LOCAL UTILITY COMPANY) REMOVE SIGN POST 79 OHE OHE OHE OHE OHE OHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEUGE UGE UGE UGE UGE UGEUGEUGETHIS DRAWING AND THE INFORMATION THEREIN IS THE PROPERTY OF DESIGN TREE ENGINEERING INC. USE BY THE HOLDER OR DISCLOSURE TO OTHERS WITHOUT THE PERMISSION OF DESIGN TREE ENGINEERING INC. IS PROHIBITED. IT CONTAINS PROPRIETARY AND CONFIDENTIAL INFORMATION OF DESIGN TREE ENGINEERING INC. REPRODUCTION OF THE MATERIAL HEREIN WITHOUT WRITTEN ERMISSION OF DESIGN TREE ENGINEERING INC. VIOLATES THE COPYRIGHT LAWS OF THE UNITED STATES AND WILL SUBJECT THE VIOLATORS TO LEGAL PROSECUTION. COPYRIGHT @ 2020 BY DESIGN TREE ENGINEERING I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. DRAWING NO. DRAWN BY: CHECKED BY: PROJECT NO.: NO.DATE DESCRIPTIONPRELIMINARY:NOT F O R CONSTRUCTIONDATE:LICENSE #: PRINTED NAME:F:\DESIGN TREE ENGINEERING\PROJECTS\000 - MISC 20\00020057 - 3725 STINSON BLVD APARTMENTS\CONSTRUCTS\CIVIL\00020057-C-BASE PROPOSED.DWG #### 11/17/2020JEREMY E. ANDERSON 44223 00020057 3725 STINSON BLVD APARTMENTS ST. ANTHONY, MN 11/17/20 RJK JEA 0 20'40' PARKING INFORMATION PARKING STALLS 44 STALLS ACCESSIBLE STALLS 2 STALLS TOTAL STALLS 46 STALLS PROPERTY INFORMATION TOTAL PROPERTY AREA 0.850 AC DISTURBED AREA 0.93 ±AC EXISTING IMPERVIOUS AREA 0.342 AC PROPOSED IMPERVIOUS AREA 0.652 AC NET INCREASE IMPERVIOUS AREA 0.310 AC LEGEND PROPOSED LIGHT BITUMINOUS PAVEMENT PROPOSED NON-REINFORCED CONCRETE PROPOSED CURB AND GUTTER PROPOSED RETAINING WALL PROPOSED TRAFFIC CONTROL SIGNAGE PROPOSED PAINTED ACCESSIBLE PARKING SYMBOL PROPOSED MANHOLE PROPOSED CATCH BASIN NOTES: 1. ALL DIMENSIONS SHOWN ARE TO FLOW LINE, CENTERLINE OF FENCE, OR EDGE OF PAVEMENT, UNLESS OTHERWISE NOTED. 2. CONTRACTOR SHALL VERIFY ALL PLAN AND DETAIL DIMENSIONS PRIOR TO CONSTRUCTION. 3. ALL CROSSWALK STRIPING SHALL BE WHITE IN COLOR. 4. ALL INTERIOR PARKING STALL STRIPING SHALL BE 4" AND YELLOW IN COLOR. 5. ACCESSIBLE PARKING STALL STRIPING, ACCESS AISLE, AND SYMBOL SHALL BE PAINTED IN ACCORDANCE WITH LOCAL AUTHORITY REQUIREMENTS. 6. GOPHER STATE ONE CALL DAMAGE PREVENTION SYSTEM FOR BURIED UTILITIES. 1-800-252-1166. FREE-STANDING GREEN SCREEN TRELLIS (SEE LANDSCAPE PLANS) BUILDING SETBACK BUILDING SETBACK BUILDING SETBACKBUILDING SETBACKTRASH ENCLOSURE (SEE ARCHITECTURAL)PROPERTY LINESITE PLAN C201 38TH AVENUE NE STINSON BLVDPROPOSED BUILDING 9.00 (TYP) 8.04 9.009.00 9.00 (TYP)9.00(TYP)19.00 (TYP)19.00(TYP)19.00(TYP)8.31R 4 . 0 0 R4.0 0 R4 . 0 0 11.92 6.92 5.0023.148.93 7.005.00 8.07 12.0022.0019.31 21.54 18.00 24.00 24.003.483.443.3020.0020.0030.00 60.834.004.0043.00 R4.00R4.0 0 29.98 30.2821.785.00PROPOSED CONCRETE SIDEWALK PROPOSED 5' PUBLIC SIDEWALK PROPOSED PEDESTRIAN RAMP PROPOSED CONCRETE DRIVE APRON (SEE ST. ANTHONY STANDARD PLATE ST-7) PROPOSED CONCRETE INTEGRAL SIDEWALK PROPOSED B612 CURB & GUTTER (TYP) PROPOSED B612 CURB & GUTTER (TYP) 1.5' HIGH BACK CURB RETAINING WALL 17.065.0062.00R 4 . 0 0 ACCESSIBLE PARKING SIGN NO PARKING SIGN 15 16 15 PROPOSED PEDESTRIAN RAMP WITH TRUNCATED DOMES PER MNDOT STD. PLAN NO. 5-297.250 UNDERGROUND STORMWATER DETENTION SYSTEM PROPOSED CONCRETE DRIVE APRON (SEE ST. ANTHONY STANDARD PLATE ST-7)24.0043.31PROPOSED 6' WIDE CONCRETE SIDEWALK PROPOSED 6' WIDE CONCRETE SIDEWALK 80 FOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFO FO FO FO FO FO FO FO FO FO FO FO FOlllllllllllllllllllFOFOFOFOFOFO lOHE OHE OHE OHE OHE OHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEUGE UGE UGE UGE UGE UGEUGEUGEFOFOFOFOFOFOFOGASGASGASGASllllllllllllllllllllllllllll >959 959 960 961 961 96 1 96095995 8 958.40 959.00 958.70 958.70 958.82 959.55 961.64 962.05 961.83 961.65 961.65 959.42958.99 958.79 958.70 958.70 959.00957.58 959.00 957.64 957.56957.32 957.78 958.04 958.15 958.75 958.00 959.89 960.59 959.00 960.15 960.50 961.13 960.53 961.22960.50959.41958.30 961.65 958.70 957.50 957.67 958.97 959.07 960.38 960.38 960.35 958.30 958.30 958.91 959.82 960.00 960.00959.82 960.39 959.79 959.66 959.06959.60 958.48 960.25 THIS DRAWING AND THE INFORMATION THEREIN IS THE PROPERTY OF DESIGN TREE ENGINEERING INC. USE BY THE HOLDER OR DISCLOSURE TO OTHERS WITHOUT THE PERMISSION OF DESIGN TREE ENGINEERING INC. IS PROHIBITED. IT CONTAINS PROPRIETARY AND CONFIDENTIAL INFORMATION OF DESIGN TREE ENGINEERING INC. REPRODUCTION OF THE MATERIAL HEREIN WITHOUT WRITTEN ERMISSION OF DESIGN TREE ENGINEERING INC. VIOLATES THE COPYRIGHT LAWS OF THE UNITED STATES AND WILL SUBJECT THE VIOLATORS TO LEGAL PROSECUTION. COPYRIGHT @ 2020 BY DESIGN TREE ENGINEERING I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. DRAWING NO. DRAWN BY: CHECKED BY: PROJECT NO.: NO.DATE DESCRIPTIONPRELIMINARY:NOT F O R CONSTRUCTIONDATE:LICENSE #: PRINTED NAME:F:\DESIGN TREE ENGINEERING\PROJECTS\000 - MISC 20\00020057 - 3725 STINSON BLVD APARTMENTS\CONSTRUCTS\CIVIL\00020057-C-BASE PROPOSED.DWG #### 11/17/2020JEREMY E. ANDERSON 44223 00020057 3725 STINSON BLVD APARTMENTS ST. ANTHONY, MN 11/17/20 RJK JEA XXXX.XX GRADING LEGEND = EXISTING MAJOR CONTOUR = EXISTING MINOR CONTOUR = EXISTING CONTOUR LABEL = PROPOSED MAJOR CONTOUR = PROPOSED MINOR CONTOUR = PROPOSED CONTOUR LABEL = EXISTING SPOT ELEVATION* = PROPOSED SPOT ELEVATION* *SPOT ELEVATIONS ALONG CURB & GUTTER AND OTHER REVEALS ARE TO FLOWLINE, UNLESS OTHERWISE NOTED. 100 0 20'40' NOTES: 1. THE LOCATIONS AND ELEVATIONS OF THE EXISTING UTILITIES SHOWN HEREIN ARE APPROXIMATE. THEY HAVE BEEN PLOTTED FROM AVAILABLE SURVEYS AND/ OR RECORDS. THE CONTRACTOR IS RESPONSIBLE FOR FIELD VERIFYING LOCATION AND ELEVATION TO ENSURE THAT ANY EXISTING UTILITIES (SHOWN OR NOT SHOWN) ARE NOT DAMAGED DURING CONSTRUCTION. 2. SIDEWALKS SHALL MEET ADA REQUIREMENTS, AND SHALL NOT EXCEED 2.00% CROSS SLOPE, OR 5.00% LONGITUDINAL SLOPE. 3. CONCRETE ENTRANCES AND APPROACHES SHALL NOT EXCEED 2.00% CROSS SLOPE IN SIDEWALK AREAS. 4. ACCESSIBLE PARKING STALLS SHALL MEET ADA REQUIREMENTS, AND SHALL NOT EXCEED 2.00% CROSS SLOPE IN ALL DIRECTIONS. 5. ONCE SUBGRADE ELEVATION IS REACHED, SCARIFY EXISTING SUBGRADE AND RECOMPACT TO 95% OF THE MAXIMUM DRY DENSITY, UNLESS OTHERWISE SPECIFIED. 6. SUBGRADE AND FILL AREAS UNDER PROPOSED PAVEMENT, SIDEWALKS, AND CURBS SHALL BE COMPACTED TO 100% OF THE MAXIMUM DRY DENSITY, UNLESS OTHERWISE SPECIFIED. 7. ALL EXCESS OR WASTE MATERIAL GENERATED AS PART OF CONSTRUCTION SHALL BE REMOVED FROM THE SITE AND DISPOSED OF IN ACCORDANCE WITH STATE AND LOCAL REQUIREMENTS. 8. ALL SITE WORK SHALL BE PERFORMED IN ACCORDANCE WITH THE RECOMMENDATIONS IN THE GEOTECHNICAL EVALUATION REPORT DATED AUGUST 14, 2020 BY BRUAN INTERTEC. 9. IN ADDITION TO THESE PLANS, A STORMWATER MANAGEMENT STUDY HAS BEEN PROVIDED. THE STORMWATER MANAGEMENT STUDY INCLUDES IMPORTANT INFORMATION REGARDING STORMWATER PROTECTION FOR THE SITE, SUCH AS CONCRETE WASH-OUTS, HAZARDOUS MATERIALS HANDLING/SPILLS, EROSION CONTROL INSTALLATION, EROSION CONTROL MAINTENANCE, ETC. THE CONTRACTOR SHALL REVIEW THE STORMWATER BOOK AND USE THE INFORMATION TO COMPLY WITH ALL STATE AND LOCAL REQUIREMENTS. 10. GOPHER STATE ONE CALL DAMAGE PREVENTION SYSTEM FOR BURIED UTILITIES. 1-800-252-1166. GRADING PLAN C301 38TH AVENUE NE STINSON BLVDPROPOSED BUILDING FFE=960.50 MATCH INTO EXISTING CONCRETE MATCH INTO EXISTING CURB AND GUTTER MNDOT STANDARD PEDESTRIAN RAMP (MATCH INTO EXISTING TOP BACK OF CURB) MNDOT STANDARD PEDESTRIAN RAMP (MATCH INTO EXISTING CONCRETE) MATCH INTO EXISTING CONCRETE SIDEWALK MATCH INTO EXISTING CURB AND GUTTER MATCH INTO EXISTING CURB AND GUTTER MATCH INTO EXISTING CURB AND GUTTER MATCH INTO EXISTING BITUMINOUS PAVEMENT UNDERGROUND STORMWATER DETENTION SYSTEM 2.00% MAX. CROSS SLOPE TOWARDS STREET GRADE BREAKMATCH INTO EXISTING CONCRETE SIDEWALK MATCH INTO EXISTING CONCRETE SIDEWALK 1.5' HIGH BACK CURB RETAINING WALL 81 FOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFO FO FO FO FO FO FO FO FO FO FO FO FOlllllllllllllllllllFOFOFOFOFOFO lOHE OHE OHE OHE OHE OHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEUGE UGE UGE UGE UGE UGEUGEUGEFOFOFOFOFOFOFOGASGASGASGASllllllllllllllllllllllllllll >THIS DRAWING AND THE INFORMATION THEREIN IS THE PROPERTY OF DESIGN TREE ENGINEERING INC. USE BY THE HOLDER OR DISCLOSURE TO OTHERS WITHOUT THE PERMISSION OF DESIGN TREE ENGINEERING INC. IS PROHIBITED. IT CONTAINS PROPRIETARY AND CONFIDENTIAL INFORMATION OF DESIGN TREE ENGINEERING INC. REPRODUCTION OF THE MATERIAL HEREIN WITHOUT WRITTEN ERMISSION OF DESIGN TREE ENGINEERING INC. VIOLATES THE COPYRIGHT LAWS OF THE UNITED STATES AND WILL SUBJECT THE VIOLATORS TO LEGAL PROSECUTION. COPYRIGHT @ 2020 BY DESIGN TREE ENGINEERING I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. DRAWING NO. DRAWN BY: CHECKED BY: PROJECT NO.: NO.DATE DESCRIPTIONPRELIMINARY:NOT F O R CONSTRUCTIONDATE:LICENSE #: PRINTED NAME:F:\DESIGN TREE ENGINEERING\PROJECTS\000 - MISC 20\00020057 - 3725 STINSON BLVD APARTMENTS\CONSTRUCTS\CIVIL\00020057-C-BASE PROPOSED.DWG #### 11/17/2020JEREMY E. ANDERSON 44223 00020057 3725 STINSON BLVD APARTMENTS ST. ANTHONY, MN 11/17/20 RJK JEA = EXISTING HYDRANT = EXISTING CURB STOP = EXISTING GATE VALVE = EXISTING SANITARY MANHOLE = EXISTING CLEANOUT = EXISTING STORM MANHOLE = EXISTING CATCH BASIN = EXISTING CULVERT APRON = EXISTING WATER LINE = EXISTING SANITARY LINE = EXISTING STORM LINE 0 20'40' NOTES: 1. THE LOCATIONS AND ELEVATIONS OF THE EXISTING UTILITIES SHOWN HEREIN ARE APPROXIMATE. THEY HAVE BEEN PLOTTED FROM AVAILABLE SURVEYS AND/ OR RECORDS. THE CONTRACTOR IS RESPONSIBLE FOR FIELD VERIFYING LOCATION AND ELEVATION TO ENSURE THAT ANY EXISTING UTILITIES (SHOWN OR NOT SHOWN) ARE NOT DAMAGED DURING CONSTRUCTION. 2. CONTRACTOR SHALL VERIFY AND COORDINATE BUILDING UTILITY CONNECTION SIZES, LOCATIONS, AND ELEVATIONS WITH PLUMBING, MECHANICAL, AND ELECTRICAL CONTRACTORS. 3. ALL WATER PIPING SHALL BE BURIED A MINIMUM OF 8'. 4. SEE WATER DETAILS FOR ADDITIONAL INFORMATION. 5. WATER LINES SHALL MAINTAIN A MINIMUM OF 10' OF SEPARATION FROM SANITARY SEWER AND STORM SEWER INFRASTRUCTURE. 6. SANITARY SEWER CLEANOUTS SHALL BE PROVIDED WITHIN 5' OF THE BUILDING FOR UNIT'S CONNECTION. 7. SANITARY SEWER CLEANOUT SPACING SHALL NOT EXCEED 90'. 8. SANITARY SEWER SERVICES SHALL HAVE A MINIMUM OF 2.00% GRADE. 9. SEE SANITARY SEWER DETAILS FOR ADDITIONAL INFORMATION. 10. ALL CONSTRUCTION AND MATERIALS SHALL BE IN ACCORDANCE WITH THE MINNESOTA STATE PLUMBING CODE. 11. ALL PIPING SHALL BE TESTED IN ACCORDANCE WITH THE MINNESOTA STATE PLUMBING CODE. 12. ALL IMPROVEMENTS SHALL REMAIN VISIBLE FOR INSPECTION . 13. GOPHER STATE ONE CALL DAMAGE PREVENTION SYSTEM FOR BURIED UTILITIES. 1-800-252-1166 = PROPOSED HYDRANT = PROPOSED CURB STOP = PROPOSED GATE VALVE = PROPOSED SANITARY MANHOLE = PROPOSED CLEANOUT = PROPOSED STORM MANHOLE = PROPOSED CATCH BASIN = PROPOSED CULVERT APRON = PROPOSED WATER LINE = PROPOSED SANITARY LINE = PROPOSED STORM LINE =PROPOSED UNDERDRAIN CO D lUTILITY LEGEND l>DESCRIPTION CB-1 CB-2 STMH-1 STMH-2 STMH-3 0S-1 STRUCTURE TYPE ST. ANTHONY DETAIL SD-1 STORM CATCH BASIN ST. ANTHONY DETAIL SD-1 STORM CATCH BASIN ST. ANTHONY DETAIL SD-2 48" STORM MANHOLE 30" NYLOPLAST AREA DRAIN 30" NYLOPLAST AREA DRAIN SEE DETAILS UTILITY PLAN C401 38TH AVENUE NE STINSON BLVDPROPOSED BUILDING FFE=960.50 CB-2 RIM:958.00 INV:953.55 SUMP:950.55 CB-1 RIM:957.50 INV:953.70 SUMP:950.70 CORE DRILL AND CONNECT TO EXISTING CATCH BASIN INV:952.10 54 LF - 12" RCP @ 0.50% 36 LF - 12" PVC @ 0.50% CONNECT TO EXISTING 6" GATE VALVE (FIELD VERIFY LOCATION, ELEVATION, SIZE, & MATERIAL) 27 LF - 6" PVC C900 @ 8' MIN. BURY 29 LF - 6" PVC SANITARY SEWER SERVICE @ 2.00% MIN. STMH-1 RIM:957.58 INV:953.37 NE INV:952.37 E,SW CONNECT TO EXISTING 6" SANITARY SEWER SERVICE STUB (FIELD VERIFY LOCATION, ELEVATION, SIZE, & MATERIAL) 6" CLEANOUT WITHIN 5' FROM BUILDING 32 LF - 8" PVC @ 1.00% CONNECT TO ROOF DRAIN (SEE ARCHITECTURAL) OS-1 RIM:958.23 INV:953.55 STMH-2 RIM:958.30 INV:953.55 STMH-3 RIM:958.08 INV:953.55 INSERTA TEE INV: 953.90 INSPECTION PORT (TYP.) STORMTECH SC-740 STORMWATER DETENTION SYSTEM BOTTOM SAND EL:952.55 6" PERF. UNDERDRAIN INV:952.55 BOTTOM STONE EL:953.05 BOTTOM CHAMBER EL:953.55 (SEE STORMTECH DETAILS) 29 LF - 12" PVC @ 0.50% 36 LF - 12" PVC @ 0.50% 8 LF - 12" PVC @0.00% 12"x6"x6" TRIWYE (2) 6" 45° BENDS 12" CLEANOUT INV:952.55 SEE STORMTECH DETAILS FOR UNDERDRAIN DETAILS 82 FOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFO FO FO FO FO FO FO FO FO FO FO FO FOlllllllllllllllllllFOFOFOFOFOFO lOHE OHE OHE OHE OHE OHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEUGE UGE UGE UGE UGE UGEUGEUGEFOFOFOFOFOFOFOGASGASGASGASllllllllllllllllllllllllllll >==========THIS DRAWING AND THE INFORMATION THEREIN IS THE PROPERTY OF DESIGN TREE ENGINEERING INC. USE BY THE HOLDER OR DISCLOSURE TO OTHERS WITHOUT THE PERMISSION OF DESIGN TREE ENGINEERING INC. IS PROHIBITED. IT CONTAINS PROPRIETARY AND CONFIDENTIAL INFORMATION OF DESIGN TREE ENGINEERING INC. REPRODUCTION OF THE MATERIAL HEREIN WITHOUT WRITTEN ERMISSION OF DESIGN TREE ENGINEERING INC. VIOLATES THE COPYRIGHT LAWS OF THE UNITED STATES AND WILL SUBJECT THE VIOLATORS TO LEGAL PROSECUTION. COPYRIGHT @ 2020 BY DESIGN TREE ENGINEERING I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. DRAWING NO. DRAWN BY: CHECKED BY: PROJECT NO.: NO.DATE DESCRIPTIONPRELIMINARY:NOT F O R CONSTRUCTIONDATE:LICENSE #: PRINTED NAME:F:\DESIGN TREE ENGINEERING\PROJECTS\000 - MISC 20\00020057 - 3725 STINSON BLVD APARTMENTS\CONSTRUCTS\CIVIL\00020057-C-BASE PROPOSED.DWG #### 11/17/2020JEREMY E. ANDERSON 44223 00020057 3725 STINSON BLVD APARTMENTS ST. ANTHONY, MN 11/17/20 RJK JEA 0 20'40' NOTES: 1. ALL DISTURBED AREAS SHALL BE FINAL GRADED AND PERMANENTLY STABILIZED WITH THE SEED MIX IDENTIFIED ON PLANS. 2. INLET PROTECTION SHALL BE PROVIDED ON ALL CATCH BASINS AND INLETS DOWN GRADIENT OF CONSTRUCTION ACTIVITY. 3. PROVIDE SILT FENCE PERIMETER CONTROL DOWN GRADIENT OF ALL CONSTRUCTION ACTIVITY AND TEMPORARY STOCKPILES. 4. TEMPORARY ROCK ENTRANCES SHALL BE INSTALLED AND MAINTAINED THROUGHOUT THE DURATION OF CONSTRUCTION. 5. NO OFFSITE VEHICLE TRACKING IS PERMITTED. STREETS SHALL BE CLEANED AND SWEPT WHENEVER TRACKING OF SEDIMENTS OCCURS AND BEFORE SITES ARE LEFT IDLE FOR WEEKENDS AND HOLIDAYS. 6. REFER TO THE SWPPP AND THE CITY OF ST. ANTHONY EROSION CONTROL REQUIREMENTS FOR FURTHER EROSION CONTROL SEQUENCING. 7. IN ADDITION TO THESE PLANS, A STORMWATER MANAGEMENT STUDY HAS BEEN PROVIDED. THE STORMWATER MANAGEMENT STUDY INCLUDES IMPORTANT INFORMATION REGARDING STORMWATER PROTECTION FOR THE SITE, SUCH AS CONCRETE WASH-OUTS, HAZARDOUS MATERIALS HANDLING/SPILLS, EROSION CONTROL INSTALLATION, EROSION CONTROL MAINTENANCE, ETC. THE CONTRACTOR SHALL REVIEW THE STORMWATER BOOK AND USE THE INFORMATION TO COMPLY WITH ALL STATE AND LOCAL REQUIREMENTS. 8. GOPHER STATE ONE CALL DAMAGE PREVENTION SYSTEM FOR BURIED UTILITIES. 1-800-252-1166. EROSION CONTROL QUANTITIES: ROCK CONSTRUCTION ENTRANCE (200 SY) SILT FENCE (330 LF) MNDOT SEED MIX 25-151 (HYDROSEED) OR SOD (1,170 SY) INLET PROTECTION (3 EA) = EROSION CONTROL PLAN C501 38TH AVENUE NE STINSON BLVDPROPOSED BUILDING PROVIDE ROCK CONSTRUCTION ENTRANCE PROVIDE ROCK CONSTRUCTION ENTRANCE PROVIDE INLET PROTECTION PROVIDE INLET PROTECTION PROVIDE INLET PROTECTION SILT FENCE SILT FENCE SILT FENCE 83 THIS DRAWING AND THE INFORMATION THEREIN IS THE PROPERTY OF DESIGN TREE ENGINEERING INC. USE BY THE HOLDER OR DISCLOSURE TO OTHERS WITHOUT THE PERMISSION OF DESIGN TREE ENGINEERING INC. IS PROHIBITED. IT CONTAINS PROPRIETARY AND CONFIDENTIAL INFORMATION OF DESIGN TREE ENGINEERING INC. REPRODUCTION OF THE MATERIAL HEREIN WITHOUT WRITTEN ERMISSION OF DESIGN TREE ENGINEERING INC. VIOLATES THE COPYRIGHT LAWS OF THE UNITED STATES AND WILL SUBJECT THE VIOLATORS TO LEGAL PROSECUTION. COPYRIGHT @ 2020 BY DESIGN TREE ENGINEERING I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. DRAWING NO. DRAWN BY: CHECKED BY: PROJECT NO.: NO.DATE DESCRIPTIONPRELIMINARY:NOT F O R CONSTRUCTIONDATE:LICENSE #: PRINTED NAME:F:\DESIGN TREE ENGINEERING\PROJECTS\000 - MISC 20\00020057 - 3725 STINSON BLVD APARTMENTS\CONSTRUCTS\CIVIL\00020057-C-DETAILS.DWG #### 11/17/2020JEREMY E. ANDERSON 44223 00020057 3725 STINSON BLVD APARTMENTS ST. ANTHONY, MN 07/22/20 RJK JEA CIVIL DETAILS C601 84 VARIES VARIABLE WIDTH 2% MAX. CROSS SLOPE 1/2" EXPANSION JOINTS AT ADJACENT WALK OR STRUCTURE MN/DOT 3702 CONCRETE SIDEWALK MN/DOT SPEC. 2521, MIX NO. 3F52CONTRACTION JOINTS PER MN/DOT SPEC. 2521 1/2" EXPANSION JOINT COMPACTED GRANULAR MATERIAL6" 4" CURB AND GUTTER MATCH EXISTING 2" SPWEB340B WEAR COURSE OR MATCH THICKNESS WHICHEVER IS GREATER 2" SPNWB330B NON-WEAR COURSE OR MATCH THICKNESS WHICHEVER IS GREATER 2357 TACK COAT BETWEEN LIFTS COMPACTED CLASS 5 AGGREGATE BASE (MATCH EXISTING THICKNESS) MATCH ROAD SLOPE SAW CUT EXISTING BITUMINOUS SURFACE 6"4'-0"36"60" MIN. - 66" MAX.NOTE: 1. PROVIDE "NO PARKING" SIGN AT ACCESSIBLE PARKING ACCESS AISLE STALLS. 16" DIA. CONC. FOOTING CAULK TO SIDEWALK/PAVEMENT GRADE 6" PIPE W/ CONC. FILL & HDPE BOLLARD COVERS BY G.C. SLEEVE @ SIGNAGE LOCATIONS 2" DOME CONC. SEALANT @ SIGNAGE LOCATIONS 2" SQ. - 12 GA. PERFORATED STEEL SIGN POST BLUE BACKGROUND, FRONT, BACK, AND POST 12" x 18" - 16 GAUGE GALV. STEEL SIGN 1" WHITE HELVETICA MEDIUM LETTERS 1/2" WHITE BORDER BITUMINOUS PAVEMENT SECTIONTYPICAL SIDEWALK DETAIL BITUMINOUS STREET REPAIR, CURB & GUTTER INSTALLATION DETAIL COMPACTED SUBGRADE -NOTIFY ENGINEER PRIOR TO PLACING AGGREGATE BASE IF ORGANIC MATERIAL IS ENCOUNTERED IN SUBGRADE 10" CLASS 5 AGGREGATE BASE 2" NON-WEARING COURSE (SPNWB330B) TACK COAT 2" WEARING COURSE (SPWEB340B) NOTES: 1. ALL ORGANIC OR OTHER UNSUITABLE MATERIAL SHALL BE REMOVED FROM BENEATH THE ROADWAY. ACCESSIBLE PARKING SIGN & POST DETAIL CLASS 5 AGGREGATE BASE TRASH ENCLOSURE CONCRETE PAD SECTION COMPACTED SUBGRADE -NOTIFY ENGINEER PRIOR TO PLACING AGGREGATE BASE IF ORGANIC MATERIAL IS ENCOUNTERED IN SUBGRADE #4 REBAR 24" O.C. IN EACH DIRECTION 6" 6" NOTE: 1. PIPE OPENING MUST BE CORE-DRILLED AND GROUTED INSIDE AND OUTSIDE MNDOT 700-7 RING CASTING WITH 716 LID CASTING 6" PRECAST REINFORCED CONCRETE SLAB PRECAST CONCRETE SECTION OUTLET PIPE (SEE PLANS) GROUT BOTTOM 6" MINIMUM SLAB THICKNESS INLET PIPE (SEE PLANS) INV. ELEV: 953.55 RIM ELEV: 958.23 6" 5" 4'-0" OUTLET STRUCTURE OS-1 DETAIL 6" WEIR WALL INV. ELEV: 955.95 6" VARIES - SEE PLAN SLOPE VARIES (NOT TO EXCEED 2.00%) BITUMINOUS PAVEMENT 10" COMPACTED GRANULAR MATERIAL CONCRETE INTEGRAL SIDEWALK DETAIL ISOLATION JOINT R 1 2"STRUCTURETHIS DRAWING AND THE INFORMATION THEREIN IS THE PROPERTY OF DESIGN TREE ENGINEERING INC. USE BY THE HOLDER OR DISCLOSURE TO OTHERS WITHOUT THE PERMISSION OF DESIGN TREE ENGINEERING INC. IS PROHIBITED. IT CONTAINS PROPRIETARY AND CONFIDENTIAL INFORMATION OF DESIGN TREE ENGINEERING INC. REPRODUCTION OF THE MATERIAL HEREIN WITHOUT WRITTEN ERMISSION OF DESIGN TREE ENGINEERING INC. VIOLATES THE COPYRIGHT LAWS OF THE UNITED STATES AND WILL SUBJECT THE VIOLATORS TO LEGAL PROSECUTION. COPYRIGHT @ 2020 BY DESIGN TREE ENGINEERING I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. DRAWING NO. DRAWN BY: CHECKED BY: PROJECT NO.: NO.DATE DESCRIPTIONPRELIMINARY:NOT F O R CONSTRUCTIONDATE:LICENSE #: PRINTED NAME:F:\DESIGN TREE ENGINEERING\PROJECTS\000 - MISC 20\00020057 - 3725 STINSON BLVD APARTMENTS\CONSTRUCTS\CIVIL\00020057-C-DETAILS.DWG #### 11/17/2020JEREMY E. ANDERSON 44223 00020057 3725 STINSON BLVD APARTMENTS ST. ANTHONY, MN 07/22/20 RJK JEA CIVIL DETAILS C602 85 ACCEPTABLE FILL MATERIALS: STORMTECH SC-740 CHAMBER SYSTEMS PLEASE NOTE: 1. THE LISTED AASHTO DESIGNATIONS ARE FOR GRADATIONS ONLY. THE STONE MUST ALSO BE CLEAN, CRUSHED, ANGULAR. FOR EXAMPLE, A SPECIFICATION FOR #4 STONE WOULD STATE: "CLEAN, CRUSHED, ANGULAR NO. 4 (AASHTO M43) STONE". 2. STORMTECH COMPACTION REQUIREMENTS ARE MET FOR 'A' LOCATION MATERIALS WHEN PLACED AND COMPACTED IN 6" (150 mm) (MAX) LIFTS USING TWO FULL COVERAGES WITH A VIBRATORY COMPACTOR. 3. WHERE INFILTRATION SURFACES MAY BE COMPROMISED BY COMPACTION, FOR STANDARD DESIGN LOAD CONDITIONS, A FLAT SURFACE MAY BE ACHIEVED BY RAKING OR DRAGGING WITHOUT COMPACTION EQUIPMENT. FOR SPECIAL LOAD DESIGNS, CONTACT STORMTECH FOR COMPACTION REQUIREMENTS. 4. ONCE LAYER 'C' IS PLACED, ANY SOIL/MATERIAL CAN BE PLACED IN LAYER 'D' UP TO THE FINISHED GRADE. MOST PAVEMENT SUBBASE SOILS CAN BE USED TO REPLACE THE MATERIAL REQUIREMENTS OF LAYER 'C' OR 'D' AT THE SITE DESIGN ENGINEER'S DISCRETION. NOTES: 1. CHAMBERS SHALL MEET THE REQUIREMENTS OF ASTM F2418-16a, "STANDARD SPECIFICATION FOR POLYPROPYLENE (PP) CORRUGATED WALL STORMWATER COLLECTION CHAMBERS". 2. SC-740 CHAMBERS SHALL BE DESIGNED IN ACCORDANCE WITH ASTM F2787 "STANDARD PRACTICE FOR STRUCTURAL DESIGN OF THERMOPLASTIC CORRUGATED WALL STORMWATER COLLECTION CHAMBERS". 3. THE SITE DESIGN ENGINEER IS RESPONSIBLE FOR ASSESSING THE BEARING RESISTANCE (ALLOWABLE BEARING CAPACITY) OF THE SUBGRADE SOILS AND THE DEPTH OF FOUNDATION STONE WITH CONSIDERATION FOR THE RANGE OF EXPECTED SOIL MOISTURE CONDITIONS. 4. PERIMETER STONE MUST BE EXTENDED HORIZONTALLY TO THE EXCAVATION WALL FOR BOTH VERTICAL AND SLOPED EXCAVATION WALLS. 5. REQUIREMENTS FOR HANDLING AND INSTALLATION: ·TO MAINTAIN THE WIDTH OF CHAMBERS DURING SHIPPING AND HANDLING, CHAMBERS SHALL HAVE INTEGRAL, INTERLOCKING STACKING LUGS. ·TO ENSURE A SECURE JOINT DURING INSTALLATION AND BACKFILL, THE HEIGHT OF THE CHAMBER JOINT SHALL NOT BE LESS THAN 2”. ·TO ENSURE THE INTEGRITY OF THE ARCH SHAPE DURING INSTALLATION, a) THE ARCH STIFFNESS CONSTANT AS DEFINED IN SECTION 6.2.8 OF ASTM F2418 SHALL BE GREATER THAN OR EQUAL TO 550 LBS/IN/IN. AND b) TO RESIST CHAMBER DEFORMATION DURING INSTALLATION AT ELEVATED TEMPERATURES (ABOVE 73° F / 23° C), CHAMBERS SHALL BE PRODUCED FROM REFLECTIVE GOLD OR YELLOW COLORS. MATERIAL LOCATION DESCRIPTION AASHTO MATERIAL CLASSIFICATIONS COMPACTION / DENSITY REQUIREMENT D FINAL FILL: FILL MATERIAL FOR LAYER 'D' STARTS FROM THE TOP OF THE 'C' LAYER TO THE BOTTOM OF FLEXIBLE PAVEMENT OR UNPAVED FINISHED GRADE ABOVE. NOTE THAT PAVEMENT SUBBASE MAY BE PART OF THE 'D' LAYER. ANY SOIL/ROCK MATERIALS, NATIVE SOILS, OR PER ENGINEER'S PLANS. CHECK PLANS FOR PAVEMENT SUBGRADE REQUIREMENTS.N/A PREPARE PER SITE DESIGN ENGINEER'S PLANS. PAVED INSTALLATIONS MAY HAVE STRINGENT MATERIAL AND PREPARATION REQUIREMENTS. C INITIAL FILL: FILL MATERIAL FOR LAYER 'C' STARTS FROM THE TOP OF THE EMBEDMENT STONE ('B' LAYER) TO 18" (450 mm) ABOVE THE TOP OF THE CHAMBER. NOTE THAT PAVEMENT SUBBASE MAY BE A PART OF THE 'C' LAYER. GRANULAR WELL-GRADED SOIL/AGGREGATE MIXTURES, <35% FINES OR PROCESSED AGGREGATE. MOST PAVEMENT SUBBASE MATERIALS CAN BE USED IN LIEU OF THIS LAYER. AASHTO M145¹ A-1, A-2-4, A-3 OR AASHTO M43¹ 3, 357, 4, 467, 5, 56, 57, 6, 67, 68, 7, 78, 8, 89, 9, 10 BEGIN COMPACTIONS AFTER 12" (300 mm) OF MATERIAL OVER THE CHAMBERS IS REACHED. COMPACT ADDITIONAL LAYERS IN 6" (150 mm) MAX LIFTS TO A MIN. 95% PROCTOR DENSITY FOR WELL GRADED MATERIAL AND 95% RELATIVE DENSITY FOR PROCESSED AGGREGATE MATERIALS. ROLLER GROSS VEHICLE WEIGHT NOT TO EXCEED 12,000 lbs (53 kN). DYNAMIC FORCE NOT TO EXCEED 20,000 lbs (89 kN). B EMBEDMENT STONE: FILL SURROUNDING THE CHAMBERS FROM THE FOUNDATION STONE ('A' LAYER) TO THE 'C' LAYER ABOVE.CLEAN, CRUSHED, ANGULAR STONE AASHTO M43¹ 3, 357, 4, 467, 5, 56, 57 NO COMPACTION REQUIRED. A FOUNDATION STONE: FILL BELOW CHAMBERS FROM THE SUBGRADE UP TO THE FOOT (BOTTOM) OF THE CHAMBER.CLEAN, CRUSHED, ANGULAR STONE AASHTO M43¹ 3, 357, 4, 467, 5, 56, 57 PLATE COMPACT OR ROLL TO ACHIEVE A FLAT SURFACE.2,3 18" (450 mm) MIN* 8' (2.4 m) MAX 6" (150 mm) MIN D C B A 12" (300 mm) MIN 12" (300 mm) TYP51" (1295 mm)6" (150 mm) MIN 30" (760 mm) DEPTH OF STONE TO BE DETERMINED BY SITE DESIGN ENGINEER 6" (150 mm) MIN *TO BOTTOM OF FLEXIBLE PAVEMENT. FOR UNPAVED INSTALLATIONS WHERE RUTTING FROM VEHICLES MAY OCCUR, INCREASE COVER TO 24" (600 mm). PAVEMENT LAYER (DESIGNED BY SITE DESIGN ENGINEER) SC-740 END CAP EXCAVATION WALL (CAN BE SLOPED OR VERTICAL) PERIMETER STONE (SEE NOTE 5) SUBGRADE SOILS (SEE NOTE 4) ADS GEOSYNTHETICS 601T NON-WOVEN GEOTEXTILE ALL AROUND CLEAN, CRUSHED, ANGULAR STONE IN A & B LAYERS NOTE: INSPECTION PORTS MAY BE CONNECTED THROUGH ANY CHAMBER CORRUGATION CREST. STORMTECH CHAMBER 8" NYLOPLAST INSPECTION PORT BODY (PART# 2708AG4IPKIT) OR TRAFFIC RATED BOX W/SOLID LOCKING COVER CONCRETE COLLAR PAVEMENT 12" (300 mm) MIN WIDTH CONCRETE SLAB 6" (150 mm) MIN THICKNESS 4" PVC INSPECTION PORT DETAIL (SC SERIES CHAMBER) NTS CONCRETE COLLAR NOT REQUIRED FOR UNPAVED APPLICATIONS 4" (100 mm) SDR 35 PIPE 4" (100 mm) INSERTA TEE TO BE CENTERED ON CORRUGATION CREST NOMINAL CHAMBER SPECIFICATIONS SIZE (W X H X INSTALLED LENGTH)51.0" X 30.0" X 85.4" (1295 mm X 762 mm X 2169 mm) CHAMBER STORAGE 45.9 CUBIC FEET (1.30 m³) MINIMUM INSTALLED STORAGE*74.9 CUBIC FEET (2.12 m³) WEIGHT 75.0 lbs.