My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
RES 25-032 ORDERING IMPROVEMENTS FOR THE 2025 STREET AND UTILITY IMPROVEMENT PROJECT
StAnthony
>
City Council
>
City Council Resolutions
>
2025
>
RES 25-032 ORDERING IMPROVEMENTS FOR THE 2025 STREET AND UTILITY IMPROVEMENT PROJECT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/23/2025 1:20:46 PM
Creation date
4/23/2025 1:20:40 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CITY OF SAINT ANTHONY VILLAGE <br />STATE OF MINNESOTA <br />RESOLUTION 25-032 <br />A RESOLUTION ORDERING IMPROVEMENTS <br />FOR THE 2025 STREET AND UTILITY IMPROVEMENT PROJECT <br />WHEREAS, a resolution of The City Council adopted on the 251h day of March 2025, fixed a date <br />for Council hearing on the proposed improvements: <br />Street & Utility Reconstruction <br />■ Macalaster Drive from 391 Ave to Railroad <br />_Mill and Overlay <br />■ 391 Avenue NE from Stinson Boulevard to Silver Lake Road <br />■ 301 Avenue NE from Stinson Boulevard to Silver Lake Road <br />■ Armour Terrace from Roosevelt Street NE to Silver Lake Road <br />■ Murray Avenue from Roosevelt Street NE Coolidge Street NE <br />■ 29' Avenue NE from Silver Lake Road to Highway 88 <br />■ Roosevelt Street NE from St. Anthony Boulevard to 301 Avenue NE <br />■ Wilson Street NE from St. Anthony Boulevard to 30' Avenue NE <br />■ Coolidge Street NE from St. Anthony Boulevard to 29' Avenue NE <br />■ Anthony Lane N from 29t' Avenue NE to Cul-de-sac <br />Miscellaneous Construction <br />• Central Park <br />o Removal and replacement of the existing bituminous trail <br />o Installation of new storm sewer along trail to address drainage <br />Pedestrian Safety Improvements <br />o Installation of the pedestrian refuge to enhance the existing pedestrian <br />crossing on Silver Lake Road at 34th Avenue NE. <br />o Bituminous overlay of existing sidewalk along St. Anthony Bouevard from <br />the south City boundary to the bridge <br />Replacement of a damaged hydrant at the intersection of Skycroft Drive and <br />Downers Drive <br />o Removal and replacement of existing hydrant <br />o Removal and replacement of concrete roadway pavement <br />o Installation of new valve for future maintenance <br />• Foss Road Lift Station Bypass Improvements <br />o Installation of new forcemain bypass for future City maintenance. <br />WHEREAS, ten days' mailed notice and two weeks' published notice in advance of said hearing <br />was given and the hearing was held thereon on the 22na day of April 2025, at which <br />time all persons desiring to be heard were given an opportunity to be heard thereon, <br />NOW, THEREFORE, BE IT RESOLVED, by the City Council of the City of Saint Anthony Village <br />approve such improvements as are hereby ordered in the Council Resolution. <br />Adopted this 22' day of April , 2025. <br />
The URL can be used to link to this page
Your browser does not support the video tag.