Loading...
HomeMy WebLinkAboutRES 24-054 RECEIVING FEASIBILITY REPORT AND ORDERING PLANS AND SPECSS FOR THE 2025 STREET AND UTILITY IMPROVEMENTSCITY OF ST. ANTHONY VILLAGE STATE OF MINNESOTA RESOLUTION 24-054 A RESOLUTION RECEIVING FEASIBILITY REPORT AND ORDERING PLANS AND SPECIFICATIONS FOR THE 2025 STREET AND UTILITY IMPROVEMENTS WHEREAS, pursuant to resolution of the Council adopted June 11, 2024, a report was prepared by W SB with reference to the improvement of: Street & Utility Reconstruction • Macalaster Drive from 391h Ave to Railroad Mill and Overlay • 391 Avenue NE from Stinson Boulevard to Silver Lake Road • 301 Avenue NE from Stinson Boulevard to Silver Lake Road • Armour Terrace from Roosevelt Street NE to Silver Lake Road • Murray Avenue from Roosevelt Street NE Coolidge Street NE • 291 Avenue NE from Silver Lake Road to Highway 88 • Roosevelt Street NE from St. Anthony Boulevard to 30' Avenue NE • Wilson Street NE from St. Anthony Boulevard to 30' Avenue NE • Coolidge Street NE from St. Anthony Boulevard to 29' Avenue NE • Anthony Lane N from 29' Avenue NE to Cul-de-sac Central Park Improvements (Optional Bid) • Removal and replacement of the existing bituminous trail • Removal and replacement of the existing basketball court surface Pedestrian Safety Improvements (Optional Bid) • Installation of the pedestrian refuge to enhance the existing pedestrian crossing on Silver Lake Road at 34' Avenue NE. WHEREAS, the feasibility report recommends the following street and utility improvements in 2025: Street & Utility Reconstruction • Macalaster Drive from 39' Ave to Railroad Mill and Overlay • 391 Avenue NE from Stinson Boulevard to Silver Lake Road • 301 Avenue NE from Stinson Boulevard to Silver Lake Road • Armour Terrace from Roosevelt Street NE to Silver Lake Road • Murray Avenue from Roosevelt Street NE Coolidge Street NE • 291 Avenue NE from Silver Lake Road to Highway 88 • Roosevelt Street NE from St. Anthony Boulevard to 30' Avenue NE • Wilson Street NE from St. Anthony Boulevard to 30' Avenue NE • Coolidge Street NE from St. Anthony Boulevard to 29' Avenue NE • Anthony Lane N from 291 Avenue NE to Cul-de-sac S VCOnnNIMeeNgffiO24IM15303U30I5 FeutlMfiOySl,,We bli.. 24434 , Central Park Improvements (Optional Bid) • Removal and replacement of the existing bituminous trail • Removal and replacement of the existing basketball court surface Pedestrian Safety Improvements (Optional Bid) • Installation of the pedestrian refuge to enhance the existing pedestrian crossing on Silver Lake Road at 341 Avenue NE. WHEREAS, the report provides information regarding whether the proposed project is necessary, cost effective, and feasible. NOW, THEREFORE, BE IT RESOLVED, by the City Council of the City of St. Anthony Village that: 1) The Council will consider the improvement of such streets in accordance with the report at an estimated total cost of improvement at approximately $2,815,300. 2) WSB is hereby designated as the engineer for this improvement. They shall prepare plans for making such improvement. Adopted this 15" day of August, 2024. r ATTEST: Je ifer Doy e, City Cle Reviewed for administration: 4 Art, * " fa-lrv/Phi Wendy WebAer, Mayor Charlie Yunker, City Manager SII('urvrcil U,,linpi2024IM152024L2025 24-054d ,