(33.6 kg) *ASSUMES 6" (152 mm) STONE ABOVE, BELOW, AND BETWEEN CHAMBERS SC-740 TECHNICAL SPECIFICATION NTS BUILD ROW IN THIS DIRECTION OVERLAP NEXT CHAMBER HERE (OVER SMALL CORRUGATION) START END 90.7" (2304 mm) ACTUAL LENGTH 85.4" (2169 mm) INSTALLED LENGTH A A C B 51.0" (1295 mm) 30.0" (762 mm) 45.9" (1166 mm)12.2" (310 mm) 29.3" (744 mm) PART #STUB A B C SC740EPE06T / SC740EPE06TPC 6" (150 mm) 10.9" (277 mm) 18.5" (470 mm)--- SC740EPE06B / SC740EPE06BPC ---0.5" (13 mm) SC740EPE08T /SC740EPE08TPC 8" (200 mm) 12.2" (310 mm) 16.5" (419 mm)--- SC740EPE08B / SC740EPE08BPC ---0.6" (15 mm) SC740EPE10T / SC740EPE10TPC 10" (250 mm) 13.4" (340 mm) 14.5" (368 mm)--- SC740EPE10B / SC740EPE10BPC ---0.7" (18 mm) SC740EPE12T / SC740EPE12TPC 12" (300 mm) 14.7" (373 mm) 12.5" (318 mm)--- SC740EPE12B / SC740EPE12BPC ---1.2" (30 mm) SC740EPE15T / SC740EPE15TPC 15" (375 mm) 18.4" (467 mm) 9.0" (229 mm)--- SC740EPE15B / SC740EPE15BPC ---1.3" (33 mm) SC740EPE18T / SC740EPE18TPC 18" (450 mm) 19.7" (500 mm) 5.0" (127 mm)--- SC740EPE18B / SC740EPE18BPC ---1.6" (41 mm) SC740EPE24B*24" (600 mm) 18.5" (470 mm)---0.1" (3 mm) SC740EPE24BR*24" (600 mm) 18.5" (470 mm)---0.1" (3 mm) ALL STUBS, EXCEPT FOR THE SC740EPE24B/SC740EPE24BR ARE PLACED AT BOTTOM OF END CAP SUCH THAT THE OUTSIDE DIAMETER OF THE STUB IS FLUSH WITH THE BOTTOM OF THE END CAP. FOR ADDITIONAL INFORMATION CONTACT STORMTECH AT 1-888-892-2694. * FOR THE SC740EPE24B/SC740EPE24BR THE 24" (600 mm) STUB LIES BELOW THE BOTTOM OF THE END CAP APPROXIMATELY 1.75" (44 mm). BACKFILL MATERIAL SHOULD BE REMOVED FROM BELOW THE N-12 STUB SO THAT THE FITTING SITS LEVEL. NOTE: ALL DIMENSIONS ARE NOMINAL PRE-FAB STUB AT BOTTOM OF END CAP WITH FLAMP END WITH "BR" PRE-FAB STUBS AT BOTTOM OF END CAP FOR PART NUMBERS ENDING WITH "B" PRE-FAB STUBS AT TOP OF END CAP FOR PART NUMBERS ENDING WITH "T" PRE-CORED END CAPS END WITH "PC" INSERTA TEE DETAIL NTS (X) SIDE VIEWSECTION A-A A A NOTE: PART NUMBERS WILL VARY BASED ON INLET PIPE MATERIALS. CONTACT STORMTECH FOR MORE INFORMATION. CHAMBER MAX DIAMETER OF INSERTA TEE HEIGHT FROM BASE OF CHAMBER (X) SC-310 6" (150 mm)4" (100 mm) SC-740 10" (250 mm)4" (100 mm) DC-780 10" (250 mm)4" (100 mm) MC-3500 12" (300 mm)6" (150 mm) MC-4500 12" (300 mm)8" (200 mm) INSERTA TEE FITTINGS AVAILABLE FOR SDR 26, SDR 35, SCH 40 IPS GASKETED & SOLVENT WELD, N-12, HP STORM, C-900 OR DUCTILE IRON CONVEYANCE PIPE MATERIAL MAY VARY (PVC, HDPE, ETC.) INSERTA TEE CONNECTION PLACE ADSPLUS WOVEN GEOTEXTILE (CENTERED ON INSERTA-TEE INLET) OVER BEDDING STONE FOR SCOUR PROTECTION AT SIDE INLET CONNECTIONS. GEOTEXTILE MUST EXTEND 6" (150 mm) PAST CHAMBER FOOT INSERTA TEE TO BE INSTALLED, CENTERED OVER CORRUGATION DO NOT INSTALL INSERTA-TEE AT CHAMBER JOINTSNYLOPLAST DRAIN BASIN NTS NOTES 1. 8-30" (200-750 mm) GRATES/SOLID COVERS SHALL BE DUCTILE IRON PER ASTM A536 GRADE 70-50-05 2. 12-30" (300-750 mm) FRAMES SHALL BE DUCTILE IRON PER ASTM A536 GRADE 70-50-05 3. DRAIN BASIN TO BE CUSTOM MANUFACTURED ACCORDING TO PLAN DETAILS 4. DRAINAGE CONNECTION STUB JOINT TIGHTNESS SHALL CONFORM TO ASTM D3212 FOR CORRUGATED HDPE (ADS & HANCOR DUAL WALL) & SDR 35 PVC 5. FOR COMPLETE DESIGN AND PRODUCT INFORMATION: WWW.NYLOPLAST-US.COM 6. TO ORDER CALL: 800-821-6710 A PART # GRATE/SOLID COVER OPTIONS 8" (200 mm)2808AG PEDESTRIAN LIGHT DUTY STANDARD LIGHT DUTY SOLID LIGHT DUTY 10" (250 mm)2810AG PEDESTRIAN LIGHT DUTY STANDARD LIGHT DUTY SOLID LIGHT DUTY 12" (300 mm)2812AG PEDESTRIAN AASHTO H-10 STANDARD AASHTO H-20 SOLID AASHTO H-20 15" (375 mm)2815AG PEDESTRIAN AASHTO H-10 STANDARD AASHTO H-20 SOLID AASHTO H-20 18" (450 mm)2818AG PEDESTRIAN AASHTO H-10 STANDARD AASHTO H-20 SOLID AASHTO H-20 24" (600 mm)2824AG PEDESTRIAN AASHTO H-10 STANDARD AASHTO H-20 SOLID AASHTO H-20 30" (750 mm)2830AG PEDESTRIAN AASHTO H-20 STANDARD AASHTO H-20 SOLID AASHTO H-20 INTEGRATED DUCTILE IRON FRAME & GRATE/SOLID TO MATCH BASIN O.D. VARIOUS TYPES OF INLET AND OUTLET ADAPTERS AVAILABLE: 4-30" (100-750 mm) FOR CORRUGATED HDPE WATERTIGHT JOINT (CORRUGATED HDPE SHOWN) BACKFILL MATERIAL BELOW AND TO SIDES OF STRUCTURE SHALL BE ASTM D2321 CLASS I OR II CRUSHED STONE OR GRAVEL AND BE PLACED UNIFORMLY IN 12" (305 mm) LIFTS AND COMPACTED TO MIN OF 90% TRAFFIC LOADS: CONCRETE DIMENSIONS ARE FOR GUIDELINE PUPOSES ONLY. ACTUAL CONCRETE SLAB MUST BE DESIGNED GIVING CONSIDERATION FOR LOCAL SOIL CONDITIONS, TRAFFIC LOADING & OTHER APPLICABLE DESIGN FACTORS ADAPTER ANGLES VARIABLE 0°- 360° ACCORDING TO PLANS 18" (457 mm) MIN WIDTH A AASHTO H-20 CONCRETE SLAB 8" (203 mm) MIN THICKNESS VARIABLE SUMP DEPTH ACCORDING TO PLANS [6" (152 mm) MIN ON 8-24" (200-600 mm), 10" (254 mm) MIN ON 30" (750 mm)] 4" (102 mm) MIN ON 8-24" (200-600 mm) 6" (152 mm) MIN ON 30" (750 mm) 12" (610 mm) MIN (FOR AASHTO H-20) INVERT ACCORDING TO PLANS/TAKE OFF NOTE: ALL ORGANIC OR OTHER UNSUITABLE MATERIAL SHALL BE REMOVED FROM BENEATH THE ROADWAY. STORMWATER DETENTION SYSTEM UNDERDRAIN DETAIL PERFORATED HDPE UNDERDRAIN, SEE PLANS FOR SIZE AND ALIGNMENT SUBGRADE NON-WOVEN GEOTEXTILE FABRIC SEE CHAMBER SECTION DETAILS NON-WOVEN GEOTEXTILE FABRIC PROCESSED SAND SEE BITUMINOUS SECTION DETAIL SAND SPECIFICATIONS: 1. PROCESSED SAND SHALL BE A POORLY GRADED SAND THAT SHALL RESIST COMPACTION AND PROVIDE FOR IMPROVED DRAINAGE/AERATION. 6" UNDERDRAIN GRAVEL BLANKET 1-1.5" DOUBLE WASHED STONE OR 1/4"-1/2" WASHED RIVER RUN PEA GRAVEL EXTENDING 6" FROM UNDERDRAIN PIPE SIDES NON-WOVEN GEOTEXTILE AROUND GRAVEL BLANKET STORMWATER DETENTION SYSTEM LAYOUT DETAIL PLACE MINIMUM 12.5' OF ADSPLUS 125 WOVEN GEOTEXTILE OVER BEDDING STONE AND UNDERNEATH CHAMBER FEET FOR SCOUR PROTECTION AT ALL CHAMBER INLET ROWS (TYP.) INSPECTION PORT (TYP.) 6" CLEANOUT 6" CLEANOUT 6" CLEANOUT 6" CLEANOUT 12"x6"x6" TRIWYE (2) 6" 45° BENDS INV:952.55 6"x6" WYE 6" 45° BEND 16 LF - 6" PERFORATED HDPE @0.00% INV:952.55 19 LF - 6" PERFORATED HDPE @0.00% INV:952.55 12" CLEANOUT 12" PVC MANIFOLD @0.00% INV:953.55 SEE PLANS FOR STORM SEWER CONTINUATION SEE PLANS FOR STORM SEWER CONTINUATION SEE PLANS FOR STORM SEWER CONTINUATION SEE PLANS FOR STORM SEWER CONTINUATION INSERTA TEE INV:953.90 STMH-2 (SEE PLANS) STMH-3 (SEE PLANS) CB-2 (SEE PLANS) 12" PVC MANIFOLD @0.00% INV:953.55 6"x6" WYE 6" 45° BEND 86 LF - 6" PERFORATED HDPE @0.00% INV:952.55 86 LF - 6" PERFORATED HDPE @0.00% INV:952.55 EXTEND STONE BEDDING TO INCLUDE UNDERDRAIN THIS DRAWING AND THE INFORMATION THEREIN IS THE PROPERTY OF DESIGN TREE ENGINEERING INC. USE BY THE HOLDER OR DISCLOSURE TO OTHERS WITHOUT THE PERMISSION OF DESIGN TREE ENGINEERING INC. IS PROHIBITED. IT CONTAINS PROPRIETARY AND CONFIDENTIAL INFORMATION OF DESIGN TREE ENGINEERING INC. REPRODUCTION OF THE MATERIAL HEREIN WITHOUT WRITTEN ERMISSION OF DESIGN TREE ENGINEERING INC. VIOLATES THE COPYRIGHT LAWS OF THE UNITED STATES AND WILL SUBJECT THE VIOLATORS TO LEGAL PROSECUTION. COPYRIGHT @ 2020 BY DESIGN TREE ENGINEERING I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. DRAWING NO. DRAWN BY: CHECKED BY: PROJECT NO.: NO.DATE DESCRIPTIONPRELIMINARY:NOT F O R CONSTRUCTIONDATE:LICENSE #: PRINTED NAME:F:\DESIGN TREE ENGINEERING\PROJECTS\000 - MISC 20\00020057 - 3725 STINSON BLVD APARTMENTS\CONSTRUCTS\CIVIL\00020057-C-DETAILS.DWG #### 11/17/2020JEREMY E. ANDERSON 44223 00020057 3725 STINSON BLVD APARTMENTS ST. ANTHONY, MN 07/22/20 RJK JEA STORMTECH DETAILS C603 86 AA PLAN SECTION A-A EXCAVATED WASHOUT STRUCTURE PLAN SECTION B-B BB STAPLE DETAIL WASHOUT STRUCTURE WITH STRAW BALES NOTE: CAN BE TWO STACKED BALES OR PARTIALLY EXCAVATED TO REACH 3 FT DEPTH BB PLAN SECTION B-B WASHOUT STRUCTURE WITH WOOD PLANKS CONSTRUCTION SPECIFICATIONS 1. LOCATE WASHOUT STRUCTURE A MINIMUM OF 50 FEET AWAY FROM OPEN CHANNELS, STORM DRAIN INLETS, SENSITIVE AREAS, WETLANDS, BUFFERS AND WATER COURSES AND AWAY FROM CONSTRUCTION TRAFFIC. 2. SIZE WASHOUT STRUCTURE FOR VOLUME NECESSARY TO CONTAIN WASH WATER AND SOLIDS AND MAINTAIN AT LEAST 4 INCHES OF FREEBOARD. TYPICAL DIMENSIONS ARE 10 FEET X 10 FEET X 3 FEET DEEP. 3. PREPARE SOIL BASE FREE OF ROCKS OR OTHER DEBRIS THAT MAY CAUSE TEARS OR HOLES IN THE LINER. FOR LINER, USE 10 MIL OR THICKER UV RESISTANT, IMPERMEABLE SHEETING, FREE OF HOLES AND TEARS OR OTHER DEFECTS THAT COMPROMISE IMPERMEABILITY OF THE MATERIAL. 4. PROVIDE A SIGN FOR THE WASHOUT IN CLOSE PROXIMITY TO THE FACILITY. 5. KEEP CONCRETE WASHOUT STRUCTURE WATER TIGHT. REPLACE IMPERMEABLE LINER IF DAMAGED (E.G., RIPPED OR PUNCTURED). EMPTY OR REPLACE WASHOUT STRUCTURE THAT IS 75 PERCENT FULL, AND DISPOSE OF ACCUMULATED MATERIAL PROPERLY. DO NOT REUSE PLASTIC LINER. WET-VACUUM STORED LIQUIDS THAT HAVE NOT EVAPORATED AND DISPOSE OF IN AN APPROVED MANNER. PRIOR TO FORECASTED RAINSTORMS, REMOVE LIQUIDS OR COVER STRUCTURE TO PREVENT OVERFLOWS. REMOVE HARDENED SOLIDS, WHOLE OR BROKEN UP, FOR DISPOSAL OR RECYCLING. MAINTAIN RUNOFF DIVERSION AROUND EXCAVATED WASHOUT STRUCTURE UNTIL STRUCTURE IS REMOVED. WOOD FRAME IMPERMEABLE SHEETING IMPERMEABLE SHEETING WOOD FRAME SECURELY FASTENED AROUND ENTIRE PERIMETER WITH TWO STAKES STAKE (TYP.) STAKE (TYP.) IMPERMEABLE SHEETING STRAW BALE (TYP.) STAPLES (2 PER BALE) BINDING WIRE STRAW BALE (TYP.) IMPERMEABLE SHEETING 1/8" DIA. STEEL WIRE WOOD OR METAL STAKES (2 PER BALE) SANDBAG IMPERMEABLE SHEETING IMPERMEABLE SHEETING 1:1 OR FLATTER SIDE SLOPE SANDBAG OR EQUIVALENT 10' TYP. 10' TYP.3' TYP. 10' TYP. 2" 4" 3' TYP. 10' TYP. 10' TYP. 3' TYP. 10' TYP. 10' TYP. CONCRETE WASHOUT DETAILS THIS DRAWING AND THE INFORMATION THEREIN IS THE PROPERTY OF DESIGN TREE ENGINEERING INC. USE BY THE HOLDER OR DISCLOSURE TO OTHERS WITHOUT THE PERMISSION OF DESIGN TREE ENGINEERING INC. IS PROHIBITED. IT CONTAINS PROPRIETARY AND CONFIDENTIAL INFORMATION OF DESIGN TREE ENGINEERING INC. REPRODUCTION OF THE MATERIAL HEREIN WITHOUT WRITTEN ERMISSION OF DESIGN TREE ENGINEERING INC. VIOLATES THE COPYRIGHT LAWS OF THE UNITED STATES AND WILL SUBJECT THE VIOLATORS TO LEGAL PROSECUTION. COPYRIGHT @ 2020 BY DESIGN TREE ENGINEERING I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. DRAWING NO. DRAWN BY: CHECKED BY: PROJECT NO.: NO.DATE DESCRIPTIONPRELIMINARY:NOT F O R CONSTRUCTIONDATE:LICENSE #: PRINTED NAME:F:\DESIGN TREE ENGINEERING\PROJECTS\000 - MISC 20\00020057 - 3725 STINSON BLVD APARTMENTS\CONSTRUCTS\CIVIL\00020057-C-DETAILS.DWG #### 11/17/2020JEREMY E. ANDERSON 44223 00020057 3725 STINSON BLVD APARTMENTS ST. ANTHONY, MN 07/22/20 RJK JEA EROSION CONTROL DETAILS C604 87 88 89 THIS PAGE LEFT INTENTIONALLY BLANK 90 CITY COUNCIL MEETING DECEMBER 8, 2020 3725 Stinson Boulevard Interstate Development: Final Plan PUD PRELIMINARY –SITE LOCATION 91 FINAL PLAN PUD –PROPOSED SITE PLAN PRELIMINARY PLAN PUD – ORIGINAL BUILDING PERSPECTIVE DRAWING 92 FINAL PLAN PUD –FIRST FLOOR PLAN FINAL PLAN PUD –SITE PLAN ILLUSTRATION 93 PRELIMINARY PLAN PUD –BUILDING ELEVATIONS PUD FINAL PLAN FLEXIBILITY REQUESTS Parking supply (code requires 2 per unit, total of 76); applicant proposes 46 spaces – 1.2 per unit or 1 per bedroom. Open parking (code requires 50% of parking spaces to be covered) Lot coverage/impervious surface (R-4 code limits this to 50%); applicant’s proposal is approximately 76.7%. Density (R-4 code limits this to approximately 24 units per acre, Comprehensive Plan calls for 20-40 units per acre); applicant is proposing approximately 44 units per acre. 94 FINAL PLAN PUD –CITY COUNCIL ACTION Consideration of approval for a Final Plan PUD as presented by Interstate Development at 3725 Stinson Blvd., and with conditions, including those recommended by staff, incorporating a PUD Rezoning Ordinance creating the Stinson Apartments PUD Sub -District of the Silver Lake Village PUD District. 95 THIS PAGE LEFT INTENTIONALLY BLANK 96 CITY OF SAINT ANTHONY VILLAGE HENNEPIN COUNTY, MINNESOTA RESOLUTION 20-089 A RESOLUTION APPROVING A REQUEST FOR A FINAL PLAN STAGE PUD, CONSITUTING AN AMENDMENT TO THE SILVER LAKE VILLAGE PUD, AND ESTABLISHING THE STINSON APARTMENTS PUD SUB-DISTRICT, FOR THE INTERSTATE DEVELOPMENT MULTI-FAMILY RESIDENTIAL PROJECT OF 38 DWELLING UNITS AT 3725 STINSON BOULEVARD NE WHEREAS, the City of St. Anthony Village received a request from Interstate Development for an amendment to the Silver Lake Village PUD, developing the site for a multiple family residential development of 38 dwelling units in a single building at 3725 Stinson Boulevard; and WHEREAS, the property consists of approximately .85 acres is located in the Silver Lake Village PUD district; and WHEREAS, the subject parcel is currently undeveloped and vacant; and WHEREAS, the project would be consistent with the St. Anthony 2040 Comprehensive Plan related to multiple family residential use; and WHEREAS, the density of the proposed project is consistent with the Comprehensive Plan density range for such use, when considering overall density in the PUD area and the remaining developable land in said PUD; and WHEREAS, the City Council has considered all of the comments and the staff report, which are incorporated by reference into the resolution; and WHEREAS, the Planning Commission held a public hearing on August 18, 2020 on the application for Preliminary Plan PUD, and the applicant and members of the public were provided the opportunity to present information to the Planning Commission; and WHEREAS, the City Council approved the Preliminary Plan PUD, subject to specific conditions listed in the staff report; and WHEREAS, the City Council makes the following findings of fact in support of the resolution for approval: 1. The property is located in an area of mixed commercial and residential use. 2. The proposed improvements to the property are consistent with the character of the neighborhood in which it is located. 3. The various aspects of the proposed development are consistent with requirements of the City’s high density housing requirements, or are supported by the goals and objectives of the requirements for PUD consideration, and the long-term expectations of the Silver Lake Village PUD. 97 4. With the modification to the site plan under conditions as approved with the Preliminary Plan PUD, the proposed improvements constitute a reasonable use of the property. 5. The density, parking, and other aspects of the site constitute reasonable accommodations within the expected range of PUD consideration. 6. The flexibility offered under the PUD, including setbacks, parking, and impervious surface are reasonably consistent with other development in this area of the PUD. 7. The proposed PUD will accommodate reasonable use without negative impacts on neighboring property nor on public improvements and services. NOW THEREFORE MAY IT BE RESOVLED, that the City Council of the City of St. Anthony Village accepts the findings and recommendations documented in the staff report and approves Final Plan for Amendment to the Silver Lake Village PUD by creation of the Stinson Apartments PUD Sub-District, as shown on the plans submitted on November 17, 2020, at 3725 Stinson Boulevard NE: 1. The applicant enters into the PUD Development Agreement and provides the securities required by it as directed by the City Attorney. 2. The Conditions noted as a part of the Preliminary Plan PUD approval (cited in the staff report for 12-8-2020) are verified as having been met, including the submission of revised plans necessary to demonstrate compliance prior to construction permitting. 3. All documents are recorded as may be required. 4. Any substantive changes to the plans or relevant documents, as determined by the City Manager, may require resubmission and revised City Council action. Passed in regular session of the City Council on the 8th day of December, 2020. ____________________________________ Randy Stille, Mayor ATTEST:____________________________ Nicole Miller, City Clerk Review for Administration: ____________________________________ Charlie Yunker, Interim City Manager 98 ORDINANCE 2020-04 1 CITY OF ST. ANTHONY RAMSEY COUNTY, MINNESOTA AN ORDINANCE AMENDING TITLE XV OF THE ST. ANTHONY CITY CODE, KNOWN AS THE ZONING ORDINANCE, BY AMENDING THE SLIVER LAKE VILLAGE PLANND UNIT DEVELOPMENT DISTRICT BY REVISING THE PUD DISTRICT DEVELOPMENT PLANS TO CONVERT THE LAND USE ON THE FOLLOWING PARCEL TO A 38 UNIT MULTI-FAMILY RESIDENTIAL DEVELOPMENT AND APPURENANT ACCESSORY USES: PID: 31-30-23-33-0209 THE CITY COUNCIL OF THE CITY OF ST. ANTHONY HEREBY ORDAINS: Section 1. Section 152.020 (E) – Planned Unit Developments is hereby amended by adding the following: (2) Stinson Apartments PUD Sub-District (a) Purpose. The purpose of the Stinson Apartments PUD Sub-District, a portion of the Silver Lake Village PUD District, is to provide for the development of certain real estate subject to the Sub-District for high- density residential land uses. (b) Permitted Uses. Permitted principal uses in the Stinson Apartments PUD Sub-District shall be those uses as found in the R-4, Multiple Family Residential District of the St. Anthony Zoning Ordinance, subject to any approved PUD Development Agreement on file with the City, as well as the Final Stage Development Plans submitted on 11/17/2020, as may be amended. The introduction of any other use from any district shall be reviewed under the requirements of the St. Anthony Zoning Ordinance, Chapter XV, Section 152.200 et seq. – Planned Unit Developments for Development Stage PUD and Final Stage PUD. (c) Accessory Uses. Accessory uses shall be those commonly accessory and incidental to the allowed uses, and as specifically identified by the approved final stage PUD plans. (d) District Performance Standards. Performance standards for the development of any lot in the Stinson Apartments PUD Sub-District shall adhere to the approved final stage PUD plans and development agreement for each lot. In such case where any proposed improvement is not addressed by the final stage PUD, then the regulations of the R- 4, Multiple Family Residential District shall apply, as applicable to the use on the subject parcel. 