STATE OF MINNESOTA
RESOLUTION 25-023
A RESOLUTION DECLARING THE COST TO BE ASSESSED AND ORDERING
PREPARATION OF THE PROPOSED ASSESSMENTS FOR THE
2025 STREET AND UTILITY IMPROVEMENTS
WHEREAS, costs have been determined for the improvement of:
Street & Utility Reconstruction
• Macalaster Drive from 391 Ave to Railroad
Mill and Overlay
• 391 Avenue NE from Stinson Boulevard to Silver Lake Road
• 301 Avenue NE from Stinson Boulevard to Silver Lake Road
• Armour Terrace from Roosevelt Street NE to Silver Lake Road
• Murray Avenue from Roosevelt Street NE Coolidge Street NE
• 29' Avenue NE from Silver Lake Road to Highway 88
• Roosevelt Street NE from St. Anthony Boulevard to 301 Avenue NE
• Wilson Street NE from St. Anthony Boulevard to 30't' Avenue NE
• Coolidge Street NE from St. Anthony Boulevard to 29'i' Avenue NE
• Anthony Lane N from 29' Avenue NE to Cul-de-sac
Miscellaneous Construction
• Central Park
o Removal and replacement of the existing bituminous trail
o Removal and replacement of the existing basketball court surface
o Installation of new storm sewer along trail to address drainage
• Pedestrian Safety Improvements
o Installation of the pedestrian refuge to enhance the existing pedestrian
crossing on Silver Lake Road at 34th Avenue NE.
o Bituminous overlay of existing sidewalk along St. Anthony Bouevard
from the south City boundary to the bridge
• Replacement of a damaged hydrant at the intersection of Skycroft Drive and
Downers Drive
o Removal and replacement of existing hydrant
o Removal and replacement of concrete roadway pavement
o Installation of new valve for future maintenance
• Foss Road Lift Station Bypass Improvements
o Installation of new force main bypass for future City maintenance.
and the bid price for such an improvement is $2,531,570.55. The total cost of the improvement with
contingencies, engineering, legal, and administrative fees will be approximately $3,041,700.
NOW, THEREFORE, BE IT RESOLVED, by the City Council of the City of St. Anthony Village that:
1.) The portion of the cost of the proposed 2025 Street and Utility Improvement Project to be paid by
the City is hereby declared to be approximately $2,408,000, and the portion of the cost to be
assessed against benefited property owners is declared to be approximately $633,700.
2.) Assessments shall be payable in equal annual installments extending over a period of 15 years for
S.'I]Co—ii Meeting,120251032520251R-dImprovements and Prep Assessmen R-1u1ro 25-023.d-.
the Street and Utility Reconstruction Project and a period of 10 years for the Mill and Overlay
Project, the first of the installments to be payable on or before the first Monday in 2026, and shall
bear interest at the rate of 2 percent (2%) above the City's borrowing rate at the time the bonds
are issued.
3.) The Consulting Engineer shall forthwith calculate the proper amount to be specially assessed for
such improvement against every assessable lot, piece, or parcel of land within the district
affected, without regard to cash valuation, as provided by law, and the City Clerk shall file a copy
of such proposed assessment in the office for public inspection.
4.) The City Clerk shall, upon the completion of such proposed assessment, notify the Council
thereof.
Adopted this 251 day of March, 2025.