99 ORDINANCE 2020-04 2 (e) Amendments. Where changes to the PUD are proposed in the manner of use, density, site plan, development layout, building size, mass, or coverage, or any other change, the proposer shall apply for an amendment to the PUD under the terms of the St. Anthony Zoning Ordinance, Section 152.200 et seq.. The City may require that substantial changes in overall use of the PUD property be processed as a new project, including a zoning district amendment. Section 2. The zoning map of the City of St. Anthony is hereby amended to rezone the following described parcels to Silver Lake Village PUD, Planned Unit Development District: PID: 313023330209 Section 3. The City Clerk is hereby directed to mark the official zoning map to reflect this ordinance. The map shall not be republished at this time. Section 4. The City Clerk is hereby directed to make the changes required by this Ordinance as part of the Official St. Anthony City Code, Title XV, Zoning Ordinance, and to renumber the tables and chapters accordingly as necessary to provide the intended effect of this Ordinance. The City Clerk is further directed to make necessary corrections to any internal citations that result from said renumbering process, provided that such changes retain the purpose and intent of the Zoning Ordinance as has been adopted. Section 5. This Ordinance shall take effect and be in full force from and after its passage and publication. The ordinance in its entirety and map shall be posted on the City website after publication. Copies of the complete Ordinance and map are available online and at St. Anthony City Hall for examination upon request. ADOPTED BY the St. Anthony City Council this 8th day of December, 2020. Effective Date: This ordinance shall become effective as of its publication. Adopted: December 8, 2020 CITY OF SAINT ANTHONY VILLAGE By:_________________________________ Randy Stille, Mayor ATTEST: By:_________________________________ Nicole Miller, City Clerk Publish: Star Tribune Publication Date: December 11, 2020 100 C:\Users\jmessner\Desktop\LTR-hmcc-112520.docx 178 E 9TH STREET | SUITE 200 | SAINT PAUL, MN | 55101 | 651.286.8450 | WSBENG.COM November 25, 2020 Honorable Mayor, City Council and Staff c/o Charlie Yunker, Interim City Manager City of St. Anthony Village 3301 Silver Lake Road NE St. Anthony, MN 55418 Re: Resolution Approving Plans and Specifications and Ordering Advertisement for Bids 2021 Street and Utility Improvement Project St. Anthony Village, MN WSB Project No. 015900-000 Dear Honorable Mayor, City Council, and Staff: Following this letter is a resolution for your consideration at the December 8, 2020, City Council Meeting. The resolution approves the plans and specifications and authorizes the advertisement for bids for the 2021 Street and Utility Improvement Project. We anticipate opening bids on or near February 3, 2021 and bringing the bid results to Council in February. Sincerely, WSB Justin Messner, PE City Engineer Attachments cc: Jeremy Gumke, City of St. Anthony Village Nicole Miller, City of St. Anthony Village Katie Koscielak, WSB jgm 101 THIS PAGE LEFT INTENTIONALLY BLANK 102 2021 Street and Utility Improvement Project CITY COUNCIL MEETING DECEMBER 8, 2020 Method for Selection -Reconstruction Projects •Flood Relief Effort •Existing Utility Deterioration •Pavement Condition •Adjacent Infrastructure Replacement (Construction Phasing) Method for Selection –Mill & Overlay Project •Maintain previously reconstructed roadways Proposed Capital Improvement Plan (CIP) 103 Proposed Street & Utility Improvement Project •Skycroft Drive (32nd Avenue to 33rd Avenue) •Croft Drive (32nd Avenue to 33rd Avenue) Location Sanitary Sewer System Improvements 104 Water Distribution System Improvements Drainage Improvements 105 Surface Improvements: Croft Drive and Skycroft Drive •31st Avenue (Rankin Road to Old Hwy 8) •Croft Drive (Rankin Road to 31st Avenue) •29th Avenue (Stinson Boulevard to Silver Lake Road) •St. Anthony Boulevard (Stinson Boulevard to Kenzie Terrace) Proposed Mill and Overlay Improvement Project Location 106 Surface Improvements: Mill and Overlay •Chandler Drive •Foss Road Lift Station Location Proposed Sanitary Sewer Capacity Improvements 107 Project Costs / Funding Breakdown Proposed Improvements Assessments City Cost Total Total Street Improvements $165,780.00 $659,320.00 $825,100.00 Total Sanitary Sewer Improvements $0.00 $164,500.00 $164,500.00 Total Water Main Improvements $25,730.00 $196,770.00 $222,500.00 Total Storm Sewer Improvements $50,900.00 $94,600.00 $145,500.00 Total Mill and Overlay Improvements $349,980.00 $640,320.00 $990,300.00 Total Chandler Drive and Foss Road Sanitary Sewer Improvements $0.00 $185,600.00 $185,600.00 Total Proposed Improvements $592,390.00 $1,941,110.00 $2,533,500.00 Project funding from Special Assessments, 429 Public Improvement Bonds, and Tax Incremental Funds (TIF) Assessed Parcels –Street Reconstruction 108 Assessed Parcels –Mill and Overlay •Council Authorizes Feasibility May 12, 2020 (1st of 8 Meetings) •Council Accepts Feasibility August 11, 2020 (2nd of 8 Meetings) •1st Public Informational Meeting October 21, 2020 (3rd of 8 Meetings) •Council Approve Plans December 8, 2020 (4th of 8 Meetings) •2nd Public Informational Meeting January 2021 (5th of 8 Meetings) •Open Bids February 3, 2021 14 Project Schedule 109 •Council Call for Hearing / Order Preparation of Assessments February 2021 (6th of 8 Meetings) •3rd Public Informational Meeting March 2021 (7th of 8 Meetings) •Public Hearing / Award Contract April 2021 (8th of 8 Meetings) •Award Sale of Bonds April 2021 •Begin Construction May/June 2021 •Substantial Completion September 2021 •Final Paving June 2022 15 Project Schedule 16 Sign up to receive email and/or text message project status updates by visiting the project webpage located under the tab on the City’s website at http://www.savmn.com Notifications / Project Updates 110 17 Find additional information regarding street reconstruction projects for the City of St. Anthony, by visiting the “St. Anthony Village Reconstruction Process” webpage located under the tab on the City’s website at http://www.savmn.com Additional Information Questions 111 THIS PAGE LEFT INTENTIONALLY BLANK 112 CITY OF ST. ANTHONY VILLAGE STATE OF MINNESOTA RESOLUTION 20-090 A RESOLUTION ACCEPTING PLANS AND SPECIFICATIONS AND ORDERING ADVERTISEMENT FOR BIDS FOR THE 2021 STREET AND UTILITY IMPROVEMENT PROJECT WHEREAS, the engineering firm of WSB has prepared plans and specifications for the improvement of: Street & Utility Reconstruction • Skycroft Drive from 32nd Avenue to 33rd Avenue • Croft Drive from 32nd Avenue to 33rd Avenue Mill and Overlay • 31st Avenue from Rankin Road to Old Highway 8 • Croft Drive from Ranking Road to 31st Avenue • 29th Avenue from Stinson Boulevard to Silver Lake Road • St. Anthony Boulevard from Stinson Boulevard to Kenzie Terrace Sanitary Sewer Capacity Improvements • Sanitary sewer on Chandler Drive • Foss Road Lift Station Pumps NOW, THEREFORE, BE IT RESOLVED, by the City Council of the City of St. Anthony Village that: 1.) Such improvements are necessary, cost-effective, and feasible. 2.) Such plans and specifications are hereby approved. 3.) The consulting engineering firm shall prepare and cause to be inserted in the official paper and in the Finance and Commerce, an advertisement for bids upon the making of such improvements under such approved plans and specifications. The advertisement shall be published for two times, shall specify the work to be done, shall state that bids will be opened on or about February 3, 2021, and bids will be considered by the City Council. Any bidder whose responsibility is questioned during consideration of the bid will be given an opportunity to address the Council on the issue of responsibility. No bids will be considered unless sealed and filed with the Clerk and accompanied by a cash deposit, cashier’s check, bid bond, or certified check payable to the City of St. Anthony Village for Five (5%) percent of the amount of such bid. Adopted this 8th day of December, 2020. _____________________________ Randy Stille, Mayor ATTEST:____________________________ Nicole Miller, City Clerk Reviewed for administration: ______________________________ Charlie Yunker, Interim City Manager 113 THIS PAGE LEFT INTENTIONALLY BLANK 114 REQUEST FOR COUNCIL CONSIDERATION Meeting Date: December 8, 2020 Resolution- a resolution approving the Joint Powers Agreement for the establishment of the North East Metropolitan Area Municipal Internetworking Collaborative, to be known as “Metro-INET”. OVERVIEW: In front of you this evening is a resolution approving the Joint Powers Agreement (JPA) for the establishment of the North East Metropolitan Area Municipal Internetworking Collaborative, to be known as “Metro-INET”. Metro-INET originally started as a collaboration between Roseville and Mounds View to share IT resources in 1999. Since that time, Metro-INET has grown to 35 member organizations receiving full IT services and 9 associate members receiving limited IT services. Not only has the number of Metro-INET members grown, each member agency’s needs have grown exponentially. Some examples in recent years include the deployment of laser fiche, remote computer access, electronic door access, wireless access points, as well as body cam support for law enforcement. Metro-INET remains under the organizational structure of the City of Roseville, and the consortium has outgrown that arrangement. The members agree that moving Metro-INET to a joint powers entity provides members more direct control over governance of Metro-INET, including costs, personnel, and policies. In 2020, a sub-committee of Metro-INET members met to work on a draft of the joint powers agreement; consisting of Pat Trudgeon of Roseville, Patrick Antonen of Circle Pines, Mark Beer of Mounds View, Mychal Fowlds of Maplewood, Doug Snyder of Mississippi Watershed Management Organization, Mark Casey of St. Anthony and Bryan Bear of Hugo, who worked on the draft with Attorney Jim Strommen of Kennedy and Graven. The draft was submitted to the League of Minnesota City’s (LMC) and the League of Minnesota Cities Insurance Trust’s (LMCIT) legal counsel and they have approved the draft. The working group is also working with LMCIT to underwrite the new organization. Staff sent the agreement to the St. Anthony City Attorney to review, and there were no concerns identified. It is expected that it will take all of 2021 to fully transition Metro-INET. Additional information about the process is included in the Metro-INET joint powers agreement transition plan included in the packet. For 2021, there are no additional costs that will be borne by members by entering into the JPA. Costs for the transition have been incorporated into the budget numbers given to each member earlier in 2020. It is expected that starting in 2022, there will be additional administrative costs for the JPA. The final financial impact, however, will be decided by the newly constituted Metro-INET board. 115 Per the Joint Powers Agreement, the resolution approving the agreement also names the City’s Member Director and Alternate Director. Staff is recommending the below individuals serve in those roles: City’s Member Director: Charlie Yunker, Interim City Manager City’s Alternate Director: Nicole Miller, Administrative Services Coordinator STAFF RECOMMENDATION: Staff recommends approval of the JPA and naming of the above individuals to serve as Director and Alternate Director to represent the City. 116 JOINT POWERS AGREEMENT FOR THE ESTABLISHMENT OF THE NORTH EAST METROPOLITAN AREA MUNICIPAL INTERNETWORKING COLLABORATIVE, TO BE KNOWN AS “METRO-INET” 117 i TABLE OF CONTENTS 1 2 Page 3 4 ARTICLE I GENERAL PURPOSE ........................................................................................ 1 5 Section 1.1 Purpose ................................................................................................ 1 6 7 ARTICLE II DEFINITION OF TERMS ................................................................................ 1 8 Section 2.1 Definitions ........................................................................................... 1 9 Section 2.1.1 Metro-INET 10 Section 2.1.2 IT Services ............................................................................................... 11 Section 2.1.3 Board ................................................................................................... 1 12 Section 2.1.4 LGU .................................................................................................... 1 13 Section 2.1.5 Member ............................................................................................... 1 14 Section 2.1.6 Associate ............................................................................................. 1 15 Section 2.1.7 Data ........................................................................................................ 2 16 17 ARTICLE III MEMBERSHIP ................................................................................................. 2 18 Section 3.1 Eligibility ............................................................................................. 2 19 Section 3.2 Execution of JPA and Payment of Member Charges ........................... 2 20 Section 3.3 Initial Members .................................................................................... 2 21 Section 3.4 Transition of Initial Member IT Services Agreements ....................... 2 22 Section 3.5 Effective Date ..................................................................................... 2 23 Section 3.6 New Members ..................................................................................... 2 24 Section 3.7 Conditions of Membership ................................................................. 2 25 Section 3.8 Appointment of Directors ................................................................... 3 26 27 ARTICLE IV BOARD OF DIRECTORS ............................................................................... 3 28 Section 4.1 Governing Body ................................................................................... 3 29 Section 4.2 Appointment of Alternate Directors .................................................... 3 30 Section 4.3 No Proxy Voting ................................................................................. 3 31 Section 4.4 Notice of Change of Director or Alternate Director ........................... 3 32 Section 4.5 Compensation of Directors and Alternate Directors ........................... 3 33 Section 4.6 Number of Votes of Directors ............................................................. 3 34 Section 4.7 Quorum ............................................................................................... 4 35 Section 4.8 Motions ............................................................................................... 4 36 Section 4.9 Suspension of Vote ............................................................................. 4 37 Section 4.10 Bylaws ................................................................................................. 4 38 Section 4.11 Remuneration of Director Expenses ................................................... 4 39 Section 4.12 Removal of Directors .......................................................................... 4 40 Section 4.13 Director Vacancies .............................................................................. 4 41 42 ARTICLE V MEETINGS AND OFFICERS ........................................................................ 4 43 Section 5.1 Special Meetings .................................................................................. 4 44 Section 5.2 Regular Meetings ................................................................................. 5 45 118 ii Section 5.3 Notice of Regular Meetings ................................................................. 5 46 Section 5.4 Public Meetings ................................................................................... 5 47 Section 5.5 Officers ............................................................................................... 5 48 Section 5.6 Chair and Vice Chair .......................................................................... 5 49 Section 5.7 Secretary ............................................................................................. 5 50 Section 5.8 Officer Vacancies ................................................................................ 5 51 52 ARTICLE VI POWERS AND DUTIES OF THE BOARD.................................................. 6 53 Section 6.1 Powers and Duties................................................................................ 6 54 Section 6.2 General Purpose .................................................................................. 6 55 Section 6.3 Governance ......................................................................................... 6 56 Section 6.4 Membership Dues ............................................................................... 6 57 Section 6.5 Service Charges .................................................................................. 6 58 Section 6.6 Gifts, Loans and Grants ...................................................................... 6 59 Section 6.7 Annual Audit ....................................................................................... 6 60 Section 6.8 Annual Budget .................................................................................... 6 61 Section 6.9 Delegation to Executive Committee ................................................... 7 62 Section 6.10 Accumulation and Maintenance of Capital ......................................... 7 63 Section 6.11 Data, Data Processing and Management Information Systems .......... 7 64 Section 6.12 PERA .................................................................................................. 7 65 Section 6.13 Necessary and Incidental Powers ........................................................ 7 66 67 ARTICLE VII FISCAL AND OPERATIONAL SERVICES; EXECUTIVE DIRECTOR ... 7 68 Section 7.1 Fiscal and Operations Agent ............................................................... 7 69 Section 7.2 Executive Director ............................................................................... 7 70 Section 7.3 Term of Executive Director ................................................................ 8 71 72 ARTICLE VIII EXECUTIVE COMMITTEE ........................................................................ 8 73 Section 8.1 Membership of Executive Committee ................................................. 8 74 Section 8.2 Bylaws of Executive Committee ........................................................ 8 75 Section 8.3 Quorum ............................................................................................... 8 76 Section 8.4 Regular Meetings ................................................................................ 8 77 Section 8.5 Special Meetings ................................................................................. 8 78 Section 8.6 Notice of Meetings .............................................................................. 8 79 Section 8.7 Duties and Responsibilities ................................................................. 8 80 Section 8.8 Preparation and Modification of Charges ........................................... 9 81 82 ARTICLE IX FINANCIAL MATTERS ............................................................................... 9 83 Section 9.1 Fiscal Year .......................................................................................... 9 84 Section 9.2 Adoption of Annual Budget ................................................................ 9 85 Section 9.3 Cost Sharing Charges .......................................................................... 9 86 Section 9.4 Invoices to Members ........................................................................... 9 87 Section 9.5 Classification of Cost Sharing Charges ............................................ 10 88 Section 9.6 Special Financial Assistance from Members .................................... 10 89 Section 9.7 Expenditures ..................................................................................... 11 90 119 iii Section 9.8 Contracts ........................................................................................... 11 91 92 ARTICLE X WITHDRAWAL ........................................................................................... 11 93 Section 10.1 Notice of Withdrawal ........................................................................ 11 94 Section 10.2 Claim to Assets upon Withdrawal .................................................... 11 95 Section 10.3 Financial Obligations upon Withdrawal ........................................... 11 96 Section 10.4 Financial Obligations prior to Withdrawal ....................................... 12 97 98 ARTICLE XI ASSOCIATES .............................................................................................. 12 99 Section 11.1 Associates ......................................................................................... 12 100 Section 11.2 Admission of Associates ................................................................... 12 101 Section 11.3 Confirmation of Associate Status ..................................................... 12 102 Section 11.4 Appointment of Director and Alternate Director .............................. 12 103 Section 11.5 Charges ............................................................................................. 12 104 Section 11.6 Application to Become a Member .................................................... 12 105 Section 11.7 Notice of Withdrawal as Associate ................................................... 12 106 107 ARTICLE XII DISSOLUTION ............................................................................................ 12 108 Section 12.1 Dissolution ........................................................................................ 12 109 Section 12.2 Effectuation of Dissolution ............................................................... 13 110 Section 12.3 Distribution of Assets and Payment of Outstanding Obligations ...... 13 111 Section 12.4 Allocation of Deficit ......................................................................... 13 112 Section 12.5 Distribution of Computer Software .................................................. 13 113 114 ARTICLE XIII INDEMNIFICATION ................................................................................. 13 115 Section 13.1 Cooperative Activity of Single Governmental Unit ......................... 13 116 Section 13.2 Indemnification ................................................................................. 13 117 118 ARTICLE XIV AMENDMENT ........................................................................................... 14 119 Section 14.1 Amendment of JPA ........................................................................... 14 120 121 ARTICLE XV MISCELLANEOUS ..................................................................................... 14 122 Section 15.1 Data Practices .................................................................................... 14 123 Section 15.2 Audit ................................................................................................. 14 124 Section 15.3 Counterparts ...................................................................................... 14 125 Section 15.4 Headings ........................................................................................... 14 126 Section 15.5 Severability ....................................................................................... 14 127 Section 15.6 Applicable Law ................................................................................. 14 128 129 ARTICLE XVI DURATION ................................................................................................ 15 130 Section 16.1 Term .................................................................................................. 15 131 120 v.11.9.20 1 JOINT POWERS AGREEMENT FOR THE ESTABLISHMENT OF 132 THE NORTH EAST METROPOLITAN AREA MUNICIPAL 133 INTERNETWORKING COLLABORATIVE 134 135 The parties to this joint powers agreement (“JPA”) are local governmental units (“LGUs”) 136 of the State of Minnesota authorized to enter into this JPA. This JPA is made and entered into 137 pursuant to Minnesota Statutes, Section 471.59. 138 139 ARTICLE I 140 GENERAL PURPOSE 141 142 Section 1.1. Purpose. The general purpose of this JPA is to provide for an organization 143 that the participating Members may jointly and cooperatively provide for the development and 144 operation of IT Services for the use and benefit of the Members, and others. To the extent permitted 145 by law, the Members will support the establishment of the IT Services and seek to expand the 146 number of participating agencies either as Members or as non-Member LGUs receiving services 147 from Metro-INET. 148 ARTICLE II 149 DEFINITION OF TERMS 150 151 Section 2.1. Definitions. The terms defined in this Article shall have the meanings given 152 them for the purposes of this JPA. 153 154 Section 2.1.1. Metro-INET. “Metro-INET” means the “North East Metropolitan Area 155 Municipal Internetworking Collaborative,” the organization created by this JPA. 156 157 Section 2.1.2. IT Services. “IT Services” means the development, operation and 158 maintenance of advanced internet networking and data services through ownership or lease of any 159 and all systems, equipment, technology or means and methods necessary to provide competitive, 160 up-to-date IT services to Members and non-Member LGUs. 161 162 163 Section 2.1.3. Board. “Board” means the Board of Directors of Metro-INET, consisting 164 of one Director from each LGU participating as a Member of Metro-INET pursuant to this JPA. 165 166 Section 2.1.4. LGU. “LGU” means any city, township, independent public safety 167 organization, watershed management organization, watershed district, cable commission or other 168 political subdivision of the State of Minnesota that is qualified to enter into joint powers 169 agreements as defined in Minnesota Statutes, Section 471.59, and as it may be amended from time 170 to time. 171 172 Section 2.1.5. Member. “Member” means an LGU that enters into this JPA and is at the 173 time involved, a Member in good standing. 174 175 Section 2.1.6. Associate. “Associate” means an LGU that is not a Member but has agreed 176 to affiliate with Metro-INET in accordance with Article XI and other applicable JPA provisions. 177 121 2 Section 2.1.7. Data. “Data” means all information in digital form that can be transmitted 178 or processed. 179 180 ARTICLE III 181 MEMBERSHIP 182 183 Section 3.1. Eligibility. Any Minnesota LGU is eligible to be a Member of Metro-INET. 184 185 Section 3.2. Execution of JPA and Payment of Member Charges. An LGU desiring to 186 be a Member shall execute a copy of this JPA and shall pay all Member charges, prorated if 187 appropriate, under Article IX. 188 189 Section 3.3. Initial Members. The initial Members of Metro-INET shall be the City of 190 Roseville (“Roseville”) and those LGUs that are parties to a joint powers agreement or an 191 otherwise existing contractual arrangement for IT Services from Roseville, on or prior to 192 December 31, 2020. Upon the execution of this JPA by an initial Member, the clerk or other 193 corresponding officer shall file with the Roseville City Manager a copy of the executed JPA, 194 together with a certified copy of the authorizing resolution or other action. The resolution 195 authorizing the execution of this JPA shall also designate the Member’s Director and Alternate 196 Director (“Alternate”). 197 198 Section 3.4 Transition of Initial Member IT Services Agreements. Any joint powers 199 agreement or contract for IT Services between two or more Metro-INET Members that has not 200 been terminated prior to the Effective Date of this JPA shall be terminated by the affected parties 201 at the earliest possible date, without disrupting the delivery of IT Services to the affected parties. 202 After the Effective Date, any term of an earlier agreement for IT Services still in force shall be 203 interpreted not to conflict with this JPA, which shall supersede the earlier agreement if the earlier 204 agreement and this JPA cannot be reconciled. The Board shall have authority to take any action it 205 deems reasonable and prudent to facilitate the transition to Metro-INET by any initial Member, 206 including the creation of a committee authorized to assist affected parties in the termination of 207 earlier agreements and to seek Board approval of action necessary to facilitate the transition. 208 209 Section 3.5. Effective Date. This JPA shall become effective on January 1, 2021 [[or other 210 date agreed upon by the initial Members]] (“Effective Date”). Within thirty (30) days after the 211 Effective Date, the Roseville City Manager shall call the first meeting of the Board, which shall 212 be held not later than fifteen (15) days after the notice has been delivered to each Director and 213 Alternate. 214 215 Section 3.6. New Members. LGUs that do not qualify for initial membership under 216 Section 3.3 and seek to join Metro-INET shall be admitted by a vote of the Board as it determines 217 at its organizational meeting, or as soon thereafter as the Board may decide and adopt in the 218 bylaws. 219 220 Section 3.7. Conditions of Membership. The Board may impose additional conditions 221 upon the admission of new Members. 222 223 122 3 Section 3.8. Appointment of Directors. Directors and Alternates shall be appointed by 224 the Member governing body to serve until their successors are appointed and qualified. Directors 225 shall be the chief administrative officer of the Member. 226 227 ARTICLE IV 228 BOARD OF DIRECTORS 229 230 Section 4.1. Governing Body. Metro-INET shall be governed by a Board of Directors 231 consisting of a Director and Alternate from each Member. At the organizational meeting and 232 annually thereafter, the Board shall elect an executive committee that may advise or act for the 233 Board as the Board may delegate to the executive committee as necessary, upon meetings duly 234 called, as provided in Article VIII. 235 236 Section 4.2. Appointment of Alternate Directors. Each Member shall appoint one 237 Alternate to the Director. The Alternate shall be entitled to attend all meetings of the Board and 238 may vote in the absence of the Director. 239 240 Section 4.3. No Proxy Voting. There shall be no voting by proxy. All votes must be cast 241 in person at Board meetings by the Director or Alternate, unless the meeting is duly conducted in 242 accordance with Minnesota Statutes, Sections 13D.02 (interactive TV) or 13D.021 (telephone or 243 other electronic means allowed if health pandemic or emergency). 244 245 Section 4.4. Notice of Change of Director or Alternate Director. When the Member 246 changes its designated Director or Alternate the Member shall provide written notice to Metro-247 INET with the name, email address and mailing address of the person so appointed. 248 249 Section 4.5. Compensation of Directors and Alternate Directors. Directors and 250 Alternates shall serve without compensation from Metro-INET, but it shall not prevent a Member 251 from providing compensation for its Director or Alternate if such compensation is lawfully 252 authorized by such Member. 253 254 Section 4.6. Number of Votes Held by Directors. Unless otherwise expressly provided 255 herein, each Director shall have the number of votes equivalent to the Member’s share of Metro-256 INET’s annual budget, as established by the Board and calculated as follows: Each Member’s 257 percentage share of Metro-INET’s annual budget shall be determined by Member use of Metro-258 INET IT Services. Said Member share shall be rounded up to the nearest whole number, and that 259 number shall be the Member’s total number of votes in any vote of the Board. Members shall have 260 at least one vote. The number of votes for initial Members, and the total votes of the Directors for 261 the initial Board, shall be as set forth in the attached Exhibit A, and is subject to change annually 262 with the addition or subtraction of Members. The number of votes for each Director shall be 263 recalculated annually upon the adoption by the Board of the next fiscal year budget. Upon the 264 addition of a new Member, the Board shall estimate the new Member’s share of Metro-INET’s 265 annual budget for the period prior to adoption of the succeeding year’s budget and assign the 266 proportionate number of votes to the new Member for the remainder of that fiscal year. The number 267 of votes of existing Members shall not change during the year that new Member or Members join 268 Metro-INET. 269 123 4 Section 4.7. Quorum. The presence of at least ten (10) Directors of Members in good 270 standing at a regular or special meeting shall constitute a quorum of the Board allowing it to 271 transact business, provided that the ten Directors hold at least a majority of the total Member votes. 272 273 Section 4.8. Motions. A majority of the Member vote totals represented by those Directors 274 present at a meeting is required to pass all motions, unless a greater majority is provided in this 275 JPA. 276 277 Section 4.9. Suspension of Vote. A Director, or Alternate shall not be eligible to vote 278 during the time the Member they represent has been notified by Metro-INET that it is in default 279 on any required assessment, contract or other contribution to Metro-INET or regarding security 280 breaches or other acts deemed by the Board to materially impair the quality of IT Services provided 281 by Metro-INET. During the existence of such default, the vote(s) of such Member shall not be 282 counted for the purposes of a meeting quorum or majority on a Board meeting vote. If a Member 283 remains in default for a period of more than forty-five (45) days after written notice on failure to 284 pay any billing from Metro-INET or notice of other default referenced above, the Board may act 285 to terminate the Member from Metro-INET by a majority vote of the Board at a regular meeting 286 or special meeting called for that purpose. 287 288 Section 4.10. Bylaws. At the Metro-INET organizational meeting the Board shall adopt 289 bylaws governing its procedures, including but not limited to, the time, place and frequency of its 290 regular meetings or procedures and voting majorities required for certain votes. Such bylaws may 291 be amended from time to time pursuant to Section 4.8 of this JPA. 292 293 Section 4.11. Remuneration of Director or Alternate Expenses. The Board shall have no 294 obligation to pay remuneration of Director or Alternate expenses, which shall be subject to the policies of 295 Member appointing them. The Board may, however, in its sole discretion, pay the reasonable and 296 necessary expenses of officers, Directors and Alternates incurred in connection with special duties 297 they undertake on behalf of Metro-INET, but such reimbursement shall not include the expenses 298 incurred solely for attending meetings of Metro-INET within the seven-county Twin Cities 299 metropolitan area. 300 301 302 Section 4.12. Removal of Directors. Any Director or Alternate shall be subject to removal 303 by the governing body of the Member. 304 305 Section 4.13. Director Vacancies. A vacancy on the Board shall be promptly filled by the 306 governing body of the Member whose position on the Board is vacant. 307 308 ARTICLE V 309 MEETINGS AND OFFICERS 310 311 Section 5.1. Special Meetings. Special meetings of the Board may be called: (a) by the 312 chair; (b) by the executive committee; or (c) upon the written request of a majority of the Directors. 313 Subject to an emergency exception, as defined by statute, at least three (3) days’ written notice of 314 124 5 special meetings shall be published and given to all Directors and Alternates. Such notice shall 315 include the agenda for the special meeting and the time, date and location of the meeting. 316 317 Section 5.2. Regular Meetings. The specific date, time and location of regular meetings 318 of the Board shall be determined by the Board as provided in the Bylaws. The Board shall be 319 required to meet at least four (4) times a year. Its regular meetings shall be held on the dates and 320 at times of each January, April, July and October as determined by the Board at the October 321 meeting and duly published to establish the four regular meetings. 322 323 Section 5.3. Notice of Regular Meetings. Notice of regular meetings of the Board shall 324 be given to the Directors and Alternates by the secretary at least fifteen (15) days in advance of 325 the meeting and the agenda for such meetings shall accompany the notice. However, business at 326 regular meetings of the Board need not be limited to matters set forth in the agenda. 327 328 Section 5.4. Public Meetings. Meetings of the Board and of the executive committee shall 329 be considered “public” meetings. Notices, agendas, and schedules of such meetings shall be given, 330 maintained and distributed pursuant to the Open Meeting Law, Minnesota Statutes, Section 331 13D.01, et seq. 332 333 Section 5.5. Officers. The officers of the Board shall consist of the chair, vice-chair, 334 secretary and two (2) officers-at-large, who shall be elected by the Directors at the initial meeting 335 of the Board. The chair and vice-chair shall be elected to three-year (3) terms, commencing at the 336 initial meeting of the Board and every three (3) years thereafter. The secretary shall be elected to 337 a two-year (2) term, commencing at the initial meeting of the Board, and shall be elected to three-338 year (3) terms following the completion of the initial term every three (3) years thereafter. The 339 officers-at-large shall be elected to a one-year (1) term, commencing at the initial meeting of the 340 Board, and shall be elected to three-year (3) terms following the completion of the initial term 341 every three (3) years thereafter. The intent of the election of officers is to ultimately establish three-342 year (3), staggered terms of officers with the chair and vice-chair being elected in the same year. 343 Other than the initial meeting of the Board, new officers shall take office at the adjournment of the 344 meeting of the Board at which they are elected. 345 346 Section 5.6. Chair and Vice Chair. The chair shall preside at all meetings of the Board 347 and the executive committee. The vice-chair shall act as chair in the absence of the chair. 348 349 Section 5.7. Secretary. The secretary shall be responsible for keeping a record of all of the 350 proceedings of the Board and the executive committee. 351 352 Section 5.8. Officer Vacancies. A vacancy shall immediately occur in the office of any 353 officer upon his or her resignation, death or upon ceasing to be an employee of the Member. Upon 354 a vacancy occurring in any office, the Alternate shall serve until the Member appoints a new 355 Director. 356 357 125 6 ARTICLE VI 358 POWERS AND DUTIES OF THE BOARD 359 360 Section 6.1. Powers and Duties. The powers and duties of the Board shall include the 361 powers set forth in this Article. 362 363 Section 6.2. General Purpose. The Board shall take such action as it deems necessary and 364 appropriate to accomplish the general purposes of the organization including, but not limited to, 365 the establishment of data processing and information systems, engaging in the development and 366 implementation of the necessary programs therefor, acquiring any necessary site, purchasing any 367 necessary supplies, equipment and machinery, employing any necessary personnel and operating 368 and maintaining any systems for the handling of data processing and management information for 369 the Members and for others. Any of the foregoing activities, or any other activities authorized by 370 the JPA, may be accomplished by entering into contracts, leases or other agreements with others, 371 whenever the Board shall deem this to be advisable. 372 373 Section 6.3. Governance. The Board shall have full supervisory control and management 374 of the affairs of Metro-INET including the power to make contracts as it deems necessary to make 375 effective any power to be exercised by Metro-INET pursuant to this JPA; to provide for the 376 prosecution and defense or other participation in actions or proceedings at law in which it may 377 have an interest; to employ such persons as it deems necessary to accomplish its duties and powers 378 on a full-time, part-time or consulting basis; to conduct such research and investigation as it deems 379 necessary on any matter related to or affecting the general purposes of the organization; to acquire, 380 hold and dispose of property both real and personal as the Board deems necessary; and to contract 381 for space, materials, supplies and personnel with a Member or Members or with others. 382 383 Section 6.4. Membership Dues. The Board may establish and collect membership dues. 384 385 Section 6.5. Service Charges. The Board may establish and collect charges for its services 386 to Members and to others. 387 388 Section 6.6. Gifts, Loans and Grants. The Board may accept gifts, apply for and use 389 grants or loans of money or other property from the state, or any other governmental units or 390 organizations and may enter into agreements required in connection therewith and may hold, use 391 and dispose of such moneys or property in accordance with the terms of the gift, grant, loan or 392 agreement relating thereto. 393 394 Section 6.7. Annual Audit. The Board shall cause an annual independent audit of the 395 books to be made and shall make an annual financial accounting and report in writing to the 396 Members. Its books and records shall be available for and open to examination by its Members at 397 all reasonable times. 398 399 Section 6.8. Annual Budget. The Board shall establish the annual budget for the 400 organization as provided in this JPA. 401 402 126 7 Section 6.9. Delegation to Executive Committee. The Board may delegate authority to 403 the executive committee of the Board, between Board meetings. Such delegation of authority shall 404 be by resolution of the Board and may be conditioned in such manner as the Board may determine. 405 406 Section 6.10. Accumulation and Maintenance of Capital. The Board may accumulate 407 and maintain reasonable working capital reserves and may invest and reinvest funds not currently 408 needed for the purposes of the organization. Such investment and reinvestment shall be in 409 accordance with and subject to the laws applicable to the investment of city funds. 410 411 Section 6.11. Data, Data Processing and Management Information Systems. The 412 Board shall make Metro-INET data processing and management information systems available to 413 its Members, subject to reasonable charges for the development and processing thereof. Metro-414 INET shall not own Member Data, which shall be returned to the Member upon its withdrawal 415 made pursuant to this JPA or upon dissolution. 416 417 Section 6.12. PERA. The Board may provide for any of its employees to be members of 418 the Public Employees Retirement Association and may make any required employer contributions 419 to that organization and any other employer contributions which municipalities are authorized or 420 required by law to make. 421 422 Section 6.13. Necessary and Incidental Powers. The Board may exercise any other power 423 necessary and incidental to the implementation of its aforementioned powers and duties. 424 425 ARTICLE VII 426 FISCAL AND OPERATIONAL SERVICES; EXECUTIVE DIRECTOR 427 428 Section 7.1. Fiscal and Operations Agent. The Board shall designate a Member to serve 429 as the fiscal and operations agent of Metro-INET (“Fiscal Agent”). The Fiscal Agent shall provide 430 services as set forth in the JPA and on additional matters as may be determined by the Board 431 through authorization for services by contract with Metro-INET. The Fiscal Agent shall be 432 responsible for management of all of Metro-INET’s funds, for the keeping and storing of Metro-433 INET’s financial records, recommending to the Board and maintaining adequate insurance 434 coverage of Metro-INET consistent with municipal liability limitations under Minnesota law, and 435 to provide for the annual financial audit and accounting of all Metro-INET related activities. The 436 Fiscal Agent shall be responsible for collecting and preserving all Metro-INET records and data 437 pursuant to the requirements of the Minnesota Government Data Practices Act, Minnesota 438 Statutes, Chapter 13. The Fiscal Agent shall post a fidelity bond or other insurance against loss of 439 organization funds in an amount approved by the Board, at the expense of Metro-INET. 440 441 Section 7.2. Executive Director. The Board shall hire an executive director to be 442 responsible for the management of the day-to-day operations of Metro-INET, executing the policy 443 directives of the Board, including, the power to implement contracts authorized by the Board, the 444 prosecution and defense or other participation in actions or proceedings in law; to employ 445 personnel or retain as consultants such persons as he or she may deem necessary to carry out 446 Metro-INET functions; to conduct such research and investigation as necessary on any matter 447 related to or affecting the general purposes of Metro-INET; to manage real and personal property 448 127 8 acquired by Metro-INET; and to investigate, advise the Board regarding contracts for space, 449 materials, supplies and personnel either with a Member or Members or with third parties and 450 coordinating with Members for the implementation of internet connection, system maintenance 451 and data processing. The executive director shall prepare a report to the Board regarding the 452 operations of Metro-INET for each quarterly and annual meeting of the Board. 453 454 Section 7.3. Term of Executive Director. The executive director shall serve for an 455 indefinite period as defined by the contract, which may be terminated and the director removed by 456 a vote of a two-thirds majority of the total votes of the Board. 457 458 ARTICLE VIII 459 EXECUTIVE COMMITTEE 460 461 Section 8.1. Membership of Executive Committee. The Board shall establish an 462 executive committee consisting of five (5) voting members. Its members shall consist of the five 463 (5) officers of the Board as defined in Article V, Section 5.5. The Fiscal Agent and Executive 464 Director shall serve as ex officio members of the executive committee in an advisory and non-465 voting capacity. 466 467 Section 8.2. Bylaws of Executive Committee. The executive committee may adopt 468 bylaws governing its own procedures, which shall be subject to this JPA, the bylaws of the Board, 469 and any resolutions or other directives of the Board. 470 Section 8.3. Quorum. Three (3) members of the executive committee shall constitute a 471 quorum and a majority of the executive committee members present at a meeting where a quorum 472 exists may act, notwithstanding the number of votes held by each member in accordance with 473 Article IV, Section 4.6. 474 Section 8.4. Regular Meetings. The specific date, time and location of regular meetings 475 of the executive committee shall be determined by the executive committee. The executive 476 committee shall meet at least four (4) times a year. Notice of regular meetings of the executive 477 committee shall be given to the members of the executive committee and the executive director at 478 least seven (7) days in advance and the agenda for such meetings shall accompany the notice. 479 Section 8.5. Special Meetings. Special meetings of the executive committee may be called 480 by the chair or upon the call of any two other members of the executive committee. The date, time 481 and location of the special meeting shall be fixed by the person or persons calling it. At least three 482 (3) days advance written notice of such special meeting shall be given to all members of the 483 executive committee by the person or persons calling the meeting. 484 485 Section 8.6. Notice of Meetings. Pursuant to the Open Meeting Law, all meetings of the 486 executive committee shall be noticed and published at least three (3) days prior to the meeting. 487 488 Section 8.7. Duties and Responsibilities. The executive committee shall have the 489 following duties and responsibilities: (a) to exercise the powers and perform the duties delegated 490 to it by the Board and subject to such conditions and limitations as may be imposed by the Board; 491 (b) to cause to be prepared a proposed annual budget each year which shall be submitted to the 492 128 9 Board at least thirty (30) days before the annual meeting for the Board’s review and ratification; 493 and (c) to present a full report of its activities at each regular meeting of the Board. 494 495 Section 8.8. Preparation and Modification of Charges. The executive committee shall 496 have the responsibility to prepare and modify charges for the use of the programs and facilities of 497 Metro-INET, both as to Members and non-members, subject to Board approval. 498 499 ARTICLE IX 500 FINANCIAL MATTERS 501 502 Section 9.1. Fiscal Year. The fiscal year of Metro-INET shall be the calendar year. 503 504 Section 9.2. Adoption of Annual Budget. The annual budget of Metro-INET must be 505 adopted in the following manner: 506 507 (a) prior to May 1 the Board will supply each member with a proposed preliminary 508 budget for the coming fiscal year; 509 510 (b) prior to the meeting of the Board in July the Board will supply each Member with 511 a proposed budget adjusted for withdrawal notifications received pursuant to 512 Article XI; 513 514 (c) the annual budget for the coming fiscal year shall be adopted at the July Board 515 meeting. 516 517 Promptly after adoption of the budget, the Board must mail copies of the budget to the 518 chief administrative officer of each Member. Upon adoption of the budget each Member is 519 obligated to Metro-INET for the budgeted revenues and cost sharing charges fixed by the Board 520 for the ensuing fiscal year in accordance with this Article. 521 522 Section 9.3. Cost Sharing Charges. The Board shall have authority to fix cost sharing 523 charges for all Members in an amount sufficient to provide the funds required by the budgets of 524 the organization. The Board shall notify the chief administrative officer of each Member of the 525 amounts of such charges, on or before May 1 of each year. The Board shall prepare, and may 526 amend, a document setting forth the cost sharing charges and policies for Members and rates for 527 services provided to non-members. Such document(s) and policies shall be made available to 528 Members for review and comment upon request. 529 530 Section 9.4. Invoices to Members. Invoices for all charges shall be sent to the Members 531 by the Fiscal Agent and shall be due when rendered. Any Member whose charges have not been 532 paid within forty-five (45) days after the date of the invoice may be declared in default by the 533 Board or executive committee and shall not be entitled to further voting privileges nor to have its 534 Director hold any office nor to use any Metro-INET facilities or programs until such time as the 535 default is cured and Metro-INET has been paid in full. Additionally, in the event that such charges 536 have not been paid within forty-five (45) days of the date of the invoice, and such default remains 537 uncured after a reasonable time following notice to cure, the membership of such Member may be 538 129 10 terminated by a majority vote of the Board. In the event of a dispute between the Member and the 539 Board as to the amount which is due and payable, the Member shall nevertheless make such 540 payment in order to preserve its status as a Member, but such payment may be made under protest 541 and without prejudice with respect to the Member’s right to dispute the amount of the charge and 542 to pursue any legal remedies available to it. 543 544 Section 9.5. Classification of Cost Sharing Charges. The charges to the Members of 545 Metro-INET shall be divided, for cost sharing purposes, into three different classes, as further 546 described in Attachment A to this JPA and incorporated herein: 547 (a) Core Services (“Class 1 Charges”). Class 1 Charges shall cover all of Metro-548 INET’s general administrative and operational expenses for core services in having 549 a member participate as a domain member of Metro-INET. Core services are 550 generally defined as services provided by Metro-INET that provides IT support to 551 the Member and its employees to conduct the Member’s business. These core 552 services may change over time upon Board approval based on different needs of 553 Members. Changes in the delivery of Class 1 Charges shall be paid by each Member 554 as fixed monthly, quarterly or annual membership dues, as determined by the 555 Board. The amount of Class 1 Charges required to be paid by each Member shall 556 be determined annually by the executive committee, upon approval by the Board. 557 Class 1 Charges shall be prorated to new Members and not retroactively applied to 558 them. 559 (b) Supplemental Services (“Class 2 Charges”). Class 2 Charges shall cover the costs 560 of design and development of computer programs and systems and other capital 561 costs for services requested by the Member. Supplemental services are generally 562 defined as services provided by Metro-INET at the request of the Member to meet 563 its specific needs. These supplemental services may change over time upon Board 564 approval based on different needs of Members and changes in the delivery of such 565 services. Class 2 Charges shall be paid by each Member as fixed monthly, quarterly 566 or annual membership dues, as determined by the Board. The amount of Class 2 567 Charges required to be paid by each Member shall be determined annually by the 568 executive committee, upon approval by the Board. Class 2 Charges shall not be 569 retroactively applied to new Members. 570 (c) Necessary Additional Charges (“Class 3 Charges”). Class 3 Charges shall cover 571 the costs of system operation and maintenance in serving non-members, on an “as 572 requested” basis as determined by the Board when it deems such charges necessary. 573 The amount of such charges that are applicable to each non-member shall be 574 determined by the Board. The amount of the charges shall cover all costs incurred 575 by Metro-INET in providing these services to the non-member. The Board shall 576 have authority to negotiate and enter into contracts with non-members receiving 577 Class 3 Charges. 578 Section 9.6. Special Financial Assistance from Members. It is anticipated that certain 579 Members may be in a position to extend special financial assistance to Metro-INET in the form of 580 grants, or other in-kind payments including use of facilities or other infrastructure deemed 581 beneficial to Metro-INET. The Board shall credit any such in-kind payment against any charges 582 130 11 which the granting Member would otherwise have to pay. The Board may also enter into an 583 agreement, as a condition to any such grant, that it will credit all or a portion of such grant towards 584 charges which have been made or in the future may be made against one or more specified 585 Members. 586 587 Section 9.7. Expenditures. Board funds may be expended by the Board in accordance 588 with procedures established by law for the expenditure of funds by cities. Orders, checks, drafts 589 and other legal instruments shall be signed by the chair or vice-chair and countersigned by the 590 secretary or such other person as shall be designated by the Board. 591 592 Section 9.8. Contracts. Contracts shall be let and purchases shall be made in accordance 593 with the legal requirements applicable to contracts and purchases by Minnesota cities. 594 595 ARTICLE X 596 WITHDRAWAL 597 598 Section 10.1. Notice of Withdrawal. Any Member may at any time prior to June 1 of a 599 given year, give written notice of withdrawal from Metro-INET. Written notice of withdrawal 600 submitted prior to June 1 shall be a timely withdrawal and the Member shall not be responsible for 601 its share of the next year’s budget not already made the obligation of the Member by a prior, multi-602 year budget commitment approved by the Board. The withdrawing Member’s financial obligation 603 prior to withdrawal upon timely notice will be based on the Charge 1, 2 and 3 Charges outstanding 604 for the remainder of the calendar year and additional years for which the Board committed Metro-605 INET to such financial obligation while the Member was with Metro-INET as a Member. In such 606 case the Member shall be responsible for the net present value of its a pro rata share of such 607 commitment. Written notice of withdrawal after June 1, shall be untimely for purposes of 608 withdrawal prior to the next calendar year but shall serve as notice for withdrawal effective the 609 year following. A Member’s nonpayment of charges as set forth herein or its failure to comply 610 with Metro-INET operational security requirements or other policy prescribed by the Board, 611 without cure after written notice and a reasonable time to cure, shall constitute the Member’s notice 612 of withdrawal from Metro-INET as determined by the Board pursuant to Section 4.8 at a regular 613 or special meeting. All Member withdrawals shall take effect at the end of the applicable fiscal 614 year, unless otherwise provided by the Board. 615 616 Section 10.2. Claim to Assets upon Withdrawal. A Member’s withdrawal from Metro-617 INET at a time when such withdrawal does not result in dissolution of the organization shall forfeit 618 the Member’s claim to any assets of the organization except that it shall have access to any 619 software developed for its use while it was a Member in accordance with and subject to the 620 provisions of Article XIII, Section 13.5(b). 621 622 Section 10.3. Financial Obligations upon Withdrawal. Upon withdrawal the Member 623 shall continue to be responsible (1) for all of its prorated share of any unpaid Class 2 Charges; (2) 624 for its share of Class 1 Charges to the effective date of withdrawal; (3) for its share of any Class 3 625 Charges to the effective date of withdrawal; and (4) for any contractual obligations it has separately 626 incurred with Metro-INET. 627 628 131 12 Section 10.4. Financial Obligations prior to Withdrawal. A Member who has not given 629 notice of withdrawal on or before June 1 of a given year is obligated for the budgeted revenues 630 and the cost sharing charges fixed by the Board for the ensuing fiscal year in accordance with 631 Article IX. 632 633 ARTICLE XI 634 ASSOCIATES 635 636 Section 11.1. Associates. It is understood that certain LGUs may desire to enter into a 637 contractual arrangement with Metro-INET for limited IT Services. Such LGUs may affiliate with 638 Metro-INET as “Associates.” 639 640 Section 11.2. Admission of Associates. An LGU desiring to become an Associate may do 641 so in the same manner as is applicable to becoming a Member, except as otherwise provided in 642 this Article. 643 644 Section 11.3. Confirmation of Associate Status. At the time of joining Metro-INET as 645 an Associate, the LGU shall indicate in writing that it is not joining as a Member but as an 646 Associate. 647 648 Section 11.4. Appointment of Director and Alternate Director. An Associate may 649 appoint a Director and an Alternate Director to the Board but such Director (or Alternate) shall be 650 without voting power, shall not be eligible to serve as an officer and shall not be counted for 651 quorum purposes. 652 653 Section 11.5. Charges. The Board shall establish the charges to be paid by Associates and 654 for that purpose it may classify Associates in accordance with their varying circumstances. 655 656 Section 11.6. Application to Become a Member. An Associate may apply for 657 membership status and become a Member upon the requisite vote as required in Article III, Section 658 3.5. 659 660 Section 11.7. Notice of Withdrawal as Associate. An Associate may discontinue its 661 association with Metro-INET at any time by giving written notice of withdrawal to the secretary. 662 Withdrawal shall not relieve such withdrawing Associate from its obligation to pay any charges 663 which the Associate has incurred up to the time of withdrawal. 664 665 ARTICLE XII 666 DISSOLUTION 667 668 Section 12.1. Dissolution. Metro-INET shall be dissolved whenever: (1) the total number 669 of remaining Members is less than five; or (2) by two-thirds of the votes represented by all 670 Members of the Board. 671 672 132 13 Section 12.2. Effectuation of Dissolution. In the event of dissolution, the Board shall 673 determine the measures necessary to effectuate the dissolution and shall provide for the taking of 674 such measures as promptly as circumstances permit and subject to the provisions of this JPA. 675 676 Section 12.3. Distribution of Assets and Payment of Outstanding Obligations. Upon 677 dissolution, the remaining assets of Metro-INET and payment of all of its outstanding obligations, 678 the remaining assets of Metro-INET shall be distributed among the then existing Members in 679 proportion to their contributions, as determined by the Board. 680 681 Section 12.4. Allocation of Deficit. If, upon dissolution, there is an organizational deficit, 682 such deficit shall be charged to and paid by the Members on a pro rata basis, based upon the Class 683 1 and 2 Charges incurred by such Members during the two years preceding the event which gave 684 rise to the dissolution. 685 686 Section 12.5. Distribution of Computer Software. In the event of dissolution the 687 following provisions shall govern the distribution of computer software owned by or licensed to 688 Metro-INET: 689 690 (a) All such software shall be an asset of Metro-INET. 691 692 (b) A Member or former Member may use (but may not authorize reuse by others) any 693 software developed during its membership upon (1) paying any unpaid sums due 694 Metro-INET; (2) paying the costs of taking such software; and (3) complying with 695 reasonable rules and regulations of the Board relating to the taking and use of such 696 software. Such rules and regulations may include a reasonable time within which 697 such software must be taken by any Member or former Member desiring to do so. 698 699 ARTICLE XIII 700 INDEMNIFICATION 701 702 Section 13.1. Cooperative Activity of Single Governmental Unit. Metro-INET shall be 703 considered a separate and distinct public entity to which the Members have transferred all 704 responsibility and control for actions taken pursuant to this JPA. To the fullest extent permitted by 705 law, actions by the Members pursuant to this JPA are intended to be and shall be construed as a 706 “cooperative activity” and it is the intent of the Members that they shall be deemed a “single 707 governmental unit” for the purposes of liability, as set forth in Minnesota Statutes, Section 471.59, 708 subdivision 1a (a); provided further that for purposes of that statute, each Member expressly 709 declines responsibility for the acts or omissions of the other party. The Members are not liable for 710 the acts or omissions of the other Members except to the extent to which they have agreed in 711 writing to be responsible. 712 Section 13.2. Indemnification. Metro-INET shall defend, indemnify and hold harmless 713 the Members against all claims, losses, liabilities, suits, judgments, costs and expenses arising out 714 of action or inaction of the Board, its Directors or Alternates, the Fiscal Agent, the executive 715 director and other employees or agents of Metro-INET pursuant to this JPA. Metro-INET shall 716 defend and indemnify the employees of any Member acting pursuant to the JPA except for any act 717 or omission for which the Member’s employee is guilty of malfeasance, willful neglect of duty or 718 133 14 bad faith. A Member shall defend, indemnity and hold harmless Metro-INET against all claims, 719 losses, liabilities, suits, judgments, costs, and expenses arising out of action or inaction of the 720 Member regarding the Member’s Data. This JPA to defend and indemnify does not constitute a 721 waiver by Metro-INET or any Member of the limitations on liability provided by Minnesota 722 Statutes, Chapter 466. 723 ARTICLE XIV 724 AMENDMENT 725 726 Section 14.1. Amendment of JPA. This JPA sets forth all understandings of the Members. 727 All prior agreements, understandings, representations whether consistent or inconsistent, verbal or 728 written, concerning this JPA, are merged into and superseded by this written JPA. No modification 729 or amendment to the JPA shall be binding unless all Members agree in writing to the proposed 730 change or amendment. 731 ARTICLE XV 732 MISCELLANEOUS 733 734 Section 15.1. Data Practices. The Members agree to comply with the Minnesota 735 Government Data Practices Act, Minnesota Statutes, Chapter 13, as it applies to all data created, 736 collected, received, stored, used, maintained or disseminated by Metro-INET. If a Member 737 receives a request to release the data referred to in this section, it must immediately notify the 738 executive director. The executive director will give the Member who has received the data request 739 instructions concerning the release of the data to the requester before the data is released. 740 Section 15.2. Audit. The books, records and documents relevant to this JPA are subject to 741 audit by the Members and the State of Minnesota at reasonable times upon written notice. 742 Section 15.3. Counterparts. This JPA may be executed simultaneously in two or more 743 counterparts, each of which will be deemed an original, but all of which together will constitute 744 one and the same instrument. 745 Section 15.4. Headings. The subject headings of the sections and subsections of the JPA 746 are included for purposes of convenience only, and shall not affect the construction of 747 interpretation of any of its provisions. 748 Section 15.5. Severability. In case any one or more of the provisions of this JPA shall be 749 invalid, illegal, or unenforceable in any respect, the validity, legality and enforceability of the 750 remaining provisions contained in this JPA will not in any way be affected or impaired thereby. 751 Section 15.6. Applicable Law. This JPA shall be governed by and construed in accordance 752 with the laws of the State of Minnesota. Any disputes, controversies, or claims arising out of this 753 JPA shall be heard in Minnesota state district or courts with the venue being in Ramsey County, 754 and the Members waive any objection to the jurisdiction of these courts, whether based on 755 convenience or otherwise. 756 134 15 ARTICLE XVI 757 DURATION 758 759 Section 16.1. Term. This JPA shall continue in effect indefinitely until terminated in 760 accordance with its terms. 761 762 135 16 IN WITNESS WHEREOF, the undersigned local governmental unit has caused this JPA 763 to be signed and delivered on its behalf. 764 765 766 767 768 769 (Name of LGU) 770 771 By: 772 773 Its: 774 775 776 By: 777 778 Its: 779 780 Dated: , 20___. 781 136 2021 Member Budget 3,559,694$ Budget Share RoundUp Votes AH Arden Hills 81,645$ 2.29%3.00%3 ANO Anoka 310,909$ 8.73%9.00%9 BV Birchwood Village 8,312$ 0.23%1.00%1 CCW Coon Creek Watershed 39,980$ 1.12%2.00%2 CFD Centennial Fire 17,234$ 0.48%1.00%1 CLPD Centennial Lakes Police 54,333$ 1.53%2.00%2 CP Circle Pines 50,772$ 1.43%2.00%2 CV Centerville 28,549$ 0.80%1.00%1 EB East Bethel 52,794$ 1.48%2.00%2 FH Falcon Heights 48,511$ 1.36%2.00%2 FL Forest Lake 171,330$ 4.81%5.00%5 GL Gem Lake 5,786$ 0.16%1.00%1 HL Ham Lake 54,323$ 1.53%2.00%2 HUGO Hugo 86,070$ 2.42%3.00%3 LAU Lauderdale 19,598$ 0.55%1.00%1 LC Little Canada 63,805$ 1.79%2.00%2 LCFD Little Canada Fire 12,688$ 0.36%1.00%1 LE Lake Elmo 80,407$ 2.26%3.00%3 LEX Lexington 29,125$ 0.82%1.00%1 LJFD Lake Johanna Fire 41,667$ 1.17%2.00%2 LL Lino Lakes 218,604$ 6.14%7.00%7 MAH Mahtomedi 56,521$ 1.59%2.00%2 MV Mounds View 160,718$ 4.51%5.00%5 MW Maplewood 69,006$ 1.94%2.00%2 MWMO Mississippi Watershed 47,877$ 1.34%2.00%2 NO North Oaks 20,139$ 0.57%1.00%1 NSP North St. Paul 222,401$ 6.25%7.00%7 OAK Oakdale 264,286$ 7.42%8.00%8 RV Roseville 678,842$ 19.07%20.00%20 RW RWMWD 59,505$ 1.67%2.00%2 SA Saint Anthony 186,022$ 5.23%6.00%6 STF Saint Francis 132,379$ 3.72%4.00%4 VH Vadnais Heights 115,580$ 3.25%4.00%4 VLM Vadnais Lakes Watershed 14,447$ 0.41%1.00%1 WBT White Bear Twp 55,529$ 1.56%2.00%2 3,559,694$ Total 119 Needed to Pass 60 137 TRANSITION PLAN FOR METRO I-NET This plan is created to guide the transition from City of Roseville Metro I-Net (RMI) to Metro I-Net Joint Powers Authority (MIJPA) Purpose of transition plan • Allow for orderly transition of operations, personnel, and assets from RMI to MIJPA • Identify transition costs • Create a measured pace of transition to allow for comfort of existing RMI employees and RMI agencies Given where we find ourselves here in 2020, during the COVID pandemic, this transition plan is underpinned by the following milestones: • In 2020, the framework and costs of the new MIJPA will be established and agreed upon by the RMI agencies. • In 2021, the MIJPA as an entity will be established, the MIJPA Board will be elected and begin to meet, and the MIJPA Executive Director will be hired and begin to create an institutional framework for the MIJPA • In 2022, all assets and personnel will be assigned to the MIJPA 138 TIMELINE FOR WORK FOR 2020 (MIJPA CREATION) Summary: The working group will finalize the draft joint powers agreement and send it out for review by agency managers and their legal counsels. Metro I-Net members are expected to approve the JPA by the end of the year. The City of Roseville, in conjunction with RMI staff will identify costs to service MIJPA during the interim period of the transition in 2021 and begin the process of identifying costs for transferring assets from RMI to MIJPA DETAILS OF 2020 WORK PLAN METRO I-NET WORKING GROUP In 2020, the Metro I-Net Working Group will do the following: • Approve JPA transition plan • Review draft Joint Powers Agreement • Finalize language with Attorney Strommen • Review JPA transition costs for 2021 • Identify long-term cost estimates for administrative/financial/legal services for MIJPA • Provide member agencies an estimate of costs for the transition and final implementation of the MIJPA • Assist in getting approval of JPA by all member agencies CITY OF ROSEVILLE/ROSEVILLE METRO I-NET In 2020, the City of Roseville/Roseville Metro I-Net will do the following: • Identify costs to serve MIJPA during the transition • Identify costs for transferring assets to MIJPA • Assist the working group in identifying long-term costs for administrative/financial/legal services for MIJPA • Assist in getting approval of JPA by all member agencies METRO I-NET MEMBER AGENCIES In 2020, the Roseville Metro I-Net member agencies will do the following: • Review the draft Metro I-Net joint powers agreement • Secure approval of JPA from governing bodies 139 TIMELINE FOR WORK FOR 2021(MIJPA TRANSITION) Summary: Upon approval of the joint powers agreement by all member agencies, the MIJPA will officially incorporate. Per the joint powers agreement, the board of the directors for the MIJPA will convene and elect officers. Once constituted, the MIJPA Board officers will be elected and consider agreements to cover the transition period (defined as calendar year 2021) for legal, administrative and financial services. The Board will also recruit and hire the Metro I-Net Executive Director (MIED). Once hired, the MIED will begin drafting organizational policies and determine longer term legal, HR/Administrative, and financial services as well as determining and securing space needs. In order to allow for an orderly transition in employees receiving wages and benefits and to ensure minimal disruption to member agency services, Metro I-Net employees will remain employees of the City of Roseville during 2021. DETAILS OF 2021 WORK PLAN METRO I-NET BOARD • Incorporate Metro I-Net as a joint powers authority • Hold first board business meeting o Elect Chair and other officers o Enter into agreements for interim period of 2021  Legal  HR/Admin  Financial • Begin recruitment and hire Metro I-Net Executive Director (MIED) • Enter into agreement with City of Roseville regarding management of Roseville Metro I-Net employees by Metro I-Net Executive Director during interim period • Carry out board business as described in joint powers agreement, including setting a 2022 budget. METRO I-NET EXECUTIVE DIRECTOR • MIED is sole employee of MIJPA • MIED focuses on administrative duties O Organizational policies O Service Contracts  Legal  Administrative/HR  Financial/Payroll O Determining space needs and securing space 140 CITY OF ROSEVILLE/ROSEVILLE METRO I-NET • Provide administrative/HR/financial services to MIJPA • Enter into agreement with MIJPA regarding management of Roseville Metro I- Net employees by Metro I-Net Executive Director during interim period • Assist in transition of RMI assets and employees to MIJPA employees at the start of 2022 MIJPA TRANSITION COMPLETE – JANUARY 2022 141 THIS PAGE LEFT INTENTIONALLY BLANK 142 CITY OF ST. ANTHONY VILLAGE STATE OF MINNESOTA RESOLUTION 20-091 A RESOLUTION APPROVING THE JOINT POWERS AGREEMENT FOR THE ESTABLISHMENT OF THE NORTH EAST METROPOLITAN AREA MUNICIPAL INTERNETWORKING COLLABORATIVE, TO BE KNOWN AS METRO-INET WHEREAS, The City of St. Anthony is a current member of the Metro-INET consortium currently under the City of Roseville for IT services; and WHEREAS, the City of St. Anthony wishes to continue as a member of the new establishment of Metro-INET for IT services; and WHEREAS, staff finds the agreement reasonable; and WHEREAS, Charlie Yunker, Interim City Manager is named as the City’s Member Director and Nicole Miller, Administrative Services Coordinator is named as the City’s Alternate Director; and NOW THEREFORE BE IT RESOLVED, that the City of St. Anthony Village City Council approves the joint powers agreement and authorizes the City Manager to execute said Agreement. Adopted this 8th day of December, 2020. ________________________________ Randy Stille, Mayor ATTEST: ________________________________ Nicole Miller, City Clerk Reviewed for administration: ___________________________________ Charlie Yunker, Interim City Manager 143 THIS PAGE LEFT INTENTIONALLY BLANK 144 REQUEST FOR COUNCIL CONSIDERATION Meeting Date: December 8, 2020 Resolution- a resolution approving the 2021 Appointments and Appointing the Chair and Vice Chair to the Planning Commission. OVERVIEW: In front of you this evening is a resolution approving the 2021 appointments and appointing the chair and vice chair to the planning commission. Planning Commission application information was advertised in the Fall 2020 Village Notes and on the City’s website. There are two vacancies. Five (5) applications were received and all were interviewed by the Mayor and Council on December 2, 2020. The mayor and city council individually chose their top two candidates based on their responses. The Mayor and city council then agreed by consensus on appointing Meridith Socha and Thomas Kuykendall for a three year appointment along with appointing Marcey Westrick as Chair and Meridith Socha as Vice Chair. 145 CITY OF ST. ANTHONY VILLAGE STATE OF MINNESOTA RESOLUTION 20-092 A RESOLUTION APPROVING THE 2021 APPOINTMENTS AND APPOINTING THE CHAIR AND VICE CHAIR TO THE PLANNING COMMISSION WHEREAS, the City Council conducted interviews for the 2021 appointments to the Planning Commission; and WHEREAS, the City Council recommended appointing Meridith Socha and Thomas Kuykendall to the Planning Commission beginning January 1, 2021 for a three year term; and WHEREAS, in accordance with St. Anthony City Code §32.07, Planning Commission Bylaws, the City Council recommends appointing Marcey Westrick as Chair and Meridith Socha as Vice Chair for the Planning Commission for 2021. NOW, THEREFORE, BE IT RESOLVED, that the City Council of the City of St. Anthony Village hereby appoints Meridith Socha and Thomas Kuykendall for 3 year terms and Marcey Westrick as Chair and Meridith Socha as Vice Chair for the Planning Commission for 2021. Adopted this 8th day of December, 2020. _________________________________________ Randy Stille, Mayor ATTEST:____________________________ Nicole Miller, City Clerk Review for Administration: _________________________________________ Charlie Yunker, Interim City Manager 146 REQUEST FOR COUNCIL CONSIDERATION Meeting Date: December 8, 2020 Resolution- a resolution approving the 2021 Appointments of the Chair and Vice Chair to the Parks and Environmental Commission. OVERVIEW: In front of you this evening is a resolution approving the 2021 appointments of the chair and vice chair to the parks and environmental commission. The Mayor and city council then agreed by consensus on appointing Therese Bellinger as Chair and James Niemi as Vice Chair. 147 CITY OF ST. ANTHONY VILLAGE STATE OF MINNESOTA RESOLUTION 20-093 A RESOLUTION APPROVING THE 2021 APPOINTMENTS FOR CHAIR AND VICE CHAIR TO THE PARKS AND ENVIRONMENTAL COMMISSION WHEREAS, in accordance with St. Anthony City Code §32.26, Parks and Environmental Commission Bylaws, the City Council recommends appointing Therese Bellinger as Chair and James Niemi as Vice Chair for the Parks and Environmental Commission for 2021. NOW, THEREFORE, BE IT RESOLVED, that the City Council of the City of St. Anthony Village hereby appoints Therese Bellinger as Chair and James Niemi as Vice Chair for the Parks and Environmental Commission for 2021. Adopted this 8th day of December, 2020. _________________________________________ Randy Stille, Mayor ATTEST:____________________________ Nicole Miller, City Clerk Review for Administration: _________________________________________ Charlie Yunker, Interim City Manager 148 TO: MAYOR AND COUNCIL MEMBERS FROM: SHELLY RUECKERT, FINANCE DIRECTOR SUBJECT: 2021 UTILITY RATES DATE: OCTOBER 22, 2020 The utility rates recommended herein for 2021 builds on the multi-year approach towards rate adjustments that began in 2012. The parameters used for adjusting rates are as follows:  Align revenue sources with corresponding costs  Provide transparency as to the basis of rates and rate adjustments  Maintain a structural balanced operation  Ensure that rates appropriately support the ability to: o Provide safe drinking water o Properly discharge sanitary sewer flows o Appropriately control and treat stormwater runoff Water Rates: As part of the annual rate adjustment process the water production and distribution costs are categorized as fixed in nature or usage driven. The 2021 budgeted water costs are comprised of $739,182 in fixed costs and $928,066 in usage driven costs, see table A summary below: OPERATING DEPRECIATION OVERALL FIXED 487,088 42% 252,094 50% 739,182 44% USAGE 674,794 58% 253,272 50% 928,066 56% 1,161,883 100% 505,366 100% 1,667,249 100% 149 The Multiyear approach to water rates includes the phase in of the flat fee which began in 2016. The transition process expected the usage rate growth to decelerate as flat fee was phased-in. Based on estimated actual results for 2020 and updated 2021 budgeted costs the proposed rates for 2021 are reflected below. Proposed 2021 water rates: 2020 2021 Per 1000 gallons Rates Rates $ Increase Water Tier I 3.07 3.13 .06 Water Tier II 3.24 3.30 .06 Water Tier III 3.55 3.63 .08 Water Tier IV 4.08 4.16 .08 Water Tier V 5.12 5.22 .10 Irrigation 4.08 4.16 .08 Quarterly flat fee 13.40 17.75 4.35 The above rates are projected to produce $1,178,842 in revenues assuming water consumption similar to 2020. At this level of revenues the operating income before depreciation is budgeted to be $17,609. The water budget is attached as Exhibit A. The recommendation’s impact on 2021 quarterly Water bills are reflected below: 2021 Tier Rates 3.13 3.13 3.30 3.63 4.16 5.22 2021 Usage levels 4,600 7,500 15,000 22,500 30,000 37,500 Fixed Fee 17.75 17.75 17.75 17.75 17.75 17.75 Usage 14.40 23.48 48.24 75.43 106.63 145.79 2021 Billing 32.15 41.23 65.99 93.18 124.38 163.54 2020 Billing 27.52 36.42 60.70 87.35 117.94 156.33 DIFFERENCE 4.63 4.81 5.30 5.83 6.44 7.21 150 Sewer Rates: As part of the annual rate adjustment process the sewer treatment and collection system costs are categorized as fixed in nature or flow volume driven. The 2021 budgeted sewer costs are comprised of $511,933 in fixed costs and $771,894 in flow volume driven costs (usage), see table B summary below: OPERATING DEPRECIATION OVERALL FIXED 436,237 37% 75,697 70% 511,933 40% USAGE 739,453 63% 32,441 30% 771,894 60% 1,175,690 100% 108,138 100% 1,283,828 100% The Multiyear approach to sewer rates also includes the phase in of the flat fee. As part of the transition process the usage rate growth was expected to decelerate as flat fee was phased-in. Based on estimated actual results for 2020 and updated 2021 budgeted costs that expectation is reflected in the proposed rates for 2021. Proposed 2020 Sewer rates are below: 2020 2021 ($ Decrease) Per 1000 gallons Rates Rates $ Increase Sewer Usage rate 4.64 4.64 - Qtr. Collection system charge 12.80 15.25 2.45 The above rates are projected to produce $1,270,083 in revenues in 2021. At this level of revenues the operating income before depreciation is budgeted to be $94,393. The sewer budget is attached as Exhibit B. The recommendation’s impact on 2021 quarterly Sewer bills is reflected below: 2021 Sewer Rate 4.64 4.64 4.64 4.64 4.64 4.64 2021 Usage levels 4,600 7,500 15,000 22,500 30,000 37,500 Fixed Fee 15.25 15.25 15.25 15.25 15.25 15.25 Usage 21.34 34.80 69.60 104.40 139.20 174.00 2021 Billing 36.59 50.05 84.85 119.65 154.45 189.25 2020 Billing 34.14 47.60 82.40 117.20 152.00 186.81 DIFFERENCE 2.45 2.45 2.45 2.45 2.45 2.45 151 Stormwater rates: The multi-year approach to Stormwater rates in place since 2012 called for an annual increase for single family residential (classifications 2 & 3) of thirty-five cent ($.35) increase. This represents a 2.12% increase in rate and should generate $4,200 in additional revenues (assuming no new construction). The 2.12% rate increase will be applied to all levels of stormwater charges. The historical impact on a residential single family user is as follows: The rate increase for other land use categories is consistent with the increase in single family residential (classifications 2 & 3) as see below: Quarterly Bill Usage Rate % Change 2011 $13.00 - - 2012 $13.35 $0.35 2.69 2013 $13.70 $0.35 2.62 2014 $14.05 $0.35 2.55 2015 $14.40 $0.35 2.49 2016 $14.75 $0.35 2.43 2017 $15.10 $0.35 2.32 2018 $15.45 $0.35 2.27 2019 $15.80 $0.35 2.22 2020 $16.15 $0.35 2.17 2021 $16.50 $0.35 2.12 Classification-Land Use Proposed 2021 Charge 2020 Charge % Change 1-Cemeteries, parks, golf courses, railroads, vacant land $68.35 per acre $66.94 per acre 2.12% 2- R-1, R-1a, and R-2 residential $65.87 per unit $64.60 per unit 2.12% 3- R-3 residential $65.87 per unit $64.60 per unit 2.12% 4- Schools and institutional uses $157.33 per acre $154.14 per acre 2.12% 5- R-4 Residential , churches and manufactured home parks $200.67 per acre $196.60 per acre 2.12% 6- Commercial and industrial $250.69 per acre $245.60 per acre 2.12% 152 The overall annual impact of the recommended rates for a residential customer at each of the five tier levels is below: The Water/Sewer Utility fund summary budget is attached as Exhibit C. Lastly a long range Utility revenues plan is attached as Exhibit D. The plan addressed a strategic plan goal to develop long term revenue planning. The rates are being managed to begin supporting capital needs of the water and sewer operations. The current plan projects that support to begin in 2022 with a transfer to Utilities Infrastructure fund. The plan includes assumptions regarding future City costs and MCES treatment costs. It also factors in the retirement of water /sewer bonds occurring in 2024. A minimum cash balance was established to recognize that the quarterly billing and collection process is recovering 90-120 days of prior cash outlays. No growth in accounts or usage was factored in the projection. Real growth will be noted annually through the process of updating the base year results. With these factors in place the phase-in of the flat fee and usage rate adjustments were determined. Staff believes the model will help guide year to year rate increases while being flexible enough to keep the annual increases reasonable for utility customers. As always your comments and suggestions are welcomed. Tier Level 1st -7,500 2nd -15,000 3rd -22,000 4th -30,000 5th- 37,500 Distribution (1st Qrt. 2019) 32% 49% 15% 3% 1% 2021 Proposed 107.78 167.34 229.33 295.33 369.29 2020 Actual 100.17 159.25 220.70 286.09 359.29 Quarterly Increase 7.61 8.10 8.63 9.24 10.00 Annual Increase 30.44 32.38 34.52 36.96 39.99 153 Fiscal Year 2021 12/31/2018 ACTUAL ACTUAL ACTUAL ACTUAL BUDGET EST. ACTUAL BUDGET % Change EXHIBIT A 2016 2017 2018 2019 2020 2020 2021 in Budget OPERATING INCOME 701-3710-0-0-00 WATER BILLINGS 911,902$ 938,997$ 978,966$ $988,887 $1,088,000 $1,087,693 $1,172,342 9.99% Includes the 2021 phase in of flat rate increase along with 2% increase in usage rates 701-3715-0-0-00 WATER ON/OFF FEES 525 915 180 45 550 550 500 0.00% No change in rate 701-3717-0-0-00 PENALTIES WATER 5,500 5,876 5,876 8,400 6,000 3,000 6,000 -9.22% No change in rate TOTAL 917,927$ 945,788$ 985,022$ $997,332 $1,094,550 $1,091,243 $1,178,842 9.85% DISTRIBUTION OPERATING EXPENDITURES 701-4110-80-0000 WT REGULAR EMPLOYEE 298,315$ 317,302$ 324,816$ 338,881$ 343,643$ 340,850 354,121 3.05% INCLUDES ESTIMATED 2021 WAGE ADJUSTMENTS / STAFF TURNOVER FROM 2020 701-4111-80-0000 WT OVERTIME EMPLOYEE 16,381 21,329 25,579 31,252 26,910 24,662 28,361 5.39% FROM DEPT SUMMARIES OT 701-4121-80-0000 WT PERA 23,433 23,892 25,585 26,438 27,791 26,699 28,686 3.22% BASED ON PERA FUNDING RATE 7.5% 701-4122-80-0000 WT FICA/MEDICARE 23,637 24,164 25,238 27,033 28,347 27,233 29,260 3.22% BASED ON ER 7.65% OF GROSS 701-4131-80-0000 WT INSURANCE HEALTH 58,664 51,904 53,462 56,141 55,553 56,538 61,883 11.39% SPLIT 9.4% PREMUIM INCREASE IN 2021 701-4135-80-0000 WT INSURANCE WC 11,559 9,895 9,265 9,175 9,128 9,685 13,264 45.31% BASED ON 2019/2020 RENEWAL 701-4211-80-0000 WT OFFICE SUPPLIES 721 585 633 1,020 750 725 800 6.67% 2021 PROJECTED RUN RATE 701-4212-80-0000 WT MOTOR FUELS 4,152 4,557 6,015 5,762 6,756 5,305 6,532 -3.32% 2020 contracted cost per gal $2.13 / 2021 projection $2.28 / 3yr avg usage 701-4221-80-0000 WT SUPPLIES-EQUIPMENT 762 118 837 538 575 836 625 8.70% 2021 PROJECTED RUN RATE 701-4226-80-0000 WT GENERAL SUPPLIES 4,253 3,396 5,649 12,081 9,500 8,865 11,500 21.05% More meter radios battery @ end of life 701-4300-80-0000 WT AUDITOR 7,350 8,324 7,443 7,476 7,601 7,076 8,072 6.20% BASED ON AUDITOR CONTRACT 701-4309-80-0000 WT IT & SFTW SUPPORT 21,693 20,640 22,801 22,990 27,615 32,136 32,700 18.41% BASED ON CONTRACTED IT /SW SPREADSHEET (SPLIT W/701-4308-85) 701-4310-80-0000 WT MISC CONTRACTED SERVICES 326 4,307 2,194 3,871 4,416 2,712 3,328 -24.64% BASED ON Misc CONTRACTED SERVIES spreadsheet 701-4310-80-0100 WT METER READING FEES 7,500 10,232 7,970 8,217 8,470 8,470 8,724 3.00% Sensus fees /estimated annual billing 701-4325-80-0000 WT COMMUNICATIONS 10,391 9,255 10,275 9,860 10,200 10,280 10,800 5.88% BASED ON COMMUNICATION SPREADSHEET 701-4337-80-0000 WT MAIN REPAIRS & MAINTENANCE 1,104 5,548 4,638 19,884 11,730 11,795 13,500 15.09% Budgeted for 1 major main break annually 701-4339-80-0000 WT EQUIP REPAIRS & MAINTENANCE 5,039 4,752 3,789 6,727 3,500 4,021 4,250 21.43% MAJORITY MOVED PRODUCTION COSTS IN 2016 701-4340-80-0000 WT BLDG REPAIRS & MAINTENANCE - - 38 117 - - - 0.00% MOVED PRODUCTION COSTS 701-4341-80-0000 WT TRAINING, CONF. & MTG.1,295 1,002 1,113 923 650 650 1,100 69.23% 2021 PROJECTED RUN RATE 701-4341-80-0100 WT TUITION- CERTIFICATIONS 371 414 326 438 450 450 400 -11.11% 2021 PROJECTED RUN RATE 701-4342-80-0000 WT MEMBERSHIPS & DUES 491 - - - 510 510 525 2.94% 2021 PROJECTED RUN RATE 701-4350-80-0000 WT PRINTING AND POSTAGE 1,681 3,840 2,476 2,738 4,422 3,672 4,400 -0.49% 2021 PROJECTED RUN RATE 701-4381-80-0000 WT ELECTRIC AND GAS UTILITIES 86,619 11,519 15,457 9,717 12,881 6,300 6,552 -49.13% MAJORITY MOVED PRODUCTION COSTS IN 2016 TOTAL 600,246$ 536,974$ 559,170$ 602,437$ 601,399$ 589,471 629,383 1.28% WATER OPERATIONS 154 Fiscal Year 2021 12/31/2018 ACTUAL ACTUAL ACTUAL ACTUAL BUDGET EST. ACTUAL BUDGET % Change EXHIBIT A 2016 2017 2018 2019 2020 2020 2021 in Budget WATER OPERATIONS PRODUCTION OPERATING EXPENDITURES 701-4110-85-0000 REGULAR EMPLOYEE 56,678 58,161 60,139 62,559 66,075 64,411 66,806 1.11% INCLUDES ESTIMATED 2021 WAGE ADJUSTMENTS 701-4111-85-0000 OVERTIME EMPLOYEE 712 1,024 367 936 1,050 1,800 1,500 42.86% FROM DEPT SUMMARIES OT 701-4121-85-0000 PERA 4,768 4,900 5,078 5,458 5,034 4,966 5,123 1.76% BASED ON CURRENT PERA FUNDING RATE 7.5% 701-4122-85-0000 FICA/MEDICARE 4,875 4,973 5,156 5,589 5,135 5,065 5,225 1.76% BASED ON ER 7.65% OF GROSS 701-4131-85-0000 INSURANCE HEALTH 9,235 10,126 11,036 10,339 11,000 12,828 14,020 27.45% SPLIT 9.4% PREMUIM INCREASE IN 2021 701-4135-85-0000 WTR FILT INSURANCE WC 4,328 3,776 3,587 3,505 3,533 3,749 5,128 45.15% BASED ON 2019/2020 RENEWAL 701-4221-85-0000 SUPPLIES- EQUIPMENT 3,146 396 772 644 1,301 855 925 -28.87% 2021 PROJECTED RUN RATE 701-4226-85-0000 GENERAL SUPPLIES 52,187 55,746 55,429 46,794 56,500 51,750 56,500 0.00% VARIOUS TREATMENT CHEMICALS 701-4226-85-0001 CARBON SUPPLY USAGE - 2,654 35,240 33,523 32,500 35,000 35,000 7.69% AMORTIZATION COST FOR CARBON BASED ON # OF GALLONS TREATED 701-4226-85-0200 UV BULB SUPPLY USAGE - - 112,418 112,337 112,400 112,400 112,400 0.00% AMORTIZATION COST FOR BULBS ASSUMING 3 YEAR LIFE 701-4226-85-0003 PEROXIDE SUPPILES - 27,930 27,920 33,000 28,533 30,000 -9.09% PEROIXIDE / AOP PROCESS 701-4303-85-0000 ENGINEER EXPENSES 13,628 1,952 4,587 1,722 3,500 1,500 1,700 -51.43% 2021 PROJECTED RUN RATE 701-4308-85-0000 WATER QUALITY PROTECTION COSTS - 12,387 12,644 12,626 14,325 12,400 12,772 -10.84% WATER TESTING / LAB COSTS 701-4309-85-0000 CONTRACTED IT & SFTW SUPPORT 330 - 3,659 2,657 3,238 2,740 2,830 -12.59% MDM FEE and security monitoring 701-4310-85-0000 MISC CONTRACTED SERVICES 386 330 345 690 570 690 720 26.32% BASED ON CONTRACTED IT /SW SPREADSHEET 701-4325-85-0000 COMMUNICATIONS 149 2,143 2,694 2,596 2,550 2,325 2,405 -5.69% added patec previously in sewer budget 701-4339-85-0000 EQUIP REPAIRS & MAINTENANCE 11,748 14,140 28,468 8,962 14,500 12,950 13,500 -6.90% 2021 PROJECTED RUN RATE 701-4340-85-0000 BLDG REPAIRS & MAINTENANCE 9,554 5,724 2,656 1,502 2,805 1,450 2,250 -19.79% 2021 PROJECTED RUN RATE 701-4365-85-0000 INSURANCE PROPERTY / LIABILITY - 14,067 16,552 19,498 19,160 17,297 16,750 -12.58% BASED ON 2020/2021 RENEWAL 701-4381-85-0000 ELECTRIC AND GAS UTILITIES 15,527 112,035 129,272 129,626 135,813 140,668 146,295 7.72% 2021 PROJECTED RUN RATE TOTAL 187,251 304,534 518,027 489,484 523,988 513,377 531,849 1.50% OPERATING INCOME (LOSS)130,430$ 104,281$ (92,175)$ (94,590)$ (30,837)$ (11,606)$ 17,609$ OTHER (INCOME) / EXPENSE 701-3891-0-0-00 WT MISCELLANEOUS INCOME (2,495) (12,559) (4,350) (7,460) (550) (550) (550) 701-3620-0-1-00 WT INTEREST INCOME (23,907) (16,714) (24,620) (28,476) (23,000) (12,000) (7,500) 701-3713-0-0-00 WT WATER CONNECTION FEES (7,650) (23,850) (25,700) (1,750) (34,000) (1,750) (34,000) 701-3910-0-0-00 WT SALE OF ASSETS (1,170) - - - - - - 701-4335-80-0000 WT BKUP RESTORATION COSTS - - - - - - - 701-4499-80-0000 WT MISCELLANEOUS EXPENSE 172 1,572 1,362 650 650 650 650 TOTAL (35,050)$ (51,551)$ (53,309)$ (37,036)$ (56,900)$ (13,650)$ (41,400)$ OPERATING INCOME BEFORE DEPRECIATION 165,480$ 155,832$ (38,866)$ (57,554)$ 26,063$ 2,044$ 59,009$ 155 Fiscal Year 2021 12/31/2018 ACTUAL ACTUAL ACTUAL ACTUAL BUDGET EST. ACTUAL BUDGET % Change EXHIBIT B 2016 2017 2018 2019 2020 2020 2021 in Budget OPERATING INCOME 701-3720-0-0-00 SEWER BILLINGS 1,005,329$ 1,098,938$ 1,136,667$ 1,212,400$ 1,249,355$ 1,221,468$ 1,270,083$ 3.29% Includes the 2021 phase in of flat rate increase TOTAL 1,005,329$ 1,098,938$ 1,136,667$ 1,212,400$ 1,249,355$ 1,221,468$ 1,270,083$ OPERATING EXPENDITURES 701-4110-75-0000 SS REGULAR EMPLOYEE 203,152$ 218,382$ 219,484$ 226,547$ 227,425$ 230,028$ 236,114$ 3.82% INCLUDES ESTIMATED 2021 WAGE ADJUSTMENTS 701-4111-75-0000 SS OVERTIME EMPLOYEE 15,398 18,028 23,832 24,129 25,098 21,854 25,600 2.00% FROM DEPT SUMMARIES OT 701-4121-75-0000 SS PERA 15,730 16,431 17,096 17,473 18,939 18,177 19,629 3.64% BASED ON PERA FUNDING RATE 7.5% 701-4122-75-0000 SS FICA/MEDICARE 15,791 16,437 16,197 17,375 19,318 18,541 20,021 3.64% BASED ON ER 7.65% OF GROSS 701-4131-75-0000 SS INSURANCE HEALTH 42,862 41,725 42,222 44,277 42,919 43,905 48,358 12.67% SPLIT 9.4% PREMUIM INCREASE IN 2021 701-4135-75-0000 SS INSURANCE WC 5,314 4,685 4,483 4,546 4,417 4,686 6,409 45.10% BASED ON 2020/2021 RENEWAL 701-4211-75-0000 SS OFFICE SUPPLIES - - - 100 150 150 150 0.00% 2021 PROJECTED RUN RATE 701-4212-75-0000 SS MOTOR FUELS 6,221 6,825 8,945 8,607 8,860 7,960 9,798 10.59% 2021 PROJECTED RUN RATE 701-4226-75-0000 SS GENERAL SUPPLIES 3,128 (120) 1,282 1,042 1,275 1,270 1,350 5.88% 2021 PROJECTED RUN RATE 701-4300-75-0000 SS AUDITOR 5,880 6,785 7,443 7,476 7,601 7,076 8,072 6.20% BASED ON AUDITOR CONTRACT 701-4309-75-0000 SS IT & SFTW SUPPORT 8,148 12,205 13,612 15,284 16,820 19,601 21,030 25.03% BASED ON CONTRACTED IT /SW SPREADSHEET 701-4310-75-0000 SS MISC CONTRACTED SERVICES 331 273 1,704 2,501 3,350 3,386 3,642 8.72% BASED ON MISC CONTRACTED SERVICES SPREADSHEET 701-4325-75-0000 SS COMMUNICATIONS 3,964 3,136 3,263 3,267 3,780 3,600 3,880 2.65% BASED ON COMMUNICATION SPREADSHEET 701-4335-75-0000 SS BKUP RESTORATION COSTS - - 5,123 - 10,000 10,000 10,000 0.00% Assumes the cost of one full deductable 701-4339-75-0000 SS EQUIP REPAIRS & MAINTENANCE 2,487 17,438 35,085 4,690 13,770 9,011 9,500 -31.01% 2021 PROJECTED RUN RATE 701-4341-75-0000 SS TRAINING, CONF. & MTG.934 205 - - 1,122 1,150 1,250 11.41% 2021 PROJECTED RUN RATE 701-4341-75-0100 SS TUITION- CERTIFICATIONS - - 1,170 904 587 600 600 2.30% 2021 PROJECTED RUN RATE 701-4342-75-0000 SS MEMBERSHIP & DUES - 238 1,131 - 950 1,182 1,250 31.58% 2021 PROJECTED RUN RATE 701-4350-75-0000 SS PRINTING AND POSTAGE 1,681 4,303 2,476 3,488 3,250 3,672 4,400 35.38% 2021 PROJECTED RUN RATE 701-4365-75-0000 SS INSURANCE PROPERTY/ LIABILITY 13,100 9,352 11,686 10,414 9,981 13,215 15,900 59.30% BASED ON 2020/2021 RENEWAL 701-4375-75-0000 SS MCES WASTE TREATMENT CHARGE 576,237 643,390 708,567 733,670 712,664 712,664 719,437 0.95% MCES amount for 2020, 3.6% rate increase, lower flow volume 701-4381-75-0000 SS ELECTRIC AND GAS UTILITIES 10,301 9,654 8,609 8,719 10,083 8,813 9,300 -7.77% 2021 PROJECTED RUN RATE TOTAL 930,659$ 1,029,372$ 1,133,409$ 1,134,511$ 1,142,359$ 1,140,540$ 1,175,690$ 2.92% OPERATING INCOME (LOSS)74,670$ 69,566$ 3,258$ 77,889$ 106,996$ 80,928$ 94,393$ OTHER (INCOME) / EXPENSE 701-3723-0-0-00 SEWER CONNECTION FEES (7,650)$ (23,800)$ (22,100)$ (1,700)$ (34,000)$ (1,750)$ (34,000)$ 701-3891-0-0-00 SS MISCELLANEOUS INCOME (6,305) (12,559) (650) (650) (650)(650)(650) 701-3910-0-0-00 SS SALE OF ASSETS (180)0 701-4499-75-0000 SS MISCELLANEOUS EXPENSE 90 170 100 100 100 100 100 TOTAL (14,045)$ (36,189)$ (22,650)$ (2,250)$ (34,550)$ (2,300)$ (34,550)$ NET INCOME (LOSS) BEFORE DEPRECIATION 88,715$ 105,754$ 25,908$ 80,139$ 141,546$ 83,228$ 128,943$ SEWER OPERATIONS 156 Fiscal Year 2021 ACTUAL ACTUAL ACTUAL ACTUAL BUDGET EST. ACTUAL BUDGET REVENUES 2016 2017 2018 2019 2020 2020 2021 Water Operations 917,927$ 945,788$ 985,022$ 997,332$ 1,094,550$ $1,091,243 $1,178,842 Sewer Operations 1,005,329 1,098,938 1,136,667 1,212,400 1,249,355 1,221,468 1,270,083 Total Operating Revenues 1,923,256$ 2,044,726$ 2,121,689$ 2,209,732$ 2,343,905$ 2,312,711$ 2,448,925$ EXPENDITURES Water Operations 787,497$ 841,508$ 1,077,197$ 1,091,922$ 1,125,387$ $1,102,848 $1,161,233 Sewer Operations 930,659 1,029,372 1,133,409 1,134,511 1,142,359 1,140,540 1,175,690 Total Operating Expenditures 1,718,156$ 1,870,880$ 2,210,606$ 2,226,432$ 2,267,746$ 2,243,388$ 2,336,923$ Combined Operating Income 205,100$ 173,846$ (88,918)$ (16,700)$ 76,159$ 69,323$ 112,003$ Other (Income)/Expense Water (11,143)$ (34,837)$ (28,689)$ (12,036)$ (33,900)$ (1,650)$ (33,900)$ Sewer (14,045)(36,189)(22,650)(2,250)(34,550)(2,300) (34,550) Interest Income (23,907) (16,714) (24,620) (25,000) (23,000) (12,000) (7,500) Depreciation Expense 332,399 352,399 371,766 611,728 631,728 631,728 656,728 Total Other (Income)/Expense 283,304 264,659 295,808 572,442 540,278 615,778 580,778 Net Income/(Loss) (78,204)$ (90,813)$ (384,725)$ (589,142)$ (464,119)$ (546,455)$ (468,775)$ Other Sources and Uses: Transfers Out (225,000)$ -$ -$ -$ -$ -$ -$ Transfers In 1,632,862 - - - - - - Debt Service Payments (138,150) (145,750) (148,200) (145,600) (147,950) (147,950) ($150,200) Net Change in Assets / Liabilities 49,451 (30,728) 49,417 (18,684) - - - Proceeds Bonding/Army 130,932 - - - - - - Add back Depreciation Expense 332,399 352,399 371,766 611,728 631,728 631,728 656,728 Total Other Sources and Uses 1,782,494 175,921 272,983 447,444 483,778 483,778 506,528 Net increase (decrease) in cash 1,704,290$ 85,108$ (111,741)$ (141,698)$ 19,659$ (62,677)$ 37,753$ BEGINNING CASH BALANCE 126,017 1,830,307 1,915,415 1,803,675 1,661,977 1,661,977 1,599,301$ ENDING CASH BALANCE 1,830,307$ 1,915,415$ 1,803,675$ 1,661,977$ 1,681,637$ 1,599,301$ 1,637,055$ UTILITY FUND SUMMARY EXHIBIT C 157 Water and Sewer 10 year operating projection Fiscal Year 2020 Assumptions 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Water Rates Flat Fee N/A N/A 3.35$ 6.70$ 10.05$ 13.40$ 17.75$ 21.10$ 23.45$ 24.62$ 25.85$ 27.15$ 28.50$ 29.93$ 31.43$ 33.00$ 34.65$ Usage (Tier one)3.10$ 3.10$ 3.07$ 3.07$ 3.07$ 3.13$ 3.13$ 3.13$ 3.22 3.32 3.42 3.52 3.63 3.74 3.85 3.96 Sewer Rates Flat Fee N/A 3.20$ 6.40$ 9.64$ 12.80$ 15.25$ 18.45$ 21.65$ 22.52$ 22.97 23.43 23.89 24.37 24.86 25.36 25.86 Usage 4.62$ 4.69$ 4.69$ 4.64$ 4.64$ 4.64$ 4.64$ 4.64$ 4.90 5.16 5.45 5.75 6.06 6.40 6.75 Expenses Met Council - $ Actual 593,381 576,237 643,390 708,567 733,670 712,664 719,437 4.50%4.50%5.00%5.50%5.50%5.50%5.50%5.50%5.50%5.50% Met Council - % Increase -4.57%-2.89%11.65%10.13%3.54%-2.86%0.95%NA NA NA NA NA NA NA NA NA NA City Water Expenses - % Increase EST ACTUAL 4.00%4.00%4.00%4.00%4.00%4.00%4.00%4.00%4.00%4.00% City Sewer Expenses - % Increase EST ACTUAL 3.50%3.50%3.50%3.50%3.50%3.50%3.50%3.50%3.50%3.50% Actual Actual Actual Actual Actual Est. Actual Projected Projected Projected Projected Projected Projected Projected Projected Projected Projected Projected REVENUES 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Water Operations 897,232$ 917,927 945,788 985,022 997,332 1,071,180 1,178,842 1,256,127 1,323,099 1,372,370 1,423,607 1,476,895 1,532,321 1,589,975 1,649,952 1,712,353 1,777,281 Sewer Operations 947,618 1,005,329 1,098,938 1,136,667 1,212,400 1,223,073 1,270,083 1,352,243 1,437,115 1,591,238 1,667,204 1,746,957 1,830,691 1,918,610 2,010,931 2,107,880 2,131,955 Total Operating Revenues 1,844,850$ 1,923,256$ 2,044,726$ 2,121,689$ 2,209,732$ 2,294,253$ 2,448,925$ 2,608,370$ 2,760,213$ 2,963,607$ 3,090,811$ 3,223,852$ 3,363,011$ 3,508,585$ 3,660,883$ 3,820,233$ 3,909,236$ EXPENDITURES Water Operations 618,069$ 787,497 841,508 1,077,197 1,091,922 1,102,848 1,161,233 1,207,682 1,255,989 1,306,229 1,358,478 1,412,817 1,469,330 1,528,103 1,589,227 1,652,796 1,718,908 Sewer Operations 963,621 930,659 1,029,372 1,133,409 1,134,511 1,140,540 1,175,690 1,231,228 1,289,501 1,350,649 1,414,817 1,482,161 1,552,842 1,627,031 1,704,908 1,786,662 1,872,492 Total Operating Expenditures 1,581,690 1,718,156 1,870,880 2,210,606 2,226,432 2,243,388 2,336,923 2,438,910 2,545,490 2,656,877 2,773,295 2,894,978 3,022,172 3,155,134 3,294,135 3,439,458 3,591,400 Combined Operating Income 263,160$ 205,100$ 173,846$ (88,917)$ (16,700)$ 50,865$ 112,003$ 169,460$ 214,723$ 306,730$ 317,516$ 328,874$ 340,840$ 353,451$ 366,748$ 380,775$ 317,836$ Other (Income)/Expense Water (1,938) (11,143) (40,051) (28,689) (12,036) (1,650) (33,900) (33,850) (2,550) (2,500) (2,450) (2,400) (2,350) (2,300) (2,250) (2,200) (2,150) Sewer (21,139) (14,045) (36,189) (22,650) (2,250) (2,300) (34,550) (34,500) (34,450) (2,600) (2,550) (2,500) (2,450) (2,400) (2,350) (2,300) (2,250) Interest income (499) (23,907) (11,500) (24,620) (25,000) (12,000) (7,500) (10,563) (11,749) (13,080) (18,335) (21,085) (23,629) (25,955) (28,350) (33,000) (35,000) Depreciation Expense 308,955 332,399 352,399 371,766 611,728 631,728 656,728 681,728 706,728 731,728 756,728 781,728 806,728 831,728 856,728 881,728 906,728 Total Other (Income)/Expense 285,380 283,304 264,659 295,807 572,442 615,778 580,778 602,815 657,979 713,548 733,393 755,743 778,299 801,073 776,073 751,073 726,073 Net Income/(Loss) (22,220)$ (78,204)$ (90,813)$ (384,724)$ (589,142)$ (564,913)$ (468,775)$ (433,355)$ (443,256)$ (406,818)$ (415,877)$ (426,869)$ (437,459)$ (447,622)$ (409,325)$ (370,298)$ (408,237)$ Other Sources and Uses: Transfers- in - 1,632,862 - - - - - - - - - - - - - - - Transfers Out CIP (15,000) (225,000) - - - - - - - - - - - - - - - Transfers Out - W/S Infrastructure - - - - - - - (25,000) (50,000) (175,000) (210,000) (255,000) (300,000) (345,000) (390,000) (435,000) (480,000) Army Reimbursements - 130,932 - - - - - - - - - - - - - - - Debt Service Payments (140,450) (138,150) (145,750) (148,200) (145,600) (147,950) (150,200) (147,400) (149,550) (156,550) - - - - - - - Net Change in Assets / Liabilities (46,105) 49,451 (30,728) 49,417 (18,684) - (150,000) - - (150,000) - - (200,000) - (200,000) - Add back Depreciation Expense 308,955 332,399 352,399 371,766 611,728 631,728 656,728 681,728 706,728 731,728 756,728 781,728 806,728 831,728 856,728 881,728 906,728 Total Other Sources and Uses 107,400 1,782,494 175,921 272,983 447,444 483,778 356,528 509,328 507,178 250,178 546,728 526,728 306,728 486,728 466,728 246,728 426,728 Net increase (decrease) in cash 85,180$ 1,704,290$ 85,108$ (111,740)$ (141,698)$ (81,135)$ (112,247)$ 75,973$ 63,922$ (156,640)$ 130,851$ 99,859$ (130,731)$ 39,106$ 57,403$ (123,570)$ 18,491$ BEGINNING CASH BALANCE 40,837 126,017 1,830,307 1,915,415 1,803,675 1,661,977 1,580,842 1,468,595 1,544,568 1,608,491 1,451,851 1,582,702 1,682,562 1,551,830 1,590,936 1,648,339 1,524,768 ENDING CASH BALANCE 126,017$ 1,830,307$ 1,915,415$ 1,803,675$ 1,661,977$ 1,580,842$ 1,468,595$ 1,544,568$ 1,608,491$ 1,451,851$ 1,582,702$ 1,682,562$ 1,551,830$ 1,590,936$ 1,648,339$ 1,524,768$ 1,543,259$ MINIMUM CASH BALANCE 755,400 779,235 827,325 855,430 882,177 912,701 966,508 1,016,857 1,069,621 1,144,419 1,030,270 1,074,617 1,121,004 1,169,528 1,220,294 1,146,486 1,197,133 EXHIBIT D 158 Fiscal Year 2021 ACTUAL BUDGET EST. ACTUAL BUDGET 2019 2020 2020 2021 PW Usage %Fixed %AD Usage %Fixed %TOTAL DISTRIBUTION EXPENSES 701-4110-80-0000 WT REGULAR EMPLOYEE 338,881$ 343,643$ 340,850$ 354,121$ 241,031 72,309 30%168,722 70%113,090 11,309 10%101,781 90%354,121 701-4111-80-0000 WT OVERTIME EMPLOYEE 31,252 26,910 24,662 28,361 19,304 5,791 30%13,513 70%9,057 906 10%8,152 90%28,361 701-4115-80-0000 WT POST BENEFIT PAYOUT 1,158 - - - - - - - - - - - - - - 701-4121-80-0000 WT PERA 26,438 27,791 26,699 28,686 19,525 5,858 30%13,668 70%9,161 916 10%8,245 90%28,686 701-4122-80-0000 WT FICA/MEDICARE 27,033 28,347 27,233 29,260 19,916 5,975 30%13,941 70%9,344 934 10%8,410 90%29,260 701-4131-80-0000 WT INSURANCE HEALTH 56,141 55,553 56,538 61,883 42,120 12,636 30%29,484 70%19,763 1,976 10%17,786 90%61,883 701-4135-80-0000 WT INSURANCE WC 9,175 9,128 9,685 13,264 13,264 3,979 30%9,285 70%- - - - - 13,264 701-4211-80-0000 WT OFFICE SUPPLIES 1,020 750 725 800 - - - - - 800 80 10%720 90%800 701-4212-80-0000 WT MOTOR FUELS 5,762 6,756 5,305 6,532 6,532 1,960 30%4,572 70%- - - - - 6,532 701-4221-80-0000 WT SUPPLIES-EQUIPMENT 538 575 836 625 625 188 30%438 70%- - - - - 625 701-4226-80-0000 WT GENERAL SUPPLIES 12,081 9,500 8,865 11,500 11,500 3,450 30%8,050 70%- - - - - 11,500 701-4300-80-0000 WT AUDITOR 7,476 7,601 7,076 8,072 - - - - - 8,072 807 10%7,265 90%8,072 701-4309-80-0000 WT IT & SFTW SUPPORT 22,990 27,615 32,136 32,700 18,564 1,856 10%16,708 90%14,136 1,414 10%12,722 90%32,700 701-4310-80-0000 WT MISC CONTRACTED SERVICES 3,871 4,416 2,712 3,328 3,328 333 10%2,995 90%- - - - - 3,328 701-4310-80-0100 WT METER READING FEES 8,217 8,470 8,470 8,724 8,724 - - 8,724 100%- - - - - 8,724 701-4325-80-0000 WT COMMUNICATIONS 9,860 10,200 10,280 10,800 10,800 7,613 70%3,187 30%- - - - - 10,800 701-4337-80-0000 WT MAIN REPAIRS & MAINTENANCE 19,884 11,730 11,795 13,500 13,500 4,050 30%9,450 70%- - - - - 13,500 701-4339-80-0000 WT EQUIP REPAIRS & MAINTENANCE 6,727 3,500 4,021 4,250 4,250 1,275 30%2,975 70%- - - - - 4,250 701-4340-80-0000 WT BLDG REPAIRS & MAINTENANCE 117 - - - - - 30%- 70%- - - - - - 701-4341-80-0000 WT TRAINING, CONF. & MTG.923 650 650 1,100 1,100 - - 1,100 100%- - - - - 1,100 701-4341-80-0100 WT TUITION- CERTIFICATIONS 438 450 450 400 400 - - 400 100%- - - - - 400 701-4342-80-0000 WT MEMBERSHIPS & DUES - 510 510 525 525 - - 525 100%- - - - - 525 701-4350-80-0000 WT PRINTING AND POSTAGE 2,738 4,422 3,672 4,400 - - - - - 4,400 220 5%4,180 95%4,400 701-4365-80-0000 WT INSURANCE PROPERTY / LIABILILITY - - - - - - - - - - - - - - - 701-4381-80-0000 WT ELECTRIC AND GAS UTILITIES 9,717 12,881 6,300 6,552 6,552 1,966 30%4,586 70%- - - - - 6,552 701-4499-80-0000 WT MISCELLANEOUS EXPENSE - 650 650 650 650 195 30%455 70%- - - - - 650 TOTAL DISTRIBUTION 602,437$ 602,049$ 590,121$ 630,033$ 442,210$ 129,433$ 29%312,777$ 71%187,823$ 18,562$ 10%169,261$ 90%630,033 WATER EXPENSES PW ADMINISTRATIVE COSTS 159 Fiscal Year 2021 ACTUAL BUDGET EST. ACTUAL BUDGET 2019 2020 2020 2021 PW Usage %Fixed %AD Usage %Fixed %TOTAL WATER EXPENSES PW ADMINISTRATIVE COSTS PRODUCTION EXPENSES 701-4110-85-0000 REGULAR EMPLOYEE 61,799 66,075 64,411 66,806 66,806 66,806 100%- 0%66,806 701-4111-85-0000 OVERTIME EMPLOYEE 950 1,050 1,800 1,500 1,500 1,500 100%- 0%1,500 701-4121-85-0000 PERA 4,706 5,034 4,966 5,123 5,123 5,123 100%- 0%5,123 701-4122-85-0000 FICA/MEDICARE 4,800 5,135 5,065 5,225 5,225 5,225 100%- 0%5,225 701-4131-85-0000 INSURANCE HEALTH 10,337 11,000 12,828 14,020 14,020 14,020 100%- 0%14,020 701-4135-85-0000 WTR FILT INSURANCE WC 3,749 3,533 3,749 5,128 5,128 5,128 100%- 0%5,128 701-4221-85-0000 SUPPLIES- EQUIPMENT 1,275 1,301 855 925 925 925 100%- 0%925 701-4226-85-0000 CHEMICAL SUPPLIES 46,800 56,500 51,750 56,500 56,500 56,500 100%- 0%56,500 701-4226-85-0001 CARBON SUPPLY USAGE 33,500 32,500 35,000 35,000 35,000 35,000 100%- 0%35,000 701-4226-85-0200 UV BULB SUPPLY USAGE 112,400 112,400 112,400 112,400 112,400 112,400 100%- 0%112,400 701-4226-85-0003 PEROXIDE SUPPILES 27,920 33,000 28,533 30,000 30,000 30,000 100%- 0%30,000 701-4303-85-0000 ENGINEER EXPENSES 3,200 3,500 1,500 1,700 1,700 - 0%1,700 100%1,700 701-4308-85-0000 WATER QUALITY PROTECTION COSTS 12,186 14,325 12,400 12,772 12,772 12,772 100%- 0%12,772 701-4309-85-0000 CONTRACTED IT & SFTW SUPPORT 3,174 3,238 2,740 2,830 2,830 2,830 100%- 0%2,830 701-4310-85-0000 MISC CONTRACTED SERVICES 690 570 690 720 720 720 100%- 0%720 701-4325-85-0000 COMMUNICATIONS 2,600 2,550 2,325 2,405 2,405 2,405 100%- 0%2,405 701-4339-85-0000 EQUIP REPAIRS & MAINTENANCE 8,962 14,500 12,950 13,500 13,500 13,500 100%- 0%13,500 701-4340-85-0000 BLDG REPAIRS & MAINTENANCE 2,750 2,805 1,450 2,250 2,250 2,250 100%- 0%2,250 701-4351-85-0000 PL NOTICES & PUBLICATIONS - - - - - - 100%0%- 701-4365-85-0000 INSURANCE PROPERTY / LIABILITY 20,023 19,160 17,297 16,750 16,750 13,400 80%3,350 20%16,750 701-4381-85-0000 ELECTRIC AND GAS UTILITIES 128,743 135,813 140,668 146,295 146,295 146,295 100%- 0%146,295 TOTAL PRODUCTION 490,565 523,988 513,377 531,849 531,849 526,799$ 99%5,050 1%- - - - 531,849 TOTAL OPERATING EXPENSES 1,093,002 1,126,037 1,103,498 1,161,883 974,059 656,232 71%317,827 35%187,823 18,562 2%169,261 18%1,161,883 531,849 DEPRECIATION EXPENSE WT DEPRECIATION TREATMENT PLANTS 145,232 145,232 145,232 145,232 145,232 145,232 100%- 0%145,232 WT DEPRECIATION MAINTENANCE EQUIP 76,358 76,358 76,358 76,358 76,358 22,907 30%53,451 70%76,358 WT DEPRECIATION WATERMAINS 283,776 283,777 283,778 283,776 283,776 85,133 30%198,643 70%283,776 TOTAL DEPRECIATION 505,366 505,367 505,368 505,366 505,366 253,272 50%252,094 50%- - - - 505,366 TOTAL OVERALL EXPENSES 1,598,368 1,631,404 1,608,866 1,667,249 1,479,425 909,504 77%569,921 48%187,823 18,562 2%169,261 14%1,667,249 FIXED 487,088 42%252,094 50%739,182 44%337,963.00$ 0.46$ USAGE 674,794 58%253,272 50%928,066 56%$827,828.00 0.89$ 1,161,883 100%505,366 100%1,667,249 100% NO ADMINISTRATIVE COSTS INCLUDED DEPRECIATION OPERATING OVERALL NO ADMINISTRATIVE COSTS INCLUDED 160 Fiscal Year 2021 ACTUAL ACTUAL BUDGET EST. ACTUAL BUDGET 2018 2019 2020 2020 2021 PW Usage %Fixed %AD Usage %Fixed %TOTAL COLLECTION SYSTEM EXPENSES 701-4110-75-0000 SS REGULAR EMPLOYEE 219,484$ 226,547$ 227,425$ 230,028$ 236,114$ 114,789 34,437 30%80,352 70%121,325 6,066 5%115,259 80%236,114 701-4111-75-0000 SS OVERTIME EMPLOYEE 23,832 24,129 25,098 21,854 25,600 12,446 3,734 30%8,712 70%13,154 658 5%12,497 95%25,600 701-4121-75-0000 SS PERA 17,096 17,473 18,939 18,177 19,629 9,543 2,863 30%6,680 70%10,086 504 5%9,582 95%19,629 701-4122-75-0000 SS FICA/MEDICARE 16,197 17,375 19,318 18,541 20,021 9,733 2,920 30%6,813 70%10,288 514 5%9,773 95%20,021 701-4131-75-0000 SS INSURANCE HEALTH 42,222 44,277 42,919 43,905 48,358 27,242 8,173 30%19,069 70%21,116 1,056 5%20,060 95%48,358 701-4135-75-0000 SS INSURANCE WC 4,483 4,546 4,417 4,686 6,409 6,409 1,923 30%4,486 70%- - - - - 6,409 701-4211-75-0000 SS OFFICE SUPPLIES - 100 150 150 150 - - - - - 150 8 5%143 95%150 701-4212-75-0000 SS MOTOR FUELS 8,945 8,607 8,860 7,960 9,798 9,798 2,939 30%6,859 70%- - - - - 9,798 701-4226-75-0000 SS GENERAL SUPPLIES 1,282 1,042 1,275 1,270 1,350 1,350 405 30%945 70%- - - - - 1,350 701-4300-75-0000 SS AUDITOR 7,443 7,476 7,601 7,076 8,072 8,072 - 0%8,072 100%- - - - - 8,072 701-4309-75-0000 SS IT & SFTW SUPPORT 13,612 15,284 16,820 19,601 21,030 2,928 2,928 100%- - 18,102 905 5%17,197 95%21,030 701-4310-75-0000 SS MISC CONTRACTED SERVICES 1,704 2,501 3,350 3,386 3,642 3,642 - 0%3,642 100%- - - - - 3,642 701-4325-75-0000 SS COMMUNICATIONS 3,263 3,267 3,780 3,600 3,880 3,880 - 0%3,880 100%- - - - - 3,880 701-4335-75-0000 SS BKUP RESTORATION COSTS 5,123 - 10,000 10,000 10,000 10,000 3,000 30%7,000 70%- - - - - 10,000 701-4339-75-0000 SS EQUIP REPAIRS & MAINTENANCE 35,085 4,690 13,770 9,011 9,500 9,500 7,613 80%1,887 20%- - - - - 9,500 701-4341-75-0000 SS TRAINING, CONF. & MTG.- - 1,122 1,150 1,250 1,250 1,000 80%250 20%- - - - - 1,250 701-4342-75-0000 SS MEMBERSHIPS & DUES 1,131 904 950 1,182 1,250 1,250 1,000 80%250 20%1,250 701-4341-75-0100 SS TUITION- CERTIFICATIONS 1,170 - 587 600 600 600 480 80%120 20%- - - - - 600 701-4350-75-0000 SS PRINTING AND PUBLISHING 2,476 3,488 3,250 3,672 4,400 4,400 - 0%4,400 100%- - - - - 4,400 701-4365-75-0000 SS INSURANCE PROPERTY/ LIABILITY 11,686 10,414 9,981 13,215 15,900 15,900 - 0%15,900 100%- - - - - 15,900 TOTAL COLLECTION SYSTEM 416,233$ 392,122$ 419,612$ 419,063$ 446,953$ 252,732$ 73,414$ 29%179,318$ 71%194,221$ 9,711$ 5%184,510$ 95%446,953 252,732$ TREATMENT EXPENSES 701-4375-75-0000 SS MCES WASTE TREATMENT CHARGE 708,567 733,670 712,664 712,664$ 719,437 719,437 647,493 90%71,944 10%719,437 701-4381-75-0000 SS ELECTRIC AND GAS UTILITIES 8,609 8,719 10,083 8,813 9,300 9,300 8,835 95%465 5%9,300 TOTAL TREATMENT 717,176 742,389 722,747 721,477 728,737 728,737 656,328 90%72,409 17%- - - - 728,737 TOTAL OPERATING EXPENSES 1,133,409 1,134,511 1,142,359 1,140,540 1,175,690 981,469 729,742 74%251,727 26%194,221 9,711 5%184,510 95%1,175,690 DEPRECIATION EXPENSE 701-4499-80-0000 WT DEPRECIATION MAINTENANCE EQUIP 28,909 32,441 32,441 32,441 32,441 32,441 9,732 30%22,709 70%32,441 WT DEPRECIATION LINES AND LIFT STATIONS 67,453 75,697 75,697 75,697 75,697 75,697 22,709 30%52,988 70%75,697 TOTAL DEPRECIATION 96,362 108,138 108,138 108,138 108,138 108,138 32,441 30%75,697 70%- - - - 108,138 TOTAL OVERALL EXPENSES 1,229,771 1,242,649 1,250,497 1,248,678 1,283,828 1,089,607 762,184 70%327,423 30%194,221 9,711 5%184,510 95%1,283,828 FIXED 436,237 37%75,697 70%511,933 40% USAGE 739,453 63%32,441 30%771,894 60%0 1,175,690 100%108,138 100%1,283,828 100% SEWER EXPENSES PW ADMINISTRATIVE COSTS NO ADMINISTRATIVE COSTS NO ADMINISTRATIVE COSTS OPERATING DEPRECIATION OVERALL 161 THIS PAGE LEFT INTENTIONALLY BLANK 162 ORDINANCE NO. 2020-03 SAINT ANTHONY VILLAGE, MINNESOTA AN ORDINANCE AMENDING MULTIPLE SECTIONS OF CHAPTER 33 SEWER, WATER, LICENSE AND PERMIT FEES, STORM WATER FACILITIES AND CHAPTER 52 WATER READING AND BILLING The City Council of the City of Saint Anthony Village ordains as follows: Section One. Amendment to the City of Saint Anthony Village City Code to Amend Sections §33.018 Sewer Charge Rate and Metro Rate Surcharge, §33.036 Water Charges to Owner, §33.038 Commencing & Discontinuing Service, §33.061 Establishment of Fee Amounts, and §33.090 Charges for Storm Water Facilities, of the City Code of the City of Saint Anthony Village is hereby amended as follows. The deleted language is represented by strikethrough text. The additional language is represented by single underlined text. Section Two. Effective Date. This Ordinance amendment shall be in full force and effect upon its publication as provided by law. § 33.018 SEWER CHARGE RATES AND METRO WASTE SURCHARGE. All sewer charges will be billed at the current rate of $4.64 per 1,000 gallons, quarterly Collection system charge $15.25 per residential equivalency unit. § 33.036 WATER RATES. Water Usage billing will be computed quarterly based on metered water used according to the tiered rates system below, quarterly Distribution system charge $17.75 per residential equivalency unit. (A) Residential. RESIDENTIAL Consumption (gallons) Rate/per 1,000 gallons TIER I 0-7,500 $3.13 TIER II 7,500-15,000 $3.30 TIER III 15,000-22,500 $3.63 TIER IV 22,500-30,000 $4.16 TIER V Over 30,000 $5.22 (B) Multi-family. The multi-family quarterly water usage billing is based on the total consumption divided by the number of units to determine the consumption per unit. Multi-family customers are billed according to the residential tier rate structure. (C) Commercial. COMMERCIAL Consumption (gallons) Rate/per 1,000 gallons TIER I 0-7,500 $3.13 TIER II 7,500-53,500 $3.30 TIER III 53,500-175,000 $3.63 TIER IV 175,000-300,000 $4.16 TIER V Over 300,000 $5.22 163 (D) Wilshire Elementary. WILSHIRE Consumption( gallons) Rate/per 1,000 gallons TIER I 0-7,500 $3.13 TIER II 7,500-510,000 $3.30 TIER III 510,000-610,000 $3.63 TIER IV 610,000-710,000 $4.16 TIER V Over 710,000 $5.22 (E) St. Anthony High School. SAVHS Consumption (gallons) Rate/per 1,000 gallons TIER I 0-7,500 $3.13 TIER II 7,500-850,000 $3.30 TIER III 850,000-1,150,000 $3.63 TIER IV 1,150,000-1,450,000 $4.16 TIER V Over 1,450,000 $5.22 (F) Happy’s Potato Chips. HAPPY’S Consumption (gallons) Rate/per 1,000 gallons TIER I 0-7,500 $3.13 TIER II 7,500-3,650,000 $3.30 TIER III 3,650,000-4,650,000 $3.63 TIER IV 4,650,000-5,650,000 $4.16 TIER V Over 5,650,000 $5.22 § 33.038 COMMENCING OR DISCONTINUING SERVICE. A hookup charge of $105 must be paid before water service to a property is first provided. A charge of $15.00 will be made for shutting off or turning on the water supply to a premise. 164 § 33.061 ESTABLISHMENT OF FEE AMOUNTS. These fees are set by Resolution as stated in §33.062. The dollar amounts of fees required by this code as stated in the following table. In addition to the application fee, applicants are responsible for the City’s out-of- pocket costs for the planner, engineer, attorney and/or other consultants to review the application. To provide for payment of such costs, the applicant will make a deposit (escrow) with the city at the end of the tie of application submittal, in an amount determined by the City Manager. If costs are less than the deposit (escrow), the difference will be billed to the applicant. Land Use Fees Purpose of Fee (Code No:) Amount Appeal $500.00 and an Escrow deposit of $1,500 Comprehensive Plan $750 and an Escrow deposit of $1500 for Residential and $3,500 for Commercial Conditional Use Permits (152.243) $1,000 and an Escrow deposit of $450 for Residential and $1,500 Commercial Easement Vacation $200 and an Escrow deposit of $500 Final Plat $500 with an Escrow deposit of $750 Garage setback permit (152.176) $60 Planned Unit Development (152.203) $1,500 with a $2,500 Escrow deposit Preliminary plat (151.03) $500 with a $750 Escrow deposit Rezoning (152.242) $750 with a $1,500 Escrow deposit Sign permit (155) $75 for cost of $1 to $500, plus $5 for each $100 over $500 Sign plan, review (155) $75 Site Plan $250 with an Escrow deposit of $750 Subdivision/Lot Split (151.03) $250 with a $1,250 Escrow deposit Variance (152.245) $750 and an Escrow deposit of $450 for Residential and $1,500 Commercial § 33.090 CHARGES FOR STORM WATER FACILITIES. Classification Charge (per acre) 1 - Cemeteries, parks, golf courses, parks, golf courses, railroads, vacant land $68.35 2 – R-1, R-1a, and R-2 residential $65.87 3 – R-3 Residential $65.87 4 – Schools and institutional uses $157.33 5 – R-4 Residential, churches & manufactured home parks $200.67 6 – Commercial & Industrial $250.69 165 Effective Date: This ordinance shall become effective as of its publication. First Reading: November 10, 2020 Second Reading: November 24, 2020 Adopted: December 8, 2020 CITY OF SAINT ANTHONY VILLAGE By:_________________________________ Randy Stille, Mayor ATTEST: By:_________________________________ Nicole Miller, City Clerk Publish: Star Tribune Publication Date: December 11, 2020 166 CITY OF ST. ANTHONY VILLAGE STATE OF MINNESOTA RESOLUTION 20-094 A RESOLUTION APPROVING SUMMARY PUBLICATION FOR ORDINANCE 2020-03 WHEREAS, the City Council of the City of St. Anthony has adopted the above referenced ordinance concerning Sewer, Water, Storm Water charges, and establishment of fees; and WHEREAS, Minnesota Statutes, section 412.191, subdivision 4 allows publication by title and summary in the case of lengthy ordinances or those containing maps or charts; and WHEREAS, the City Council believes that the following summary would clearly inform the public of the intent of Ordinance 2020-03. NOW, THEREFORE, BE IT RESOLVED that: the following summary of Ordinance 2020-03 shall be published in the official paper in lieu of the entire ordinance. SUMMARY PUBLICATION Ordinance 2020-03 An Ordinance Amending Multiple Sections of Chapter 33 for Sewer Charges, Water Charges, Storm Water Charges, License and Permit Fees, Storm Water Facilities, and Chapter 52 Water Reading and Billing; The City Council of the City of St. Anthony adopted Ordinance 2020-03 on December 8, 2020, amending multiple sections of Chapter 33 Fees, Rates, and Charges and Chapter 52 Water Reading and Billing. The amended ordinance elements include: • Amended Sewer Rates • Amended Water Rates • Amended Storm Water Charges • Amended Fees for Building and Electrical Permits The full Ordinance is available for review at City Hall, St. Anthony City Hall, 3301 Silver Lake Road, St. Anthony, MN 55418. Adopted this 8th day of December, 2020. _________________________________ Randy Stille, Mayor ATTEST: _________________________ Nicole Miller, City Clerk Reviewed for administration: _________________________________ Charlie Yunker, Interim City Manager 167 THIS PAGE LEFT INTENTIONALLY BLANK 168 City of St. Anthony Village 3301 Silver Lake Road St. Anthony, Minnesota 55418 FEE SCHEDULE 2021 169 1 Table of Contents General Construction Building ................................................................................................... 1 Electrical .................................................................................................. 2 Mechanical .............................................................................................. 3 Miscellaneous ......................................................................................... 3 Plumbing ............................................................................................... 4 Manufactured Home/Accessory Installation Permit ............................... 4 Land Use Applications ................................................................................... 4 Licenses ............................................................................................................. 5 Miscellaneous Fees.......................................................................................... 6 Park Contributions ................................................................................ 7 Right of Way ........................................................................................... 7 Utilities Fire Control Devices .............................................................................. 8 Irrigation Rates ....................................................................................... 8 Sewer Rates ............................................................................................. 8 Storm water Facilities Rates ................................................................. 8 Water Meters .......................................................................................... 9 Water Rates ........................................................................................... 10 170 1 GENERAL CONSTRUCTION BUILDING PERMITS FEES: Total Valuation Amount $1 to $500 $29.50 $501 to $2,000 $28 for the first $500 plus $3.70/additional $100 or fraction thereof, to including $2,000 $2,001 to $25,000 $83.50 for the first $2,000 plus $16.55/additional $1,000 or fraction thereof, to including $25,000 $25,001 to $50,000 $464.15 for the first $25,000 plus $12.00/additional $1,000 or fraction thereof, to including $50,000 $50,001 to $100,000 $764.15 for the first $50,000 plus $8.45/additional $1,000 or fraction thereof, to including $100,000 $100,001 to $500,000 $1,186.65 for the first $100,000 plus $6.75/additional $1,000 or fraction thereof, to including $500,000 $500,001 to $1,000,000 $3,886.65 for the first $500,000 plus $5.50/additional $1,000 or fraction thereof, to including $1,000,000 $1,000,001 and up $6,636.65 for the first $1,000,000 plus $4.50/additional $1,000 or fraction thereof Inspections outside of normal business hours (minimum charge, 2 hours) $65.00 per hour (or the total hourly cost to the jurisdiction, which is the greatest. This cost shall include supervision, overhead, equipment, hourly wages, and fringe benefits of the employees involved.) Re-inspection; fees assessed under provisions of §32.08 $65.00 per hour Inspections for which no fee is specifically indicated (minimum charge, 1/2 hour) $65.00 per hour Additional plan review required by changes, additions, or revisions to plans (minimum charge, 1/2 hour) $65.00 per hour For use of outside consultants for plan checking and inspections, or both Actual costs (including administrative and overhead costs) Notes to Table: A plan review fee of 65% of the permit fee will be charged for building permits which requires the submittal of plans. Fees for similar plans will be charged in accordance with provisions of MN Rules, Chapter 1300.0160, subd. 5. 171 2 ELECTRICAL PERMITS FEES: Purpose of Fee: Description Amount Residential or Commercial Building or Garage Electrical panel change out, repair or service upgrade, new panel replacement is $110.00 Up to 300 amps $55.00 400 amps $71.00 For each additional 100 amps add $16.00 Residential or Commercial Building or Garage New circuits or reconnected circuits spliced outside of electric panel are at full fee Charge for each up to 100 amps $9.00 Charge for each 101-200 amps $15.00 For each additional 100 amps add $6.00 All Remodel Projects Single Family Residence or Building Remodel $190 not over 200ampcircuits and 2 inspections. Apartment Buildings Fee per unit of an apartment or condominium complex. This does not cover service, unit feeders or house panels. $80.00 Additional inspection trip $45.00 House Wiring and service is separate. Above fees apply. Transformers 0 -10 kilovolt-amperes $5.00 11 - 75 kilovolt-amperes $45.00 75 - 299 kilovolt -amperes $60.00 Over 299 kilovolt-amperes $165.00 Retro fit lighting (ballast & lamps only; new fixture is per circuit fee) Each fixture $.85 cents Sign Transformer $9.00 Solar PV Systems-The inspection fee for the installation is as follows (plan review fee is $100.00 per hour) 0 watts to and including 5,000 watts $90.00 5,001 watts to and including 10,000 watts $150.00 10,001 watts to and including 20,000 watts $225.00 20,001 watts to and including 30,000 watts $300.00 30,001 watts to and including 40,000 watts $375.00 172 3 40,001 watts and larger $375.00 & $25 for each additional 10,000 watts over 40,000 watts Swimming Pools Includes 2 inspections plus circuit fees $90.00 Street Lights and lot lights per pole $5.00 Traffic Signals per standard $8.00 Remote Control, Signal, fire alarm & energy management Each device $.85 cents MECHANICAL PERMIT: Purpose of Fee Amount Residential (R-1, R-1A, and R-2) Each dwelling unit (new construction) $150 Other (furnace, gas range, gas dryer, hot water heater, air conditioner, gas piping, duct work, and the like) $30 Commercial, light industrial, and multi-family (C, LI, R-3,and R-4) All 3% of contract price Add $20 Administrative fee and $1.00 surcharge to all permits NOTES TO TABLE: The minimum permit fee for commercial, industrial, institutional, or business occupancies is $20 plus state permit fee surcharge. MISCELLANEOUS PERMIT: Permit Amount Antennas, disk antennas and towers Per Building Permit Fee Schedule Demolition Permit $50 Residential $75 Commercial Driveway/Sidewalk $75 Fence $75 Hydrant Meter Rental $500 deposit plus cost of water usage per Tier IV water fee Public Safety $20 Solar $50 plus 1.25% of total valuation 173 4 Zoning Permit $75 Storage Tank Removal $95 PLUMBING PERMIT: Residential (R-1, R-1A, and R-2) First bath $100 Each additional bath $35 3/4 bath $35 1/2 bath $20 Laundry $20 Water softener $20 Other $30 Commercial, Light Industrial, and Multi-Family (C, LI, R-3, and R-4) All 3% of contract price Lawn sprinklers, residential $20 Lawn sprinklers, commercial $30 Add $20 Administrative fee and $1.00 surcharge to all permits MANUFACTURED HOME/ACCESSORY INSTALLATION PERMIT: Permit Amount Single Wide $79 Double Wide $95 Each Additional 1’ Width $16 Add $20 Administrative fee and $1.00 surcharge to all permits LAND USE APPLICATION: Purpose of Fee (Code #) Amount Appeal $500.00 and an Escrow deposit of $1,500 Comprehensive Plan $750 and an Escrow deposit of $1,500 for Residential and $3,500 for Commercial Conditional Use Permit (§152.243) $ 1,000 and an Escrow deposit of $450 for Residential and $1,500 for Commercial Easement Vacation (§151.11) $200 Final Plat (§151.04) $500 with an Escrow deposit of $750 Garage Setback permit (§152.176) $60 174 5 Planned Unit Development (§152.176) $ 1,500 with a $2,500 Escrow deposit Preliminary Plat (§151.03) $500 with a $750 Escrow deposit Rezoning (§152.242) $ 750 with a $1,500 Escrow deposit Sign Permit (§155) $75 for cost of $1 to $500, plus $5 each $100 over $500 Sign Plan review (§155) $75 Site Plan (§152.241) $250 with an Escrow deposit of $750 Subdivision/Lot Split $250 with a $1,250 Escrow deposit Variance (§152.245) $ 750 and an Escrow deposit of $450 for Residential and $1,500 Commercial LICENSES: License (Ord. #) Amount Alarm Permits: (§111.152) Commercial $25 Residential $10 Christmas Tree Lots: Non-Profit No fee Other Applicants $50 Contractors (§111.231) $35 or $5 if licensed by state Courtesy Ad Bench $30 per bench New $10 per bench renewal Dangerous Dog/Potentially Dangerous Dog $500 Fireworks: (§111.371) $100 Existing $350 Stand Alone Gasoline service stations (stations with multiple products dispensed through 1 hose) $75 for station and 1 production line, plus $15 for each product line dispensed. Haulers of Garbage or Recyclables (§111.216) $150 Kennel (§91.20) $50 Laundromats (coin-operated not in multiple family building) $10 per machine, up to a maximum of $190 per location Liquor: (March 15th renewal date; annually) (§112.03) Beer: off-sale; 3.2% malt liquor license $100 Beer: on-sale; 3.2% malt liquor license $350 Beer: Temporary on-sale 3.2% malt liquor license None 175 6 Liquor: on-sale intoxicating liquor $8,000 Liquor: Sunday on-sale Wine: only Wine: with strong beer endorsement Wine: temporary $200 $400 license fee & $100 processing fee $1,500 license fee & a 100 processing fee None Multiple Dwellings (§111.188) $150 base fee plus $10 per unit for 3 or more (penalty after July 1st base fee increase to $250) Pawnbroker (§111.287) $8,000 license fee; $750 investigation fee Peddler (§113.01) $50 Physical culture and health service or club, reducing club or salon, sauna parlor, therapeutic massage studio (§111.341) $500 investigation $250 Therapist Secondhand good dealer (§111.252) $5,000 license fee; $750 investigation fee Tobacco or tobacco related products (§111.047) $300 Towing/Motor Vehicle Starting (§111.111) $30 for first vehicle and $20 for each additional vehicle Transient Merchant (§113.01) $50 MISCELLANEOUS FEES: Type Amount Security False Alarm (§111.155 D) First 2 are free, 3rd is $75 and each additional is an additional $25 Vehicle Impounding Fee (§72.33) $85 for tow: $25 per day storage (applied the first day) $25 Tow Company Administration $15 SAPD Administration Convenience fees Utility billing payments made over the phone $0.95 per transaction. Licenses, permits and other invoices payments via credit/debit cards • 2.95 % of transaction amount or $2.95, whichever is greater • E checks $0.95 per transaction 176 7 PARK CONTRIBUTION: (§151.12) Type Amount Single Family lot $1,500/unit Duplex lot $1,800/unit Townhouse development $2,000/unit Mobile Home $1,000/unit Multi-family, apartment or condominium $1,500/unit Commercial/Industrial $4,000 per acre RIGHT OF WAY: Permit Amount Registration Fee $60 Excavation Permit Fee: Hole $150 Trench $70/100 lineal foot (plus hole fee) Obstruction permit base fee $50 plus $.05/lineal foot Permit Extension fee $55 Street Excavation (§150.031) $50 Small Cell Wireless ROW Rent $150 per year (plus $25 per site) Small Cell Wireless Monthly Electrical Fee Actual Cost or $73 per radio node less than or equal to 100 maximum watts; $182 per radio node over 100 maximum watts (whichever is greater) 177 8 UTILITIES: FIRE CONTROL DEVICES: (billed quarterly) Size Amount 2" $8.25 3" $11.00 4" $16.50 6" $22.00 8" $27.50 10" $44.00 IRRIGATION RATES: $4.16 per 1,000 gallons SEWER CONNECTION PERMIT: $850.00-per Metropolitan Council Environmental Services (MCES) units initial or re-determination. SEWER RATES: $4.64 per 1,000 gallons, quarterly Collection system charge $15.25 per residential equivalency unit. STORM WATER FACILITIES: (billed quarterly) Classification Charge (per acre) 1 $68.35 2 $65.87 3 $65.87 4 $157.33 5 $200.67 6 $250.69 178 9 WATER CONNECTION PERMIT: $850.00-per Metropolitan Council Environmental Services (MCES) units initial or re-determination. RESIDENTIAL WATER METERS: SIZE METER PRICE RADIO TOTAL COST ¾” $165.00 $145.00 $310.00 1” $225.00 $145.00 $370.00 n COMMERCIAL WATER METERS: Cost of meter dependent upon size and type required. Cost will be included in plumbing permit 179 10 WATER RATES: (billed quarterly) Water Usage billing will be computed quarterly based on metered water used according to the tiered rates system below, quarterly Distribution system charge $17.75 per residential equivalency unit. RESIDENTIAL Consumption (gallons) Rate/per 1,000 gallons TIER 1 0-7,500 $3.13 TIER II 7,500-15,000 $3.30 TIER III 15,000-22,500 $3.63 TIER IV 22,500-30,000 $4.16 TIER V Over 30,000 $5.22 COMMERCIAL Consumption (gallons) Rate/per 1,000 gallons TIER 1 0-7,500 $3.13 TIER II 7,500-53,500 $3.30 TIER III 53,500-175,000 $3.63 TIER IV 175,000-300,000 $4.16 TIER V Over 300,000 $5.22 WILSHIRE Consumption( gallons) Rate/per 1,000 gallons TIER 1 0-7,500 $3.13 TIER II 7,500-510,000 $3.30 TIER III 510,000-610,000 $3.63 TIER IV 610,000-710,000 $4.16 TIER V Over 710,000 $5.22 SAVHS Consumption (gallons) Rate/per 1,000 gallons TIER 1 0-7,500 $3.13 TIER II 7,500-850,000 $3.30 TIER III 850,000-1,150,000 $3.63 TIER IV 1,150,000-1,450,000 $4.16 TIER V Over 1,450,000 $5.22 HAPPY’S Consumption (gallons) Rate/per 1,000 gallons TIER 1 0-7,500 $3.13 TIER II 7,500-3,650,000 $3.30 TIER III 3,650,000-4,650,000 $3.63 TIER IV 4,650,000-5,650,000 $4.16 TIER V Over 5,650,000 $5.22 Late payment penalty for quarterly utility bills is equal to 5% of the account balance at the date the account becomes past due. 180 CITY OF ST. ANTHONY VILLAGE STATE OF MINNESOTA RESOLUTION 20-095 A RESOLUTION APPROVING THE 2021 FEE SCHEDULE WHEREAS, the City of St. Anthony Village has approved an ordinance allowing fees to be established by resolution; and WHEREAS, staff has established a fee schedule that can be amended annually; and WHEREAS, attached is the 2021 Fee Schedule. Adopted this 8th day of December, 2020. ________________________________ Randy Stille, Mayor ATTEST: ________________________________ Nicole Miller, City Clerk Reviewed for administration: ___________________________________ Charlie Yunker, Interim City Manager 181 THIS PAGE LEFT INTENTIONALLY BLANK 182 Website Sep Oct Nov Total Visitors 4,830 7,359 4,129 St. Anthony/CTV Landing (Page Views) 145 153 66 St. Anthony – Meeting 143 155 101 St. Anthony – City Council 57 48 67 Social Media Sep Oct Nov CTV Facebook posts 74 101 75 CTV Facebook Total Likes 1666 1674 1693 November 2020 Programming, Website & Social Media PROGRAMMING • PRODUCTION SERVICES: • St. Anthony/NB School District “Thank You” video, 11/11 • NYFS Campaign videos (2) “Trauma to Transformation” & “Bridging the Gap” • Cities Speak (3 shows) featuring city and communications officials {Beverly Xie episode, 895 Facebook views} • Chamber Check In (3 shows) partnership w/TC North Chamber • NEW PROGRAMS on CTV CHANNELS (112 Total) = 129 hours of programming • CITY MEETINGS (43 Total): 2 – St. Anthony city meetings + web streams • NORTH SUBURBAN COMMUNICATIONS COMMISSION - Live 11/18 • RAMSEY COUNTY BOARD MEETINGS: 4, [LIVE Tuesdays, Ch. 19 – 9am] • SA/NB 282 SCHOOL BOARD MEETINGS: 1, 11/10 [Live Ch. 20 & web] • RICE CREEK WATERSHED Meetings: 1, 11/10 •  • ADDITIONAL PROGRAMMING: • Governor Address Translation (Spanish, Hmong, Somali) LIVE 11/10 & 11/18 • Africans and African-Americans Listening Session, 11/11 • St. Anthony HS Sports – Volleyball, 11/20 183 THIS PAGE LEFT INTENTIONALLY BLANK 184 Date Type Staff Present December 15 Special 5:30 PM Worksession City Council City Manager December 22 Regular City Council City Manager January 12 Regular Planning Commission items from December Housekeeping Resolutions Resolution for the Street Improvement Bond Reimbursement Quarterly Donations & Grants City Council City Manager January 26 Regular Public Works Snow Plowing Operations presentation NYFS Agreement Winterfest Outside Orgs-Council City Council City Manager February 9 Regular Planning Commission items from January 2021 Planning Commission Work Plan- (motion only) City Council City Manager February 23 Regular Administration Annual Report Adoption of Strategic Plan 2021 Parks and Environmental Commission Work Plan- (motion only) 2021 Street Project Call for Hearing on Improvements, Call for Hearing on Assessments, Order Preparation of Assessments City Council City Manager City Engineer March 9 Regular Planning Commission Items from February Liquor Annual Report Liquor License Renewals GreenCorp Member application-resolution CTV Presentation Public Works Annual Report City Council City Manager Liquor Op Manager Public Works Director March 23 Regular Police Annual Report Wyland Water Challenge Public Hearing-Budget Calendar City Council City Manager Police Dept Finance Director April 13 Regular Planning Commission Items from March Quarterly Donations & Grants Fire Annual Report Spirit of St. Anthony Award 2021 Street Project Public Hearing, Order Improvements, Adopt & Confirm Assessments, Award Contract for Construction, Call for Sale of GO Bonds Arbor Day Proclamation Earth Day Proclamation Public Hearing-Budget Calendar City Council City Manager Fire Dept City Engineer April 27 Regular 2020 Street Project-Approve Sale of Bonds City Council City Manager FUTURE COUNCIL AGENDA ITEMS 2021 2020 185 Date Type Staff Present FUTURE COUNCIL AGENDA ITEMS May 11 Regular Planning Commission items from April Insurance Renewal Tort Limits - Consent Order 2022 Feasibility Study Police Department Annual Report City Council City Manager City Engineer May 25 Regular Salo Park Concert Series Chamber of the Year and Business of the Year Finance Annual Report City Council City Manager Finance Director June 8 Regular Planning Commission Items from May City Council City Manager June 22 Regular Audit Presentation City Council City Manager Finance Director July 13 Regular Planning Commission items from June Quarterly Donations & Grants City Council City Manager July 27 Regular Liquor Operations Mid Year Report VillageFest Presentation Quarterly Goals Update Wyland Mayor's Water Challenge Night to Unite Presentation Night to Unite Proclamation City Council City Manager Liquor Op Mgr Police Chief August 10 Regular Planning Commission items from July Approve 2022 Feasibility Study and Order Plans and Specs City Council City Manager August 24 Regular Budget Presentation Students in Leadership-Consent SANB #282 Presentation City Council City Manager Finance Director September 14 Regular Planning Commission items from August 2022 Preliminary Operating Budget and Levy-Public Hearing Kiwanis Peanut Day Union Contracts City Council City Manager Finance Director September 28 Regular Fire Prevention Presentation Spirit of St. Anthony Award City Council City Manager Fire Dept October 12 Regular Planning Commission items from September Quarterly Donations & Grants Preliminary Certification of Delinquent Waste Hauler Accounts-Consent Agenda Preliminary Certification of Delinquent Utility Accounts-Consent Agenda Quarterly Goals Update City Council City Manager October 26 Regular 1st Reading Water, Sewer, & Stormwater-Public Hearing City Council City Manager Finance Director 186 Date Type Staff Present FUTURE COUNCIL AGENDA ITEMS November 9 Regular Planning Commission items from October 2nd Reading Water, Sewer, & Stormwater Authorizing polling places for 2022 Approval of CIP City Council City Manager November 23 Regular Fire Prevention Poster Winners Final Reading and Adoption Water, Sewer, & Stormwater Students in Government Presentation PD Body Cam Audit Water Conservation Poster Winners 2022 Fee Schedule City Council City Manager December 14 Regular Planning Commission items from November Appoint Parks and Planning Commissioners and Chair/Vice Chairs Setting Salary of City Manager Authorizing Transfers & Closing of Specified Funds Setting the 2022 City & HRA Budgets and Final Property Tax Levy -Public Hearing 2022 Street Project Approve Plans & Specifications, Authorize Advertisement for Bids City Council City Manager Finance Director City Engineer 187